Loading...
PC 09-02-20 Meeting Agenda1.Call to Order 2.Adoption of Agenda – Pursuant to established procedures, the Planning Commission should adopt the Agenda for the meeting. 3.Meeting Minutes 4.Committee Reports 5.Citizen Comments 6.Public Hearings 6.A.Conditional Use Permit #05-20 for Bartonsville Energy Facility, LLC Submitted to construct a 705 acre utility-scale solar power generating facility (disturbed area) located on a property totaling approximately 1,605.50 acres. The properties are generally located along Marlboro Road (Route 631), Passage Road (Route 648), Springdale Road (Route 649), Middle Road (Route 628), and west of the CSX rail corridor in Frederick County and partially within the Town of Stephens City limits and are identified with Property Identification Numbers 74-A-45, 74-A-44A, 74-A-4, 74-A-6C, 74-A-44, 74-A-35A, 74-A-20, 74-A-21, 74-A-3 and lots 1-12 (inclusive) in the Springdale Glen Subdivision and lots 1-52 (inclusive) in the Carrollton Estates Subdivision and in the Back Creek and Opequon Magisterial Districts. 6.B.Conditional Use Permit #10-20 for Hans Holthaus Submitted for a public garage with no body repair (vehicles and farm equipment). The property is located at 5115 Cedar Creek Grade, Winchester, Virginia and is identified with Property Identification Number 72-A-22A in the Back Creek Magisterial District. AGENDA PLANNING COMMISSION WEDNESDAY, SEPTEMBER 2, 2020 7:00 PM THE BOARD ROOM FREDERICK COUNTY ADMINISTRATION BUILDING WINCHESTER, VIRGINIA PC09-02-20CUP05-20.pdf PC09-02-20CUP05-20ConditionsofApproval.pdf PC09-02-20CUP10-20.pdf 1 6.C.Ordinance Amendment - Day-Care Facilities Ordinance Amendment to the Frederick County Code – Chapter 165 Zoning, ARTICLE I General Provisions, Amendments and Conditional Use Permits; Part 101 General Provisions, §165-101.02 Definitions and word usage. Day-Care Facility. ARTICLE VI Business and Industrial Zoning Districts; Part 602 B1 Neighborhood Business District, §165-602.02. Allowed Uses; Part 603 B2 General Business District, §165- 603.02. Allowed Uses; Part 605 OM Office-Manufacturing Park District, §165-605.03. Secondary or accessory uses. Revision to the Frederick County Zoning Ordinance to expand the definition for Day-Care Facility to include the care, protection and guidance of adults in addition to children, and to include this definition in the B1 (Neighborhood Business) District, B2 (General Business) District, and the OM (Office-Manufacturing) District. 7.Other 8.Adjourn PC09-02-20DRRC-OA.pdf 2 Planning Commission Agenda Item Detail Meeting Date: September 2, 2020 Agenda Section: Public Hearings Title: Conditional Use Permit #05-20 for Bartonsville Energy Facility, LLC Attachments: PC09-02-20CUP05-20.pdf PC09-02-20CUP05-20ConditionsofApproval.pdf 3 CONDITIONAL USE PERMIT #05-20 Bartonsville Energy Facility, LLC Staff Report for the Planning Commission Prepared: August 13, 2020 Staff Contact: M. Tyler Klein, AICP, Senior Planner This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this request. It may also be useful to others interested in this zoning matter. Reviewed Action Planning Commission: 09/02/20 Pending Board of Supervisors: 09/23/20 Pending EXECUTIVE SUMMARY: This is a request for a Conditional Use Permit (CUP) to enable construction of a 705-acre utility- scale solar power generating facility (disturbed area) located on properties totaling approximately 1605.5-acres. Should the Planning Commission find this use for a utility-scale solar power generating facility to be appropriate, Staff would suggest the following Conditions of Approval: 1. All review agency comments provided during the review of this application shall be complied with at all times. 2. An engineered site plan, in accordance with the requirements of Article VIII of the Fredrick County Zoning Ordinance, shall be submitted to and subject to approval by Frederick County prior to the establishment of the use. The site plan shall address additional regulations for specific uses outlined in §165-204.26 of the Frederick County Zoning Ordinance and be in general conformance with the Concept Plan, included with the CUP application, prepared by Greenway Engineering, dated August 7, 2020. 3. Buffers and screening shall be provided around the perimeter of the project in general conformance with quantity of the proposed plantings depicted on Sheets 3 and 4 of the Concept Plan, “Landscape Buffer A, B, C, D, E & F,” included with the CUP application, prepared by Greenway Engineering, dated August 7, 2020. The landscape buffer plantings shall be maintained in good health for the life of the project. 4. Prior to site plan approval, the owner shall enter into a written agreement with Frederick County to decommission solar energy equipment, facilities, or devices pursuant to the terms and conditions of §15.2-2241.2(B) of the Code of Virginia. The written agreement shall be updated every five (5) years and in general conformance with the Exhibit D: Preliminary Decommissioning Plan, included with the CUP application, prepared by Torch Clean Energy, dated May 2020. 4 Page 2 CUP #05-20 – Bartonsville Energy Facility, LLC August 13, 2020 5. Batteries, for the purposes of mass storage of electricity that will eventually be transferred to the grid, are prohibited as part of this CUP. 6. This conditional use permit shall not be effective unless and until the vacations of the Springdale Glen and Carrollton Estates Subdivisions are approved and recorded. In addition, the approval and recordation of such vacations shall take place prior to the approval of any site plan for the use authorized by this conditional use permit. 7. Access to the site shall be limited to two (2) entrances from Springdale Road and one (1) entrance from Passage Road, and be in general conformance with the Concept Plan, included with the CUP application, prepared by Greenway Engineering, dated August 7, 2020. Delivery of solar array panel construction materials will occur at the site access entrance off of Passage Road identified as Deer Lane on Sheet 4 of the Concept Plan. Solar array panel materials delivery laydown area will be limited to Tax Parcel 74-A-44A (Carbaugh Property). 8. Pile-driving of poles for solar arrays during construction shall be limited to 7:00AM to 5:00PM Monday through Friday. All other construction activities are permitted 7:00am to 7:00PM Monday through Friday and 7:00AM to 5:00PM on Saturday. No construction activities are permitted on Sundays. 9. Any expansion or modification of this land use will require the approval of a new CUP. Following this public hearing, it would be appropriate for the Planning Commission to offer a recommendation concerning this application to the Board of Supervisors. Any recommendation for approval should also include a statement affirming that the proposed solar facility is in substantial accord with the Comprehensive Plan. 5 Page 3 CUP #05-20 – Bartonsville Energy Facility, LLC August 13, 2020 LOCATION: The properties are generally located along Passage Road (Route 648), Marlboro Road (Route 631), Springdale Road (Route 649), Middle Road (Route 628), and west of the CSX rail corridor and partially within the Town of Stephens City limits. MAGISTERIAL DISTRICT: Back Creek and Opequon PROPERTY ID NUMBERS: 74-A-3, 74-A-21, 74-A-45, 74-A-44A, 74-A-4, 74-A-6C, 74-A- 44, 74-A-35A, 74-A-20 and all lots 1-12 in the Springdale Glen Subdivision and lots 1-52 in the Carrolton Estates Subdivision. PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas), R1 (Town of Stephens City) Land Use: Agricultural, Forestal, Vacant & Residential (platted only) ADJOINING PROPERTY ZONING & PRESENT USE: North: RA (Rural Areas) Use: Agricultural/Residential/Institutional South: RA (Rural Areas) Use: Agricultural/Residential East: RA/Town of Stephens City Use: Agricultural/Residential/Industrial West: RA (Rural Areas) Use: Agricultural/Residential PROPOSED USE: This is a request to enable construction of a 705-acre utility-scale solar power generating facility (disturbed area) located on properties totaling approximately 1605.5acres. REVIEW EVALUATIONS: Virginia Department of Transportation: The application for a Conditional Use Permit for these properties appear to have little measurable impact on Route 649 (Springdale Road), Route 648 (Passage Road), the VDOT facilities providing access to the properties. Locations have been identified for a low-volume commercial entrance, on Route 648 and Route 649. The new entrances will need to meet VDOT standards for the proposed use. Should the use ever expand in the future, the entrance will need to be reviewed, to determine if additional improvements may be required. See comment letter dated May 26, 2020. 6 Page 4 CUP #05-20 – Bartonsville Energy Facility, LLC August 13, 2020 Frederick County Fire Marshal: Plans approved by Fire Marshal, Frederick County. See comment letter dated May 14, 2020. Frederick County Inspections: Conditional Use Permit for installation of solar arrays shall be designed per the 2015 Virginia Building Code, U-Utility Use Group. Solar panel installation not associated with publicly regulated utilities require permits. Plans submitted for permits may require the design to be sealed by a Registered Design Professional licensed in the State of Virginia. Arrays shall be designed for the applicable loads as required in Chapter 16 VBC. Please note the requirements in Chapter 17 of VBC for special inspection requirements on the type of structure (soil, concrete etc.). See comment letter dated May 14, 2020. Town of Stephens City: The Town has no objection to the CUP Application and will provide comments at the time of site plan submittal. See comment letter dated June 2, 2020. Historic Resources Advisory Board (HRAB): The Frederick County Historic Resources Advisory Board (HRAB) considered the above referenced Conditional Use Permit application during their meeting on June 16, 2020. The HRAB reviewed information from the Virginia Department of Historic Resources (VDHR) and information provided by the Applicant. This application seeks to construct a utility scale solar project located on 68 parcels of land that total 957 acres. The project will consist of rows of ground-mounted photovoltaic modules, commonly known as solar panels. The site is located along Passage Road and Springdale Road, west of the CSX corridor and the Town of Stephens City. Historic Resources Advisory Board Comments: The following historic resources are located on the subject site: • #034-1078 Cherry Dale (Mary Stephens House) – located on site – 74-A-20 ▪ Eligible for listing in the National Register of Historic Places (NRHP) • Survey Area 2 has a structure (labeled building 1) that is not mapped. o Building 1 is located in the southern portion of the APE and consists of a series of 7 Page 5 CUP #05-20 – Bartonsville Energy Facility, LLC August 13, 2020 collapsed buildings. Investigators did identify a potential residence, barn, and several collapsed outbuildings. The property is in the relative mapped location of the building attributed to R. R. Turner on the 1885 atlas (see Figure 13). No evidence of the adjacent building depicted on the early twentieth century quadrangles was noted during the reconnaissance. (Phase 1A survey - see page 22 for text and appendix C for photograph). The following historic resources are located adjacent or within the vicinity of the subject site (buffer area as described in the Applicant’s Phase 1A survey): • #034-0071 – Rice Robinson House • #034-0083 - Carter Hall ▪ Eligible for listing in the NRHP ▪ Located adjacent to the area of potential affect (APE) • #034-1044 – Willow Grove ▪ Located adjacent to the area of potential affect (APE) • #034-0007 – Kernstown Battlefield ▪ Eligible for listing in the NRHP After reviewing the information provided, the Historic Resources Advisory Board (HRAB) recommended approval of the CUP with the following comments: • The buffers around the historic resources should contain a mixture of evergreen plant species to ensure a natural appearing vegetative buffer. • An enhanced buffer along Carter Hall should be provided; similar to the buffer surrounding the proposed substation. • A Phase 1 Archeological Survey will be completed as part of the permitting of this project. This survey should document the collection of historic structures on and around this development. o This survey should determine if the structures onsite (Building 1 and associated structures within survey area 2) are potentially significant. o This survey should determine if this area would qualify as a rural historic district. See comment letter dated June 18, 2020. Planning and Zoning: Utility-scale solar power generating facilities are a permitted use in the RA (Rural Areas) Zoning District with an approved Conditional Use Permit (CUP). The Board of Supervisors added “utility-scale solar power generating facilities” to the Zoning Ordinance on January 8, 2020, including additional regulations for specific uses. These additional regulations further specify for utility-scale solar power generating facilities to prepare an engineered site plan and enter into a written agreement with Frederick County for facility decommissioning. 