HomeMy WebLinkAbout04-19 Commentsd"
J'i. 151 Windy Hill Lane
Winchester, VA 22602
ENGINEERING
October 17, 2019
Frederick County Planning Department
Attn: Candice Perkins, Assistant Director
107 North Kent Street
Winchester, VA 22601
RE: Perry Properties Commercial Rezoning Revised Proffer Statement Comment Response Letter
Dear Candice:
As you know, I prepared a comment response letter that was provided to VDOT, the County Attorney
and the Planning Department specific to the Perry Properties Commercial Rezoning Proffer Statement
dated June 19, 2019, which included a revised Proffer Statement dated September 5, 2019. Each
agency reviewed the revised September 5, 2019 Proffer Statement and there were a few minor
comments that have been addressed in the final Proffer Statement dated October 17, 2019. The
following information is intended to provide additional comment responses specific to the final Proffer
Statement dated October 17, 2019:
Preliminary Matters Section
➢ The October 17, 2019 Proffer Statement references and includes the Rezoning Plat that
provides the surveyed boundary between the B-2 District and M-1 District portions of the
subject property as requested by the County Attorney.
Transportation Improvements Section
➢ The October 17, 2019 Proffer Statement requires the submittal of a traffic study for any land
use that is developed on the B-2 District portion of the property when traffic counts exceed
3,000 VPD and requires the Owner to make improvements to the Millwood Pike/Independence
Drive/Constitution Drive intersection and/or Constitution Drive if warranted. The 3,000 VPD
was utilized as acceptable background traffic in the VDOT approved TIA for the recently
constructed improvements at the Millwood Pike/Independence Drive/Constitution Drive
intersection.
➢ The proffered October 17, 2019 Transportation Improvements Exhibit provides a Landscape
Enhancement Area Detail as requested by the Planning Department.
Project #0297/EAW
General Matters
The Rezoning Proffer Statement provides commitments specific to the 6.18± portion of the
subject property to mitigate transportation impacts associated with the rezoning request.
VDOT has requested proffers for the M-1 District portion of the property including
construction of a third west bound through travel lane along the entire frontage of Millwood
Pike, construction of a right turn lane along the M-1 District portion of the Millwood Pike
frontage, right-of-way dedication along the M-1 District portion of the Millwood Pike frontage,
and construction of a four -lane section of Constitution Drive along the M-1 District portion of
the subject property. These requests are extreme and are outside of the scope of the rezoning
request. VDOT will have an opportunity to evaluate future land use applications for the M-1
District portion of the property through future rezoning requests or through the Site Plan review
process and will be able to determine warranted improvements specific to the M-1 District
portion of the subject property at those points in time.
➢ The Rezoning Proffer Statement does not provide for one shared monument business sign for
the 6.18± portion of the subject property. The property owner believes that the sign
requirements in Section 165-201.06 of the Zoning Ordinance provide for acceptable regulations
for commercial development in the County. The property owner desires to utilize the same
regulations that are available to other commercial properties in the County.
Please review the information in this letter and the October 17, 2019 Proffer Statement and October 17,
2019 Proffered Transportation Improvements Exhibit and advise me if you have any questions.
Sincerely,
Evanlyatt, Dii ctor of Land Planning
Greenway Engineering
Cc: Mike Perry, Perry Properties, LLC
Project #0297/EAW 2
r
151 Wig Hill Lane
Winchester, VA 22602
ENGINEERING
September 19, 2019
Virginia Department of Transportation
Attn: Hiatt Smith, P.E and Bobby Boyce, Land Development Engineer
14301 Old Valley Pike
Edinburg, VA 22824
Frederick County Attorney's Office
Attn: Rod Williams, County Attorney
107 North Kent Street
Winchester, VA 22601
Frederick County Planning Department
Attn: Candice Perkins, Assistant Director
107 i'�?orth Kent Street
Winchester, VA 22601
RE: Perry Properties Commercial Rezoning Revised Proffer Statement Comment Response Letter
Dear Natt, Bobby, Rod and Candice:
I received your review comments specific to the Perry Properties Commercial Rezoning Proffer
Statement dated June 19, 2019. There were several comments that were similar from each agency
resulting in a fairly comprehensive revision to the Proffer Statement; therefore, i thought it would be
more efficient to prepare a joint review agency comment response letter for the purpose of
summarizing these revisions. Please note that following information for the revised Proffer Statement
dated September 5, 2019:
Transportation improvements Section
1) Proffer A.1 has been revised to provide for the additional right-of-way that will be needed for
the Constitution Drive southbound lane widening and for applicable easements that are
determined during the public improvement plan approval process. The improvements and
easements in this section are required to be completed prior to the issuance of the first
certificate of occupancy permit for the B-2 portion of the property. The Proffered
Transportation Improvements Exhibit has been revised to identify the general location of the
proffered improvements and easements.
