HomeMy WebLinkAbout26-19 CommentsOctober 25, 2019
Mr. Trenton Caudill
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22601
COUNTY cnf FREDERICK
Department o; Public Works
,40/665-5643
FAX: 54W678-0682
RE: Revised Site Plan Comments — Graystone Industrial Center Phase 1-3
Dear Mr. Caudill:
Upon review of the revised site plan dated June 28, 2019, we recommend approval of the
subject plan.
:' {, d
Joseph W. Johnson, P.E.
Civil Engineer
JCW/kco
cc: Planning and Development
file
Sincerely,
f
Joe C. Wilder
Director of Public Works
107 North Kent Street, Second Floor, Suite 200 - Winchester, Virginia 22601-51100
Trenton Caudill
From: Timothy Rhodes <timothy.rhodes@vdot.virginia.gov>
Sent: Wednesday, October 23, 2019 8:58 AM
To: Randy Kepler
Cc: Matthew Smith; Rhonda Funkhouser; Edwin Carter; Trenton Caudill; Tyler Klein; John
Bishop 0bishop @co.frederick.va.us)"John Bishop; Candice Perkins; Gregory Hoffman
Subject: Graystone industrial Center Phase I Site Plan Approval
.41
DEPARTMENT OF TRANSPORTATION
Staunton/Edinburg Land Development
14031 Old Valley Pike
Edinburg, VA 22824
Randy,
A VDOT review has been conducted for the Graystone Industrial Center Phase I Site Plan, signature
dated October 21, 2019. Based off of the review of the Drawings, all of the previous VDOT
comments have been addressed and the Site Plan is approved by our office. Please ensure that all
applicable agencies have the most recent set of approved Drawings.
We offer the following general comments:
• Our review and comments are general in nature. Should details be overlooked during plan
review or conditions in the field exist such that additional measures are warranted, such
measures shall be completed to the satisfaction of the department.
• Materials used and methods of construction shall adhere to the current observed VDOT Road
and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control
Devices, and Land Use Permit Special Provisions.
• A preconstruction conference shall be held by the engineer and/or the developer with the
attendance of the contractor, various County agencies, utility companies, and VDOT prior to
initiation of work.
• All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a
pipe or drainage easement.
• Any construction related changes to the approved plan must come through the design
engineer to VDOT for approval. Please allow a minimum of 5 business days for VDOT review.
• A Land Use Permit shall be obtained before any work is performed on the State's right-of-
way. The permit is issued by this office and may require application fees, the salary &
expenses of a State assigned inspector, and surety bond coverage.
If you have any questions or need further information, please do not hesitate to contact me.
Sincerely,
Timothy Rhodes
VD®T—Land Development Engineer
Clarke, Frederick, Shenandoah & Warren Counties
14031 Old Valley Pike
Edinburg, VA. 22824
(540)-984-5630
FREDERICK NATER
FREDERICK
MATER
PO Bot 1877. Winchester, VA 22604-8377
:315 Tasker Road, Stephens City. VA ?26>5
Project
i^PAY�fbN Co .
Applicant V lG/t �1
REVIEW STATUS
dt---�if :f,
40.868.1061 voice
attention_ 11: e, ��� T'`TD (—
540.868.1429
fax
/,7
IAV " Q
Zcorrreview number 0-7-
correct
ect &- resubmit pproved as noted number of items to be corrected
VNS
DRAW
send me by
1. print of sheets L
2. two CDs: each disc shall contain the following plan sheets
1
a) One CD (containing all of the above noted sheets) shall be in PDF format. Each sheet shall be in its
own file and be in landscape orientation. Each file shall be titled with the project name and appropriate
sheet number.
b) One CD shall be in DWG format; (1) in Model Space, (2) instate plane coordinate system NAD 83.(3)
compatible with AutoCAD 2006.
c) Each of the two CDs shall be labeled with its format and project name, and placed in its own paper CD
envelope.
EASEMENTS
YIN
Y/N
o
0
0
OTHER
Y
Y /(9
A copy of the recorded onsite FW easement(s) is/are required.
A copy of the recorded offsite FW easement(s) is/are required.
The easement document shall contain a plat and both shall be signed by the Frederick Water_
The Frederick Water requires specific language in its deed of easement.
Visit our website www.frederick�%ater.com to obtain a copy of the. form.
A copy of the recorded deed(s) of easement shall be received before service will be authorized.
This project also requires DEQ - Valley Region Office approval.
This project also requires VDH — Lexington Field Office approval.
