Loading...
PC 12-18-19 Meeting Agenda AGENDA FREDERICK COUNTY PLANNING COMMISSION The Board Room Frederick County Administration Building Winchester, Virginia December 18, 2019 7:00 P.M. CALL TO ORDER TAB 1)Adoption of Agenda: Pursuant to established procedures, the Planning Commission should adopt the Agenda for the meeting ................................................................ (no tab) 2)Committee Reports .................................................................................................. (no tab) 3)Citizen Comments ................................................................................................... (no tab) PUBLIC HEARING 4)Rezoning #05-19 for Martinsburg Pike, LLC., submitted by Painter-Lewis, P.L.C. to rezone 1.724+/- acres from the RA (Rural Areas) District to the B2 (General Business) District with proffers. The properties are located at 2674 and 2682 Martinsburg Pike approximately 1,000 feet south of Stephenson Road in the Stonewall Magisterial District and are identified by Property Identification Numbers 44-A-58, 44-A-59 and 44-A-60. Ms. Perkins ...................................................................................................................... (A) 5)Rezoning #07-19 for Gentle Harvest LC., submitted by Thomas Lawson, P.C. to rezone 1.204 acres from the B2 (General Business) District to the B3 (Industrial Transition) District with proffers. The property is located at 120 Front Royal Pike in the Shawnee Magisterial District and is identified by Property Identification Number 64-A-1C. Ms. Perkins ...................................................................................................................... (B) ACTION ITEMS 6)Rezoning #03-19 for Berlin Steel and Dennis Ridings, submitted by Painter-Lewis, P.L.C., to rezone 15.3933+/- acres from the RA (Rural Areas) District to the M1 (Light Industrial) District with proffers. The properties are on the eastern side of Ridings Lane, which intersects with Route 277 in Opequon Magisterial District and are identified by Property Identification Numbers 86-A-179C and 87-A-12. Ms. Perkins ...................................................................................................................... (C) 7) Rezoning #06-19 Winchester Medical Center, Inc., submitted by Valley Engineering, PLC to revise the proffered Generalized Development Plan approved with Rezoning #02- 03 for 37.5424+/- acres zoned B2 (General Business) District and 51.8675+/- acres zoned MS (Medical Support) District to the MS (Medical Support) District. The property is on the northern side of Route 50 West and west of Route 37 and is identified by Property Identification Number 53-A-68. Ms. Perkins ...................................................................................................................... (D) PUBLIC HEARING 8) Ordinance Amendment to the Frederick County Code – Chapter 165 Zoning, ARTICLE I General Provisions; Amendments; and Conditional Use Permits, Part 101 General Provisions, §165-101.02 Definitions and word usage; ARTICLE II Supplementary Use Regulations; Parking; Buffers; and Regulations for Specific Uses, Part 204 Additional Regulations for Specific Uses, §165-204.26 Public Utilities; ARTICLE IV Agricultural and Residential Districts Part 401 RA Rural Areas District, §165-401.02 Permitted Uses; §165-401.03 Conditional Uses; Part 402 RP Residential Performance District, §165- 402.02 Permitted Uses; Part 403 MH1 Mobile Home Community District, §165-403.02 Permitted Uses; ARTICLE V Planned Development Districts, Part 502 R5 Residential Recreational Community District, §165-502.04 Permitted Uses; ARTICLE VI Business and Industrial Zoning Districts, Part 602 B1 Neighborhood Business District §165- 602.02 Allowed Uses; Part 603 B2 General Business District, §165-603.02 Allowed Uses; Part 604 B3 Industrial Transition Distric,t §165-604.02 Allowed Uses; Part 606 M1 Light Industrial District, §165-606.02 Allowed Uses; Part 608 EM Extractive Manufacturing District, §165-608.02 Permitted Uses; Part 609 HE Higher Education District, §165- 609.02 Permitted Uses. Revisions to the Frederick County Zoning to include a definition for Public Utilities that includes utility-scale solar power generating facilities and amendments to the supplemental use regulation for public utilities. Mr. Klein .......................................................................................................................... (E) Other Adjourn -2- Commonly Used Planning Agenda Terms Meeting format Citizen Comments – The portion of the meeting agenda offering an opportunity for the public to provide comment to the Planning Commission on any items not scheduled as public hearing items. Public Hearing– A specific type of agenda item, required by State law, which incorporates public comment as a part of that item prior to Planning Commission or Board of Supervisors action. Public hearings are held for items such as: Comprehensive Plan policies and amendments; Zoning and Subdivision Ordinance amendments; and Rezoning and Conditional Use Permit applications. Following the Public Hearing, the Planning Commission will take action on the item (see below). Action Item–There are both public hearing and non-public hearing items on which the Planning Commission takes action. Depending on the actual item, the Planning Commission may approve, deny, table, or forward a recommendation to the Board of Supervisors regarding the agenda item. No public comment is accepted during the Action Item portion of the agenda. Information/Discussion Item– The portion of the meeting agenda where items are presented to the Planning Commission for information and discussion. The Planning Commission may offer comments and suggestions, but does not take action on the agenda item. No public comment is accepted during the Information/Discussion Item portion of the agenda. Planning Terminology Urban Development Area or UDA – The UDA is the county’s urban growth boundary identified in the Comprehensive Plan in which more intensive forms of residential development will occur. The UDA is an area of the county where community facilities and public services are more readily available and are provided more economically. Sewer and Water Service Area or SWSA – The SWSA is the boundary identified in the Comprehensive Plan in which public water and sewer is or can be provided. The SWSA is consistent with the UDA in many locations; however the SWSA may extend beyond the UDA to promote commercial, industrial, and institutional land uses in area where residential land uses are not desirable. Land Use – Land Use is the nomenclature which refers to the type of activity which may occur on an area of land. Common land use categories include: agricultural, residential, commercial, and industrial. Zoning District - Zoning district refers to a specific geographic area that is subject to land use standards. Frederick County designates these areas, and establishes policies and ordinances over types of land uses, density, and lot requirements in each zone. Zoning is the main planning tool of local government to manage the future development of a community, protect neighborhoods, concentrate retail business and industry, and channel traffic. Rezoning – Rezoning is the process by which a property owner seeks to implement or modify the permitted land use activities on their land. A rezoning changes the permitted land use activities within the categories listed above under Land Use. Conditional Use Permit or CUP - A CUP allows special land uses which may be desirable, but are not always appropriate based on a location and surrounding land uses. The CUP requested use, which is not allowed as a matter of right within a zoning district, is considered through a public hearing process and usually contains conditions to minimize any impacts on surrounding properties. Ordinance Amendment – The process by which the County Code is revised. Often the revisions are the result of a citizen request with substantial justification supporting the change. Amendments ultimately proceed through a public hearing prior to the PC forwarding a recommendation to the Board of Supervisors. County Bodies Involved Board of Supervisors or BOS - Frederick County is governed by an elected Board of Supervisors composed of seven members, one from each magisterial district, and one chairman-at-large. The Board of Supervisors is the policy-making body of the county. Functions of the Board of Supervisors related to planning include making land use decisions, and establishing growth and development policies. Planning Commission or PC - The PC is composed of 13 members, two from each magisterial districts and one at-large, appointed by the Board of Supervisors. The Planning Commission serves in an advisory capacity to the Board of Supervisors which then takes final action on all planning, zoning, and land use matters. Comprehensive Plans and Programs Committee or CPPC – The CPPC is a major committee of the PC whose primary responsibility is to formulate land use policies that shape the location and timing of development throughout the County. Included in the work are studies of specific areas to develop guidelines for future land use within those areas. The CPPC also considers requests for amendments to the Comprehensive Plan. Decisions by CPPC are then forwarded to the PC for consideration. Development Review and Regulations Committee or DRRC – The DRRC is the second major committee of the PC whose primary responsibilities involve the implementation of the Comprehensive Plan in the form of Zoning and Subdivision ordinance requirements. Requests to amend the ordinances to the DRRC are made by the Board of Supervisors, Planning Commission, local citizens, businesses, or organizations. DRRC decisions are also forwarded to the PC for consideration. A REZONING APPLICATION #05-19 MARTINSBURG PIKE, LLC. Staff Report for the Planning Commission Prepared: December 6, 2019 Staff Contact: Candice E. Perkins, AICP, CZA, Assistant Director Reviewed Action Planning Commission: 12/18/19 Pending Board of Supervisors: 01/22/20 Pending PROPOSAL: To rezone 1.724+/- acres from the RA (Rural Areas) District to the B2 (General Business) District with proffers. LOCATION: The subject properties are located at 2674 and 2682 Martinsburg Pike approximately 1,000 feet south Stephenson Road. EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 12/18/19 PLANNING COMMISSION MEETING: This is an application to rezone 1.724+/- acres from the RA (Rural Areas) District to the B2 (General Business) District with proffers. The site contains three properties, one contains a nonconforming structure that was once operated as a store but has been closed more than two years, one parcel is vacant, and one parcel contains a single-family dwelling. The site is located within the limits of the Northeast Frederick Land Use Plan of the 2035 Comprehensive Plan. The 2035 Comprehensive Plan identifies these with a mixed use industrial/office land use. The owner intends to operate a restaurant in the existing commercial structure. The site was previously utilized as a country general store (Oates Grocery). In general, the proposed commercial zoning is inconsistent with the current land use supported by the Comprehensive Plan. However, considering the site is bordered by residential property to the south and east and was previously utilized for commercial purposes, the requested commercial may be acceptable as it is of a lesser impact to the surrounding properties. The proffers associated with this rezoning request are as follows: Proffer Statement – Dated October 17, 2019: 1. The existing interior lot lines will be vacated, and the three parcels will be consolidated into one lot. 2. The driveway connection from the existing residential use to Route 11 will be eliminated. 3. The owner will provide 6.5’ of right of way dedication for future road improvements along Route 11. 4. The owner will reserve 12’ of right of way for future road improvements. Ownership of this reservation area will be ceded to Frederick County upon demand to accommodate future road improvements along Route 11. 5. The owners of this property will donate or will cause to be donated to Frederick County the sum of $310.40 ($0.10 per square foot of commercial space) for impacts to fire and rescue services. A recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. Rezoning #05-19 MARTINSBURG PIKE, LLC. December 6, 2019 Page 2 This report is prepared by the Frederick County Planning Staff to p rovide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this application. It may also be useful to others interested in this zoning matter. Unresolved issues concerning this application are noted by Staff where relevant throughout this Staff report. Reviewed Action Planning Commission: 12/18/19 Pending Board of Supervisors: 01/22/20 Pending PROPOSAL: To rezone 1.724+/- acres from the RA (Rural Areas) District to the B2 (General Business) District with proffers. LOCATION: The subject properties are located at 2674 and 2682 Martinsburg Pike approximately 1,000 feet south of Stephenson Road. MAGISTERIAL DISTRICT: Stonewall PROPERTY ID NUMBERS: 44-A-58, 44-A-59 and 44-A-60 PROPERTY ZONING: RA (Rural Areas) District PRESENT USE : Vacant commercial building and residential ADJOINING PROPERTY ZONING & PRESENT USE: North: RA (Rural Areas) Use: Residential South: MH-1 (Mobile Home Community) Use: Residential M1 (Light Industrial) Industrial East: RA (Rural Areas) Use: Residential M1 (Light Industrial) Residential West: MH-1 (Mobile Home Community) Use: Residential Rezoning #05-19 MARTINSBURG PIKE, LLC. December 6, 2019 Page 3 REVIEW EVALUATIONS: Virginia Dept. of Transportation: We have reviewed the rezoning application for Lanzeta Properties located on Rte. 11 in Frederick County, VA. This application is to rezone 1.724 acres identified as parcels TM #44-A- 48, TM #44-A-59 and TM #44-A-60 from RA to B2. The proposal is to consolidate the three lots into one, if the rezoning is successful. We offer the following comments: Frederick County’s Comprehensive Plan calls for this segment of Rte. 11 to be a future Urban 6 lane divided highway (U6D). We suggest coordination with County Staff to determine appropriate future right-of-ways needs. Please remove the proposed “improved driveway and access to residence” from the last sheet of this submittal. Entrance proposals and design will take place at the site plan stage. Thank you for submitting this rezoning application to our office for review. Please feel free to contact me if you have any questions. Frederick County Transportation: Regarding ROW reservation/dedication