8 Page 6 CUP #05-20 – Bartonsville Energy Facility, LLC August 13, 2020 The application proposes use of approximately 1605.05-acres of rural area property, primarily used for agriculture, to generate 80 to 130 megawatts (MWS) or photovoltaic (solar) electricity. Approximately 705-acres of the subject parcels will be utilized (disturbed) for the installation of rows of ground-mounted photovoltaic modules, commonly known as solar panels, other necessary equipment for facility operations, a transmission substation, access paths, fencing and landscaping. The solar panels will be interconnected, and the power generated by each solar panel will be combined, converted, and the voltage increased to allow delivery of the power to the adjacent First Energy 138 kilovolt (KV) transmission line. The proximity of the project to the existing transmission line was a significant factor in the selection of these properties for the development of the facility. A portion of the project (approximately +/- 135.9-acres) is within the limits of the Town of Stephens City. These properties are subject to the regulations of the Town, and the project will receive separate approvals for the use of this acreage for the proposed use. Public utilities, including utility-scale solar power generating facilities, are a by-right use under the Town of Stephens City Zoning Ordinance. Frederick County Staff will coordinate with the Town during the site plan review and approval process if this CUP application is approved by the Board. Approximately 361-acres of the project area are currently platted as rural residential subdivision lots (lots 1-12 inclusive, Springdale Glen Subdivision and lots 1-52 inclusive, Carrollton Estates Subdivision including dedicated right-of-way (ROW)). If this project were to be approved, the Applicant would need to vacate (remove) the 64 platted residential lots and ROW prior to site plan approval. The removal of these residential lots may ultimately reduce the future capital impact to County services. Additionally, the project as proposed does not include any batteries for the purposes of mass storage of electricity that will eventually be transferred into the grid. Small batteries will be utilized as backup for solar tracker motors, substation, and associated equipment. The Zoning Ordinance requirements for “Public Utilities” including “utility-scale solar power generating facilities” (§165-204.26) specifies the Zoning Administrator has the authority to determine appropriate setbacks for lots. Setbacks for the solar arrays (panels) will conform to the setback requirements contained in the Zoning Ordinance for principle uses in the RA (Rural Areas) Zoning District (§165-401.07): 60-feet (FT) front setbacks from right-of-way streets and roads, and side/rear setbacks of 50-FT from adjoining parcels 6-acres or less, 100-FT from adjoining parcels of more than 6-acres, and 200-FT from Agricultural and Forestal Districts (more than 6-acres) and orchards (regardless of size). After consultation with Staff during the pre-development of the application, the Applicant has proposed setbacks for the solar arrays (panels) for this project will be a minimum of 100-feet (FT) from all external roads and property lines, and 200-FT from Agricultural and Forestal Districts. In order to protect the viewshed and mitigate the visual impact to neighboring properties in the 9 Page 7 CUP #05-20 – Bartonsville Energy Facility, LLC August 13, 2020 vicinity of the property the applicant has proposed buffering and screening around the perimeter of the property, in addition to maintaining existing mature woodlands (where feasible), to shield view of the facility from adjacent roadways, residences, and other agriculture uses. In addressing viewshed concerns from a residential neighbor, the Applicant will provide an enhanced buffer (shown as Landscape Buffer F, Sheet 4, Concept Plan) that includes a seven (7) foot earthen berm in addition to landscape plantings. Access to the Bartonsville Energy Facility will be limited to two (2) entrances located on Springdale Road (Route 649) and one (1) entrance from Passage Road (Route 648). No access is proposed from Marlboro Road (Route 631) or Middle Road (Route 628). Proposed entrances are ultimately subject to approval by the Virginia Department of Transportation (VDOT) and will be formally reviewed during the site plan review and approval process. The proposed setbacks, buffers/screening and project entrances are clearly depicted on the Concept Plan prepared by Greenway Engineering, dated August 7, 2020, and included with the CUP application. Finally, a draft Preliminary Decommissioning Plan included with the application materials, satisfies requirements contained in §165-204.26 of the Zoning Ordinance, ensuring that in the event the facility is no longer in operation, the land will be returned to the pre-development condition with all solar infrastructure and related facilities removed, ensuring future viability of the land to resume agricultural operations. Further, proposed condition of approval #4 ensures that Frederick County would maintain a bond that is updated every five (5) years keeping it up to date. The 2035 Comprehensive Plan envisions this area of the County to remain primarily rural in nature and for agricultural land to be preserved for future generations. The project is generally compatible with the Comprehensive Plan, with the rural character of the area, and with the adjoining agricultural and residential uses. The preservation of the underlying land maintains the ability for agricultural uses in the future. The proposed use is highly passive with limited noise, odor, glare, lighting, and traffic during operations. In addition to requirements contained in the Zoning Ordinance, the applicant will pursue a “Permit-by-Rule” (PBR) application through the Virginia Department of Environmental Quality (DEQ). The PBR is a state-level administrative review and approval process for the siting of solar energy facilities in the Commonwealth, including environmental and cultural review and study. One component of the state required PBR review is local jurisdiction “approval” of solar project siting; this CUP application, if approved by the Frederick County Board of Supervisors, would satisfy that requirement enabling completion of a PBR process for this project. 10 Page 8 CUP #05-20 – Bartonsville Energy Facility, LLC August 13, 2020 STAFF CONCLUSIONS FOR THE 09/02/20 PLANNING COMMISSION MEETING: This is a request for a Conditional Use Permit (CUP) to enable construction of a 705-acre utility- scale solar power generating facility (disturbed area) located on properties totaling approximately 1605.5 acres. Should the Planning Commission find this use for a utility-scale solar power generating facility to be appropriate, Staff would suggest the following Conditions of Approval: 1. All review agency comments provided during the review of this application shall be complied with at all times. 2. An engineered site plan, in accordance with the requirements of Article VIII of the Fredrick County Zoning Ordinance, shall be submitted to and subject to approval by Frederick County prior to the establishment of the use. The site plan shall address additional regulations for specific uses outlined in §165-204.26 of the Frederick County Zoning Ordinance and be in general conformance with the Concept Plan, included with the CUP application, prepared by Greenway Engineering, dated August 7, 2020. 3. Buffers and screening shall be provided around the perimeter of the project in general conformance with quantity of the proposed plantings depicted on Sheets 3 and 4 of the Concept Plan, “Landscape Buffer A, B, C, D, E & F,” included with the CUP application, prepared by Greenway Engineering, dated August 7, 2020 The landscape buffer plantings shall be maintained in good health for the life of the project. 4. Prior to site plan approval, the owner shall enter into a written agreement with Frederick County to decommission solar energy equipment, facilities, or devices pursuant to the terms and conditions of §15.2-2241.2(B) of the Code of Virginia. The written agreement shall be updated every five (5) years and in general conformance with the Exhibit D: Preliminary Decommissioning Plan, included with the CUP application, prepared by Torch Clean Energy, dated May 2020. 5. Batteries, for the purposes of mass storage of electricity that will eventually be transferred to the grid, are prohibited as part of this CUP. 6. This conditional use permit shall not be effective unless and until the vacations of the Springdale Glen and Carrollton Estates Subdivisions are approved and recorded. In addition, the approval and recordation of such vacations shall take place prior to the approval of any site plan for the use authorized by this conditional use permit. 7. Access to the site shall be limited to two (2) entrances from Springdale Road and one (1) entrance from Passage Road, and be in general conformance with the 11 Page 9 CUP #05-20 – Bartonsville Energy Facility, LLC August 13, 2020 Concept Plan, included with the CUP application, prepared by Greenway Engineering, dated August 7, 2020. Delivery of solar array panel construction materials will occur at the site access entrance off of Passage Road identified as Deer Lane on Sheet 4 of the Concept Plan. Solar array panel materials delivery laydown area will be limited to Tax Parcel 74-A-44A (Carbaugh Property). 8. Pile-driving of poles for solar arrays during construction shall be limited to 7:00AM to 5:00PM Monday through Friday. All other construction activities are permitted 7:00am to 7:00PM Monday through Friday and 7:00AM to 5:00PM on Saturday. No construction activities are permitted on Sundays. 9. Any expansion or modification of this land use will require the approval of a new CUP. Following this public hearing, it would be appropriate for the Planning Commission to offer a recommendation concerning this application to the Board of Supervisors. Any recommendation for approval should also include a statement affirming that the proposed solar facility is in substantial accord with the Comprehensive Plan. 12 £¤11 §¨¦81 §¨¦81 ¬«277 NEILDR MARYSWINDCT S T E L L A C T CORALN HYDECT B I G L I M B L N F I R E F L Y L N SCHOOLST GREENST B R I D L ECT V E L V E T W A L L W A Y C A R R O L L D R STEPHENSCT P A N T O P S D R INDUSTRIALDR W A L N U TLN FARMVIEWDR G E R M A I N S T SMOKEHOUSECT M U L B E R R Y S THALFPENNYCT OVERVIEWCT ASHFORDDR W O O D S I D E C I R L I N W O O D C T NEWTOWNCT S T E P H E N S R U N S T PLYMOUTHST BUNCHBERRYRIDGE CT H I G H L A N D E R R D RAVENWOODRD D R I F T W O O D D RTOWNSHIP C T S E R V I C E B E R R Y C T M E A D O W B R O O K E D R Stephens City 74 A 20 74 A 21 74 A 35A 74 A 44 74 A 45 74 A 44A 74 A 6C 74 A 3 74 A 4 829VAUCLUSE RD 700VAUCLUSE RD 365CARSON LN 388VAUCLUSE RD 320CONESTOGA LN 365FAMILY DR 846STRODEMCLEOD LN 5698VALLEYPIKE 5782VALLEYPIKE 332TOWNRUN LN 472EWINGS LN 150DOLLIE MAE LN 704HITES RD 685HITES RD 5658VALLEYPIKE 458HITES RD 564HITES RD 197CARSON LN 5498VALLEYPIKE 560HITES RD 1213MARLBORO RD 181CHANTERELLE CT 131CHANTERELLE CT 345ESTEP RD 1215MARLBORO RD 1211MARLBORO RD 969MARLBORO RD 820MARLBORO RD131POMMECIR 120POMMECIR 1381MARLBORO RD1687MARLBORO RD 184HITES RD 1541MARLBORO RD 116CORA LN 1677MARLBORO RD 1512MARLBORO RD 1009GERMANY RD 242INEZ LN 967MARLBORO RD 641MARLBORO RD 1736MARLBORO RD 173OAK HILL DR 1086GERMANY RD 1030LIME KILN RD 1156MARLBORO RD 123INEZ LN 868MARLBORO RD 820MARLBORO RD 5095SQUIRREL LN 700AYLOR RD 231OAK HILL DR 173CARTERS LN125CARTERS LN 199BRACKENFERN LN 4975MAIN ST 4832VALLEYPIKE 626AYLOR RD 1682MARLBORO RD 860GERMANY RD 229CARTERS LN 258CARTERS LN 5100PASSAGE LN 4724VALLEYPIKE 4737VALLEYPIKE 5699MIDDLE RD 5621MIDDLE RD 5600MIDDLE RD 289CARTERS LN 310CARTERS LN 1037SPRINGDALE RD 4656VALLEYPIKE5585MIDDLE RD 766GERMANY RD 784GERMANY RD 743CARTERS LN 9112 5452MIDDLE RD 5533MIDDLE RD 5455MIDDLE RD 701GERMANY RD 225SERVICEBERRY CT 662PASSAGE LN 4560VALLEYPIKE 4506VALLEYPIKE4548VALLEYPIKE 4541VALLEYPIKE 4527VALLEYPIKE 596GERMANY RD668GERMANY RD 842CARTERS LN 634SPRINGDALE RD 976SPRINGDALE RD 839SPRINGDALE RD 371SPRINGDALE DR 341LAURELGROVE RD 199LAURELGROVE RD 171LAURELGROVE RD5320MIDDLE RD 950CARTERS LN 950CARTERS LN 561GERMANY RD 1216SPRINGDALE RD 5236MIDDLE RD 1056CARTERS LN 5153MIDDLE RD484GERMANY RD 579SPRINGDALE RD 507SPRINGDALE RD 117SPRINGDALE RD 4330VALLEY PIKE 5141MIDDLE RD 1711SPRINGDALE RD 834SHADYELM RD 385SPRINGDALE RD 224SPRINGDALE RD 140SPRINGDALE RD 5019MIDDLE RD 327GERMANY RD 1662SPRINGDALE RD 4555MIDDLE RD 970SHADYELM RD 983SHADYELM RD 1043SHADYELM RD 4118VALLEYPIKE 5030MIDDLE RD 5005MIDDLE RD 1786SPRINGDALE RD 161SKYJES LN 831SHADYELM RD 779BARLEY LN 4929MIDDLE RD 196GERMANY RD203GERMANY RD 180SKYJES LN 158BARLEY LN 110BARLEY LN 4661MIDDLE RD 4701MIDDLE RD 190HOCKMAN CT 553SHADYELM RD 452BARLEY LN 194BARLEY LN 4668MIDDLE RD 4750MIDDLE RD 4253MIDDLE RD 690SHADYELM RD 561SHADY ELM RD 510BARLEY LN 370BARLEY LN 395LICKSKILLET LN 4634MIDDLE RD 4536MIDDLE RD 140LICKSKILLET LN 4275MIDDLE RD 4101MIDDLE RD 540BARLEY LN 4338MIDDLE RD 344RUBINETTEWAY 4063MIDDLE RD 171OLDMIDDLE RD 229SOLDIERSREST LN 243SOLDIERSREST LN 480SHADYELM RD 278RUBINETTE WAY 3735MIDDLE RD 275SOLDIERSREST LN 242RUBINETTE WAY 311BROOKNEIL DR 4032MIDDLE RD 3862MIDDLE RD 3475MIDDLE