TO: Comprehensive Plans and Programs Committee (CPPC)
FROM: Candice E. Perkins, AICP, CZA, Assistant Director
RE: August 12, 2019 Meeting
DATE: August 1, 2019
The Frederick County Comprehensive Plans and Programs Committee (CPPC) will be meeting on
Monday, August 12, 2019 at 7:00 p.m. in the first-floor conference room (purple room) of the
County Administration Building, 107 North Kent Street, Winchester, Virginia.
The CPPC will discuss the following agenda items:
AGENDA
1. Comprehensive Plan Amendment (CPPA) Request for 2019:
A. CPPA #02-19 – Woodside Business Park – Woodside Road – Clearbrook
2. Other
Access to this building is limited during the evening hours. Therefore, it will be necessary to enter
the building through the rear door of the four-story wing. Committee members and interested
citizens are encouraged to park in the County parking lot located behind the County Office
Building or in the joint Judicial Center parking lot and follow the sidewalk to the back door of the
four-story wing.
CEP/pd
Attachments
MEMORANDUM
Item 1
2019 Comprehensive Plan Amendment (CPPA)
At the CPPC’s July 2019 meeting, Comprehensive Plan Amendment (CPPA) #02-19 was discussed.
This item was continued to the August 2019 meeting. This application proposes the following:
CPPA #02-19, for Woodside Business Park – Sewer and Water Service Area (SWSA)
Inclusion Request and land use designation change; Parcels 34-A-129E, 34-A-129I and 34-
A-129G. This is a request to expand the boundary of the Sewer and Water Se rvice Area
(SWSA) to include 181.56 acres of land. The request also seeks to change the land use
designation from warehousing as show in the Northeast Land Use Plan to industrial; t he
properties are currently zoned RA (Rural Areas). The properties are located on the
northeastern side of Woodside Road, the site also has frontage on Grace Church Road, in
the Stonewall Magisterial District.
Committee Discussion:
The Committee inquired if the County would be responsible to provide water and sewer service to
a property if it was included in the SWSA knowing that lines were not available to the property at
that time. What would happen if the County approved the SWSA expansion and then Frederick
Water stated that they cannot serve it? Staff stated that the SWSA is outlined in the 2035
Comprehensive Plan and it is the policy that while properties must be in the SWSA to have access
to public water and sewer, it does not mean that lines must be extended at the County’s expense
to serve properties within the line. The Sewer and Water Service Area (SWSA) designates the limit
of where public sewer and water could be extended. It would be the responsibility of the Applicant
to extend service to a site if they chose to rezone prior to lines being extended by Frederick Water.
The Committee further questioned the timing for the request, as Frederick Water cannot serve the
property. The Committee requested confirmation from the County Attorney regarding the liability
to the County if the SWSA was expanded knowing service was not available.
The CPPC then deferred action on the CPPA until the August meeting.
Staff Comments for the August CPPC Meeting:
The Sewer and Water Service Area (SWSA), as stated in the 2035 Comprehensive Plan, designates
the limit of where public sewer and water could be extended. County policy states that properties
must be within the limits of the SWSA to have access to public water and sewer. It should be noted
that being within the limits of the SWSA does not guarantee that utilities will be readily available to
connect to – it only means that if available one can connect if there is capacity.
The UDA and SWSA provide a clear boundary between the Urban Areas and the Rural Areas. Using
the UDA and SWSA as urban growth boundaries, Frederick County seeks to focus growth in
strategic areas where community facilities and pu blic services are more readily available. It is
expected that the land uses within the UDA and SWSA will be served by public water and sewer. In
no way does being within the SWSA bind the County to serve a property or extend public utilities to
a site. The County Attorney was consulted on this issue as requested by the CPPC, he concurred
that being within the SWSA does not obligate the County to provide utilities to a site.