I would suggest you consider a bit of a hybrid. Typically, it is preferable to get the full right-of-way dedication up front so the site can develop with that in mind, but it is my understanding that the right-of-way for a 6-lane Route 11 as the Comprehensive Plan calls for would render the site undevelopable since you are trying to use the existing structure. Given the fact that the 6-lane facility is likely a long-term improvement and a 4-lane facility is more likely to happen sooner, I would suggest consideration of a dedication sufficient to accommodate t he 4-lane roadway with a future reservation for the 6-lane that would perhaps be triggered by redevelopment. Based on coordination w ith VDOT, the width from the center of the existing right-of-way that would be needed for a 4-lane facility with sidewalk in the right-of-way would be 46.5'. That grows by an additional 12' for the future 6-lane roadway. This assumes a curb and gutter roadway and does not include right turn lane which would depend upon warrants. A turn lane analysis is suggested to determine if would be warranted. *ROW needs have been included in the proffer. Virginia Dept. of Health: Please see letter from Jim Davis, REHS Environmental Health Supervisor dated September 5, 2019. Frederick Water: No comments at this time. Frederick County Department of Public Works: We offer no comments at this time. Frederick County Fire Marshall: Plan approved. Frederick County Department of Parks & Recreation: Park and Recreation recommends some form of bicycle/pedestrian accommodation along the Route 11 frontage. County of Frederick Attorney: I am in receipt of your letter dated October 8 and accompanying revised proffer statement. I believe that the revisions address my previous concerns. Rezoning #05-19 MARTINSBURG PIKE, LLC. December 6, 2019 Page 4 Planning & Zoning: 1) Site History The original Frederick County Zoning Map (U.S.G.S. Stephenson Quadrangle) depicts the zoning for both parcels as A-2 (Agricultural General) District. The A-2 (Agricultural General) District zoning classification was modified to RA (Rural Areas) District on February 14, 1990 during the comprehensive amendment to the County’s Zoning Ordinance. 2) Comprehensive Plan The 2035 Comprehensive Plan is the guide for the future growth of Frederick County. The 2035 Comprehensive Plan is an official public document that serves as the Community's guide for making decisions regarding development, preservation, public facilities and other key components of Community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. The Area Plans, Appendix I of the 2035 Comprehensive Plan, are the primary implementation tool and will be instrumental to the future planning ef forts of the County. Land Use The site is located within the limits of the Northeast Frederick Land Use Plan of the 2035 Comprehensive Plan. The 2035 Comprehensive Plan identifies these with a mixed use industrial/office land use. In general, the proposed commercial zoning is inconsistent with the current land use supported by the Comprehensive Plan. However, considering the site is bordered by residential property to the south and east, the requested commercial may be acceptable as it is of a lesser impact to the surrounding properties. Transportation The site currently has one large entrance on Martinsburg Pike that served the existing commercial structure and one entrance that serves the residential use. The Applicant is proposing to consolidate those entrances into one and will modify the commercial entrance to meet VDOT standards. The Applicant is also proffering right-of-way dedications to meet the future widening of Martinsburg Pike. A recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately add ress all concerns raised by the Planning Commission. PROFFER STATEMENT Martinsburg Pike, LLC Parcel TM #44-A-58 Property: 0.5739 acres Parcel TM #44-A-59 Property: 0.5739 acres Parcel TM #44-A-60 Property: 0.5762 acres Stonewall Magisterial District October 17, 2019 Prepared by: PAINTER-LEWIS, P.L.C. 817 Cedar Creek Grade, Suite 120 Winchester, VA 22601 Tel.: (540)662-5792 email: office@painterlewis.com Job Number: 1807028 PROFFER STATEMENT PARCEL ID 44-((A))-58, 44-((A))-59, 44-((A))-60 INTRODUCTION Pursuant to the applicable provisions of the Frederick County Zoning Ordinance, the undersigned owners proffer that in the event that the Board of Supervisors of Frederick County shall approve Rezoning Application # for the rezoning of 1. 724 acres of Parcels #44-A-58, #44-A-59, and #44-A-60 from RA to 82, development of this particular 1. 724 acres will be in conformity with the terms and conditions set forth in this document and the attached "GENERALIZED DEVELOPMENT PLAN". These terms and conditions may be subsequently amended or revised by the owners of the properties with permission from the Frederick County Board of Supervisors in accordance with Frederick County codes. These proffers shall be binding on the property owners and their legal successors or assigns. PROFFERS 1. The existing interior lot lines will be vacated and the three parcels will be consolidated into one lot. 2. The driveway connection from the existing residential use to Route 11 will be eliminated. 3. The owner will provide 6.5' of right or way dedication for future road improvements along Route 11. - 4. The owner will reserve 12' of right of way for future road improvements. Ownership of this reservation area will be ceded to Frederick County upon demand to accommodate future road improvements along Route 11. These proffers will be completed upon approval of the next site plan for any facility or structure on these subject lands. Monetary Contribution to Frederick County Service Organizations The owners of this property will donate or will cause to be donated to the Frederick County the sum of $310.40 ($0.1 O per square foot of commercial space) for impacts to fire and rescue services. This sum will be paid upon the approval of the next site plan for any facility or structure on these subject lands. The conditions proffered above shall be binding on the heirs, executors, administrators, assigns and successors in the interest of the owners. In the event that the Frederick Country Board of Supervisors grant this rezoning and accepts these proffers, then these proffers shall apply to the land rezoned in addition to the other requirements of the Frederick County Code. 1 IMPACT ANALYSIS STATEMENT Lanzeta Properties Martinsburg Pike, LLC Parcel TM #44-A-58 Property: 0.5739 acres Parcel TM #44-A-59 Property: 0.5739 acres Parcel TM #44-A-60 Property: 0.5762 acres Stonewall Magisterial District August 30, 2019 I a i I ; ' ------------------~ -~ --~ ---------~--~ -~ ---~ Prepared by: PAINTER-LEWIS, P.L.C. 817 Cedar Creek Grade, Suite 120 Winchester, VA 22601 Tel.: (540)662-5792 email: office@painterlewis.com Job Number: 1807028 IMPACT ANALYSIS STA, EMENT PARCEL TM #s 44-A-58, 44-A-59, 44-A-60 IMPACT ANALYSIS STATEMENT TABLE OF CONTENTS f secron i. INTRODUCTION A. SITE SUITABILITY B. SURROUNDING PROPERTIES C. TRAFFIC D. SEWAGE CONVEYANCE AND TREATMENT E. WATER SUPPLY F. DRAINAGE G. SOLID WASTE DISPOSAL FACILITIES H. HISTORIC SITES AND STRUCTURES I. COMMUNITY FACILITIES J. LOT CONSOLIDATION . 1 page 2 2 3 3 4 4 4 5 5 5 6 IMPACT ANALYSIS STA1 ~MENT PARCEL TM #s 44-A-58, 44-A-59, 44-A-60 i. INTRODUCTION Martinsburg Pike LLC wishes to convert the old Oates Grocery store into a restaurant. The old store building contains 3,104 square feet and will be renovated to contain a pizza restaurant. The building is located on TM#44-A-58 which contains 0.5739 acres. Martinsburg Pike LLC also owns two adjoining lots. Please refer to Exhibit 1 in the Appendix for a location map. TM #44-A-59 contains a single family house on 0.5793 acres which will remain . TM #44-A-60 contains 0.5762 acres and is currently vacant. All lots are zoned RA-Rural Agricultural District. Under this rezoning application, Martinsburg Pike LLC proposes to rezone all three lots from RA to B2-General Business District. Please refer to Exhibit 2 for a property overview exhibit. See Exhibit 3 for a metes and bounds illustration of the area to be rezoned. A. SITE SUITABILITY The subject parcels are located on the east side of Martinsburg Pike about 800 feet south of Stephenson Road in the Stonewall Magisterial District. This site is suited for rezoning to the General Business District. The Eastern Frederick County Long Range Land Use Plan designates these parcels as "Mixed Use Industrial/Commercial". The parcels are within the Sewer and Water Service Area. Public water serves the current residential property and the former grocery store. There is no public sanitary sewer service. The properties are served by an on-site sewage disposal systems. As part of the rezoning, a plan for continued on-site sewage disposal will be presented to the Virginia Department of Health. 100 YEAR FLOOD PLAIN FIRM Community Panel Number 51069 C0250 D shows the subject area to be outside of any flood hazard zone. WETLANDS No jurisdictional wetlands have been identified on this property. STEEP SLOPES No steep slopes have been identified on this property. MATURE WOODLANDS No mature woodlands have been identified on this property. SOILS According to the Soil Survey of Frederick County, the property contains the following soil types: Frederick-Poplimento loams (148) and Swimley silt loam (398 & 39C). These soils are generally moderately deep and formed from weathered limestone . The 2 IMPACT ANALYSIS STA1cMENT PARCEL TM #s 44-A-58, 44-A-59, 44-A-60 Hydrologic Soils Groups are B and C. Weathered bedrock can be expected at depths exceeding 80 inches below the ground surface. B. SURROUNDING PROPERTIES The property to be rezoned is surrounded by residential and commercial properties. The following table lists all adjacent owners and parcel numbers. Tax Map No. Owner Ex. Zonina Ex.Use 44-A-57 Garv L. Payne etals M1 Commercial 44-A-56 Jack K. Wampler Sr. & Jr. MH1 Residential 44-A-61 Ernest & Marv Bailey, Trustee RA Residential 44-A-73 Brandy & Dale Haoer RA Residential 44-A-74 Douolas Keracofe RA Residential 44-1-D Garv L. Payne RA Residential 44-1-A Simkhovitch Family Livinq Part. LP RA Residential Rezoning the property to 82 will create the requirement for buffers and landscaping along adjacent properties in accordance with Section 165-203.01 of the Frederick County Zoning Ordinance. The adjacent parcel which is zoned M1 would typically require an "A" category buffer consisting of an inactive buffer of 25 ' and an active buffer of 25'. However, the existing building on TM # 44-A-58 is located 1 O' off the common property line, therefor the inactive/active buffer distance for this site will be 1 O' along this common property line. Refer to the Generalized Development Plan . C. TRAFFIC Access to the property is via Martinsburg Pike, Route 11, a Minor Arterial Road. According to figures from the Virginia Department of Transportation , the traffic on route 11 at this location is 5400 vehicles per day. The existing access will be improved and the existing driveway to the residence will be eliminated . Traffic generation estimates for the proposed uses of the property can be made using the ITE Trip Generation Manual, 9th Edition, Volume 2. Trip estimates are based on a 16 seat restaurant and one single family residence. The estimates are shown below. TRAFFIC IMPACT: DATA SOURCE: ITE TRIP GENERATION MANUAL-9th EDITION-VOLUME 3 Land Use 932: high-turnover restaurant with 16 seats Weekday: 16x4.83=77 trips (50% entering , 50% exiting) AM Peak Hour: 16x0.6=10 trips (58% entering, 42% exiting) PM Peak Hour: 16x0.72=12 trips (52% entering , 48% exiting) Saturday: 16x6.21=99 trips (50% entering, 50% exiting) Sunday: 16x5.17=82 trips (50% entering, 50% exiting) 3 IMPACT ANALYSIS STAl c::rvlENT PARCEL TM #s 44-A-58, 44-A-59, 44-A-60 Land Use 210: single-family detached housing Weekday: 1x9.52=10 trips (50% entering, 50% exiting) AM Peak Hour: 1x0 .77=1 trips (26% entering, 74% exiting) PM Peak Hour: 1x1 .02=1 trips (64% entering, 36% exiting) Saturday: 1x9.91=10 trips (50% entering, 50% exiting) Sunday: 1x8.52=9 trips (50% entering, 50% exiting) Totals: Weekday : AM Peak Hour: PM Peak Hour: Saturday: Sunday: 87 trips (50% entering, 50% exiting) 11 trips 13 trips 109 trips (50% entering, 50% exiting) 91 trips (50% entering, 50% exiting) D. SEWAGE CONVEYANCE AND TREATMENT The site is within the limits of the Frederick County Sewer and Water Service Area. There are no public sewerage facilities serving the immediate area. The closest public sewer is located at Yardmaster Court, approximately 900 feet to the north. This property and the adjacent parcels are served by individual, private, on-site sewage disposal systems. The former Oates Grocery Store and previously existing residential mobile home were served by a conventional on-site disposal system consisting of a septic tank and drainfield. A new pretreatment system will be installed along with the renovation of the old store which will produce a high quality effluent to be disposed in the existing drainfield. The total daily flow from the proposed use will be about 860 gallons. The Virginia Department of Health has required that a reserve drainfield with the capacity to dispose 860 gallons per day be located. This drainfield has been located on TM #44-A- 60. E. WATER SUPPLY The site receives domestic and fire flow from Frederick Water. A 1 O" diameter waterline is located on the south side of the Route 11 right of way. The water demand is essentially limited by the sewage treatment capacity. It is anticipated that the proposed use will require a maximum of 860 gallons of water per day. A new water meter will be installed along with the renovation of the old store. F. DRAINAGE Development of the site for the proposed use will not result in significant increase in impervious surfaces. There will be little or no increase in stormwater runoff form the site . Stormwater management will be provided in accordance with the Frederick County Code, Chapter 165 and Chapter 143. With no increase in runoff and a disturbed area 4 IMPACT ANALYSIS STAlt:MENT PARCEL TM #s 44-A-58, 44-A-59, 44-A-60 less than one acre, there will be no storm water management system installed along with the renovation. G. SOLID WASTE DISPOSAL FACILITIES In general, the collection of solid waste from the proposed commercial development will be accomplished by a private hauler. It is estimated that the development will generate approximately ten pounds of solid waste per employee per day that will be transported to the landfill. The anticipated maximum number of daily employees is 6. Tipping fees are currently $50 per ton for commercial haulers. No additional solid waste disposal facilities will be required for the proposed development. It is estimated that the annual cost in tipping fees will be about $468. H. HISTORIC SITES AND STRUCTURES This site does not contain any historic or "potentially significant" historic structures as listed in The Rural Landmarks Survey Report of Frederick County. The "Survey" lists three sites to the north of the site as significant for their architectural style. Please refer to Exhibit 4. The "Possible Historic Districts" map from the 2035 Comprehensive Plan shows the Brucetown district to the north of the site and the Third Winchester Battlefield to the south of the site. Please refer to Exhibit 5. According to the Frederick County Comprehensive Plan Battlefield inventory, the property lies within or in close proximity to the commonly accepted limits of the civil war battle known as Stephenson Depot. Please refer to Exhibit 6. I. COMMUNITY FACILITIES DEVELOPMENT IMPACT MODEL The Frederick County Development Impact Model (D.I.M.) is utilized primarily for residential rezoning requests. It is anticipated that the capital facilities impacts of commercial and industrial rezoning requests are ultimately fiscally positive to the County by policy. Accordingly, the D.I.M. does not apply a fiscal impact to commercial rezoning. EMERGENCY SERVICES Police protection is provided by the Frederick County Sheriff's Department The nearest fire and rescue facility is Station 13-Clear Brook Fire and Rescue located at 1256 Brucetown Road, approximately two miles to the north of the property in Clear Brook. 