Loading...
HomeMy WebLinkAbout39-19 CommentsRECEIVED SEP REQUEST FOR SITE PLAN COMMENTS Publtc Works & f ountty-r,.,. Frederick County Inspections Department Comment Mail to: Frederick County Inspections Department Attn: Building Official 107 North Kent Street Winchester, Virginia 22601 Hand deliver to: Frederick County Inspections Dept, 107 North Kent Street, 2"d Floor Winchester, Virginia 22601 Phone: (540) 665-5650 Applicant It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the Site Plan with this sheet Applicant's Name: GreyWolfe, Inc. - Gary R. Oates,LS-13,10E Telephone: (54(1) 667-2001 Email Address: GreyWolfelnc@aol,com Mailing Address: 1073 Redbud Road, Winchester, VA 22603 Name of development and description of the request: TSM -Warehouse - Site Plan to build 43,500 warehouse with office Location of Property: Bounded by Welltown Road Route 661), Route 860, and McGhee Road Route F-732 in Stonewall Industrial Park. Inspections Department Comments: O_Q� 'n&-%-. ani CT.n -FREDERICK COUNTY INSPECTIONS DEPARTMENT USE ONLY - gate Received 17 19 Review Numbeol 2 3 4 5 (circle one) Date Reviewed 1} Revision Required T V Date Al4proved Signature & Date: G(�L/ � % 6Z74 1 ** Please Return Form to Applicant** 18 Buildings shall comply with The Virginia Uniform Statewide Building Code (VUSBC) Sections 311, S Storage of the International Building Code/2015, the 2015 International Fire Code. Other Code that applies is ICC Al 17.1-3-09. Accessible and Usable Buildings and Facilities and 2015 Virginia Energy Code Proposed 43500 sq ft building shall comply with height and area per section 506 for type of construction. FDC located on the plans. Fire pump shall meet NFPA 20. All required exits shall meet ANSI Al 17.1-09 for accessibility and slopes. Maximum travel distance per IBC/USB to an exit is 400'. All required exits shall be accessible. Exterior area of refuge shall comply with Section 1016 of the USBC/IBC. One hour rated walls with 45 min. doors shall be provided at exterior areas of assisted rescue as noted. Storage in racks exceeding 12' in height require a permit and shall comply with the International Fire Code. High pile storage areas require fire department access around perimeter of the building. Access/doors shall not be spaced further apart than 100' ANSI parking spaces shall be provided as required per T1 I06.1. Accessible parking and unloading shall not exceed 2% slope (1:48). Accessible Route shall extend from parking and unloading area to accessible route to main entrance. Curb ramps shall have a minimum 3' landing at the top and bottom of the landing. Van spaces require minimum unloading area 8' with 8' of parking or a minimum of 11' wide parking with 5' of unloading space is required. No enlargement provided. Accessible parking and unloading access to main entrance appears to meet ANSI A117 for slopes. Public entrances into spaces larger than 3000 sq ft shall be provided with a vestibule as detailed per ANSI A117.1-09 All structural plans submitted for permit application shall be sealed by a VA Design Professional Special inspection requirements of Chapter 17 of IBC shall apply to this type of structure. (soils, compaction, concrete, steel etc.) No gutters of other water shall discharge over walkways A geotechnical evaluation shall be performed and submitted with application as required USBC/1BC Section 1803. S:1Site Plan comments12015\Storage, TSM Welltown.doc Tred'erick (�ountjl- Department ql`fir ire and Rescue Ojflce oftht-! fire Marshal 1080 COVeMW- 1), iv e 07sido-A-r. VA 22602 (540) 665-b350 F -Cm (54a) 678-4739 E aikfijuar IIIJ #ficvaIjs Plan Review & Commen-ILs Date ReceM,.-O 911712019 Pian/Pe-mi! TyrPo Site Plan 09-17-19 Narnf,,�t TSNI.-Warehouse & Repair Facillity JI-.dJfqSz" Wefltown Rd,,McGhee Rd Winchester Project Marne Warehouse wift, Officu Appilcant. Namf.- & Nufriber GreyWolfe, Inc, 540-667-2001 REE Permit Number Emergeripy Vc-hicic Act� Act?�uate lmadequ;Ac NIA Hydrant Lor IiCm Im-Aximite-1 N/A Si8 'r,.tme LocMian.adequate ,eq/u3te InNU A Fire Lanes Rvquiwzi Yd$ 41� P)an Ap-)r"',)fl'I fl, i�; Approve Comme,T,ts Areas hl-lifil-led iii p-Ilow shall be strippej in yellow Areas hi-rlqhted In ojonge shallhave N alloct 9-F-arking Fire Lane 61, nF Inst, s. Reviewed By, Kennath, Sr-ott., Jr. Date ReViowed I Oil 1;2019 VA 22603 FREDERICK FREDERICK WATER WATER SITE PLANREVIEW CO-IMMENTS PO Box 18117_�`irlchester. VA 22604-8377 -540.868,1061 voice 315 Tasker Road. Stephens Citv, VA 1?65"i Ig 540.968 1429 fax Project J a'J"/ M Applicnt REVIEW STATUS attention IA/ x, review nurnbcr corce"I & resubrni' , approve d as noted number of item, to be corrected approv,M DRAWINGS send me by. I, f P pl.t V F, 7z", -- rt- J 2. Iwo CDs: each di -;c shall cont tin the following plan :Meets t"4 a" 0ow CD (coraaininl- all of the abut e noted shl­ett)shall he. in PDF format. Eiach -heet, shall be in its own file and be in landscape, rientation. Lach file shall be titled with the project name and app!