RD 756BROOKNEIL DR 152NEIL DR 190NEIL DR 217LOY CIR 3782MIDDLE RD ELEVEN MOONS PL R A V E N C T W O O D T O P C T D E C A T U R C I R BERKSHIRE CT M U L B E R R Y R U N C T W E S T C H E S T E R D R BRUNSWICK RD G L E N O A K C T M U L B E R R Y C T BARKWOOD DR W A T E R F A L L W A Y L O Y C I R M U L B E R R Y T E RROWELN G R E E N W I C H D R G R O V E C T W A T E R S T P R ESSHOUSEWAY S T R O S N I D E R L N C O M E R D R BELLAIR ST LOCUSTST F R E D E R I C K T O W N E D R E W I N G S L N DOLLIEMAE LN F I L B E R T S T MARTINST D O W N I N G C I R V D O T L N C H I P L E Y D R K E R N C I R SHOEBUCKLE CT FAIRFAX ST M A I N S T S H E F F I E L D P L C H E I F T O N P L F A I R F A XPIKE GEM DR D R U ID H ILL P L G R O V E S T DEVONDR H I G H V I E W A V E STEELE CT P I T T M A N C T P O M M E C I R I N E Z L N FAMILYDR M A S S I E S T MEADOWLARKLN SKYJES LN NIGHTBIRDWAY LITTLE W IN G W A Y CHANTERELLECT L A U R A D R N O L A N C T HARMON PL HOCKMAN CT GUILFORDCT R A B B I T L NBRACKENFERN L N R I D G E F I E L D A V E C R O O K E D L N F A I R F A X E X I T R A M P S VAUCLUSE RD C I D E R M IL L W A Y F A I R F A X E N T E R R A M P N S Q U I R R E L L N RT3 7 N D O U B L E C H U R C H R D O L D M I D D L E R D O A K H I L L D R N ITT A N Y S O U TH W A Y RT37 S S T I C K L E Y D R A Y L O R R D G RASSY LN B A R L E Y D R G A R D E N G A TE D R F A I R F A X E N T E R R A M P S F A I R F A X E X I T R A M P N S H A D Y E L M R D T O W N R U N L N S O L D IE R S R E S T L N E S T E P R D R U B I N E T T EWAY LAUREL GROVE RD M A R L B O R O R D P A S S A G E L N CARSON LN H I T E S R D CARROLLTON DR LICKSKILLET LN P A S S A G E R D V A L L E Y P I K E G R A N G E L N M I D D L E R D C A R T E R S L N S P R I N G D A L E R D BARLEY LN G E R M A N Y R D S TR O D E M C LE O D L N Application Sewer and Water Service A rea Parcels B1 (Neighborhood Business District) B2 (General Business District) EM (Ex tractive Manufacturing District) M1 (Light Industrial District) RP (Residential Per form ance District)Agricultural & Foresta l Districts South Frederick District µ Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: June 12, 2020 Stephens City Winchester M I D D L E R D H I T E S R D C E D A R C R E E K G R TASKER RD SPRINGDALE RD LAUREL GROVE RD C L A R K R D BARLEY LN V A L L E Y P I K ECHAPEL RD B R O O K N E I L D R BRANDY LN C H I N K A P I N D R CARSON LN ¬«37 ¬«277 ¬«37 ¬«277 0 3,100 6,2001,550 Feet C U P # 0 5 - 2 0 : B a r t o n s v i l l e E n e r g y F a c i l i t y , L L CPINs: 7 4 - A - 3 , 7 4 - A - 4 , 7 4 - A - 6 C , 7 4 - A - 2 0 , 7 4 - A - 2 1 , 7 4 - A - 3 5 A , 7 4 - A - 4 4 , 7 4 - A - 4 4 A , 7 4 - A - 4 5 ,7 4 - 5 - 1 t h r u 7 4 - 5 - 5 2 , 7 4 - 7 - 1 - 1 t h r u 7 4 - 7 - 1 - 6 , a n d 7 4 - 7 - 2 - 7 t h r u 7 4 - 7 - 2 - 1 2Utility S c a l e S o l a r F a c i l i t yZoning M a p CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 13 £¤11 §¨¦81 §¨¦81 ¬«277 NEILDR MARYSWINDCT S T E L L A C T CORALN HYDECT B I G L I M B L N F I R E F L Y L N SCHOOLST GREENST B R I D L ECT V E L V E T W A L L W A Y C A R R O L L D R STEPHENSCT P A N T O P S D R INDUSTRIALDR W A L N U TLN FARMVIEWDR G E R M A I N S T SMOKEHOUSECT M U L B E R R Y S THALFPENNYCT OVERVIEWCT ASHFORDDR W O O D S I D E C I R L I N W O O D C T NEWTOWNCT S T E P H E N S R U N S T PLYMOUTHST BUNCHBERRYRIDGE CT H I G H L A N D E R R D RAVENWOODRD D R I F T W O O D D RTOWNSHIP C T S E R V I C E B E R R Y C T M E A D O W B R O O K E D R Stephens City 74 A 20 74 A 21 74 A 35A 74 A 44 74 A 45 74 A 44A 74 A 3 74 A 6C 74 A 4 829VAUCLUSE RD 700VAUCLUSE RD 365CARSON LN 388VAUCLUSE RD 320CONESTOGA LN 365FAMILY DR 846STRODEMCLEOD LN 5698VALLEYPIKE 5782VALLEYPIKE 332TOWNRUN LN 472EWINGS LN 150DOLLIE MAE LN 704HITES RD 685HITES RD 5658VALLEYPIKE 458HITES RD 564HITES RD 197CARSON LN 5498VALLEYPIKE 560HITES RD 1213MARLBORO RD 181CHANTERELLE CT 131CHANTERELLE CT 345ESTEP RD 1215MARLBORO RD 1211MARLBORO RD 969MARLBORO RD 820MARLBORO RD131POMMECIR 120POMMECIR 1381MARLBORO RD1687MARLBORO RD 184HITES RD 1541MARLBORO RD 116CORA LN 1677MARLBORO RD 1512MARLBORO RD 1009GERMANY RD 242INEZ LN 967MARLBORO RD 641MARLBORO RD 1736MARLBORO RD 173OAK HILL DR 1086GERMANY RD 1030LIME KILN RD 1156MARLBORO RD 123INEZ LN 868MARLBORO RD 820MARLBORO RD 5095SQUIRREL LN 700AYLOR RD 231OAK HILL DR 173CARTERS LN125CARTERS LN 199BRACKENFERN LN 4975MAIN ST 4832VALLEYPIKE 626AYLOR RD 1682MARLBORO RD 860GERMANY RD 229CARTERS LN 258CARTERS LN 5100PASSAGE LN 4724VALLEYPIKE 4737VALLEYPIKE 5621MIDDLE RD5699MIDDLE RD 5600MIDDLE RD 289CARTERS LN 310CARTERS LN 1037SPRINGDALE RD 4656VALLEYPIKE5585MIDDLE RD 784GERMANY RD 766GERMANY RD 743CARTERS LN 9112 5452MIDDLE RD 5533MIDDLE RD 5455MIDDLE RD 701GERMANY RD 225SERVICEBERRY CT 662PASSAGE LN 4560VALLEYPIKE 4506VALLEYPIKE4548VALLEYPIKE 4541VALLEYPIKE 4527VALLEYPIKE 596GERMANY RD668GERMANY RD 842CARTERS LN 634SPRINGDALE RD 976SPRINGDALE RD 839SPRINGDALE RD 371SPRINGDALE DR 341LAURELGROVE RD 199LAURELGROVE RD 171LAURELGROVE RD5320MIDDLE RD 950CARTERS LN 950CARTERS LN 561GERMANY RD 1216SPRINGDALE RD 5236MIDDLE RD 1056CARTERS LN 5153MIDDLE RD484GERMANY RD 579SPRINGDALE RD 507SPRINGDALE RD 117SPRINGDALE RD 4330VALLEY PIKE 5141MIDDLE RD 1711SPRINGDALE RD 834SHADYELM RD 385SPRINGDALE RD 224SPRINGDALE RD 140SPRINGDALE RD 5019MIDDLE RD 327GERMANY RD 1662SPRINGDALE RD 4555MIDDLE RD 970SHADYELM RD 1043SHADYELM RD 983SHADYELM RD 4118VALLEYPIKE 5030MIDDLE RD 5005MIDDLE RD 1786SPRINGDALE RD 161SKYJES LN 831SHADYELM RD 779BARLEY LN 4929MIDDLE RD 196GERMANY RD203GERMANY RD 180SKYJES LN 158BARLEY LN 110BARLEY LN 4661MIDDLE RD 4701MIDDLE RD 190HOCKMAN CT 553SHADYELM RD 452BARLEY LN 194BARLEY LN 4750MIDDLE RD 4668MIDDLE RD 4253MIDDLE RD 690SHADYELM RD 561SHADY ELM RD 510BARLEY LN 370BARLEY LN 395LICKSKILLET LN 4634MIDDLE RD 4536MIDDLE RD 140LICKSKILLET LN 4275MIDDLE RD 4101MIDDLE RD 540BARLEY LN 4338MIDDLE RD 344RUBINETTEWAY 4063MIDDLE RD 171OLDMIDDLE RD 229SOLDIERSREST LN 243SOLDIERSREST LN 480SHADYELM RD 278RUBINETTE WAY 3735MIDDLE RD 275SOLDIERSREST LN 242RUBINETTE WAY 311BROOKNEIL DR 4032MIDDLE RD 3862MIDDLE RD 3475MIDDLE RD 756BROOKNEIL DR 152NEIL DR 190NEIL DR 217LOY CIR 3782MIDDLE RD ELEVEN MOONS PL R A V E N C T W O O D T O P C T D E C A T U R C I R BERKSHIRE CT M U L B E R R Y R U N C T W E S T C H E S T E R D R BRUNSWICK RD G L E N O A K C T M U L B E R R Y C T BARKWOOD DR W A T E R F A L L W A Y L O Y C I R M U L B E R R Y T E RROWELN G R E E N W I C H D R G R O V E C T W A T E R S T P R ESSHOUSEWAY S T R O S N I D E R L N C O M E R D R BELLAIR ST LOCUSTST F R E D E R I C K T O W N E D R E W I N G S L N DOLLIEMAE LN F I L B E R T S T MARTINST D O W N I N G C I R V D O T L N C H I P L E Y D R K E R N C I R SHOEBUCKLE CT FAIRFAX ST M A I N S T S H E F F I E L D P L C H E I F T O N P L F A I R F A XPIKE GEM DR D R U ID H ILL P L G R O V E S T DEVONDR H I G H V I E W A V E STEELE CT P I T T M A N C T P O M M E C I R I N E Z L N FAMILYDR M A S S I E S T MEADOWLARKLN SKYJES LN NIGHTBIRDWAY LITTLE W IN G W A Y CHANTERELLECT L A U R A D R N O L A N C T HARMON PL HOCKMAN CT GUILFORDCT R A B B I T L NBRACKENFERN L N R I D G E F I E L D A V E C R O O K E D L N F A I R F A X E X I T R A M P S VAUCLUSE RD C I D E R M IL L W A Y F A I R F A X E N T E R R A M P N S Q U I R R E L L N RT3 7 N D O U B L E C H U R C H R D O L D M I D D L E R D O A K H I L L D R N ITT A N Y S O U TH W A Y RT37 S S T I C K L E Y D R A Y L O R R D G RASSY LN B A R L E Y D R G A R D E N G A TE D R F A I R F A X E N T E R R A M P S F A I R F A X E X I T R A M P N S H A D Y E L M R D T O W N R U N L N S O L D IE R S R E S T L N E S T E P R D R U B I N E T T EWAY LAUREL GROVE RD M A R L B O R O R D P A S S A G E L N CARSON LN H I T E S R D CARROLLTON DR LICKSKILLET LN P A S S A G E R D V A L L E Y P I K E G R A N G E L N M I D D L E R D C A R T E R S L N S P R I N G D A L E R D BARLEY LN G E R M A N Y R D S TR O D E M C LE O D L N Application Sewer and Water Service A rea Parcels µ Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: June 12, 2020 Stephens City Winchester M I D D L E R D H I T E S R D C E D A R C R E E K G R TASKER RD SPRINGDALE RD LAUREL GROVE RD C L A R K R D BARLEY LN V A L L E Y P I K ECHAPEL RD B R O O K N E I L D R BRANDY LN C H I N K A P I N D R CARSON LN ¬«37 ¬«277 ¬«37 ¬«277 0 3,100 6,2001,550 Feet C U P # 0 5 - 2 0 : B a r t o n s v i l l e E n e r g y F a c i l i t y , L L CPINs: 7 4 - A - 3 , 7 4 - A - 4 , 7 4 - A - 6 C , 7 4 - A - 2 0 , 7 4 - A - 2 1 , 7 4 - A - 3 5 A , 7 4 - A - 4 4 , 7 4 - A - 4 4 A , 7 4 - A - 4 5 ,7 4 - 5 - 1 t h r u 7 4 - 5 - 5 2 , 7 4 - 7 - 1 - 1 t h r u 7 4 - 7 - 1 - 6 , a n d 7 4 - 7 - 2 - 7 t h r u 7 4 - 7 - 2 - 1 2Utility S c a l e S o l a r F a c i l i t yLocation M a p CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 CUP #05-20 14 5 ____ ____ APPLICATION FOR CONDITIONAL USE PERMIT FREDERICK COUNTY, VIRGINIA 1. Applicant (check one): Property Owner _ _ Other _ NAME: Bartonsville Energy Facility, LLC Attn: Sam Gulland ADDRESS: 230 Court Square, Suite B102, Charlottesville, VA 22902 TELEPHONE: _(703) 999 - 4280 2.Please list all owners, occupants, or parties in interest of the property: Louis C. Carbaugh et. als; Joseph Carbaugh; Robert R. Staples; Stephen Dubois Brim, et als; Judith B. Cates, Eleanor K. Brim R&T Packing Corporation, APR Mini Storage LLC, William C. Staples, Wright Renovations, Inc., West Oaks Farm Market LLC 3.The property is located at: (please give exact directions and include the route number of your road or street) Along Passage Road and Springdale Road, west of CSX rail corridor, in Frederick County and Stephens City. 4.The property has a road frontage of feet and a depth of feet and consists of 1,160.5 acres. Refer to Concept Plan for road frontages and property depths. 5.The property is owned by as evidenced by deed from (previous owner) recorded in deed book no. on page , as recorded in the records of the Clerk of the Circuit Court, County of Frederick. See Attachment 1. 6.Property Identification Number (P.I.N.) 74-A-45, 74-A-44A, 74-A-4, 74-A-6C, all lots in Springdale ✔ Submittal Deadline P/C Meeting BOS Meeting 15 6 Glen/Carrolton Estates, 74-A-44, 74-A-35A, 74-A-20, 74-A-3, 74-A-21Magisterial District Back Creek and Opequon District Current Zoning RA RA Ref 16 7 7. Adjoining Property: Refer to Sheet 2 of Concept Plan. 8. The type of use proposed is (consult with the Planning Dept. before completing): Utility-scale solar photovoltaic facility 9. It is proposed that the following buildings will be constructed: Grounded-mounted PV solar energy generation facilities and interconnection facilities. 10. The following are all of the individuals, firms, or corporations owning property adjacent to both sides and rear and in front of (across street from) the property where the requested use will be conducted. (Continue on back if necessary.) These people will be notified by mail of this application: Refer to Sheet 2 of the Concept Plan. 17 8 11. Please use this page for your sketch of the property. Show proposed and/or existing structures on the property, including measurements to all property lines. Refer to Sheet 3 and Sheet 4 of the Concept Plan. 18 19 Attachment 1: Property Owners Parcel Owner Record/Instrument # 74-A-45 Robert R. Staples Will Bk/Pg 112 / 111 74-A-44A Louis C. Carbaugh, Et Als 190013725 74-A-4 R&T Packing Corporation Deed Bk/Pg 543 / 543 74-A-6C Eleanor K. Brim 040023461 Lots 1 – 12, Springdale Glen Stephen D. Brim, Judith B. Cates 100003803 Lots 1 – 52, Carrollton Estates Stephen D. Brim, Et Als 100012733 74-A-44 Joseph Carbaugh 080003967 74-A-35A APR Mini Storage LLC 050017541 74-A-20 William Staples Deed Bk/Pg 844 / 1067 74-A-3 West Oaks Farm Market LLC 150007227 74-A-21 Wright Renovations, Inc. 190001950 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 Owner Signature Page Bartonsville Energy Facility CUP Application Form I (we), the undersigned, do hereby respectfully make application and petition the governing body of Frederick County, Virginia to allow the use described in this application. I understand that the sign issued to me when this application is submitted must be placed at the front property line at least seven (7) days prior to the first public hearing and maintained so as to be visible until after the Board of Supervisors' public hearing. Your application for a Conditional Use Permit authorizes any member of the Frederick County Planning Commission, Board of Supervisors or Planning and Development Department to inspect your property where the proposed use will be conducted. Tax Map: 74-A-3 Mary Snapp West Oaks Farm Market, LLC Owner's Mailing Address: 229 West Oaks Lane, Winchester, VA 22602 36 August 7, 2020 Application Narrative and Statement of Intent for Conditional Use Permit (CUP) 230 Court Square Suite B102, Charlottesville, VA 22902 Bartonsville Energy Facility 37 2 Table of Contents 1. EXECUTIVE SUMMARY 2. DESCRIPTION OF PROPERTY 3. PROJECT OVERVIEW FACILITY SUMMARY CONSTRUCTION SCHEDULE COMPLIANCE WITH COUNTY REGULATION COORDINATION WITH STEPHENS CITY 4. ANALYSIS OF IMPACTS VISUAL ECOLOGICAL AND DRAINAGE CULTURAL RESOURCES NOISE TRAFFIC LIGHTING ODORS, DUST, FUMES, VIBRATIONS FIRE SAFETY / SECURITY COMMUNITY OUTREACH 5. DECOMMISSIONING LIST OF EXHIBITS EXHIBIT A – EXECUTIVE SUMMARY SUPPORT EXHIBITS EXHIBIT B – CONCEPT PLAN EXHIBIT C – CULTURAL RESOURCES REPORT EXHIBIT D – PRELIMINARY DECOMMISSIONING PLAN 38 3 1. Executive Summary Bartonsville Energy Facility, LLC, a subsidiary of Torch Clean Energy (“Torch”), requests a Conditional Use Permit (“CUP”) to allow the construction and operation of a photovoltaic solar energy generation facility (the “Project”) as described in this Application. The Project is proposed on the parcels identified by Frederick County as Tax Map IDs 74-A-45, 74-A-44A, 74-A-3, 74-A-4, 74-A-6C, as well as lots 1 through 12 of the Springdale Glen subdivision and lots 1 through 52 of the Carrollton Estates subdivision. The Project area includes parcels that total 1,160.5 acres (the “Property”). A maximum of 690 acres will be used for solar modules, and a maximum of 705 acres will be disturbed. The majority of the site is located in the Back Creek Magisterial District in Frederick County and a portion is in the Opequon Magisterial District in Stephens City. The Project has been sited and proposed with the following considerations: ▪ The Project location was selected for its proximity to existing transmission facilities and minimal visual impact to existing residential areas. ▪ The Project will vacate two large subdivisions on agricultural land. This will maintain the character of the County’s rural landscape and settlement pattern. ▪ The Project has been planned and designed to avoid impacts to cultural and environmental resources. ▪ The Project will provide clean energy that matches the electricity consumption of approximately 15,000 homes in Virginia and will help the Commonwealth meet its goals for the adoption of clean energy. ▪ The Project will provide personal property and increased real estate taxes to the County over the course of its life as well as injecting direct economic activity into the County during the construction and operating periods. If approved by the Board of Supervisors, the Project will bring economic benefits to Frederick County with no detrimental effects on the neighboring properties or the County as a whole. Torch Clean Energy Torch Clean Energy is developer and owner of renewable energy generation facilities in the United States with offices in Virginia and Colorado. We have developed solar and wind facilities, including the Red Horse Project, a 101 Megawatt (“MW”) solar and wind hybrid project. Torch has over 500MW of solar under development in the Commonwealth of Virginia, including the Chester Solar Technology Park in Chesterfield County, which was permitted in September of 2019 , and the Jarratt Energy Facility, which was permitted in March of 2020. To date, Torch has developed and financed over $600 million of renewable energy projects through the c ountry. 39 4 2. Description of Property The Project Property is zoned RA (Frederick County) and R1 (Stephens City) and consists of the following parcels: Parcels by Usage and Acreage Parcel Acreage in Frederick County Acreage in Stephens City Zoning Use Used for Solar Generating Equipment 74-A-45 11.00 85.55 R1 Crops 74-A-44A 0.00 40.01 R1 Crops 74-A-3 200.00 0.00 RA Crops/Event Center 74-A-4 265.41 0.00 RA Crops / Forested 74-A-6C 3.80 0.00 RA Crops / Forested Lots 1 – 12, inclusive, Springdale Glen 53.20 0.00 RA Crops / Orchard Lots 1 – 52, inclusive, Carrollton Estates 307.90 0.00 RA Crops / Orchard Used for Generation-Tie Line and Interconnection Facilities 74-A-44 2.93 6.88 R1 Residence 74-A-35A 18.00 0.00 RA Crops 74-A-20 162.0 0.00 RA Crops 74-A-21 0 3.52 R1 Vacant The Carrollton Estates subdivision contains 52 parcels and the Springdale Glen subdivision contains 12 parcels. Prior to the approval of the Site Plan, each of these subdivisions will be vacated. As noted and highlighted above, Parcels 74-A-44A, 74-A-44, 74-A-45, and 74-A-21 contain a total of 135.96 acres in Stephens City. These properties are subject to the regulations of the Town, and the Project will receive separate approvals for the use of this land. The entirety of the Project is shown in this application for clarity. The Property is located approximately 1.2 miles west of I-81 and Stephens City, and comprises agricultural fields, orchards, and forest stands. The surrounding properties are primarily rural residences, farmland, and forested areas. An existing FirstEnergy 138 kV transmission line runs less than one mile to the east of the Project site, adjacent to the railroad corridor and industrial district flanking Stephens City. This transmission line runs between the Bartonville and Meadowbrook substations. 40 5 Article IV of the Frederick County Zoning Ordinance permits utility-scale solar facilities in the RA district with a CUP. The Applicant requests a CUP to allow the construction and operation of the Project on the Property. 3. Project Overview Facility Summary The Bartonsville Energy Facility will produce over 180,000 megawatt-hours of clean energy in its first year of operation, which represents the energy consumption of approximately 1 5,000 homes. The Project will generate electricity from photovoltaic solar modules that will be attached to a racking supported by driven posts. Single-axis trackers will be used to follow the sun from East to West and increase the efficiency of the Project. A series of central inverters will be used to convert the electricity from direct current to alternating current. The Project will interconnect to a FirstEnergy 138-kilovolt transmission line adjacent to the CSX railroad corridor. The Project substation and switching station will be built on parcels 74-A-20 and 74-A-21, and will be linked to the Project site via a 34.5kV distribution voltage Generation-Tie line that will run along an easement corridor crossing parcels 74- A-20, 74-A-35A, and 74-A-44. This Generation-Tie line will be underground. No new transmission- voltage lines will be built for the Project. The Project will not use grid-scale energy storage. Batteries will not be used, except for small backup batteries for the solar tracker motors, substation, and associated equipment. The Project will be developed generally as depicted on Exhibit B, the Concept Plan, as included with this Application. The Concept Plan provides a map of the solar array area, the proposed point of interconnection with the transmission system, vegetative buffer zones, perimeter fencing, access points, and other features of the Project. As shown on the Concept Plan, three points of access are proposed, two of which will be from Springdale Road (Route 649). An entrance to the northern section of the Project will be located approximately 0.75 miles east of the intersection with Germany Road (Route 625), and an entrance to the southern portion will follow Carrollton Lane. A third, southeastern access will be on Passage Road (Route 648), approximately 0.3 miles from the intersection with Marlboro Road. Construction Schedule The construction of the Project is estimated to take approximately 1 2 months to achieve substantial completion. The first phase of the Project will be civil works, such as area-specific grading, in order to prepare for the installation of the solar equipment. The second phase will consist of the mechanical and electrical installation of the solar equipment . The final phase is the testing of the facility and the energization. Phase 1 –Site Preparation and Civil Work: 3-6 Months Phase 2 - Mechanical and Electrical Installation: 4-6 Months 41 6 Phase 3 – Facility Testing and Energization: 3 Months Overlap between the first two phases is expected, subject to the final construction schedule. Additionally, construction of the interconnection facilities by FirstEnergy will span all three phases of construction. Compliance with County Regulation The Applicant completed a Pre-Application meeting with Frederick County Planning and has gathered and addressed feedback from required County agencies. The Applicant conferred with the County Historic Resources Advisory Board to discuss historical and cultural resources in the County. Additional CUP materials have been compiled according to the County Zoning Ordina nce and Planning process guidelines. Coordination with Stephens City The Applicant is working concurrently with Stephens City to permit the portion of the Project that falls within the Town. This Application requests a CUP for the County portion of the P roject but shows the entirety of the Project for clarity. 4. Analysis of Impacts Pursuant to Chapter 165, Part 103 of the Zoning Ordinance, a CUP may be granted where the Board of Supervisors finds that (i) the proposed use is in accordance with the policies expressed in the Comprehensive Plan of the County, and (ii) the proposed use is in harmony and shall not adversely affect the use and enjoyment of surrounding properties (§ 165-103.02). The Project is supported by the 2035 Comprehensive goals. In particular, the Plan seeks to cluster residential development in appropriate locations and support the agricultural economy and allow residents to harness new opportunities. The Project will vacate two large subdivisions in the Agricultural district and allow residents to harness a new technology that constitutes a safe, passive, and temporary use of the land. In accordance with the criteria set forth in the Zoning Ordinance for CUP approval, the proposed Project will not adversely affect the health, safety, or welfare of persons residing or working in the neighborhood of the proposed use and will not be detrimental to public welfare or injurious to the Property or improvements in the neighborhood. As a passive use located in a Rural district, the Project will not be detrimental to, or substantively change, the character of the surrounding area. The proposed Project will not cause any increase in demand for County services. It will have minimal impacts on drainage and erosion and will not require the use of local water or sewer utilities. Erosion and sediment controls and permanent stormwater management facilities will be provided as part of the Project to the extent required by app licable laws. The Project will not significantly increase traffic 42 7 in the area, and no public road improvements will be required for the construction or servicing of the Project. The effects of the Project are evaluated as follows: Visual Along the perimeter of the Property, a setback from the Property line to solar generating equipment shall be used. Within this setback, a buffer consisting of new and/or existing vegetation will be used to screen the Project, as outlined below and shown in Exhibit B. The setback from external roads and property lines will generally be 100 feet, with the fence installed between 75 and 100 feet from the property lines. These setbacks shall not apply to the undergound Generation Tie -Line or the interconnection facilities. The most traveled routes near the Project are Middle Road, to the north, and Marlboro road, to the south. The Project has no frontage on either of these routes , except for the underground distribution voltage Generation-Tie line crossing occurring near the intersection of Marlboro Road and Passage Lane. The Project has approximately 0.25 miles of frontage along Passage Road and 0.85 miles of frontage along Springdale Road. The Landscaping Plan will minimize visual impacts to surrounding properties and rights-of-way by maintaining and enhancing existing tree lines and vegetative buffers, while providing for new plantings in targeted areas. Specifically, the Project will do the following: ▪ Maintain existing tree lines along western and southern boundaries of the Carrollton Estates and Springdale Glen property; ▪ Use existing topography to ensure that the Project is not visible from Middle Road; ▪ Plant new vegetative buffers on the southern side of parcel 74-A-45, along Springdale Road; and along a property line to the north of Springdale Road. This plan is depicted in Exhibit B. Ecological and Drainage Wetlands will be delineated and avoided in the construction of the Project. Additionally, the Project will complete thorough consultation with the Department of Environmental Quality as part of the “Permit by Rule” process for renewable energy facilities. The Project will submit Erosion and Sediment Control and Stormwater Management plans prior to the issuance of the building permit when the design is nearly complete. Because the racking system uses driven posts for structural support, changes to the impervious surface will be limited to inverter and transformer pads, access roads, and interconnection equipment . These uses constitute a small percentage of the total project area. The Project will be designed to minimize stormwater impacts and accommodate existing topography to the extent possible. 