5 IMPACT ANALYSIS STATt:IVIENT PARCEL TM #s 44-A-58, 44-A-59, 44-A-60 No additional fire and rescue facilities will be required for the area proposed to be rezoned. The owner recognizes the importance of emergency services and proposes to proffer a monetary contribution to the local emergency responder. See the attached Proffer Statement. PARKS AND RECREATION There are typically no impacts on Parks and Recreation facilities associated with rezoning to a commercial use. J. LOT CONSOLIDATION It is anticipated that with a successful rezoning, the three lots will be consolidated into one lot. Consolidation will eliminate interior lot lines. 6 IMPACT ANALYSIS STAl L.:MENT PARCEL TM #s 44-A-58, 44-A-59, 44-A-60 APPENDIX EXHIBIT 1 LOCATION MAP EXHIBIT 2 PROPERTY EXHIBIT EXHIBIT 3 METES & BOUNDS MAP EXHIBIT 4 RURAL LANDMARKS SURVEY EXHIBIT 5 HISTORIC DISTRICTS MAP EXHIBIT 6 CIVIL WAR BATTLEFIELDS MAP 7 J. lh~ ~tpplicmt n:u :Ji. apply i o 1hi s ,,ffa:1.· l'n:-;i plan 11..:viL:w ,J f tlh.: pn pus1..:d food s1..Tvie1.: facility. The applicant must indud1.· :in.:h i11.·c1ural plans ~:huwin g th-.· proposed deign of the interior ufthc fociltty l'.g. locatinn and typ,: orkitd11:111.:qipmL'nt. fond 1m:.p sinks. hand \\~1shin g sinks. g n:w,,: 1rap it' luc:111.:d i111hc inll..'rinr. s1:ati11.~ ,m.::1 :·;. r,:s trnon1 s . li ghting .. wa ll ;md 1lnur 1.:ovc rings and de. 1\ppliu1hk (:x ti..:rior n.:qir1.;111cms including but not limit1.:d !u th(: loca tkm o f a dumpster :ir,.a. exterior grcas-.· 1rnp ir' applic ;,1bk and c1,;. sl1(1uld l The applicant must :1ppiy 111 this pffa:1.· l<•r a Food ScrvicL· Permit. 5. lh1..:rt> i:, ,t r,c,J:-J on lik for:.: :,c:\\Hg ,: dispo::d c()nstruction p~·rmit cbtcd :\1larch 17. I ,;i:j .. J :md f!U! d:it t:d Dl'c ,:rnh:r l. I 'Xi ··I !(J!' the exi s tin g d wo..:1lin g 1ha1 i;-; l o 1\;m ;,ii11 dll T rv Jii :.1,.l-1\-:-9. ll11} sy !cn1 i:, l:011n:11ti\l11al g ravity li:d and lk:si g ncd to acc11mmudatc ;1 llm:.,· n) bL~dniom dwdling. 300 gullons p-:r d:1y maximum . .. / S:ncc·,Tlv. / 1 · // ·. / ·1.1. I. 1-1 · · 1 • 1···1 · s· . . 11n J ~1v 1s . , ~. 1. ''--;,;--, J 111 '' ' . l ·:11v1 rurn rn:nla cai 111 :--up1.·n·1sor I To be completed by Planning Sta.fl (, Zoning Amenillr!ent Nmpber {'\ .. :-> -I I Date Received 1 C. ti..~• t e, --+----1,-------- Fee Amount Pai d $ ,t, :>,II;},. Gv • Anticipated PC Hearing Date I .;:i..\ \ ~' \ \: Anticipated BOS Hearing Date i\ f'; r:·:,:.,J \ } REZONING APPLICATION FREDERICK COUNTY, VA DEPARTMENT OF PLANNING & DEVELOPMENT 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Martinsburg Pike, LLC Specific Contact Person if Other than Above: _D_o_n_a_t_o_L_a_n_z_et_a __________ _ Address: 109 Wild Rose Circle Winchester, VA 22602 Telephone: 540-667-9797 Email:-------------- Nam e:------------------------------- Specific Contact Person if Other than Above: ________________ _ Addres s:----------------------------- Telephone: __________ _ Email: -------------- 2. Other Applicant Party (such as a contract purchaser) (please attach additional page(s) if necessary): Nam e:------------------------------- Specific Contact Person if Other than Above: ----------------- Address:------------------------------- Telephone: __________ _ Email:-------------- 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name: Painter-Lewis, P.L.C. Specific Contact Person at Firm: _J_o_h_n_L_e _w_is ______________ _ Address: 817 Cedar Creek Grade #120 Winchester, VA 22601 Telephone: 540-662-5792 Email: jclewis@painterlewis.com Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. Page 12 4. Project Name (if any): _S_t_e.;._p_h_e _ns_o_n_P_iz_z_a _________________ _ 5. Property Information: a. Property Identification Number(s): 445-A-58, 44-A-59, 44-A-60 b. Total acreage of the parcel(s): _1_.7_2_4 _________________ _ c. Total acreage of parcel(s) to be rezoned (if other than whole parcel(s) is being rezoned): d. Current zoning designation(s) and acreage(s) in each designation: RA, 1. 724 acres e. Proposed zoning designation(s) and acreage(s) in each designation: 82, 1.742 acres f. Magisterial District(s): _S_t_o_n_e_w_a_ll __________________ _ g. Location -the property is located at (give street address( es) if assigned or otherwise exact location based on nearest road and distance from nearest intersection, using road names and route numbers): h. 267 4 & 2682 Martinsburg Pike section "h' continue (additional adjoiner: 44-1-A Residential RA) Adjoining Properties: Parcel ID Number Use 44-A-57 Commercial 44-A-56 Residential 44-A-61 Residentail 44-A-73 Residential 44-A-74 Residential 44-1-D Residential -------------Please attach additional page( s) if necessary. Zoning M1 MH1 RA RA RA RA Property identification numbers, magisterial districts, and deed book and page numbers/ instrument numbers may be obtained from the Office of the Commissioner of the Revenue, Real Estate Division, 107 North Kent Street, Winchester, VA 22601. Page 13 4. Project Name (if any): _S_t_e_p_he_n_s_o_n_P_iz_z_a _________________ _ 5. Property Information: a. Property Identification Number(s): 445-A-58, 44-A-59, 44-A-60 b. Total acreage of the parcel(s): _1_.7_2_4 _________________ _ c. Total acreage of parcel(s) to be rezoned (if other than whole parcel(s) is being rezoned): d. Current zoning designation(s) and acreage(s) in each designation: RA, 1. 724 acres e. Proposed zoning designation(s) and acreage(s) in each designation: B2, 1.742 acres f. Magisterial District(s): _S_t_o_n_e_w_a_ll __________________ _ g. Location -the property is located at (give street address( es) if assigned or otherwise exact location based on nearest road and distance from nearest intersection, using road names and route numbers): h. 2674 & 2682 Martinsburg Pike section "h' continue (additional adjoiner: 44-1-A Residential RA) Adjoining Properties: Parcel ID Number Use 44-A-57 Commercial 44-A-56 Residential 44-A-61 Res id entail 44-A-73 Residential 44-A-74 Residential 44-1-D Residential --------------Please attach additional page( s) if necessary. Zoning M1 MH1 RA RA RA RA Property identification numbers, magisterial districts, and deed book and page numbers/ instrument numbers may be obtained from the Office of the Commissioner of the Revenue, Real Estate Division, 107 North Kent Street, Winchester, VA 22601. Page 13 6. Disclosure of real parties in interest. Virginia Code§ 15.2-2289 provides that localities may by ordinance require any applicant for a zoning amendment to make complete disclosure of the equitable ownership of the real estate to be affected including, in the case of corporate ownership, the name of stockholders, officers, and directors, and in any case the names and addresses of all real parties of interest. Frederick County has, by County Code§ 165-101.09, adopted such an ordinance. For each business entity that is an owner or contract purchaser of the property, please list the name and address of each person owning an interest in, or who is an officer or director of, any entity that is an owner or contract purchaser of the property (you need not indicate the amount or extent of the ownership interest). Please note that this requirement does not apply to a corporation whose stock is traded on a national or local stock exchange and having more than 500 shareholders. Please attach additional page(s) if necessary. 7. Checklist . Please check that the following items have been included with this application: 0 Location Map [Z] Plat Depicting Metes/Bounds of Proposed Zoning [Z] Impact Analysis Statement !ZJ Proffer Statement (if any) [Z] Agency Comments [Z] Fee [Z] Copies of Deed( s) to Property(ies) 0 Tax Payment Verification [ZJ Digital copies (pdf s) of all submitted items Page 14 B REZONING APPLICATION #07-19 GENTLE HARVEST, LC. Staff Report for the Planning Commission Prepared: December 6, 2019 Staff Contact: Candice E. Perkins, AICP, CZA, Assistant Director Reviewed Action Planning Commission: 12/18/19 Pending Board of Supervisors: 01/22/20 Pending PROPOSAL: To rezone 1.204+/- acres from the B2 (General Business) District to the B3 (Industrial Transition) District with proffers. LOCATION: The subject property is located at 120 Front Royal Pike. EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 12/18/19 PLANNING COMMISSION MEETING: This is an application to rezone 1.204+/- acres from the B2 (General Business) District to the B3 (Industrial Transition) District with proffers. The site is located within the limits of the Senseny/Eastern Urban Area Plan of the 2035 Comprehensive Plan and identifies this property with commercial land use designation. In general, the existing B2 zoning and the proposed B3 zoning are consistent with the current land use supported by the Comprehensive Plan, however; the Comprehensive Plan states that this area should be designed specifically to accommodate and promote highway commercial land uses. Staff would note that the site was previously utilized for a restaurant which is now closed and the intended user for this site is a Discount Tire. The proffers associated with this rezoning request are as follows: Proffer Statement – Dated November 21, 2019: 1. Land Use Restrictions: 1.1 The Owner hereby proffers not to engage in the following uses on the Property: • Landscape and Horticultural Services (SIC 078) • Local and Suburban Transit Services (SIC 41) • Motor Freight Transportation & Warehousing (SIC 42) • Transportation by Air (SIC 45) • Utility Facilities and their Accessory Uses (SIC 49) • Drive-In Motion Picture Theaters (SIC 7833) • Tractor Truck & Tractor Truck Trailer Parking (No SIC) 1.2 When used in these proffers, the “Preliminary Landscape Plan”, shall refer to the plan entitled “Preliminary Landscape Plan” dated September 24, 2019. The Preliminary Landscape Plan shall be incorporated by reference herein as “Exhibit 1”. The Owner proffers that its development of the Property will be in substantial conformity with the Preliminary Landscape Plan. Staff Note: This proffer seeks to implement the Senseny/Eastern Urban Area Rezoning #07-19 GENTLE HARVEST LC. December 6, 2019 Page 2 Plan that states “enhanced area of buffer and landscaping shall be provided adjacent to the Interstate 81 right-of-way and its ramps”. 2 Monetary Contribution to Offset Impact of Development 2.1 The Owner hereby proffers to provide a monetary contribution of $0.10 per developed building square foot for County Fire and Rescue Services. A recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. Rezoning #07-19 GENTLE HARVEST LC. December 6, 2019 Page 3 This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this application. It may also be useful to others interested in this zoning matter. Unresolved issues concerning this application are noted by Staff where relevant throughout this Staff report. Reviewed Action Planning Commission: 12/18/19 Pending Board of Supervisors: 01/22/20 Pending PROPOSAL: To rezone 1.204+/- acres from the B2 (General Business) District to the B3 (Industrial Transition) District with proffers. LOCATION: The subject property is located at 120 Front Royal Pike. MAGISTERIAL DISTRICT: Shawnee PROPERTY ID NUMBER: 64-A-1C PROPERTY ZONING: B2 (General Business) District PRESENT USE: Vacant Restaurant ADJOINING PROPERTY ZONING & PRESENT USE: North: B2 (General Business) Use: Commercial/Route 50E South: B2 (General Business) Use: Commercial East: B2 (General Business) Use: Commercial West: B2 (General Business) Use: Commercial Rezoning #07-19 GENTLE HARVEST LC. December 6, 2019 Page 4 REVIEW EVALUATIONS: Virginia Dept. of Transportation: VDOT has no objection to the rezoning as presented. Frederick-Winchester Service Authority: FWSA will defer to Frederick Water. Frederick Water: Thank you for the opportunity to provide review comments on the Discount Tire rezoning application. The subject property located 120 Front Royal Pike, Winchester, Virginia, is currently served by the City of Winchester. Through redevelopment of the site, the City will continue to provide the water and sewer services. Frederick County Department of Public Works: We offer no comments at this time. Frederick County Fire Marshall: Plan approved. Winchester Regional Airport: None. County of Frederick Attorney: Proffer is in acceptable legal form. City of Winchester: The City of Winchester has reviewed the following: Discount Tire Site Plan at 120 Front Royal Pike, Winchester, VA 22602. Based on our review, we have the following comments: Water 1. The existing water main and water meter may need to be relocated. If it is the case, vacation of existing easement and dedication of new easements may be required. 2. Please show location of all existing utility including water main, sewer main, lateral, water services, clean out and water meter. Planning & Zoning: 1) Site History The original Frederick County Zoning Map (U.S.G.S. Winchester Quadrangle) depicts the zoning for the parcel as B2 (General Business). 