Conclusions:
The Board of Supervisors will hold a joint work session with the Planning Commission to consider
the request in September. The CPPC will be notified when the date and time have been
determined. The purpose of the work session will be to review the CPPA request and determine if
it merits additional study and formal action through the public hearing process. In keeping with the
County’s established protocol for long-range policy planning, if the request is selected to advance
through the process, it will be referred to the CPPC for further consideration.
Attached you will find a map showing the location of the proposal, a map showing the location of
the proposal in the context of the Northeast Land Use Plan, a copy of the application and
comments from Frederick Water.
315 Tasker Road PH (540) 868‐1061 Eric R. Lawrence
Stephens City, Virginia 22655 Fax (540) 868‐1429 Executive Director
www.FrederickWater.com
Water At Your Service
MEMORANDUM
TO: Candice Perkins, Assistant Director, Frederick County Planning Department
FROM: Eric R. Lawrence, Executive Director
SUBJECT: 2019 Comprehensive Policy Plan Amendment Review – Woodside Business Park
DATE: July 2, 2019
Thank you for the opportunity to provide preliminary comments on the Comprehensive Policy
Plan Amendment applications received for the 2019 application period. We understand that
Frederick Water’s preliminary comments will be shared with the Board of Supervisors and
Planning Commission during their CPPA review joint work session later this summer. We
welcome the opportunity to participate in a more thorough review of the application once the
Board decides if the application warrants further evaluation.
Our preliminary comment:
Woodside Business Park SWSA Expansion and Industrial Land Use Designation Request;
Parcels 34‐A‐129E, 34‐A‐129I, and 34‐A‐129G.
These properties are located in the Northeast Land Use Plan (NELUP), east of Woodside Road.
Frederick Water does presently provide water to the Amazon distribution facility, located west
of the application’s parcels; no water or sewer lines enter the subject parcels.
The current sewer infrastructure serving the NELUP was funded through 2001‐era Grant‐in‐Aid
agreements by a number of property owners who sought access to public and sewer. Sewer
capacity is limited as the sewer improvements constructed with the Grant‐in‐Aid effort were
Page 2
Comment on the 2019 Comprehensive Policy Plan Amendment Application for Woodside Business Park
Candice Perkins
July 2, 2019
sized for those property owners, and the land uses within the SWSA depicted in the 2000
NELUP.
Frederick Water’s 2017 Sanitary Sewer Master Plan (2017 SSMP) utilized the County’s 2035
Comprehensive Policy Plan (2035 CPP) as guidance and foundation for its sewer improvement
recommendations. The 2017 SSMP evaluated the 2035 CPP future land uses and the SWSA, and
then projected the necessary sewer system improvements to meet the projected demands.
The 2017 SSMP recommended a number of improvements to meet the projected demands
generated by the 2035 CPP, including a new wastewater treatment plant. Any additional future
land uses and SWSA expansions beyond those in the 2035 CPP would not be captured by the
2017 SSMP, and therefore may not be positioned for adequate sanitary sewer service in the
future.
The Woodside Business Park CPPA was discussed by the Frederick Water Planning Committee
on July 1, 2019. The Planning Committee recognized the recommendations from the 2017
SSMP and the projected costs in excess of $40 million. The Planning Committee recommended
that property owners who benefit from a SWSA expansion and new land use designations be
accountable for the improvements so that the existing customer base not be burdened with
improvement costs that benefit new development. Ultimately, the Planning Committee voiced
that the existing sewer system and improvements recommended in the 2017 Sanitary Sewer
Master Plan would not be adequate to meet the demands of an expanded SWSA and additional
Industrial land use designation.
Frederick Water does not support further study of the application without consideration of a
much larger study area that would collectively constrict the SWSA, and contribute to
infrastructure improvements that convey the study area sewage directly to the OWRF or to a
new WWTP. A study of opportunities, and implementation of results, for expansion of
wastewater treatment facilities would also be necessary.
