Loading...
HomeMy WebLinkAbout40-19 ApplicationSITE PLAN APPLICATION q-2-0-11 v�2'q Office L'se Only- Date Application Received: i �0_ / Application #: Fees Received: 5 Receipt #: Q.e) 3' initials. 1. Project Title: Valvoline Instant Oil 2. Project Description: Develop the vacant lot at 190 Front Royal Pike for a Valvoline Instant Oil Change 3. Location of Property: 190 Front Royal Pike, Winchester, VA 22602 (Street address) 4 A nnli—nt/DesiQ7ler: _-• - Name: CEf'.30 Telephone: 614-942-3006 Primary Point of Contact: Edward Brouch email: brouch@)cesoinc.com Address: 2800 Corporate Exchange Drive, Suite 160 Columbus, OH 43231 5. Property Ow ler (if different than above): Name: Valvo ine Instant Oil Change (developer) Telephone: 859-:357-7188 Address: 10) Valvoline Way Lex;ngton, KY 40509 6. Property Info oration: a. Propert_, Identification Number: b. Total acreage of the parcel to be developed: C. Total di€turbed area of the parcel: d. Present'Jse: e. Propose- i Use: f. Magisterial District(s) 8 64-A-1 F 1 .1 J Vacant Lot Valvoline Instant Oil Change Shawnee (Shenandoah Precinct) 7. Site Plan Type: a. Is this an original or new site plan? Yes II NoI � b. Is this a revised site plan? Yes No If yes provide all previous site plan numbers: I � ! c. Is this a minor site plan? Yes No If yes provide all previous site plan numbers: SP# 15-17 8. Zoning Information: a. Current Zoning: B3 - Industrial Transition District b. Was this property Rezoned? Yes El No C. If yes provide the rezoning number for this property: Rz# 02-17 d. Are there any proffers for this property? Yes✓ No e. Has a MDP been approved for this property? Yes No ✓ f. If yes provide the MDP number for this property: 9. Adjoining property zoning and use: USE North IHOP East Front Royal Pike/Costco South ARS Winchester West Cracker Barrel ZONING B2 - General Business District B2 - General Business District B2 - General Business District B2 - General Business District I Lave read the material included in this package and understand'what is required by the Frederick County Planning D€spartment. I also understand that all required material will be complete prior to the submission of my site plan. Signature: ��4 Name (Printed): Edward Brouch Date: 29 Aug 2019 9