2) Comprehensive Plan The 2035 Comprehensive Plan is the guide for the future growth of Frederick County. The 2035 Comprehensive Plan is an official public document that serves as the Community's guide for making decisions regarding development, preservation, public facilities and other key components of Community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. Rezoning #07-19 GENTLE HARVEST LC. December 6, 2019 Page 5 The Area Plans, Appendix I of the 2035 Comprehensive Plan, are the primary implementation tool and will be instrumental to the future planning efforts of the County. Land Use The 2035 Comprehensive Plan and the Senseny/Eastern Urban Area Plan provide guidance on the future development of the property. The property is located within the SWSA. The Senseny/Eastern Urban Area Plan identifies this property with commercial land use designation. In general, the existing B2 zoning and the proposed B3 zoning are consistent with the current land use supported by the Comprehensive Plan, however; the Comprehensive Plan states that this area should be designed specifically to accommodate and promote highway commercial land uses A recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. £¤522 £¤50 64 A 1C 170FRONTROYAL PIKE 158FRONT ROYALPIKE 156DELCO PLAZA 160FRONTROYAL PIKE 980MILLWOODPIKE MILLW O O D E X I T R A M P N FRO N T R O Y A L PIK E MILL W O O D PIKE Application Parcels B2 (General Business District)µ Frederick County Planning & Development107 N Kent StWinchester, VA 22601540 - 665 - 5651Map Created: November 25, 2019 Winchester MILLW O O D P I K E MA L L B L V D DELCO P L ZFRO N T R O Y A L P I K E TU L A N E D R MILLWO O D E X I T R A M P N §¨¦81 §¨¦81 £¤50 0 100 20050 Feet MILL W O O D PIKE REZ # 07 - 19: Gentle Harvest, LCPIN: 64 - A - 1CRezoning from B2 to B3Zoning Map REZ #07-19 £¤522 £¤50 64 A 1C 170FRONTROYAL PIKE 158FRONT ROYALPIKE 156DELCO PLAZA 160FRONTROYAL PIKE 980MILLWOODPIKE MILLW O O D E X I T R A M P N FRO N T R O Y A L PIK E MILL W O O D PIKE Application Parcels µ Frederick County Planning & Development107 N Kent StWinchester, VA 22601540 - 665 - 5651Map Created: November 25, 2019 Winchester MILLW O O D P I K E MA L L B L V D DELCO P L ZFRO N T R O Y A L P I K E TU L A N E D R MILLWO O D E X I T R A M P N §¨¦81 §¨¦81 £¤50 0 100 20050 Feet MILL W O O D PIKE REZ # 07 - 19: Gentle Harvest, LCPIN: 64 - A - 1CRezoning from B2 to B3Location Map REZ #07-19 £¤522 £¤50 §¨¦81 64 A 1C 170FRONTROYAL PIKE 200FRONT ROYALPIKE 158FRONTROYAL PIKE 156DELCO PLAZA 160FRONT ROYALPIKE 980MILLWOODPIKE MILLWO O D E X I T R A M P N FRO N T R O Y A L PIK E MILL W O O D PIKE Application ParcelsLong Range Land Use Residential Neighborhood Village Urban Center Mobile Home Community Business Highway Commercial Mixed-Use Mixed Use Commercial/Office Mixed Use Industrial/Office Industrial Warehouse Heavy Industrial Extractive Mining Commercial Rec Rural Community Center Fire & Rescue Sensitive Natural Areas Institutional Planned Unit Development Park Recreation School Employment Airport Support Area B2 / B3 Residential, 4 u/a High-Density Residential, 6 u/a High-Density Residential, 12-16 u/a Rural Area Interstate Buffer Landfill Support Area Natural Resources & Recreation Environmental & Recreational Resources µ Frederick County Planning & Development107 N Kent StWinchester, VA 22601540 - 665 - 5651Map Created: November 25, 2019 Winchester MILLW O O D P I K E MA L L B L V D DELCO P L ZFRO N T R O Y A L P I K E TU L A N E D R MILLWO O D E X I T R A M P N §¨¦81 §¨¦81 £¤50 0 100 20050 Feet MILL W O O D PIKE REZ # 07 - 19: Gentle Harvest, LCPIN: 64 - A - 1CRezoning from B2 to B3Long Range Land Use Map REZ #07-19 REZONING: PROPERTY: RECORD OWNER: APPLICANT: PROJECT NAME: ORIGINAL DATE OF PROFFERS: PROFFER STATEMENT RZ# General Business (B2) to Industrial Transition (B3) 1.204 Acres +/-; Tax Map Parcel 64-A-1 C (the "Property") Gentle Harvest LC Halle Properties LLC Discount Tire November 21, 2019 The undersigned Owner hereby proffers that the use and development of the Property shall be in strict conformance with the following conditions, which shall supersede all other proffers on the Property that may have been made prior hereto. In the event that the above- referenced B3 conditional rezoning is not granted as applied for by the owner ("Owner"), these proffers shall be deemed withdrawn and shall be null and void. Further, these proffers are contingent upon final rezoning of the Property with "final rezoning" defined as that rezoning which is in effect on the day following the last day upon which the Frederick County Board of Supervisors' (the "Board") decision granting the rezoning may be contested in the appropriate court. If the Board's decision is contested, and the Owner elects not to submit development plans until such contest is resolved, the term rezoning shall include the day following entry of a final court order affirming the decision of the Board which has not been appealed, or, if appealed, the day following which the decision has been affirmed on appeal. 1. Land Use Restrictions 1.1 The Owner hereby proffers not to engage in the following uses on the Property: • Landscape and Horticultural Services SIC 078 • Local and Suburban Transit Services SIC 41 • Motor Freight Transportation & Warehousing SIC 42 • Transportation by Air SIC 45 • Utility Facilities & Their Accessory Uses SIC 49 • Drive-In Motion Picture Theaters SIC 7833 • Tractor Truck & Tractor Truck Trailer Parking No SIC 1.2 The headings of the proffers set forth below have been prepared for convenience or reference only and shall not control or affect the meaning or be taken as an interpretation of any provision of the proffers. The improvements proffered herein shall be provided at the time of development of that portion of the Property adjacent to or including the improvement or other proffered requirement, unless otherwise specified herein. The term "Owner" as referenced herein shall include within its meaning all future owners and successors in interest. When used in these proffers, the "Preliminary Landscape Plan," shall refer to the plan entitled "Preliminary Landscape Plan" dated September 24, 2019. The Preliminary Landscape Plan shall be incorporated by reference herein as "Exhibit 1." The Owner proffers that its development of the Property will be in substantial conformity with the Preliminary Landscape Plan. 2. Monetary Contribution to Offset Impact of Development 2.1 The Owner hereby proffers to provide a monetary contribution of $0.10 per developed building square foot for County Fire and Rescue Services. The monetary contribution shall be made payable to Frederick County at the time of the issuance of the Certificate of Occupancy Permit for any primary structure constructed on the Property. SIGNATURES APPEAR ON THE FOLLOWING PAGES 2 EXHIBIT 1 DISCOUNT TIRE RETAIL STORE DEVELOPMENT INTRODUCTION This report has been prepared for the purpose of assessing the impact on Frederick County by the proffered rezoning of a 1.204 +/-acre subject property owned by Gentle Harvest LC and identified as Tax Map Parcel 64-A-l C. The subject property is located on the west side of Front Royal Pike (U.S. Route 522 South) at the intersection of Front Royal Pike (U.S. Route 522 South), Millwood Pike (U.S. Route 50) and the Interstate 81 Exit 313 northbound on-ramp, and is currently zoned B-2, Business General District. The Applicant proposes to rezone the 1.204 +/-acre subject property to B-3, Industrial Transition District, with proffers to allow for the development of a Discount Tire retail store that is approximately 8,192 square feet with 6 service bays along the commercial corridor. Basic Information Location: Magisterial District: Property ID Number: Current Zoning: Current U se: Proposed Zoning: Proposed Use: Total Rezoning Area: Urban Development Area Fronting on the west side of Front Royal Pike (U.S. Route 522 South); at the intersection of Front Royal Pike (U.S. Route 522 South), Millwood Pike (U.S. Route 50) and the Interstate 81 Exit 313 northbound on-ramp Shawnee District 64-A-lC B -2, General Business District Vacant Restaurant B-3, Industrial Transition District Discount Tire Retail Store 1.2 04 +/-acres with proffers for the subject property COMPREHENSIVE POLICY PLAN The Urban Development Area (UDA) defines the general area in which residential, commercial, industrial and institutional land use development is encouraged in the County. The 1.204 +/- acre subject property is currently located in the UDA; therefore, expansion of the UDA boundary to accommodate the proposed development of commercial land use is not required for this rezoning application. Sewer and Water Service Area The Sewer and Water Service Area (SWSA) is generally consistent with the UDA, but also extends outside of the UDA to accommodate areas of the County in which commercial and industrial land use development is only desired. The 1.204 +/-acre subject property is currently located within the SWSA; therefore, expansion of the SWSA boundary to accommodate the proposed development of commercial land use is not required for this rezoning application. Comprehensive Plan Conformity The 1.204 +/-acre subject property is located in the UDA and the SWSA and is within the study area boundary of the Senseny/Eastem Frederick Urban Area Study. The Senseny/Eastem Frederick Urban Area Study is a large-area plan that identifies land uses, transportation networks, and other matters that are recommended for consideration for future land use and development within this geographic area of the County. The 1.204 +/-acre subject property is identified for B2/B3 commercial land use; therefore, the proposed B-3, Industrial Transition District rezoning is in conformance with the land use recommendations of the Comprehensive Plan Policy. The Comprehensive Plan specifies that the 1.204 +/-acre subject property should accommodate and promote highway commercial land uses. The B-3, Industrial Transition District rezoning is proposed to allow for the development of the Discount Tire retail store, which has been determined not to be a permitted stand-alone land use with the B-2, Business General District. The Discount Tire retail store, being a retailer of tires and wheels for motor vehicles with service bays for the installation of the same, is an appropriate highway commercial land use along a major commercial corridor. SUITABILITY OF THE SITE Access The 1.204 +/-acre subject property is located on the west side of Front Royal Pike (U.S. Route 522 South), approximately 380 feet north of the Front Royal Pike/Travel Lodge Drive signalized intersection. Access to the subject property will be through the Front Royal Pike/Travel Lodge Drive signalized intersection. Flood Plains The 1.204 +/-acre subject property does not contain areas of floodplain as demonstrated on FEMA NFIP Map #51069C0216D, Effective Date September 2 , 2009; as well as information from the Frederick County GIS Database. Wetlands The 1.204 +/-acre subject property does not contain wetland areas as demonstrated on the National Wetlands Inventory (NWI) Map information from the Frederick County GIS Database. Soil Types The 1.204 +/-acre subject property contains one soil type as demonstrated by the Soil Survey of Frederick County, Virginia and the Frederick County GIS Database. The following soil type is present on site: 3B Blairton Silt Loams 2-7% slope 2 The Blairton Silt Loam soil type is identified as a prime agricultural soil and has severe wet properties. The existing commercial land uses that have been constructed along the east and west sides of the Front Royal Pike (U.S. Route 522 South) commercial corridor contain the same soil type, and the subject property is not conducive for agricultural land use per the Comprehensive Policy Plan. The soil type is conducive for commercial development of the subject property. Other Environmental Features The 1.204 +/-acre subject property does not contain areas of steep slope, lakes or ponds or natural stormwater retention areas as defined by the Frederick County Zoning Ordinance. There are no known environmental features present that create development constraints for the proposed commercial development project. SURROUNDING PROPERTIES Adjoining property zoning and present use: North: Millwood Pike/Interstate 81 Exit 313 northbound on-ramp South: B-2, Business General District West: B-2, Business General District East: B-2, Business General District TRANSPORTATION Use: Highway/Interstate Use: Office Use: Hotel (Travelodge) Use: Retail/Grocery (Delco Plaza) The 1.204 +/-acre subject property is located on the west side of Front Royal Pike (U.S. Route 522 South), approximately 380 feet north of the Front Royal Pike/Travel Lodge Drive signalized intersection. Subsequent to final rezoning approval, access to the subject property will be through the existing intersection. In order to assess the potential traffic impacts for the proposed Discount Tire retail store , the Applicant has analyzed the trips generated by the existing use of the site compared to the trips generated by the proposed use, a Tire Store. Restaurants (SIC 58) would be the appropriate land use to compare to the proposed Discount Tire retail store (SIC 75). The Applicant analyzed traffic study data from the Institute of Traffic Engineers (ITE) Manual, 101h Edition specific to a Quality Restaurant (931) and Tire Store (848). The following analysis compares traffic volumes for the Weekday AM and PM Peak Hours, the Saturday Peak Hours, and the Sunday Peak Hours assuming 7,554 square feet of Quality Restaurant (931) and 8,192 square feet of Tire Store (848) land use specific to the ITE traffic study data: 3 B-2, Business General Land Use ITE (931) Weekday AM Peak: ITE (931) Weekday PM Peak: ITE (931) Saturday Peak: ITE (931) Sunday Peak: Q = 0. 73 Trips per 1,000 square feet gross floor area Q = 0.73 Trips x 7.554 (7,554 sq.ft./1,000 sq .ft.) Q = 5.51 or 6 Trips Q = 7.80 Trips per 1,000 square feet gross floor area Q = 7.80 Trips x 7.554 (7,554 sq.ft./1,000 sq.ft.) Q = 58.92 or 59 Trips Q = 10.68 Trips per 1,000 square feet gross floor area Q = 10.68 Trips x 7.554 (7,554 sq.ft./1,000 sq.ft.) Q = 80 .67 or 81 Trips Q = 7.80 Trips per 1,000 square feet gross floor area Q = 7.80 Trips x 7.554 (7,554 sq.ft./1,000 sq.ft.) Q = 58.92 or 59 Trips B-3, Industrial Transition Land Use ITE (848) Weekday AM Peak: ITE (848) Weekday PM Peak: ITE (848) Saturday Peak: ITE (848) Sunday Peak: Q = 2.72 Trips per 1,000 square feet gross floor area Q = 2.72 Trips x 8.192 (8,192 sq.ft./1,000 sq.ft.) Q = 22.28 or 23 Trips Q = 3.98 Trips per 1,000 square feet gross floor area Q = 3.98 Trips x 8.192 (8,192 sq.ft./1,000 sq.ft.) Q = 32.60 or 33 Trips Q = 5.05 Trips per 1,000 square feet gross floor area Q = 5.05 Trips x 8.192 (8,192 sq.ft./1,000 sq.ft.) Q = 41.37 or 42 Trips NIA The ITE projected traffic volumes identified above indicate that the proposed Discount Tire retail store (848) has the potential to decrease traffic volumes during the weekday peak hours by approximately 0-9 Trips and by approximately 39 Trips during the Saturday peak hour compared to the Quality Restaurant (931) land use. The Sunday trips generated are not applicable as Discount Tire is not open on Sundays, and therefore will not generate any trips. These calculations demonstrate a decrease in potential traffic volumes during these time frames (approximately 3 vehicles every 15 minutes during the weekday peak hours and approximately 1 O vehicles every 15 minutes during the Saturday peak hour). The proposed Discount Tire retail store will result in an overall decrease in trips, compared to that of the existing restaurant. Therefore, it is assumed that the infrastructure in place is adequate for the proposed development. 