Loading...
HomeMy WebLinkAbout29-19 Site PlanI- 8 1 R o u t e 3 7 Route 1 1 T R E X C O M P A N Y I N C . S I T E P L A N B U I L D I N G 6 - W I N C H E S T E R P L A N T L O T 6 3 A 1 1 0 FREDERICK C O U N T Y , V A - S H A W N E E M A G I S T E R I A L D I S T R I C T O W N E R & D E V E L O P E R T R E X C O M P A N Y , I N C . 3 2 2 9 S h a w n e e D r i v e W i n c h e s t e r , V A 2 2 6 0 2 ( 5 4 0 ) 5 4 2 - 6 3 3 3 A P P R O V E D B Y F R E D E R I C K C O U N T Y Z O N I N G A D M I N I S T R A T O R TITLE SHEET 1 LOCAL UTILITY SERVICE PROVIDERSWATER AND SEWERWINCHESTER PUBLIC UTILITIES15 NORTH CAMERON STREETWINCHESTER, VA 22601540.667.1815ELECTRIC SERVICESHENANDOAH VALLEY ELECTRIC COOP3463 VALLEY PIKEWINCHESTER, VA 22602540-450-0111TELEPHONE SERVICEVERIZON404 HILLANDALE LANEWINCHESTER, VA 22602540.665.3153CABLE SERVICECOMCAST COMMUNICATIONS195 RAINVILLE ROADWINCHESTER, VA 22602NATURAL GAS SERVICEWASHINGTON GASP. O. BOX 2400WINCHESTER, VA 22604540.869.1111 P L A N V A L I D F O R F I V E Y E A R S F R O M A P P R O V A L D A T E PRO J E C T LOC A T I O N S C A L E 1 " = 2 0 0 0 ' D A T E : S C A L E : C H E C K E D B Y : S H E E T O F 5 7 TREX COMPANY, INC - BUILDING 6 LOT 63 A 110 SHAWNEE MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA T S S 1 1 8 3 . 0 103 Heath Court Winchester, VA 22602 (540) 686-7373 fax (540) 301-1100T S S A S S H O W N A U G U S T 1 5 , 2 0 1 9 P R O J E C T N U M B E R : D R A W N B Y : STOWE ENGINEERING, PLCT i m o t h y S . S t o w e 9 / 1 2 / 1 9 D A T E CALL BEFORE YOU DIGCALL 811 FROM YOU CELL PHONE OR1-800-552-7001 FROM A LAND LINE.SECTION 56-265.17 OF THE CODE OF VA REQUIRES THATYOU PROVIDE THREE WORKING DAYS NOTICE TO UTILITYOWNERS BEFORE YOU EXCAVATE, DRILL OR BAST. 1 0 3 H E A T H C O U R T W I N C H E S T E R , V A 2 2 6 0 2 V 5 4 0 . 6 8 6 . 7 3 7 3 F 5 4 0 . 3 0 1 . 1 1 0 0 S T O W E E N G I N E E R I N G , P L C P R E P A R E D B Y C S 1 0 1 S I T E P L A N # 2 9 - 1 9 GENERAL NOTES1.THE CONTRACTOR SHALL FURNISH ALL MATERIAL, LABOR AND EQUIPMENT AND PERFORM ALL WORK, INCLUDING RESTORATION, OF ALL IMPROVEMENTS SHOWN OR IMPLIED A S NECESSARY FOR THE COMPLETED PROJECT READY FOR USE. UNLESS OTHERWISE NOTED, SPECIFICATIONS FOR ALL WORK TO BE IN ACCORDANCE WITH APPLICABLESTANDARDS AND CONSTRUCTION SPECIFICATIONS INCLUDING BUT NOT LIMITED TO VDOT ROAD AND BRIDGE STANDARDS, VDOT ROAD AND BRIDGE SPECIFICATIONS, AMERICA N WATER WORKS ASSOCIATION STANDARDS, AND FREDERICK WATER STANDARDS AND SPECIFICATIONS.2.ALL CONSTRUCTION SHALL COMPLY WITH THE LATEST U.S. DEPARTMENT OF LABOR, OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), AND VIRGINIAOCCUPATIONAL SAFETY & HEALTH (VOSH) RULES AND REGULATIONS.3.THE CONTRACTOR SHALL COMPLY WITH TITLE 59.1, CHAPTER 30 SECTION 406, ET. SEQ. OF THE CODE OF VIRGINIA (OVERHEAD HIGH VOLTAGE LINES SAFETY ACT).4.THE CONTRACTOR SHALL COMPLY WITH TITLE 56, CHAPTER 10.3, SECTION 265, ET. SEQ. OF THE CODE OF VIRGINIA (UNDERGROUND UTILITY DAMAGE PREVENTION ACT).5.ACCESS FOR EMERGENCY, SERVICE, AND UTILITY MAINTENANCE VEHICLES SHALL BE MAINTAINED.6.THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION SURVEYING STAKE OUT.7.THE OWNER WILL PROVIDE THE MATERIALS TESTING FOR THE PROJECT.8.THE ENGINEER HAS ATTEMPTED TO SHOW ALL SUBSURFACE UTILITIES. HOWEVER, SUCH MAY EXIST THAT ARE NOT SHOWN. THE CONTRACTOR SHALL EXERCISE CARE IN THISWORK SO AS TO AVOID DAMAGE TO ANY UTILITIES. ANY DAMAGE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR SHALL NOTIFY MISS UTILITY OFVIRGINIA AT LEAST 72 HOURS PRIOR TO EXCAVATING.9.IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE AND IDENTIFY UTILITY FACILITIES OR ITEMS THAT MAY BE IN CONFLICT WITH THE PROPOSED CONSTRUCTIONACTIVITY. APPROVAL OF THESE PLANS DOES NOT INDEMNIFY THE CONTRACTOR FROM THIS RESPONSIBILITY.10.ACCESS AND UTILITY SERVICES FOR NEIGHBORING PROPERTIES IS TO BE MAINTAINED.11.THE EXISTING PAVEMENT AT ALL PAVEMENT TIE INS SHALL BE SAW CUT TO PROVIDE SMOOTH AND STRAIGHT PAVEMENT EDGES.12.ALL ROADWAY SURFACES OUTSIDE OF THE CONSTRUCTION LIMITS THAT ARE DAMAGED OR DISTURBED BY THE CONTRACTOR SHALL BE RESTORED BY THE CONTRACTOR TOTHEIR PRE-CONSTRUCTION CONDITION.13.CONTRACTOR SHALL ENSURE ADEQUATE DRAINAGE IS ACHIEVED AND MAINTAINED ON THE SITE DURING AND AT THE END OF CONSTRUCTION.14.ANY UNUSUAL SUBSURFACE CONDITIONS (E.G., UNSUITABLE SOILS, SPRINGS, SINKHOLES, VOIDS, CAVES, ETC.) ENCOUNTERED DURING THE COURSE OF CONSTRUCTION SHALLBE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER. WORK SHALL CEASE IN THAT VICINITY UNTIL AN ADEQUATE DESIGN CAN BE DETERMINED BY THE ENGINEER.15.ALL FILL AREAS, BORROW MATERIAL, FOOTERS, AND UNDERCUT AREAS SHALL BE INSPECTED AND APPROVED BY A THE GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT OFFILL, AGGREGATE, OR CONCRETE.16.ALL SUBGRADE MATERIAL AND BACKFILL IN THE UTILITY/STORM SEWER TRENCHES, SHALL BE PLACED IN TEN (10) INCH LIFTS TO 95% OF THEORETICAL MAXIMUM DENSITY ASDETERMINED BY ASTM D-698 STANDARD PROCTOR WITHIN PLUS OR MINUS 23 OF OPTIMUM MOISTURE OVER THE COMPLETE AREA/LENGTH. DENSITY TESTS SHALL BEPERFORMED BY THE SOILS TESTING FIRM.17.EXISTING STRUCTURES, TANKS, AND OTHER EXISTING FEATURES DESIGNATED TO BE REMOVED OR DEMOLISHED SHALL BE CAREFULLY REMOVED AND DISPOSED OF AT ANAPPROVED WASTE DISPOSAL SITE.DRAINAGE NOTES1."H" DIMENSIONS AND TOP ELEVATIONS SHOWN ON THE PLANS ARE MEASURED FROM THE INVERT OUT TO THE TOP OF THE STRUCTURE. "H" DIMENSIONS AND TOP ELEVATIONSARE APPROXIMATE AND ARE PROVIDED FOR ESTIMATING PURPOSES. ACTUAL DIMENSIONS SHALL BE DETERMINED BY THE CONTRACTOR FROM FIELD CONDITIONS.2.ALL DRAINAGE STRUCTURES SHALL MEET THE REQUIREMENTS OF VDOT ROAD AND BRIDGE STANDARDS AND VDOT SPECIFICATIONS. SEE DETAILS IN THIS PLAN SET.3.ALL STRUCTURES SHALL HAVE VDOT STANDARD INVERT SHAPING IS-1. SEE DETAIL IN THIS PLAN SET.4.ALL STORM DRAINAGE PIPE SHALL BE REINFORCED CONCRETE PIPE CLASS III UNLESS OTHERWISE NOTED.GRADING NOTES1.ALL EARTHWORK ON THIS PROJECT IS TO BE COMPLETED IN ACCORDANCE WITH - REPORT OF GEOTECHNICAL INVESTIGATION, TREX BUILDING 6 - PREPARED BY VIOLAENGINEERING AND DATED JULY 5, 20190. EARTHWORK IS TO BE OBSERVED AND TESTED BY THE GEOTECHNICAL ENGINEER.2.ALL EXCAVATION IS UNCLASSIFIED.3.MATERIALS - THE MATERIAL TO BE USED IN EMBANKMENTS SHALL BE FREE OF FROZEN OR ORGANIC MATERIALS SUCH AS LEAVES, ROOTS, GRASS, WEEDS, AND ALL OTHERMATERIAL NOT CONSISTENT WITH CONSTRUCTION OF A STABLE, HOMOGENEOUS FILL. EMBANKMENTS SHALL NOT BE CONSTRUCTED ON FROZEN GROUND. ALL PROPOSED FIL L MATERIALS SHOULD BE APPROVED BY THE GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT, AND REPRESENTATIVE SAMPLES SHOULD BE OBTAINED ONE WEEK PRIOR TOPLACEMENT OF THAT MATERIAL TO ALLOW TIME FOR COMPLETION OF THE NECESSARY LABORATORY TESTS.4.SITE PREPARATION - ALL VEGETATION, ROOTMAT, TOPSOIL, ASPHALT AND CONCRETE SHALL BE REMOVED FROM AREAS UPON WHICH EMBANKMENT WILL BE CONSTRUCTED.CLEARING SHALL EXTEND TEN (10) FEET BEYOND THE BUILDING AND PAVEMENT LIMITS, AND ONE ADDITIONAL FOOT FOR EACH FOOT OF PROPOSED FILL. TOPSOIL SHALL BESTOCKPILED AS REQUIRED BY THE E&S PLAN. ALL SLOPING AREAS UPON WHICH FILL IS TO BE PLACED SHOULD BE BENCHED OR “NOTCHED” SO THAT A SMOOTH INTERFACEBETWEEN EXISTING GROUND AND NEW FILL WILL NOT BE PRESENT. EACH LAYER OF FILL SHOULD BE BENCHED INTO THE EXISTING GROUND A MINIMUM OF 3 FEETHORIZONTALLY AND THE DEPTH OF ONE FILL LAYER. FLAT AREAS UPON WHICH FILL IS TO BE PLACED SHALL BE DEEPLY PLOWED TO ALLOW FOR BONDING WITH THE EXISTINGMATERIAL. THE CONTROLLED FILL SLOPES AND EMBANKMENTS SHOULD BE CONSTRUCTED AT THE DESIGNED 2H:1V SLOPES OR FLATTER.5.FORMATION IN LAYERS - ALL FILL LAYERS SHALL BE CONSTRUCTED WITH MATERIALS AND METHODS PRESCRIBED IN THE GEOTECHNICAL REPORT. ANY SOIL PLACED ASENGINEERED FILL SHOULD BE AN APPROVED MATERIAL, FREE OF ORGANIC MATTER OR DEBRIS WITH A MAXIMUM LIMITING LIQUID LIMIT OF 65 AND A MAXIMUM NOMINAL PARTIC L E SIZE OF 5 INCHES. SHOT ROCK SHALL BE PROCESSED TO MAXIMUM NOMINAL PARTICLE SIZE OF FIVE (5) INCHES AND PLACED IN MAXIMUM NOMINAL LOOSE LIFTS OF 12 INCHE S . PROCESSED ROCK FILL SHALL HAVE SUFFICIENT FINES TO FILL VOID SPACES BETWEEN LARGER PARTICLES. EXTENSIVE MOISTURE CONDITIONING OF ROCK FILL MAY BEREQUIRED. THIS RECOMMENDATION MAY BE WAIVED BY THE GEOTECHNICAL ENGINEER DEPENDING ON LOCATION OF ENGINEERED FILL WITHIN THE DEVELOPMENT.UNACCEPTABLE ENGINEERED FILL MATERIALS INCLUDE TOPSOIL, ORGANIC MATERIALS (OH, OL), CONSTRUCTION DEBRIS AND LARGE ROCK. ALL SUCH MATERIALS REMOVEDDURING GRADING OPERATIONS SHOULD BE EITHER STOCKPILED FOR LATER USE IN LANDSCAPED AREAS OR PLACED IN APPROVED DISPOSAL AREAS EITHER ON OR OFF SITE.ONSITE MATERIALS ARE SUITABLE FOR FILL MATERIAL EXCLUDING TOPSOIL. ALL FROZEN SOIL SHOULD BE REMOVED PRIOR TO CONTINUATION OF FILL OPERATIONS. BORROWFILL SHALL NOT CONTAIN FROZEN MATERIALS AT THE TIME OF PLACEMENT. ALL FROST-HEAVED SOIL SHOULD BE REMOVED PRIOR TO PLACEMENT OF FILL, STONE, CONCRETEOR ASPHALT. IT IS RECOMMENDED THAT PROCESSED SHOT ROCK BE UTILIZED AS FILL WITHIN THE UPPER FIVE (5) FEET OF FINISH SUBGRADE TO PROVIDE A WEATHER RESILIE N T CONSTRUCTION AREA WHICH CAN BE UTILIZED TO REDUCE CONCRETE SLAB, PAVEMENT SECTION THICKNESS, OR FOUNDATION SIZE. THE SITE CONTRACTOR SHALL HAVEMEANS OF PROVIDING WATER AT ALL TIMES DURING STRUCTURAL FILL PLACEMENT.NORMAL FILL SHOULD BE PLACED IN LIFTS NOT EXCEEDING 10 INCHES IN LOOSE THICKNESS (UNLESS NOTED OTHERWISE) AND MOISTURE CONDITIONED TO WITHIN ±3% OF THEOPTIMUM MOISTURE CONTENT. WE RECOMMEND THAT EACH LIFT BE COMPACTED TO A MINIMUM OF 95% OF THE MAXIMUM DRY DENSITY OBTAINED IN ACCORDANCE WITH AST M D-698 (OR VTM-1), STANDARD PROCTOR METHOD. NUCLEAR DENSITY TESTING OF COARSE FILL MATERIALS WITH EXCESS PLUS ¾- INCH PARTICLES MAY BE WAIVED BY THEGEOTECHNICAL ENGINEER IF ADEQUATE VISUAL INSPECTION IS PROVIDED. RECOMMENDED TEST RESULTS SHOULD BE CONSIDERED A GENERAL GUIDELINE; ADDITIONALTESTING OF MATERIAL SHORTLY BEFORE FILL OPERATIONS COMMENCE SHOULD BE PERFORMED TO VERIFY MAXIMUM DRY DENSITY AND OPTIMUM MOISTURE CONTENT OFACTUAL FILL MATERIAL. ALL AREAS RECEIVING FILL SHOULD BE GRADED TO FACILITATE POSITIVE DRAINAGE AND PREVENT PONDING OF WATER. THE UPPER SIX INCHES OFPAVEMENT SUBGRADE SHALL BE COMPACTED TO 100% OF THE MAXIMUM DRY DENSITY IN ACCORDANCE WITH LATEST VIRGINIA DOT SPECIFICATIONS.AS THE EMBANKMENT IS CONSOLIDATED, THE SLOPES SHALL BE CAREFULLY DRESSED TO THE DESIRED SECTION AND MAINTAINED TO THEIR PROPER HEIGHT, DIMENSIONS, AN D SHAPE UNTIL THE WORK IS ACCEPTED. WHEN TRANSPORTING MATERIAL WITH RUBBER-TIRED EQUIPMENT, CARE SHALL BE TAKEN TO SEE THAT THE TRAILING UNITS DO NOTFOLLOW IN THE TRACKS OF THE PRECEDING UNIT. AT THE END OF EACH DAY'S WORK THE EMBANKMENT SHALL BE DRESSED TO SHED ANY WATER THAT MIGHT FALL DURINGTHE NIGHT.6.ALL BLASTING OPERATIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE FIRE MARSHALL'S REQUIREMENTS. THE CONTRACTOR SHALL PROTECT THE OVERHEADPOWER LINES AND TOWERS FROM FLY ROCK AND ITS ASSOCIATED DAMAGE.7.IF KARST FEATURES SUCH AS CAVES, DISAPPEARING STREAMS, OR LARGE SPRINGS ARE ENCOUNTERED DURING THE PROJECT, CONTACT WIL ONDORFF OF VA DCR(540-394-2552) TO DOCUMENT AND MINIMIZE ADVERSE IMPACTS.WATER & SEWER NOTES1.THE PUBLIC WATER AND SEWER LINES TO WHICH CONNECTIONS ARE BEING MADE ARE OWNED AND OPERATED BY THE CITY OF WINCHESTER. ALL CONSTRUCTION,CONNECTIONS AND ACTIVITIES PERTAINING TO THE WATER AND SEWER LINES SHALL CONFORM TO THE REQUIREMENTS PRESCRIBED IN THE WINCHESTER PUBLIC SERVICESSTANDARDS MANUAL WHICH CAN BE FOUND AT HTTPS://WWW.WINCHESTERVA.GOV/SITES/DEFAULT/FILES/DOCUMENTS/ENGINEERING/2017-STANDARDS.PDF2.MANHOLE RIMS, VALVE BOXES, ETC. SHALL BE ADJUSTED TO MATCH THE SURROUNDING FINISHED GRADE.3.THE CONTRACTOR SHALL COORDINATE WATER AND SEWER CONSTRUCTION WITH THE WINCHESTER PUBLIC UTILITIES DEPARTMENT.4.THE CONTRACTOR SHALL PROVIDE THE WINCHESTER INSPECTOR 24 HOURS NOTICE PRIOR TO TAPPING WATER AND/OR SEWER LINES. THE EXACT LOCATIONS FOR WATER ANDSEWER CONNECTIONS/TAPS SHALL BE DIRECTED BY THE WINCHESTER INSPECTOR DURING CONSTRUCTION.5.ALL PROPOSED WATER AND SEWER LINES WILL REQUIRE TESTING IN ACCORDANCE WITH THE WINCHESTER PUBLIC SERVICES MANUAL. THE CONTRACTOR SHALL SCHEDULETHESE TEST WITH THE INSPECTOR AND PROVIDE ASSISTANCE AS NEEDED.SURVEY NOTES1.THIS DESIGN IS BASED ON TOPOGRAPHIC AND PROPERTY SURVEY DATA PROVIDED BY MARSH & LEGGE LAND SURVEYORS, 560 NORTH LOUDOUN STREET, WINCHESTER, VA22601.2.TOPOGRAPHIC INFORMATION SHOWN HEREON IS BASED ON AN ACTUAL FIELD SURVEY COMPLETED MAY 6, 2019 AND JUNE 25, 2019. BOUNDARY INFORMATION IS BASED ON ABOUNDARY SURVEY PLAT BY ERNEST S. HOLZWORTH, L.S. DATED MARCH 24, 2016 AND RECORDED IN INSTRUMENT NUMBER 160003175.3.ANY UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEES THAT THEUNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT WARRANT THAT THEUNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION INDICATED ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROMINFORMATION AVAILABLE.4.HORIZONTAL ORIENTATION IS BASED ON VA. NAD 83 NORTH ZONE STATE GRID; VERTICAL DATUM IS BASED ON NAVD 88 ELEVATIONS ESTABLISHED USING GPS METHODS.SIGN NOTES1.A MONUMENT SIGN IS NOT PROPOSED WITH THIS PROJECT. INTERNAL DIRECTION SIGNS WILL BE UTILIZED. GENERAL NOTES 2 D A T E : S C A L E : C H E C K E D B Y : S H E E T O F 5 7 TREX COMPANY, INC - BUILDING 6 LOT 63 A 110 SHAWNEE MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA T S S 1 1 8 3 . 0 103 Heath Court Winchester, VA 22602 (540) 686-7373 fax (540) 301-1100T S S A S S H O W N A U G U S T 1 5 , 2 0 1 9 P R O J E C T N U M B E R : D R A W N B Y : STOWE ENGINEERING, PLCT i m o t h y S . S t o w e 9 / 1 2 / 1 9 L E G E N D E X I S T I N G F E A T U R E S P R O P O S E D F E A T U R E S I N D E X C O U N T O U R C O U N T O U R W A T E R M E T E R W A T E R L I N E S A N I T A E R Y M A N H O L E S A N I T A R P I P E F E N C E G A S L I N E O V E R H E A D U T I L I T I E S P O L E T R E E T R E E L I N E G R A V E L P A V E M E N T E P R O P O S E D I N D E X C O N T O U R P R O P O S E D C O N T O U R W A T E R L I N E W A T E R M E T E R S A N I T A R Y M A N H O L E S A N I T A R Y P I P E S A N I T A R Y L A T E R A L P A V E M E N T L I M I T S O F C O N S T R U C T I O N S X 8 7 0 0 8 6 0 C S 1 0 2 SURROUNDING P R O P E R T I E S , R O A D S , A N D L A N D U S E S SURROUNDING PROPERTIES ROADS & LAND USES 3 T R E X C O M P A N Y , I N C . I N D U S T R I A L U S E Z O N I N G - M 2 G R A F T O N S C H O O L , I N C . . I N D U S T R I A L U S E Z O N I N G - M 1 ( W i n c h e s t e r ) H A R R Y H A M I L T O N R E S I D E N T I A L U S E Z O N I N G - R P D O D S O N B O R S . E X T E R M I N A T I N G C O B U S I N E S S U S E Z O N I N G - B 2 T H E Y O U T H D E V E L O P M E N T C E N T E R B U S I N E S S U S E Z O N I N G - M 1 T R E X C O M P A N Y , I N C . V A C A N T Z O N I N G - M 2 ANNA LEE FRYE BUSINESS USE ZONING - B3GEORGE LENGYELBUSINESS USE ZONING - B3SHREEJI GAS MART, LLC BUSINESS USEZONING - B3JALALI MOSHEN,MARIOSTRAINS, LLC, T&T-III,LLC, NAVAEI KEAVAN, JAYNEPETTLER, JOEL MILLER,JAHALI MAMOOD, SYLVIAJOHNSON, DENA, LLC, SANDYNGUYENSOUTH GATE CONDOSBUSINESS USEZONING - B2JENKINS-COOPER, LLCBUSINESS USEZONING - B2 VIRGINIA EAGLE PROPER T I E S , L L C MANUFACTURING USEZONING - M2 H . P . H O O D , I N C . I N D U S T R I A L U S E Z O N I N G - M 2 VALLEY AVENUE S H A W N E E D R I V E C S X R A I L R O A D S O U T H S I D E C H O F C H R I S T R E S I D E N T I A L U S E Z O N I N G - R P B A T T A I L E D R I V E J O H N R U S S E L L . V A C A N T L A N D Z O N I N G - R A HOG E R U N H O G E R U N C I T Y O F W I N C H E S T E R F R E D E R I C K C O U N T Y T R E X C O M P A N Y , I N C . V A C A N T Z O N I N G - M 2 P R O J E C T S I T E T R E X C O M P A N Y , I N C . V A C A N T Z O N I N G - M 2 D A T E : S C A L E : C H E C K E D B Y : S H E E T O F 5 7 TREX COMPANY, INC - BUILDING 6 LOT 63 A 110 SHAWNEE MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA T S S 1 1 8 3 . 0 103 Heath Court Winchester, VA 22602 (540) 686-7373 fax (540) 301-1100T S S A S S H O W N A U G U S T 1 5 , 2 0 1 9 P R O J E C T N U M B E R : D R A W N B Y : STOWE ENGINEERING, PLCT i m o t h y S . S t o w e 9 / 1 2 / 1 9 T R E X C O M P A N Y , I N C . I N D U S T R I A L U S E Z O N I N G - M 2 C S 1 0 3 HOG E R U N L1 L2 225.00'S 56°47'04" EL3L4L5L6L7L8L9L10L11L12 C 1 1 3 2 . 4 3 ' S 4 7 ° 0 9 ' 0 0 " E L13 N 32°53'40" E 1480.70' N 5 1 ° 2 6 ' 2 5 " W 1 4 8 3 . 2 5 ' N 4 0 ° 5 7 ' 3 0 " W 4 3 2 . 6 3 ' S 6 0 ° 1 0 ' 2 7 " W 827 . 2 6 ' C4 2 2 1 . 2 8 ' S 4 7 ° 2 2 ' 1 9 " E C 2 C 3 2 1 0 . 2 4 ' S 1 9 ° 0 8 ' 1 2 " W S 0 2 ° 1 3 ' 5 0 " E 2 5 2 . 1 2 ' 1 2 1 . 2 5 ' S 0 9 ° 1 6 ' 3 9 " E 7 1 0 . 5 6 ' S 5 4 ° 3 6 ' 2 4 " E L15 L14N 32°52'20" E 573.09'S 51°26'25" E 731.65'L16 L17 N 32°53'40" E 1027.15' S 39°14'33" W 589.15' T R E X C O M P A N Y , I N C . P I N 6 3 A 1 1 0 6 2 . 3 2 A C TREX COMPANY, I N C . PIN 63 A 8711.83 AC PROPERTY BOUNDARY 4 D A T E : S C A L E : C H E C K E D B Y : S H E E T O F 5 7 TREX COMPANY, INC - BUILDING 6 LOT 63 A 110 SHAWNEE MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA T S S 1 1 8 3 . 0 103 Heath Court Winchester, VA 22602 (540) 686-7373 fax (540) 301-1100T S S A S S H O W N A U G U S T 1 5 , 2 0 1 9 P R O J E C T N U M B E R : D R A W N B Y : STOWE ENGINEERING, PLCT i m o t h y S . S t o w e 9 / 1 2 / 1 9 C S 1 0 4 BUILDING 4 BUILDING 4 FINISHED GOODS YARD R&D BUILDING BUILDING 3 BUILDING 1 BUILDING 4 SCALES CSX RAILROAD ROUT E 1 1 VALL E Y P I K E HOG E R U N SATELLITE PARKING AREA PROPOSED BUILDING 6 187,660 SF BUILDING 175,240 SF MANUFACTURING AREA 12,420 SF OFFICE AREA FFE = 728.00 HEIGHT = 41' +/- RAIL YARD DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 OV E R A L L S I T E P L A N 5 CS105 BUILDING 4 BUILDING 4 FINISHED GOODS YARD R&D BUILDING BUILDING 3 BUILDING 1 BUILDING 4ELECTRIC LINE TO BE BURIED SCALES CSX RAILROAD HOG E R U N SATELLITE PARKING AREA RAIL YARD BUILDING 4 BUILDING 4 FINISHED GOODS YARD R&D BUILDING BUILDING 3 BUILDING 1 BUILDING 4 LOOP ROAD BUILDING 6 AREA SCALES CSX RAILROAD HOG E R U N SATELLITE PARKING AREA PROP. 6' HIGH BOARD ON BOARD (TREX) FENCE RAIL YARD PROP. 3' HIGH BOARD ON BOARD (TREX) FENCE DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 SE Q U E N C E O F C O N S T R U C T I O N STAGE 1 SITE PREPARATION Phase 1 A.Install conduits and prepare to relocate overhead electric line to underground system. Place aggregate and concrete pads for switch gear, junctions, and transformers. B.SVEC to pull conductors, set switches, junctions and transformers. C.SVEC to de-energize OH electric service to Building 4, and energize underground service. D.Building 4 returned to service. Phase 2 A.Disconnect and terminate utilities serving the Poly to Oil Building. B.Dismantle Poly to Oil Bldg. C.Install erosion and sediment control measures D.Demolish existing pavement and Poly to Oil bldg foundation, and remove landscaping items STAGE 2 ROUGH GRADING & UTILITIES Phase 1 A.Provide temporary access for R & D Building B.Install Erosion & Sediment Control measures C.Install traffic barracaides along west side of existing Shipping/Receiving Road. D.Perform rough grading, storm drainage, and underground utility installation. Install shoring as needed. 