HomeMy WebLinkAbout23-16 ApplicationSITE PLAN APPLICATION
- Office Use Only -
Date Application Received: (.p L2 / c Application #: 3-1 (..p
i
Fees Received --10 :' • J
� Receipt #: C) �� ��..� %-S Initials:
1. Project Title: SVEC Storage Building
2. Location of Property Property is located on east side of Valley Pike (Rte. 11) and
(Street address) 1 100'south of intersection with Apple Valley Road (Rte. 652).
Address is 3463 Valley Pike.
3. Applicant/Designer:
Name: Dice Engineering, PLC (Dennie Dunlap)
Telephone: (540) 974-5157
Address: 101 Shelby Ct.
Winchester, VA 22602
4. Property Owner (if different than above):
Name: Shenandoah Valley Electric Cooperative, Inc.
Telephone: (540) 667-7700
Address: 3463 Valley Pike
Winchester, VA 22602
5. Property Information:
a. Property Identification Number:
TM 63-A-80
b. Total acreage of the parcel to be developed:
14.49 acres
C. Total disturbed area of the parcel:
0.17 acres
d. Present Use:
Industrial / Office for Public Utility
e. Proposed Use:
Auxiliary Storage
f. Magisterial District(s)
Shawnee
8
6. Site Plan Type:
a. Is this an original or new site plan?
Yes n No
I V I
b. Is this a revised site plan?
Yes F r No
If yes provide all previous site plan numbers:
C. Is this a minor site plan?
Yes No
If yes provide all previous site plan numbers:
SP # 26-89, 53-89, 15-10,
22-12
7. Zoning Information:
a. Current Zoning:
M-2
b. Was this property Rezoned?
Yes o
No
V
C. If yes provide the rezoning number for this
property:
d. Are there any proffers for this property?
Yes
No
✓
e. Has a MDP been approved for this property? Yes F
No
F71
f. If yes provide the MDP number for this property:
8. Adjoining property zoning and use:
USE
North Industrial
East Industrial
South Industrial
West Right-of-way
ZONING
M-2
M-2
B-2
N/A
I have read the material included in this package and understand what is required by the Frederick County Planning
Department. I also understand that all required material will be complete prior to the submission of my site plan.
Signature: ALL
Date: June 21, 2018
9