4 SEWAGE COVEYANCE AND TREATMENT The 1.204 +/-acre subject property is located within the Sewer and Water Service Area (SWSA); therefore, the property is entitled to be served by public sewer based on County Policy. The City of Winchester is the provider of public sewer service within this area of the County, which is managed by the City of Winchester Public Services Department. The City of Winchester has an existing 8-inch gravity sewer line that enters the subject property through the southern boundary of the subject property within a 20-foot easement that is accessible to the property. All commercial land uses on the west side of Front Royal Pike (U.S. Route 522 South) within proximity of the subject property convey sewer effluent through the 8- inch gravity sewer line that goes under Interstate 81 to a manhole located on the Apple Blossom Mall parcel, which then gravities to the Abram's Creek sewer transmission line that connects to the Opequon Wastewater Treatment Facility. Based on comparable discharge patterns, the City of Winchester Public Services Department has determined that 75 gallons/day per 1,000 square feet of commercial land development is an appropriate calculation for estimating the sewer demand for commercial land uses. Q = 75 gallons/day per 1,000 square feet commercial Q = 75 GPD x 8.192 (8,192 sq.ft./1,000 sq.ft.) Q = 614.40 GDP TOT AL: Q = 615 GPD projected sewer demand The Opequon Wastewater Treatment Facility has a total capacity of 12.6 MGD, of which 7.125 MGD is allocated to the City of Winchester. The City of Winchester currently averages approximately 5.0 MGD of the allocated capacity and has approximately 2.125 MGD of allocated capacity available for future development projects. The projected 615 GPD for the proposed project represents 0.0003% of the available treatment capacity; therefore, the proposed rezoning can be sufficiently accommodated by public sewer service through a system with adequate conveyance, capacity and treatment. The proposed Discount Tire will generate significantly less sanitary sewage into the public system than that of the previous restaurant use at this site. WATER SUPPLY The 1.204 +/-acre subject property is located within the Sewer and Water Service Area (SWSA); therefore, the property is entitled to be served by public water based on County Policy. The City of Winchester is the provider of public water service within this area of the County, which is managed by the City of Winchester Public Services Department. The City of Winchester has an existing 12-inch water transmission located on the east side of Front Royal Pike that provides public water service to the commercial land uses on the west side of Front Royal Pike (U.S . Route 522 South). An 8-inch water line is looped off of the 12-inch 5 water transmission line that adjoins the southern boundary of the subject property within a 10- foot easement that is accessible to the property. Based on comparable discharge patterns, the City of Winchester Public Services Department has determined that 75 gallons/day per 1,000 square feet of commercial development 1s an appropriate calculation for estimating the water demand for commercial land uses. Q = 75 gallons/day per 1,000 square feet commercial Q = 75 GPD x 8.192 (8,192 sq.ft./1,000 sq.ft.) Q = 614.40 GPD TOTAL: Q = 61 5 GPD projected water demand The City of Winchester obtains potable water from the North Fork of the Shenandoah River, which is treated at the Percy D. Miller Water Treatment Plant located near Middletown. The Percy D. Miller Water Treatment Plant can treat approximately 10 MGD of potable water daily, which is transmitted to serve all properties in the City of Winchester; as well as some properties in Frederick County. The City has sufficient water capacity to serve these properties; as well as sell excess capacity to the Frederick County Sanitation Authority to supplement other water systems in Frederick County. The Applicant has met with the City of Winchester Public Services Director to discuss the proposed development project and was advised that the City has adequate capacity to serve this project and that the existing 8-inch water loop provides adequate pressure and fire flow for all commercial land uses within this portion of the County. Therefore, the proposed rezoning can be sufficiently accommodated by public water service through a system with adequate conveyance, capacity, pressure and fire flow. The proposed Discount Tire will use significantly less water from the public system than that of the prev ious restaurant us e at this site. SITE DRAINAGE The topographic relief of the 1.204 +/-acre subject property generally follows a northeasterly pattern, which directs site drainage towar ds existing inlets on site. The Applicant prepared an ALT A Survey for the 1.204 +/-acre subject property, which identifies a 10-foot drainage easement on the property that has been improved with a drop inlet and storm sewer line that ties into the overall drainage system constructed during the development of the Cracker Barrel site. This stormwater collection system conveys stormwater to a regional stormwater management facility that was constructed during the development of the Cracker Barrel site; therefore, development of the subject property will utilize this regional facility. The 1.204 +/-subject property will comply with all water quality and quantity regulations. The Applicant will work with the County Engineer during the Site Development Plan process to identify stormwater volumes from the proposed development of the subject property to ensure that ther e are no detrimental impacts to the regional stormwater management facility and to adjoining propertie s. The stormwater management plan and erosion and sediment control plan will be d esig ned in conformance with all applicable state and local r egulations; therefore, site 6 drainage and stormwater management impacts to adjoining properties and the community will be mitigated. SOLID WASTE DISPOSAL The impact on solid waste disposal facilities associated with the development of the proposed Discount Tire retail store on the 1.204 +/-acre subject property can be projected from an average annual commercial consumption of 5 .4 cubic yards per 1,000 square feet of structural area (Civil Engineering Reference Manual, 4th Edition). The Applicant proposes to develop a Discount Tire retail store that is approximately 8,192 square feet with 6 service bays; therefore, solid waste disposal impacts are based on the following figures that provide the increase in average solid waste volume based on the development of this facility: AAV = 5.4 cu.yd. per 1,000 square feet commercial AAV = 5.4 cu. yd. x 8.192 (8,192 sq.ft./1,000 sq.ft.) AAV = 44.24 cu. yd. at build-out, or 5.53 tons/yr. at build-out The Municipal Solid Waste area of the Regional Landfill has a current remaining capacity of 13,100,000 cubic yards of air space. The projected commercial development will generate approximately 5.53 tons of solid waste annually on average. This represents a 0.003% increase in the annual solid waste received by the Municipal Solid Waste area of the Regional Landfill, which currently averages 200,000 tons per year. Solid waste produced by the commercial development will be disposed at the Regional Landfill by a commercial waste hauler; therefore, the County will receive tipping fees associated with this land use to mitigate this impact. The proposed Discount Tire will produce significantly less refuse than that of the previous restaurant use at this site. Used tires will not be included as part of the solid waste generated from this site to be transferred to the Regional Landfill. Discount Tire has a separate collection and recycling program for the used tires generated from their facilities. The Regional Landfill has adequate capacity to accommodate the solid waste impacts associated with this proposal. HISTORICAL SITES AND STRUCTURES The Frederick County Rural Landmarks Survey identifies the Garber Farm (#34-424) within close proximity of the 1.204 +/-acre subject property. The Garber Farm was inventoried as part of the overall report; however, the property was not recommended for inclusion on the list of potentially significant properties in the final report. The Garber Farm has been subdivided into multiple properties, which are developed as commercial and residential land uses along Garber Lane (Route 763), and as commercial land uses along Front Royal Pike (U .S. Route 522 South). The National Park Service Study of Civil War Sites in the Shenandoah Valley identifies the 1.204 +/-acre subject property as being located within the First Winchester study area boundary, and within close proximity of the First Winchester core battlefield area boundary. The final report identifies all land within the study area boundary that is located in the southeastern quadrant of Interstate 81 Exit 313 as having lost integrity due to the existing commercial and residential land use development patterns; as well as the construction of Interstate 81. 7 The development of commercial land use on the 1.204 +/-acre subject property is consistent with other properties in this area of the County. The Senseny/Eastem Frederick Urban Area Study does not identify this area of the County as historic or as a developmentally sensitive area. The proposed rezoning of the property will not create negative impacts a ssociated with historic properties and historic resources. OTHER POTENTIAL IMPACTS The commercial development of the 1.204 +/-acre subject property will provide new economic development opportunities for Frederick County, which has been determined by the County's Development Impact Model to be positive in the consideration of fiscal impacts to County Capital Facilities. It is recognized that the development of commercial land use has the potential to increase service demands on fire and rescue services; therefore, the Applicant's Proffer Statement provides a monetary contribution of $0.10 per developed building square foot to the County to provide additional revenues that are specifically directed to fire and rescue services. There are no other identified potential impacts above those discussed in this Impact Analysis Statement that would be detrimental to surrounding properties or to the County from the rezoning and development of the 1.204 +/-acre subject property. 8 To ht! completed by Planning Staff.' Zoning Amendment Number O "1 ·· \ "\ Date Received ~1~1-_:/~1_-~l 9~------ Fee Amount Paid $ S IBD _!_ .;· Anticipated PC Hearing Date \.J \!(\It\ Anticipated BOS Hearing Date l !· :? 'vJ J,q REZONING APPLICATION FREDERICK COUNTY, VA DEPARTMENT OF PLANNING & DEVELOPMENT 1. Property Owner(s) (please attach additional page(s) if more than two owners): Name: Gentle Harvest LC Specific Contact Person if Other than Above : Thomas Moore Lawson, Esquire Address : P.O . Box 2740, Winchester, VA 22604 Telephone: (540) 665-0050 Email : tlawson@lsplc.com Name: ------------------------------- Specific Contact Person if Other than Above: ----------------- Address:------------------------------ Telephone: __________ _ Email : ------------- 2. Other Applicant Party (such as a contract purchaser) (please attach additional page(s) if necessary): Name : Halle Properties LLC Specific Contact Person if Other than Above : ----------------- Address:------------------------------ Telephone: __________ _ Email: ------------- 3. Law firm, engineering firm, or other person, if any, serving as the primary contact person for this application: Firm Name: Thomas Moore Lawson, P.C. Specific Contact Person at Firm : Thomas Moore Lawson, Esquire Address : P.O. Box 2740, Winchester, VA 22604 Telephone: (540) 665-0050 Email: tlawson@lsplc.com Please note that, if a law firm, engineering firm, or other person, other than the owner of the property, will be acting on behalf of the owner and/or executing papers on behalf of the owner in connection with the rezoning, the owner will need to execute a power of attorney form granting the firm or person such authority. 4. Project Name (if any): _D_i_sc_o_u_n_t _T_ir_e ___________________ _ 5. Property Information: a. Property Identification Number(s): _6_4_-_A_-1_C _______________ _ b. Total acreage of the parcel(s): _1_.2_0_4 ___________________ _ c. Total acreage of parcel(s) to be rezoned (if other than whole parcel(s) is being rezoned): d . Current zoning designation(s) and acreage(s) in each designation: B2 (1 .204 acr es) e. Proposed zoning designation(s) and acreage(s) in each designation : 83 (1.204 acres) f . Magisterial District(s): _S_h_a_w_n_e_e ___________________ _ g. Location -the property is located at (give street address(es) if assigned or otherwise exact location based on nearest road and distance from nearest intersection, using road names and route numbers): h. 120 Front Royal Pike, Winchester, VA 22602 Adjoining Properties: Parcel ID Number Use Zoning 64-A-18 office building 82 64-A-1D hotel 82 64-A-1 roadway 82 Please attach additional page(s) if necessary. Property identification numbers, magisterial districts, and deed book and page numbers/ instrument numbers may be obtained from the Office of the Commissioner of the Revenue, Real Estate Division, I 07 North Kent Street, Winchester, VA 2260 I. 6. Disclosure of real parties in interest. Virginia Code§ 15.2-2289 provides that localities may by ordinance require any applicant for a zoning amendment to make complete disclosure of the equitable ownership of the real estate to be affected including, in the case of corporate ownership, the name of stockholders, officers, and directors, and in any case the names and addresses of all real parties of interest. Frederick County has, by County Code § 165-101.09, adopted such an ordinance. For each business entity that is an owner or contract purchaser of the property, please list the name and address of each person owning an interest in, or who is an officer or director of, any entity that is an owner or contract purchaser of the property (you need not indicate the amount or extent of the ownership interest). Please note that this requirement does not apply to a corporation whose stock is traded on a national or local stock exchange and having more than 500 shareholders. See attached. Please attach additional page(s) if necessary. 