6 CS106 BUILDING 4 BUILDING 4 FINISHED GOODS YARD R&D BUILDING BUILDING 3 BUILDING 1 BUILDING 4 BUILDING 6 AREA SCALES CSX RAILROAD HOG E R U N SATELLITE PARKING AREA RAIL YARD BUILDING 4 BUILDING 4 FINISHED GOODS YARD R&D BUILDING BUILDING 3 BUILDING 1 BUILDING 4 SCALES CSX RAILROAD HOG E R U N SATELLITE PARKING AREA 38' RAIL YARD DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 SE Q U E N C E O F C O N S T R U C T I O N 7 STAGE 3 FINE GRADING AND FOUNDATION Phase 1 A.Construct Building 6 foundations and retaining walls. B.Perform remaining site grading. C.Construct steel frame for Building 6. D.Install under slab utilities, wall panels, and roof. E.Pour floor. Install doors and finishes. Install MEP systems and energize. F.Perform fine garding around Building 6. G.Install curbing, pavement and pavement markings. Phase 2 (simulitanious with Phase 1) A.Fine grade Loop Road. Install aggregate. B.Install foundation for scales. Install curbing and asphalt on Loop Road. C.Install new scales and outdoor lighting. D.Provide temporary pavement markings. E.Activate new scales. Open Loop Road to traffic F.Relocate existing scales Phase 3 A.Install delineators and pavement markings at satellite parking area. B.Install landscaping. STAGE 4 CONSTRUCTION Phase 1 A.Install traffic barricades to separate Loop Road traffic from construction area. B.Install erosion control measures. Phase 2 A.Construct new roadway area between the Loop Road and Hoge Run. B.Eradicate old pavement markings and place new pavement markings C.Shift traffic to new roadway segment. Phase 3 A.Install traffic barricades to separate Loop Road traffic from construction area B.Construct foundation for international scale and install scale. C.Complete pavement markings, lighting and signs. D.Remove pavement that is not a part of the finished Loop Road. CS107 CAPITOL LANE H O G E R U N P I N 6 3 - A - 1 1 5 T R E X C O M P A N Y , I N C . I N S T . 1 6 0 0 0 3 1 7 4 5 . 1 1 7 4 A C R E S P I N 6 3 - A - 1 1 0 T R E X C O M P A N Y , I N C . I N S T . 0 2 0 0 2 2 7 9 8 N 3 6 ° 5 2 ' 2 5 " E 4 0 6 . 9 1 ' S 4 7 ° 2 2 ' 1 9 " E 2 2 1 . 2 8 ' C 1 C 2 S 1 9 ° 0 8 ' 1 2 " W 2 1 0 . 2 4 ' S 0 2 ° 1 3 ' 5 0 " E 2 5 2 . 1 2 ' S 0 9 ° 1 6 ' 3 9 " E 1 2 1 . 2 5 ' P I N 6 3 - A - 1 1 0 T R E X C O M P A N Y , I N C . I N S T . 0 2 0 0 2 2 7 9 8 R E C E I V I N G S H I P P I N G A C C E S S R O A D ONE S T O R Y CONCR E T E B U I L D I N G (BL D G . # 2 ) F.F.E. = 7 2 3 . 6 0 O N E S T O R Y M E T A L B U I L D I N G T R A V . S 2 3 N = 7 0 9 6 5 3 3 . 4 9 7 E = 1 1 5 7 2 8 6 1 . 2 9 0 E L E V . = 7 0 8 . 0 6 I R w / C A P S 1 N = 7 0 9 7 1 0 0 . 2 1 2 E = 1 1 5 7 2 5 0 9 . 1 0 4 E L E V . = 7 2 5 . 3 2 I R w / C A P S 2 N = 7 0 9 6 9 2 2 . 2 0 5 E = 1 1 5 7 2 3 8 1 . 7 8 6 E L E V . = 7 3 2 . 3 6 TRAV. S11 N=7096391.351 E=11572278.045 ELEV.=735.57 V A . S E C . R T E . 6 5 2 - S H A W N E E D R I V E 4 0 ' R / W ( D B 2 6 8 P G 1 4 9 ) H O G E R U N FINISH PRODUCT YARD FINISH PRODUCT YARD C O N C R E T E B U I L D I N G ( B L D G . # 4 ) F . F . E . = 7 3 8 . 6 0 R & D - BU I L D I N G 2 B U I L D I N G 4 D A T E : S C A L E : C H E C K E D B Y : S H E E T O F 5 7 TREX COMPANY, INC - BUILDING 6 LOT 63 A 110 SHAWNEE MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA T S S 1 1 8 3 . 0 103 Heath Court Winchester, VA 22602 (540) 686-7373 fax (540) 301-1100T S S A S S H O W N A U G U S T 1 5 , 2 0 1 9 P R O J E C T N U M B E R : D R A W N B Y : STOWE ENGINEERING, PLCT i m o t h y S . S t o w e 9 / 1 2 / 1 9 8 C S 1 0 8 EXISTING CONDITIONS MATCHLINE S H E E T 9 CAPITOL LANE C I T Y O F W I N C H E S T E R C O U N T Y O F F R E D E R I C K P I N 6 3 - A - 1 1 0 T R E X C O M P A N Y , I N C . I N S T . 0 2 0 0 2 2 7 9 8 S 0 9 ° 1 6 ' 3 9 " E 1 2 1 . 2 5 ' O N E S T O R Y C O N C R E T E B U I L D I N G ( B L D G . # 2 ) F . F . E . = 7 2 3 . 6 0 O N E S T O R Y M E T A L B U I L D I N G T R A V . S 2 3 N = 7 0 9 6 5 3 3 . 4 9 7 E = 1 1 5 7 2 8 6 1 . 2 9 0 E L E V . = 7 0 8 . 0 6 T R A V . S 1 1 N = 7 0 9 6 3 9 1 . 3 5 1 E = 1 1 5 7 2 2 7 8 . 0 4 5 E L E V . = 7 3 5 . 5 7 T M 3 7 1 - 1 - 1 T R E X C O . , L . L . C . D B 9 6 5 , P G 5 3 2 ( F R E D . C O . ) D B 3 0 3 , P G 1 5 4 3 ( C I T Y O F W I N C H E S T E R ) P I N 6 3 - A - 1 1 0 TR E X C O M P A N Y , I N C . I N S T . 0 2 0 0 2 2 7 9 8 CITY OF WINCHESTERPUMP STATION SITEDB 438 PG 488 PIN 63-A-86A HP HOOD, INC.DB 935 PG 739STORM WAT E R D E T E N T I O N P O N D H O G E R U N F I N I S H P R O D U C T Y A R D F I N I S H P R O D U C T Y A R D FINISH PRODUCT YARD R & D - B U I L D I N G 2 D A T E : S C A L E : C H E C K E D B Y : S H E E T O F 5 7 TREX COMPANY, INC - BUILDING 6 LOT 63 A 110 SHAWNEE MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA T S S 1 1 8 3 . 0 103 Heath Court Winchester, VA 22602 (540) 686-7373 fax (540) 301-1100T S S A S S H O W N A U G U S T 1 5 , 2 0 1 9 P R O J E C T N U M B E R : D R A W N B Y : STOWE ENGINEERING, PLCT i m o t h y S . S t o w e 9 / 1 2 / 1 9 EXISTING CONDITIONS 9 C S 1 0 9 M A T C H L I N E S H E E T 8 CAPITOL LANE H O G E R U N P I N 6 3 - A - 1 1 5 T R E X C O M P A N Y , I N C . I N S T . 1 6 0 0 0 3 1 7 4 5 . 1 1 7 4 A C R E S P I N 6 3 - A - 1 1 0 T R E X C O M P A N Y , I N C . I N S T . 0 2 0 0 2 2 7 9 8 N 3 6 ° 5 2 ' 2 5 " E 4 0 6 . 9 1 ' S 4 7 ° 2 2 ' 1 9 " E 2 2 1 . 2 8 ' C 1 C 2 S 1 9 ° 0 8 ' 1 2 " W 2 1 0 . 2 4 ' S 0 2 ° 1 3 ' 5 0 " E 2 5 2 . 1 2 ' S 0 9 ° 1 6 ' 3 9 " E 1 2 1 . 2 5 ' N 48°11'20" W 619. 1 3 ' 9 8 . 4 4 ' N 5 4 ° 3 5 ' 4 4 " W P I N 6 3 - A - 1 1 0 T R E X C O M P A N Y , I N C . I N S T . 0 2 0 0 2 2 7 9 8 R E C E I V I N G S H I P P I N G A C C E S S R O A D ONE S T O R Y CONCR E T E B U I L D I N G (BL D G . # 2 ) F.F.E. = 7 2 3 . 6 0 O N E S T O R Y M E T A L B U I L D I N G ONE STORY METALBUILDINGF.F.E. (718.53) V A . S E C . R T E . 6 5 2 - S H A W N E E D R I V E 4 0 ' R / W ( D B 2 6 8 P G 1 4 9 ) Rem o v e Tre e s R e m o v e T r e e s RemoveTrees R e l o c a t e S h e d D e m o . E x . C o n c r e t e D e m o . E x . C o n c r e t e t o h e r e Demo.Ex. Concre t e Demo. Ex. Concrete D e m o . E x . C o n c r e t e Demo. Ex. Concreteto beDemolished Demo.Ex. AsphaltDemo.Ex. AsphaltDemo. E x . Concr e t e Demo. Ex. Asphalt Demo. Ex. Asphalt D e m o . E x . A s p h a l t D e m o . E x . A s p h a l t D e m o . E x . A s p h a l t RemoveTreesDemo. Ex.Concrete Ele c t r i c t o b e relo c a t e d und e r g r o u n d Electric to be relocatedundergroundElectric to be relocatedunderground E l e c t r i c t o b e r e l o c a t e d u n d e r g r o u n d Electric to be relocated undergroundDemo.Ex. Concrete w/ slotteddrianage grateRemoveEx. Pipe R e m o v e E x . P i p e Remove Ex. Fe n c e Remove Ex. Fe n c eProperty Line to be Vacated P r o p e r t y L i n e t o b e V a c a t e d P r o p e r t y L i n e t o b e V a c a t e d P a r c e l t o b e C o n s o l i d a t e d w i t h T M 6 3 - A - 1 1 0 R e m o v e E x . G u a r d r a i l Demo.Ex. AsphaltRelocate FHand Valve.Abandon pipe D e m o . E x . A s p h a l t Demo. Ex. Asphalt Demo.Ex. Asphalt R e m o v e E x . G r a v e l R e m o v e E x . G r a v e l H O G E R U N FINISH PRODUCT YARD FINISH PRODUCT YARD C O N C R E T E B U I L D I N G ( B L D G . # 4 ) F . F . E . = 7 3 8 . 6 0 R e l o c a t e S h e d Demo.Ex. Asphalt Cut 1" waterline and cap Close valve on 6" waterline, cap, remove valvebox, and buryRemove 2aboveground tanks R & D - BU I L D I N G 2 B U I L D I N G 4 R e l o c a t e S h e d R e m o v e L i g h t P o l e a n d t e r m i n a t e e l e c . Remove Light Poleand terminate elec. T E R M I N A T E E L E C T R I C S E R V I C E T O O U T D O O R L I G H T S D A T E : S C A L E : C H E C K E D B Y : S H E E T O F 5 7 TREX COMPANY, INC - BUILDING 6 LOT 63 A 110 SHAWNEE MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA T S S 1 1 8 3 . 0 103 Heath Court Winchester, VA 22602 (540) 686-7373 fax (540) 301-1100T S S A S S H O W N A U G U S T 1 5 , 2 0 1 9 P R O J E C T N U M B E R : D R A W N B Y : STOWE ENGINEERING, PLCT i m o t h y S . S t o w e 9 / 1 2 / 1 9 DEMOLITION PLAN 1 0 C S 1 1 0 MAT C H L I N E S H E E T 1 1 CAPITOL LANE C I T Y O F W I N C H E S T E R C O U N T Y O F F R E D E R I C K 5 . 1 1 7 4 A C R E S P I N 6 3 - A - 1 1 0 T R E X C O M P A N Y , I N C . I N S T . 0 2 0 0 2 2 7 9 8 S 0 2 ° 1 3 ' 5 0 " E 2 5 2 . 1 2 ' S 0 9 ° 1 6 ' 3 9 " E 1 2 1 . 2 5 ' N 48°11'20" W 619 . 1 3 ' 9 8 . 4 4 ' N 5 4 ° 3 5 ' 4 4 " W O N E S T O R Y C O N C R E T E B U I L D I N G ( B L D G . # 2 ) F . F . E . = 7 2 3 . 6 0 O N E S T O R Y M E T A L B U I L D I N G O N E S T O R Y M E T A L B U I L D I N G F . F . E . ( 7 1 8 . 5 3 ) T M 3 7 1 - 1 - 1 T R E X C O . , L . L . C . D B 9 6 5 , P G 5 3 2 ( F R E D . C O . ) D B 3 0 3 , P G 1 5 4 3 ( C I T Y O F W I N C H E S T E R ) PIN 63-A-110TREX COMPANY, I N C . INST. 020022798CITY OF WINCHESTERPUMP STATION SITEDB 438 PG 488 STORM WATER DETEN T I O N P O N D Remove Trees R e l o c a t e S h e d Demo. Ex. Concrete D e m o . E x . C o n c r e t e Demo. Ex. Concrete D e m o . E x . C o n c r e t e D e m o . E x . C o n c r e t e t o b e D e m o l i s h e d Demo. Ex. Asphalt Demo. Ex. Asphalt D e m o . E x . C o n c r e t e Demo. Ex. Asphalt Demo. Ex. Asphalt D e m o . E x . A s p h a l t D e m o . E x . A s p h a l t Remove Trees D e m o . E x . C o n c r e t e E l e c t r i c t o b e r e l o c a t e d u n d e r g r o u n d E l e c t r i c t r a n s f o r m e r t o b e r e l o c a t e d D e m o . E x . C o n c r e t e w / s l o t t e d d r i a n a g e g r a t e R e m o v e E x . P i p e R e m o v e E x . P i p e Remove Ex. Fe n c eProperty Line to be Vacated P r o p e r t y L i n e t o b e V a c a t e d P a r c e l t o b e C o n s o l i d a t e d w i t h T M 6 3 - A - 1 1 0 R e l o c a t e F H a n d V a l v e . A b a n d o n p i p e D e m o . E x . A s p h a l t Demo. Ex. Asphalt D e m o . E x . A s p h a l t R e m o v e E x . G r a v e l H O G E R U N R e m o v e E x . P i p e R e m o v e E x . P i p e F I N I S H P R O D U C T Y A R D F I N I S H P R O D U C T Y A R D FINISH PRODUCT YARD A b a n d o n E x . L a t e r a l R e l o c a t e S h e d D e m o . E x . A s p h a l t C u t 1 " w a t e r l i n e a n d c a p C l o s e v a l v e o n 6 " w a t e r l i n e , c a p , r e m o v e v a l v e b o x , a n d b u r y R e m o v e 2 a b o v e g r o u n d t a n k s P O L Y - T O - O I L B L D G R & D - B U I L D I N G 2 R e l o c a t e S h e d R e m o v e L i g h t P o l e a n d t e r m i n a t e e l e c . R e m o v e L i g h t P o l e a n d t e r m i n a t e e l e c . T E R M I N A T E E L E C T R I C S E R V I C E T O O U T D O O R L I G H T S D A T E : S C A L E : C H E C K E D B Y : S H E E T O F 5 7 TREX COMPANY, INC - BUILDING 6 LOT 63 A 110 SHAWNEE MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA T S S 1 1 8 3 . 0 103 Heath Court Winchester, VA 22602 (540) 686-7373 fax (540) 301-1100T S S A S S H O W N A U G U S T 1 5 , 2 0 1 9 P R O J E C T N U M B E R : D R A W N B Y : STOWE ENGINEERING, PLCT i m o t h y S . S t o w e 9 / 1 2 / 1 9 1 1 C S 1 1 1 DEMOLITION PLAN M A T C H L I N E S H E E T 1 0 CA P I T O L L A N E HOGE R U N PIN 63-A-115 TREX COMPANY, INC. INST. 160003174 5.1174 ACRES PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 N 36°52'25" E 406.91' S 4 7 ° 2 2 ' 1 9 " E 2 2 1 . 2 8 ' C 1 C 2 S 19°08'1 2 " W 2 1 0 . 2 4 ' S 02°1 3 ' 5 0 " E 2 5 2 . 1 2 ' S 09°16'39" E 121.25' PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 RECEIVING SHIPPING ACCESS ROAD ONE STORY CONCRETE BUILDING (BLDG. #2) F.F.E. = 723.60 ONE STORY METAL BUILDING V A . S E C . R T E . 6 5 2 - S H A W N E E D R I V E 4 0 ' R / W ( D B 2 6 8 P G 1 4 9 ) TREX COMPANY, INC. INST. 020022798 HOG E R U N FINISH PRODUCT YARD FINISH PRODUCT YARD CONCRETE BUILDING (BLDG. #4) F.F.E. = 738.60 B L O C K B U I L D I N G R & D - BUILDING 2 BUILDING 4 167.2 ft 7 PROP. H.C. SIGNS N 5'R typ CG-6 RETAINING WALL BY OTHERS LIGHT DUTY PVMT (TYP)TRANSFORMERS AND NORDICS TO BE SET BY SVEC. FOR CONDUIT TO BUILDING SEE MEP PLANS 9'x20' typ 52.7' 22' 20' 22' 16' 180.6' 24' RETAINING WALL BY OTHERS 10 11 12 13 14 15 16171819 2021 22 23 24 25 26 28 29 30 63 64 31 35 3332 C D PROP. 6' HIGH BOARD ON BOARD (TREX) FENCE PROPOSED BUILDING 6 187,660 SF BUILDING 175,240 SF MANUFACTURING AREA 12,420 SF OFFICE AREA FFE = 728.00 HEIGHT = 41' +/- 156' T T T T TWO 4" CONDUITS FOR VERIZON (one spare) SERVICE. PVC SCH 40 F O FO FO FO FO F O TWO 3" CONDUITS FOR TREX FIBER OPTIC CABLE (one spare) PVC SCH 40 Prop Water Line Esmt. Prop Water Line Esmt. REMOVE FIRE HYDRANT DURING CONST. REINSTALL ON WM #8 WHEN BIDG. BACKFILL COMPLETE. PROP. 3' HIGH BOARD ON BOARD (TREX) FENCE 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) CLEANWAY DOWNSPOUT FILTER (TYP). SEE DETAIL SHEET 31 SEE PLUMBING PLAN P1.1 FOR SAN SEWER CONTINUATION SEE COMMERCIAL ENTRANCE PLAN SHEET 22 FOR WORK IN THIS AREA Place GR-2 guardrail on top side of retaining wall INS T A L L D O U B L E G A T E WIT H I N T E R C O M A N D RE M O T E C O N T R O L FR O M S H I P P I N G O F F I C E . FA A C M O D E L 6 4 0 O R AP P R O V E D E Q U A L . DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 SI T E P L A N 12 CS112 MATCHLINE SHEET 13 CA P I T O L L A N E CITY O F W I N C H E S T E R COU N T Y O F F R E D E R I C K TREX COMPANY, INC. PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 S 09°16'39" E 121.25' ONE STORY CONCRETE BUILDING (BLDG. #2) F.F.E. = 723.60 ONE STORY METAL BUILDING TM 371-1-1 PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 P I N 6 3 - A - 8 6 A H P H O O D , I N C . D B 9 3 5 P G 7 3 9 STORM WATER DETENTION POND HOG E R U N FINISH PRODUCT YARD FINISH PRODUCT YARD FINISH PRODUCT YARD R & D - BUILDING 2 7 PROP. H.C. SIGNS N 5'R typ CG-6 RETAINING WALL BY OTHERS LIGHT DUTY PVMT (TYP)TRANSFORMERS AND NORDICS TO BE SET BY SVEC. FOR CONDUIT TO BUILDING SEE MEP PLANS 9'x20' typ 52.7' 22' 20' 16' 180.6' 24' 37.5' RETAINING WALL #3 SEE DETAILS 22 23 24 25 26 28 29 30 51 60 61 63 64 70 71 72 73 7490 91 92 31 3332 PRPOSED VDOT GR-2 GUARDRAIL VDOT GR-7 GUARDRAIL TERMINAL TREATMENT VDOT GR-11 TERMINAL TREATMENT Prop Water Line Esmt. 32 . 2 5 ' LIGHT DUTY PAVEMENT PROP. 3' HIGH BOARD ON BOARD (TREX) FENCE 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) CLEANWAY DOWNSPOUT FILTER (TYP). SEE DETAIL SHEET 31 PROPOSED VDOT GR-2 GUARDRAIL DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 SI T E P L A N 13 CS113 MATCHLINE SHEET 12 REMOVE PHASE 1 PVMT AND RESTORE AREA WITH GRASS. INSTALL NEW CG-6 REMOVE HEADWALLS EXTEND PIPES REINSTALL HEADWALLS HOGE R U N TREX COMPANY, INC. INST. 020022798 S 19°08'1 2 " W 2 1 0 . 2 4 ' S 02°1 3 ' 5 0 " E 2 5 2 . 1 2 ' S 09°16'39" E 121.25 ' ONE STORY CONCRETE BUILDING (BLDG. #2) F.F.E. = 723.60 ONE STORY METAL BUILDING HOG E R U N R & D - BUILDING 2 F2 F3 F4 F5 F6 F7 F8 F1 10 11 12 13 14 15 22 23 24 25 26 28 29 30 31 35 3332 38' INT E R N A T I O N A L SCA L E S NOTE: FLOODPLAIN MODIFICATION TO BE APPROVED PRIOR TO WORK BEGINNING ON PHASE 2 - INTERNATIONAL SCALES 129' PROP. 3' HIGH BOARD ON BOARD (TREX) FENCE INS T A L L D O U B L E G A T E WI T H I N T E R C O M A N D RE M O T E C O N T R O L FR O M S H I P P I N G O F F I C E . FA A C M O D E L 6 4 0 O R AP P R O V E D E Q U A L . DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 DE T A I L E D S I T E P L A N P H A S E 2 - I N T E R N A T I O N A L S C A L E S 14 CS114 BRICK BUILDING HEIGHT=14.3' METAL BUILDING B L D G . EXISTING PAVED WALKWAY EXISTING TREES (TYP) EX I S T I N G P A V E M E N T TO SHAWEE DRIVE 30' 24' 24' 24' DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 DE T A I L E D S I T E P L A N SA T E L L I T E P A R K I N G A R E A 15 CS115 SATELLITE PARK AREA ·NUMBER OF SPACES PROVIDED = 78 ·SATELLITE PARKING IS TEMPORARY UNTIL PERMANANT PARKING SOLUTION IS DEVELOPED. ·PERIMETER OF PARKING AREA TO BE DELINEATED ON THE WEST SIDE WITH RUBBER CURB & FLEXIBLE DELINEATOR POST. SEE DETAIL BELOW. ·EXISTING PAVEMENT AND CONCRETE SURFACE TO BE SWEPT CLEAN PRIOR TO STRIPING. ·ALL PAVEMENT MARKINGS TO BE 4" WHITE PAINT. DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 8/15/19 12" x 18" sign panel meeting ADA requirements VDOT STP-1 STEEL SIGN POST AND FOUNDATION TYPICAL TRUCK BOLLARD DETAIL 6" PAINT POST BRIGHT YELLOW SET POST IN CONCRETE FILL POST WITH CONCRETE 4" WIDE, WHITE REFLECTIVE TAPE 8" DIAM STEEL PIPE GRADE 36" 24" 36" 6" 12" 16 CS116 SYMBOL HEAVY DUTY PAVEMENT SECTION n.t.s. 2" SM-12.5A ASPHALT 12" - 21B AGGREGATE COMPACTED SUBGRADE 3.5" BM-25 ASPHALT NOTES 1.AREAS OF EXITING PAVEMENT SHALL BE REMOVED FROM THE AREA OF THE NEW PAVEMENT SECTION. ANY VOIDS RESULTING FROM THIS REMOVAL SHALL BE BACKFILLED WITH VDOT AGGREGATE NO 21-B. 2.JOINTS WHERE NEW PAVEMENT ABUTS EXISTING PAVEMENT SHALL BE SAW CUT TO PROVIDE A SMOOTH STRAIGHT EDGE. A 10' WIDE STRIP OF THE EXISTING PAVEMENT ADJACENT TO THE JOINT SHALL BE MILLED TO A DEPTH EQUAL TO THE THICKNESS OF THE SURFACE COURSE, AND THE NEW SURFACE COURSE SHALL EXTEND THROUGH THIS MILLED AREA. LIGHT DUTY/PARKING AREA PAVEMENT SECTION for parking area east of building 6 and pump sta access rd n.t.s. 2" SM-12.5A ASPHALT 8" - 21B AGGREGATE COMPACTED SUBGRADE 10" - 21B AGGREGATE SHOULDER 17.5" - 21B AGGREGATE SHOULDER 6" - 4000 psi CONCRETE 8" - REINFORCED DIRTY TAILINGS COMPACTED SUBGRADE 6" 21-A AGGREGATE NOTES 1.THE SUBGRADE AND SURROUNDING AREA SHALL BE PREPARED IN ACCORDANCE WITH THE RECOMMENDATIONS IN THE GEOTECHNICAL REPORT. 2.6 X 6-INCH 10/10 WWF SHALL BE PLACED MID-DEPTH IN THE CONCRETE. CONCRETE APRON PAVEMENT SECTION for trailer drop area north of building 6 n.t.s. 200 # WOVEN GEOTEXTILE FABRIC SI T E D E T A I L S FF=728.00 CA P I T O L L A N E HOGE R U N PIN 63-A-115 TREX COMPANY, INC. INST. 160003174 5.1174 ACRES PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 N 36°52'25" E 406.91' S 4 7 ° 2 2 ' 1 9 " E 2 2 1 . 2 8 ' C 1 C 2 S 19°08'1 2 " W 2 1 0 . 2 4 ' S 02°1 3 ' 5 0 " E 2 5 2 . 1 2 ' S 09°16'39" E 121.25' PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 RECEIVING SHIPPING ACCESS ROAD ONE STORY CONCRETE BUILDING (BLDG. #2) F.F.E. = 723.60 ONE STORY METAL BUILDING TRAV. S23 N=7096533.497 E=11572861.290 ELEV.=708.06 I R w / C A P S 1 N = 7 0 9 7 1 0 0 . 2 1 2 E = 1 1 5 7 2 5 0 9 . 1 0 4 E L E V . = 7 2 5 . 3 2 I R w / C A P S 2 N = 7 0 9 6 9 2 2 . 2 0 5 E = 1 1 5 7 2 3 8 1 . 7 8 6 E L E V . = 7 3 2 . 3 6 T R A V . S 1 1 N = 7 0 9 6 3 9 1 . 3 5 1 E = 1 1 5 7 2 2 7 8 . 0 4 5 E L E V . = 7 3 5 . 5 7 V A . S E C . R T E . 6 5 2 - S H A W N E E D R I V E 4 0 ' R / W ( D B 2 6 8 P G 1 4 9 ) TREX COMPANY, INC. HOG E R U N FINISH PRODUCT YARD FINISH PRODUCT YARD CONCRETE BUILDING (BLDG. #4) F.F.E. = 738.60 B L O C K B U I L D I N G R & D - BUILDING 2 BUILDING 4 10 11 12 13 14 15 16171819 2021 22 23 24 25 26 28 29 30 63 64 31 35 3332 C D PROPOSED BUILDING 6 187,660 SF BUILDING 175,240 SF MANUFACTURING AREA 12,420 SF OFFICE AREA FFE = 728.00 HEIGHT = 41' +/- 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) CLEANWAY DOWNSPOUT FILTER (TYP). SEE DETAIL SHEET 31 DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 GR A D I N G P L A N 17 CS117 MATCHLINE SHEET 18 FF=728.00 CA P I T O L L A N E CITY O F W I N C H E S T E R COU N T Y O F F R E D E R I C K PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 S 09°16'39" E 121.25' ONE STORY CONCRETE BUILDING (BLDG. #2) F.F.E. = 723.60 ONE STORY METAL BUILDING T R A V . S 1 1 N = 7 0 9 6 3 9 1 . 3 5 1 E = 1 1 5 7 2 2 7 8 . 0 4 5 E L E V . = 7 3 5 . 5 7 TM 371-1-1 TREX CO., L.L.C. DB 965, PG 532 (FRED. CO.) DB 303, PG 1543 PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 P I N 6 3 - A - 8 6 A H P H O O D , I N C . D B 9 3 5 P G 7 3 9 STORM WATER DETENTION POND HOG E R U N FINISH PRODUCT YARD FINISH PRODUCT YARD FINISH PRODUCT YARD R & D - BUILDING 2 F2 F3 F4 F5 F122 23 24 25 26 28 29 30 51 60 61 63 64 70 71 72 73 7490 91 92 31 3332 187,660 SF BUILDING 175,240 SF MANUFACTURING AREA 12,420 SF OFFICE AREA FFE = 728.00 HEIGHT = 41' +/- 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) CLEANWAY DOWNSPOUT FILTER (TYP). SEE DETAIL SHEET 31 DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 GR A D I N G P L A N 18 CS118 MATCHLINE SHEET 17 N 36°52'25" E 406.91' S 4 7 ° 2 2 ' 1 9 " E 2 2 1 . 2 8 ' RECEIVING SHIPPING ACCESS ROAD I R w / C A P S 1 N = 7 0 9 7 1 0 0 . 2 1 2 E = 1 1 5 7 2 5 0 9 . 1 0 4 E L E V . = 7 2 5 . 3 2 V A . S E C . R T E . 6 5 2 - S H A W N E E D R I V E 4 0 ' R / W ( D B 2 6 8 P G 1 4 9 ) 1617 C D C 1 11 12 13 14 15 35 22 23 28 29 30 PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 31 32 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) CLEANWAY DOWNSPOUT FILTER (TYP). SEE DETAIL SHEET 31 DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 DE T A I L E D G R A D I N G P L A N 19 CS119 NORTH WEST CORNER NORTH EAST CORNER EAST PARKING AREA TRANSFORMER AREA CA P I T O L L A N E CITY O F W I N C H E S T E R COU N T Y O F F R E D E R I C K ONE STORY CONCRETE BUILDING (BLDG. #2) F.F.E. = 723.60 ONE STORY METAL BUILDING STORM WATER DETENTION POND FINISH PRODUCT YARD 51 60 61 63 64 70 71 72 DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 DE T A I L E D G R A D I N G P L A N TR U C K T I E D O W N A R E A 20 CS120TRUCK TIE DOWN AREA LOC LOC LOC LOC LOC LOC HOGE R U N TREX COMPANY, INC. INST. 020022798 S 19°08'1 2 " W 2 1 0 . 