HomeMy WebLinkAbout08-19 PC Staff ReportCONDITIONAL USE PERMIT #08-19
TowerCo
Staff Report for the Planning Commission
Prepared: January 2, 2020
Staff Contact: Mark Cheran, Zoning Administrator
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on
this request. It may also be useful to others interested in this zoning matter.
Reviewed Action
Planning Commission: 01/15/20 Pending
Board of Supervisors: 02/12/20 Pending
EXECUTIVE SUMMARY:
This is a request for a Conditional Use Permit to construct a commercial telecommunication
facility consisting of a 195-foot monopole telecommunication facility and accessory structures.
Should the Planning Commission find the use to be appropriate, Staff would suggest the
following conditions:
1. All review agency comments and requirements shall be complied with at all times.
2. The tower shall be available for collocating personal wireless services providers.
3. A minor site plan shall be approved by Frederick County.
4. The tower shall be removed by the Applicant or property owner within twelve (12)
months of abandonment of operation.
5. In the event a telecommunications tower is not erected within twelve (12) months of the
approval of this Conditional Use Permit, the CUP will be deemed invalid.
6. Any expansion or modification of this use will require a new Conditional Use Permit.
Following this public hearing, it would be appropriate for the Planning Commission to offer
a recommendation concerning this application to the Board of Supervisors.
Page 2
CUP #08-19 Tower Co.
January 2, 2020
LOCATION: This property is located at 107 Emory Court, Stephens City, Virginia.
MAGISTERIAL DISTRICT: Opequon
PROPERTY ID NUMBER: 75-A-118
PROPERTY ZONING & PRESENT USE: Zoned: RA (Rural Areas)
Land Use:
ADJOINING PROPERTY ZONING & PRESENT USE:
North: RA (Rural Areas) Use: County Park
South: RA (Rural Areas) Use: County Park
East: RA (Rural Areas) Use: County Park
West: RA (Rural Areas) Use: County Park
PROPOSED USE: This is a request for a Conditional Use Permit to enable the construction of
a 195-foot Monopole-Type Commercial Telecommunications Facility.
REVIEW EVALUATIONS:
Virginia Department of Transportation: The application for a Conditional Use Permit for this
property appears to have little measurable impact on Emory Court, the Future VDOT facility
providing access to the property. A low volume commercial entrance will be required at the tie-
in to the cul-de-sac. Should the use ever expand in the future, the entrance will need to be
reviewed, to determine if additional improvements may be required.
Frederick County Inspections: Please see the attached comment sheet from Mark Fleet,
Building Official dated December 2, 2019.
Winchester-Frederick County Health Department: The Frederick County Health Department
has no objection to this project since no wells or septic systems will be affected by this addition
to 75B-A-1.
Frederick County Fire Marshall: Conditional Use Permit Approved provided that fire
department access and turnaround meet Frederick County Fire Prevention Code 503.2.1
Dimensions. Fire apparatus access roads shall have an unobstructed width of not less than 20
feet (6096 mm), exclusive of shoulders D103.4 Dead-end fire apparatus access roads in excess
of 150 feet (45 720 mm) shall be provided with width and turnaround provisions in accordance
with Table D103.4. A site plan will need to be submitted showing this.
Page 3
CUP #08-19 Tower Co.
January 2, 2020
Winchester Regional Airport: Please see attached letter from Nick Sabo, A.A.E. Executive
Director dated August 8, 2019.
Frederick County Park and Recreation Dept: The Parks and Recreation Department is
concerned with the aesthetic impact of the proposed cell tower CUP based on its location. The
property with the proposed tower is bordered on all sides by park land and is in an open area
where planned park development will be in view of the proposed tower site.
Planning and Zoning: The 2035 Comprehensive Policy Plan of Frederick County
(“Comprehensive Plan”) provides guidance when considering any land use action. This proposed
195-foot monopole-type commercial telecommunication facility is located on a 4 +/- acre
property that is zoned RA (Rural Areas) Zoning District District. The property is located within
the UDA and SWSA as identified within the Comprehensive Plan and is located within the
Southern Frederick Area Plan. These plans identify this area as a recreational resource with the
area north to remain residential in character.
The Frederick County Zoning Ordinance allows for commercial telecommunication facilities in
the RA Zoning District with an approved Conditional Use Permit (CUP). The properties
immediately adjacent to this proposed CUP are currently zoned RA Zoning District. The zoning
ordinance requires that all proposed telecommunication facilities be subject to additional
performance standards in order to promote orderly economic development and mitigate the
negative impacts to adjoining properties, residential properties, land use patterns, scenic areas
and properties of significant historic value.
Furthermore, the Frederick County Zoning Ordinance requires an Applicant to provide
confirmation that an attempt was made to collocate on an existing telecommunication facility,
and possible collocation structures. The Applicant has provided an inventory of existing
telecommunication facilities, and no other telecommunication facility or possible collocation
opportunity structures exist in this area. Should this facility be approved this commercial
telecommunication facility will be positioned to provide the existing and future land uses in this
area of the County with telecommunication needs.
STAFF CONCLUSIONS FOR THE 01/15/20 PLANNING COMMISSION MEETING:
Should the Planning Commission find this use appropriate, Staff would suggest the following
conditions be placed on the CUP:
1. All review agency comments and requirements shall be complied with at all times.
2. The tower shall be available for collocating personal wireless services providers.
3. A minor site plan shall be approved by Frederick County.
Page 4
CUP #08-19 Tower Co.
January 2, 2020
4. The tower shall be removed by the Applicant or property owner within twelve (12)
months of abandonment of operation.
5. In the event a telecommunications tower is not erected within twelve (12) months of the
approval of this Conditional Use Permit, the CUP will be deemed invalid.
6. Any expansion or modification of this use will require a new Conditional Use Permit
Following this public hearing, it would be appropriate for the Planning Commission to offer a
recommendation concerning this application to the Board of Supervisors.