HomeMy WebLinkAbout02-20 Site AcquisitionISSUED DATE_ _
SITE ACQUISITION
5/31/2018
REQUEST• '
MENS APPROM DAF t J
ISSUED BY _
Gaurav Behl
_
TRIDENT APPROVAL DATE
APPROVED BY
Sandeep Gupta
PEFORMANCE MANAGER
Andres Gomez
SITE ACQUIS71ON COMPANY
Smartlink
DESIGN MANAGER
Sandeep Gupta
SITE ID (COMMON ID)
4124
_
DESIGN ENGINEER
Gaurav Behl
SEARCH RING ID
�EGION _
IMARKETCLUSTER
MARKET_
SUBMARKET `_
4124
No
Washington DC/ Maryland
SEARCH RING NAME
FROG EYE SIRBAUGH
2
GORE
Frederick
LOCATION COIN_MON NAME
E911 PHASE
CITY
COUNTY i� _
(POLYGON CLUSTER
SITE PRIORITY
1 -High
CASPR PROJECT 41 _
FREQUENCY BAND
850/1900/700/AWS
F7 D ASSET # _
10138153
_
TECHNOLOGY
LTE
S CT OBJECTIVE -�
B -COV
ER=
C l
PASTE/INSERT SEARCH
SEARCH RING
RING MAP HERE
PARAMETERS
LOCATION SHORT DESCRiNi-ON_
Route 50 and SR 733
LATITUDE (N) (DD-MM-SS.S)�
39-17-4
LATITUDE DECIMAL (N)
39.284485
LONGITUDE (W) (DDD-MM-SS.S)�
78-23-5
LONGITUDE DECIMAL (W)
-78.384773
GROUND ELEVATION AMSL (FEET)
1120
SEARCH RING RADIUS (miles)
0.7
UIRED HEIGHT - MAX AGL (FEET)
180
(FEET)
_
OVERALL TOTAL HEIGHT -MAX AMS'L
1320
.,
�REQUIIREDHEIGHT- MIN AGL (FEET)
200
(FEET)
COVERAGEOBJECTIVE
OVERALL TOTAL HEIGHT - MIN AMSI.�
1300
extend coverage in Freerick County along Route 50, SR 733 , 707, 610 and 703
there an available Crown or ATC. candidate within i.5 times the radius of the center of the search ring? If yes, include in
rssible candidate 1 _
rssible candidate 2 _
rssible candidate 3
."e candidate 4
iscandidate .i _
submit candidates within the red polygon shown above
INFINIGY8
FROM ZERO TO INFINIGY
the solutions are endless
6865 Deerpath Road, Suite 152, Elkridge, MD 21075
10/1/19
RE: AT&T Site Name: Frog Eye_ _
AT&T FA #: 10138153
Site Address: 141 Fairview Road
Gore, VA 22637
To Whom It May Concern,
This letter is written to address the proposed AT&T cell site installation located at 141 Fairview
Road, Gore, VA 22637.
The proposed cell site structure will be ordered by AT&T to be designed to adhere to TIA-222-G-2005
Structural Standards for antenna supporting structures and antennas. In addition, the structure will
adhere to the International Building Code 2012 as amended and adopted by the Virginia Uniform
Statewide Building code and all other local, state, and federal codes and requirements. Infinigy will
confirm the order as requiring these codes to be met with final structure design and code adherence by
tower manufacturer.
The proposed tower structure which is proposed to measure 193' above ground level to top of steel and
199' above ground level to the lightning rod tip height. The tower will be designed with a critical design
point located at the midpoint of the tower, 100' above grade level. This would be accomplished by
ensuring an appropriate overdesign within the base 100' of the tower. This critical design point
effectively increases the structural integrity of the design, and shall a tower failure occur, the critical
design point would eb the point at which the tower would fail, thus reducing the fall zone in half, or
100'.
Should you have any questions on the above, please do not hesitate to reach out to me directly at (518)
690-0790.
Respectfully Submitted,
Joe Johnston, PE
Infinigy
I
INFINIGY8
vv
♦ �.
JOSPs
Lic. No. 53459 4a4 ,o
0
`S ONAL �'0
00+4440*