2 4 ' S 02°1 3 ' 5 0 " E 2 5 2 . 1 2 ' S 09°16'39" E 121.25 ' ONE STORY CONCRETE BUILDING (BLDG. #2) F.F.E. = 723.60 ONE STORY METAL BUILDING HOG E R U N R & D - BUILDING 2 F2 F3 F4 F5 F6 F7 F8 F1 10 11 12 13 14 15 22 23 24 25 26 28 29 30 31 35 3332 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) CLEANWAY DOWNSPOUT FILTER (TYP). SEE DETAIL INS T A L L D O U B L E G A T E WI T H I N T E R C O M A N D RE M O T E C O N T R O L FR O M S H I P P I N G O F F I C E . FA A C M O D E L 6 4 0 O R AP P R O V E D E Q U A L . DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 DE T A I L E D G R A D I N G P L A N P H A S E 2 - I N T E R N A T I O N A L S C A L E S 21 CS121 1" = 5 0 ' ( H ) 1 " = 5 ' ( V ) DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 22 CS122 VD O T E N T R N C E P L A N EA S T C O M M E R C I A L E N T R A N C E EAST COMMERCIAL ENTRANCE PLAN EAST COMMERCIAL ENTRANCE GRADING PLAN EAST COMMERCIAL ENTRANCE WB-67 WHEEL TRACKS EAST ENTRANCE PROFILE PAVEMENT MARKING LEGEND A TYPE B, CLASS 1, WHITE PAVEMENT LINE MARKING, 4” WIDTH B TYPE B, CLASS 1, YELLOW PAVEMENT LINE MARKING, 4” WIDTH C TYPE B, CLASS 1, WHITE PAVEMENT LINE MARKING, 4” WIDTH, 2' LINE, 4' SPACE D TYPE B, CLASS 1, WHITE PAVEMENT LINE MARKING, 24” WIDTH STOP C D H O G E R U N RE C E I V I N G S H I P P I N G A C C E S S R O A D VA. SEC. RTE. 6 5 2 - S H A W N E E D R I V E 40' R/W (DB 26 8 P G 1 4 9 ) STOP 82 80 81 83 84 89 99 C D H O G E R U N RE C E I V I N G S H I P P I N G A C C E S S R O A D VA. SEC. RTE. 6 5 2 - S H A W N E E D R I V E 40' R/W (DB 26 8 P G 1 4 9 ) VA. SEC. RTE. 6 5 2 - S H A W N E E D R I V E 40' R/W (DB 268 P G 1 4 9 ) VA. SEC. RTE. 6 5 2 - S H A W N E E D R I V E 40' R/W (DB 268 P G 1 4 9 ) DETAIL 'A' 1" = 5 0 ' ( H ) 1 " = 5 ' ( V ) DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 22A CS122A TR A N S P O R T A T I O N M A N A G E M E N T P L A N SH A W N E E D R S H O U L D E R C L O S U R E EA S T C O M M E R C I A L E N T R A N C E EAST COMMERCIAL ENTRANCE PLAN 350 FT 350 FT 350 FT 500 FT 500 F T 350 F T WORK AREA BARRICADES 35 0 F T 35 0 F T END ROAD WORK ROAD WORK AHEAD RIGHT SHOULDER CLOSED RIGHT SHOULDER CLOSED RIGHT SHOULDER CLOSED AHEAD EN D R O A D WO R K 1" = 5 0 ' ( H ) 1 " = 5 ' ( V ) DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 22A2 CS122A2 TR A N S P O R T A T I O N M A N A G E M E N T P L A N S H A W N E E D R L A N E C L O S U R E EA S T C O M M E R C I A L E N T R A N C E EAST COMMERCIAL ENTRANCE PLAN BE PREPARED TO STOP BE PREPARED TO STOP ONE LANE ROAD AHEAD ROAD WORK AHEAD 350 FT 350 FT 350 FT EN D R O A D WO R K END ROAD WORK 500 FT 500 F T 350 F T WORK AREA BARRICADES ONE LANE ROAD AHEAD ROAD WORK AHEAD 35 0 F T 35 0 F T 35 0 F T 1" = 5 0 ' ( H ) 1 " = 5 ' ( V ) DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 22B CS122B ST O R M S E W E R P R O F I L E A N D C O M P U T A T I O N S EA S T C O M M E R C I A L E N T R A N C E Junction Loss Elev Inlet US Outlet Do Qo Lo Sfo Hf Vo Ho Qi Vi QiVi Vi^2/2g Hi Angle Hdelta Ht 1.3Ht 0.5Ht Final H Water Rim Station Inlet WSE in cfs ft ft/ft ft ft ft ft ft ft ft ft Surface Elev 80 Starting Elevation 720.89 721.49 81 720.89 36 42.78 50.74 0.0041 0.21 10.03 0.39 0.81 0.44 1.65 0.00 0.82 1.03 721.92 723.81 83 42.78 12.24 523.76 2.33 0.81 19 0.44 83 721.92 30 42.78 65.55 0.0109 0.71 12.24 0.58 0.81 0.05 1.44 0.00 0.72 1.43 723.36 725.48 82 42.29 12.22 516.62 2.32 0.81 0 0.00 84 0.49 2.45 1.20 0.09 0.03 51 0.05 84 723.36 15 0.49 30.55 0.0001 0.00 2.45 0.02 0.00 0.00 0.02 0.03 0.02 0.02 723.37 723.50 - 82 723.36 30 42.29 28.28 0.0106 0.30 12.22 0.58 0.00 0.00 0.58 0.75 0.38 0.68 724.03 723.92 - INLET SAG INLETS ONLY GRATE INLETS ONLY NU M B E R TY P E LE N G T H ( F T ) DR A I N A G E A R E A ( A C ) C CA su m C A Tc , T i m e t o I n l e t ( M I N ) I ( I N / H R ) Q, I N C R ( C F S ) Qb , C A R R Y O V E R ( C F S ) QT , G U T T E R F L O W ( C F S ) S, G U T T E R S L O P E ( F T / F T ) Sx , C R O S S S L O P E ( F T / F T ) T, S P R E A D W ( F T ) W/ T Sw ( F T / F T ) Sw / S x Eo a= 1 2 W ( S w - S x ) + L o c a l D e p r e s s i o n S' w = a / ( 1 2 W ) Se = S x + S ' w ( E o ) , ( F T / F T ) CO M P U T E D L E N G T H L t , ( F T ) L, S P E C I F I E D L E N G T H ( F T ) L/ L t E Qi , I N T E R C E P T E D ( C F S ) Qb , C A R R Y O V E R ( C F S ) d ( F T ) h ( F T ) d/ h T, S P R E A D @ S A G ( F T ) EF F E C T I V E P E R I M E T E R d ( F T ) 81 MH-2-4DIA 0.00 0.50 0.00 0.00 0.00 6.42 0.00 0.00 83 MH-2-6DIA 0.00 0.50 0.00 0.00 5.00 6.42 0.00 0.00 84 DI-1 0.20 0.59 0.12 0.12 27.00 6.42 0.76 0.00 4 0.159 99 DI-3B (L=10')0.50 0.57 0.29 0.29 5.00 6.42 1.83 0.0010.00 1.83 0.0170 0.0100 8.95 2.0 0.2235 0.0833 8.33 0.751 3.76 0.157 0.13 9.75 10 1.03 1.000 1.83 0.00 From To DA C CA Inlet Time Peak Time Intensity Q10 Inverts Length Slope Dia Cap Vel Flow Time (Acres)Factor Incr.Accum.(min)(mim)(in/hr)(cfs)US DS (ft)(ft/ft)(in)(cfs)(fps)(min) 84 83 0.20 0.59 0.12 0.12 27.00 27.00 4.16 0.49 720.80 720.65 30.55 0.0051 15 4.61 2.45 0.21 83 81 0.00 0.50 0.00 10.29 5.00 27.21 4.16 42.78 720.40 719.25 65.55 0.0175 30 54.21 12.24 0.09 82 83 12.25 0.83 10.17 10.17 25.00 25.00 4.16 42.29 720.89 720.40 28.28 0.0175 30 54.21 12.22 0.04 81 80 0.00 0.50 0.00 10.29 0.00 27.30 4.16 42.78 719.00 718.49 50.74 0.0101 36 66.84 10.03 0.08 99 89 0.50 0.57 0.29 0.29 5.00 5.00 6.42 1.86 720.61 718.49 61.40 0.0346 15 12.92 7.11 0.14 DETAIL 'B' I R w / C A P S 1 N = 7 0 9 7 1 0 0 . 2 1 2 E = 1 1 5 7 2 5 0 9 . 1 0 4 E L E V . = 7 2 5 . 3 2 PIN 63-A-110TREX COMPANY, INC.INST. 020022798 VA. SEC. RTE. 652 - SHAWNEE DRIVE40' R/W (DB 268 PG 149)8886 8587 EXIST. COMM.ENTRANCEEXIST. COMM.ENTRANCE E X I S T R O U T E 6 5 2 C / L WEST ENTRANCE C/L I R w / C A P S 1 N = 7 0 9 7 1 0 0 . 2 1 2 E = 1 1 5 7 2 5 0 9 . 1 0 4 E L E V . = 7 2 5 . 3 2 PIN 63-A-110TREX COMPANY, INC.INST. 020022798 VA. SEC. RTE. 652 - SHAWNEE DRIVE40' R/W (DB 268 PG 149) 1 2 . 0 ' 4 8 . 0 ' 49.3'CG-7CG-7 MILL AND OVERLAY -SEE DETAIL WP-2 S H A D I N G D E N O T E S N E W P A V E M E N T A R E A 200.0'12.0'PROP CG-11 ENT.WITH CG-13 4 ' C O N C . M O U N T A B L E A P R O N . S E E D E T A I L S H T 2 2 F ( T Y P ) E D G E O F P V M T EXISTING FENCE TOBE REMOVED ANDREINSTALLED AFTERCONSTRUCTION REPLACE LANDSCAPINGFOLLOWING CONSTRUCTIONAS NEEDED. E X T E N D N O R T H P I P E B Y 1 6 ' A N D S O U T H P I P E B Y 8 ' O N E X I S T I N G G R A D E . D I S C H A R G E U D - 4 T O O U T F A L L O F C U L V E R T . C U L V E R T N O T E S : 1 . A C O N C . C R A D L E R E Q D O V E R E X I S T I N G C U L V E R T P I P E S F R O M B A C K O F C U R B T O B A C K O F C U R B . C R A D E L S H A L L B E 6 " A B O V E T H E T O P O F P I P E O R T O T H E B O T T O M O F T H E B A S E A S P H A L T L A Y E R , W H I C H E V E R I S L E S S . C L A S S A 3 C O N C R E T E S H A L L B E U S E D F O R T H E C R A D L E . S D E T A I L I N E N T R A N C E P R O F I L E . 2 . I N S T A L L C D - 2 I N S O U T H S I D E O F C O N C . C R A D L E . E X T E N D O U T L E T S T O M H - 8 7 A N D C U L V E R T O U T F A L L N O T E : E X I S T I N G C U R B I N G A N D P A V E M E N T T O B E R E M O V E D I N T H E A R E A O F N E W C O N S T R U C T I O N WARP CURB IN THISAREA. SEE NOTE 9 ONCG-11 DETAIL R40.0'R2.0'R26.0'40.0'SECT.'A'SECT.'B'SECT.'C'CAB D DDSTOPADJ VALVETO GRADE R/W R / W UD-4 DISCHGTO STR 85 U D - 4 D I S C H G T O E W - 1 2 Provide Scupper - 4 ft opening reqd.L=2.5 ft from gutter flow line. Slope = 10%Extend 7" class A3 conc for scupper.Q10=0.32cfsChannel DimensionsSide Slopes: 2:1Bottom Width = 4 ftLine with CL I riprap over geotextile fabPIN 63-A-110TREX COMPANY, INC.INST. 020022798 V A . S E C . R T E . 6 5 2 - S H A W N E E D R I V E 4 0 ' R / W ( D B 2 6 8 P G 1 4 9 ) BATTAILE DRIVE888685 8 7 PIN 63-A-110TREX COMPANY, INC.INST. 020022798 V A . S E C . R T E . 6 5 2 - S H A W N E E D R I V E 4 0 ' R / W ( D B 2 6 8 P G 1 4 9 ) BATTAILE DRIVEPS 2 . 0 8 % S E E D E T A I L ' A ' 2 . 0 0 % 2 : 1 C U T 2 . 0 8 % 2 . 0 0 % 2 0 . 0 ' 2 0 . 0 ' 4 . 0 ' 4 . 0 ' 2 4 1 3 C E N T E R L I N E D E T A I L ' A ' ( N O T T O S C A L E ) 7 5 6 9 8 S E E D E T A I L ' B ' 2 % 2 % 1 2 . 0 ' 4 . 0 ' 2 4 1 3 E X I S T I N G E D G E O F P V M T E X I S T . P V M T M I L L A N D O V E R L A Y A D J T R A V E L L A N E P E R W P 2 E X . G R N D P R O P . G R A D E D E T A I L ' B ' ( N O T T O S C A L E ) 7 5 6 D A T E : S C A L E : C H E C K E D B Y : S H E E T O F 5 7 TREX COMPANY, INC - BUILDING 6 LOT 63 A 110 SHAWNEE MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA T S S 1 1 8 3 . 0 103 Heath Court Winchester, VA 22602 (540) 686-7373 fax (540) 301-1100T S S A S S H O W N A U G U S T 1 5 , 2 0 1 9 P R O J E C T N U M B E R : D R A W N B Y : STOWE ENGINEERING, PLCT i m o t h y S . S t o w e 9 / 1 2 / 1 9 2 2 C C S 1 2 2 C VDOT ENTRNCE PLAN WEST COMMERCIAL ENTRANCE ROUTE 652 SHAWNEE DRIVE AADT-5800 (VDOT DATA)FUNCTIONAL CLASS - URBAN COLLECTORPOSTED SPEED LIMIT -35 MPHREQD INTERSECTION SIGHT DIST - 390'WEST COMMERCIAL E N T R A N C E P L A N 050100 1,839 ft to Route 11475 ft to CL of Battaile Dr. 4 , 3 4 6 f t t o R o u t e 6 4 4 4 3 1 f t t o T r e x E . E n t r a n c e WEST COMMERCIAL ENTR A N C E G R A D I N G P L A N 050100SIGHT DISTAN C E P R O F I L E 050100 1 . 2 " A S P H A L T C O N C R E T E S U R F A C E C O U R S E , T Y P E S M - 1 2 . 5 D 2 . 4 " A S P H A L T B A S E C O U R S E , T Y P E B M - 2 5 . 0 D 3 . 7 " A G G R E G A T E B A S E M A T E R I A L , T Y P E 1 , N o . 2 1 - B 4 . 8 " S E L E C T M A T E R I A L ( S E E N O T E ) P L A C E D O N S E P A R A T I O N G E O T E X T I L E 5 . S T A N D A R D V D O T C G - 7 6 . 6 " A G G R E G A T E B A S E M A T E R I A L , T Y P E 1 , N o . 2 1 B 7 . S T A N D A R D V D O T U D - 4 8 . S T A N D A R D V D O T C G - 1 3 9 . 4 " A G G R E G A T E B A S E M A T E R I A L , T Y P E 1 , N o . 2 1 B E N T R A N C E T Y P I C A L S E C T I O N N O T E : V I E W I S L O O K I N G S O U T H T O W A R D S T R E X P L A N T N O T E S 1 . A R E A S O F E X I T I N G C U R B I N G A N D P A V E M E N T S H A L L B E R E M O V E D F R O M T H E A R E A O F T H E N E W P A V E M E N T S E C T I O N . A N Y V O I D S R E S U L T I N G F R O M T H I S R E M O V A L S H A L L B E B A C K F I L L E D W I T H V D O T A G G R E G A T E N O 2 1 - B . 2 . O N T R E X P R O P E R T Y W H E R E N E W P A V E M E N T A B U T S E X I S T I N G P A V E M E N T J O I N T S S H A L L B E S A W C U T T O P R O V I D E A S M O O T H S T R A I G H T E D G E . 3 . L I M I T S O F F U L L D E P T H P A V E M E N T W I D E N I N G A L O N G R T E . 6 5 2 S H A L L B E D E T E R M I N E D B Y E X C A V A T I O N I N T H E P R E S E N C E O F A V D O T I N S P E C T O R A N D M A T C H I N G C O R E S A M P L E S R E Q U I R E D P E R W P - 2 D E T A I L . 4 . S E L E C T M A T E R I A L S H A L L C O N S I S T O F P R I M A R Y C R U S H E R R U N A N D S H A L L B E F R E E F R O M S E A M S , C R A C K S , A N D O T H E R S T R U C T U R A L D E F E C T S . R O C K M A T E R I A L S H A L L N O T E X C E E D 8 I N C H E S I N I T S G R E A T E S T D I M E N S I O N A N D A P P R O X I M A T E L Y 5 0 % O F T H E R O C K M A T E R I A L S H A L L B E 4 I N C H E S I N S I Z E . T H E S M A L L E S T D I M E N S I O N S H A L L N O T B E L E S S T H A N 2 I N C H E S . 5 . I N S H O U L D E R A R E A S A G G R E G A T E A N D S E L E C T M A T E R I A L S H A L L E X T E N D T O D A Y L I G H T . T U R N L A N E T Y P I C A L S E C T I O N N O T E : V I E W I S L O O K I N G E A S T T O W A R D S E N T R A N C E P A V E M E N T M A R K I N G L E G E N D A T Y P E B , C L A S S 1 , W H I T E P A V E M E N T L I N E M A R K I N G , 4 ” W I D T H B T Y P E B , C L A S S 1 , Y E L L O W P A V E M E N T L I N E M A R K I N G , 4 ” W I D T H C T Y P E B , C L A S S 1 , W H I T E P A V E M E N T L I N E M A R K I N G , 4 ” W I D T H , 2 ' L I N E , 4 ' S P A C E D T Y P E B , C L A S S 1 , W H I T E P A V E M E N T L I N E M A R K I N G , 2 4 ” W I D T H S T O P S I G N S U M M A R Y 3 5 0 F T 350 FT350 FT 500 FT W O R K A R E A B A R R I C A D E S BATTAILE AVE. R O A D W O R K A H E A D E N D R O A D W O R K RIGHTSHOULDERCLOSEDAHEAD RIGHTSHOULDERCLOSEDROADWORKAHEAD END ROADWORK D A T E : S C A L E : C H E C K E D B Y : S H E E T O F 5 7 TREX COMPANY, INC - BUILDING 6 LOT 63 A 110 SHAWNEE MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA T S S 1 1 8 3 . 0 103 Heath Court Winchester, VA 22602 (540) 686-7373 fax (540) 301-1100T S S A S S H O W N A U G U S T 1 5 , 2 0 1 9 P R O J E C T N U M B E R : D R A W N B Y : STOWE ENGINEERING, PLCT i m o t h y S . S t o w e 9 / 1 2 / 1 9 2 2 D C S 1 2 2 D TRANSPORTATION MANAGEMENT PLAN SHAWNEE DR SHOULDER CLOSURE TREX COMMERCIAL ENTRANCES T R A N S P O R T A T I O N M A N A G E M E N T P L A N N O T E S 1 . W o r k a t W e s t E n t r a n c e s h a l l b e a c c o m p l i s h e d a s a s h o u l d e r o p e r a t i o n w i t h m i n o r e n c r o a c h m e n t . 1 2 o f t h e e n t r a n c e m u s t r e m a i n o p e n t o t r a f f i c a t a l l t i m e s . 2 . A l l a c t i v i t i e s p e r f o r m e d u n d e r t h e a u s p i c e s o f a V D O T L a n d U s e P e r m i t i n v o l v i n g t h e i n s t a l l a t i o n , m a i n t e n a n c e a n d r e m o v a l o f w o r k z o n e t r a f f i c c o n t r o l d e v i c e s m u s t h a v e a t l e a s t o n e ( 1 ) p e r s o n o n - s i t e w h o , a t a m i n i m u m , i s a c c r e d i t e d b y V D O T i n B a s i c W o r k Z o n e T r a f f i c C o n t r o l . T h e p e r s o n a c c r e d i t e d b y V D O T i n B a s i c W o r k Z o n e T r a f f i c C o n t r o l m a y i n s t a l l , m a i n t a i n a n d r e m o v e w o r k z o n e s t h a t a r e i n a c c o r d a n c e w i t h t h e V i r g i n i a W o r k A r e a P r o t e c t i o n M a n u a l a n d / o r a w o r k z o n e t h a t h a s b e e n p r e - a p p r o v e d b y V D O T . A p e r s o n a c c r e d i t e d b y V D O T i n I n t e r m e d i a t e W o r k Z o n e T r a f f i c C o n t r o l m u s t b e o n - s i t e t o p r o v i d e s u p e r v i s i o n d u r i n g w o r k z o n e a d j u s t m e n t s o r c h a n g e s t o t r a f f i c c o n t r o l d u e t o f i e l d c o n d i t i o n s . T h e s e p e r s o n s m u s t h a v e t h e i r a c c r e d i t a t i o n c a r d w i t h t h e m w h i l e o n t h e p r o j e c t s i t e . 0 1 0 0 2 0 0 ROADWORKAHEAD END ROADWORK B E P R E P A R E D T O S T O P BATTAILE AVE. ROADWORKAHEAD ONELANEROADAHEAD END ROADWORK B E P R E P A R E D T O S T O P O N E L A N E R O A D A H E A D R O A D W O R K A H E A D R O A D W O R K A H E A D E N D R O A D W O R K E N D R O A D W O R K W O R K A R E A B A R R I C A D E S B E P R E P A R E D T O S T O P R O A D W O R K A H E A D R O A D W O R K A H E A D D A T E : S C A L E : C H E C K E D B Y : S H E E T O F 5 7 TREX COMPANY, INC - BUILDING 6 LOT 63 A 110 SHAWNEE MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA T S S 1 1 8 3 . 0 103 Heath Court Winchester, VA 22602 (540) 686-7373 fax (540) 301-1100T S S A S S H O W N A U G U S T 1 5 , 2 0 1 9 P R O J E C T N U M B E R : D R A W N B Y : STOWE ENGINEERING, PLCT i m o t h y S . S t o w e 9 / 1 2 / 1 9 2 2 D 2 C S 1 2 2 D 2 TRANSPORTATION MANAGEMENT PLAN SHAWNEE DR LANE CLOSURE TREX COMMERCIAL ENTRANCES TRANSPORTATION MANAGEMENT PLAN NOTES1.Work at West Entrance shall be accomplished as a shoulder operation with minorencroachment. 12 of the entrance must remain open to traffic at all times.2.All activities performed under the auspices of a VDOT Land Use Permit involvingthe installation, maintenance and removal of work zone traffic control devicesmust have at least one (1) person on-site who, at a minimum, is accredited byVDOT in Basic Work Zone Traffic Control. The person accredited by VDOT in Basic Work Zone Traffic Co n t r o l m a y i n s t a l l , m a i n t a i n a n d r e m o v e w o r k z o n e s that are in accordance with t h e V i r g i n i a W o r k A r e a P r o t e c t i o n M a n u a l a n d / o r a work zone that has been pr e - a p p r o v e d b y V D O T . A p e r s o n a c c r e d i t e d b y V D O T in Intermediate Work Zone T r a f f i c C o n t r o l m u s t b e o n - s i t e t o p r o v i d e s u p e r v i s i o n during work zone adjustme n t s o r c h a n g e s t o t r a f f i c c o n t r o l d u e t o f i e l d c o n d i t i o n s . These persons must have t h e i r a c c r e d i t a t i o n c a r d w i t h t h e m w h i l e o n t h e p r o j e c t site. 11"VAR. CONC. CAP - 6" MAX5' S E E D E T A I L ' C ' 2 % 2 % 2 4 1 3 E X . G R N D P R O P . G R A D E R T E 6 5 2 C E N T E R L N E ( V I E W L O O K I N G E A S T ) R / W R / W 3 : 1 E X . W B L E F T T U R N L N E X . E B L A N E F U L L D E P T H M I L L P R . E B . R T . T U R N L A N E E X . W B L A N E 3 : 1 1 2 . 0 ' 1 2 . 0 ' 1 2 . 0 ' 1 2 . 0 ' 4 . 0 ' 3 0 . 0 ' 5 7 . 6 ' B U F F E R S T R I P 7 . 5 ' D E T A I L ' C ' ( N O T T O S C A L E ) 7 5 6 D A T E : S C A L E : C H E C K E D B Y : S H E E T O F 5 7 TREX COMPANY, INC - BUILDING 6 LOT 63 A 110 SHAWNEE MAGISTERIAL DISTRICT FREDERICK COUNTY, VIRGINIA T S S 1 1 8 3 . 0 103 Heath Court Winchester, VA 22602 (540) 686-7373 fax (540) 301-1100T S S A S S H O W N A U G U S T 1 5 , 2 0 1 9 P R O J E C T N U M B E R : D R A W N B Y : STOWE ENGINEERING, PLCT i m o t h y S . S t o w e 9 / 1 2 / 1 9 2 2 E C S 1 2 2 E CROSS SECTYIONS AND DETAILS WEST COMMERCIAL ENTRANCE TURN LANE CROSS SECTION S 050100 S T O R M S E W E R P R O F I L E S ENTRANCE PROFILE R O U T E 6 5 2 T Y P I C A L S E C T I O N 1 . 2 " A S P H A L T C O N C R E T E S U R F A C E C O U R S E , T Y P E S M - 1 2 . 5 D 2 . 4 " A S P H A L T B A S E C O U R S E , T Y P E B M - 2 5 . 0 D 3 . 7 " A G G R E G A T E B A S E M A T E R I A L , T Y P E 1 , N o . 2 1 - B 4 . 8 " S E L E C T M A T E R I A L ( S E E N O T E ) P L A C E D O N S E P A R A T I O N G E O T E X T I L E 5 . S T A N D A R D V D O T C G - 7 6 . 6 " A G G R E G A T E B A S E M A T E R I A L , T Y P E 1 , N o . 2 1 B 7 . S T A N D A R D V D O T U D - 4 8 . S T A N D A R D V D O T C G - 1 3 9 . 4 " A G G R E G A T E B A S E M A T E R I A L , T Y P E 1 , N o . 2 1 B N O T E S 1 . A R E A S O F E X I T I N G C U R B I N G A N D P A V E M E N T S H A L L B E R E M O V E D F R O M T H E A R E A O F T H E N E W P A V E M E N T S E C T I O N . A N Y V O I D S R E S U L T I N G F R O M T H I S R E M O V A L S H A L L B E B A C K F I L L E D W I T H V D O T A G G R E G A T E N O 2 1 - B . 2 . O N T R E X P R O P E R T Y W H E R E N E W P A V E M E N T A B U T S E X I S T I N G P A V E M E N T J O I N T S S H A L L B E S A W C U T T O P R O V I D E A S M O O T H S T R A I G H T E D G E . 3 . L I M I T S O F F U L L D E P T H P A V E M E N T W I D E N I N G A L O N G R T E . 6 5 2 S H A L L B E D E T E R M I N E D B Y E X C A V A T I O N I N T H E P R E S E N C E O F A V D O T I N S P E C T O R A N D M A T C H I N G C O R E S A M P L E S R E Q U I R E D P E R W P - 2 D E T A I L . 4 . S E L E C T M A T E R I A L S H A L L C O N S I S T O F P R I M A R Y C R U S H E R R U N A N D S H A L L B E F R E E F R O M S E A M S , C R A C K S , A N D O T H E R S T R U C T U R A L D E F E C T S . R O C K M A T E R I A L S H A L L N O T E X C E E D 8 I N C H E S I N I T S G R E A T E S T D I M E N S I O N A N D A P P R O X I M A T E L Y 5 0 % O F T H E R O C K M A T E R I A L S H A L L B E 4 I N C H E S I N S I Z E . T H E S M A L L E S T D I M E N S I O N S H A L L N O T B E L E S S T H A N 2 I N C H E S . 5 . I N S H O U L D E R A R E A S A G G R E G A T E A N D S E L E C T M A T E R I A L S H A L L E X T E N D T O D A Y L I G H T . 