Note: This revision is intended to address VDOT Comment #1 and County Attorney Bullet
Point Comment 3
Project #0297/EAW t
2) Proffer A.2 has been revised to provide for the right and left turn lane/tapers that may be
determined to be required during the public improvement plan approval process. This section
does not commit to specific design standards such as median extension as this will be
determined during the public improvement plan approval process. The improvements in this
section are required to be completed prior to the issuance of the first certificate of occupancy
permit for the B-2 portion of the property. The Proffered Transportation Improvements Exhibit
has been revised to identify the general location of the full access commercial entrance.
Note: This revision is intended to address VDOT Comment #2 and County Attorney Bullet
Point Comment 3
3) Proffer A.3 has been revised to provide for the completion of the right-in/right-out commercial
entrance prior to the issuance of the first certificate of occupancy permit for the B-2 portion of
the property. The Proffered Transportation Improvements Exhibit has been revised to identify
the general location of the right-in/right-out commercial entrance. The general location of the
right-in/right-out commercial entrance has been previously discussed with VDOT and will
meet the current entrance spacing requirements from the Constitution Drive intersection and
from the existing right-in/right-out commercial entrance that is to the west on Millwood Pike.
The VDOT comment regarding the right turn lane/taper is addressed in Proffer A.4.
Note: This revision is intended to address County Attorney Bullet Point Comment 3
4) Proffer AA has been revised to provide for the completion of the right turn lane between the
Constitution Drive intersection and the right-in/right-out commercial entrance prior to the
issuance of the first certificate of occupancy permit for the B-2 portion of the property. The
Proffered Transportation Improvements Exhibit has been revised to identify the general
location of the right turn lane area. This section does not commit to specific design standards
as this will be determined during the public improvement plan approval process.
Note: This revision is intended to address VDOT Comment #3 and County Attorney Bullet
Point Comment 4
5) Proffer A.5 has been revised to provide for the completion of the internal private road network
between the full access commercial entrance and the right-in/right-out commercial entrance
prior to the issuance of the first certificate of occupancy permit for the B-2 portion of the
property.
Note: This revision is intended to address VDOT Comment #2 and #3 specific to inter -parcel
connection and County Attorney Bullet Point Comment 4
6) Proffer A.6 provides for additional right-of-way dedication for the B-2 portion of the property
along the Millwood Pike frontage and the Proffered Transportation Improvements Exhibit has
been revised to provide the dimensions and area for the dedication and to provide for the
variable right-of-way width of Millwood Pike; as well as the distance between the right turn
lane area and the B-2 portion of the property. Millwood Pike has a variable right-of-way width
of 194'± to 198'± along the frontage of the B-2 portion of the property which is more than
Project #0297/EAW 2
adequate to accommodate the Comprehensive Policy Plan designation of a 6 -lane divided
facility when this improvement project is funded in the future by VDOT and Frederick County.
The revised Proffer Statement does not provide any commitment for the construction of an
additional through lane on Millwood Pike and the property owner has advised that this will not
be offered in conjunction with the rezoning request.
Note: This revision is intended to address VDOT Comment #4 and #5
7) Proffer A.7 has been revised to provide for the completion of the 10' asphalt trail along the
Constitution Drive frontage of the B-2 portion of the property that is located outside of the
public right-of-way prior to the issuance of the first certificate of occupancy permit for the B-2
portion of the property. The Proffered Transportation Improvements Exhibit has been revised
to identify the general location of the 10' asphalt trail as well as a schematic that provides
dimensions for the asphalt trail and associated grass strip.
