Loading...
HomeMy WebLinkAbout33-19 ApplicationSITE PLAN APPLICATION (�, Office Use Oily - Date Apptisat on Received: a7 I '7 Application #: Fees :-zeceived: X00 O � ' Receipt #: 01�a S10--1 �n nAl 1. Project Title: Miller's Supplies At Work 2 3 rd Project Description: Proposed existing fire hydrant relocation and the addition of more pavement along the western drive lane to facilitate truck movements leaving the existing loading dock. Location of Property: Lot 5 Commonwealth Business Center, Frederick County (Street address)161 Commonwealth Court, Winchester, VA 22602 Applicant/Designer: Name: Greenway Engineering Primary point of Contact: Trenton Caudill Address: 151 Windy Hill Lane Winchester, VA 22602 Telephone: 540-662-4185 email: tcaudill@greenwayeng.com 5. Property Owner (if different than above): Name: Winchester Real Estate, LLC Telephone: 703-966-4368 Address: PO Box 1173 Newington, VA 22122 6. Property Information: a. Property Identification Number: b. Total acreage of the parcel to be developed: C. Total disturbed area of the parcel: d. Present Use: C. Proposed Use: f. Magisterial District(s) 8 75 -A -91E 1.218 Acres 0.17 Acres Office / Warehouse Complex Office / Warehouse Complex Back Creek 7. Site Plan Type: a. Is this an original or new site plan? Yes II No 2 b. Is this a revised site plan? Yes o No 71�'' If yes provide all previous site plan numbers: C. Is this a minor site plan? Yes vl' No LL If yes provide all previous site plan numbers: sP# 57-99, 5P#13-18 8. Zoning Information: a. Current Zoning: 82 b. Was this property Rezoned? Yes -7 No 1__L_ C. If yes provide the rezoning number for this property: #09-16 d. Are there any proffers for this property? Yes No e. Has a MDP been approved for this property? Yes19 No f. If yes provide the MDP number for this property: 9. Adjoining property zoning and use: USE ZONING North Industrial M2/132 East Commercial B3 South Commercial B3 West Vacant B3 I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: Name (Printed): T' enton Caudill. Date: 08/23/2019 9