1" = 5 0 ' ( H ) 1 " = 5 ' ( V ) DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 22F CS122F VD O T E N T R A N C E P L A N GE N E R A L N O T E S A N D D E T A I L S 1" = 5 0 ' ( H ) 1 " = 5 ' ( V ) DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 22G CS122G VD O T C O M M E R C I A L E N T R A N C E D E T A I L S 1" = 5 0 ' ( H ) 1 " = 5 ' ( V ) DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 22H CS122H VD O T C O M M E R C I A L E N T R A N C E D E T A I L S 1" = 5 0 ' ( H ) 1 " = 5 ' ( V ) CROSSING NOTES: LOOP ROAD GEOMETRY LOOP ROAD TYPICAL SECTION HEAVY DUTY PAVEMENT SECTION DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 23 CS123 LO O P R O A D P L A N A N D P R O F I L E 26 51 60 61 63 64 70 71 72 73 7490 91 92 CA P I T O L L A N E ONE STORY CONCRETE BUILDING (BLDG. #2) F.F.E. = 723.60 ONE STORY METAL BUILDING STORM WATER DETENTION POND FINISH PRODUCT YARD FINISH PRODUCT YARD R & D - BUILDING 2 1" = 5 0 ' ( H ) 1 " = 5 ' ( V ) CROSSING NOTES: BERM TYPICAL SECTION LOOP ROAD STATIONS DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 24 CS124 LO O P R O A D P L A N A N D P R O F I L E 10 11 12 13 14 15 16 17 22 23 24 25 26 28 29 30 31 35 33 32 C D HOG E R U N PI N 6 3 - A - 1 1 5 T R E X C O M P A N Y , I N C . IN S T . 1 6 0 0 0 3 1 7 4 5. 1 1 7 4 A C R E S PI N 6 3 - A - 1 1 0 T R E X C O M P A N Y , I N C . IN S T . 0 2 0 0 2 2 7 9 8 R E C E I V I N G S H I P P I N G A C C E S S R O A D O N E S T O R Y C O N C R E T E B U I L D I N G ( B L D G . # 2 ) F . F . E . = 7 2 3 . 6 0 O N E S T O R Y M E T A L B U I L D I N G V A . S E C . R T E . 6 5 2 - S H A W N E E D R I V E 4 0 ' R / W ( D B 2 6 8 P G 1 4 9 ) HOGE RUN R & D - B U I L D I N G 2 Station CL Right From To Special EP O/S X-Slp X-Slp EP O/S Notes 2+31.40 9.13 TIE TO EX.PAVEMENT 2+40.54 16.48 TIE TO EX.PAVEMENT 2+98.95 2.00%-2 Variable 3+19.17 14.00 Variable Variable 23.50 3+47.49 14.00 2.00%0.00%23.50 4+41.49 2.00%-4.00%23.50 5+35.49 2.00%0.00%23.50 6+31.95 2.00%-4.00%23.50 6+44.23 2.00%Variable 24.97 6+75.00 2.00%-1.80%32.45 7+14.90 14.00 2.00%-2.00%42.14 7+23.13 14.00 2.00%-2.00%Variable 7+26.24 14.00 2.00%-2.00%43.50 7+27.93 Variable 2.00%-2.00%43.50 7+55.70 19.45 2.00%-2.00%43.50 7+94.53 32.83 2.50%-2.00%43.50 Lt.Side EP Return 7+97.82 N/A N/A -1.80%43.50 Rt. CG Return 8+19.90 N/A N/A -1.80%43.50 Rt. CG Return 8+60.10 11+35.70 Variable Variable Variable Variable Lt.Side Tie to existing pavement, Rt.side see plan for grades 8+76.12 Variable Variable -3.00%43.50 Low Point, Lt.Side tie to existing pavement 10+53.60 Variable Variable -1.80%43.50 Lt.Side tie to existing pavement 10+64.41 Variable Variable -1.80%41.04 Lt.Side tie to existing pavement 10+78.09 Variable Variable -1.90%33.64 Lt.Side tie to existing pavement 10+92.18 Variable Variable -2.00%23.61 Lt.Side tie to existing pavement 11+14.22 Variable Variable -2.00%11.28 Lt.Side tie to existing pavement 11+34.96 Variable Variable -2.00%8.00 Lt.Side tie to existing pavement 11+56.78 42.62 Variable -2.00%8.00 Lt.Side tie to existing pavement 11+82.01 26.02 2.00%-2.00%8.00 12+07.76 15.77 2.00%-2.00%8.00 Lt.EP Return 12+69.95 20.63 2.00%-2.00%8.00 Rt.EP Return 13+08.99 20.94 2.00%-2.00%8.00 Lt.Side Transition 13+47.95 14.00 2.00%-2.00%8.00 Lt.Side Transition 13+47.95 15+66.92 15+66.92 14.00 2.00%-2.00%8.00 Lt.Side Begin Taper 16+70.26 21.98 2.00%-2.00%8.00 Lt.Side End Taper 16+75.00 17+75.00 14.00 2.00%-2.00%8.00 17+75.00 20+26.44 14.00 2.00%-2.00%8.00 Berm grading Rt.Side 20+26.44 CL Cap.Lane Entrance Grading See Plan Left 7+05.5 14.00 2.00%-2.00%42.14 Lt begin 2' shoulder 3+85.0 16.5+/-2.00%0.00%23.50 Lt end 2' shoulder, pvmt to face of wall 16.5+/- 16.5+/- 16.5+/- 16.5+/- 16.5+/- Lt pvmt to face of wall Lt pvmt to face of wall Lt pvmt to face of wall Lt pvmt to face of wall Lt pvmt to face of wall 1" = 5 0 ' ( H ) 1 " = 5 ' ( V ) CROSSING NOTES: YARD ACCESS GEOMETRY YARD ACCESS STATIONS CAPITOL LANE GEOMETRY CAPITOL LANEINBOUND YARD ACCESS ROAD YARD ACCESS TYPICAL see table for variations CAPITOL LANE TYPICAL Station Notes From To Special 1+33.62 RT.TIE TO EX.PAVEMENT, 2' SHOULDER 1+66.45 END SHOULDER, BEGIN CG-6 1+33.65 5+28.77 LT.SIDE TIE TO EX.PAVEMENT 5+00.00 RT.SIDE END CG-6, BEGIN 8' PVMT W/ 2' SHOULDER 5+28.77 LT.SIDE BEGIN 8' PVMT AND 2' SHOULDER 6+27.81 LT.SIDE START RETURN 6+45.73 RT.BEGIN EP RETURN 7+05.56 LT.SIDE END EP RETURN 7+11.00 TIE TO EXISTING PAVMENT CAPITOL LANE STATIONS Station Notes From To Special 6+38.00 BEGIN CONSTRUCTION MATCH TO EX.PAVEMENT 7+09.95 LT.SIDE BEGIN EP RETURN 7+12.83 RT.SIDE BEGIN EP RETURN DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 25 CS125 IN B O U N D Y A R D A C C E S S R O A D P L A N A N D PR O F I L E 51 60 61 63 64 70 71 72 73 7490 91 92 CA P I T O L L A N E STORM WATER DETENTION POND FINISH PRODUCT YARD FINISH PRODUCT YARD ST O R M P R O F I L E S CROSSING NOTES: DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 26 CS126 CROSSING NOTES: FU T U R E S T O R M FU T U R E S T O R M DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 27 CS127 ST O R M P R O F I L E S DR A I N A G E D I V I D E S DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 28 CS128 FF=728.00 LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC CA P I T O L L A N E HOGE R U N CITY O F W I N C H E S T E R COU N T Y O F F R E D E R I C K PIN 63-A-115 TREX COMPANY, INC. INST. 160003174 5.1174 ACRES PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 RECEIVING SHIPPING ACCESS ROAD ONE STORY CONCRETE BUILDING (BLDG. #2) F.F.E. = 723.60 ONE STORY METAL BUILDING ONE STORY METAL BUILDING F.F.E. (718.53) V A . S E C . R T E . 6 5 2 - S H A W N E E D R I V E 4 0 ' R / W ( D B 2 6 8 P G 1 4 9 ) TM 371-1-1 PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 STORM WATER DETENTION POND HOG E R U N FINISH PRODUCT YARD FINISH PRODUCT YARD FINISH PRODUCT YARD CONCRETE BUILDING (BLDG. #4) F.F.E. = 738.60 R & D - BUILDING 2 to Str.# 11 DA=0.13 Ac. C=0.59 Tc=5 min. to Str.# 12 DA=0.20 Ac. C=0.58 Tc=5 min. to Str.# 13 DA=0.09 Ac. C=0.54 Tc=5 min. to Str.# 14 DA=0.94 Ac. C=0.80 Tc=5 min. to Str.# 17 DA=0.62 Ac. C=0.85 Tc=5 min. to Str.# 18 DA=0.62 Ac. C=0.85 Tc=5 min. to Str.# 20 DA=0.27 Ac. C=0.52 Tc=5 min. to Str.# 21 DA=0.64 Ac. C=0.85 Tc=5 min. to Str.# 23 DA=0.33 Ac. C=0.45 Tc=5 min. to Str.# 24 DA=0.42 Ac. C=0.60 Tc=5 min. to Str.# 25 DA=0.23 Ac. C=0.83 Tc=5 min. to Str.# 26 DA=0.18 Ac. C=0.79 Tc=5 min. to Str.# 28 DA=0.45 Ac. C=0.72 Tc=5 min. to Str.# 29 DA=0.68 Ac. C=0.58 Tc=5 min. to Str.# 31 DA=0.56 Ac. C=0.63 Tc=5 min. to Str.# 32 DA=0.84 Ac. C=0.85 Tc=5 min. to Str.# 33 DA=0.80 Ac. C=0.85 Tc=5 min. to Str.# 34 DA=0.11 Ac. C=0.72 Tc=5 min. to Str.# 35 DA=0.75 Ac. C=0.85 Tc=5 min. to Str.# 51 DA=1.83 Ac. C=0.77 Tc=5 min. to Str.# 63 DA=0.41 Ac. C=0.68 Tc=5 min. to Str.# 71 DA=0.69 Ac. C=0.82 Tc=5 min. to Str.# 72 DA=0.18 Ac. C=0.76 Tc=5 min. to Str.# 91 DA=1.30 Ac. C=0.90 Tc=5 min. to Str.# 92 DA=0.93 Ac. C=0.90 Tc=5 min. to Str.# 73 DA=0.10 Ac. C=0.78 Tc=5 min. to Str.# 74 DA=0.10 Ac. C=0.78 Tc=5 min. to Str.# 99 DA=0.50 Ac. C=0.57 Tc=5 min. ST O R M C O M P U T A T I O N S From To DA C CA Inlet Time Peak Time Intensity Q10 Inverts Length Slope Dia Cap Vel Flow Time (Acres)Factor Incr.Accum.(min)(mim)(in/hr)(cfs)US DS (ft)(ft/ft)(in)(cfs)(fps)(min) 92 91 0.93 0.90 0.84 0.84 5.00 5.00 6.42 5.38 720.15 714.33 162.30 0.0358 15 10.60 8.67 0.31 91 90 1.30 0.90 1.17 2.01 5.00 5.31 6.33 12.72 714.33 714.00 64.73 0.0051 24 16.20 5.71 0.19 72 71 0.18 0.76 0.14 0.14 5.00 5.00 6.42 0.89 714.87 713.87 199.50 0.0050 15 3.97 2.61 1.27 71 70 0.69 0.82 0.57 0.70 5.00 6.27 6.06 4.27 713.62 713.54 16.84 0.0050 18 6.45 3.90 0.07 64 61 4.33 0.90 3.90 3.90 5.00 5.00 6.42 25.03 715.69 713.76 120.80 0.0160 24 28.61 10.27 0.20 63 61 0.41 0.68 0.28 0.28 5.00 5.00 6.42 1.79 715.94 714.51 114.46 0.0125 15 7.22 4.88 0.39 61 60 0.00 0.80 0.00 4.18 5.00 5.39 6.31 26.35 713.26 712.99 26.42 0.0102 30 41.45 8.95 0.05 35 12 0.75 0.85 0.64 0.64 5.00 5.00 6.42 4.10 720.00 717.79 49.00 0.0451 15 13.71 9.76 0.08 33 28 0.80 0.85 0.68 0.68 5.00 5.00 6.42 4.34 720.64 713.99 131.06 0.0507 15 14.54 10.35 0.21 32 31 0.84 0.85 0.71 0.71 5.00 5.00 6.42 4.58 720.65 719.00 49.00 0.0337 12 6.54 9.01 0.09 31 30 0.56 0.63 0.35 1.07 5.00 5.09 6.40 6.82 718.75 717.00 56.42 0.0309 18 16.01 8.70 0.11 30 29 0.00 0.50 0.00 1.07 5.00 5.20 6.37 6.79 716.75 715.54 59.63 0.0203 18 12.98 7.43 0.13 29 28 0.68 0.58 0.40 1.46 5.00 5.33 6.33 9.25 715.29 712.24 115.55 0.0264 18 14.78 8.83 0.22 28 23 0.45 0.72 0.33 2.46 5.00 5.55 6.27 15.44 711.99 710.81 67.40 0.0175 24 29.92 9.60 0.12 26 25 0.18 0.79 0.14 0.14 5.00 5.00 6.42 0.89 713.87 713.01 51.47 0.0167 15 8.34 4.43 0.19 25 24 0.23 0.83 0.19 0.33 5.00 5.19 6.37 2.07 713.01 711.54 100.27 0.0147 15 7.83 5.39 0.31 24 23 0.42 0.60 0.25 0.57 5.00 5.50 6.28 3.61 711.29 710.81 63.26 0.0075 18 9.09 4.85 0.22 23 22 0.33 0.45 0.15 3.19 5.00 5.72 6.22 19.83 710.56 710.50 10.08 0.0065 30 33.05 7.04 0.02 21 20 0.64 0.85 0.54 0.54 5.00 5.00 6.42 3.49 732.08 729.80 78.52 0.0290 12 5.26 7.16 0.18 20 19 0.27 0.52 0.14 0.69 5.00 5.18 6.37 4.38 729.80 728.57 36.54 0.0338 15 10.30 8.05 0.08 19 18 0.00 0.50 0.00 0.69 5.00 5.26 6.35 4.36 728.57 726.48 87.40 0.0239 15 8.64 7.06 0.21 18 17 0.62 0.85 0.53 1.22 5.00 5.46 6.29 7.66 726.48 723.62 158.79 0.0180 18 12.21 7.30 0.36 17 16 0.62 0.85 0.53 1.75 5.00 5.83 6.19 10.82 723.62 722.17 66.89 0.0217 18 13.42 8.45 0.13 16 15 0.00 0.50 0.00 1.75 5.00 5.96 6.15 10.76 721.17 714.82 262.99 0.0241 18 16.31 9.86 0.44 15 13 0.00 0.50 0.00 1.75 5.00 6.40 6.03 10.54 714.57 714.15 84.00 0.0050 24 15.99 5.44 0.26 14 13 0.94 0.80 0.75 0.75 5.00 5.00 6.42 4.83 715.34 714.15 75.83 0.0156 15 8.08 6.88 0.18 13 12 0.09 0.54 0.05 2.55 5.00 6.66 5.95 15.17 713.90 713.48 83.90 0.0050 30 25.18 5.37 0.26 12 11 0.11 0.72 0.08 3.27 5.00 6.92 5.88 19.21 713.23 712.86 70.67 0.0052 30 29.69 6.43 0.18 11 10 0.34 0.58 0.20 3.46 5.00 7.10 5.83 20.18 712.61 712.50 16.12 0.0070 30 34.26 7.27 0.04 INLET SAG INLETS ONLY GRATE INLETS ONLY NU M B E R TY P E LE N G T H ( F T ) DR A I N A G E A R E A ( A C ) C CA su m C A Tc , T i m e t o I n l e t ( M I N ) I ( I N / H R ) Q, I N C R ( C F S ) Qb , C A R R Y O V E R ( C F S ) QT , G U T T E R F L O W ( C F S ) S, G U T T E R S L O P E ( F T / F T ) Sx , C R O S S S L O P E ( F T / F T ) T, S P R E A D W ( F T ) W/ T Sw ( F T / F T ) Sw / S x Eo a= 1 2 W ( S w - S x ) + L o c a l D e p r e s s i o n S' w = a / ( 1 2 W ) Se = S x + S ' w ( E o ) , ( F T / F T ) CO M P U T E D L E N G T H L t , ( F T ) L, S P E C I F I E D L E N G T H ( F T ) L/ L t E Qi , I N T E R C E P T E D ( C F S ) Qb , C A R R Y O V E R ( C F S ) d ( F T ) h ( F T ) d/ h T, S P R E A D @ S A G ( F T ) EF F E C T I V E P E R I M E T E R d ( F T ) 11 DI-3B RIGHT (L=8')8.00 0.34 0.58 0.20 0.20 5.00 6.42 1.26 0.00 1.26 0.0100 0.0200 5.56 2.0 0.3597 0.0833 4.17 0.852 3.52 0.147 0.14 6.57 8 1.22 1.000 1.26 0.00 12 DI-3BB LEFT (L=6')6.00 0.11 0.72 0.08 0.08 5.00 6.42 0.52 0.00 0.52 0.0100 0.0300 2.16 2.0 0.9259 0.0833 2.78 1.000 3.28 0.137 0.17 4.18 6 1.44 1.000 0.52 0.00 13 DI-3BB LEFT (L=8')8.00 0.09 0.54 0.05 0.05 5.00 6.42 0.31 0.00 0.31 0.0618 0.0200 1.25 2.0 1.6000 0.0833 4.17 1.000 3.52 0.147 0.17 5.81 8 1.38 1.000 0.31 0.00 14 DI-3B RIGHT (L=14')14.00 0.94 0.80 0.75 0.75 5.00 6.42 4.83 0.00 4.83 0.0060 0.0200 12.40 2.0 0.1613 0.0833 4.17 0.477 3.52 0.147 0.09 13.20 14 1.06 1.000 4.83 0.00 15 MH-2-4DIA 0.00 0.50 0.00 0.00 5.00 6.42 0.00 0.00 16 MH-2-4DIA 0.00 0.50 0.00 0.00 5.00 6.42 0.00 0.00 17 MH-2-4DIA 0.62 0.85 0.53 0.53 5.00 6.42 3.41 0.00 18 Nyloplast Round 24''0.62 0.85 0.53 0.53 5.00 6.42 3.41 0.00 3.14 0.296 19 Nyloplast Round 24''0.00 0.50 0.00 0.00 5.00 6.42 0.00 0.00 3.14 0.001 20 Nyloplast Round 24''0.27 0.52 0.14 0.14 5.00 6.42 0.92 0.00 3.14 0.212 21 Nyloplast Round 24''0.64 0.85 0.54 0.54 5.00 6.42 3.49 0.00 3.14 0.311 23 DI-3B RIGHT (L=6')6.00 0.33 0.45 0.15 0.15 5.00 6.42 0.96 0.00 0.96 0.0100 0.0200 4.62 2.0 0.4329 0.0833 4.17 0.914 3.52 0.147 0.15 5.66 6 1.06 1.000 0.96 0.00 24 DI-3C (L=10')10.00 0.42 0.60 0.25 0.25 5.00 6.42 1.60 0.00 1.60 0.0050 0.0200 7.75 2.0 0.2581 0.0833 4.17 0.704 3.52 0.147 0.12 6.51 10 1.54 1.000 1.60 0.00 0.14 0.43 0.32 6.83 25 DI-3B LEFT (L=8')8.00 0.23 0.83 0.19 0.19 5.00 6.42 1.20 0.00 1.20 0.0100 0.0200 5.39 2.0 0.3711 0.0833 4.17 0.863 3.52 0.147 0.15 6.40 8 1.25 1.000 1.20 0.00 28 DI-3BB RIGHT (L=12')12.00 0.45 0.72 0.33 0.33 5.00 6.42 2.09 0.00 2.09 0.0300 0.0200 5.41 2.0 0.3697 0.0833 4.17 0.862 3.52 0.147 0.15 11.24 12 1.07 1.000 2.09 0.00 29 DI-7 0.68 0.58 0.40 0.40 5.00 6.42 2.54 0.00 5.5 0.287 30 MH-2-4DIA 0.00 0.50 0.00 0.00 5.00 6.42 0.00 0.00 31 DI-3B RIGHT (L=10')10.00 0.56 0.63 0.35 0.35 5.00 6.42 2.27 0.00 2.27 0.0100 0.0300 6.15 2.0 0.3252 0.0833 2.78 0.757 3.28 0.137 0.13 8.85 10 1.13 1.000 2.27 0.00 32 Nyloplast Round 24''0.84 0.85 0.71 0.71 5.00 6.42 4.58 0.00 3.14 0.534 33 Nyloplast Round 24''0.80 0.85 0.68 0.68 5.00 6.42 4.34 0.00 3.14 0.481 35 Nyloplast Round 24''0.75 0.85 0.64 0.64 5.00 6.42 4.10 0.00 3.14 0.427 51 CURB CUT (L=14') Sag 14.00 1.85 0.77 1.42 1.42 5.00 6.42 9.14 0.00 9.14 0.0050 0.0298 13.13 2.0 0.1523 0.0833 2.80 0.412 3.28 0.137 0.09 16.76 14 0.84 0.961 8.78 0.36 0.37 0.43 0.86 12.38 61 MH-2-4DIA 0.00 0.80 0.00 0.00 5.00 6.42 0.00 0.00 63 DI-1 0.41 0.68 0.28 0.28 5.00 6.42 1.78 0.00 4 0.281 64 MH-2-4DIA 4.33 0.90 3.90 3.90 5.00 6.42 25.02 0.00 71 DI-3B LEFT (L=14')14.00 0.69 0.82 0.57 0.57 5.00 6.42 3.64 0.00 3.64 0.0186 0.0200 8.42 2.0 0.2375 0.0833 4.17 0.663 3.52 0.147 0.12 14.04 14 1.00 1.000 3.64 0.00 72 DI-3C (L=8')8.00 0.18 0.76 0.14 0.14 5.00 6.42 0.89 0.00 0.89 0.0001 0.0300 11.24 2.0 0.1779 0.0833 2.78 0.475 3.28 0.137 0.09 1.84 8 4.35 1.000 0.89 0.00 0.10 0.43 0.24 3.40 73 PAVEMENT 7.00 0.10 0.78 0.08 0.08 5.00 6.42 0.52 0.00 0.52 0.0001 0.0200 11.46 2.0 0.1745 0.0833 4.17 0.513 3.52 0.147 0.10 1.47 7 4.78 1.000 0.52 0.00 74 END CURB 7.00 0.10 0.78 0.08 0.08 5.00 6.42 0.48 0.00 0.48 0.0050 0.0200 3.44 2.0 0.5814 0.0833 4.17 0.975 3.52 0.147 0.16 3.33 7 2.10 1.000 0.48 0.00 91 DI-3B RIGHT (L=20')20.00 1.30 0.90 1.17 1.17 5.00 6.42 7.52 0.00 7.52 0.0139 0.0150 14.96 2.0 0.1337 0.0833 5.55 0.431 3.64 0.152 0.08 21.90 20 0.91 0.988 7.43 0.09 92 DI-3B RIGHT (L=20')20.00 0.93 0.90 0.84 0.84 5.00 6.42 5.37 0.00 5.37 0.0175 0.0150 12.25 2.0 0.1633 0.0833 5.55 0.523 3.64 0.152 0.09 18.52 20 1.08 1.000 5.37 0.00 99 DI-3B (L=10')10.00 0.50 0.57 0.29 0.29 5.00 6.42 1.83 0.00 1.83 0.0170 0.0100 8.95 2.0 0.2235 0.0833 8.33 0.751 3.76 0.157 0.13 9.75 10 1.03 1.000 1.83 0.00 Junction Loss Elev Inlet US Outlet Do Qo Lo Sfo Hf Vo Ho Qi Vi QiVi Vi^2/2g Hi Angle Hdelta Ht 1.3Ht 0.5Ht Final H Water Rim Station Inlet WSE in cfs ft ft/ft ft ft ft ft ft ft ft ft Surface Elev 10 Starting Elevation 715.00 712.53 11 715.00 30 20.18 16.12 0.0024 0.04 7.27 0.20 0.22 0.08 0.51 0.67 0.33 0.37 715.37 718.00 12 19.21 6.43 123.62 0.64 0.22 11 0.08 12 715.37 30 19.21 70.67 0.0022 0.16 6.43 0.16 0.42 0.25 0.83 1.08 0.54 0.70 716.07 726.52 13 15.17 5.37 81.45 0.45 0.16 65 0.25 35 4.10 8.80 36.03 1.20 0.42 11 0.16 13 716.07 30 15.17 83.90 0.0018 0.15 5.37 0.11 0.26 0.28 0.65 0.84 0.42 0.57 716.64 721.99 14 4.83 6.88 33.19 0.73 0.26 14 0.10 15 10.54 5.44 57.28 0.46 0.16 76 0.28 14 716.64 15 4.83 75.83 0.0056 0.42 6.88 0.18 0.00 0.00 0.18 0.24 0.12 0.54 717.19 719.34 - 15 716.64 24 10.54 84.00 0.0022 0.18 5.44 0.11 0.53 0.00 0.64 0.00 0.32 0.50 717.15 723.05 16 10.76 9.86 106.08 1.51 0.53 0 0.00 16 717.15 18 10.76 262.99 0.0105 2.76 9.86 0.38 0.39 0.78 1.54 0.00 0.77 3.53 720.68 727.71 17 10.82 8.45 91.43 1.11 0.39 90 0.78 17 723.67 18 10.82 66.89 0.0141 0.95 8.45 0.28 0.29 0.00 0.57 0.74 0.37 1.31 724.98 728.26 18 7.66 7.30 55.92 0.83 0.29 0 0.00 18 725.12 18 7.66 158.79 0.0071 1.12 7.30 0.21 0.27 0.00 0.48 0.62 0.31 1.44 726.56 732.01 19 4.36 7.06 30.80 0.77 0.27 0 0.00 19 727.73 15 4.36 87.40 0.0061 0.53 7.06 0.19 0.35 0.25 0.80 0.00 0.40 0.93 728.66 733.53 20 4.38 8.05 35.23 1.01 0.35 21 0.25 20 729.82 15 4.38 36.54 0.0061 0.22 8.05 0.25 0.28 0.20 0.73 0.95 0.47 0.70 730.51 733.52 21 3.49 7.16 25.02 0.80 0.28 21 0.20 21 730.80 12 3.49 78.52 0.0128 1.01 7.16 0.20 0.00 0.00 0.20 0.26 0.13 1.13 731.94 735.09 - 35 719.04 15 4.10 49.00 0.0054 0.26 8.80 0.30 0.00 0.00 0.30 0.39 0.20 0.46 719.50 727.05 - 22 Starting Elevation 713.72 712.53 23 713.72 30 19.78 10.08 0.0023 0.02 7.04 0.19 0.50 0.24 0.93 1.21 0.61 0.63 714.35 716.69 24 3.61 4.85 17.51 0.37 0.13 80 0.24 28 15.36 9.59 147.32 1.43 0.50 4 0.00 24 714.35 18 3.61 63.26 0.0012 0.07 4.85 0.09 0.16 0.00 0.25 0.32 0.16 0.24 714.59 716.31 25 2.07 5.39 11.15 0.45 0.16 1 0.00 25 714.59 15 2.07 100.27 0.0010 0.10 5.39 0.11 0.11 0.17 0.39 0.51 0.25 0.36 714.94 717.07 26 0.89 4.43 3.94 0.30 0.11 61 0.17 26 714.94 15 0.89 51.47 0.0002 0.01 4.43 0.08 0.00 0.00 0.08 0.10 0.05 0.06 715.00 715.00 - 28 714.35 24 15.36 67.40 0.0046 0.31 9.59 0.36 0.47 0.58 1.41 1.83 0.92 1.23 715.58 723.89 29 9.21 8.82 81.23 1.21 0.42 40 0.52 33 4.34 9.32 40.51 1.35 0.47 44 0.58 29 715.58 18 9.21 115.55 0.0102 1.18 8.82 0.30 0.30 0.48 1.08 1.40 0.70 1.88 717.46 720.50 30 6.75 7.42 50.12 0.85 0.30 61 0.48 30 717.46 18 6.75 59.63 0.0055 0.33 7.42 0.21 0.30 0.42 0.93 0.00 0.47 0.80 718.26 724.43 31 6.82 7.39 50.43 0.85 0.30 54 0.42 31 718.50 18 6.82 99.81 0.0056 0.56 7.39 0.21 0.53 0.92 1.66 2.15 1.08 1.64 720.14 726.97 32 4.58 9.85 45.06 1.51 0.53 79 0.92 32 720.14 12 4.58 49.00 0.0220 1.08 9.85 0.38 0.00 0.00 0.38 0.49 0.24 1.32 721.46 727.90 - 33 715.58 15 4.34 131.06 0.0060 0.79 9.32 0.34 0.00 0.00 0.34 0.44 0.22 1.01 716.59 727.90 - 60 Starting Elevation 715.49 712.53 61 715.49 30 26.35 26.42 0.0041 0.11 8.95 0.31 0.57 0.49 1.37 0.00 0.69 0.80 716.29 718.03 63 1.79 4.88 8.71 0.37 0.13 0 0.00 64 25.03 10.27 256.97 1.64 0.57 25 0.49 63 716.29 15 1.79 114.46 0.0008 0.09 4.88 0.09 0.00 0.00 0.09 0.12 0.06 0.15 716.43 718.84 - 64 716.29 24 25.03 120.80 0.0122 1.48 10.27 0.41 0.00 0.00 0.41 0.53 0.27 1.74 718.03 721.35 - 70 Starting Elevation 715.04 712.53 71 715.04 18 4.27 16.84 0.0022 0.04 3.90 0.06 0.04 0.06 0.16 0.20 0.10 0.14 715.18 718.85 72 0.89 2.61 2.31 0.11 0.04 68 0.06 72 715.18 15 0.89 199.50 0.0003 0.05 2.61 0.03 0.00 0.00 0.03 0.03 0.02 0.07 715.25 719.65 - 90 Starting Elevation 716.00 712.53 91 716.00 24 12.72 64.73 0.0032 0.20 5.71 0.13 0.41 0.58 1.12 1.45 0.73 0.93 716.93 721.23 92 5.38 8.67 46.60 1.17 0.41 52 0.58 92 716.93 15 5.38 162.30 0.0092 1.50 8.67 0.29 0.00 0.00 0.29 0.38 0.19 1.69 718.62 723.95 - Ditch Comps ID ROAD NAME SIDE STATIONING Direction of AREA C CA CA Tc I2 Q2 CHANNEL GEOMETRY DITCH SLOPE EARTH PROTECTIVE LINING 10 YEAR COMPS L/R START END Flow INCR ACC LEFT BOTTOM RIGHT TOTAL TYPE VEL fps ALLOW Actual (A)head/(B)ack SLOPE WIDTH SLOPE DEPTH (V,T,R)Ft./Ft.Allow Actual VEL fps Type VEL.DEPTH I10 Q10 DEPTH 1 Str10-Outfall 00+00.0 -00+50.0 3.46 1 3.46 3.46 7.10 4.10 14.2 2 6 2 1 T 0.0553 2.5 5.58 4 EC-2 3.99 0.51 5.83 20.17 0.62 2 Str10-Outfall -00+50.0 END 3.46 1 3.46 3.46 7.10 4.10 14.2 2 6 2 1 T 0.0270 2.5 4.41 4 EC-2 3.14 0.62 5.83 20.17 0.76 3 Str22-Outfall 00+00.0 -00+30.0 3.19 1 3.19 3.19 5.78 4.47 14.3 2 6 2 1 T 0.0848 2.5 6.43 10 EC-3 Type A 4.61 0.45 6.20 19.78 0.54 4 Str22-Outfall -00+30.0 END 3.19 1 3.19 3.19 5.80 4.47 14.2 2 6 2 1 T 0.0186 2.5 3.91 4 EC-2 2.77 0.70 6.20 19.77 0.84 5 Str60-Outfall 00+00.0 -00+68.0 4.18 1 4.18 4.18 5.39 4.58 19.2 2 6 2 1 T 0.0416 2.5 5.64 4 EC-2 4.01 0.65 6.31 26.38 0.78 6 Str60-Outfall -00+68.0 End 4.18 1 4.18 4.18 5.36 4.59 19.2 2 6 2 1 T 0.0150 2.5 4.01 4 EC-2 2.83 0.87 6.32 26.42 1.05 6 Str51-Outfall 00+00.0 End 1.42 1 1.42 1.42 5.0 4.69 6.7 2 5 2 1 T 0.0100 2.5 2.57 4 EC-2 1.82 0.59 6.42 9.12 0.71 FUTURE STORM PIPES From To DA C CA Inlet Time Peak Time Intensity Q10 Inverts Length Slope Dia Cap Vel Flow Time (Acres)Factor Incr.Accum.(min)(mim)(in/hr)(cfs)US DS (ft)(ft/ft)(in)(cfs)(fps)(min) F8 F7 3.46 1.00 3.46 3.46 7.10 7.10 5.83 20.17 712.50 712.37 18.42 0.0071 30 34.44 7.29 0.04 F7 F6 0.00 0.01 0.00 3.46 5.00 7.14 5.82 20.13 711.17 711.01 25.20 0.0065 30 33.06 7.06 0.06 F5 F4 0.42 0.60 0.25 0.25 5.00 5.00 6.42 1.62 711.89 711.54 12.96 0.0268 18 17.19 6.12 0.04 F2 F3 0.00 0.01 0.00 3.19 5.00 5.74 6.21 19.82 709.13 709.00 19.54 0.0065 30 33.06 7.04 0.05 F1 F2 3.19 1.00 3.19 3.19 5.70 5.70 6.22 19.86 710.50 710.40 15.28 0.0065 30 33.05 7.04 0.04 DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 29 CS129 DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 8/15/19 30 CS130 ST O R M D E T A I L S DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 8/15/19 31 CS131 ST O R M D E T A I L S CLEANWAY DOWNSPOUT FILTER NOTES 1.SEE PLUMBING DRAWINGS FOR DOWNSPOUT LOCATIONS. 