Loading...
HomeMy WebLinkAbout26-19 Approval LetterOctober 28, 2019 Randy Kepler, PE Greenway Engineering, Inc. 151 Windy Hill Lane Winchester, VA 22601 COUNTY of FREDERICK Department of Planning and Development 540/ 665-5651 Re: Approval for Site Plan #26-19, Graystone Industrial Center — Phase I Property Identification Number (PIN): 44-A-25, 44-A-26, 44 -A -31A Dear Mr. Kepler: Fax: 540/665-6395 The above -referenced site plan was approved on October 25, 2019. The site plan is approved for a two (2) one-story office/warehouse buildings totaling 228,760 square feet (SF) in the Ml (Light Industrial) Zoning District in the Stonewall Magisterial District. The site plan also includes approval for 136 parking spaces, 104 loading spaces, site lighting, landscaping and screening, and amenities for employees. All requirements of the Frederick County Zoning Ordinance have been met in the approved site plan. Attached are three (3) hard copies of the signed site plan by the Zoning Administrator. Please forward these copies to the appropriate representative(s). Furthermore, advise the owner(s) that a copy should be kept for future reference, and an approved copy must be kept on the construction site throughout the development process. Further, once site development is complete, the owner(s) should contact this office to schedule an on-site inspection. Do not hesitate to contact me if you have any questions or concerns. Sincerely, M. Tyler Klein, AICP Senior Planner MTK/pd Attachments cc: Judith McCann -Slaughter, Stonewall Magisterial District Gary R. Oates & William H. Cline, Stonewall District Planning Commissioners Jane Anderson, Real Estate Commissioner of Revenue Mark Fleet, Frederick County Building Inspections (email only) Patrick Barker, Frederick County Economic Development Authority (email only) Kenneth Scott, Frederick County Fire & Rescue (email only) Graystone Corporation, P.O. Box 2530, Winchester, VA 22604 107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000