HomeMy WebLinkAbout03-20 ApplicationApplication #
MASTER DEVELOPMENT PLAN
APPLICATION FORM
- Department of Planning & Development Use Only —
0 , --2,o
PC Meeting Date N J A
Fee Amount Paid $ 3 0 C, C7, '
Date Application Received: -7 J f 3/ze z Q
_ BOS Meeting Date NI,A
Initials: Receipt # 1Q
1. Project Title: Snowden Bridge - Revised MDP - Rev. #9
2. Applicant:
Name: Greenway Engineering, Inc. Telephone: (540) 662-4185
Address: 151 Windy Hill Lane
Winchester, VA 22602
3. Property Owner (if different than above):
Name: Brookfield Stephenson Village, LLC Telephone: (571) 581-4791
Address: 3201 Jermantown Road, Suite 150
Fairfax, VA 22031
4. Design Company:
Name: Greenway Engineering, Inc. Telephone: (540) 662-4185
Address: 151 Windy Hill Lane Winchester, VA 22602
Email: ewyatt@greenwayeng.com
5. Please list names of all owners, principals, and/or majority stockholders:
Brookfield Stephenson Village, LLC
6. Magisterial District: Stonewall District
9
%. Property Location: East side of Snowden Bridge Boulevard; approximately 0.85 miles south
of intersection of Snowden Bridge Boulevard and Old Charles Town Road (Route 761)
(Give State Route # and name, distance and direction from intersection)
8. Is this an original or amended Master Development Pian?
Original Amended _�, Previous MDP# 01-20
9. Property Information:
a)
Property Identification Number (PIN):
44-A-31 B, 44 -A -292A & 44-A-293
b)
Total Acreage:
4.2 Acres
C)
Current Zoning:
R4, Residential Planned Community
d)
Present Use:
Undeveloped
e)
Proposed Uses:
Residential
10. If residential uses are proposed, provide the following:
a)
Density:
7.38 units/acre
b)
Number of Units:
31
c)
Housing Types:
TH; MF; SF
11. Adjoining Property use and zoning:
USE
North Residential & Undeveloped
East
South
West
Residential & Undeveloped
Residential & Undeveloped
Residential & Undeveloped
ZONING
R4 District & RA District
RA District
R4 District
R4 District
I have read the material included in this package and understand what is required by the
Frederick County Department of Planning and Development. I also understand that the master
development plan shall include all contiguous land under single or common ownership. All
required material will be complete prior to the submission of my master development plan
application.
I (we) hereby certify that this application and its accompanying materials are true and accurate to
the best of my (our) knowledge.
Applicant(s): U;t ►wl 1� . (r
Owner(s):
10
Date: -1 /1 4
Date:
Date:
Date: