Loading...
HomeMy WebLinkAbout26-19 CommentsOctober 25, 2019 Mr. Trenton Caudill Greenway Engineering 151 Windy Hill Lane Winchester, Virginia 22601 COUNTY cnf FREDERICK Department o; Public Works ,40/665-5643 FAX: 54W678-0682 RE: Revised Site Plan Comments — Graystone Industrial Center Phase 1-3 Dear Mr. Caudill: Upon review of the revised site plan dated June 28, 2019, we recommend approval of the subject plan. :' {, d Joseph W. Johnson, P.E. Civil Engineer JCW/kco cc: Planning and Development file Sincerely, f Joe C. Wilder Director of Public Works 107 North Kent Street, Second Floor, Suite 200 - Winchester, Virginia 22601-51100 Trenton Caudill From: Timothy Rhodes <timothy.rhodes@vdot.virginia.gov> Sent: Wednesday, October 23, 2019 8:58 AM To: Randy Kepler Cc: Matthew Smith; Rhonda Funkhouser; Edwin Carter; Trenton Caudill; Tyler Klein; John Bishop 0bishop @co.frederick.va.us)"John Bishop; Candice Perkins; Gregory Hoffman Subject: Graystone industrial Center Phase I Site Plan Approval .41 DEPARTMENT OF TRANSPORTATION Staunton/Edinburg Land Development 14031 Old Valley Pike Edinburg, VA 22824 Randy, A VDOT review has been conducted for the Graystone Industrial Center Phase I Site Plan, signature dated October 21, 2019. Based off of the review of the Drawings, all of the previous VDOT comments have been addressed and the Site Plan is approved by our office. Please ensure that all applicable agencies have the most recent set of approved Drawings. We offer the following general comments: • Our review and comments are general in nature. Should details be overlooked during plan review or conditions in the field exist such that additional measures are warranted, such measures shall be completed to the satisfaction of the department. • Materials used and methods of construction shall adhere to the current observed VDOT Road and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and Land Use Permit Special Provisions. • A preconstruction conference shall be held by the engineer and/or the developer with the attendance of the contractor, various County agencies, utility companies, and VDOT prior to initiation of work. • All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or drainage easement. • Any construction related changes to the approved plan must come through the design engineer to VDOT for approval. Please allow a minimum of 5 business days for VDOT review. • A Land Use Permit shall be obtained before any work is performed on the State's right-of- way. The permit is issued by this office and may require application fees, the salary & expenses of a State assigned inspector, and surety bond coverage. If you have any questions or need further information, please do not hesitate to contact me. Sincerely, Timothy Rhodes VD®T—Land Development Engineer Clarke, Frederick, Shenandoah & Warren Counties 14031 Old Valley Pike Edinburg, VA. 22824 (540)-984-5630 FREDERICK NATER FREDERICK MATER PO Bot 1877. Winchester, VA 22604-8377 :315 Tasker Road, Stephens City. VA ?26>5 Project i^PAY�fbN Co . Applicant V lG/t �1 REVIEW STATUS dt---�if :f, 40.868.1061 voice attention_ 11: e, ��� T'`TD (— 540.868.1429 fax /,7 IAV " Q Zcorrreview number 0-7- correct ect &- resubmit pproved as noted number of items to be corrected VNS DRAW send me by 1. print of sheets L 2. two CDs: each disc shall contain the following plan sheets 1 a) One CD (containing all of the above noted sheets) shall be in PDF format. Each sheet shall be in its own file and be in landscape orientation. Each file shall be titled with the project name and appropriate sheet number. b) One CD shall be in DWG format; (1) in Model Space, (2) instate plane coordinate system NAD 83.(3) compatible with AutoCAD 2006. c) Each of the two CDs shall be labeled with its format and project name, and placed in its own paper CD envelope. EASEMENTS YIN Y/N o 0 0 OTHER Y Y /(9 A copy of the recorded onsite FW easement(s) is/are required. A copy of the recorded offsite FW easement(s) is/are required. The easement document shall contain a plat and both shall be signed by the Frederick Water_ The Frederick Water requires specific language in its deed of easement. Visit our website www.frederick�%ater.com to obtain a copy of the. form. A copy of the recorded deed(s) of easement shall be received before service will be authorized. This project also requires DEQ - Valley Region Office approval. This project also requires VDH — Lexington Field Office approval. X�l�/ N This project also require, VDH — Lexington Field Office —Project Summary Report. B1' DATE FOR DRAWINGS ABOVE, see VDH website for form Y(N? This project has a sewer pump station that FW will own. Title to the pump station site shall be (Yranted to the Frederick Nater in fee simple absolute. Also, (1) a copy of DEQ's Certificate to Construct. (2) a copy of DEQ's Certificate to Operate. and (3) two copies of the Fvb' approved O R M manual are required. These documents must be received before service will be authorized. (d) Work cannot commence that would connect to FAV facilities or require FW inspections until the contract is returned to this office. ) f Earl W. Wiley — Engineering Assistant REQUEST FOR SITE PLAN COMMENTS Request for Street Warne Comment Mail to: Frederick County Information Technologies, GIS Division Attn: GIS Manager 107 North Kent Street, Winchester, Virginia 22601 Mand deliver to: Frederick County Information Technologies, GIS Division 107 North Kent Street, I" Floor Winchester, Virginia 22601 Phone: (540) 665-5614 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the Site Plan with this sheet Applicant's Name: Greenway Engineering, Inc. Mailing Address: 151 Windy Hill Lane Winchester, VA 22602 Telephone: (540) 662-4185 Name of development and/or description of the request: Graystone Industrial Center - Phase 1 Construction of 2 industrial warehouses, with related utilities, parking, and roadways. Location of Property: Frederick Countv GIS Manager Comments: Please see attached sheet for comments! -GIS MANAGER USE ONLY - Date Received 09/17/2019 Review Number 1U3 4 5 (circle one) 09 23/223/2%19 Date Reviewed Revision Required NO Date Approved 09/24/2019 Signature & Date' a / ** Please Return Form to Applicant** 17 RVQUE'ST FCR SITE PLAN COMMENTS Frederick County, Fire 11;,r-sJjj1 C0,11ment Mail to: Firc, Nlanshal AM]: Firy 1680 ('0verstom Drivc WilldICS1', Virg,inia 22602 Hand deliver to: Public Safetv HUNCH112 11180 Covc.rstono Drive Wirldlester- Virginia 22602 Phone: (540) 665-6350 'kPPlic-11-16: It k Your responsibility to complete t1lis forin fj_q as possible ii, order to assist the agency with 111eir review, Jllua.w a(ta0l tw-f) 1-1) copies of the ,ite p][1j, %vilh Email Addrc-zs: A-dreb.': 1 Name 01'deve-lopmentand &Nuriplion of the request: Gr.'iY',5t0r1v Irldil �(rjal center- Phase 1 _T,C_aPr,1_jO_cA th)-volupripni -will consiztofthe constfuctior, a! burs (2) iTUJLISt 1'.fl w.irehou�cs, witi-I related Lj K'Jes. paiking, and raaaway.s. Imeation 1�ire Nlarshid Coninjelit.5- -FREDERICK COI.qN,l I, FIRV. -NIARSHAL I -SE - - - - - - - - - ­QNLY- DaTe !ZCccivcd ------------------- Roview iNUMbel'(1) 3 4 _5 (circle one) Datc Revicwed Revi, DILIc Approved —1 Siglialurv& Date., s ca Please Rgitil-11 rq)rjj to ApOicamA A Date Received 6128/2019 Frederick [ oujztiy Department of ire and Rescue Qqzice oj*t]2e Fire Marshal -1086' t'oxersrcrne IJriae 1l lrac`6c sds r, VA 22602 (540) 665-6.356 FtLv_ (510) 678-4170 Email. frnoCa fc-va.us Plan Review & Comments Plam('Permit Type Site Plan 06-28-19 N2me Graystone Industrial Center Phase 9 Address Snowden Bridge BLVD Winchester Proje � Name Two Industrial Warehouses Applicant Name R Number RE# Permit Number Emergency Vehicle Access: Hydrant Lonation: Sia_niese Loa ation. Fire Lanes Require Paan Approval Stzitus Greenway Engineering 540-662-4185 Ad r nate Inado(plate N/A Ade96ate Inadequalt- NIA Ade[iate Inadequate railA YOs No Nr,4 Approve Comments Area in yellow shall be snipped in ye9cve Areas in orange shall have No Farling Fire lane signs Installed. I'll ANY changes to the wz: for lines per t5sn a site plan will need to bas submitted for review Slgnattare.