X�l�/ N This project also require, VDH — Lexington Field Office —Project Summary Report. B1' DATE FOR
DRAWINGS ABOVE, see VDH website for form
Y(N? This project has a sewer pump station that FW will own. Title to the pump station site shall be (Yranted
to the Frederick Nater in fee simple absolute. Also, (1) a copy of DEQ's Certificate to Construct. (2) a
copy of DEQ's Certificate to Operate. and (3) two copies of the Fvb' approved O R M manual are
required. These documents must be received before service will be authorized. (d) Work cannot
commence that would connect to FAV facilities or require FW inspections until the contract is returned
to this office. ) f
Earl W. Wiley — Engineering Assistant
REQUEST FOR SITE PLAN COMMENTS
Request for Street Warne Comment
Mail to:
Frederick County
Information Technologies, GIS Division
Attn: GIS Manager
107 North Kent Street,
Winchester, Virginia 22601
Mand deliver to:
Frederick County
Information Technologies, GIS Division
107 North Kent Street, I" Floor
Winchester, Virginia 22601
Phone: (540) 665-5614
Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the Site Plan with this sheet
Applicant's Name: Greenway Engineering, Inc.
Mailing Address:
151 Windy Hill Lane
Winchester, VA 22602
Telephone: (540) 662-4185
Name of development and/or description of the request:
Graystone Industrial Center - Phase 1
Construction of 2 industrial warehouses, with related utilities, parking, and roadways.
Location of Property:
Frederick Countv
GIS Manager Comments:
Please see attached sheet for comments!
-GIS MANAGER USE ONLY -
Date Received 09/17/2019 Review Number 1U3 4 5 (circle one)
09 23/223/2%19
Date Reviewed
Revision Required NO Date Approved 09/24/2019
Signature & Date' a /
** Please Return Form to Applicant**
17
RVQUE'ST FCR SITE PLAN COMMENTS
Frederick County, Fire 11;,r-sJjj1 C0,11ment
Mail to:
Firc, Nlanshal
AM]: Firy
1680 ('0verstom Drivc
WilldICS1', Virg,inia 22602
Hand deliver to:
Public Safetv HUNCH112
11180 Covc.rstono Drive
Wirldlester- Virginia 22602
Phone: (540) 665-6350
'kPPlic-11-16: It k Your responsibility to complete t1lis forin fj_q as possible ii, order to assist the agency with 111eir
review, Jllua.w a(ta0l tw-f) 1-1) copies of the ,ite p][1j, %vilh
Email Addrc-zs:
A-dreb.': 1
Name 01'deve-lopmentand &Nuriplion of the request:
Gr.'iY',5t0r1v Irldil �(rjal center- Phase 1
_T,C_aPr,1_jO_cA th)-volupripni -will consiztofthe constfuctior,
a! burs (2) iTUJLISt 1'.fl w.irehou�cs, witi-I related Lj K'Jes. paiking, and raaaway.s.
Imeation
1�ire Nlarshid Coninjelit.5-
-FREDERICK COI.qN,l I, FIRV. -NIARSHAL I -SE - - - - - - - - -
QNLY-
DaTe !ZCccivcd
------------------- Roview iNUMbel'(1) 3 4 _5 (circle one)
Datc Revicwed
Revi,
DILIc Approved —1
Siglialurv& Date., s ca
Please Rgitil-11 rq)rjj to ApOicamA A
Date Received
6128/2019
Frederick [ oujztiy
Department of ire and Rescue
Qqzice oj*t]2e Fire Marshal
-1086' t'oxersrcrne IJriae 1l lrac`6c sds r, VA 22602
(540) 665-6.356 FtLv_ (510) 678-4170 Email. frnoCa fc-va.us
Plan Review & Comments
Plam('Permit Type Site Plan 06-28-19
N2me Graystone Industrial Center Phase 9
Address Snowden Bridge BLVD Winchester
Proje � Name Two Industrial Warehouses
Applicant Name R Number
RE#
Permit Number
Emergency Vehicle Access:
Hydrant Lonation:
Sia_niese Loa ation.
Fire Lanes Require
Paan Approval Stzitus
Greenway Engineering 540-662-4185
Ad r nate Inado(plate N/A
Ade96ate Inadequalt- NIA
Ade[iate Inadequate railA
YOs No Nr,4
Approve
Comments
Area in yellow shall be snipped in ye9cve
Areas in orange shall have No Farling Fire lane signs Installed.