43 8 Cultural Resources The Project has undergone an archeological and architectural study in accordance with County regulations and will not directly impact any identified landmarks. Cultural and historical resources in the vicinity of the Project are described in Exhibit C. Additionally, the Project will require concurrence from the Department of Historic Resources as part of the “Permit by Rule” process for renewable energy facilities. Noise Once operational, the Project will not be audible to adjacent landowners. Construction activities will generally be limited to daylight hours, with pile driving work scheduled for daylight hours between Monday and Saturday. Traffic General construction traffic will use the Project’s three access points on Springdale Road and Passage Road and will use the Project’s internal road network to move around the site. General construction traffic consists of personal vehicles (e.g. pickup trucks) carrying passengers, tools, and minor equipment to and around the Project site. Due to the proximity of the Project to I -81 and the existing road network, there will be little impact to current traffic. Component deliveries (e.g. solar panels, inverters, concrete trucks, construction equipment, etc.) will primarily access the site from I-81, Marlboro Road, and Passage Road. The laydown area for solar array deliveries will be on Parcel 74-A-44A. A separate laydown area for the Project Interconnection will be on Parcels 74-A-20 and 74-A-21, which will be accessed from Marlboro Road. Operations and Maintenance for the Project will not measurably increase vehicular traffic. Lighting Except for minimal safety and security lighting in a few locations, the Project will not be lit. Any installed lighting will comply with applicable County ordinances. Odors, Dust, Fumes, Vibrations The Project will not generate air emissions. Once operational, no odors, trash, or recycled materials will be produced. No fuel or fuel storage and no outside storage will be needed on the Project after construction is completed. There will be no impact on water or air quality. Fire Safety / Security The Project will not pose increased security or safety risks or fire hazards. Once the Project is constructed, a permanent perimeter/boundary fence will enclose the solar panels. The fence will have a minimum height of six (6) feet. The fence will be posted with security signage along with contact information for a 24-hour manned communication system. The three site entrances and internal road network will provide access to every part of the Project. 44 9 The Project will be monitored remotely on a 24/7 basis. The Operations Team will have the ability to remotely de-energize the Project if necessary and immediately contact and coordinate with the appropriate local fire and EMS personnel. Training will be pr ovided to local fire and EMS on FirstEnergy emergency procedures and notification in case of emergency. Community Outreach During the last nine months, the Applicant has met with landowners in the vicinity of the Project site, including residents and owners of businesses. These meetings have influenced the Project’s Conceptual Plan, particularly with respect to the buffer planting and use of existing topography to screen the Project from view. 5. Decommissioning The Code of the Commonwealth of Virginia requires the owner, lessee, or developer of a solar project to enter into a written agreement to decommission the project prior to the issuance of a site plan . To support this application, the Applicant has provided Exhibit D, the Preliminary Decommissioning Plan. Prior to the issuance of the Site Plan, a Decommissioning Cost Estimate and means of financial security will be provided in accordance with Exhibit D and Virginia Code. 45 1 CO V E R S H E E T AS SHOWN OPEQUON/ BACK CREEK MAGISTERIAL DISTRICT FREDERICK COUNTY & TOWN OF STEPHENS CITY, VIRGINIA VICINITY MAP SCALE: 1" 2000' APR MINI STORAGE, LLC - 127 MERCEDES COURT WINCHESTER, VA 22603 STEVEN D. BRIM, ET ALS - 254 W. QUEEN STREET STRASBURG, VA 22657 ELEANOR K. BRIM - 4125 32ND AVE SW SEATTLE, WA 98126 JUDITH B. CATES - 102 FOREST VALLEY ROAD WINCHESTER, VA 22602 WEST OAKS FARM MARKET LLC - 229 W OAKS LN WINCHESTER, VA 22602 LOUIS C. CARBAUGH, ET ALS - 5140 PASSAGE LANE STEPHENS CITY, VA 22655 R & T PACKING CORPORATION - 1835 VALLEY AVENUE WINCHESTER, VA 22601 CHARLES W. STAPLES - P.O. BOX 986 STEPHENS CITY, VA 22655 ROBERT R. STAPLES - 1708 TUNBRIDGE DRIVE RICHMOND, VA 23238 WRIGHT RENOVATIONS INC - 124 PAGE CT WHITE POST, VA 22663 DEVELOPER TORCH CLEAN ENERGY 230 COURT SQUARE SUITE B102 CHARLOTTESVILLE, VA 22902 (703) 999-4280 OP E Q U O N / B A C K C R E E K M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y & T O W N O F S T E P H E N S C I T Y , V I R G I N I A 8/28/2020 ZJ 4 4505T Plan Revisions Date Comment 15 1 W i n d y H i l l L a n e Wi n c h e s t e r , V i r g i n i a 2 2 6 0 2 Te l e p h o n e : ( 5 4 0 ) 6 6 2 - 4 1 8 5 Fa x : ( 5 4 0 ) 7 2 2 - 9 5 2 8 ww w . g r e e n w a y e n g . c o m F N D 1 9 7 1 E N G I N E E R I N G SHEET OF DESIGNED BY: FILE NO. SCALE: DATE: LIST OF SERVICES: CIVIL ENGINEERING I GIS I LAND SURVEYING I ENVIRONMENTAL I ANALYTICAL LABORATORY I QUALITY CONTROL TESTING & INSPECTIONS PR O U D L Y S E R V I N G V I R G I N I A & W E S T V I R G I N I A OF F I C E S I N : W I N C H E S T E R , V A & M A R T I N S B U R G , W V BA R T O N S V I L L E E N E R G Y F A C I L I T Y CONCEPT PLAN BARTONSVILLE ENERGY FACILITY OWNERS 46 B A C K C R E E K O P E Q U O N B A C K C R E E K O P E Q U O N B A C K C R E E K O P E Q U O N ST E P H C I T Y S T E P H E N S C I T Y ST E P H E N S C I T Y 151 Windy Hill Lane Winchester, Virginia 22602 Telephone: (540) 662-4185 Fax: (540) 722-9528 www.greenwayeng.com FND 1971 E N G I N E E R I N G S H E E T O F D E S I G N E D B Y : F I L E N O . S C A L E : D A T E : PROUDLY SERVING VIRGINIA & WEST VIRGINIA OFFICES IN: WINCHESTER, VA & MARTINSBURG, WV 1 " 1 0 0 0 ' 2 PROJECT AREA OPEQUON/ BACK CREEK MAGISTERIAL DISTRICT FREDERICK COUNTY & TOWN OF STEPHENS CITY, VIRGINIA 8 / 2 8 / 2 0 2 0 Z J - - - - 4 4 5 0 5 T BARTONSVILLE ENERGY FACILITY FRE D E R I C K C O U N T Y P A R C E L S ADJOINER PARCEL TABLE L E G E N D S O L A R A R R A Y A R E A P A R C E L S S U B J E C T P A R C E L T A B L E I D ' S A D J O I N E R P A R C E L T A B L E I D ' S S T E P H E N S C I T Y C O R P O R A T E L I M I T S GENERAL PROJECT NOTESBARTONSVILLE ENERGY FACILITY: 80-130MW SOLAR PROJECT 34.5kV GENERATION TIE LINE PROJECT SUBSTATION/SWITCHING S T A T I O N TOTAL PROJECT PARCEL AREA: 1160.19± AC. (MAXIMUM OF 690 ACRES FO R S O L A R A R R A Y S ) ACREAGE/ZONING: FREDERICK COUNTY 1010.30± AC./RA DISTRICT TOWN OF STEPHENS CITY 149.89± AC./R1 DISTRICTMAGISTERIAL DISTRICT: BACK CREEK DISTRICT & OPEQUON DISTRICTEXISTING LAND USE: AGRICULTURAL & RESIDENTIALPROJECT DEVELOPMENT NOTES1.SOLAR ARRAY DEVELOPMENT LIMITS WILL CONSIST OF GROUND-MOUNTE D P H O T O V O L T A I C MODULES AND CENTRAL INVERTERS2.SOLAR ARRAY DEVELOPMENT LIMITS WILL BE SETBACK 100' FROM EXTER N A L R O A D S A N D PROPERTY LINES3.A 6' HIGH SECURITY FENCE WITH SECURITY SIGNAGE/24-HOUR CONTACT I N F O R M A T I O N W I L L B E INSTALLED AROUND PERIMETER OF SOLAR ARRAY DEVELOPMENT APPRO X I M A T E L Y 7 5 - 1 0 0 ' F R O M EXTERNAL ROADS AND PROPERTY LINES4.MINIMAL SAFETY AND SECURITY LIGHTING WILL BE INSTALLED WITH LOCA T I O N S A N D SPECIFICATIONS PROVIDED ON SITE PLAN5.CONSTRUCTION SEDIMENT PONDS AND PERMANENT STORMWATER MANA G E M E N T F A C I L I T I E S WILL BE PROVIDED ON SITE PLAN6.ACCESS TO BARTONSVILLE ENERGY FACILITY WILL BE PROVIDED VIA TWO E N T R A N C E S L O C A T E D ON SPRINGDALE ROAD (IDENTIFIED ON SHEET 3) AND ONE ENTRANCE LOC A T E D O N P A S S A G E ROAD (IDENTIFIED ON SHEET 4). DELIVERY OF SOLAR ARRAY PANEL CONS T R U C T I O N M A T E R I A L S WILL OCCUR AT THE SITE ACCESS ENTRANCE OFF OF PASSAGE ROAD IDE N T I F I E D A S D E E R L A N E ON SHEET 4 OF THE CONCEPT PLAN. SOLAR ARRAY PANEL MATERIALS DE L I V E R Y L A Y D O W N AREA WILL BE LIMITED TO TAX PARCEL 74-A-44A (CARBAUGH PROPERTY).7.CARROLLTON ESTATES AND SPRINGDALE GLEN SUBDIVISION PARCELS (B, C , D ) T O B E CONSOLIDATED/VACATED PRIOR TO DEVELOPMENT8.THE LANDSCAPE BUFFER PLANTINGS SHALL BE MAINTAINED IN GOOD HEA L T H F O R T H E L I F E O F THE PROJECT. EXISTING VEGETATION PRESERVATION AREAS IDENTIFIED O N S H E E T 4 S H A L L REMAIN UNDISTURBED FOR THE LIFE OF THE PROJECT.S T E P H E N S C I T Y P A R C E L S PROJ E C T A R E A P A R C E L T A B L E S R e v . N o . D a t e I N T E R C O N N E C T I O N P A R C E L S 47 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X S O L A R A R R A Y D E V E L O P M E N T L I M I T S S O L A R A R R A Y D E V . L M T . SO L A R A R R A Y D E V . L I M I T S S O L A R A R R A Y D E V . L I M I T S SO L A R A R R A Y D E V . L I M I T S X X X X X X X X X X X X X X X X X X X X X X X X 20 0 ' 2 0 0 ' SOLAR ARRAY DEV. LIMITS L A N D S C A P E B U F F E R " A " L A N D S C A P E B U F F E R " C " L A N D S C A P E B U F F E R " B " X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 151 Windy Hill Lane Winchester, Virginia 22602 Telephone: (540) 662-4185 Fax: (540) 722-9528 www.greenwayeng.com FND 1971 E N G I N E E R I N G S H E E T O F D E S I G N E D B Y : F I L E N O . S C A L E : D A T E : PROUDLY SERVING VIRGINIA & WEST VIRGINIA OFFICES IN: WINCHESTER, VA & MARTINSBURG, WV 1 " 4 0 0 ' 3 CONCEPT DEVELOPMENT PLAN OPEQUON/ BACK CREEK MAGISTERIAL DISTRICT FREDERICK COUNTY & TOWN OF STEPHENS CITY, VIRGINIA 8 / 2 8 / 2 0 2 0 Z J - - - - 4 4 5 0 5 T BARTONSVILLE ENERGY FACILITY M A T C H L I N E S H E E T 4 M A T C H L I N E S H E E T 4 PROPOSED AC C E S S R O A D T Y P I C A L S E C T I O N LEGENDPROJECT AREAPARCELSLANDSCAPE BUFFER AREASTREAMSWATER/PONDS X SOLAR ARRAY DEVELOPMENTLIMITS/SECURITY FENCENWI WETLANDS PROPOSED ACCESS ROADS100 YR FLOODPLAIN SOLAR ARRAY AREA PROPOSED SITE ENTRANCEEXISTING VEGETATION/TREELINE INTERCONNECTION PARCELS TYP I C A L R O A D S E C T I O N 2 % M I N 2 0 ' M I N C O M P A C T E D N A T I V E S U B G R A D E P E R G E O T E C H N I C A L E N G I N E E R A L L W E A T H E R S U R F A C E / B A S E P E R G E O T E C H N I C A L E N G I N E E R N T S 14' MAX 2 6 ' T R A C K E R P A N E L S T O W E D P O S I T I O N T R A C K E R P A N E L F U L L T I L T P O S I T I O N 1 9 ' SOLAR A R R A Y P A N E L D E T A I L SOLAR A R R A Y C R O S S S E C T I O N N T S R e v . N o . D a t e R e v . N o . D a t e LANDSCAPE BUFFER "C"LANDSCAPE BUFFER "A"100' LANDSCAPE BUFFER "A"not to scale DESCRIPTION :EXTEND EXISTING TREELINES USING SIMILAR DECIDUOUS AND EVERGREEN SPECIES LANDSCAPE BUFFER "A"EX TREELINEPROPERTY BOUNDARY 100' 1.DECIDUOUS TREES TO BE A MINIMUM 2” CALIPER AT PLANTING;EVERGREEN TREES TO BE A MINIMUM 4' HEIGHT AT PLANTING2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OFDECIDUOUS AND EVERGREEN TREES TO BE PROVIDED ON SITEPLAN SOLAR ARRAY DEVELOPMENT LIMITS15' OC LANDSCAPE BUFFER "B"not to scale DESCRIPTION :PROVIDE SINGLE ROW OF DECIDUOUS AND EVERGREEN SAPLINGS ALONG BOTH SIDES OFSPRINGDALE ROAD FOR FUTURE VIEWSHED ENHANCEMENTS LANDSCAPE BUFFER "B"100' PROPERTY BOUNDARY 100' SOLAR ARRAY DEVELOPMENT LIMITS15' OC LANDSCAPE BUFFER "B"LANDSCAPE BUFFER "C"not to scale DESCRIPTION :PROVIDE THREE ROWS OF EVERGREEN TREES TO SUPPLEMENT EXISTING TREELINE ALONGPROPERTY LINE LANDSCAPE BUFFER "C"100' PROPERTY BOUNDARY 100' SOLAR ARRAY DEVELOPMENT LIMITSEX TREELINE 15' OC 1.EVERGREEN TREES TO BE A MINIMUM 4' HEIGHT AT PLANTING 2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OFEVERGREEN TREES TO BE PROVIDED ON SITE PLAN 48 E E E E E B A R T O N S V I L L E - M E A D O W B R O O K 1 3 8 K V T R A N S M I S S I O N L I N E SO L A R A R R A Y D E V . L M T . S O L A R A R R A Y D E V . L I M I T S P R O P 3 5 ' P O W E R L I N E E S M N T PR O P 3 5 ' P O W E R L I N E E S M N T P R O P O S E D S U B S T A T I O N / S W I T C H I N G S T A T I O N B A R T O N S V I L L E - M E A D O W B R O O K 1 3 8 K V T R A N S M I S S I O N L I N E P R O P . C O N N E C T I O N T O T R A N S M I S S I O N L I N E X X X X X X X X X 8 4 7 7 ' S O L A R A R R A Y A N D M A T E R I A L S L A Y D O W N A R E A L A N D S C A P E B U F F E R " F " L A N D S C A P E B U F F E R " E " L A N D S C A P E B U F F E R " D " L A N D S C A P E B U F F E R " D " 2 7 5 . 