- Reviewed By: Kenneth Scott, Jr. - s Title._'+ Date Reviewed 7/3/2019 VA 22602 J U N1 "26 8 201.194 Fradenck, County REQ,17-TST F-cj',-R SITE PL A N Fre-der-ek C;- Jr V:- 4 Dep-7 Cr�- 4. _ ? 1 -1. nslf L B I di V., 1i I C i I e S t C I - I C L, i I I i a. 2 wnlice nt: It i,-; your responsibiliri to t'()rll- 1S 2C,:U:.,Clv ai possibl,- in order to ai-sis� the a-en,:N %Nit1h their 11 review. Please attach tl,%,o (2) copies of the Site Plan with this sheet. Applicant's Name: Greenway Engineering. Inc Email Address: tcaudili@greenv.,ayeng.com vlailin-c, Address: 151 Windy Hill Lane Winchester- VA 22602 Name of development and description ok thO I-CCILIeSt: Graystone Industrial Center - Phase I Telephone: 540-662-4185 The Project development will consist of the construction of two (2) industrial warehouses with related utilities. parking. and roadways. Location of Property: _Frederick County�_ Ins ction-s Department Cornments: -FREDERICK f-C)UNTI.- INSPECTIONS DEP.AiRT."IEN'T I'SE ON Date Received —&JZ,Y, Date Reviewed 116 J6 1 (circle one) 2 3 , 4 5 Revie%k- NumberD il Revision Required a Date pproved Signature & Date:. /Y1 S4, Please Return For to Applicant" N 7 - Le sy ta U M Wings shall comply with The Virginia Uniform Statewide Buildin If the International Buildingg Code ICC A117.1 ��_ Code/2015, the 2015 VUSBC/ International Fire Code. Other Cos 3 i 1, S Storage 09. Accessible and Usable Buildings and Facilities and 2015 Virginia de that applies is Proposed buildings shall comply Energy Code facilities (Section 507, Unlimited Area Brcgldir�sd area Per T504 for type of construction or unlimited area Plans- Fire Pump shall meet NFPA 20. g) and maintain an open perimeter of 60'. FDC located on the All required exits shall meet ANSI Al 17. 1-09 for accessibility and accessible exits. Maximum travel distance per IBC/USB to an exit is 40 tY slopes. Question on the location of accessible. Site Plan approved pending accessible exits to public �•a - All required exits shall be area of assisted rescue shall comply with Section 10 16 of the USBClIB doors shall be provided at exterior areas S assisted rescue y °r exterior area of refuge. Exterior C. One hour rated walls with 45 min. shall be in accordance with Section 2902.3.2. as noted. Maximum (Maximum 500,unless otherwise approved distance to restrooms Storage in racks exceeding 12' in height require a e by AHJ) High pile storage areas require fire de q P nnit and shall comply with the International Fire Code. be spaced fiirther apart than 100, department access around perimeter of the building. g Access/doors shall not ANS[ parking spaces shall be provided as required per T1106.1. Ac exceed 2% slope (1:48). Accessible Route shall extend from main entrance. Curb ramps shall have a minimum 3 Accessible unl parking and unloading shall not require minimum unloading area 8' with 8' of Parking t and unloading area to accessible route to 'landing at the top and bottom of the landing. V space is required. No enlargement Provided. parking or a minimum of I 1 ' wide g• an spaces Parking/unloading g P Accessible route with max 5% Slopes be provided unloading 1;/unloadin to main entrance. Accessible parking and unloading access to main entrance appears to meet ANSI A 117 for slopes. Public entrances into spaces larger than 3000 sq ft shall be Provided A117.1-09 P ed with a vestibule as detailed per ANSI All structural plans submitted for permit application shall be sealed Special inspection requirements of Chapter 17 of IBC shall a 1 concrete, steel etc.) by a VA Design professional pp y to this type of structure. (soils, compaction, Light poles require permits and inspections. Retaining walls wi No gutters of other water shall discharge over walkways th more than 3' unbalanced fill require permits. A geotechnical evaluation shall be performed and submitted with appl 1803. ication as required USBC/IBC Section SES' 10 2019 �Y :Site Plan c0mments120151Storage, Graystone Industrial Center, Phase Ldoc