Turkey
Run
Coyle
R
u
n
Turkey R
u
n
Turk
e
y
R
u
n
BERKELEY COUNTY
WEST VIRGINIA
34 A 129E
34 A 129I
34 A 129G
1435BRUCETOWN RD
1435BRUCETOWN RD
1673BRUCETOWN RD
340GRACECHURCH RD 570GRACECHURCH RD
120JOHN DEERE CT
643GRACECHURCH RD 663GRACECHURCH RD
493SIR JOHNS RD
2490WOODSIDE RD
603GRACECHURCH RD
471GRACECHURCH RD
167ABRILS RUN LN
571GRACECHURCH RD
527GRACECHURCH RD
181ABRILSRUN LN
569SIRJOHNS RD
445GRACECHURCH RD
311ABRILSRUN LN
2619WOODSIDE RD
2619WOODSIDE RD
461GRACECHURCH RD
217GRACECHURCH RD
305ABRILSRUN LN
271BRANSONSPRING RD
4170MARTINSBURGPIKE
4230MARTINSBURGPIKE
2066GILLIE LN
280WOODBINE RD 2973WOODSIDE RD
3026WOODSIDE RD
276WOODBINE RD 3150WOODSIDE RD4392MARTINSBURGPIKE
4420MARTINSBURGPIKE
4442MARTINSBURGPIKE
331WOODBINE RD
4470MARTINSBURGPIKE
3121WOODSIDE RD 3220WOODSIDE RD
BRANS
O
NSPRING
R
D
WOOD
B
I
N
E
R
D
WOO
D
S
I
D
E
R
D
GRACE
C
H
U
R
C
H
R
D
Application
Urban Development Area
Sewer and Water Service Area
ParcelsEastern Road Plan
Major Arterial
Improved Major Arterial
Minor Arterial
Improved Minor Arterial
Major Collector
Improved Major Collector
Minor Collector
Improved Minor Collector
Ramp
Roundabout
Trails
Long Range Land Use
Business
Mixed Use Industrial/Office
Industrial
Warehouse
Heavy Industrial
Extractive Mining
Rural Community Center
Sensitive Natural Areas µ
Frederick County Planning & Development107 N Kent StWinchester, VA 22601540 - 665 - 5651Map Created: June 20, 2019
§¨¦81
§¨¦81 CHR
I
S
T
O
REY
D
R
JEFFS
WAY
WOODB
I
N
E
R
D
GRAC
E
C
H
U
R
C
H
R
D
GILL
I
E
LN
LO
R
E
T
T
O
D
R
SIR JO
H
N
S
R
D
CED
A
RHILL
R
D
ZA
C
H
A
R
Y
AN
N
L
N
WOO
D
S
I
D
E
R
D
BRANSONSPRING RD
SHADYCREEK
R
D
MA
R
T
I
N
S
B
U
R
G
P
I
K
E
Clear Brook
Clear Brook
0 1,000 2,000500 Feet
BERKELEY
COUNTY
CPPA # 02 - 19: Woodside Business ParkPINs: 34 - A - 129E, 34 - A - 129G, 34 - A - 129IDraft NELUP and SWSA AmendmentsLong Range Land Use Map
CPPA #02-19
CPPA #02-19
CPPA #02-19
Turkey
Run
Coyle
R
u
n
Turkey R
u
n
Tur
k
e
y
R
u
n
BERKELEY
COUNTY
WEST VIRGINIA
34 A 129E
34 A 129I
34 A 129G
1435BRUCETOWN RD
1435BRUCETOWN RD
1673BRUCETOWN RD 1761BRUCETOWN RD
570GRACECHURCH RD
111JOHNDEERE CT
120JOHNDEERE CT
663GRACECHURCH RD
493SIR JOHNS RD
340GRACECHURCH RD
2490WOODSIDE RD
603GRACECHURCH RD
471GRACECHURCH RD 527GRACECHURCH RD
569SIRJOHNS RD
167ABRILS RUN LN
571GRACECHURCH RD 181ABRILSRUN LN
445GRACECHURCH RD
311ABRILSRUN LN
2619WOODSIDE RD
2619WOODSIDE RD
461GRACECHURCH RD
217GRACECHURCH RD
305ABRILSRUN LN
271BRANSONSPRING RD
4170MARTINSBURGPIKE
4230MARTINSBURGPIKE
2066GILLIE LN
280WOODBINE RD 2973WOODSIDE RD
3026WOODSIDE RD
276WOODBINE RD 3150WOODSIDE RD
4420MARTINSBURGPIKE
4442MARTINSBURGPIKE
331WOODBINE RD 3121WOODSIDE RD
WOODB
I
N
E
R
D
BRANSONSPRING R
D WOO
D
S
I
D
E
R
D
GRACE
C
H
U
R
C
H
R
D
Application
Urban Development Area
Sewer and Water Service Area
ParcelsEastern Road Plan
Major Arterial
Improved Major Arterial
Minor Arterial
Improved Minor Arterial
Major Collector
Improved Major Collector
Minor Collector
Improved Minor Collector
Ramp
Roundabout
Trails
Zoning
EM (Extractive Manufacturing District)
M1 (Light Industrial District)
M2 (Industrial General District)µ
Frederick County Planning & Development107 N Kent StWinchester, VA 22601540 - 665 - 5651Map Created: June 20, 2019
§¨¦81
§¨¦81 CHR
I
S
T
O
REY
D
R
JEFFS
WAY
WOODB
I
N
E
R
D
GRAC
E
C
H
U
R
C
H
R
D
GILL
I
E
LN
LO
R
E
T
T
O
D
R
SIR JO
H
N
S
R
D
CED
A
RHILL
R
D
ZA
C
H
A
R
Y
AN
N
L
N
WOO
D
S
I
D
E
R
D
BRANSONSPRING RD
SHADYCREEK
R
D
MA
R
T
I
N
S
B
U
R
G
P
I
K
E
Clear Brook
Clear Brook
0 1,000 2,000500 Feet
BERKELEY
COUNTY
CPPA # 02 - 19: Woodside Business ParkPINs: 34 - A - 129E, 34 - A - 129G, 34 - A - 129IDraft NELUP and SWSA AmendmentsZoning Map
CPPA #02-19
CPPA #02-19
CPPA #02-19
COMPREHENSIVE POLICY PLAN AMENDMENT
INITIATION REQUEST FORM
(Please type all information. The application will not be deemed complete unless all
items listed below have been submitted.)
A. Owner(s) Information:
1. Name: Woodside Land Company, LLC; Light, H.G. & Son, Inc.; and Light, John
H, Trustee
2. Project Name: Woodside Business Park
3. Mailing Address: 2873 Woodside Road, Clear Brook, VA 22624
4. Telephone Number: 540.539.3834
Authorized Agent Information:
1. Name: Tim Stowe, Stowe Engineering, PLC
2. Project Name: Woodside Business Park
3. Mailing Address: 103 Heath Court
Winchester, VA 22602
4. Telephone Number: 540.686.7373
B. Legal interest in the property affected or reason for the request:
The owner would like to change the future land use from warehousing to Industrial and
would also like to have the property included in the Sewer and Water Service Area.
C. Proposed Comprehensive Policy Plan amendment - please provide the following information.
1. FOR A MAP AMENDMENT
a. PIN(s): 34 A 129E, 34 A 129I, & 34 A 129G
Magisterial District: Stonewall
b. Parcel size (approximate acres): 181.56
c. Plat of area proposed for CPPA amendment, including metes and bounds description.
See tab labeled “PLAT”
d. Existing Comprehensive Plan land use classification(s):
Warehousing and a small Sensitive Natural Area are the existing land uses in the
2035 Comprehensive Plan.
e. Proposed Comprehensive Plan land use classification(s):
The proposed Comprehensive Plan land use designation is industrial. The Sensitive
Natural Area will remain unchanged.
f. Existing zoning and land use of the subject parcel:
The existing zoning is Rural Agricultural.
g. What use/zoning will be requested if the amendment is approved?
