HomeMy WebLinkAbout29-19 CommentsTim Stowe
From: Timothy Rhodes <timothy.rhodes@vdot.virginia.gov>
Sent: Monday, December 9, 2019 2:17 PM
To: Tim Stowe
Cc: Matthew Smith; Rhonda Funkhouser; Tyler Klein; Edwin Carter, John Bishop;
Sara Siver; pbarker@topofvirginiahockey.com
Subject: Trex Company, Inc. Site Plan Approval
DEPARTMENT OF TRANSPORTATION
Staunton/Edinburg Land Development
14031 Old Valley Pike
Edinburg, VA 22824
Mr. Stowe,
A VDOT review has been conducted for the Trex Company, Inc. Site Plan signature dated
September 12, 2019, with a final revision date of December 3, 2019. Based off of the review
of the Drawings, all of the previous VDOT comments have been addressed and the Site Plan
is approved by our office. Please ensure that all applicable agencies have the most recent set
of approved Drawings.
We offer the following general comments:
Our review and comments are general in nature. Should details be overlooked during
plan review or conditions in the field exist such that additional measures are warranted,
such measures shall be completed to the satisfaction of the department.
Materials used and methods of construction shall adhere to the current observed VDOT
Road and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic
Control Devices, and Land Use Permit Special Provisions.
A preconstruction conference shall be held by the engineer and/or the developer with
the attendance of the contractor, various County agencies, utility companies, and VDOT
prior to initiation of work.
All drainage is to be carried within the right-of-way in ditch lines or gutters along the
street to a pipe or drainage easement.
Any construction related changes to the approved plan must come through the design
engineer to VDOT for approval. Please allow a minimum of 5 business days for VDOT
review.
A Land Use Permit shall be obtained before any work is performed on the State's right-
of-way. The permit is issued by this office and may require application fees, the salary
& expenses of a State assigned inspector, and surety bond coverage.
Please provide a complete digital set of the plans for file and permitting.
If you have any questions or need further information, please do not hesitate to contact me.
Sincerely,
Timothy Rhodes
VDOT—Land Development Engineer
Clarke, Frederick, Shenandoah & Warren Counties
14031 Old Valley Pike
Edinburg, VA. 22824
(540)-984-5630