I'll ANY changes to the wz: for lines per t5sn a site plan will need to bas submitted for review
Slgnattare.-
Reviewed By: Kenneth Scott, Jr.
- s
Title._'+
Date Reviewed
7/3/2019
VA 22602
J U N1 "26 8 201.194
Fradenck, County
REQ,17-TST F-cj',-R SITE PL A N
Fre-der-ek C;- Jr V:-
4
Dep-7 Cr�-
4. _ ? 1 -1. nslf
L
B I di
V., 1i I C i I e S t C I - I C L, i I I i a. 2
wnlice nt: It i,-; your responsibiliri to t'()rll- 1S 2C,:U:.,Clv ai possibl,- in order to ai-sis� the a-en,:N %Nit1h their 11
review. Please attach tl,%,o (2) copies of the Site Plan with this sheet.
Applicant's Name: Greenway Engineering. Inc
Email Address: tcaudili@greenv.,ayeng.com
vlailin-c, Address: 151 Windy Hill Lane
Winchester- VA 22602
Name of development and description ok thO I-CCILIeSt:
Graystone Industrial Center - Phase I
Telephone: 540-662-4185
The Project development will consist of the construction of two (2) industrial warehouses with related utilities. parking. and roadways.
Location of Property:
_Frederick County�_
Ins ction-s Department Cornments:
-FREDERICK f-C)UNTI.- INSPECTIONS DEP.AiRT."IEN'T I'SE ON
Date Received —&JZ,Y,
Date Reviewed 116 J6
1 (circle one)
2 3 , 4 5
Revie%k- NumberD
il Revision Required a Date pproved
Signature & Date:. /Y1
S4,
Please Return For to Applicant" N 7 -
Le
sy
ta U
M
Wings shall comply with The Virginia Uniform Statewide Buildin
If the International Buildingg Code
ICC A117.1 ��_ Code/2015, the 2015 VUSBC/ International Fire Code. Other Cos 3 i 1, S Storage
09. Accessible and Usable Buildings and Facilities and 2015 Virginia
de that applies is
Proposed buildings shall comply Energy Code
facilities (Section 507, Unlimited Area Brcgldir�sd area Per T504 for
type of construction or unlimited area
Plans- Fire Pump shall meet NFPA 20. g) and maintain an open perimeter of 60'.
FDC located on the
All required exits shall meet ANSI Al 17. 1-09 for accessibility and
accessible exits. Maximum travel distance per IBC/USB to an exit is 40
tY slopes. Question on the location of
accessible. Site Plan approved pending accessible exits to public �•a - All required exits shall be
area of assisted rescue shall comply with Section 10 16 of the USBClIB
doors shall be provided at exterior areas S assisted rescue y °r exterior area of refuge. Exterior
C. One hour rated walls with 45 min.
shall be in accordance with Section 2902.3.2. as noted. Maximum
(Maximum 500,unless otherwise approved
distance to restrooms
Storage in racks exceeding 12' in height require a e by AHJ)
High pile storage areas require fire de q P nnit and shall comply with the International Fire Code.
be spaced fiirther apart than 100, department access around perimeter of the building. g Access/doors shall not
ANS[ parking spaces shall be provided as required per T1106.1. Ac
exceed 2% slope (1:48). Accessible Route shall extend from
main entrance. Curb ramps shall have a minimum 3 Accessible unl parking and unloading shall not
require minimum unloading area 8' with 8' of Parking t and unloading area to accessible route to
'landing at the top and bottom of the landing. V
space is required. No enlargement Provided. parking or a minimum of I 1 ' wide g• an spaces
Parking/unloading g P Accessible route with max 5% Slopes be provided unloading
1;/unloadin to main entrance. Accessible parking and unloading access to main entrance appears to meet
ANSI A 117 for slopes.
Public entrances into spaces larger than 3000 sq ft shall be Provided
A117.1-09 P ed with a vestibule as detailed per ANSI
All structural plans submitted for permit application shall be sealed
Special inspection requirements of Chapter 17 of IBC shall a 1
concrete, steel etc.) by a VA Design professional
pp y to this type of structure. (soils, compaction,
Light poles require permits and inspections. Retaining walls wi
No gutters of other water shall discharge over walkways th more than 3'
unbalanced fill require permits.
A geotechnical evaluation shall be performed and submitted with
appl
1803.
ication as required USBC/IBC Section
SES' 10 2019
�Y
:Site Plan c0mments120151Storage, Graystone Industrial Center, Phase Ldoc