M-1 Light Industrial.
h. Describe, using text and maps as necessary, the existing zoning,
Comprehensive Policy Plan designations, and/or approved uses and
densities along with other characteristics of properties that are within:
• 1/4 mile from the parcel(s) perimeter if the parcel is less than 20 acres in size;
• ½ mile if 21 - 100 acres in size; or
• One mile if more than 100 acres in size.
Note: Colored maps cannot be duplicated in the Planning Department.
The maps on the following pages show existing conditions, future land use designations, and
zoning as of May 2019 within 1 mile of the Woodside Business Park. The 2035
Comprehensive Plan designates the Route 11 North corridor for commercial and industrial
growth. The following table provides a summary of the surrounding land uses and zoning.
Direction Land Use Zoning
South Extractive Mining & Heavy
Industrial
Extractive Mining
East Agricultural Rural Agricultural
North Industrial, Agricultural Manufacturing, Rural
Agricultural
West Business and Industrial M1, B2, B3, and RA
The 2035 Comprehensive Plan strategies and goals are being accomplished with the
growth of commercial and industrial land use in the Route 11 North corridor.
Establishing additional land for industrial use will further advance these goals and
strategies to attract quality industries to Frederick County that help offset the cost of
services to residential development.
Farmland - According to the USDA Web Soil Survey, 20% of the area encompassed in
this proposed amendment is Prime Farmland. Although the land is used for farming the
poor draining soils in this area are not ideal for farming. In Frederick County, the
Prime Farmlands are generally west of I-81 where the soils support healthy farming.
i. The name, mailing address, and parcel number of all property owners within 200
ft. of the subject parcel(s), with Adjacent Property Owners Affidavit (page 8).
The mailing list is on the following page.
2. FOR A TEXT AMENDMENT
a. Purpose and intent of the amendment.
To recognize and implement critically needed transportation improvements
along the Route 11 North corridor. Also, to obtain the participation of proposed
industrial facilities with the expansion of wastewater capacity in the area.
b. Cite Plan chapter, goal, policy and/or action strategy text that is proposed to
be amended.
Chapter V Transportation, Planning Assumptions, Route 11 North Corridor.
Chapter VI Public Facilities, Frederick Water – Focus for the Future
c. Proposed new or revised text.
Chapter V – Transportation. PLANNING ASSUMPTIONS
Route 11 North Amendment (pg. 44)
Existing Text - “Modeling of the expected development along the Route 11 North
corridor indicates a need for widening and access management to the entire corridor
with the corridor to become six lanes to Cedar Hill Road and four lanes to the West
Virginia State line. The most immediate need is to widen from Route 37 to Old
Charlestown Road.”
Proposed additional text – Until recent years the area from Hopewell Road and
Brucetown Road to Rest Church Road has been comprised mainly of rural residential,
and agricultural land uses. In recent years large distribution facilities including
Amazon and McKesson have been developed along the corridor, and more are
expected. Akin to changes in land use are changes in traffic volume and composition.
To fully evaluate these changes, a detailed traffic study should accompany any future
industrial rezoning proposal and should identify transportation deficiencies and
remedies to be provided by the proposed development. Project timing may necessitate
the improvement of local roads before the Route 11 mainline improvements. The cost
for improvements should be spread equitably among landowners along the Route 11
corridor, which will benefit from the improvements in connection with future rezonings.
Funding from VDOT should be pursued to leverage private investments in
transportation improvements.
Chapter VI – Public Facilities. FREDERICK WATER
Focus for the Future (pg. 75)
Insert after the last paragraph – In the Route 11 North Corridor, there is limited sewer
capacity. Future industrial rezoning proposals should recognize the sewer capacity
constraint and participate in the construction of wastewater infrastructure necessary
to serve the Route 11 North Corridor area.