2.ALL CONNECTIONS ON THE CLEANWAY UNITS SHALL BE SIZED FOR 8" PVC PIPE. 3.DOWNSPOUNT PIPE TO CONNECT TO TOP OPENING OF CLEANWAY UNIT. NECESSARY FITTINGS TO BE PROVIDED BY CONTRACTOR. 4.BOTTOM DISCHARGE OPENING TO BE USED FOR A DRY FILTATION. ALL UNUSED OPENING ARE TO BE PLUGGED. 5.DISCHARGE PIPE TO EXTEND DOWNWARD AND CONNECT TO THE ADJACENT STORM STRUCTURE AS SHOWN ON A MAX SLOPE OF 1 8":1'. ALL NECESSARY BENDS AND FITTING TO BE PROVIDE BY THE CONTRACTOR. SEE STORM PROFILES FOR DISCHARGE CONNECTION ELEVATION. CONN FOR 8" DOWNSPOUT (TYP) ST O R M W A T E R M A N A G E M E N T STORM WATER NARRATIVE: DRAINAGE AREA QUANTITY ANALYSIS QUALITY ANALYSIS OVERALL DRAINAGE SHED FOR 1% RULE ANALYSIS AREA / SOILS MAP EXISTING POND ANALYSIS AREA Runoff Events 1 Year 2.40 2 Year 2.89 10 Year 4.22 100 Year 6.65 24Hr Storm (Inches) Notes · · Events for Subcatchment Pre: Event Rainfall (inches) Runoff (cfs) Volume (acre-feet) Depth (inches) 1-Year 2.40 15.30 0.804 1.86 2-Year 2.89 18.91 1.009 2.34 10-Year 4.22 28.62 1.572 3.64 100-Year 6.65 46.13 2.611 6.05 Events for Link Pst: Study Event Inflow (cfs) Primary (cfs) Elevation (feet) 1-Year 13.50 13.50 0.00 2-Year 16.45 16.45 0.00 10-Year 24.40 24.40 0.00 100-Year 45.99 45.99 0.00 Events for Pond SWM: Bio #1 Event Inflow (cfs) Outflow (cfs) Primary (cfs) Secondary (cfs) Elevation (feet) Storage (cubic-feet) 1-Year 2.74 0.02 0.02 0.00 712.51 6,408 2-Year 3.34 0.05 0.05 0.00 712.64 6,669 10-Year 4.95 0.27 0.16 0.11 713.51 8,546 100-Year 7.87 7.56 0.19 7.37 713.78 9,177 Summaries for All Events SOURCE: NRCS - WEB SOIL SURVEY SOIL BOUNDARIES SOILS LEGEND MAP MAP UNIT NAME HYDRAULIC SYMBOL SOIL GROUP D6CCARBO-OAKLET, VERY ROCK SILY LOAMS, 2 TO 15 PERCENT SLOPES C32BOAKLET SILT LOAM, 2 TO 7 PERCENT SLOPES DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 32 CS132 DA=1451 Ac.+/- 2.27± Sq. Miles PROJECT AREA 6C32B 6C32B 51 60 61 63 64 70 71 72 73 7490 91 92 LOC LOC LOC LOC LOC LOC CA P I T O L L A N E T R A V . S 1 1 N = 7 0 9 6 3 9 1 . 3 5 1 E = 1 1 5 7 2 2 7 8 . 0 4 5 E L E V . = 7 3 5 . 5 7 PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 STORM WATER DETENTION POND Demo. Ex. Concrete Re m o v e Tr e e s u n d e r g r o u n d Ex. Concrete w/ slotted Remove Ex. Pipe Demo. Ex. Asphalt Relocate FH and Valve. Abandon pipe Demo. Ex. Asphalt Remove Ex. Pipe FINISH PRODUCT YARD FINISH PRODUCT YARD FINISH PRODUCT YARD Abandon Ex. Lateral Demo. Ex. Asphalt Cut 1" water line and cap Remove Light Pole and terminate elec. [Pre] PRE-DEVELOPMENT AREA DA=5.179 AC. CN=95 Tc=7.5 Min. [Pst02] POST DEVELOPMENT (UN-DETAINED) DA=4.306 AC. CN=97 Tc=7.5 Min. [Pst01] POST DEVELOPMENT (BIO-RETENTION) DA=.873 AC. CN=97 Tc=7.5 Min. ST O R M W A T E R M A N A G E M E N T Summary for Subcatchment Pre: Runoff =15.30 cfs @ 11.99 hrs, Volume=0.804 af, Depth>1.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.40" Area (ac)CN Description 0.994 80 >75% Grass cover, Good, HSG D 2.217 98 Paved parking, HSG D 1.968 98 Paved parking, HSG C 5.179 95 Weighted Average Tc Length Slope Velocity Capacity Description (min)(feet)(ft/ft)(ft/sec)(cfs) 7.5 Direct Entry, Summary for Subcatchment Pst01: Runoff =2.74 cfs @ 11.98 hrs, Volume=0.150 af, Depth>2.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.40" Area (ac)CN Description 0.067 80 >75% Grass cover, Good, HSG D 0.790 98 Paved parking, HSG D 0.016 98 Paved parking, HSG C 0.873 97 Weighted Average Tc Length Slope Velocity Capacity Description (min)(feet)(ft/ft)(ft/sec)(cfs) 7.5 Direct Entry, Summary for Subcatchment Pst02: Un-detained Runoff =13.50 cfs @ 11.98 hrs, Volume=0.740 af, Depth>2.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Type II 24-hr 1-Year Rainfall=2.40" Area (ac)CN Description 0.304 80 >75% Grass cover, Good, HSG D 2.049 98 Paved parking, HSG D 1.953 98 Paved parking, HSG C 4.306 97 Weighted Average Tc Length Slope Velocity Capacity Description (min)(feet)(ft/ft)(ft/sec)(cfs) 7.5 Direct Entry, Summary for Pond SWM: Bio #1 Inflow Area =0.873 ac, Inflow Depth > 2.06" for 1-Year event Inflow =2.74 cfs @ 11.98 hrs, Volume=0.150 af Outflow =0.02 cfs @ 23.15 hrs, Volume=0.003 af, Atten= 99%, Lag= 670.1 min Primary =0.02 cfs @ 23.15 hrs, Volume=0.003 af Secondary=0.00 cfs @ 0.00 hrs, Volume=0.000 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.01 hrs Peak Elev= 712.51' @ 23.15 hrs Surf.Area= 1,919 sf Storage= 6,408 cf Plug-Flow detention time= 1,098.1 min calculated for 0.003 af (2% of inflow) Center-of-Mass det. time= 624.6 min ( 1,395.3 - 770.7 ) Volume Invert Avail.Storage Storage Description #1 707.67'11,016 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Voids Inc.Store Cum.Store (feet)(sq-ft)(%)(cubic-feet)(cubic-feet) 707.67 0 0.0 0 0 707.68 1,850 40.0 4 4 709.50 1,850 25.0 842 845 712.50 1,850 100.0 5,550 6,395 712.51 1,950 100.0 19 6,414 713.50 2,305 100.0 2,106 8,521 714.50 2,686 100.0 2,496 11,016 Device Routing Invert Outlet Devices #1 Device 2 709.18'15.000 in/hr Exfiltration over Horizontal area above 709.18' Excluded Horizontal area = 1,850 sf #2 Primary 709.18'6.0" Round Culvert L= 20.0' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 709.18' / 708.98' S= 0.0100 '/' Cc= 0.900 n= 0.010 PVC, smooth interior, Flow Area= 0.20 sf #3 Secondary 713.50'20.0' long x 9.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.46 2.55 2.70 2.69 2.68 2.68 2.67 2.64 2.64 2.64 2.65 2.64 2.65 2.65 2.66 2.67 2.69 Primary OutFlow Max=0.02 cfs @ 23.15 hrs HW=712.51' (Free Discharge) 2=Culvert (Passes 0.02 cfs of 1.66 cfs potential flow) 1=Exfiltration (Exfiltration Controls 0.02 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=707.67' (Free Discharge) 3=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 1 Year Computation Constants Type of Development Re-Development Storm Event Jurisdiction State Avg.1 Year 2 Year 10 Year Annual Rainfall (inches)43 2.5 3.0 4.0 Target Rainfall Event (inches)1.00 Phosphorus EMC (mg/L)0.26 1.86 Nitrogen EMC (mg/L) Target Phosphorus Target Load (lb/acre/yr)0.41 Pj 0.90 Rv Coefficients A soils B Soils C Soils D Soils Forest/Open Space 0.02 0.03 0.04 0.05 Managed Turf 0.15 0.20 0.22 0.25 Impervious Cover 0.95 0.95 0.95 0.95 Land Cover (Acres) Pre-Development A soils B Soils C Soils D Soils Totals Forest/Open Space 0.000 0.000 0.000 0.000 0.000 Managed Turf 0.000 0.000 0.804 7.148 7.952 Impervious Cover 0.000 0.000 0.271 2.333 2.604 Total 10.556 Post-Development A soils B Soils C Soils D Soils Totals Forest/Open Space 0.000 0.000 0.000 0.000 0.000 Managed Turf 0.000 0.000 0.252 2.117 2.369 Impervious Cover 0.000 0.000 0.824 7.363 8.187 Total 10.556 Post Development Pre-Development Land Cover Summary Final Re-Devel.New Impv.Listed Adjusted Forest/Open Space Cover (acres)0.000 0.000 0.000 0.000 Weighted Rv(forest)0.00 0.000 0.000 0.000 % Forest 0.0%0.0%0.0%0.0% Managed Turf Cover (acres)2.369 2.369 7.952 2.369 Weighted Rv(turf)0.25 0.247 0.247 0.247 % Managed Turf 22.4%47.6%75.3%47.6% Impervious Cover (acres)8.187 2.604 5.583 2.604 2.604 Rv(impervious)0.95 0.95 0.95 0.950 0.950 % Impervious 77.6%52.4%24.7%52.4% Total Site Area (acres)10.556 4.973 10.556 4.973 Site Rv 0.79 0.62 0.42 0.62 Treatment Volume (acre-ft)0.6969 0.2549 0.4420 0.3698 0.2549 Development Treatment Volume (cubic feet)30,355 11,102 19253 16,109 11,102 Development Load (TP) (lb/yr)19.07 6.98 12.10 10.12 6.98 Maximum % Reduction Req'd. Below Pre-Development Load 20.00% Allowable Load (TP) (lb/yr)1.40 9.81 Total Load (TP) Reduction Required (lb/yr)11.20 Nitrogen Load (TN) (lb/yr)136.44 72.40 Pre-Development Load Site Results Total Site Area (Ac)10.556 Total Treated Area (Ac)0.873 % Treated 8% Phosphorous Total Treatment Volume (cf)30,355 Total Phosphorous Load Reduction Required (lb/yr)11.20 Runoff Reduction (cf)2,272 Phosphorous Load Reduction Achieved (lb/yr)1.60 Adjusted Post Development Phosphorous Load (TP) (lb/yr)17.47 Remaining Phosphorous Load Reduction (lb/yr) needed -9.60 -9.60 LB/YR Additional removal required Nitrogen (for information purposes) Total Treatment Volume (cf)30,355 Runoff Reduction (cf)2,272 Nitrogen Load Reduction Achieved (lb/yr)11.73 Adjusted Post Development Nitrogen Load (TP) (lb/yr)124.71 Drainage Area "A"Soils Total A B C D Area Weighted RVs Forest/Open Space Area (Ac.)0.000 0.000 0.000 0.000 0.000 0.00 CN 30 55 70 77 Managed Turf Area (Ac.)0.000 0.000 0.000 0.067 0.067 0.25 CN 39 61 74 80 Impervious Cover Area (Ac.)0.000 0.000 0.016 0.790 0.806 0.95 CN 98 98 98 98 DA RV Weighted CN 97 0.873 0.90 Runoff Reduction Phosporus Nitrogen Drainage Area "A"Area Upstream Structure IDs Credit Volume from Upstream RR Practice (cf) Runoff Reduction (cf) Remaining Runoff Volume (cf) Eff. Load from Upstream Practices (lbs) Untreated Load to Practice (lbs.) Removed By Practice (lbs.) Remaining Load (lbs.)Eff. Load from Upstream Practices (lbs) Untreated Load to Practice (lbs.) Removed By Practice (lbs.) Remaining Load (lbs.) Struture ID Structure Practice Unit (Ac.)(1)(2)(3)(4) Bio1 6.b. Bioretention #2 (Spec #9)impervious acres 0.806 80%0 2,224 556 50%0.00 1.74 1.57 0.17 60%0.00 12.48 11.48 1.00 turf acres 0.067 80%0 48 12 50%0.00 0.04 0.03 0.00 60%0.00 0.27 0.25 0.02 Water Quality Computations To be purchased Availability Letter DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 33 CS133 BI O R E T E N T I O N L A N D S C A P I N G P L A N TYPICAL BIO-RETENTION CROSS SECTION PLANT LIST FOR BIO RETENTION TREE SYMBOL SCIENTIFIC NAME COMMON NAME LB LINDERA BENZOIN SPICEBUSH 8 SHRUB SYMBOL SCIENTIFIC NAME COMMON NAME MIN.SIZE HUMMINGBIRD SWEET PEPPER BUSH 3 GAL.24 Total Plants 32 ** PLANT MATERIAL MAY BE REVISED BY LANDSCAPE ARCHITECT WITH APPROVAL BY JURISDICTION, HOWEVER, THE PLANT SELECTION MUST BE MORE "WET-FOOTED" AND SALT-TOLERANT THAN THOSE TYPICALLY USED IN THE PIEDMONT. CA CLETHRA ALNIFOLIA 'HUMMINGBIRD" Bio-Retention Computation Structure:1 Level 2 Rv 0.90 From RRM Computation Effective Depth Computation Actual Design Area 0.873 Acres Void Depth Depth 38,028 SF Ratio (Ft)(Ft) Gravel 0.40 1.50 0.60 Treatment volume computation Choker Layer Stone 0.40 0.16 0.06 Tv=(Rv*A)/12 Choker Layer Sand 0.25 0.16 0.04 2,852 CF Media 0.25 3.00 0.75 Pool 1.00 1.00 1.00 Surface Area Computation Totals 5.8 2.45 SA=((Coeff.*Tv)-volume reduced by upstream BMP)/Effective Depth Elevations Coeff 1.50 Water Surface 713.50 Eff.Depth 2.45 Top of Media 712.50 Bottom of Media 709.50 Req'd.1,743 SF Bottom Choking Layer 709.18 Provided 1,850 SF Invert of Underdrain 709.18 Bottom of gravel layer 707.68 Geometry Ratio of shortest flow path to overall length SFP 40 Ft. L 45 Ft. SFP/L 0.89 Provided 0.80 Req'd. Pretreatment Gravel Diaphram Minimum Tree Planting Surface area coverage of at least 90% within 2 Years Tree planted at 1 per 250 SF of Surface area 8 Trees Minimum Shrubs Provide 3 per every tree required. 24 Shrubs DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 34 CS134 LOC LOC NO WORK ON BIO-RETENTION SITE IS TO BEGIN UNTIL TEMPORARY EROSION STABILIZATION ON THE BIO-RETENTION SITE HAS OCCURRED. SEQUENCE OF CONSTRUCTION FOR BIORETENTION 1.INSTALL SEDIMENT CONTROL DEVICES AS SHOWN ON THE PLANS. 2.GRADE SITE TO ELEVATIONS SHOWN ON PLAN. 3.STABILIZE GRADING WITHIN LIMIT OF DISTURBANCE EXCEPT FOR BIORETENTION AREA. 4.EXCAVATE BIORETENTION AREA TO PROPOSED INVERT DEPTH AND SCARIFY THE EXISTING SOIL SURFACES, TAKING CARE NOT TO COMPACT THE IN-SITU MATERIALS. 5.INSTALL UNDERDRAIN SYSTEM. 6.BACKFILL BIORETENTION AREA WITH FILTER MEDIA AS SHOWN IN THE PLANS AND DETAILED IN THE SPECIFICATIONS. OVERFILLING IS RECOMMENDED TO ACCOUNT FOR SETTLEMENT. 7.PRESOAK THE FILTER MEDIA PRIOR TO PLANTING VEGETATION TO ALLOW FOR SETTLEMENT. THIS CAN BE DONE BY WATER TRUCK OR ALLOWING WATER TO ENTER THE PIT FROM A RAIN EVENT. 8.EXCAVATE OR FILL TO ACHIEVE PROPER DESIGN GRADE, LEAVING SPACE FOR THE UPPER LAYER OF MULCH AND/OR TOPSOIL THAT WILL BRING THE SURFACE TO FINAL GRADE AND READY FOR PLANTING. 9.PLANT VEGETATION SPECIFIED IN THE PLANTING PLAN FOR BIORETENTION AREA. 10.MULCH AND INSTALL EROSION PROTECTION AT ENTRANCE POINTS; REMOVE SEDIMENT CONTROL PRACTICES OR ENTRANCE BLOCKS WITH INSPECTOR AUTHORIZATION.NOTES 9.2.First Year Maintenance Operations Successful establishment of bioretention areas requires that the following tasks be undertaken in the first year following installation: ·Initial inspections. For the first 6 months following construction, the site should be inspected at least twice after storm events that exceed 1/2 inch of rainfall. ·Spot Reseeding. Inspectors should look for bare or eroding areas in the contributing drainage area or around the bioretention area, and make sure they are immediately stabilized with grass cover. ·Fertilization. One-time, spot fertilization may be needed for initial plantings. ·Watering. Watering is needed once a week during the first 2 months, and then as needed during first growing season (April-October), depending on rainfall. ·Remove and replace dead plants. Since up to 10% of the plant stock may die off in the first year, construction contracts should include a care and replacement warranty to ensure that vegetation is properly established and survives during the first growing season following construction. The typical thresholds below which replacement is required are 85% survival of plant material and 100% survival of trees. 9.3. Maintenance Inspections It is highly recommended that a spring maintenance inspection and cleanup be conducted at each bioretention area. The following is a list of some of the key maintenance problems to look for: ·Check to see if 75% to 90% cover (mulch plus vegetative cover) has been achieved in the bed, and measure the depth of the remaining mulch. ·Check for sediment buildup at curb cuts, gravel diaphragms or pavement edges that prevents flow from getting into the bed, and check for other signs of bypassing. ·Check for any winter- or salt-killed vegetation, and replace it with hardier species. ·Note presence of accumulated sand, sediment and trash in the pre-treatment cell or filter beds, and remove it. ·Inspect bioretention side slopes and grass filter strips for evidence of any rill or gully erosion, and repair it. ·Check the bioretention bed for evidence of mulch flotation, excessive ponding, dead plants or concentrated flows, and take appropriate remedial action. ·Check inflow points for clogging, and remove any sediment. ·Look for any bare soil or sediment sources in the contributing drainage area, and stabilize them immediately. ·Check for clogged or slow-draining soil media, a crust formed on the top layer, inappropriate soil media, or other causes of insufficient filtering time, and restore proper filtration characteristics. Example maintenance inspection checklists for Bioretention areas can be accessed in Appendix C of Chapter 9 of the Virginia Stormwater Management Handbook (2010). 9.4. Routine and Non-Routine Maintenance Tasks Maintenance of bioretention areas should be integrated into routine landscape maintenance tasks. If landscaping contractors will be expected to perform maintenance, their contracts should contain specifics on unique bioretention landscaping needs, such as maintaining elevation differences needed for ponding, proper mulching, sediment and trash removal, and limited use of fertilizers and pesticides. A customized maintenance schedule must be prepared for each bioretention facility, since the maintenance tasks will differ depending on the scale of bioretention, the landscaping template chosen, and the type of surface cover. A generalized summary of common maintenance tasks and their frequency is provided in Table 9.8. The most common non-routine maintenance problem involves standing water. If water remains on the surface for more than 48 hours after a storm, adjustments to the grading may be needed or underdrain repairs may be needed. The surface of the filter bed should also be checked for accumulated sediment or a fine crust that builds up after the first several storm events. There are several methods that can be used to rehabilitate the filter (try the easiest things first, as listed below): ·Open the underdrain observation well or cleanout and pour in water to verify that the underdrains are functioning and not clogged or otherwise in need of repair. The purpose of this check is to see if there is standing water all the way down through the soil. If there is standing water on top, but not in the underdrain, then there is a clogged soil layer. If the underdrain and stand pipe indicates standing water, then the underdrain must be clogged and will need to be snaked. ·Remove accumulated sediment and till 2 to 3 inches of sand into the upper 8 to 12 inches of soil. ·Install sand wicks from 3 inches below the surface to the underdrain layer. Sand wicks can be installed by excavating or augering (using a tree auger or similar tool) down to the gravel storage zone to create vertical columns which are then filled with a clean open-graded coarse sand material (coarse sand mix similar to the gradation used for the soil media). A sufficient number of wick drains of sufficient dimension should be installed to meet the design dewatering time for the facility. ·Last resort - remove and replace some or all of the soil media. Sample Construction Inspection Checklist for Bioretention Practices: The following checklist provides a basic outline of the anticipated items for the construction inspection of Bioretention Practices. This checklist does not necessarily distinguish between all the design variations and differences in construction between the family of practices: bioretention basins, micro-bioretention (or raingardens), and urban bioretention. Similarly, the use of an infiltration sump below an underdrain, or an infiltration sump with an “upturned elbow”, and other variations between Level 1 and Level 2 bioretention may not be clearly identified in this checklist. Inspectors should review the plans carefully, and adjust these items and the timing of inspection verification as needed to ensure the intent of the design is met. Finally, users of this information may wish to incorporate these items into a VSMP Authority Construction Checklist format consistent with the format used for erosion and sediment control and BMP construction inspections. Pre-Construction Meeting ☐Pre-construction meeting with the contractor designated to install the bioretention practice has been conducted. ☐Identify the tentative schedule for construction and verify the requirements and schedule for interim inspections and sign-off. ☐Subsurface investigation and soils report supports the placement of an bioretention practice in the proposed location. ☐Impervious cover has been constructed/installed and area is free of construction equipment, vehicles, material storage, etc. ☐All pervious areas of the contributing drainage areas have been adequately stabilized with a thick layer of vegetation and erosion control measures have been removed. ☐Area of bioretention practice has not been impacted during construction. ☐Stormwater has been diverted around the area of the bioretention practice and perimeter erosion control measures to protect the facility during construction have been installed. . Excavation ☐Compare the bioretention surface and invert design elevations with the actual constructed elevations of the inflow and outlet inverts and adjust design elevations as needed. ☐Area of bioretention excavation is marked and the size and location conforms to plan. ☐If the excavation area has been used as a sediment trap: verify that the bottom elevation of the proposed stone reservoir is lower than the bottom elevation of the existing trap. ☐For Level 2 bioretention, ensure the bottom of the excavation is scarified prior to placement of stone. ☐Subgrade surface is free of rocks and roots, and large voids. Any voids should be