Note: This revision is intended to address County Attorney Bullet Point Comment 4
8) Proffer A.8 has been provided for the construction of a 10' asphalt trail along the Millwood
Pike frontage of the B-2 portion of the property that is located within the public right-of-way.
The Proffered Transportation Improvements Exhibit has been revised to identify the general
location of the 10' asphalt trail as well as a schematic that provides dimensions for the asphalt
trail and associated grass strip.
Note: This new proffer is intended to address VDOT Comment #5 and County Planning
Comment #2
9) Proffer A.9 has been revised in its entirety to limit development within the B-2 portion of the
property to 3,000 VPD based on actual traffic volumes prior to additional traffic studies being
required and provides for requirements for traffic counts to be conducted by the property owner
that will be provided to VDOT and Frederick County.
Note: This revision is intended to address VDOT Comment #6 and County Attorney Bullet
Point Comment 5
10) Proffer A.10 has been revised to be consistent with the requirements in revised Proffer A.9 and
to correct the spelling of Independence Drive.
Note: This revision is intended to address VDOT Comment #6 and County Attorney Bullet
Point Comment 6
11) Proffer A.11 has been provided to provide additional landscaping along the Millwood Pike
frontage of the B-2 portion of the property that is located between the 10' asphalt trail and the
parking lot areas to provide for corridor enhancements. The additional landscaping will be
designed and installed specific to any Site Plan that has frontage along Millwood Pike.
Note: This new proffer is intended to address County Planning Comment #3
Project #0297/EAW 3
Please review the information in this letter and the revised Proffer Statement and Proffered
Transportation Improvements Exhibit and advise me if you have any questions. If not, I would
appreciate your comments for the proposed revisions at your earliest possible convenience.
Sincerely,
r-
Evan Wyatt, Director of Land Planning
Greenway Engineering
Cc: Mike Perry, Perry Properties, LLC
Project #0297/EAW
Erwin Wyatt
From: Rod Williams <rwillia@fcva.us>
sent: Friday, September 20, 2019 3:43 PM
C: Evan Wyatt
Candice Perkins
Subject: RE: Perry Properties rezoning
Evan,
I have reviewed the Proffer Statement dated September 5, 2019. Subject to one small
comment that can be addressed without the need for further review, it is acceptable as to legal
form. The comment is that the Rezoning Plat should be actually included as part of the Proffer
Statement and so referenced at the end of the Preliminary Matters section as "the attached Rezoning
Plat ...". I neglected to make this comment previously — my apologies. Thanks.
two
From: Evan Wyatt <ewyatt@greenwayeng.com>
Sent: Wednesday, August 14, 2019 9:30 AM
To: Rod Williams <rwillia@fcva.us>
Cc: Candice Perkins <cperkins@icva.us>
Subject: RE: Perry Properties rezoning
Hi Rod,
I hope you enjoyed your time away from the office. I appreciate the quick turnaround on your review and will make the
editorial revisions and discuss the timing comments with Mike Perry and will be back in touch.
Thanks again, Evan
From: Rod Williams <rwillia@fcva.us>
Sent: Tuesday, August 13, 2019 1:22 PM
To: Evan Wyatt <ewyatt@greenwayeng.com>
Cc: Candice Perkins <cperkins@fcva.us>
Subject: Perry Properties rezoning
Dear Evan — Please see my comment letter, attached.
Best,
Rod
Roderick B. Williams
County Attorney
Frederick County, Virginia
107 North Kent Street
Winchester, VA 22601
540-722-8383
rwillia@fcva.us
COUNTY of FREDERICK
Department of Planning and Development
540/ 665-5651
Fax: 540/ 665-6395
October 8, 2019
Mr. Evan Wyatt
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
RE: Proposed Rezoning for Perry Properties — Second Comment
Property Identification Nuinber (PIN): 64-A-158
Dear Evan:
I have had the opportunity to review the draft rezoning application for the Perry Properties
Commercial Rezoning. This application seeks to rezone 6.18 acres (of a 44.97 -acre tract) from the
M1 (Light Industrial) District to the B2 (Business General) with proffers. The review is generally
based upon the proffer statement dated September 5, 2019. Prior to formal submission to the
County, please ensure that these comments and all review agency comments are adequately
addressed. At a minimum, a letter describing how each of the agencies and their comments have
been addressed should be included as part of the submission.
