Loading...
HomeMy WebLinkAbout19-20 ApplicationSITE PLAN APPLICATION - office Use Onv- Date Application Received: S al Application #: Pees Received: d Receipt #: LIS 30 —1 S Initials: 6 I . Project Title: ZM Sheetmetal - Parking Addition 2. Project Description: Additional parking for employees 3. Location of Property: Stonewall Industrial Park (Street address) 260 Lenoir Drive 4. Applicant/Designer: Name: GreyWolfe, Inc Telephone: (540) 667-2001 Primary Point of Contact: Gary R. Oates, LS -B, PE email: GreyVVolfelnc@aol.com Address: 1073 Redbud Road, Winchester, VA 22603 5. Property Owner (if different than above): Name: Zivie Family, LLC Telephone: (540) 667-0084 Address: 260 Lenoir Drive Winchester, VA 22603 6. Property Information: a. Property Identification Number: 43-(19)-19 b. Total acreage of the parcel to be developed: 10.016 acres C. Total disturbed arca of the parcel: 0.54 acres d. Present use: Metal Fabrication e. Proposed use: Metal Fabrication C. Magisterial Districts) Stonewall 8 7. Site Plan Type: a. Is this an original or new site plan? Yes 1-1 No I b. Is this a revised site plan? Yes o No -k- If yes provide all previous site plan numbers: C. Is this a minor site plan? Yes I' I No El If yes provide all previous site plan numbers: 26-77, 34-86, 62-99, 01-04, 13-17 8. Zoning Information: a. Current Zoning: M-1 b. Was this property Rezoned? Yes II No ✓ C. If yes provide the rezoning number for this property: d. Are there any proffers for this property? Yes No ✓ e. Has a MDP been approved for this property? YesH No ✓ f. If yes provide the MDP number for this property: 9. Adjoining property zoning and use: USE North Industrial East Industrial South Industrial West Industrial ZONING M-1 M-1 M-1 M-1 I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: Name (Printed): hA!-V Date: l 9