refilled with the base aggregate to create a level surface for the placement of aggregates and underdrain (if required). ☐No groundwater seepage or standing water is present. Any standing water is dewatered to an acceptable dewatering device. ☐Excavation of the bioretention practice has achieved proper grades and the required geometry and elevations without compacting the bottom of the excavation. ☐Certification of Excavation Inspection: Inspector certifies the successful completion of the excavation steps listed above. Filter Layer, Underdrain, and Stone Reservoir Placement ☐All aggregates, including, as required, the filter layer (choker stone & sand), the stone reservoir layer or infiltration sump conform to specifications as certified by quarry. ☐Underdrain size and perforations meet the specifications. ☐For Level 2 installations: placement of filter layer and initial lift of stone reservoir layer aggregates with underdrain or infiltration sump, spread (not dumped) to avoid aggregate segregation; or ☐Impermeable liner, when required, meets project specifications and is placed in accordance with manufacturers specifications. ☐Sides of excavation covered with geotextile, when required, prior to placing stone reservoir aggregate; no tears or holes, or excessive wrinkles are present. ☐Placement of underdrain, observation wells, and underdrain fittings (45 degree wyes, cap at the upstream end, etc.) are in accordance with the approved plans. ☐Elevations of underdrain and outlet structure are in accordance with approved plans, or as adjusted to meet field conditions. ☐Placement of remaining lift of stone reservoir layer as needed to achieve the required reservoir depth. ☐Certification of Filter Layer and Underdrain Placement Inspection: Inspector certifies the successful completion of the filter layer and underdrain placement steps listed above. Bioretention Soil Media Placement ☐Soil media is certified by supplier or contractor as meeting the project specifications. ☐Soil media is placed in 12-inch lifts to the design top elevation of the bioretention area. Elevation has been verified after settlement (2 to 4 days after initial placement). ☐Side slopes of ponding area are feathered back at the required slope (no steeper than 3H:1V). ☐Certification of Soil Media Placement Inspection: Inspector certifies the successful completion of the soil media steps listed above. Pretreatment and Plant Installation ☐Placement of energy dissipators and pretreatment practices (forebays, gravel diaphragms, etc.) are installed in accordance with the approved plans. ☐Riser, overflow weir, or other outflow structure is set to the proper elevation and functional; or. ☐External bypass structure is built in accordance with the approved plans. ☐Appropriate number and spacing of plants are installed in accordance with the approved plans. ☐All erosion and sediment control practices have been removed. ☐ Follow-up inspection and as-built survey/certification has been scheduled. ☐GPS coordinates have been documented for all bioretention practice installations on the parcel. 4" P.V.C. Cleanout Detail Observation Well Detail GRAVE PRE-TREATNEMT DIAPHRAGM N.T.S. ·DRAWING TAKEN FROM DEQ SPEC NO.9 DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 ST O R M W A T E R M A N A G E M E N T Q U A L I T Y NO T E S A N D D E T A I L S 35 CS135 WA T E R M A I N P R O F I L E S CROSSING NOTES: DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 36 CS136 WA T E R M A I N A N D S E W E R P R O F I L E S CROSSING NOTES: DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 37 CS137 DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 8/15/19 38 CS138 WA T E R & S E W E R D E T A I L S DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 8/15/19 39 CS139 WA T E R & S E W E R D E T A I L S LI F E S A F E T Y P L A N 1"=50' NO PARKING FIRE LANE NO PARKING FIRE LANE NO PARKING FIRE LANE NO PARKING FIRE LANE DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 40 CS140 MATCHLINE SHEET 41 PROPOSED BUILDING 6 187,660 SF BUILDING 175,240 SF MANUFACTURING AREA 12,420 SF OFFICE AREA FFE = 728.00 HEIGHT = 41' +/- NO PARKING FIRE LANE NO PARKING FIRE LANE NO PARKING FIRE LANE LI F E S A F E T Y P L A N 1"=50' NO PARKING FIRE LANE DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 41 CS141 MATCHLINE SHEET 40 CITY O F W I N C H E S T E R COU N T Y O F F R E D E R I C K PROPOSED BUILDING 6 187,660 SF BUILDING 175,240 SF MANUFACTURING AREA 12,420 SF OFFICE AREA FFE = 728.00 HEIGHT = 41' +/- LA N D S C A P E P L A N 1"=50' DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 42 CS142 GENERAL PLANTING NOTES 1.THE LANDSCAPING WILL CONFORM TO SECTION 165-201.01 OF THE FREDERICK COUNTY ZONING ORDINANCE. 2.SUBSTITUTION OF LANDSCAPE MATERIALS MUST BE APPROVED IN WRITING BY THE FREDERICK COUNTY PLANNING DEPARTMENT. 3.THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR FAMILIARIZING HIMSELF WITH ALL OTHER SITE IMPROVEMENTS PRIOR TO BEGINNING LANDSCAPE WORK. 4.THE GENERAL CONTRACTOR IS TO PROVIDE SUBGRADES 4" BELOW HARD SURFACES PLUS/MINUS .1 FOOT. 5.LANDSCAPE PLANTING AREAS SHALL BE FREE OF DEBRIS AND ROCKS LARGER THAN 3" IN ANY DIRECTION. 6.TOPSOIL WITH A MINIMUM OF 30% ORGANIC CONTENT SHALL BE PLACED AT A MINIMUM DEPTH OF 4" IN LANDSCAPE PLANTING AREAS. 7.TOPSOIL SHALL BE TILLED INTO THE EXISTING SUBGRADE TO ELIMINATE SOIL INTERFACE PROBLEMS. 8.ALL LANDSCAPE PLANTING AREAS RECEIVE A MINIMUM OF 2" MEDIUM-FINE BARK MULCH. 9.ALL PLANT MATERIALS ARE TO CONFORM TO THE AMERICAN ASSOCIATION OF NURSERYMEN, STANDARDS FOR NURSERY STOCK, LATEST EDITION. 10.PLANT SPECIES SUBSTITUTIONS ARE DISCOURAGED. IF PLANT AVAILABILITY IS A PROBLEM, CONTACT THE LANDSCAPE DESIGNER FOR ACCEPTABLE ALTERNATIVES. 11.IF THE SITE WORK IS DIFFERENT OR MODIFIED FROM WHAT IS DEPICTED ON THE LANDSCAPE PLAN, OR POOR SOIL AND/OR DEBRIS ARE ENCOUNTERED, REQUIRING CHANGES TO THE LANDSCAPE PLAN, CONTACT THE LANDSCAPE DESIGNER FOR INSTRUCTION. 12.THE CONTRACTOR SHALL MAINTAIN AND WATER PLANT MATERIAL UNTIL OWNER'S FINAL ACCEPTANCE. 13.FIELD ADJUST THE LOCATION OF TREES AND SHRUBS TO AVOID CONFLICT WITH LOCATION OF ANY UTILITIES. CONTACT LANDSCAPE DESIGNER IF PROBLEMS ARE ENCOUNTERED. 14.NEW LANDSCAPE AREAS WILL NEED TO BE WATERED FOR THE FIRST ONE TO TWO GROWING SEASONS TO ESTABLISH PLANTINGS. NOT TO SCALE 2"x2" WOOD STAKE AT OR BELOW GRADE FINISH GRADE WIDE NYLON WEBBING ROOT CROWN TO BE AT FINISH GRADE OR 1-2" ABOVE GRADE TILLED OR BROKEN UP SOIL MIN 12" DEEP 2" SETTLED LAYER OF MULCH 1/ 3 T R E E HE I G H T 2X WIDTH OF ROOTBALL PLAN VIEW STAKE 120° GUY WIRE TREE TRUNK MATCHLINE SHEET 43 PROPOSED BUILDING 6 187,660 SF BUILDING 175,240 SF MANUFACTURING AREA 12,420 SF OFFICE AREA FFE = 728.00 HEIGHT = 41' +/- LA N D S C A P E P L A N 1"=30' DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 43 CS143 MATCHLINE SHEET 42 SECTION THROUGH ZONING BUFFER AT UPPER LOADING DOCKS. VIEW LOOKING WEST. SCALE: AS SHOWN COU N T Y O F F R E D E R I C K PROPOSED BUILDING 6 187,660 SF BUILDING 175,240 SF MANUFACTURING AREA 12,420 SF OFFICE AREA FFE = 728.00 HEIGHT = 41' +/- DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 8/15/19 44 CS144 ER O S I O N & S E D I M E N T C O N T R O L N A R R A T I V E Erosion and Sediment Control Narrative Project Description This project consists of the construction of a 181,231 SF industrial production facility with supporting internal private roadways, parking, and utilities. 10.6 acres of land will be disturbed with the construction of this project. Date of Construction Construction is planned to begin in the 4th quarter of 2019 and extend through the 3rd quarter of 2020. Existing Site Conditions The site is on the Trex Winchester Campus and currently has a trailer drop lot and two buildings. Adjacent Property Hoge Run bounds the site to the east and Shawnee Drive to the north. Trex Campus bounds the site on the south and west. Offsite Areas There are no planned off-site borrow or disposal areas associated with this project. Soils For the project area, generalized soils data contained on the USDA Natural Resource Conservation Service's Web Soil Survey shows the project area has 87% Carbo-Oaklet soil and 8.5% Oaklet silt loam soil. The remaining area is in the floodplain and outside of the project area. Geology Several rock outcroppings observed during the site walkover. No karst features were observed. Critical Erosion Areas Areas, where concentrated stormwater is discharged, will be critical. Erosion and Sediment Control Measures Unless otherwise indicated, all vegetative and structural erosion and sediment control practices shall be constructed and maintained according to minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook. The minimum standards of the handbook shall be adhered to unless otherwise waived or approved by a variance. CONSTRUCTION NARRATIVE The work shall generally be carried out in the following sequence: PHASE 1 1.Hold pre-construction meeting on-site with the inspector. The Frederick County inspector shall have 48 hours notice to schedule an on-site pre-construction inspection following the issuance of a land disturbance permit. The certified responsible land disturber must attend the pre-construction meeting 2.Install the construction entrance. Temporary Construction Entrance (3.02) installed at the entrance to the site to minimize mud carried onto the roadway. 3.Clearing and grubbing for sediment control and sediment trapping devices only. Silt Fence Barrier (3.05) and Diversion Dikes (3.09) are to be installed down-slope of work areas and around the on-site stockpile area to filter sediment-laden runoff from sheet flow as indicated on the plans. 4.Construct and/or place sediment trapping and sediment control devices. The temporary sediment traps (3.13) shall be constructed first and shall retain the runoff from the site to allow sediment to settle out before runoff leaves the site. PHASE 2 1.Clear and grub the remainder of the site. Topsoil in the on-site stockpile area shall be stripped stockpiled area for later use. All stockpiles shall be stabilized with seeding and surrounded with silt fence. 2.Rough grade the site. 3.Grading work for the building pad, road, and parking shall commence. Stone shall be placed on surfaces in accordance with requirements for temporary and/or permanent stabilization contained in this plan. 4.Storm drain structures and pipe shall be installed. Inlet protection (3.07) and culvert inlet protection (3.08) shall be installed as shown on the plans around inlets to filter sediment-laden runoff. Outlet protection (3.18) and riprap channels will be placed to minimize erosion at the pipe outlets. The area shall be stabilized upon completion of grading. 5.Final grading. 6.Top Soiling (3.30) and Surface Roughening (3.29) shall be applied to all areas that will be seeded. 7.Permanent Seeding (3.32) shall be applied as soon as the grading operations are completed. 8.Remove erosion and sediment control measures within 30 days from when they are no longer needed and with approval of the inspector. Vegetative Practices Temporary seeding (3.31) soil stabilization shall be applied to denuded areas within seven days after the final grading is complete on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 30 days, but less than one year. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. Stockpile areas shall be surrounded with silt fence and protected by mulch and/or temporary seeding immediately after grading. Diversion dike and temporary sediment trap embankments shall be compacted by machine, seeded and mulched (hay mulch or straw) for temporary and/or permanent vegetative cover immediately after construction. Vegetative stabilization shall be uniform, mature enough to survive, and adequate to inhibit erosion. Any areas not meeting these requirements shall be reseeded. Management Practices Construction will be carried out so that grading operations can begin and end as quickly as possible. Sediment trapping measures will be installed as the first step in grading. These measures will be seeded and mulched immediately following installation. Temporary seeding or other stabilization will follow immediately after grading. Areas which are not to be disturbed will be clearly marked by flags, signs, etc. The job superintendent shall be responsible for the installation and maintenance of all erosion and sediment control practices. Maintenance of these measures throughout the project is critical to the effectiveness of the program. Devices listed herein are considered to be minimum erosion and sediment controls. Addition E&S measures may be necessary due to contractor phasing or other unforeseen conditions. It is the contractor's responsibility to provide measures in addition to those shown in order to control erosion and contain sediment on the site. All measures shall be installed in accordance with the Virginia Erosion and Sediment Control Handbook. After achieving adequate stabilization, the temporary E&S controls will be cleaned up and removed. Permanent Stabilization All areas disturbed by construction shall be stabilized with permanent seeding immediately following finish grading. Seeding shall be done with Kentucky 31 Tall Fescue according to Std. & Spec. 3.32, PERMANENT SEEDING, of the handbook. Mulch (straw or fiber) will be installed over fill slopes which have been brought to final grade and have been seeded to protect the slopes from hill and gully erosion and to allow the seed to germinate properly will be used on relatively flat areas. In all seeding operations, seed, fertilizer, and lime will be applied before mulching. STORMWATER MANAGEMENT This project consists of the construction of a 181,231 SF industrial production facility with supporting internal private roadways, parking, and utilities. 10.6 acres of land will be disturbed with the construction of this project. However, this site comprises less than 1% of the land area of the Hoge Run drainage basin upstream of the site. Therefore, based on Erosion & Sediment Control minimum standard 19, and Virginia Stormwater Management Program Regulation Chapter 870 Section 66.B.4.B, stormwater management for the quantity of stormwater leaving the site is not required. Stormwater quality is addressed with the purchase of nutrient credits and construction of a bioretention basin. MAINTENANCE In general, all erosion and sediment control measures will be checked daily and after each rainfall event. The following items are to be checked: 1.The gravel construction entrance shall be checked regularly for sediment buildup which will prevent drainage. If the gravel is clogged by sediment, it shall be removed and cleaned or replaced. 2.The temporary sediment traps shall be checked and cleaned if the sediment level is found to be equal to or greater than the sediment clean-out point. The temporary sediment trap and temporary sediment basin shall remain in place until all on-site contributing areas are stabilized. 3.The inlet protection and rock check dams shall be checked, cleaned of silt, and where needed repaired. 4.The seeded areas will be checked regularly to ensure that a good stand is maintained. Areas should be fertilized and reseeded as needed. 5.The contractor shall be responsible for keeping all roads and travel ways, both public and private, clean of all dust and mud at all times. 6.All downstream properties and waterways shall be provided adequate protection from erosion and sediment deposition. SEEDING SCHEDULE 1.All permanent seeding shall be in accordance with section 3.32 of the VESCH. 2.On non-rock surfaces, spread topsoil at a minimum depth of four inches. 3.Incorporate pulverized agricultural lime into the soil at a rate of 92 lbs. per 1000 sq. ft. (2 tons per acre). 4.Fertilize with 10-10-10 fertilizer at a rate of 23 lbs. per 1000 sq. ft. (1000 lbs. per acre). 5.Seed all areas with a seed mix consisting of 67% Kentucky 31 Tall Fescue and 33% Red Top Clover. 6.Mulch all seeded areas with straw mulch applied at a rate of 3,500 lbs. per acre anchored with cutback or emulsified asphalt applied at a rate of 200 gallons per acre. DUST CONTROL 1.Temporary seeding shall be applied to all disturbed areas subject to little or no construction traffic. 2.All haul roads and other heavy traffic routes shall be sprinkled with water until the surface is wet. This process shall be repeated as needed to control dust. MINIMUM CONSTRUCTION EROSION & SEDIMENT CONTROL STANDARDS 9VAC25-840-40. Minimum standards. A VESCP must be consistent with the following criteria, techniques and methods: 1.Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. 2.During construction of the project, soil stock piles and borrow areas shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site. 3.A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosion. 4.Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional before upslope land disturbance takes place. 5.Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6.Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin. a.The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap shall only control drainage areas less than three acres. b.Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area. The outfall system shall, at a minimum, maintain the structural integrity of the basin during a 25-year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. 7.Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8.Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume or slope drain structure. 9.Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10.All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11.Before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12.When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13.When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of nonerodible material shall be provided. 14.All applicable federal, state and local requirements pertaining to working in or crossing live watercourses shall be met. 15.The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16.Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: a.No more than 500 linear feet of trench may be opened at one time. b.Excavated material shall be placed on the uphill side of trenches. c.Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off-site property. d.Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e.Restabilization shall be accomplished in accordance with this chapter. f.Applicable safety requirements shall be complied with. 17.Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well as to larger land-disturbing activities. 18.All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the VESCP authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. 19.Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following standards and criteria. Stream restoration and relocation projects that incorporate natural channel design concepts are not man-made channels and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels: a.Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate natural or man-made receiving channel, pipe or storm sewer system. For those sites where runoff is discharged into a pipe or pipe system, downstream stability analyses at the outfall of the pipe or pipe system shall be performed. b.Adequacy of all channels and pipes shall be verified in the following manner: (1)The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is one hundred times greater than the contributing drainage area of the project in question; or (2)(a)Natural channels shall be analyzed by the use of a two-year storm to verify that stormwater will not overtop channel banks nor cause erosion of channel bed or banks. (a)All previously constructed man-made channels shall be analyzed by the use of a ten-year storm to verify that stormwater will not overtop its banks and by the use of a two-year storm to demonstrate that stormwater will not cause erosion of channel bed or banks; and (b)Pipes and storm sewer systems shall be analyzed by the use of a ten-year storm to verify that stormwater will be contained within the pipe or system. c.If existing natural receiving channels or previously constructed man-made channels or pipes are not adequate, the applicant shall: (1)Improve the channels to a condition where a ten-year storm will not overtop the banks and a two-year storm will not cause erosion to channel the bed or banks; or (2)Improve the pipe or pipe system to a condition where the ten-year storm is contained within the appurtenances; (3)Develop a site design that will not cause the pre-development peak runoff rate from a two- year storm to increase when runoff outfalls into a natural channel or will not cause the pre- development peak runoff rate from a ten-year storm to increase when runoff outfalls into a man- made channel; or provide a combination of channel improvement, stormwater detention or other measures which is satisfactory to the VESCP authority to prevent downstream erosion. d.The applicant shall provide evidence of permission to make the improvements. e.All hydrologic analyses shall be based on the existing watershed characteristics and the ultimate development condition of the subject project. f.If the applicant chooses an option that includes stormwater detention, he shall obtain approval from the VESCP of a plan for maintenance of the detention facilities. The plan shall set forth the maintenance requirements of the facility and the person responsible for performing the maintenance. g.Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipators shall be placed at the outfall of all detention facilities as necessary to provide a stabilized transition from the facility to the receiving channel. h.All on-site channels must be verified to be adequate. i.Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent property shall be diverted to a stable outlet, adequate channel, pipe or pipe system, or to a detention facility. j.In applying these stormwater management criteria, individual lots or parcels in a residential, commercial or industrial development shall not be considered to be separate development projects. Instead, the development, as a whole, shall be considered to be a single development project. Hydrologic parameters that reflect the ultimate development condition shall be used in all engineering calculations. k.All measures used to protect properties and waterways shall be employed in a manner which minimizes impacts on the physical, chemical and biological integrity of rivers, streams and other waters of the state. Any plan approved prior to July 1, 2014, that provides for stormwater management that addresses any flow rate capacity and velocity requirements for natural or man-made channels shall satisfy the flow rate capacity and velocity requirements for natural or man-made channels if the practices are designed to (i) detain the water quality volume and to release it over 48 hours; (ii) detain and release over a 24-hour period the expected rainfall resulting from the one year, 24- hour storm; and (iii) reduce the allowable peak flow rate resulting from the 1.5, 2, and 10-year, 24-hour storms to a level that is less than or equal to the peak flow rate from the site assuming it was in a good forested condition, achieved through multiplication of the forested peak flow rate by a reduction factor that is equal to the runoff volume from the site when it was in a good forested condition divided by the runoff volume from the site in its proposed condition, and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels as defined in any regulations promulgated pursuant to § 62.1-44.15:54 or 62.1- 44.15:65 of the Act. l.For plans approved on and after July 1, 2014, the flow rate capacity and velocity requirements of § 62.1-44.15:52 A of the Act and this subsection shall be satisfied by compliance with water quantity requirements in the Stormwater Management Act (§62.1-44.15:24 et seq. of the Code of Virginia) and attendant regulations, unless such land-disturbing activities are in accordance with 9VAC25-870-48 of the Virginia Stormwater Management Program (VSMP) Permit Regulations. m.Compliance with the water quantity minimum standards set out in 9VAC25-870-66 of the Virginia Stormwater Management Program (VSMP) Permit Regulations shall be deemed to satisfy the requirements of Minimum Standard 19. FF=728.00 LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC CA P I T O L L A N E HOGE R U N PIN 63-A-115 TREX COMPANY, INC. INST. 160003174 5.1174 ACRES PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 N 36°52'25" E 406.91' S 4 7 ° 2 2 ' 1 9 " E 2 2 1 . 2 8 ' C 1 C 2 S 19°08'1 2 " W 2 1 0 . 2 4 ' S 02°1 3 ' 5 0 " E 2 5 2 . 1 2 ' S 09°16'39" E 121.25' PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 RECEIVING SHIPPING ACCESS ROAD ONE STORY CONCRETE BUILDING (BLDG. #2) F.F.E. = 723.60 ONE STORY METAL BUILDING V A . S E C . R T E . 6 5 2 - S H A W N E E D R I V E 4 0 ' R / W ( D B 2 6 8 P G 1 4 9 ) TREX COMPANY, INC. INST. 020022798 HOG E R U N FINISH PRODUCT YARD FINISH PRODUCT YARD CONCRETE BUILDING (BLDG. #4) F.F.E. = 738.60 B L O C K B U I L D I N G R & D - BUILDING 2 BUILDING 4 7 PROP. H.C. SIGNS N 10 11 12 13 14 15 16171819 2021 22 23 24 25 26 28 29 30 63 64 31 35 3332 C D PROPOSED BUILDING 6 187,660 SF BUILDING 175,240 SF MANUFACTURING AREA 12,420 SF OFFICE AREA FFE = 728.00 HEIGHT = 41' +/- ST ST #2 #1 > > > > > X X X X X X > > > >>>> > > > > > > DD DD DD X X DD SF CE CE Prop Water Line Esmt. Prop Water Line Esmt. REMOVE FIRE HYDRANT DURING CONST. REINSTALL ON WM #8 WHEN BIDG. BACKFILL COMPLETE. 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) CLEANWAY DOWNSPOUT FILTER (TYP). SEE DETAIL SHEET 31 SEE PLUMBING PLAN P1.1 FOR SAN SEWER CONTINUATION SEE COMMERCIAL ENTRANCE PLAN SHEET 22 FOR WORK IN THIS AREA INS T A L L D O U B L E G A T E WIT H I N T E R C O M A N D RE M O T E C O N T R O L FR O M S H I P P I N G O F F I C E . FA A C M O D E L 6 4 0 O R AP P R O V E D E Q U A L . DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 ER O S I O N & S E D I M E N T CO N T R O L P L A N P H A S E 1 45 CS145 E&S LEGEND CE Construction Entrance CIP Culvert Inlet Protection ST Sediment Trap SF Silt Fence IP Inlet Protection SR Surface Roughening TS Temporary Seeding PS Permanent Seeding MATCHLINE SHEET 46 LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC CA P I T O L L A N E CITY O F W I N C H E S T E R COU N T Y O F F R E D E R I C K TREX COMPANY, INC. PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 S 09°16'39" E 121.25' ONE STORY CONCRETE BUILDING (BLDG. #2) F.F.E. = 723.60 ONE STORY METAL BUILDING TM 371-1-1 PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 P I N 6 3 - A - 8 6 A H P H O O D , I N C . D B 9 3 5 P G 7 3 9 STORM WATER DETENTION POND HOG E R U N FINISH PRODUCT YARD FINISH PRODUCT YARD FINISH PRODUCT YARD R & D - BUILDING 2 7 PROP. H.C. SIGNS N 22 23 24 25 26 28 29 30 51 60 61 63 64 70 71 72 73 7490 91 92 31 3332 ST ST ST #4 #3 #2 > > > >>>> > > > > > > >>>>>>>>> > > DD DD DD DD > > > > > X X X DD SF CE PRPOSED VDOT GR-2 GUARDRAIL VDOT GR-7 GUARDRAIL TERMINAL TREATMENT VDOT GR-11 TERMINAL TREATMENT Prop Water Line Esmt. LIGHT DUTY PAVEMENT PROP. 3' HIGH BOARD ON BOARD (TREX) FENCE 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) CLEANWAY DOWNSPOUT FILTER (TYP). SEE DETAIL SHEET 31 PROPOSED VDOT GR-2 GUARDRAIL DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 ER O S I O N & S E D I M E N T CO N T R O L P L A N P H A S E 1 46 CS146 MATCHLINE SHEET 45 FF=728.00 LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC CA P I T O L L A N E HOGE R U N PIN 63-A-115 TREX COMPANY, INC. INST. 160003174 5.1174 ACRES PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 N 36°52'25" E 406.91' S 4 7 ° 2 2 ' 1 9 " E 2 2 1 . 2 8 ' C 1 C 2 S 19°08'1 2 " W 2 1 0 . 2 4 ' S 02°1 3 ' 5 0 " E 2 5 2 . 1 2 ' S 09°16'39" E 121.25' PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 RECEIVING SHIPPING ACCESS ROAD ONE STORY CONCRETE BUILDING (BLDG. #2) F.F.E. = 723.60 ONE STORY METAL BUILDING V A . S E C . R T E . 6 5 2 - S H A W N E E D R I V E 4 0 ' R / W ( D B 2 6 8 P G 1 4 9 ) PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 HOG E R U N FINISH PRODUCT YARD FINISH PRODUCT YARD CONCRETE BUILDING (BLDG. #4) F.F.E. = 738.60 B L O C K B U I L D I N G R & D - BUILDING 2 BUILDING 4 7 PROP. H.C. SIGNS N 10 11 12 13 14 15 16171819 2021 22 23 24 25 26 28 29 30 63 64 31 35 3332 C D PROPOSED BUILDING 6 187,660 SF BUILDING 175,240 SF MANUFACTURING AREA 12,420 SF OFFICE AREA FFE = 728.00 HEIGHT = 41' +/- ST ST #2 #1 > > > > > X X X X X X > > > >>>> > > > > > > DD DD DD X X SF DD SF CE CE IP IP IP IP IP IP IP IP IP IPIP IP OP OP RR SR TO TS PS SR TO TS PS SR TO TS PS SR TO TS PS SR TO TS PS SR TO TS PS Prop Water Line Esmt. Prop Water Line Esmt. REMOVE FIRE HYDRANT DURING CONST. REINSTALL ON WM #8 WHEN BIDG. BACKFILL COMPLETE. CIP 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) CLEANWAY DOWNSPOUT FILTER (TYP). SEE DETAIL SHEET 31 SEE PLUMBING PLAN P1.1 FOR SAN SEWER CONTINUATION SEE COMMERCIAL ENTRANCE PLAN SHEET 22 FOR WORK IN THIS AREA INS T A L L D O U B L E G A T E WIT H I N T E R C O M A N D RE M O T E C O N T R O L FR O M S H I P P I N G O F F I C E . FA A C M O D E L 6 4 0 O R AP P R O V E D E Q U A L . DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 ER O S I O N & S E D I M E N T CO N T R O L P L A N P H A S E 2 47 CS147 E&S LEGEND CE Construction Entrance CIP Culvert Inlet Protection ST Sediment Trap SF Silt Fence IP Inlet Protection SR Surface Roughening TS Temporary Seeding PS Permanent Seeding MATCHLINE SHEET 48 FF=728.00 LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC LOC CA P I T O L L A N E CITY O F W I N C H E S T E R COU N T Y O F F R E D E R I C K TREX COMPANY, INC. PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 S 09°16'39" E 121.25' ONE STORY CONCRETE BUILDING (BLDG. #2) F.F.E. = 723.60 ONE STORY METAL BUILDING TM 371-1-1 PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 P I N 6 3 - A - 8 6 A H P H O O D , I N C . D B 9 3 5 P G 7 3 9 STORM WATER DETENTION POND HOG E R U N FINISH PRODUCT YARD FINISH PRODUCT YARD FINISH PRODUCT YARD R & D - BUILDING 2 7 PROP. H.C. SIGNS N 22 23 24 25 26 28 29 30 51 60 61 63 64 70 71 72 73 7490 91 92 31 3332 ST ST ST #4 #3 #2 > > > >>>> > > > > > > >>>>>>>>> > > DD DD DD DD > > > > > X X X DD SF CE IP IP IP IP IP IPIP IP IP OP OP OP RR RR OP OP SR TO TS PS SR TO TS PS SR TO TS PS SR TO TS PS SR TO TS PS SR TO TS PS PRPOSED VDOT GR-2 GUARDRAIL VDOT GR-7 GUARDRAIL TERMINAL TREATMENT VDOT GR-11 TERMINAL TREATMENT Prop Water Line Esmt. LIGHT DUTY PAVEMENT PROP. 3' HIGH BOARD ON BOARD (TREX) FENCE CIP IP IP 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) CLEANWAY DOWNSPOUT FILTER (TYP). SEE DETAIL SHEET 31 PROPOSED VDOT GR-2 GUARDRAIL DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 ER O S I O N & S E D I M E N T CO N T R O L P L A N P H A S E 2 48 CS148 MATCHLINE SHEET 47 DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 8/15/19 49 CS149 ER O S I O N & S E D I M E N T C O N T R O L D E T A I L S DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 8/15/19 50 CS150 ER O S I O N & S E D I M E N T C O N T R O L D E T A I L S OU T D O O R L I G H T I N G P L A N 1"=50' DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 51 CS151 MATCHLINE SHEET 52 Calculation Summary Label Units Avg Max Min CalcPts_1 Fc 1.87 16.2 0.0 BUILDING 4 TBTB TBTB 0 . 2 0 . 0 2 . 4 0 . 7 0 . 2 0 . 0 5 . 6 3 . 8 1 . 1 0 . 3 0 . 1 0 . 0 1 . 9 3 . 8 4 . 6 3 . 5 1 . 8 0 . 6 0 . 2 0 . 1 0 . 5 1 . 2 2 . 0 2 . 7 2 . 5 1 . 8 1 . 0 0 . 3 0 . 1 0 . 0 0 . 1 0 . 3 0 . 6 1 . 1 1 . 5 1 . 6 1 . 6 1 . 3 0 . 5 0 . 2 0 . 1 0 . 1 0 . 0 0 . 1 0 . 2 0 . 3 0 . 5 0 . 8 0 . 9 1 . 2 1 . 1 0 . 7 0 . 4 0 . 2 0 . 2 0 . 1 0 . 1 0 . 1 0 . 2 0 . 3 0 . 4 0 . 6 0 . 7 0 . 8 0 . 7 0 . 5 0 . 5 0 . 5 0 . 3 0 . 1 0 . 1 0 . 1 0 . 2 0 . 2 0 . 3 0 . 4 0 . 5 0 . 6 0 . 6 0 . 8 1 . 0 0 . 9 0 . 5 0 . 1 0 . 1 0 . 2 0 . 2 0 . 3 0 . 4 0 . 5 0 . 7 1 . 0 1 . 6 2 . 4 1 . 8 0 . 6 0 . 0 0 . 1 0 . 1 0 . 2 0 . 2 0 . 3 0 . 4 0 . 7 1 . 2 1 . 9 3 . 1 3 . 8 1 . 8 0 . 6 0 . 1 0 . 1 0 . 1 0 . 2 0 . 2 0 . 4 0 . 7 1 . 3 2 . 2 3 . 3 5 . 0 5 . 7 1 . 6 0 . 2 0 . 1 0 . 1 0 . 1 0 . 2 0 . 3 0 . 6 1 . 1 2 . 2 3 . 1 4 . 8 7 . 1 4 . 4 1 . 1 0 . 3 0 . 1 0 . 1 0 . 1 0 . 2 0 . 4 0 . 7 1 . 6 2 . 7 3 . 8 5 . 9 6 . 2 2 . 3 0 . 7 0 . 1 0 . 1 0 . 2 0 . 3 0 . 4 0 . 8 1 . 9 2 . 9 3 . 6 4 . 5 3 . 6 1 . 2 0 . 3 0 . 1 0 . 1 0 . 2 0 . 3 0 . 5 1 . 2 2 . 3 2 . 8 3 . 2 3 . 2 1 . 9 0 . 6 0 . 2 0 . 1 0 . 1 0 . 2 0 . 4 0 . 7 1 . 4 1 . 9 2 . 1 2 . 2 1 . 8 1 . 0 0 . 5 0 . 2 0 . 1 0 . 1 0 . 2 0 . 3 0 . 5 0 . 8 1 . 2 1 . 4 1 . 5 1 . 5 1 . 4 1 . 3 0 . 9 0 . 3 0 . 1 0 . 1 0 . 2 0 . 3 0 . 5 0 . 7 0 . 9 1 . 1 1 . 4 1 . 7 2 . 3 2 . 5 1 . 0 0 . 1 0 . 2 0 . 2 0 . 3 0 . 5 0 . 7 0 . 9 1 . 4 1 . 9 2 . 8 3 . 9 2 . 7 1 . 0 0 . 1 0 . 2 0 . 2 0 . 3 0 . 5 0 . 8 1 . 3 2 . 1 3 . 0 4 . 5 6 . 0 2 . 6 0 . 4 0 . 1 0 . 2 0 . 3 0 . 4 0 . 6 1 . 0 1 . 9 2 . 9 3 . 9 6 . 8 7 . 0 1 . 7 0 . 4 0 . 1 0 . 2 0 . 3 0 . 4 0 . 6 1 . 2 2 . 4 3 . 4 5 . 1 6 . 2 3 . 1 0 . 9 0 . 3 0 . 1 0 . 1 0 . 2 0 . 3 0 . 4 0 . 7 1 . 5 2 . 8 3 . 4 4 . 6 4 . 0 1 . 4 0 . 4 0 . 1 0 . 1 0 . 2 0 . 3 0 . 5 1 . 0 2 . 1 2 . 8 3 . 1 3 . 3 2 . 2 0 . 6 0 . 2 0 . 1 0 . 1 0 . 2 0 . 4 0 . 7 1 . 3 1 . 9 2 . 1 2 . 2 1 . 9 0 . 8 0 . 3 0 . 1 0 . 0 0 . 1 0 . 2 0 . 3 0 . 5 0 . 8 1 . 2 1 . 5 1 . 6 1 . 5 1 . 1 0 . 5 0 . 2 0 . 0 0 . 0 0 . 0 0 . 1 0 . 2 0 . 4 0 . 5 0 . 8 1 . 1 1 . 4 1 . 5 1 . 4 0 . 8 0 . 2 0 . 1 0 . 0 0 . 0 0 . 0 0 . 0 0 . 2 0 . 3 0 . 4 0 . 7 1 . 1 1 . 5 1 . 9 2 . 2 1 . 6 0 . 4 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 2 0 . 2 0 . 4 0 . 6 1 . 2 1 . 9 2 . 4 3 . 2 2 . 5 0 . 6 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 2 0 . 3 0 . 6 1 . 2 2 . 4 3 . 1 4 . 5 3 . 4 0 . 9 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 3 0 . 6 1 . 2 2 . 6 3 . 4 5 . 4 5 . 3 1 . 1 0 . 1 0 . 1 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 5 1 . 1 2 . 7 3 . 9 7 . 0 6 . 4 0 . 8 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 1 . 2 2 . 7 3 . 8 6 . 4 5 . 6 1 . 0 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 0 0 . 0 2 . 7 3 . 6 4 . 9 3 . 8 1 . 0 0 . 3 0 . 2 0 . 2 0 . 2 0 . 2 0 . 2 0 . 2 0 . 2 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 0 1 . 3 2 . 4 3 . 3 4 . 1 3 . 0 0 . 7 0 . 5 0 . 5 0 . 4 0 . 3 0 . 3 0 . 3 0 . 3 0 . 3 0 . 3 0 . 2 0 . 2 0 . 2 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 1 . 3 2 . 1 2 . 9 3 . 2 2 . 2 0 . 5 0 . 9 1 . 0 0 . 9 0 . 6 0 . 4 0 . 4 0 . 5 0 . 6 0 . 6 0 . 5 0 . 4 0 . 3 0 . 2 0 . 2 0 . 2 0 . 2 0 . 1 0 . 1 0 . 1 0 . 1 1 . 3 2 . 0 2 . 7 2 . 5 1 . 3 0 . 8 1 . 2 1 . 8 2 . 2 1 . 9 1 . 0 0 . 6 0 . 6 0 . 8 1 . 2 1 . 2 0 . 9 0 . 6 0 . 4 0 . 3 0 . 3 0 . 3 0 . 2 0 . 2 0 . 2 0 . 1 0 . 1 0 . 1 1 . 5 2 . 4 2 . 7 2 . 2 1 . 0 1 . 0 1 . 3 2 . 1 3 . 4 4 . 6 3 . 7 1 . 7 0 . 6 0 . 7 1 . 6 2 . 6 2 . 5 1 . 6 1 . 0 0 . 6 0 . 5 0 . 4 0 . 4 0 . 3 0 . 3 0 . 2 0 . 2 0 . 2 0 . 1 0 . 1 1 . 0 2 . 0 3 . 3 3 . 6 2 . 5 0 . 8 1 . 1 1 . 5 1 . 9 2 . 8 5 . 2 8 . 2 6 . 6 2 . 2 0 . 3 5 . 6 4 . 7 2 . 7 1 . 5 0 . 9 0 . 7 0 . 6 0 . 6 0 . 6 0 . 5 0 . 4 0 . 3 0 . 2 0 . 2 0 . 1 1 . 1 2 . 5 4 . 8 4 . 8 3 . 0 0 . 7 1 . 4 2 . 0 2 . 6 2 . 5 2 . 6 4 . 4 7 . 9 0 . 0 3 . 5 1 . 9 1 . 2 1 . 0 1 . 0 1 . 1 1 . 0 0 . 8 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 1 1 . 1 2 . 6 5 . 9 6 . 6 4 . 1 0 . 7 1 . 4 2 . 2 3 . 6 4 . 8 3 . 7 2 . 3 1 . 9 1 . 1 1 . 7 1 . 6 1 . 7 2 . 0 1 . 9 1 . 4 0 . 9 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 1 0 . 4 1 . 0 2 . 6 5 . 6 7 . 5 3 . 9 0 . 5 1 . 6 2 . 0 3 . 1 5 . 6 8 . 3 6 . 3 1 . 6 3 . 0 3 . 9 3 . 7 2 . 5 1 . 5 0 . 9 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 1 0 . 2 0 . 5 1 . 4 3 . 2 5 . 7 6 . 8 2 . 7 0 . 4 0 . 0 2 . 1 2 . 6 2 . 7 3 . 0 4 . 9 8 . 3 0 . 0 6 . 7 4 . 0 2 . 3 1 . 4 0 . 9 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 1 0 . 1 0 . 3 0 . 7 1 . 7 3 . 7 5 . 5 5 . 2 1 . 8 0 . 4 0 . 0 2 . 3 3 . 7 4 . 9 3 . 8 2 . 5 2 . 3 0 . 0 5 . 0 3 . 3 2 . 0 1 . 2 0 . 8 0 . 5 0 . 4 0 . 3 0 . 2 0 . 1 0 . 0 0 . 1 0 . 2 0 . 3 0 . 8 1 . 7 3 . 2 4 . 2 3 . 4 1 . 0 0 . 4 0 . 0 1 . 6 2 . 0 3 . 2 5 . 7 8 . 5 6 . 3 1 . 6 5 . 1 4 . 5 2 . 9 1 . 7 1 . 1 0 . 7 0 . 5 0 . 3 0 . 2 0 . 2 0 . 1 0 . 0 0 . 0 0 . 1 0 . 2 0 . 4 0 . 8 1 . 5 2 . 6 2 . 9 2 . 2 0 . 7 0 . 2 0 . 0 2 . 2 2 . 7 2 . 6 3 . 0 4 . 9 8 . 3 0 . 0 6 . 9 4 . 1 2 . 4 1 . 5 0 . 9 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 0 0 . 0 0 . 0 0 . 1 0 . 1 0 . 2 0 . 4 0 . 8 1 . 4 2 . 3 2 . 5 1 . 6 0 . 5 0 . 2 0 . 0 2 . 5 3 . 9 5 . 0 3 . 6 2 . 4 2 . 2 4 . 8 3 . 1 2 . 1 1 . 3 0 . 8 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 0 0 . 0 0 . 0 0 . 0 0 . 1 0 . 1 0 . 2 0 . 4 0 . 8 1 . 4 2 . 3 2 . 7 1 . 4 0 . 3 0 . 2 0 . 0 2 . 3 3 . 5 6 . 0 8 . 5 6 . 0 1 . 3 4 . 0 3 . 0 1 . 9 1 . 2 0 . 8 0 . 5 0 . 4 0 . 3 0 . 2 0 . 2 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 1 0 . 1 0 . 2 0 . 4 0 . 8 1 . 5 2 . 4 2 . 5 1 . 4 0 . 4 0 . 1 0 . 0 2 . 9 3 . 2 3 . 5 5 . 3 8 . 5 6 . 4 4 . 6 2 . 7 1 . 6 1 . 0 0 . 7 0 . 5 0 . 3 0 . 3 0 . 2 0 . 2 0 . 1 0 . 1 0 . 1 0 . 1 0 . 0 0 . 0 0 . 0 0 . 1 0 . 1 0 . 2 0 . 4 0 . 9 1 . 8 2 . 8 2 . 8 1 . 7 0 . 5 0 . 1 0 . 0 3 . 8 5 . 5 4 . 7 2 . 9 2 . 7 6 . 0 3 . 5 2 . 3 1 . 4 0 . 9 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 1 0 . 1 0 . 2 0 . 2 0 . 2 0 . 1 0 . 0 0 . 0 0 . 1 0 . 1 0 . 2 0 . 5 1 . 1 2 . 2 3 . 8 4 . 1 2 . 5 0 . 6 0 . 2 0 . 0 2 . 4 5 . 3 8 . 9 7 . 1 2 . 4 3 . 9 3 . 2 2 . 1 1 . 3 0 . 9 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 2 0 . 2 0 . 2 0 . 2 0 . 3 0 . 4 0 . 5 0 . 5 0 . 1 0 . 1 0 . 1 0 . 1 0 . 2 0 . 4 1 . 1 2 . 5 5 . 1 5 . 5 4 . 2 0 . 9 0 . 2 0 . 0 0 . 4 0 . 8 1 . 7 4 . 0 7 . 2 5 . 3 5 . 1 3 . 2 1 . 9 1 . 2 0 . 8 0 . 5 0 . 4 0 . 3 0 . 3 0 . 2 0 . 3 0 . 3 0 . 4 0 . 6 0 . 8 1 . 2 1 . 2 0 . 7 0 . 1 0 . 1 0 . 1 0 . 2 0 . 4 1 . 0 2 . 3 5 . 4 6 . 8 6 . 3 1 . 0 0 . 2 0 . 0 0 . 1 0 . 2 0 . 4 0 . 8 1 . 1 7 . 5 4 . 3 2 . 5 1 . 7 1 . 1 0 . 7 0 . 5 0 . 4 0 . 3 0 . 3 0 . 3 0 . 4 0 . 6 0 . 9 1 . 4 2 . 2 3 . 0 2 . 8 0 . 9 0 . 1 0 . 1 0 . 2 0 . 3 0 . 8 2 . 0 5 . 0 7 . 2 8 . 0 1 . 2 0 . 3 0 . 0 0 . 0 0 . 0 0 . 1 0 . 1 4 . 5 3 . 4 2 . 4 1 . 5 1 . 0 0 . 7 0 . 5 0 . 4 0 . 4 0 . 4 0 . 5 0 . 8 1 . 2 2 . 0 3 . 4 5 . 2 7 . 5 6 . 4 0 . 5 0 . 1 0 . 2 0 . 4 0 . 9 2 . 2 5 . 3 7 . 5 7 . 2 1 . 6 0 . 4 0 . 1 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 5 . 1 3 . 7 2 . 2 1 . 4 0 . 9 0 . 6 0 . 5 0 . 4 0 . 5 0 . 6 0 . 9 1 . 4 2 . 3 3 . 8 6 . 5 1 1 . 4 1 1 . 2 2 . 1 0 . 1 0 . 2 0 . 4 1 . 0 2 . 4 5 . 0 6 . 8 5 . 6 1 . 8 0 . 6 0 . 1 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 8 . 3 5 . 3 3 . 0 1 . 9 1 . 2 0 . 8 0 . 6 0 . 5 0 . 5 0 . 6 0 . 9 1 . 4 2 . 2 3 . 7 5 . 6 8 . 3 7 . 5 3 . 0 0 . 4 0 . 2 0 . 4 1 . 0 2 . 4 4 . 4 5 . 9 5 . 2 2 . 0 0 . 5 0 . 1 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 5 . 6 3 . 8 2 . 7 1 . 7 1 . 1 0 . 8 0 . 6 0 . 6 0 . 6 0 . 8 1 . 3 1 . 9 2 . 8 3 . 8 4 . 6 4 . 2 2 . 2 0 . 6 0 . 2 0 . 4 1 . 0 2 . 2 4 . 2 6 . 2 5 . 7 2 . 6 0 . 8 0 . 1 0 . 0 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 4 . 9 4 . 0 2 . 5 1 . 5 1 . 0 0 . 8 0 . 6 0 . 6 0 . 7 1 . 0 1 . 4 1 . 9 2 . 5 2 . 9 2 . 4 1 . 5 0 . 6 0 . 3 0 . 4 0 . 8 2 . 0 3 . 9 7 . 2 7 . 1 4 . 1 0 . 8 0 . 1 0 . 1 0 . 1 0 . 2 0 . 3 0 . 3 0 . 4 7 . 9 6 . 2 3 . 5 2 . 1 1 . 4 1 . 0 0 . 7 0 . 6 0 . 6 0 . 8 1 . 0 1 . 3 1 . 5 1 . 5 1 . 2 0 . 9 0 . 5 0 . 3 0 . 3 0 . 7 1 . 6 3 . 4 7 . 1 8 . 2 5 . 9 0 . 7 0 . 1 0 . 2 0 . 3 0 . 5 0 . 8 1 . 1 6 . 7 4 . 1 2 . 8 2 . 0 1 . 3 0 . 9 0 . 7 0 . 6 0 . 7 0 . 8 0 . 9 0 . 9 0 . 9 0 . 7 0 . 5 0 . 3 0 . 2 0 . 3 0 . 6 1 . 2 2 . 8 6 . 5 8 . 5 7 . 3 0 . 9 0 . 2 0 . 4 0 . 8 1 . 5 2 . 6 4 . 3 4 . 0 3 . 9 2 . 9 1 . 8 1 . 2 0 . 9 0 . 7 0 . 6 0 . 6 0 . 6 0 . 6 0 . 5 0 . 4 0 . 3 0 . 2 0 . 2 0 . 3 0 . 5 1 . 3 2 . 9 6 . 5 8 . 0 6 . 3 1 . 2 0 . 3 0 . 4 0 . 9 1 . 9 4 . 2 7 . 7 8 . 6 6 . 5 4 . 3 2 . 6 1 . 6 1 . 1 0 . 8 0 . 6 0 . 5 0 . 5 0 . 4 0 . 4 0 . 3 0 . 2 0 . 2 0 . 2 0 . 3 0 . 6 1 . 3 2 . 9 5 . 6 6 . 7 4 . 8 1 . 4 0 . 5 0 . 8 1 . 7 3 . 6 6 . 3 6 . 4 8 . 9 5 . 6 3 . 5 2 . 3 1 . 5 1 . 0 0 . 7 0 . 6 0 . 4 0 . 4 0 . 3 0 . 2 0 . 2 0 . 2 0 . 2 0 . 3 0 . 5 1 . 3 2 . 7 4 . 8 5 . 7 4 . 6 1 . 6 0 . 4 1 . 2 2 . 2 3 . 3 2 . 7 1 . 3 5 . 3 4 . 7 3 . 4 2 . 1 1 . 3 0 . 9 0 . 6 0 . 5 0 . 4 0 . 3 0 . 2 0 . 2 0 . 2 0 . 2 0 . 3 0 . 5 1 . 1 2 . 5 4 . 5 6 . 1 5 . 1 1 . 