1. Corridor Enhancements. Proffer 11 regarding landscaping is ambiguous, a detail should
be provided that depicts the buffer — this detail could be made part of the transportation
exhibit.
2. Signage. One shared monument sign for the site should be considered.
3. Verification of Taxes Paid. Submit tax payment verification.
4. Fees. Based on the fees adopted by the Board of Supervisors on April 23, 2008, the
rezoning fee for this application would be $10,618 based upon acreage of 6.81 acres.
All of the above comments and reviewing agency comments should be appropriately addressed
before Staff can accept this rezoning application. Please feel free to contact me with questions
regarding this application.
Sincerely,
Candice E. Perkins, AICP, CZA
Assistant Director
CEP/pd
Evan Matt
From: John Bishop <jbishop@fcva.us>
Sent: Wednesday, October 16, 2019 1:18 PM
To: Evan Wyatt
Cc: Candice Perkins
Subject: Perry Property Rezoning
Eva n;
Thank you for the opportunity to comment on the proposed Perry Property rezoning at the intersection of Route 50/17
and Constitution Drive. I have reviewed your revised proffer statement along with the comments you had received from
VDOT and the County attorney and have no further comment at this time. I reserve the right to comment further as the
application proceeds forward should the draft change or currently unforeseen items arise.
Thank you
John
John A. Bishop AICP
Assistant Director—Transportation
Frederick County Planning and Development
107 N. Kent Street
Winchester, VA 22601
540-665-5651
1
Egan Wyatt
From: John Bishop <jbishop@fcva.us>
Sent: Monday, March 18, 2019 8:52 AM
To: Evan Wyatt
Subject: RE: Perry Properties TIA Waiver Request
Eva n,
You are good to proceed without a TIA for the 6 acres owned by Perry as proposed in the waiver request you have
submitted to me.
Thank you
John
John A. Bishop AICP
Assistant Director—Transportation
Frederick County Planning and Development
107 N. Kent Street
Winchester, VA 22601
540-665-5651
From: Evan Wyatt <ewyatt@greenwayeng.com>
Sent: Tuesday, March 12, 2019 9:01 AM
To: John Bishop <jbishop@fcva.us>
Subject: Perry Properties TIA Waiver Request
Hi John,
Hope all is well your way —just a quick follow up to see where you are with the TIA waiver request that was submitted a
couple of weeks ago so I can give Mike Perry an update.
Thanks, Evan
Evar. A. Wyatt I Director of Land Planning
151 Windy Hill Lane
Winchester, VA 22602
Phone: 540.662.4185
Phone 540.974.2701
F��x 540.722.9528
Web www.GreenwayEng.com
Email: ewyatt@greenwayeng.com
GREEhll`I AY
ENGINEERING
1
Evan Wvatt
From: Arthur Boyce <bobby.boyce@vdot.virginia.gov>
Sent: Thursday, October 10, 2019 5:04 PM
To: mcheran@co.frederick.va.us
Ce: Matthew Smith; Funkhouser, Rhonda (VDOT),- Evan Wyatt
SubbjeC.4: Frederick County - Route 50 -- Perry Properties Commercial Rezoning and Subdivision
DEPARTMENT OF TRANSPORTATION
Staunton/Edinburg Land Development
14031 Old Valley Pike
Edinburg, VA 22824
Dear Mr. Cheran:
We have reviewed the above subject Commercial Rezoning Proffer Statement received September 5; 2019. This
application is to rezone and subdivide a 6.I8 acre portion of the existing 44.97 acre parent parcel from B-2 to M-1. Our
comments appear to be addressed with the following exceptions:
Proffer- #1 - The proffer indicates the necessary additional right -of -..gay dedication along Corxstitution Drive and
references the September 5; 2019 Exhibit. However, the dedication is not indicated on the exhibit (notation or
graphic). Relocating the curb & gutter 2' along the Constitution Drive frontage between A and B is now
acknowledged and proffered. The asphalt trail is off the proposed right -of way if agreeable with the County.