7. Checklist. Please check that the following items have been included with this application: 0 Location Map [Z] Plat Depicting Metes/Bounds of Proposed Zoning [Z] Impact Analysis Statement 0 Proffer Statement (i f any) [Z] Agency Comments [Z] Fee IZJ Copies of Deed(s) to Property(ies) IZJ Tax Payment Verification IZJ Digital copies (pdf's) of all submitted items 6. Disclosure of real parties in interest. Property Owner: Gentle Harvest LC Sole Owner: Sak Group, LC 8458 W. Main Street Marshall, VA 20115 Sandy Lerner, Manager D. Brook Middleton, Manager 8458 W. Main Street Marshall, VA 20115 Applicant: Halle Properties LLC Managing Member: Wilanna, Inc. 20225 N. Scottsdale Road Scottsdale , AZ 85225 Lisa M . Halle Pedersen, President and Director Michael S. Zuieback, Treasurer and Director Douglas S. Wilson, Secretary Timothy J. Schafer, Officer Susan R. Halle Lyle, Director Diane M. Halle, Director Bruce T. Halle, Jr., Director R.T. Corp, Shareholder 20225 N . Scottsdale Road Scottsdale, AZ 85255 Member: Teton-Pitkin L.L.C. 20225 N . Scottsdale Road Scottsdale, AZ 85255 BTJHR TP Trust u/a BTH 2003 TP Irrevocabl e Trust LMHP TP Trust u/a BTH 2003 TP Irrevocable Trust MSZ TP Trust u/a BTH 2003 TP Irrevocable Trust SRHL TP Trust u/a BTH 2003 TP Irrevocable Trust 4 785 Caughlin Parkway Reno, NV 89519 C REZONING APPLICATION #03-19 BERLIN STEEL ESTATE INC. Staff Report for the Planning Commission Prepared: December 6, 2019 Staff Contact: Candice E. Perkins, AICP, CZA, Assistant Director Reviewed Action Planning Commission: 10/16/19 Public Hearing Held; Tabled 60 Days Planning Commission: 12/18/19 Public Meeting Board of Supervisors: 01/08/19 Pending PROPOSAL: To rezone 15.3933+/- acres from the RA (Rural Areas) District to the M1 (Light Industrial) District with proffers. LOCATION: The subject property is located at 280 Ridings Lane which intersects with Route 277. EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 12/18/19 PLANNING COMMISSION MEETING: This is an application to rezone 15.3933+/- acres from the RA (Rural Areas) District to the M1 (Light Industrial) District with proffers. The site is located within the limits of the Southern Frederick Land Use Plan of the 2035 Comprehensive Plan and depicts the subject properties with an industrial land use designation. The proposed M1 Zoning is generally consistent with the Southern Frederick Land Use Plan as it relates to this area. These properties are not located within the limits of the Sewer and Water Service Area (SWSA). The Comprehensive Plan states that it is expected that the land uses within the UDA and SWSA will be served by public water and sewer. However, as this site is contiguous to existing M1 Zoning and is intended to facilitate an expansion to an existing business (Berlin Steel), this request to rezone property outside of the SWSA may be appropriate. The proffers associated with this rezoning request are as follows; Staff has provided comments regarding concerns associated with this request: Proffer Statement – Dated November 18, 2019: 1. The land and any improvements thereto will be expressly used for a metal fabrication business as permitted under the M1 Zoning. 2. Prior to approval of the next site plan for any facility or structure on these subject lands, the owner will conduct a traffic count on Route 277 to determine the need for any turn lanes from Route 277 into the site via Ridings Lane. The method used to conduct the traffic count and design of any resultant improvement to Route 277 will be subject to VDOT approval. 3. As shown on the Generalized Development Plan, a 100’ wide strip of land will be reserved on the subject lands for future road network improvements. No permanent buildings will be erected within this area. 4. Monetary Contribution – The owners will donate $1,000 for impacts to fire and rescue services. Staff Comments: Rezoning #03-19 Berlin Steel Estate Inc. December 6, 2019 Page 2 • Proffer 2 – the Applicant has not committed to constructing a turn lane if warranted by VDOT – only a traffic count and design. The Applicant should clarify the construction of a turn lane if necessary, in conjunction with site development. • Proffer 3 – This proposed reservation area does not follow the minor collector roadway planned through this site per the Southern Frederick Land Use Plan. However, the reservation location would still allow the future road to be constructed in general conformance with the Comprehensive Plan. A recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. Rezoning #03-19 Berlin Steel Estate Inc. December 6, 2019 Page 3 This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this application. It may also be useful to others interested in this zoning matter. Unresolved issues concerning this application are noted by Staff where relevant throughout this Staff report. Reviewed Action Planning Commission: 10/16/19 Public Hearing Held; Tabled 60 Days Planning Commission 12/18/19 Public Meeting Board of Supervisors: 01/08/19 Pending PROPOSAL: To rezone 15.3933+/- acres from the RA (Rural Areas) District to the M1 (Light Industrial) District with proffers. LOCATION: The subject property is located at 280 Ridings Lane which intersects with Route 277. MAGISTERIAL DISTRICT: Opequon PROPERTY ID NUMBERS: 86-A-179C and 87-A-12 PROPERTY ZONING: RA (Rural Areas) District PRESENT USE: Vacant ADJOINING PROPERTY ZONING & PRESENT USE: North: M1 (Light Industrial) Use: Berlin Steel – Industrial East: RA (Rural Areas) Use: Residential/Agricultural East: RA (Rural Areas) Use: Residential/Agricultural West: RA (Rural Areas) Use: Vacant/Agricultural Rezoning #03-19 Berlin Steel Estate Inc. December 6, 2019 Page 4 REVIEW EVALUATIONS: Virginia Dept. of Transportation: We have reviewed the rezoning application for Berlin Steel and Ridings to rezone a total of 15.3933 acres from RA to M1 for the use of metal fabrication business. We have also reviewed a turn lane warrant analysis associated with this rezoning. The turn lane analysis indicated needs for turn lane in the future, however, the proffer statement does not include mitigation to offset future turn lane and intersection needs. Frederick County Transportation: County Staff concurs with VDOT regarding the need for a turn lane at the entrance per the requested expanded use in the rezoning, however I would note that the proffer statement does not include accommodation for this expected impact on the transportation network. Frederick-Winchester Health Department: The Frederick County Health Department has no objection to the proposed zoning changes from RA to M1 since this change does not affect any proposed or existing wells or septic systems on the properties. Frederick Water: Please see letter from Eric R. Lawrence, AICP, Executive Director dated May 15, 2019. Frederick County Department of Public Works: In the Impact Analysis Statement, Section F- Drainage also reference Chapter 143 of County Code – Stormwater/Erosion and Sediment Control Ordinance comprehensive review will occur at the time of site plan submission. Frederick County Fire Marshall: Plan approved. County of Frederick Attorney: Please see email from Roderick B. Williams, County Attorney dated August 28, 2019. Planning & Zoning: 1) Site History The original Frederick County Zoning Map (U.S.G.S. Stephens City Quadrangle) depicts the zoning for both parcels as A-2 (Agricultural General) District. The A-2 (Agricultural General) District zoning classification was modified to RA (Rural Areas) District on February 14, 1990 during the comprehensive amendment to the County’s Zoning Ordinance. *The adjacent Berlin Steel property was rezoned in 1983 and 2001. 2) Comprehensive Plan The 2035 Comprehensive Plan is the guide for the future growth of Frederick County. Rezoning #03-19 Berlin Steel Estate Inc. December 6, 2019 Page 5 The 2035 Comprehensive Plan is an official public document that serves as the Community's guide for making decisions regarding development, preservation, public facilities and other key components of Community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. The Area Plans, Appendix I of the 2035 Comprehensive Plan, are the primary implementation tool and will be instrumental to the future planning efforts of the County. Land Use The site is located within the limits of the Southern Frederick Land Use Plan of the 2035 Comprehensive Plan and depicts the subject properties with an industrial land use designation. The proposed M1 Zoning is generally consistent with the Southern Frederick Land Use Plan as it relates to this area. Staff would note that these properties are not located within the limits of the Sewer and Water Service Area (SWSA). Transportation The site is accessed via an existing commercial entrance (Ridings Lane) that intersects with Fairfax Pike (Route 277). No improvements are proposed by the Applicant. VDOT stated in their comment that the turn lane analysis indicated needs for a turn lane in the future, however, the proffer statement does include mitigation to offset future turn lane and intersection needs. County transportation Staff notes that they concur with the need for the turn lane, and further notes that the Applicant has not addressed this impact of the rezoning in their proffer statement. Staff would note that the Southern Frederick Land Use Plan shows a new minor collector roadway planned through this site. It is noted that this is a planned roadway and not designed at this time and the location may be subject to future modifications. The Applicant has proffered a slightly adjusted location for this planned roadway. Environmental Parcel 86-A-179C contains an approximately three-acre pond, there are no floodplains or wetlands as stated in the Applicant’s impact statement. The site does contain some steep slopes that are identified eastern portion of the site. Woodlands generally cover parcel 87-A-12 and the southern and eastern portion of 86-A-179C. The Applicant proposes to clear much of the woodlands with the development of the site. This site is not within the limits of the Sewer and Water Service Area (SWSA) and therefore is served via a private onsite sewage disposal system. This system is monitored by the Virginia Department of Environmental Quality. Rezoning #03-19 Berlin Steel Estate Inc. December 6, 2019 Page 6 3) Proffer Statement – Dated November 18, 2019: 1. The land and any improvements thereto will be expressly used for a metal fabrication business as permitted under the M1 Zoning. 2. Prior to approval of the next site plan for any facility or structure on these subject lands, the owner will conduct a traffic count on Route 277 to determine the need for any turn lanes from Route 277 into the site via Ridings Lane. The method used to conduct the traffic count and design of any resultant improvement to Route 277 will be subject to VDOT approval. 3. As shown on the Generalized Development Plan, a 100’ wide strip of land will be reserved on the subject lands for future road network improvements. No permanent buildings will be erected within this area. 4. Monetary Contribution – The owners will donate $1,000 for impacts to fire and rescue services. PLANNING COMMISSION SUMMARY AND ACTION FR OM THE 10/18/19 MEETING: Staff provided an overview of the application and the proposed proffers. The Commission questioned the left turn lane possibly needed along Route 277 and the location of the planned collector road shown in the Comprehensive Plan. The Commission expressed concerns that the Applicant was not addressing VDOT’s comment regarding the need for a turn lane, as well as, the planned collector road. Mr. Lewis addressed the proposed collector road and stated that it could possibly be relocated since its not designed. The current location in the Comprehensive Plan greatly impacts their proposed new laydown yard. He further stated that the need for the turn lane would be determined at the site plan stage. The Commission questioned the turn lane need and requested the Applicant consider modifying the application to state that the turn lane would be constructed if warranted by VDOT. Mr. Lewis stated that the was amendable to that language. There was one comment during the public hearing. The Planning Commission postponed the application for 60 days to allow the Applicant to allow the owner to work with the County to relocate the collector roadway off the property. A recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. ¬«277 ¬«277 87 A 12 87 A 12 270RIDINGS LN 214APPRENTICE LN 1702FAIRFAXPIKE 260RIDINGS LN 1588FAIRFAXPIKE 109APPRENTICE LN 1500FAIRFAXPIKE 1290FAIRFAXPIKE 1518FAIRFAXPIKE 1450FAIRFAXPIKE 1308FAIRFAXPIKE 1532FAIRFAXPIKE 1400FAIRFAXPIKE 1304FAIRFAXPIKE 1436FAIRFAXPIKE 1553FAIRFAXPIKE 1312FAIRFAXPIKE 160JOURNEYMAN LN 1487FAIRFAXPIKE 1501FAIRFAXPIKE1465FAIRFAXPIKE 1475FAIRFAXPIKE 1445FAIRFAXPIKE 1457FAIRFAXPIKE 1261FAIRFAXPIKE 1301FAIRFAXPIKE 1371FAIRFAXPIKE 1389FAIRFAXPIKE 1415FAIRFAXPIKE 173JOURNEYMAN LN JOU R N E Y M A N L N APP R E N T I C E L N FAIRFAX P I K E RID I N G S L N Areas to be Rezoned Application Parcels M1 (Light Industrial District)µ Frederick County Planning & Development107 N Kent StWinchester, VA 22601540 - 665 - 5651Map Created: September 16, 2019 Armel FAIRFAX PI K E WHIT E O A K R D RID I N G S L N WRIG H T S R U N L N CEDAR LN APP R E N T I C E L N ¬«277 0 410 820205 Feet 87 A 12 REZ # 03 - 19: Berlin Steel Real Estate, Inc.PINs: 86 - A - 179C, 87 - A - 12Rezoning from RA to M1Zoning Map REZ #03-19 REZ #03-19 86 A 179C 86 A 179C ¬«277 ¬«277 87 A 12 87 A 12 270RIDINGS LN 214APPRENTICE LN 1702FAIRFAXPIKE 260RIDINGS LN 1588FAIRFAXPIKE 109APPRENTICE LN 1500FAIRFAXPIKE 1290FAIRFAXPIKE 1518FAIRFAXPIKE 1450FAIRFAXPIKE 1308FAIRFAXPIKE 1532FAIRFAXPIKE 1400FAIRFAXPIKE 1304FAIRFAXPIKE 1436FAIRFAXPIKE 1553FAIRFAXPIKE 1312FAIRFAXPIKE 160JOURNEYMAN LN 1487FAIRFAXPIKE 1501FAIRFAXPIKE1465FAIRFAXPIKE 1475FAIRFAXPIKE 1445FAIRFAXPIKE 1457FAIRFAXPIKE 1261FAIRFAXPIKE 1301FAIRFAXPIKE 1371FAIRFAXPIKE 1389FAIRFAXPIKE 1415FAIRFAXPIKE 173JOURNEYMAN LN JOU R N E Y M A N L N APP R E N T I C E L N FAIRFAX P I K E RID I N G S L N Areas to be Rezoned Application Parcels µ Frederick County Planning & Development107 N