0 ' E X V E G P R E S E R V A T I O N A R E A X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X E X V E G P R E S E R V A T I O N A R E A E X V E G P R E S E R V A T I O N A R E A E X V E G P R E S E R V A T I O N A R E A 151 Windy Hill Lane Winchester, Virginia 22602 Telephone: (540) 662-4185 Fax: (540) 722-9528 www.greenwayeng.com FND 1971 E N G I N E E R I N G S H E E T O F D E S I G N E D B Y : F I L E N O . S C A L E : D A T E : PROUDLY SERVING VIRGINIA & WEST VIRGINIA OFFICES IN: WINCHESTER, VA & MARTINSBURG, WV 4 CONCEPT DEVELOPMENT PLAN OPEQUON/ BACK CREEK MAGISTERIAL DISTRICT FREDERICK COUNTY & TOWN OF STEPHENS CITY, VIRGINIA 8 / 2 8 / 2 0 2 0 Z J - - - - 4 4 5 0 5 T BARTONSVILLE ENERGY FACILITY M A T C H L I N E S H E E T 3 M A T C H L I N E S H E E T 3 N O T E S ·BARTONSVILLE EN E R G Y F A C I L I T Y W I L L I N S T A L L AN UNDERGROUN D G E N E R A T I O N - T I E L I N E WITHIN AN EASEM E N T O N T A X M A P P A R C E L S 74-A-20, 74-A-35A, A N D 7 4 - A - 4 4 . ·PROJECT SUBSTAT I O N A N D S W I T C H I N G STATION WILL BE C O N S T R U C T E D O N T A X M A P PARCELS 74-A-20 & 7 4 - A - 2 1 , A D J A C E N T T O C S X RAILROAD·PROJECT WILL SU P P L Y E L E C T R I C I T Y I N T O T H E BARTONSVILLE - M E A D O W B R O O K 1 3 8 K V TRANSMISSION LIN E INTERCONNECTION POWERLINE EASMENT DETAILTYPICAL EASEMENT 35'35' EASEMENT W/PRIVATE ACCESS &UNDERGROUNDGEN-TIE LINE 1 " 4 0 0 ' PROPOSED ACCESS ROAD TYPICAL SECTIONTYPICAL ROAD SECTION 2% MIN 20' MINCOMPACTED NATIVE SUBGRADE PERGEOTECHNICAL ENGINEER ALL WEATHERSURFACE/BASE PERGEOTECHNICALENGINEERNTS NTS SOLAR AR R A Y P A N E L D E T A I L 14' MAX 2 6 ' T R A C K E R P A N E L S T O W E D P O S I T I O N T R A C K E R P A N E L F U L L T I L T P O S I T I O N 1 9 ' SOLAR AR R A Y C R O S S S E C T I O N N T S L E G E N D P R O J E C T A R E A P A R C E L S L A N D S C A P E B U F F E R A R E A S T R E A M S W A T E R / P O N D S X S O L A R A R R A Y D E V E L O P M E N T L I M I T S / S E C U R I T Y F E N C E N W I W E T L A N D S P R O P O S E D A C C E S S R O A D S 1 0 0 Y R F L O O D P L A I N S O L A R A R R A Y A R E A P R O P O S E D S I T E E N T R A N C E E X I S T I N G V E G E T A T I O N / T R E E L I N E I N T E R C O N N E C T I O N P A R C E L S R e v . N o . D a t e LANDSCAPE BUFFER "D" & "E"LANDSCAPE BUFFER "D" & "E"not to scale DESCRIPTION :PROVIDE DOUBLE ROW OF EVERGREEN TREES ALONG PROPERTY LINE LANDSCAPE BUFFER "D" & "E"100' PROPERTY BOUNDARY 100' SOLAR ARRAY DEVELOPMENT LIMITS15' OC 1.EVERGREEN TREES TO BE APPROXIMATELY 6' HEIGHT AT PLANTING 2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF EVERGREENTREES TO BE PROVIDED ON SITE PLANLANDSCAPE BUFFER "F"LANDSCAPE BUFFER "F"not to scale DESCRIPTION :PROVIDE EARTH BERM AND DOUBLE ROW OF EVERGREEN TREES ALONG PROPERTY LINE LANDSCAPE BUFFER "F"PROPERTY BOUNDARY 100' SOLAR ARRAY DEVELOPMENT LIMITS15' OC 1.EVERGREEN TREES TO BE APPROXIMATELY 6' HEIGHT AT PLANTING 2.SPECIES, QUANTITIES AND PLANTING SPECIFICATIONS OF EVERGREENTREES TO BE PROVIDED ON SITE PLAN3.7' AVERAGE HEIGHT EARTH BERM TO BE CONSTRUCTED ALONG ENTIRELENGTH OF ADJOINING PROPERTY LINE 49 [Type text] [Type text] [Type text] 1 Exhibit D: Preliminary Decommissioning Plan May 2020 Bartonsville Energy Facility 50 d 2 Table of Contents 1. INTRODUCTION 2. DECOMMISSIONING OF SOLAR FACILITY EQUIPMENT DISMANTLING AND REMOVAL SITE RESTORATION MANAGING EXCESS MATERIALS AND WASTE 3. PROVISION OF DECOMMISSIONING COST ESTIMATE 4. PROVISION OF FINANCIAL SECURITY 51 d 3 1. Introduction Article 6 of Chapter 22 of the Code of Virginia (§ 15.2 -2241.2) requires that the owner, lessee, or developer of real property for a solar project enter into a written agreement to decommission the project prior to the approval of the Site Plan. Bartonsvil le Energy Facility, LLC (“the Owner”) submits this Decommissioning Plan (the “Plan”) to provide clarity on the methods and process of decommissioning the Bartonsville Energy Facility (“the Project”). The Plan shall be finalized prior to the approval of the Site Plan and shall be binding on each successor and assignee of the Owner. The Project is planned on parcels that total 957 acres, with a maximum of 595 disturbed acres. The majority of the site is located in the Back Creek Magisterial District in Frederick County and a portion is in the Opequon Magisterial District in Stephens City. The Project will interconnect to the FirstEnergy 138kV Bartonsville-Meadowbrook transmission line. The Project is expected to operate for a minimum of 30 years, based on th e useful life of the equipment and the warrantees that guarantee that equipment. The Plan describes the approach for removal of the Project and land restoration activities. These measures shall be taken upon the end of the useful life of the Project, or if the Project or any portion thereof ceases to perform its intended function for more than twelve (12) consecutive months. 2. Decommissioning of Solar Facility The Owner shall arrange for and be responsible for the decommissioning of the Project, including the following: Equipment Dismantling and Removal Many of the Project’s components are largely composed of recyclable materials, including glass semiconductor material, steel, and wiring. When the project reaches the end of its operational life, reusable and recyclable parts will be dismantled, removed from the site, and transported to reuse or recycling facilities. All waste resulting from the decommissioning of the facility will be transported by a certified and licensed contractor and taken to a landfill facility. Above-ground Structure Decommissioning Solar Panel Arrays and Project Substation: ▪ De-energize and disconnect the Project from the utility power grid; ▪ Disconnect all above ground wirings, cables, fuses and electrical and protection components and reuse or recycle off‐site by an approved facility; ▪ Remove concrete foundations of inverter and transformer pads ▪ Remove PV modules and metallic structures and ship to reuse or recycling facilities for aftermarket use or recycling and material reuse; 52 d 4 ▪ Remove all waste; ▪ Remove the perimeter fence and recycle off‐site by an approved metal recycler. ▪ Remove inverters, transformers, meters, fans, lighting fixture and other electrical components and recycle off‐site by an approved recycler; Access Roads: ▪ Consult with landowner (if applicable) to determine if any access roads should be left in place for their continued use. ▪ If access road is deemed unnecessary, remove access road, and restore access road location as practicable to its previous condition with native soils and seeding. Below-ground Structure Decommissioning ▪ Disconnect all underground cables and transmission lines and remove and recycle off‐site by an approved recycling facility; ▪ Remove all PV panel racking below and above ground, including the steel pile foundations This Plan is based on current best industry practices and procedures. These practices may be subject to revision based on the development of new and improved decommissioning practices in the future. Site Restoration The Owner will develop a comprehensive restoration plan designed to restore the site so it can be returned to its previous use. Restoration will include the following: ▪ Redistribution of topsoil, if necessary, to provide similar ground cover as was present prior to the site disturbance. ▪ De-compacting of access roads and other areas where soils have been compacted. Where Project infrastructure has been removed, disturbed areas will be seeded with a quick growing native species to prevent topsoil erosion. Erosion and control measures will be installed at ditches and will be left in place until ground cover is fully established. Watercourses Within the project location there are no water bodies (i.e., permanent watercourses, intermittent watercourses, seepage areas or lakes). As no water bodies are present and the renewable energy facility does not release emissions which could pollute the air and water bodies, no impact to aquatic environment is expected. As a result, no restoration of water bodies, either during construction or decommissioning is planned. 53 d 5 Agricultural Lands Once all Project facilities are removed, agricultural and silvicultural lands compacted during project operation (such as access roads) will be de-compacted via tilling, plowing or subsoiling and affected areas will be seeded with native grass species. Similar to the construction phase, soil erosion and sedimentation control measures will be re implemented during the decommissioning period and until the site is stabilized in order to mitigate erosion and silt/sediment runoff. Access roads will be left at landowner's requests or graded to restore terrain profiles (to the extent practicable) and vegetated. If removed, filter fabric will be bundled and disposed of in accordance with all applicable regulations. As necessary, these areas will be backfilled and restored to meet existing grade. This material may come from existing long‐term berm or stockpile. Managing Excess Materials and Waste During the decommissioning phase, waste materials will be removed in accordance with applicable local regulations. It is the goal of the Owner to reuse and recycle materials to the extent practicable and to work with local subcontractors and waste firms to segregate material to be recycled. As an example, it is anticipated that nearly 100% of the above grade metal is salvageable based on current industry practices and trends. Many components of the Project are reusable or recyclable and have salvage value. The Owner will manage decommissioning to minimize, to the extent practicable, the volume of project components and materials discarded as waste. Table 1 below outlines the anticipated disposition methods of the different project components. Table 1 Anticipated Project Decommissioning Disposition Methods Concrete Foundations Crush and recycle Solar Panels Reuse or recycle Metal racks and mounts Salvage/recycle Steel piles and rack foundations Salvage/recycle Wiring and cabling Recycle/salvage Inverters, transformers, and breakers Salvage/recycle/reuse Granular material Reuse/dispose Fence steel Salvage/recycle Project Substation Controls Dispose/reuse 54 d 6 Major pieces of equipment such as transformers and breakers are recyclable and reusable and will have significant market value. The solar panels are expected to retain over 80% of their generation capability after 30 years of operation and the potential for re-use is high. Existing solar panel manufacturers have programs to buy and salvage panels. These programs extract the raw materials in the panels to make new panels at a significant discount from new material costs. Recycled materials include the semiconductor and glass. Other components such as electrical cable have a high salvage-market value due to their copper and aluminum content. The same is true for the steel and aluminum racks and foundations that support the solar panels. 3. Provision of Decommissioning Cost Estimate Prior to site plan approval for installation of the Project, the Owner shall provide a Decommissioning Cost Estimate, as determined by a Virginia Licensed Engineer . The Decommissioning Cost Estimate shall be the gross estimated cost of performing the Decommissioning and associated administrative costs, minus 90% of the estimated resale and salvage value of Project equipment. The Estimate will be updated every fifth (5th) year throughout the life of the project. 4. Provision of Financial Security Pursuant to Article 6 of Chapter 22 of the Code of Virginia and County regulation, the Owner shall provide financial security in the form of “certified funds, cash escrow, bond, letter of credit, or parent guarantee” (§ 15.2-2241.2) for removal of the Facility, amounting to the Decommissioning Cost Estimate as determined. Financial security shall be provided prior to the commencement of Commercial Operations. If the Facility is owned by a public utility company or an independent power producer with an investment grade credit rating with Moody’s of Standard and Poor’s, no financial security shall be required. 55 56 57 58 59 60 61 62 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000 June 18, 2020 Evan Wyatt Greenway Engineering 151 Windy Hill Ln Winchester, Virginia 22602 RE: Request for Historic Resources Advisory Board (HRAB) Comments Conditional Use Permit – the Bartonsville Energy Facility – Utility Scale Solar Project Zoning: RA (Rural Areas) District Magisterial District: Back Creek Dear Mr. Wyatt: The Frederick County Historic Resources Advisory Board (HRAB) considered the above referenced Conditional Use Permit application during their meeting on June 16, 2020. The HRAB reviewed information from the Virginia Department of Historic Resources (VDH R) and information provided by the Applicant. This application seeks to construct a utility scale solar project located on 68 parcels of land that total 957 acres. The project will consist of rows of ground-mounted photovoltaic modules, commonly known as solar panels. The site is located along Passage Road and Springdale Road, west of the CSX corridor and the Town of Stephens City. Historic Resources Advisory Board Comments: The following historic resources are located on the subject site: • #034-1078 Cherry Dale (Mary Stephens House) – located on site – 74-A-20 ▪ Eligible for listing in the National Register of Historic Places (NRHP) • Survey Area 2 has a structure (labeled building 1) that is not mapped. o Building 1 is located in the southern portion of the APE and consists of a series of collapsed buildings. Investigators did identify a potential residence, barn, and several collapsed outbuildings. The property is in the relative mapped location of the building attributed to R. R. Turner on the 1885 atlas (see Figure 13). No evidence of the adjacent building depicted on the early twentieth century quadrangles was noted during the reconnaissance. (Phase 1A survey - see page 22 for text and appendix C for photograph). The following historic resources are located adjacent or within the vicinity of the subject site (buffer area as described in the Applicant’s Phase 1A survey): 63 Historic Resources Advisory Board CUP Comments – Bartonsville Energy Facility June 18, 2020 Page 2 • #034-0071 – Rice Robinson House • #034-0083 - Carter Hall ▪ Eligible for listing in the NRHP ▪ Located adjacent to the area of potential affect (APE) • #034-1044 – Willow Grove ▪ Located adjacent to the area of potential affect (APE) • #034-0007 – Kernstown Battlefield ▪ Eligible for listing in the NRHP After reviewing the information provided, the Historic Resources Advisory Board (HRAB) recommended approval of the CUP with the following comments: • The buffers around the historic resources should contain a mixture of evergreen plant species to ensure a natural appearing vegetative buffer. • An enhanced buffer along Carter Hall should be provided; similar to the buffer surrounding the proposed substation. • A Phase 1 Archeological Survey will be completed as part of the permitting of this project. This survey should document the collection of historic structures on and around this development. o This survey should determine if the structures onsite (Building 1 and associated structures within survey area 2) are potentially significant. o This survey should determine if this area would qualify as a rural historic district. Thank you for the chance to comment on this application. Please call if you have any questions or concerns. Sincerely, Candice E. Perkins, AICP, CZA, Assistant Director CEP/pd cc: Chris Oldman, HRBA Chairman, Tyler Klein 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 Special Limited Power of Attorney County of Frederick, Virginia Frederick Planning Website: www.fcv a.u s Department of Planning & Development, County of Frederick, Virginia 107 North Kent Street, Winchester, Virginia 22601 Phone (540) 665-5651 Facsimile (540) 665-6395 Know All Men By These Presents That: West Oaks Farm Market, LLC / Joseph Snapp Name of Property Owner/Applicant Please note : If the property owner/applicant is an enti ty, the name of the entity should appear above. If multiple persons own t he property or are appl ican ts, an execu ted power of attorney from each owne r will be needed . 