Proffer #2 (Repeat Cornment) - The proposed commercial entrance on Constitution Drive will also require either
a joint -use entrance or interparcel connection with the M-1 parent tract. See Virginia Access Management
Regulation.
Proffer #3 (Repeat Comment) - The proposed commercial entrance on Millwood Pike ,vl II also requite either
joint --use entrance or interparcel connection with the M-1 parent tract. This should be reflected sornewbere in the
proffer staternent. See Virginia Access Management Regulation.
Proffer #4 - The future additional through line on Millwood Pike should be installed along the frontage of both
the proposed (B-2) and parent tract (M-1) when each. develop. This additional through lane will act as a
continuous right turn lane until needed at a future date. All entrances installed will then need to be offset
12 -'additional feet just as was done on Constitution Drive. The applicant is proffering to construct the right turn
lane on the B-2 fr=ontage however this should be proff=ered on the JM -1 as well. light turn lanes could then be
constructed during a public improvement project and have very little impact to the entrance, parking lots, etc...
Proffer #5 — This internal road may provide the interparcel connections with the M-1 parent tract near Millwood
Pike and Constitution Drive commercial entrances.
Proffer #6 (Repeat Comment) - A dimension should he provided in the text and/or- exhibit and should include the
residual (M -1;i. We need to verify that the width of the. night -of -way dedication will accommodate the County
Comprehensive Plan designation of a 6 -Jane divided facility for IIS 17/50 with the MPC) Bicvcle and Pedestrian
Master Plan facilities alone this section of US 17/50.
Proffer #9 - 'Flie develof v limit of 3,000 VPD needs to be based r TE codes. This is the only way to
determine / verify the potential site velnculw- vohmne prior to development (especially for the initial site.
plan). Subsequent site plaurs on the B-2 portion of the development may be. supported by actual traffic counts. A
different use could double traffic gencrated and that could have an unknown impact on the adjacent road
networks. Therefore, VDOT recornmends a 3,000 VPD cap based on the current version of the FFF Trip
Generation AManuarl, as the maximum development associated with the rezoning. Exceeding this trip threshold
would require a. proffer amendment with the provision for an additional _I1A to determine impacts and
recommended mitigation improvements to be provided by the developer.
Proffer #1_(1- Given proffer #9, we. do not see vwhere Proffer #10 is necessary. The TPOF / NFCU improvements
will be completed prior to the initial development_ on the Perry Property.
Repeat Comment on Parent Parcel -The existing 80' right-of-way on Constitution Drive is insufficient for
future widening of the'2 lane road to the U4D design depicted in Frederick Cou.ntv's Transportation
Plan. Easements are also needed for constructiongrading, slope maintenance; drainage, utilities; etc... The
inadequate space would render t:he future widening on. Constitution Drive impossible without the voluntary
dedication of additional right-of-way and easements from this 44.97 acre- parcel. This rezoning and subdivision
provides an opportunity to ensure complete, widening of the facility by a developer or a government
entity. Therefore; we suggest that the right-of-way and easements for the U41)are secure with the rezoning
approval and the 4 Jane improvements be tied to the first site plan submission for the A4-1 portion of the property.
We appreciate the County's efforts to include VDOT in the early planning stages for development and the opportunity to
provide comments. if you have anv questions or need further information, please do not hesitate to give me a call.
Sincerely.
Bobby Boyce
VDOT- Land Development Engineer
Shenandoah, Frederick, Clarke; & Warren Counties
14031 Old Vallev Pike
Edinburg. VA 22824
(540)984-5631
From: Arthur Boyce <bobby.boyce@vdot.virginia.gov>
Sent: Wednesday, August 28, 2019 9:20 AM
To: 'mcheran@co.frederick.va.us' <mcheran@co.frederick.va.us>
Cc: 'Funkhouser, Rhonda (VDOT)' <Rhonda.Fun khouser@VDOT.Virginia.gov>; 'Smith, Matthew, P.E. (VDOT)'
<Matthew.Smith @vdot.virginia.gov>; 'ewyatt@greenwayeng.com' <ewyatt@greenwayeng.com>
Subject: Frederick County - Route 50 -- Perry Properties Commercial Rezoning
<<...>>
DEPARTMENT OF TRANSPORTATION
Staunton/Edinburg Land Development
14031 Old Valley Pike
Edinburg, VA 22824
fEIVEC
Rezoning Comments
Frederick County Department of Public
Mail to:
Frederick County Dept. of Public Works
Attn: Director of Engineering
107 North Kent Street
Winchester, Virginia 22601
"540} 665-5643
Hand deliver to-.