-opriate sheet mimt-er. b) One CD shall be in DWG form ti: (1) in Model Space, (22)ill state plane coordinate systimi NAD 83, (3) compatible witli AutoCAD 2006. cl Each of the two CDs shall be labeled with its i-cmnat and proicct naive. and pla,:ed in its own paper CD envelope. EASEME,WS Y, N A opy of the recorded un ate fes' easement{) is!afe required. Y X\) / I A copy of the recorded ofts-ite FW ease­rent(s) isfare required. 11 fhe laslMlent docs mentshalt conrain a plat and b­th:�'hall be signedby the Frederick %`ater. .the E-ederick Wa1Cl'rC-QUi!_C5 S.Pk.CifiC Llu�lu,';qt� il'; C: I iis clecd of- easemept, * Visit our wt -bsite v, 1i+":t+ 1 h l%i:�itl to nbf..Jil a copy of the foo rn. * A copy of th, recotdcd dced(sl 4 v,,ernent shall 'be received before service will be authorized. OTHER y ifN '-this pruject also requires f)1".Q - Vallee Region Offi=:e approval. Y/ - lhis pi jeer d_so t zrequires VDI I -- Le:6no ton field 0 ffi -:e approval This pro zct also requires VDH - Lexill toil Field Office - Project Surnrlary Report. BY DATE FOR N 9 DRA1,AINGS BON L, see VDII %velisite for forru vii - PrOjeCL has a SOWCr Punip station that MV vVi I I own. "Title to the poinp station site sb:A1 I be oranle,,] to the.1'rederick W-4ter in fek, simplo. abl-.olute. Ako, (1) a copy of DE'Q',, Certificate to C,03014FUO, copy of DF -,Q's Cellillc-,tc to Operate, i1rid (3) lwo copies of the 1 -AV fjpprk:ved (1) &_ 1\4 rMinual are rcquired. These docunlea-its must be recci\ed b-,-finre scvtiice tNifl be authorized. (4) Work cannot coprinence that t�ould conneCt, to FW f-ACililiCS Or require (-W J11111CClioil,; until flw,corltract is rctUricd J, to t?fs tdfit:e. Date: rarl W. Wiley - Engitieering AAStant February 11, 2020 Mr. Gary Oates, LS -B, PE GreyWolfe, Inc. 1073 Redbud Road Winchester, Virginia 22603 C01 N'I Y of FREDERICK DERICK. Depa.r lent. of Public NVc k`'s RE: Revised Site Plan Comments — TSM -Warehouse & Repair Facility Dear Mr. Oates: Upon review of the revised site plan dated December 11, 2019, we recommend approval of the subject plan. r Joseph W. Johnson, P.E. Civil Engineer JCW/kco cc: Planning and Development file Sincerely, Joe C. Wilder Director of Public Works 107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000 Tyler Klein From: Timothy Rhodes <timothy.rhodes@vdot.virginia.gov> Sent: Tuesday, November 19, 2019 1:44 PM To: Gary Oates Cc: Matthew Smith; Rhonda Funkhouser; Tyler Klein; Gregory Hoffman Subject: TSM Warehouse and Repair Facility Site Plan Approval Tia.. I� i... 7 <l�:'.� a, P r i �$ �• P �b IL .a i.i 'A DEPARTMENT OF TRANSPORTATION Staunton/Edinburg Land Development 14031 Old Valley Pike Edinburg, VA 22824 Gary, A VDOT review has been conducted for the TSM Warehouse and Repair Facility Site Plan signature dated November 14, 2019. Based off of the review of the Drawings, all of the previous VDOT comments have been addressed and the Site Plan is approved by our office. Please ensure that all applicable agencies have the most recent set of approved Drawings. We offer the following general comments: Our review and comments are general in nature. Should details be overlooked during plan review or conditions in the field exist such that additional measures are warranted, such measures shall be completed to the satisfaction of the department. Materials used and methods of construction shall adhere to the current observed VDOT Road and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and Land Use Permit Special Provisions. A preconstruction conference shall be held by the engineer and/or the developer with the attendance of the contractor, various County agencies, utility companies, and VDOT prior to initiation of work. All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or drainage easement. Any construction related changes to the approved plan must come through the design engineer to VDOT for approval. Please allow a minimum of 5 business days for VDOT review. A Land Use Permit shall be obtained before any work is performed on the State's right-of- way. The permit is issued by this office and may require application fees, the salary & expenses of a State assigned inspector, and surety bond coverage. Please submit an electronic set of plans to this office for file and permitting. If you have any questions or need further information, please do not hesitate to contact me. Sincerely, Timothy Rhodes VDOT—Land Development Engineer Clarke, Frederick, Shenandoah & Warren Counties 14031 Old Valley Pike Edinburg, VA. 22824 (540)-984-5630