229 West Oaks Lane, Winchester, VA 22602 Mailing Address of Property Owner/Applicant Telephone Number as owner of, or applicant with respect to, the tract(s) or parcel(s) ofland in Frederick County, Virginia, identified by following property identification numbers: 74-A-3 do hereby make, constitute, and appoint: Sam Gulland and Scott Leach, or either of them Name of Attorney-In-Fact Bartonsville Energy Facility, LLC, 230 Court Square Suite B102, Charlottesville, VA 22902 Mailing Address of Attorney-In-Fact 703-999-4280 Telephone Number to act as my true and lawful attorney-in-fact for and in my name, place, and stead, with the same full power and authority I would have if acting personally, to file and act on my behalf with respect to appli~tion with Frederick County, Virginia for the following, for the above identified property: Rezoning D Subdivision ✓ Conditional Use Permit [Z] Site Plan Master Development Plan (prelim. or final) D Variance or Zoning Appeal and, further, my attorney-in-fact shall have the authority to offer proffered conditions and tQ Q>ake . , amendments to previously approved proffered conditions except as follows: · ~ ~Nf,' ''tr ,'< None. '< pu1,l.1 . 1,:1:.G-ii-. This appointment shall expire one year from the day that it is signed, or at such sooner ti_me as~3\i~~,-20 , otherwise rescind or modify it. -~:; ~0 /!)lf .,-.r- •:,,: " ("'\ ~ ~)'V Signature .le>xrzL IL r..,loc'f¥2 ,, 1 lrvt:AL''·' ., Title (if sig&n behalf of an entity) 1111 r 11' · State of V ; % 1 a ,~ 0-, County/City of [e,,:e,d,-R._£' 1' LD:¾ , To wit: I, L CLu.. c <:,.... f\ t=\-,' ch,s , a Notary Public in and for the jurisdiction aforesaid, certify that the person who signed the foregoing instrument personally appeare~before me and has acknowledged the sarn:.,fore me in the jurisdiction a~oresaid this 'j <fh.....day of ,l_j_4.<lpi)j , 2Qi) ~f QI&,(>--~. st 1 c:J/1'..J My Commission Expires: ,o / 3 1 bo ao otary Public Registration Number: 'l (o 8 '8 d 4}~ 96 Special Limited Power of Attorney County of Frederick, Virginia Frederick Planning Website: www.fcva .us Department of Planning & Development, County of Frederick, Virginia 107 North Kent Street, Winchester, Virginia 22601 Phone (540) 665-5651 Facsimile (540) 665-6395 Know All Men By These Presents That: West Oaks Farm Market, LLC / Mary Snapp Name of Property Owner/Applicant Please note: If the property 0\\7ler/applicant is an entity, the name of the entity should appear above. If multiple persons own the property or are applicants, an executed power of attorney rrom each owner will be needed. 229 West Oaks Lane, Winchester, VA 22602 Mailing Address of Property Owner/ Applicant Telephone Number as owner of, or applicant with respect to, the tract(s) or parcel(s) of land in Frederick County, Virginia, identified by following property identification numbers: 74-A-3 do hereby make, constitute, and appoint: Greenway Engineering, Inc. Name of Attorney-In-Fact 151 Windy Hill Lane, Winchester, VA 22602 540-662-4185 Mailing Address of Attorney-In-Fact Telephone Number to act as my true and lawful attorney-in-fact for and in my name, place, and stead, with the same full power and authority I would have if acting personally, to file and act on my behalf with respect to appli~tion with Frederick County, Virginia for the following, for the above identified property: Rezoning O Subdivision ✓ Conditional Use Permit [Z] Site Plan Master Development Plan (prelim. or final) D Variance or Zoninf\~1w,J and, further, my attorney-in-fact shall have the authority to offer proffered conditio~'~'r,t,W~e-// amendments to previously approved proffered conditions except as follows: ~'~~····· .. ····· .. 7°,si "'~ 2 S./ ~R'< P\)81.IC \. 2-:. None. :: : t,l()'T 0 EG-# •• -------------------------------=~+·----n1~~266 :z= -(') : ~ .... 15S10l>I : ;;;_ = -Q · Cv-"' fl.ES • ...,_ This appointment shall expire one year from the day that it is signed, or at such ~~~r ti..M~_o-f·fff otherwise rescind or modify it. ~,.. ~o·· .... io/31':::···[<. .... ~ ,,,,/✓,twiAL1~,~,,,' Signature ~!)., 1,,,,,,,,11' Title (if si~ onbeha1f of anenity) ______________________ _ State of V,• f!b1Y\;; CL , County/City of (RR d~<'\' c}S , To wit: I, lOJ.L<'Q,_ A • \,k-'cJ::\ S , a Notary Public in and for the jurisdiction aforesaid, certify that the person who signed the foregoing instrument personally appeared before me and has acknowledged the v fore me in the jurisdiction aforesaid this Ll~day of ~ •.S } , 20~ ---.....,,1Ll.,!l.e.,.,~ · \J..,,t..!)..y--__) My Commission Expires: \0 Ii I l~o~o Notary Public Registration Number: ?+ CoE) l..{'~le"2 97 Special Limited Power of Attorney County of Frederick, Virginia Frederick Planning Website: www.fcva.us Department of Planning & Development, County of Frederick, Virginia 107 North Kent Street, Winchester, Virginia 2 2601 Phone (540) 665-5651 Facsimile (540) 665-6395 Know All Men By These Presents That: West Oaks Farm Market, LLC / Mary Snapp Name of Property Owner/Applicant Please note: lfthe property owner/applicant is an entity, the name of the entity should appear above. If multiple persons own the property or are applicants, an executed power of attorney from eac h owner will be needed. 229 West Oaks Lane, Winchester, VA 22602 Mailing Address of Property Owner/Applicant Telephone Number as owner of, or applicant with respect to, the tract(s) or parcel(s) of land in Frederick County, Virginia, identified by following property identification numbers: 74 -A-3 do hereby make, constitute, and appoint: Sam Gulland and Scott Leach, or either of them Name of Attomey-ln-Fact Bartonsville Energy Facility, LLC, 230 Court Square Suite 8102, Charlottesville, VA 22902 Mailing Address of Attorney-In-Fact 703-999-4280 Telephone Number to act as my true and lawful attorney-in -fact for and in my name, place, and stead, with the same full power and authority I would have if acting personally, to file and act on my behalf with respect to appli§tion with Frederick County, Virginia for the following, for the above identified property: Rezoning D Subdivision ✓ Conditional Use Permit !ZJ Site Plan Master Development Plan (prelim. or final) O Variance or Zoning Appeal and, further, my attorney-in-fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered conditions except as follows: None. This appointment shall expire one year from the day that it is signed, or at such sooner ,tJm®'''',,, othenvise rescind or modify it. ,,~~""#_ ....... f!tc,::,,,, ,, v .. • ··. ·1.n ,..,.. .... s . . . ,,,. ,, Signature ~ !) J:"'¥/1 [ /~oT~"1;'"'-'0 ·-. ___ };_ Title (if si ~on behalf of an entity) :: O : 7=9.. i z:: -o. co ·--v ,--d c...K :: ~ ·.. ~~.~..:c ... (!);: State of : 'b 1YI 1k,_ , County/City of \l-A,9 ~•--O .... f \~ ~,..,~0.:,vi~ ./S-~ /\ l ( I ,..,.._/11,i· .......... ···o« ,,,' I, Lo .. J ,A.<'u.... v~ ' ~' ~s , a Notary Public in and for the jurisdiction aforesa(d(/Q ~~~,, the person who signed the foregoing instrument personally appeare before me and has ac.knowle ge~ the same before me in the J. urisdiction aforesaid this I---\ ""-day of_--1......J'--""''°I"'-'~--' 20ol) ~ -, · &.u..\4..-'t , ~ \ c1/ ,:_, My Commission Expiresc ~O b:Jtc:,;;,O ' Notary Public Registration Number: '":\Co 8fa n (p 98 Special Limited Power of Attorney County of Frederick, Virginia Frederick Planning Website: www.fc va.us Department of Planning & Development, County of Frederick, Virginia 107 North Kent Street, Winchester, Virginia 22601 Phone (540) 665-5651 Facsimile (540) 665-6395 Know All Men By These Presents That: West Oaks Farm Market, LLC / Joseph Snapp Name of Property Owner/ Applicant Please note : If the property owner/apphcant is an entity, the name of the entity should appear above , If multiple persons own the property or are applicants, an executed power of attorney from each owner will be needed. 229 West Oaks Lane, Winchester, VA 22602 Mailing Address of Property Owner/Applicant Telephone Number as owner of, or applicant with respect to, the tract(s) or parcel(s) ofland in Frederick County, Virginia, identified by following property identification numbers: 74-A-3 do hereby make, constitute, and appoint: Greenway Engineering, Inc. Name of Anomey-ln-Fact 151 Windy Hill Lane, Winchester. VA 22602 540-662-4185 Mailing Address of Attorney-In-Fact Telephone Number to act as my true and lawful attorney-in-fact for and in my name, place, and stead, with the same full power and authority I would have if acting personally, to file and act on my behalf with respect to appli~tion with Frederick County, Virginia for the following , for the above identified property: Rezoning D Subdivision ✓ Conditional Use Permit 1Z] Site Plan Master Development Plan (prelim. or final) • Variance or Zoning Appeal and, further, my attorney-in-fact shall have the authority to offer proffered conditions and to make amendments to previously approved proffered conditions except as follows: None. This appointment shall expire one year from the day that it is signed, or at such sooner time ~'lp_HN'~;.''1,11 otherwise rescind or modify it. ~ .... ,~~··· .. ·······~-i""I.,., :::: ~,.. _ ..... c··. --1 -/ 7' r;.,,.. ALJ -✓;~1~'(~ •. ,., Signature v--,-. /./• ,I,..~ = : REGJo ·: :: Title (ifsiinonbehalfofan entity) = o: 7~ss1ot-1 : = .. 0 ·. co~~~..,,..,: = --.. r-\ {\' ~~---. ,~/ 2 State of \ f 1' C{(j 1):::) 1 0-..... , County/City of 1J:>A s, d, o "· ,:( JS, • To ~o··... ./~ S, V \ .,.,~• ....... •·o , I, \c{}._\.J., f'~ ~ \.J .1 C: %S . a Notary Public in and for the jurisdiction aforesaid, ce~(f~,~~~ ~~,,,,,' the person who signed the foregoing instrument personally appeared before me and has acknowledged the same before me in the jurisdiction aforesaid this lj 'tl.-day of A, ,[)1 ,,S:t . 20;;:D 'i]-11, &,.,10--~, & ~/~ My Commission Expires: '() I :) \ ) ~o~'t) Notary Public Registration Number: '3 lo 8 ~,.:;) ~ C,f) 99 Draft Rev. 9/1/2020 CUP #05-20 – Bartonsville Energy Facility, LLC Conditions of Approval Should the Planning Commission find this use for a utility-scale solar power generating facility to be appropriate, Staff would suggest the following Conditions of Approval: 1. All review agency comments provided during the review of this application shall be complied with at all times. 2. An engineered site plan, in accordance with the requirements of Article VIII of the Fredrick County Zoning Ordinance, shall be submitted to and subject to approval by Frederick County prior to the establishment of the use. The site plan shall address additional regulations for specific uses outlined in §165-204.26 of the Frederick County Zoning Ordinance and be in general conformance with the Concept Plan, included with the CUP application, prepared by Greenway Engineering, dated August 28, 2020. 3. Buffers and screening shall be provided around the perimeter of the project in general conformance with quantity of the proposed plantings depicted on Sheets 3 and 4 of the Concept Plan, “Landscape Buffer A, B, C, D, E & F,” included with the CUP application, prepared by Greenway Engineering, dated August 28, 2020. The landscape buffer plantings shall be maintained in good health for the life of the project. 4. Prior to site plan approval, the owner shall enter into a written agreement with Frederick County to decommission solar energy equipment, facilities, or devices pursuant to the terms and conditions of §15.2-2241.2(B) of the Code of Virginia. The written agreement shall be updated every five (5) years and in general conformance with the Exhibit D: Preliminary Decommissioning Plan, included with the CUP application, prepared by Torch Clean Energy, dated May 2020. 