Frederick County Dept. of Public Works
Attn: Director of Engineering
107 North Kent Street
Suite 200
Winchester, Virginia
Applicant: Please fill out the information as accurately as possible in order to assist the Department of
Public Works with their review. Attach a copy of your application foram, location map, proffer
statement, impact analysis, and any other pertinent information.
Applicant's Name: Greenway Engineering Telephone: (540) 662-4185
Mailing Address: 151 Windy Hill Lane
Location of property: North side of Millwood Pike (Route 50 East) and West
side of Constitution Drive
Current zoning: M-1
Zoning requested: B-2 & M-1 Acreage: 6.18+l- Ac
Department of Public Works Comments:
INA-
ve- Ali
rde,"�-, Via. _ yr ew ° -- " e
Public Works Signature & Date: lop�"'✓
Notice to Dept. of Public Works - Please Return This Form to the Applicant
22
Rezoning C-3-ruismen"'s
Fti edQr.el<. t✓oa.t:~j' Fire I'ai-sla.•:rl:
hLafft
Frederick County Fire Marshal
1800 Cbverstone Drive
Winchester, Virginia 22602
(540) 665-6350
kfa-sgi d del ver tot :
Frederick i ounty Fire & Rescue Dept.
Attn: Fire Marshal
Public Safety Building
1800 Coverstone Drive
7-Anchester, Virginia
Applicant Please -fill out the infonnation as accurately as possible in order to assist the Frederick County
Fire Marshal With his review. Attach a e apy of yo-ar aspiplication forL5+, loci im p, pt•co'tf r
statement, impact analysis, and any other pertinent information.
Applicant's Name: Greenway Engineering
Mailing Address:
151 Windy Hill Lane
Winchester, VA 22602
IF (540) 662-4185
Location of property: North side of Millwood Pike (Route 50 East) and west
side of Constitution Drive
C'ur;ent zoning: Ni -1
Fire IFViars mi's C'cralunents:
Fire Marshal's cignatun
Zoning requested: B-2 & M-1 Acreage: 6.18+/- Ac
Notice to Fire Marshal - Please Return This Form to the Applicant
23
Date Received
Freinerick County
.Department of re and .Rks: c e
030 e..^o?rctone orhoe !ti'.nnc estei, V14 x21:012
Flan Review & Comments
Plan/Permit Type
Name Perry ProposAUes
Address Mifiwood PIKE
Project Name
Applicant Name & Number
RE#
Permit Number
Emergency Vehicle Access:
Hydrant Location:
Siamese Location:
Fire Lanes Required:
Plan Approval Status
Comments
Rezoning AppUcaltion 07-26-19
Wind -pester
Comrnerc!M Rezoning
Greenway Engineering 540-662-4165
Adequate Inadequate
N/A
Adequate
inadequate
IJ/A
Adequate inadequate
i A
Yes No
ani/A
Approve
Signature: a ,
Reviewed By: Kenneth Scott, Jr.
r
Title.
_�5�� - ------
Date Reviewed
612/20/9
kfA 22602
d
FREDERICK
WATER
315 Tasker Road PH (540) 868-1061 Eric R. Lawrence
Stephens City, Virginia 22655 Fax (540) 868-1429 Executive Director
www.FrederickWater.com
August 14, 2019
Evan Wyatt
Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
RE- Rezoning Application Comment
Perry Properties
Ta:)(Map Numbers: 64-A-168
6.18+- acres
Dear Mr. Wyatt:
Thank you for the opportunity to offer review comments on the Perry Properties commercial
rezoning application package, dated June 19, 2019, and received at Frederick Water. Frederick
Water (FW) offers comments limited to the anticipated impact/effect upon FW's public water
and sanitary sewer system and the demands thereon.