8 0 . 6 1 . 2 1 . 5 1 . 2 0 . 7 0 . 2 7 . 2 5 . 1 3 . 0 1 . 8 1 . 1 0 . 8 0 . 5 0 . 4 0 . 3 0 . 2 0 . 2 0 . 2 0 . 2 0 . 2 0 . 4 0 . 9 2 . 2 4 . 4 7 . 0 6 . 7 2 . 5 0 . 5 0 . 7 0 . 6 0 . 4 0 . 2 0 . 1 9 . 7 6 . 5 3 . 8 2 . 4 1 . 5 1 . 0 0 . 7 0 . 5 0 . 4 0 . 3 0 . 2 0 . 2 0 . 2 0 . 2 0 . 3 0 . 7 1 . 7 3 . 8 6 . 8 7 . 8 3 . 2 0 . 4 0 . 4 0 . 4 0 . 3 0 . 2 0 . 2 5 . 0 4 . 2 3 . 2 2 . 0 1 . 3 0 . 9 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 2 0 . 2 0 . 3 0 . 6 1 . 3 3 . 2 6 . 5 8 . 1 4 . 0 0 . 5 0 . 3 0 . 3 0 . 4 0 . 6 0 . 8 5 . 8 4 . 7 2 . 9 1 . 8 1 . 2 0 . 8 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 2 0 . 3 0 . 6 1 . 4 3 . 1 6 . 4 6 . 9 4 . 0 0 . 7 0 . 4 0 . 7 1 . 2 2 . 1 3 . 2 6 . 7 3 . 8 2 . 4 1 . 6 1 . 1 0 . 7 0 . 5 0 . 4 0 . 3 0 . 2 0 . 2 0 . 3 0 . 6 1 . 4 2 . 9 5 . 3 5 . 1 2 . 8 0 . 7 0 . 2 1 . 0 2 . 1 4 . 2 7 . 6 6 . 6 5 . 7 4 . 1 3 . 4 2 . 5 1 . 6 1 . 0 0 . 7 0 . 5 0 . 3 0 . 3 0 . 3 0 . 3 0 . 6 1 . 2 2 . 3 3 . 9 4 . 0 2 . 4 0 . 6 0 . 1 1 . 0 2 . 1 4 . 4 7 . 6 7 . 1 4 . 7 5 . 3 3 . 8 2 . 3 1 . 4 0 . 9 0 . 6 0 . 4 0 . 3 0 . 3 0 . 4 0 . 6 1 . 0 1 . 9 3 . 0 3 . 4 2 . 2 0 . 7 0 . 2 1 . 5 2 . 8 4 . 1 3 . 2 1 . 4 8 . 7 5 . 6 3 . 2 1 . 9 1 . 2 0 . 8 0 . 5 0 . 4 0 . 3 0 . 4 0 . 5 1 . 0 1 . 7 2 . 6 3 . 3 2 . 3 0 . 7 0 . 3 1 . 5 1 . 9 1 . 5 0 . 8 0 . 2 8 . 3 5 . 9 4 . 2 2 . 7 1 . 7 1 . 0 0 . 7 0 . 5 0 . 4 0 . 4 0 . 5 0 . 9 1 . 7 2 . 9 3 . 7 2 . 8 0 . 9 0 . 2 0 . 9 0 . 7 0 . 5 0 . 2 5 . 1 5 . 5 3 . 9 2 . 4 1 . 4 0 . 9 0 . 6 0 . 5 0 . 4 0 . 5 1 . 0 1 . 9 3 . 5 4 . 6 3 . 6 1 . 1 0 . 4 0 . 5 0 . 4 0 . 3 0 . 2 8 . 5 5 . 6 3 . 2 1 . 9 1 . 1 0 . 7 0 . 5 0 . 4 0 . 5 0 . 9 1 . 9 4 . 0 5 . 8 5 . 3 1 . 7 0 . 4 0 . 4 0 . 4 0 . 5 0 . 6 0 . 8 5 . 7 3 . 7 2 . 5 1 . 6 1 . 0 0 . 6 0 . 5 0 . 5 0 . 7 1 . 6 3 . 6 5 . 9 6 . 9 2 . 2 0 . 4 0 . 5 0 . 8 1 . 4 2 . 3 2 . 7 4 . 0 4 . 1 3 . 5 2 . 3 1 . 3 0 . 7 0 . 5 0 . 4 0 . 6 1 . 2 3 . 0 5 . 9 7 . 6 2 . 9 0 . 4 1 . 2 2 . 5 4 . 8 8 . 0 6 . 5 5 . 8 3 . 3 1 . 7 0 . 9 0 . 5 0 . 4 0 . 6 1 . 3 3 . 0 6 . 0 6 . 4 3 . 1 0 . 5 2 . 6 5 . 3 8 . 2 6 . 1 7 . 4 3 . 9 1 . 9 1 . 0 0 . 6 0 . 5 0 . 6 1 . 4 2 . 8 5 . 0 4 . 5 2 . 3 0 . 6 3 . 4 4 . 4 3 . 0 0 . 8 4 . 7 2 . 7 1 . 5 0 . 8 0 . 5 0 . 5 0 . 6 1 . 2 2 . 1 3 . 3 3 . 3 1 . 8 0 . 5 1 . 8 2 . 0 1 . 3 0 . 6 1 . 0 1 . 9 1 . 5 1 . 0 0 . 6 0 . 5 0 . 4 0 . 5 0 . 9 1 . 5 2 . 2 2 . 2 1 . 4 0 . 5 0 . 9 0 . 7 0 . 4 0 . 2 0 . 0 2 . 2 1 . 8 1 . 1 1 . 0 0 . 7 0 . 5 0 . 4 0 . 4 0 . 4 0 . 7 1 . 1 1 . 6 1 . 8 1 . 3 0 . 5 0 . 4 0 . 3 0 . 3 0 . 2 2 . 9 4 . 3 3 . 3 1 . 9 1 . 0 0 . 6 0 . 4 0 . 3 0 . 3 0 . 4 0 . 6 0 . 9 1 . 3 1 . 6 1 . 2 0 . 6 0 . 4 0 . 5 0 . 7 0 . 8 5 . 7 7 . 9 5 . 4 2 . 7 1 . 3 0 . 7 0 . 4 0 . 3 0 . 3 0 . 4 0 . 5 0 . 8 1 . 2 1 . 4 1 . 2 0 . 9 1 . 5 2 . 4 8 . 7 5 . 2 2 . 7 1 . 3 0 . 7 0 . 4 0 . 3 0 . 3 0 . 4 0 . 5 0 . 8 1 . 3 1 . 6 1 . 6 1 . 3 2 . 7 5 . 2 8 . 0 3 . 1 2 . 1 1 . 6 0 . 9 0 . 5 0 . 4 0 . 3 0 . 4 0 . 6 1 . 0 1 . 6 2 . 1 2 . 4 2 . 9 5 . 9 8 . 4 5 . 1 6 . 1 2 . 8 1 . 4 0 . 7 0 . 5 0 . 4 0 . 4 0 . 6 1 . 3 2 . 3 2 . 9 3 . 7 4 . 4 2 . 8 1 3 . 9 9 . 8 4 . 3 1 . 8 0 . 9 0 . 5 0 . 4 0 . 5 0 . 7 1 . 6 2 . 8 3 . 6 1 . 9 1 . 2 0 . 4 1 5 . 8 1 2 . 9 7 . 7 3 . 6 1 . 6 0 . 9 0 . 6 0 . 5 0 . 5 0 . 8 1 . 9 3 . 1 0 . 9 0 . 6 0 . 3 0 . 1 1 5 . 2 1 5 . 2 1 2 . 6 7 . 9 4 . 2 2 . 2 1 . 2 0 . 8 0 . 6 0 . 6 0 . 7 1 . 1 2 . 3 3 . 4 0 . 4 0 . 3 0 . 2 0 . 2 1 4 . 9 1 5 . 3 1 1 . 2 7 . 0 4 . 0 2 . 5 1 . 5 1 . 0 0 . 7 0 . 6 0 . 7 0 . 9 1 . 4 2 . 5 0 . 3 0 . 4 0 . 5 1 5 . 8 1 3 . 6 9 . 6 5 . 9 3 . 6 2 . 4 1 . 5 1 . 0 0 . 8 0 . 8 0 . 9 1 . 0 1 . 2 1 . 7 0 . 8 1 . 4 2 . 1 1 1 . 0 1 3 . 9 1 1 . 3 7 . 7 4 . 7 3 . 1 2 . 1 1 . 4 1 . 0 0 . 9 0 . 9 1 . 0 1 . 3 1 . 5 1 . 6 2 . 7 5 . 0 7 . 3 4 . 5 7 . 4 7 . 8 5 . 6 3 . 7 2 . 6 1 . 8 1 . 3 1 . 0 0 . 9 1 . 0 1 . 2 1 . 6 1 . 9 2 . 2 3 . 3 6 . 6 8 . 9 9 . 0 5 . 2 4 . 4 3 . 6 2 . 7 2 . 0 1 . 5 1 . 1 0 . 9 0 . 9 1 . 0 1 . 4 1 . 8 2 . 3 3 . 0 4 . 6 5 . 4 3 . 8 1 4 . 3 1 3 . 7 8 . 5 4 . 3 2 . 6 2 . 0 1 . 5 1 . 2 0 . 9 0 . 8 0 . 8 1 . 0 1 . 4 1 . 9 2 . 4 3 . 2 3 . 4 3 . 5 4 . 1 1 5 . 4 1 3 . 6 9 . 1 4 . 9 2 . 7 1 . 7 1 . 3 1 . 0 0 . 8 0 . 7 0 . 8 1 . 0 1 . 4 1 . 9 2 . 5 3 . 2 4 . 7 7 . 9 7 . 8 1 6 . 0 1 2 . 1 8 . 1 4 . 7 2 . 8 1 . 8 1 . 2 0 . 9 0 . 7 0 . 7 0 . 8 1 . 0 1 . 4 1 . 9 2 . 6 3 . 3 7 . 4 7 . 1 1 6 . 2 1 4 . 3 1 0 . 8 6 . 8 4 . 1 2 . 6 1 . 7 1 . 1 0 . 8 0 . 7 0 . 7 0 . 9 1 . 1 1 . 4 1 . 9 2 . 5 3 . 7 4 . 5 4 . 3 4 . 1 3 . 0 1 4 . 9 1 3 . 0 9 . 2 5 . 6 3 . 5 2 . 4 1 . 6 1 . 1 0 . 8 0 . 7 0 . 8 1 . 0 1 . 2 1 . 6 2 . 0 2 . 4 3 . 3 4 . 5 3 . 5 4 . 6 6 . 3 1 4 . 6 1 1 . 5 7 . 6 4 . 6 3 . 0 2 . 1 1 . 4 1 . 0 0 . 8 0 . 8 0 . 9 1 . 1 1 . 4 1 . 8 2 . 2 2 . 5 3 . 0 3 . 9 6 . 2 9 . 3 6 . 1 1 3 . 4 9 . 7 6 . 2 3 . 9 2 . 6 1 . 8 1 . 3 0 . 9 0 . 8 0 . 8 0 . 9 1 . 2 1 . 6 2 . 0 2 . 6 3 . 1 3 . 5 3 . 6 6 . 0 4 . 1 1 2 . 9 1 0 . 9 7 . 9 4 . 9 3 . 2 2 . 3 1 . 6 1 . 1 0 . 9 0 . 8 0 . 8 1 . 0 1 . 3 1 . 7 2 . 1 2 . 8 3 . 8 4 . 7 4 . 9 2 . 4 2 . 7 5 . 0 6 . 7 5 . 5 3 . 6 2 . 6 1 . 9 1 . 4 1 . 1 0 . 9 0 . 9 1 . 0 1 . 1 1 . 5 1 . 8 2 . 2 2 . 7 3 . 7 5 . 0 7 . 4 1 . 4 1 . 7 2 . 5 2 . 6 2 . 3 1 . 9 1 . 5 1 . 1 1 . 0 0 . 9 0 . 9 1 . 1 1 . 3 1 . 6 2 . 1 2 . 5 2 . 9 3 . 2 4 . 3 0 . 9 1 . 1 1 . 2 1 . 2 1 . 0 0 . 9 0 . 9 0 . 9 1 . 0 1 . 2 1 . 4 1 . 8 2 . 3 3 . 1 3 . 8 4 . 0 0 . 6 0 . 7 0 . 7 0 . 7 0 . 8 1 . 0 1 . 2 1 . 4 1 . 6 1 . 9 2 . 3 3 . 2 4 . 2 0 . 4 0 . 5 0 . 7 1 . 0 1 . 4 1 . 7 2 . 1 2 . 3 2 . 4 2 . 7 3 . 9 0 . 4 0 . 6 0 . 9 1 . 3 1 . 9 2 . 6 3 . 2 3 . 6 3 . 4 0 . 6 1 . 0 1 . 6 2 . 5 3 . 8 4 . 8 1 . 0 1 . 8 3 . 1 4 . 8 1 . 6 PROPOSED BUILDING 6 187,660 SF BUILDING 175,240 SF MANUFACTURING AREA 12,420 SF OFFICE AREA FFE = 728.00 HEIGHT = 41' +/- OU T D O O R L I G H T I N G P L A N 1"=50' DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 52 CS152 MATCHLINE SHEET 51 CITY O F W I N C H E S T E R COU N T Y O F F R E D E R I C K 0 . 1 0 . 2 0 . 2 0 . 1 0 . 9 0 . 6 0 . 3 0 . 2 0 . 1 1 . 8 1 . 7 1 . 4 0 . 8 0 . 4 0 . 2 0 . 1 2 . 1 2 . 1 2 . 0 2 . 0 2 . 0 1 . 6 1 . 0 0 . 5 0 . 3 0 . 0 3 . 9 3 . 1 2 . 3 1 . 7 1 . 7 2 . 1 2 . 5 2 . 6 1 . 5 0 . 7 0 . 2 0 . 0 6 . 5 5 . 2 3 . 7 2 . 2 1 . 5 1 . 5 2 . 2 3 . 3 4 . 3 4 . 7 2 . 2 0 . 5 0 . 2 0 . 0 7 . 0 5 . 7 4 . 8 2 . 7 1 . 6 1 . 1 1 . 1 1 . 8 3 . 4 5 . 4 6 . 6 7 . 6 2 . 3 0 . 6 0 . 2 3 . 9 2 . 2 1 . 5 0 . 9 0 . 6 0 . 7 1 . 2 2 . 2 4 . 1 5 . 8 7 . 1 6 . 2 1 . 9 0 . 6 0 . 2 0 . 9 0 . 6 0 . 4 0 . 3 0 . 4 0 . 6 1 . 1 1 . 9 3 . 9 6 . 2 5 . 6 3 . 6 1 . 2 0 . 4 0 . 2 0 . 2 0 . 2 0 . 2 0 . 2 0 . 3 0 . 5 1 . 0 2 . 2 4 . 4 5 . 0 3 . 9 2 . 2 0 . 8 0 . 3 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 3 0 . 6 1 . 4 2 . 5 3 . 5 3 . 6 2 . 8 1 . 6 0 . 7 0 . 1 0 . 0 0 . 0 0 . 0 0 . 0 0 . 1 0 . 2 0 . 4 0 . 8 1 . 5 2 . 2 2 . 8 3 . 1 2 . 6 1 . 2 0 . 4 0 . 1 0 . 0 0 . 0 0 . 1 0 . 1 0 . 2 0 . 5 0 . 9 1 . 5 2 . 2 3 . 1 3 . 6 2 . 4 1 . 0 0 . 3 0 . 1 0 . 0 0 . 0 0 . 1 0 . 2 0 . 3 0 . 6 1 . 1 1 . 9 3 . 4 4 . 6 4 . 7 2 . 5 0 . 6 0 . 1 0 . 0 0 . 0 0 . 1 0 . 1 0 . 2 0 . 4 0 . 8 1 . 6 3 . 1 5 . 5 6 . 6 6 . 3 1 . 4 0 . 4 0 . 1 0 . 0 0 . 0 0 . 1 0 . 1 0 . 2 0 . 5 1 . 1 2 . 1 4 . 2 5 . 9 7 . 2 5 . 1 1 . 0 0 . 3 0 . 0 0 . 0 0 . 0 0 . 1 0 . 1 0 . 3 0 . 6 1 . 1 2 . 1 4 . 7 6 . 1 5 . 8 2 . 2 0 . 6 0 . 1 0 . 0 0 . 0 0 . 0 0 . 1 0 . 1 0 . 3 0 . 6 1 . 3 3 . 0 5 . 5 5 . 0 3 . 2 1 . 1 0 . 4 0 . 1 0 . 0 0 . 0 0 . 0 0 . 1 0 . 1 0 . 3 0 . 9 2 . 0 3 . 3 3 . 9 3 . 2 2 . 0 0 . 9 0 . 3 0 . 2 0 . 0 0 . 0 0 . 0 0 . 1 0 . 2 0 . 6 1 . 2 1 . 9 2 . 6 2 . 9 2 . 8 1 . 8 0 . 8 0 . 4 0 . 1 0 . 0 0 . 0 0 . 1 0 . 2 0 . 3 0 . 7 1 . 1 1 . 6 2 . 2 2 . 9 2 . 6 2 . 1 0 . 9 0 . 5 0 . 1 0 . 0 0 . 1 0 . 1 0 . 2 0 . 4 0 . 7 1 . 0 1 . 7 2 . 6 3 . 4 3 . 8 3 . 2 1 . 2 0 . 4 0 . 1 0 . 1 0 . 1 0 . 2 0 . 4 0 . 7 1 . 2 2 . 1 3 . 6 5 . 1 5 . 7 5 . 1 1 . 0 0 . 3 0 . 0 0 . 0 0 . 1 0 . 1 0 . 2 0 . 4 0 . 8 1 . 5 2 . 7 5 . 1 5 . 9 7 . 4 4 . 9 0 . 9 0 . 3 0 . 1 0 . 1 0 . 1 0 . 1 0 . 3 0 . 5 0 . 9 1 . 6 2 . 7 4 . 9 6 . 1 6 . 3 2 . 5 0 . 6 0 . 2 0 . 0 0 . 1 0 . 1 0 . 1 0 . 2 0 . 4 0 . 7 1 . 4 2 . 9 5 . 8 5 . 4 3 . 6 1 . 3 0 . 5 0 . 2 0 . 0 0 . 1 0 . 1 0 . 1 0 . 2 0 . 4 0 . 9 2 . 0 3 . 5 4 . 4 3 . 5 2 . 0 0 . 8 0 . 3 0 . 1 0 . 0 0 . 1 0 . 1 0 . 2 0 . 6 1 . 2 2 . 2 3 . 1 3 . 3 2 . 6 1 . 5 0 . 6 0 . 1 0 . 0 0 . 0 0 . 1 0 . 2 0 . 4 0 . 7 1 . 3 2 . 0 2 . 7 3 . 0 2 . 4 1 . 1 0 . 4 0 . 1 0 . 0 0 . 1 0 . 1 0 . 2 0 . 5 0 . 9 1 . 4 2 . 3 3 . 2 3 . 6 2 . 3 1 . 0 0 . 3 0 . 0 0 . 0 0 . 0 0 . 1 0 . 2 0 . 3 0 . 6 1 . 1 2 . 1 3 . 6 4 . 8 5 . 0 2 . 4 0 . 6 0 . 1 0 . 0 0 . 0 0 . 1 0 . 1 0 . 2 0 . 4 0 . 8 1 . 7 3 . 2 5 . 7 6 . 8 6 . 9 1 . 6 0 . 4 0 . 1 0 . 0 0 . 1 0 . 1 0 . 3 0 . 5 1 . 1 2 . 1 4 . 1 6 . 0 7 . 5 5 . 4 1 . 1 0 . 4 0 . 1 0 . 0 0 . 1 0 . 1 0 . 3 0 . 6 1 . 1 2 . 0 4 . 6 6 . 2 5 . 6 2 . 6 0 . 7 0 . 2 0 . 1 0 . 0 0 . 1 0 . 1 0 . 3 0 . 5 1 . 3 2 . 8 5 . 2 4 . 9 3 . 5 1 . 7 0 . 8 0 . 3 0 . 1 0 . 0 0 . 1 0 . 1 0 . 3 0 . 8 1 . 8 2 . 9 3 . 5 3 . 2 2 . 6 1 . 6 0 . 7 0 . 4 0 . 1 0 . 0 0 . 0 0 . 1 0 . 2 0 . 5 1 . 0 1 . 6 2 . 2 2 . 6 2 . 9 2 . 5 1 . 7 0 . 8 0 . 4 0 . 1 0 . 0 0 . 1 0 . 1 0 . 3 0 . 5 0 . 9 1 . 3 1 . 9 2 . 7 3 . 1 3 . 2 2 . 5 1 . 1 0 . 4 0 . 0 0 . 1 0 . 2 0 . 3 0 . 5 0 . 8 1 . 3 2 . 2 3 . 4 4 . 6 4 . 9 4 . 2 0 . 9 0 . 2 0 . 0 0 . 1 0 . 2 0 . 3 0 . 5 0 . 9 1 . 6 2 . 8 5 . 1 6 . 1 7 . 2 4 . 2 0 . 7 0 . 2 0 . 0 0 . 1 0 . 2 0 . 3 0 . 5 1 . 0 1 . 8 3 . 1 5 . 4 6 . 5 6 . 7 2 . 4 0 . 7 0 . 2 0 . 0 0 . 1 0 . 2 0 . 3 0 . 5 0 . 8 1 . 5 3 . 1 5 . 8 5 . 6 3 . 8 1 . 1 0 . 3 0 . 1 0 . 0 0 . 1 0 . 1 0 . 2 0 . 4 0 . 8 1 . 9 3 . 8 4 . 6 3 . 5 1 . 8 0 . 6 0 . 2 0 . 1 0 . 0 0 . 1 0 . 1 0 . 2 0 . 5 1 . 2 2 . 0 2 . 7 2 . 5 1 . 8 1 . 0 0 . 3 0 . 1 0 . 0 0 . 0 0 . 1 0 . 1 0 . 3 0 . 6 1 . 1 1 . 5 1 . 6 1 . 6 1 . 3 0 . 5 0 . 2 0 . 1 0 . 1 0 . 0 0 . 1 0 . 2 0 . 3 0 . 5 0 . 8 0 . 9 1 . 2 1 . 1 0 . 7 0 . 4 0 . 2 0 . 2 0 . 1 0 . 1 0 . 1 0 . 2 0 . 3 0 . 4 0 . 6 0 . 7 0 . 8 0 . 7 0 . 5 0 . 5 0 . 5 0 . 3 0 . 1 0 . 1 0 . 1 0 . 2 0 . 2 0 . 3 0 . 4 0 . 5 0 . 6 0 . 6 0 . 8 1 . 0 0 . 9 0 . 5 0 . 1 0 . 1 0 . 2 0 . 2 0 . 3 0 . 4 0 . 5 0 . 7 1 . 0 1 . 6 2 . 4 1 . 8 0 . 6 0 . 0 0 . 1 0 . 1 0 . 2 0 . 2 0 . 3 0 . 4 0 . 7 1 . 2 1 . 9 3 . 1 3 . 8 1 . 8 0 . 6 0 . 1 0 . 1 0 . 1 0 . 2 0 . 2 0 . 4 0 . 7 1 . 3 2 . 2 3 . 3 5 . 0 5 . 7 1 . 6 0 . 2 0 . 1 0 . 1 0 . 1 0 . 2 0 . 3 0 . 6 1 . 1 2 . 2 3 . 1 4 . 8 7 . 1 4 . 4 1 . 1 0 . 3 0 . 1 0 . 1 0 . 1 0 . 2 0 . 4 0 . 7 1 . 6 2 . 7 3 . 8 5 . 9 6 . 2 2 . 3 0 . 7 0 . 1 0 . 1 0 . 2 0 . 3 0 . 4 0 . 8 1 . 9 2 . 9 3 . 6 4 . 5 3 . 6 1 . 2 0 . 3 0 . 1 0 . 1 0 . 2 0 . 3 0 . 5 1 . 2 2 . 3 2 . 8 3 . 2 3 . 2 1 . 9 0 . 6 0 . 2 0 . 1 0 . 1 0 . 2 0 . 4 0 . 7 1 . 4 1 . 9 2 . 1 2 . 2 1 . 8 1 . 0 0 . 5 0 . 2 0 . 1 0 . 1 0 . 2 0 . 3 0 . 5 0 . 8 1 . 2 1 . 4 1 . 5 1 . 5 1 . 4 1 . 3 0 . 9 0 . 3 0 . 1 0 . 1 0 . 2 0 . 3 0 . 5 0 . 7 0 . 9 1 . 1 1 . 4 1 . 7 2 . 3 2 . 5 1 . 0 0 . 1 0 . 2 0 . 2 0 . 3 0 . 5 0 . 7 0 . 9 1 . 4 1 . 9 2 . 8 3 . 9 2 . 7 1 . 0 0 . 1 0 . 2 0 . 2 0 . 3 0 . 5 0 . 8 1 . 3 2 . 1 3 . 0 4 . 5 6 . 0 2 . 6 0 . 4 0 . 1 0 . 2 0 . 3 0 . 4 0 . 6 1 . 0 1 . 9 2 . 9 3 . 9 6 . 8 7 . 0 1 . 7 0 . 4 0 . 1 0 . 2 0 . 3 0 . 4 0 . 6 1 . 2 2 . 4 3 . 4 5 . 1 6 . 2 3 . 1 0 . 9 0 . 3 0 . 1 0 . 1 0 . 2 0 . 3 0 . 4 0 . 7 1 . 5 2 . 8 3 . 4 4 . 6 4 . 0 1 . 4 0 . 4 0 . 1 0 . 1 0 . 2 0 . 3 0 . 5 1 . 0 2 . 1 2 . 8 3 . 1 3 . 3 2 . 2 0 . 6 0 . 2 0 . 1 0 . 1 0 . 2 0 . 4 0 . 7 1 . 3 1 . 9 2 . 1 2 . 2 1 . 9 0 . 8 0 . 3 0 . 1 0 . 0 0 . 1 0 . 2 0 . 3 0 . 5 0 . 8 1 . 2 1 . 5 1 . 6 1 . 5 1 . 1 0 . 5 0 . 2 0 . 0 0 . 0 0 . 0 0 . 1 0 . 2 0 . 4 0 . 5 0 . 8 1 . 1 1 . 4 1 . 5 1 . 4 0 . 8 0 . 2 0 . 1 0 . 0 0 . 0 0 . 0 0 . 0 0 . 2 0 . 3 0 . 4 0 . 7 1 . 1 1 . 5 1 . 9 2 . 2 1 . 6 0 . 4 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 2 0 . 2 0 . 4 0 . 6 1 . 2 1 . 9 2 . 4 3 . 2 2 . 5 0 . 6 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 2 0 . 3 0 . 6 1 . 2 2 . 4 3 . 1 4 . 5 3 . 4 0 . 9 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 3 0 . 6 1 . 2 2 . 6 3 . 4 5 . 4 5 . 3 1 . 1 0 . 1 0 . 1 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 5 1 . 1 2 . 7 3 . 9 7 . 0 6 . 4 0 . 8 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 1 . 2 2 . 7 3 . 8 6 . 4 5 . 6 1 . 0 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 0 0 . 0 2 . 7 3 . 6 4 . 9 3 . 8 1 . 0 0 . 3 0 . 2 0 . 2 0 . 2 0 . 2 0 . 2 0 . 2 0 . 2 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 0 1 . 3 2 . 4 3 . 3 4 . 1 3 . 0 0 . 7 0 . 5 0 . 5 0 . 4 0 . 3 0 . 3 0 . 3 0 . 3 0 . 3 0 . 3 0 . 2 0 . 2 0 . 2 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 0 . 1 1 . 3 2 . 1 2 . 9 3 . 2 2 . 2 0 . 5 0 . 9 1 . 0 0 . 9 0 . 6 0 . 4 0 . 4 0 . 5 0 . 6 0 . 6 0 . 5 0 . 4 0 . 3 0 . 2 0 . 2 0 . 2 0 . 2 0 . 1 0 . 1 0 . 1 0 . 1 1 . 3 2 . 0 2 . 7 2 . 5 1 . 3 0 . 8 1 . 2 1 . 8 2 . 2 1 . 9 1 . 0 0 . 6 0 . 6 0 . 8 1 . 2 1 . 2 0 . 9 0 . 6 0 . 4 0 . 3 0 . 3 0 . 3 0 . 2 0 . 2 0 . 2 0 . 1 0 . 1 0 . 1 1 . 5 2 . 4 2 . 7 2 . 2 1 . 0 1 . 0 1 . 3 2 . 1 3 . 4 4 . 6 3 . 7 1 . 7 0 . 6 0 . 7 1 . 6 2 . 6 2 . 5 1 . 6 1 . 0 0 . 6 0 . 5 0 . 4 0 . 4 0 . 3 0 . 3 0 . 2 0 . 2 0 . 2 0 . 1 0 . 1 1 . 0 2 . 0 3 . 3 3 . 6 2 . 5 0 . 8 1 . 1 1 . 5 1 . 9 2 . 8 5 . 2 8 . 2 6 . 6 2 . 2 0 . 3 5 . 6 4 . 7 2 . 7 1 . 5 0 . 9 0 . 7 0 . 6 0 . 6 0 . 6 0 . 5 0 . 4 0 . 3 0 . 2 0 . 2 0 . 1 1 . 1 2 . 5 4 . 8 4 . 8 3 . 0 0 . 7 1 . 4 2 . 0 2 . 6 2 . 5 2 . 6 4 . 4 7 . 9 0 . 0 3 . 5 1 . 9 1 . 2 1 . 0 1 . 0 1 . 1 1 . 0 0 . 8 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 1 1 . 1 2 . 6 5 . 9 6 . 6 4 . 1 0 . 7 1 . 4 2 . 2 3 . 6 4 . 8 3 . 7 2 . 3 1 . 9 1 . 1 1 . 7 1 . 6 1 . 7 2 . 0 1 . 9 1 . 4 0 . 9 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 1 0 . 4 1 . 0 2 . 6 5 . 6 7 . 5 3 . 9 0 . 5 1 . 6 2 . 0 3 . 1 5 . 6 8 . 3 6 . 3 1 . 6 3 . 0 3 . 9 3 . 7 2 . 5 1 . 5 0 . 9 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 1 0 . 2 0 . 5 1 . 4 3 . 2 5 . 7 6 . 8 2 . 7 0 . 4 0 . 0 2 . 1 2 . 6 2 . 7 3 . 0 4 . 9 8 . 3 0 . 0 6 . 7 4 . 0 2 . 3 1 . 4 0 . 9 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 1 0 . 1 0 . 3 0 . 7 1 . 7 3 . 7 5 . 5 5 . 2 1 . 8 0 . 4 0 . 0 2 . 3 3 . 7 4 . 9 3 . 8 2 . 5 2 . 3 0 . 0 5 . 0 3 . 3 2 . 0 1 . 2 0 . 8 0 . 5 0 . 4 0 . 3 0 . 2 0 . 1 0 . 0 0 . 1 0 . 2 0 . 3 0 . 8 1 . 7 3 . 2 4 . 2 3 . 4 1 . 0 0 . 4 0 . 0 1 . 6 2 . 0 3 . 2 5 . 7 8 . 5 6 . 3 1 . 6 5 . 1 4 . 5 2 . 9 1 . 7 1 . 1 0 . 7 0 . 5 0 . 3 0 . 2 0 . 2 0 . 1 0 . 0 0 . 0 0 . 1 0 . 2 0 . 4 0 . 8 1 . 5 2 . 6 2 . 9 2 . 2 0 . 7 0 . 2 0 . 0 2 . 2 2 . 7 2 . 6 3 . 0 4 . 9 8 . 3 0 . 0 6 . 9 4 . 1 2 . 4 1 . 5 0 . 9 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 0 0 . 0 0 . 0 0 . 1 0 . 1 0 . 2 0 . 4 0 . 8 1 . 4 2 . 3 2 . 5 1 . 6 0 . 5 0 . 2 0 . 0 2 . 5 3 . 9 5 . 0 3 . 6 2 . 4 2 . 2 4 . 8 3 . 1 2 . 1 1 . 3 0 . 8 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 0 0 . 0 0 . 0 0 . 0 0 . 1 0 . 1 0 . 2 0 . 4 0 . 8 1 . 4 2 . 3 2 . 7 1 . 4 0 . 3 0 . 2 0 . 0 2 . 3 3 . 5 6 . 0 8 . 5 6 . 0 1 . 3 4 . 0 3 . 0 1 . 9 1 . 2 0 . 8 0 . 5 0 . 4 0 . 3 0 . 2 0 . 2 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 0 0 . 1 0 . 1 0 . 2 0 . 4 0 . 8 1 . 5 2 . 4 2 . 5 1 . 4 0 . 4 0 . 1 0 . 0 2 . 9 3 . 2 3 . 5 5 . 3 8 . 5 6 . 4 4 . 6 2 . 7 1 . 6 1 . 0 0 . 7 0 . 5 0 . 3 0 . 3 0 . 2 0 . 2 0 . 1 0 . 1 0 . 1 0 . 1 0 . 0 0 . 0 0 . 0 0 . 1 0 . 1 0 . 2 0 . 4 0 . 9 1 . 8 2 . 8 2 . 8 1 . 7 0 . 5 0 . 1 0 . 0 5 . 5 4 . 7 2 . 9 2 . 7 6 . 0 3 . 5 2 . 3 1 . 4 0 . 9 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 1 0 . 1 0 . 2 0 . 2 0 . 2 0 . 1 0 . 0 0 . 0 0 . 1 0 . 1 0 . 2 0 . 5 1 . 1 2 . 2 3 . 8 4 . 1 2 . 5 0 . 6 0 . 2 7 . 1 2 . 4 3 . 9 3 . 2 2 . 1 1 . 3 0 . 9 0 . 6 0 . 4 0 . 3 0 . 2 0 . 2 0 . 2 0 . 2 0 . 2 0 . 2 0 . 3 0 . 4 0 . 5 0 . 5 0 . 1 0 . 1 0 . 1 0 . 1 0 . 2 0 . 4 1 . 1 2 . 5 5 . 1 5 . 5 4 . 2 0 . 9 5 . 3 5 . 1 3 . 2 1 . 9 1 . 2 0 . 8 0 . 5 0 . 4 0 . 3 0 . 3 0 . 2 0 . 3 0 . 3 0 . 4 0 . 6 0 . 8 1 . 2 1 . 2 0 . 7 0 . 1 0 . 1 0 . 1 0 . 2 0 . 4 1 . 0 2 . 3 5 . 4 6 . 8 7 . 5 4 . 3 2 . 5 1 . 7 1 . 1 0 . 7 0 . 5 0 . 4 0 . 3 0 . 3 0 . 3 0 . 4 0 . 6 0 . 9 1 . 4 2 . 2 3 . 0 2 . 8 0 . 9 0 . 1 0 . 1 0 . 2 0 . 3 0 . 8 2 . 0 5 . 0 4 . 5 3 . 4 2 . 4 1 . 5 1 . 0 0 . 7 0 . 5 0 . 4 0 . 4 0 . 4 0 . 5 0 . 8 1 . 2 2 . 0 3 . 4 5 . 2 7 . 5 6 . 4 0 . 5 0 . 1 0 . 2 0 . 4 0 . 9 2 . 2 5 . 1 3 . 7 2 . 2 1 . 4 0 . 9 0 . 6 0 . 5 0 . 4 0 . 5 0 . 6 0 . 9 1 . 4 2 . 3 3 . 8 6 . 5 1 1 . 4 1 1 . 2 2 . 1 0 . 1 0 . 2 0 . 4 8 . 3 5 . 3 3 . 0 1 . 9 1 . 2 0 . 8 0 . 6 0 . 5 0 . 5 0 . 6 0 . 9 1 . 4 2 . 2 3 . 7 5 . 6 8 . 3 7 . 5 3 . 0 0 . 4 0 . 2 5 . 6 3 . 8 2 . 7 1 . 7 1 . 1 0 . 8 0 . 6 0 . 6 0 . 6 0 . 8 1 . 3 1 . 9 2 . 8 3 . 8 4 . 6 4 . 2 2 . 2 4 . 9 4 . 0 2 . 5 1 . 5 1 . 0 0 . 8 0 . 6 0 . 6 0 . 7 1 . 0 1 . 4 1 . 9 2 . 5 2 . 9 2 . 4 7 . 9 6 . 2 3 . 5 2 . 1 1 . 4 1 . 0 0 . 7 0 . 6 0 . 6 0 . 8 1 . 0 1 . 3 1 . 5 1 . 5 6 . 7 4 . 1 2 . 8 2 . 0 1 . 3 0 . 9 0 . 7 0 . 6 0 . 7 0 . 8 0 . 9 4 . 0 3 . 9 2 . 9 1 . 8 1 . 2 0 . 9 0 . 7 0 . 6 0 . 6 6 . 5 4 . 3 2 . 6 1 . 6 1 . 1 0 . 8 0 . 6 8 . 9 5 . 6 3 . 5 2 . 3 1 . 5 5 . 3 4 . 7 3 . 4 PROPOSED BUILDING 6 187,660 SF BUILDING 175,240 SF MANUFACTURING AREA 12,420 SF OFFICE AREA FFE = 728.00 HEIGHT = 41' +/- DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 8/15/19 53 CS153 OU T D O O R L I G H T I N G D E T A I L S DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 8/15/19 54 CS154 OU T D O O R L I G H T I N G D E T A I L S DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 8/15/19 55 CS155 OU T D O O R L I G H T I N G D E T A I L S TYPICAL TRUCK BOLLARD DETAIL 6" PAINT POST BRIGHT YELLOW SET POST IN CONCRETE FILL POST WITH CONCRETE 4" WIDE, WHITE REFLECTIVE TAPE 8" DIAM STEEL PIPE GRADE 36" 24" 36" 6" 12" CA P I T O L L A N E HOGE R U N PIN 63-A-115 TREX COMPANY, INC. INST. 160003174 5.1174 ACRES PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 N 36°52'25" E 406.91' S 4 7 ° 2 2 ' 1 9 " E 2 2 1 . 2 8 ' C 1 C 2 S 19°08'1 2 " W 2 1 0 . 2 4 ' PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 RECEIVING SHIPPING ACCESS ROAD ONE STORY CONCRETE BUILDING (BLDG. #2) F.F.E. = 723.60 V A . S E C . R T E . 6 5 2 - S H A W N E E D R I V E 4 0 ' R / W ( D B 2 6 8 P G 1 4 9 ) PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 FINISH PRODUCT YARD CONCRETE BUILDING (BLDG. #4) F.F.E. = 738.60 B L O C K B U I L D I N G R & D - BUILDING 2 BUILDING 4 7 PROP. H.C. SIGNS N 10 11 12 13 14 15 16171819 2021 22 23 24 28 29 30 31 35 3332 C D PROPOSED BUILDING 6 187,660 SF BUILDING 175,240 SF MANUFACTURING AREA 12,420 SF OFFICE AREA FFE = 728.00 HEIGHT = 41' +/- T T T T TWO 4" CONDUITS FOR VERIZON (one spare) SERVICE. PVC SCH 40 F O FO FO FO FO F O TWO 3" CONDUITS FOR TREX FIBER OPTIC CABLE (one spare) PVC SCH 40 Prop Water Line Esmt. Prop Water Line Esmt. REMOVE FIRE HYDRANT DURING CONST. REINSTALL ON WM #8 WHEN BIDG. BACKFILL COMPLETE. 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) CLEANWAY DOWNSPOUT FILTER (TYP). SEE DETAIL SHEET 31 SEE PLUMBING PLAN P1.1 FOR SAN SEWER CONTINUATION SEE COMMERCIAL ENTRANCE PLAN SHEET 22 FOR WORK IN THIS AREA INS T A L L D O U B L E G A T E WIT H I N T E R C O M A N D RE M O T E C O N T R O L FR O M S H I P P I N G O F F I C E . FA A C M O D E L 6 4 0 O R AP P R O V E D E Q U A L . DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 DR Y U T I L I T Y P L A N 56 CS156 CA P I T O L L A N E HOGE R U N CITY O F W I N C H E S T E R COU N T Y O F F R E D E R I C K 5.1174 ACRES PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 S 19°08'1 2 " W 2 1 0 . 2 4 ' S 02°1 3 ' 5 0 " E 2 5 2 . 1 2 ' S 09°16'39" E 121.25' ONE STORY CONCRETE BUILDING (BLDG. #2) F.F.E. = 723.60 ONE STORY METAL BUILDING TM 371-1-1 TREX CO., L.L.C. DB 965, PG 532 (FRED. CO.) DB 303, PG 1543 (CITY OF WINCHESTER) PIN 63-A-110 TREX COMPANY, INC. INST. 020022798 STORM WATER DETENTION POND HOG E R U N FINISH PRODUCT YARD FINISH PRODUCT YARD R & D - BUILDING 2 7 PROP. H.C. SIGNS N 10 11 12 13 14 15 22 23 24 25 26 28 29 30 51 60 61 63 64 70 71 72 73 92 31 35 3332 FFE = 728.00 HEIGHT = 41' +/- Prop Water Line Esmt. LIGHT DUTY PAVEMENT 8" PVC CLEANWAY CONNECTOR PIPE AT 1/8" PER FT. (typ) CLEANWAY DOWNSPOUT FILTER (TYP). SEE DETAIL SHEET 31 DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 9/12/19 DR Y U T I L I T Y P L A N 56A CS156A DATE: SCALE: CHECKED BY: SHEET OF 57 TR E X C O M P A N Y , I N C - B U I L D I N G 6 LO T 6 3 A 1 1 0 SH A W N E E M A G I S T E R I A L D I S T R I C T FR E D E R I C K C O U N T Y , V I R G I N I A TSS 1183.0 10 3 H e a t h C o u r t Wi n c h e s t e r , V A 2 2 6 0 2 (5 4 0 ) 6 8 6 - 7 3 7 3 fa x ( 5 4 0 ) 3 0 1 - 1 1 0 0 TSS AS SHOWN AUGUST 15, 2019 PROJECT NUMBER: DRAWN BY: ST O W E E N G I N E E R I N G , P L C Timothy S. Stowe 8/15/19 57 CS157 DR Y U T I L I T Y D E T A I L S