5. Batteries, for the purposes of mass storage of electricity that will eventually be transferred to the grid, are prohibited as part of this CUP. 6. This conditional use permit shall not be effective unless and until the vacations of the Springdale Glen and Carrollton Estates Subdivisions are approved and recorded. In addition, the approval and recordation of such vacations shall take place prior to the approval of any site plan for the use authorized by this conditional use permit. 7. Access to the site shall be limited to two (2) entrances from Springdale Road and one (1) entrance from Passage Road, and be in general conformance with the Concept 100 Draft Rev. 9/1/2020 Plan, included with the CUP application, prepared by Greenway Engineering, dated August 28, 2020. Delivery of solar array panel construction materials will occur at the site access entrance off of Passage Road identified as Deer Lane on Sheet 4 of the Concept Plan. Solar array panel materials delivery laydown area will be limited to Tax Parcel 74-A-44A (Carbaugh Property). 8. Pile-driving of poles for solar arrays during construction shall be limited to 7:00AM to 5:00PM Monday through Friday. All other construction activities are permitted 7:00AM to 7:00PM Monday through Friday and 7:00AM to 5:00PM on Saturday. No construction activities are permitted on Sundays. 9. The location of inverters serving the solar project shall be at least 450-feet from all adjacent residences. 10. Any expansion or modification of this land use will require the approval of a new CUP. 101 Planning Commission Agenda Item Detail Meeting Date: September 2, 2020 Agenda Section: Public Hearings Title: Conditional Use Permit #10-20 for Hans Holthaus Attachments: PC09-02-20CUP10-20.pdf 102 CONDITIONAL USE PERMIT #10-20 Hans Holthaus – Public Garage Without Body Repair Staff Report for the Planning Commission Prepared: August 13, 2020 Staff Contact: Mark R. Cheran, Zoning Administrator This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this request. It may also be useful to others interested in this zoning matter. Reviewed Action Planning Commission: 09/02/20 Pending Board of Supervisors: 09/23/20 Pending EXECUTIVE SUMMARY: This is a request for a Conditional Use Permit (CUP) for the establishment of a public garage without body repair (for vehicles and farm equipment) business in the RA (Rural Areas) Zoning District. Should the Planning Commission find this application to be appropriate, Staff recommends that the following conditions be attached to the CUP: 1. All review agency comments and requirements shall be complied with at all times. 2. An illustrative sketch plan shall be submitted to and approved by Frederick County and all improvements completed prior to the establishment of the use. 3. All auto repair related activities, including storage of vehicles awaiting service, shall occur entirely within an enclosed structure. Any exterior storage of parts and equipment shall be screened from view by an opaque fence or screen at least six (6) feet in height. 4. Hours of operation shall be from 8 a.m. to 8 p.m. Monday through Friday, 8 a.m. to noon on Saturdays and closed Sundays. 5. Any proposed business sign shall conform to Cottage Occupation sign requirements and shall not exceed four (4) square feet in size and five (5) feet in height. 6. Any expansion or change of use shall require a new Conditional Use Permit. Following this public hearing, it would be appropriate for the Planning Commission to offer a recommendation concerning this application to the Board of Supervisors. 103 Page 2 CUP #10-20, Hans Holthaus August 13, 2020 LOCATION: The subject property is located at 5115 Cedar Creek Grade, Winchester. MAGISTERIAL DISTRICT: Back Creek PROPERTY ID NUMBER: 72-A-22A PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas) ADJOINING PROPERTY ZONING & PRESENT USE: North: RA (Rural Areas) Use: Vacant South: RA (Rural Areas) Use: Vacant East: RA (Rural Areas) Use: Vacant West: RA (Rural Areas) Use: Vacant PROPOSED USE: The Applicant proposes the establishment of a public garage without body repair (for vehicles and farm equipment). REVIEW EVALUATIONS: Virginia Department of Transportation: The application for a Conditional Use Permit for this property appears to have little measurable impact on Route 622, Cedar Creek Grade Road, the VDOT facility providing access to the property. The location of the existing entrance meets sight distance requirements for a low-volume commercial entrance. Should the use ever expand in the future, the entrance may need to be reviewed to determine if any additional improvements to the entrance would be required. Frederick County Fire Marshall: Approved. The garage shall have at least 1 working smoke detector and 1-10-pound fire extinguisher. May substitute 2-5-pound fire extinguishers if more feasible for the owner. Frederick County Inspections: Conditional Use request to use existing residential garage for commercial use. The area utilized shall comply with The 2015 Virginia Uniform Statewide Building Code, Virginia Mechanical Code 2015, and ANSI A 117.1-09 – Accessible and Usable Buildings and Facilities. Please submit a permit application for the change of use. Please include a floor plan of the current garage layout and a future floor plan of the proposed layout, if altering. Accessible parking shall be provided per ANSI A117.1-09. Accessible route from parking area/unloading to entrance shall be provided. Site appears to be flat. 104 Page 3 CUP #10-20, Hans Holthaus August 13, 2020 Final inspection/approval with certificate of occupancy shall be issued prior to new use of the facility. Public restrooms facilities shall be provided with 500’. Winchester-Frederick County Health Department: This main dwelling is served by an approved on-site sewage system and private well. This office has no objections to the property owner working out of his garage. Owner has access to a restroom. No employees. No public access to residential facilities. . Planning and Zoning: This proposed Conditional Use Permit (CUP) is for a public garage without body repair.(vehicles and farm equipment) The Frederick County Zoning Ordinance defines a “Public Garage” as designed or used for servicing, repairing or equipping motor vehicles. There will be one (1) employee with this use. The proposed use takes place entirely within an existing building on-site. Access to the property is provided by a private driveway from Cedar Creek Grade Road (Route 622). The property is surrounded by other RA (Rural Areas) zoned property, which includes single- family detached residences. The 2035 Comprehensive Policy Plan of Frederick County (Comprehensive Plan) identifies this area of the County as “rural” and is to remain rural/agricultural in nature and is not part of any land use study. STAFF CONCLUSIONS FOR THE 09/02/20 PLANNING COMMISSION MEETING: This is a request for a Conditional Use Permit (CUP) for the establishment of a public garage without body repair (vehicle and farm equipment) business in the RA (Rural Areas) Zoning District. Should the Planning Commission find this application to be appropriate, Staff recommends that the following conditions be attached to the CUP: 1. All review agency comments and requirements shall be complied with at all times. 2. An illustrative sketch plan shall be submitted to and approved by Frederick County and all improvements completed prior to the establishment of the use. 3. All auto repair related activities, including storage of vehicles awaiting service, shall occur entirely within an enclosed structure. Any exterior storage of parts and equipment shall be screened from view by an opaque fence or screen at least six (6) feet in height. 4. Hours of operation shall be from 8 a.m. to 8 p.m. Monday through Friday, 8 a.m. to noon on Saturdays and closed Sundays. 5. Any proposed business sign shall conform to Cottage Occupation sign requirements and shall not exceed four (4) square feet in size and five (5) feet in height. 105 Page 4 CUP #10-20, Hans Holthaus August 13, 2020 6. Any expansion or change of use shall require a new Conditional Use Permit. Following this public hearing, it would be appropriate for the Planning Commission to offer a recommendation concerning this application to the Board of Supervisors. 106 72 A 22A 5130CEDARCREEK GR 5044CEDARCREEK GR C E D A R C R E E K G R Application Parcels µ Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: August 7, 2020 C E D A R C R E E K G R SERENITY LN F R O M A N S R D 0 220 440110 Feet CUP # 10 - 20: Hans HolthausPIN: 72 - A - 22APublic Garage - No Auto Body RepairZoning Map CUP #10-20 G R E E N S P R I N G R D 107 72 A 22A 5130CEDARCREEK GR 5044CEDARCREEK GR C E D A R C R E E K G R Application Parcels µ Frederick C ounty Planning & Development107 N Kent StWinchester, V A 22601540 - 665 - 5651Map Created: August 7, 2020 C E D A R C R E E K G R SERENITY LN F R O M A N S R D 0 220 440110 Feet CUP # 10 - 20: Hans HolthausPIN: 72 - A - 22APublic Garage - No Auto Body RepairLocation Map CUP #10-20 G R E E N S P R I N G R D 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 Planning Commission Agenda Item Detail Meeting Date: September 2, 2020 Agenda Section: Public Hearings Title: Ordinance Amendment - Day-Care Facilities Attachments: PC09-02-20DRRC-OA.pdf 123 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Planning Commission FROM: M. Tyler Klein, AICP, Senior Planner SUBJECT: Ordinance Amendment – Day-Care Facilities DATE: August 13, 2020 This is a request to amend Chapter 165 - Zoning Ordinance to expand the definition for “Day-Care Facility” to include “adult-care” and to use consistent terminology for “Day-Care Facility” throughout the ordinance. This ordinance amendment was proposed by a local engineering firm working in conjunction with Westminster Canterbury to allow this use in the RP (Residential Performance) district. Under the current definition, day-care facilities only include child-care and would not allow for adult-care. Day-care facilities, as defined in Part 101, are currently allowed with an approved conditional use permit (CUP) in the County’s RA (Rural Areas) and RP (Residential Performance) zoning district. Staff notes a separate use, “Child Day-Care Services,” is an allowed by-right use in the B1 (Neighborhood Business), B2 (General Business) and OM (Office-Manufacturing Park) zoning districts and defined by the Standard Industrial Classification (SIC). The proposed amendment would also revise the terminology to “Day-Care Facilities” (as defined in Part 101 of the County’s Zoning Ordinance) in the B1, B2, and OM zoning districts for consistency. Adult care facilities, like child/day-care facilities, are regulated by the Virginia Department of Social Services (VDSS) in addition to those requirements of the Frederick County Zoning Ordinance. Further, for uses such as churches, where day-care facilities are accessory to the principle use (place of worship), these facilities would continue to be allowed without a CUP. The Development Review and Regulations (DRRC) discussed this item on June 25th. The DRRC generally supported the proposed ordinance amendment to expand the definition for “Day-Care Facility” to include “adult-care” noting a gap in this type of service within the community for care of elderly and/or disabled adults during the workweek. The Planning Commission discussed this item on August 5th. The Board of Supervisors discussed this item on August 12th and specified staff should ensure consistent terminology for “day-care facilities” throughout the ordinance and sent the item forward for public hearing. The attached document shows the existing ordinance with the proposed changes supported by the DRRC (with bold italic for text added). Following a public hearing, Staff is seeking a 124 recommendation from the Planning Commission to the Board of Supervisors on this proposed ordinance amendment. Attachments: 1. Revised ordinance with additions shown in bold underlined italics. 2.Zoning Ordinance Amendment Cover Letter from Greenway dated June 11, 2020 3. Adult-Day Care & In-Home Care Cost Comparison Table MTK/sc 125 Revised 8/13/2020 ARTICLE I General Provisions, Amendments and Conditional Use Permits Part 101 General Provisions §165-101.02. Definitions and word usage. Day-Care Facility A facility in which more than five children and/or adults, not including persons children who are related by blood, marriage or adoption to the people who maintain the facility, are received for care, protection and guidance during only part of the twenty-four-hour day. ARTICLE VI Business and Industrial Zoning Districts Part 602 B1 Neighborhood Business District §165-602.02. Allowed Uses. Allowed Uses Standard Industrial Classification (SIC) Child-Care Services 835 Day-Care Facilities - Part 603 B2 General Business District §165-603.02. Allowed Uses. Allowed Uses Standard Industrial Classification (SIC) Child-Care Services 835 Day-Care Facilities - Part 605 OM Office-Manufacturing Park District §165-605.03. Secondary or accessory uses. Secondary Uses Standard Industrial Classification (SIC) Child-Care Services 835 Day-Care Facilities - 126 127 128 129 Adult Day Care vs. In-Home Care Cost Comparison 2019 National Average Costs Type of Service Daily Median Cost Monthly Median Cost Annual Median Cost Adult Day Care Service $75 $1,625 $19,500 In -Home Care Service $141 $4,290 $51,480 Source: Genworth Financial, Inc. Cost of Care Survey 130