The project parcel is in the sewer and water service area (SWSA) and is served by FW. Based on
the project's location both water and sanitary sewer services are available. Water service is
readily available, with adequate treatment and distribution capacities. Sanitary sewer
treatment capacity at the wastewater treatment plant is presently available for the anticipated
9,000 gpd 6.18 -acre site, but the sewage conveyance system has areas with limited capacity.
Flows from the subject rezoning site will flow to the West View Business Center sewage
pumping station. The West View pump station requires upgrades to ensure adequate capacity
is available to handle the projected 9,000gpd of sewage from the subject rezoning site. In
recent months, the pump station has experienced overflows when the pump station facility was
overwhelmed by excess flows. The pump station was designed and constructed by the
developer of West View Business Center to accommodate the development's sewage flows, of
which an adjacent 26 -acre split zoned B2/M1 site remains undeveloped.
S
ANNIVERSARY
Water At Your Service L� I.
rage z
Perry Properties comme- al rezoning application
Evan Wyatt
August 14, 2019
Flows which leave the West View pump station ultimately flow into additional downstream
pump stations that also warrant consideration. The US 50 East Sewage Pumping Station is also
in need of upgrades to accommodate additi-I fll,�.,
u
uveal flows.
s.
Please keep in mind that sewer conveyance capacities and water supplies change daily, and
with new customer connections bring additional flows. This letter does not guarantee system
capacities to accommodate your development proposal, but offers a point in time observation
to assist in the decision make process associated with rezoning a property.
Water and sanitary sewers are to be constructed in accordance with the FW standards
specifications. Dedicated easements may be required and based on the layout vehicular access
will need to be incorporated into the final design.
Thank you for the opportunity to offer review comments.
Sincerely,
Eric R. Lawrence
Executive Director
Cc: Michael T. Ruddy, AICP, County Planning Department
Rezoning comments
Freder!cls-WJncheStF;r Service Atr' bunt ty
Mail
Fred -Wine Service Authority
Attn: Executive Director
P.O. Box 43
Winchester, Virginia 22504,
(540) 722-3579
Hand deliver to.-
Fred-Wine
ai.Fred-Wine Service Authority
Attn: Executive Director
9 W. Piccadilly Street
Winchester, Virginia
Applicant: Please fill out the information as accurateiy as possible in order to assist the Fred -Wine
Service Authority with their review. Attach a copy of your application form, iocaflon reap, proffer
state tent, impact analysis, and any other pertinent information.
Appii :ant's Narne: Greenway Engineering
Mailing .Address
151 Wridy Hill Lane
Winchester, VA 22602
Telephone: (540) 662.4,185
Location of property: Horth side of Millwood Pike (Route 50 East) and west
side of Constitution Drive
Current zoning: M-1 Zoning requested: B-2 & FA -1 Acreage: 6.18+/- Ac
is R ed--' ID, Ser<Ree Authority's Comments:
Fred -Wine Service Authority'
Signature &c mate: t -
Notice to Fred -Wine Service Authority - Please Return Form to Applicant
34
eze .Lrhig l,_,,wa rte$eos
Winchester lt.egiotta:l M:rjwirr
V�Ji,�chester Regional Airport
Atta: Executive Director
491 Airport Road
Winchester, Virginia 22602
,,540} 662..,.2422
IRRId de"U' fere te,-
Wincbesiow Regional. Aispon
Attn: Executive Director
491 Airport Road
?t. 645, of -3 of Rt. 522 South)
Winchester, Virginia
Ap.plicq.nt.� Please ail out the information as a-ccurately as possible in order to assist the Winchester
Regional airport with their review. AtfAKIJ a eopy of von' a,ppik'a- tie, farm, location map, Proffer
statement, impact analysis, and any other pertinent inforo-iation.
Appiicant's :Name: Greenway Engineering
Address: 151 Windy Hill Lane
Vftchester, %!A- 22602
'elephope: (540) 562-6185
Location of property: North side of Millwood Pike (Monte 50 East) and west
side of Donsiitution Drive
Current zoning: M-1
Zca ng requested: 8-2 & M-1 Acreage: E;.18+/ -Ac
tThiehester Regional Airport's Coin mmeea€s:
Winchester Regional
Signature &- Date: -
Notice to Winchester Reginal Airport - Please Return Form to Applicant
31