Kent StWinchester, VA 22601540 - 665 - 5651Map Created: September 16, 2019 Armel FAIRFAX PI K E WHIT E O A K R D RID I N G S L N WRIG H T S R U N L N CEDAR LN APP R E N T I C E L N ¬«277 0 410 820205 Feet 87 A 12 REZ # 03 - 19: Berlin Steel Real Estate, Inc.PINs: 86 - A - 179C, 87 - A - 12Rezoning from RA to M1Location Map REZ #03-19 REZ #03-19 86 A 179C 86 A 179C FISHERSubdivision WRIGHTS RUN ACRESSubdivision ¬«277 ¬«277¬«277 87 A 12 87 A 12 1702FAIRFAXPIKE 214APPRENTICE LN 270RIDINGS LN109CEDAR LN 107CEDAR LN 1155HUDSONHOLLOW RD 260RIDINGS LN 1588FAIRFAXPIKE 1500FAIRFAXPIKE 109APPRENTICE LN 1290FAIRFAXPIKE 1518FAIRFAXPIKE 1214FAIRFAXPIKE1120FAIRFAXPIKE 1450FAIRFAXPIKE 107APPRENTICE LN107APPRENTICE LN 1308FAIRFAXPIKE 1532FAIRFAXPIKE 127APPRENTICE LN 127APPRENTICE LN 1400FAIRFAXPIKE 1304FAIRFAXPIKE 1553FAIRFAXPIKE1555FAIRFAXPIKE 1312FAIRFAXPIKE 1436FAIRFAXPIKE 160JOURNEYMAN LN 1176FAIRFAXPIKE 1194FAIRFAXPIKE 1256FAIRFAXPIKE 1250FAIRFAXPIKE 1487FAIRFAXPIKE 1445FAIRFAXPIKE 1457FAIRFAXPIKE 1465FAIRFAXPIKE 1475FAIRFAXPIKE 1201FAIRFAXPIKE 1207FAIRFAXPIKE 1217FAIRFAXPIKE 1227FAIRFAXPIKE 1237FAIRFAXPIKE 1261FAIRFAXPIKE 1301FAIRFAXPIKE 1371FAIRFAXPIKE 1389FAIRFAXPIKE 1415FAIRFAXPIKE 173JOURNEYMAN LN 1165FAIRFAXPIKE 1175FAIRFAXPIKE 1185FAIRFAXPIKE 1195FAIRFAXPIKE 1247FAIRFAXPIKE WRIGH T S R U N L N JOUR N E Y M A N L N APP R E N T I C E L N RID I N G S L N FAIRFAX PIKE Areas to be Rezoned Application ParcelsEastern Road Plan New Major Arterial Improved Major Arterial New Minor Arterial Improved Minor Arterial New Major Collector Improved Major Collector New Minor Collector Improved Minor Collector Ramp Roundabout Trails Long Range Land Use Residential Neighborhood Village Urban Center Mobile Home Community Business Highway Commercial Mixed-Use Mixed Use Commercial/Office Mixed Use Industrial/Office Industrial Warehouse Heavy Industrial Extractive Mining Commercial Rec Rural Community Center Fire & Rescue Sensitive Natural Areas Institutional Planned Unit Development Park Recreation School Employment Airport Support Area B2 / B3 Residential, 4 u/a High-Density Residential, 6 u/a High-Density Residential, 12-16 u/a Rural Area Interstate Buffer Landfill Support Area Natural Resources & Recreation Environmental & Recreational Resources µ Frederick County Planning & Development107 N Kent StWinchester, VA 22601540 - 665 - 5651Map Created: September 16, 2019 Armel FAIRFAX PI K E WHIT E O A K R D RID I N G S L N WRIG H T S R U N L N CEDAR LN APP R E N T I C E L N ¬«277 0 625 1,250312.5 Feet 87 A 12 REZ # 03 - 19: Berlin Steel Real Estate, Inc.PINs: 86 - A - 179C, 87 - A - 12Rezoning from RA to M1Long Range Land Use Map REZ #03-19 REZ #03-19 86 A 179C 86 A 179C D REZONING APPLICATION #06-19 WINCHESTER MEDICAL CENTER, INC. Staff Report for the Planning Commission Prepared: December 6, 2019 Staff Contact: Candice E. Perkins, AICP, CZA, Assistant Director Reviewed Action Planning Commission: 12/18/19 Pending Board of Supervisors: 01/08/20 Pending PROPOSAL: To revise the proffered Generalized Development Plan approved with rezoning #02-03 for 37.5424+/- acres zoned B2 (General Business) District and 51.8675+/- acres zoned MS (Medical Support) District to the MS (Medical Support) District. Minor text revisions are also proposed to reflect the updated internal street network within the development. LOCATION: The subject property is on the northern side of Route 50 West and west of Route 37. EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 12/18/19 PLANNING COMMISSION MEETING: This is a proposed minor proffer amendment for minor text revisions and revisions to the approved Generalized Development Plan (GDP) associated with Rezoning #02-03 which rezoned parcel 53-A-68 to the B2 (General Business) and MS (Medical Support) Districts with proffers. The site consists of 37.5424+/- acres zoned B2 (General Business) District and 51.8675+/- acres zoned MS (Medical Support) District. The approved GDP labeled individual land bays with specific uses; the Applicant proposes to remove the uses shown on the proffered GDP to allow for potential alternative development. The Applicant is also proposing to remove proffer 3 from the landscape design features which required a landscaped roundabout. This feature was removed, and the internal road system has already been constructed – therefore this proffer is unnecessary. The impacts associated with the change of use are very limited; no additional impact s to Frederick County or the surrounding property owners are anticipated. Staff is supportive of this request for a minor proffer modification to the GDP and text. A recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. Rezoning #06-19 WINCHESTER MEDICAL CENTER, INC. December 6, 2019 Page 2 This report is prepared by the Frederick County Planning Staff to provide information to the Planning Commission and the Board of Supervisors to assist them in making a decision on this application. It may also be useful to others interested in this zoning matter. Unresolved issues concerning this application are noted by Staff where relevant throughout this Staff report. Reviewed Action Planning Commission: 12/18/19 Pending Board of Supervisors: 01/08/20 Pending PROPOSAL: To revise the proffered Generalized Development Plan approved with Rezoning #02-03 for 37.5424+/- acres zoned B2 (General Business) District and 51.8675+/- acres zoned MS (Medical Support) District to the MS (Medical Support) District. Minor text revisions are also proposed to reflect the constructed internal street network within the development. LOCATION: The subject property is on the northern side of Route 50 West and west of Route 37. MAGISTERIAL DISTRICT: Gainesboro PROPERTY ID NUMBER: 53-A-68 PROPERTY ZONING: B2 (General Business) District MS (Medical Support) District PRESENT USE: Vacant ADJOINING PROPERTY ZONING & PRESENT USE: North: RA (Rural Areas) Use: Agricultural South: B2 (General Business) Use: Commercial East: N/A Interstate Use: Route 37 West: RA (Rural Areas) Use: Agricultural, Residential B2 (General Business) Vacant Rezoning #06-19 WINCHESTER MEDICAL CENTER, INC. December 6, 2019 Page 3 REVIEW EVALUATIONS: Virginia Dept. of Transportation: We have reviewed the above subject Rezoning Application dated August 5, 2019 for impacts to the local transportation system. We have no overall objection to the proposed rezoning with the following comment being addressed. We suggest that the conditions as they relate to the Western Campus-Limited Access Control Changes Route 37 (December 17, 2009) be brought into the amended proffer. As it remains important for all parties to be reminded of the gated-access limitation envisioned as part of the Commonwealth Transportation Board (CTB) approval. This could be accomplished by amending the Street Improvements section of the proffers as follows: “The Applicant shall design and construct all roads on the subject property consistent with the County’s adopted Round Hill Land Use Plan for the area, and requirements as consistent with the Commonwealth Transportation Board’s “Right of Way and Limited Access Control Changes Route 37 and Campus Boulevard Interchange” approval dated December 17, 2009, and according to uniform standards…” We also suggest including a copy of the Resolution of the CTB (attached) be included as an appendix to the proffer. Staff Note: Per VDOT’s comment, the Applicant has referenced the Commonwealth Transportation Board’s “Right of Way and Limited Access Control Changes Route 37 and Campus Boulevard Interchange” approval dated December 17, 2009 in the updated proffer statement. County of Frederick Attorney: Proffer appears acceptable. Planning & Zoning: 1) Site History The subject property was rezoned from the RA (Rural Areas) District to the B2 (General Business) District and the MS (Medical Support) District with the approval of Rezoning #02- 03. 2) Comprehensive Plan The 2035 Comprehensive Plan is the guide for the future growth of Frederick County. The 2035 Comprehensive Plan is an official public document that serves as the Community's guide for making decisions regarding development, preservation, public facilities and other key components of Community life. The primary goal of this plan is to protect and improve the living environment within Frederick County. It is in essence a composition of policies used to plan for the future physical development of Frederick County. The Area Plans, Appendix I of the 2035 Comprehensive Plan, are the primary implementation tool and will be instrumental to the future planning efforts of the County. Rezoning #06-19 WINCHESTER MEDICAL CENTER, INC. December 6, 2019 Page 4 Land Use The site is located within the limits of the Route 37 West Area Land Use Plan of the 2035 Comprehensive Plan and depicts the subject property with commercial land use designation. The existing B2 Zoning and MS Zoning is consistent with the Comprehensive Plan. A recommendation regarding this rezoning application to the Board of Supervisors would be appropriate. The Applicant should be prepared to adequately address all concerns raised by the Planning Commission. MILLERSTECKSubdivision WINCHESTERMEDICAL CENTERSubdivision £¤50 ¬«37 Winchester 53 A 68 219ROUND HILL RD 200WARD AVE 165WARD 307COLIN CT 304COLIN CT 432WESTSIDESTATION 2093NORTHWESTERNPIKE134WARD AVE 135WARDAVE 125WARD AVE 1997NORTHWESTERNPIKE 1983NORTHWESTERNPIKE 301COLIN CT 427WESTSIDESTATION 108STONEWALL DR 122WARDAVE 121WARD AVE 419WESTSIDESTATION 416WESTSIDESTATION 1961KATHY CT 113STONEWALL DR 107WARDAVE 409WESTSIDESTATION 1954KATHY CT 2161NORTHWESTERNPIKE 2131NORTHWESTERNPIKE 2051NORTHWESTERNPIKE 2035NORTHWESTERNPIKE 150CROCKWELLS MILL180CROCK WELLSMILL 230CROCKWELLS MILL 2054NORTHWESTERNPIKE 300MARRIOTDRIVE 501WALMART DR 501WALMART DR 501WALMART DR 174BOTANICALBLVD 194ECHO LN 2106NORTHWESTERNPIKE 377ECHO LN 377ECHO LN 956POORHOUSE RD 925ECHO LN 925ECHO LN 448THWAITE LN 343MARGARET LN WES T S I D E STA T I O N D R HOSPI T A L R D CH A M B E R S V I L L E LN STONEWALL DR CO N F E R E N C E CEN T E R D R MARRIOTT D R NORTH SECTOR C T KATHY CT CROCK W E L L S MILL DR NORTHWESTERNPIKE BO T A N I C A L BLV D OM P S D R AMHERST ST WALMART D R WA R D A V E M E A D O W B R A N C H A V E MER R I M A N S L N LIN D E N D R CAMP U S B L V D KE A T I N G D R ECH O L N Application Parcels B2 (General Business District) MS (Medical Support District) RP (Residential Performance District)µ Frederick County Planning & Development107 N Kent StWinchester, VA 22601540 - 665 - 5651Map Created: October 29, 2019 WinchesterRound Hill FO X D R ECH O L N LIN D E N D R CAMPU S B L V D MARGARET LN ALL E Y KE A T I N G D R WA R D A V E WEST S I D E S T A T I O N D R ¬«37¬«37 0 910 1,820455 Feet REZ # 06 - 19: Winchester Medical Center, Inc.PIN: 53 - A - 68Rezoning from B2 to MSZoning Map REZ #06-19 MILLERSTECKSubdivision WINCHESTERMEDICAL CENTERSubdivision £¤50 ¬«37 Winchester 53 A 68 219ROUND HILL RD 200WARD AVE 165WARD 307COLIN CT 304COLIN CT 432WESTSIDESTATION 2093NORTHWESTERNPIKE134WARD AVE 135WARDAVE 125WARD AVE 1997NORTHWESTERNPIKE 1983NORTHWESTERNPIKE 301COLIN CT 427WESTSIDESTATION 108STONEWALL DR 122WARDAVE 121WARD AVE 419WESTSIDESTATION 416WESTSIDESTATION 1961KATHY CT 113STONEWALL DR 107WARDAVE 409WESTSIDESTATION 1954KATHY CT 2161NORTHWESTERNPIKE 2131NORTHWESTERNPIKE 2051NORTHWESTERNPIKE 2035NORTHWESTERNPIKE 150CROCKWELLS MILL180CROCK WELLSMILL 230CROCKWELLS MILL 2054NORTHWESTERNPIKE 300MARRIOTDRIVE 501WALMART DR 501WALMART DR 501WALMART DR 174BOTANICALBLVD 194ECHO LN 2106NORTHWESTERNPIKE 377ECHO LN 377ECHO LN 956POORHOUSE RD 925ECHO LN 925ECHO LN 448THWAITE LN 343MARGARET LN WES T S I D E STA T I O N D R HOSPI T A L R D CH A M B E R S V I L L E LN STONEWALL DR CO N F E R E N C E CEN T E R D R MARRIOTT D R NORTH SECTOR C T KATHY CT CROCK W E L L S MILL DR NORTHWESTERNPIKE BO T A N I C A L BLV D OM P S D R AMHERST ST WALMART D R WA R D A V E M E A D O W B R A N C H A V E MER R I M A N S L N LIN D E N D R CAMP U S B L V D KE A T I N G D R ECH O L N Application Parcels µ Frederick County Planning & Development107 N Kent StWinchester, VA 22601540 - 665 - 5651Map Created: October 29, 2019 WinchesterRound Hill FO X D R ECH O L N LIN D E N D R CAMPU S B L V D MARGARET LN ALL E Y KE A T I N G D R WA R D A V E WEST S I D E S T A T I O N D R ¬«37¬«37 0 910 1,820455 Feet REZ # 06 - 19: Winchester Medical Center, Inc.PIN: 53 - A - 68Rezoning from B2 to MSLocation Map REZ #06-19 WINCHESTERMEDICAL CENTERSubdivision £¤50 ¬«37 Winchester 53 A 68 365ROCKHARBOR DR 219ROUNDHILL RD 200WARD AVE 165WARD 307COLIN CT 304COLIN CT 183ROUNDHILL RD 2093NORTHWESTERNPIKE 136WARD AVE 132WARDAVE 135WARD AVE 125WARD AVE 1997NORTHWESTERNPIKE 1983NORTHWESTERNPIKE 301COLIN CT 427WESTSIDESTATION 420WESTSIDESTATION 104STONEWALL DR 108STONEWALL DR 112STONEWALL DR 116STONEWALL DR 122WARDAVE 121WARD AVE 419WESTSIDESTATION 1953KATHY CT 2275NORTHWESTERNPIKE 113STONEWALL DR 113WARD AVE 409WESTSIDESTATION 1954KATHY CT 137ROUND HILL RD 2161NORTHWESTERNPIKE 2131NORTHWESTERNPIKE 2051NORTHWESTERNPIKE 2035NORTHWESTERNPIKE 2255NORTHWESTERNPIKE 110CROCKWELLS MILL 150CROCKWELLS MILL 180CROCKWELLS MILL 230CROCKWELLS MILL 2054NORTHWESTERNPIKE 300MARRIOTDRIVE 2178NORTHWESTERNPIKE 501WALMART DR 501WALMART DR 501WALMART DR 174BOTANICALBLVD 194ECHO LN 2106NORTHWESTERNPIKE 400CLOCKTOWERRIDGE 400CLOCKTOWERRIDGE 377ECHO LN 377ECHO LN 956POORHOUSE RD 925ECHO LN 925ECHO LN 448THWAITE LN WES T S I D E STA T I O N D R HOSPI T A L R D CH A M B E R S V I L L E LN CO N F E R E N C E CEN T E R D R MARRIOTT D R LIN D E N DR ROUN D H I L L R D K E A T I N G D R KATH Y C T RE T A I L BLV D BO T A N I C A L BLV D AMHERST STNORTHWESTERN PIKE WA R D A V E M E A D O W B R A N C H A V E CROCK WELLS MILL DR MER R I M A N S L N WALMART D R S T O N E W A L L D R CAMPU S B L V D ECH O L N Application ParcelsLong Range Land Use Residential Neighborhood Village Urban Center Mobile Home Community Business Highway Commercial Mixed-Use Mixed Use Commercial/Office Mixed Use Industrial/Office Industrial Warehouse Heavy Industrial Extractive Mining Commercial Rec Rural Community Center Fire & Rescue Sensitive Natural Areas Institutional Planned Unit Development Park Recreation School Employment Airport Support Area B2 / B3 Residential, 4 u/a High-Density Residential, 6 u/a High-Density Residential, 12-16 u/a Rural Area Interstate Buffer Landfill Support Area Natural Resources & Recreation Environmental & Recreational Resources µ Frederick County Planning & Development107 N Kent StWinchester, VA 22601540 - 665 - 5651Map Created: October 29, 2019 WinchesterRound Hill FO X D R ECH O L N LIN D E N D R CAMPU S B L V D MARGARET LN ALL E Y KE A T I N G D R WA R D A V E WEST S I D E S T A T I O N D R ¬«37¬«37 0 900 1,800450 Feet REZ # 06 - 19: Winchester Medical Center, Inc.PIN: 53 - A - 68Rezoning from B2 to MSLong Range Land Use Map REZ #06-19 E COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Planning Commission FROM: M. Tyler Klein, AICP, Senior Planner SUBJECT: Ordinance Amendment – Public Utilities including utility-scale solar power generating facilities – Public Hearing DATE: December 10, 2019 At their November 13th public hearing, the Board of Supervisors directed Staff to amend the proposed ordinance amendment for “public utilities” to further specify “utility-scale solar power energy facilities” as a conditional use in the RA Zoning District, and not allow this use by-right. As a result of this change in the use allowance, the item was sent back to the Planning Commission for a new public hearing. This is a proposed amendment to Chapter 165 – Zoning Ordinance to provide: 1. A definition for “Public Utilities” that includes utility-scale solar power energy generating facilities; 2. A definition for “decommissioning” and “utility-scale solar power generating facilities,” consistent with the Code of Virginia; 3. Additional regulations for specific uses that requires utility-scale solar generating energy facilities to make arrangements, including financial security, for decommissioning consistent with/as required by the Code of Virginia, and site plan review/approval only for utility-scale solar power generating facilities; and 4. Add “utility-scale solar power energy facilities” as a conditional use in the RA (Rural Areas) Zoning District. The above changes to the additional regulations for specific uses section does not affect current public utilities, including water/sewer treatment and distribution facilities. The only change from what was previously considered by the Planning Commission on October 16th is “utility-scale solar power energy facilities” as a conditional use in the RA Zoning District. The General Assembly amended the Code of Virginia (§15.2-22.41.2) to include decommissioning of solar energy facilities effective July 1, 2019. Previously, the County Attorney and Staff provided a determination that was shared with the Board of Supervisors on July 2018, stating that utility-scale solar power generating energy facilities would qualify as a “public utility” type- facility and would otherwise be allowed by-right in the County’s RA (Rural Areas) Zoning District (and other zoning districts where public utilities are permitted by-right). In that determination, it was noted that the Board could restrict the use to a conditional use permit. This item was proposed by the County Attorney and Staff and discussed by the DRRC at their June 27th, July 25th, and August 22nd regular meetings. The DRRC agreed with the proposed changes from August 22nd, and the item was forwarded to the Planning Commission for discussion. The Planning Commission discussed this item on September 4th and the Board of Supervisors discussed this item on September 25th. During their discussion, the Board directed Staff to also provide a definition for “decommissioning” and “utility-scale solar power energy generating facilities” and the item was sent forward, with requested amendments, for public hearing. The Planning Commission held a public hearing on the public utilities ordinance amendment on October 16th and recommended the item go forward to the Board of Supervisors for approval. However, at their November 13th public hearing, the Board of Supervisors directed Staff to amend the proposed ordinance amendment to include “utility-scale solar power energy facilities” as a conditional use in the RA Zoning District. The attached document shows the existing ordinance with the proposed changes (with bold italic for text added). This proposed amendment is being presented to the Planning Commission as a public hearing item. Staff is seeking a recommendation from the Planning Commission. The recommendation from the Planning Commission will be forwarded to the Board of Supervisors. Attachments: 1. Revised ordinance with additions shown in bold underlined italics. 2. Code of Virginia §15.2-2241.2 3. Memo to the Board of Supervisors, July 26, 2018 MTK/pd Revised 11/27/19 ARTICLE I General Provisions; Amendments; and Conditional Use Permits Part 101 General Provisions § 165-101.02 Definitions and word usage. Decommissioning The removal and proper disposal of solar energy equipment, facilities, or devices on real property that has been determined by the County to be subject to § 15.2-2232 of the Code of Virginia and therefore subject to § 15.2-2241.2 of the Code of Virginia. "Decommission" includes the reasonable restoration of the real property upon which such solar equipment, facilities, or devices are located, including (i) soil stabilization and (ii) revegetation of the ground cover of the real property disturbed by the installation of such equipment, facilities, or devices. Public Utilities Power generating facilities, booster or relay stations, transformer substations, transmission lines and towers, pipes, meters and other facilities (including utility-scale solar power generating facilities), and sewer and water treatment facilities including sewer and water transmission lines. Such facilities may be owned by public utilities, public agencies, those operators with a Certificate of Public Convenience, or those that are operating under a Permit by Rule (PBR). Utility-Scale Solar Power Generating Facilities Any personal property designed and used primarily for the purpose of collecting, generating, or transferring electric energy from sunlight. Any such facility primarily designed or intended to offset personal energy consumption by the owner of the facility does not constitute a utility-scale solar power generating facility. Revised 11/27/19 ARTICLE II Supplementary Use Regulations; Parking; Buffers; and Regulations for Specific Uses Part 204 Additional Regulations for Specific Uses § 165-204.26. Public Utilities 1. Public utilities. Lot requirements for lots used by political subdivisions, municipal corporations, the Virginia Department of Transportation, the Frederick-Winchester Service Authority, or the Frederick Water County Sanitation Authority for public utility purposes shall be as follows: A. In all zoning districts, the Zoning Administrator shall have the authority to determine the minimum lot size necessary for such public utilities and the appropriate setbacks for such lots used for public utility purposes. B. Such lots shall be exempt from the individual on-site sewage disposal system requirements. C. Such lots may be accessed by private access easements; any such easement shall be a minimum of 15 feet in width. 2. Utility-Scale Solar Power Generating Facilities. A. Any owner, lessee, or developer of real property for the purposes of solar power energy generation shall enter into a written agreement, prior to site plan approval, with Frederick County to decommission solar energy equipment, facilities, or devices pursuant to the terms and conditions of § 15.2-2241.2(B) of the Code of Virginia. B. For Utility-Scale Solar Power Generating Facilities a site plan, in accordance with Article VIII, shall be submitted to and approved by Frederick County, prior to the establishment of the use. Revised 11/27/19 ARTICLE IV Agricultural and Residential Districts Part 401 RA Rural Areas District § 165-401.02. Permitted Uses Q. Public utility generating, booster, or relay stations, transformer substations, transmission lines and towers, pipes, meters and other facilities, railroad facilities and sewer and water facilities, and lines owned by public facilities, railroad companies or public agencies. Public Utilities except Utility-Scale Solar Power Generating Facilities §165-401.03. Conditional Uses CC. Utility-Scale Solar Power Generating Facilities Part 402 RP Residential Performance District § 165-402.02. Permitted Uses B. Structures and land shall be used for one of the following uses: (6) Utility distribution facilities necessary to serve residential uses, including, but not limited to, poles, lines, distribution transformers, pipes, and meters. Public Utilities excluding energy generating facilities. Part 403 MH1 Mobile Home Community District § 165-403.02. Permitted Uses H. Public utilities including poles, lines, distribution transformers, pipes and meters, water and sewer facilities and lines. Public Utilities excluding energy generating facilities. Revised 11/27/19 ARTICLE V Planned Development Districts Part 502 R5 Residential Recreational Community District §165-502.04. Permitted uses. P. Public sewer and water facilities and lines. Public Utilities excluding energy generating facilities. Revised 11/27/19 ARTICLE VI Business and Industrial Districts Part 602 B1 Neighborhood Business District §165-602.02. Allowed Uses. Public utility distribution facility Public Utilities excluding energy generating facilities. Part 603 B2 General Business District §165-603.02. Allowed Uses. Public utility distribution facility Public Utilities excluding energy generating facilities. Part 604 B3 Industrial Transition District §165-604.02. Allowed Uses. Public utility distribution facility Public Utilities Part 606 M1 Light Industrial District §165-606.02. Allowed Uses. Public utility distribution facility Public Utilities Part 608 EM Extractive Manufacturing District §165-608.02. Permitted Uses. K. Public utilities, including poles, lines, distribution transformers, pipes, meters, and sewer facilities. Public Utilities. Part 609 HE Higher Education District §165-609.02. Permitted uses. B. Utilities necessary to serve allowed uses, including poles, lines, distribution transformers, pipes and meters. Public Utilities excluding energy generating facilities. COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Fax: 540/ 665-6395 MEMORANDUM TO: Frederick County Board of Supervisors CC: Kris C. Tierney, County Administrator Roderick B. Williams, County Attorney Mike T. Ruddy, AICP, Director of Planning & Development Mark R. Cheran, Zoning Administrator FROM: M. Tyler Klein, AICP, Senior Planner SUBJECT: Solar (Photovoltaic) Energy Facilities Text Amendment – Update DATE: July 26, 2018 This is an update to the proposed text amendment to Chapter 165 – Zoning Ordinance to add solar (photovoltaic) power generating facilities (i.e. solar farms) to the permitted use list for the RA (Rural Areas) Zoning District. This item was previously discussed by the Board of Supervisors on January 10th, February 14th and April 11th. Following our last discussion, the Board of Supervisors had directed Staff to make the proposed use a “conditional use” and provide additional supplemental use regulations to address abandonment on the facility and return of the land to its pre-development state. At the time of the presentation to the Board, the premise of the draft text amendment, as supported by the Development Review and Regulations Committee (DRRC), and previously discussed by the Planning Commission, was that because solar farms are typically “privately-owned”, they would not qualify as “public utility” generating facilities. Since the Board discussion in April, the County Attorney and the Planning and Development Staff have met and determined that solar (photovoltaic) energy facilities would appear to qualify as “public utility generating” facilities and would otherwise today be allowed by-right in the County’s RA Zoning District. The Zoning Ordinance currently permits a by-right use in the RA Zoning District, “Public utility generating, booster, or relay stations, transformer substations, transmission lines, and towers, pipes, meters, and other facilities, railroad facilities, and sewer and water facilities and lines owned by public utilities, railroad companies or public agencies” (§165- 401.02(Q)). The term “public utility” does not address the public or private nature of the ownership of the facility; most electricity generating facilities in the United States are owned by “private” entities as opposed to government, i.e. “public” entities. Further, the Frederick County Zoning Ordinance does not define the term “public utility” and definitions not included in the definitions section of the Zoning Ordinance “shall have the meaning ascribed to such word, term or phrase in the most recent addition of Merriam-Webster’s Dictionary unless, in the opinion of the Zoning Administrator, established customs or practices in Frederick -2- County, Virginia justify a different or additional meaning” (§165-101.02). Webster’s defines “public utility” simply as “a business organization (such as an electric company) performing a public service and subject to special governmental regulation.” This definition does not limit the concept of a “public utility” to entities that sell electricity directly to the public or to entities that are publicly traded and therefore does not exclude from its reach solar farms owned by non- publicly traded entities. Within the Code of Virginia §56-1, nothing in the definition of public service companies suggests a distinction between the types of companies that operate solar farms and the types of companies that operate other types of electricity generation facilities. State law specifically regulates solar facilities as it does other electricity generating facilities, regardless of the nature of ownership, by requiring the operator to seek a certificate of public convenience and necessity from the State Corporation Commission (SCC) (§56-265.2). The County would recognize a solar energy facility as a public utility under this interpretation. This determination of solar electric generating facilities qualifying as a “public utility” would not preclude the Board of Supervisors in the future from further regulating solar (photovoltaic) energy facilities as allowed under the Code of Virginia or excluding them all from the current allowance in §165-401.02(Q). Staff notes that possible supplementary regulations as previously discussed, such as a requirement for removal of the facilities upon abandonment of use would place them in a category currently unique to telecommunications towers. As well, any requirement for a bon d securing the removal of an abandoned facility might be sufficient economic disincentive as t o preclude any use of the opportunity that would be enabled by the ordinance generally. Please contact the County Attorney’s office or Planning and Development Staff directly with any questions or comments. Unless otherwise directed by the Board of Supervisors, Staff will proceed with the above interpretation to allow solar energy facilities (i.e. solar farms), by right, under the present allowance for public utilities in the RA Zoning District. MTK/pd