Note: Please attach and specify text changes with additions underlined and
deletions crossed through.
d. Demonstrate how the proposal furthers the goals, policies/objectives, and
action strategies set forth in the Comprehensive Policy Plan chapter(s)
relative to the amendment request and why proposed revisions to said goals,
policies, and action strategies are appropriate.
(reference is made to the corresponding section of the 2035 Comprehensive Plan)
Comprehensive Plan Section IV. Business Development, Introduction, Focus for the
Future
To encourage commercial and industrial uses to Frederick County has designated
certain areas solely for these types of uses such as the Route 11 North corridor,
Kernstown area, Round Hill, the Route 277 Triangle area, and in the vicinity of the
Winchester Regional Airport. Future planning efforts will continue to identify
opportunities to align land uses to promote business development.
Policy Appropriateness - In response to this policy, the proposed Comprehensive Plan
amendment will establish an additional 181.56 acre of land for industrial development,
thereby aligning land use with business development opportunities.
Comprehensive Plan Section IV. Business Development. Introduction, Community
Benefits
Adequate amounts of land must be planned for and designated for both Commercial
and Industrial uses and residential developments. Striking a balance of these land uses
and ensuring that the tax rates remain low and that services are available to support
these initiatives will help make Frederick County an economic engine within the
region.
Policy Appropriateness - In response to this policy, the Light Property will be
designated as industrial land. Its development as such will enable the county to better
strike the desired balance between all land uses.
GOAL: Develop a Strategy that Promotes the Expansion of Desirable Business, and
Industrial Land Uses.
STRATEGIES:
Frederick County Economic Development Authority (EDA) targeted industries: (as of
February 2016):
• Light Industrial
• Pharmaceutical & Medicine Manufacturing, Scientific Research & Development,
and Lab Services
• Business Services
• Retail
The proposed land use and SWSA change will further the goals, policies, objectives,
and strategies outlined in the Comprehensive Plan by opening lands for commercial
and industrial uses. The proposed amendment is appropriate because it incorporates
large tracts of land where planning for inter-parcel movement of goods and services,
multi-modal movement of raw and finished products, and regional water and sewer
service become practical and efficient. Additionally, the presence of natural gas lines
and right of ways, an electric sub-station, and fiber optic infrastructure will provide the
utility services necessary for industrial development.
Comprehensive Plan Section IV. Business Development, Office and Industrial,
Community Benefits
The continuation of a low residential tax rate is a direct result of the expansion of the
commercial and industrial tax. Currently, commercial and industrial tax revenue
accounts for approximately 13% of the County’s tax base. The County’s goal indicates
that this should be around 25% to ensure a balanced fiscal environment. Tax revenue
derived from the average single-family residence is approximately fifty percent of the
cost of service provided for that same residence. The County’s fiscal survival is
dependent upon recruiting office and industrial occupants which offset those
residential costs.
The proposed land use and SWSA changes designate an additional 181.56 acres of
land for industrial use, strengthening the county’s financial position and offsetting
residential costs.
GOAL: Identify and Recognize Areas in the County Most Strategically Suited for
Office and Industrial Development
STRATEGIES:
• Complete review of area land use plans to ensure sufficient acreage is designated for
office and industrial uses.
• All infrastructure, such as voice and data fiber, electric, water, wastewater, and
natural gas, should be extended to areas identified for office and industrial uses and
non-rural residential areas.
• The rezoning process should be examined and streamlined as appropriate in order to
encourage landowners of properties identified in Area Plans (see Appendix I) to
proceed with rezoning.
The Light Property meets this goal as it is well suited for industrial development. Its
proximity to I-81 and the Winchester & Western railroad encourage multi-modal
transportation solutions, and its proximity to similar uses fosters an atmosphere of
success. The property is a short distance from the Anderson Water Treatment plant,
which supplies quality water at high pressures to the area. Wastewater will be pumped
to the Frederick Water system.
Comprehensive Plan Section VII – Natural Resources, Water Supply and Water
Quality
Water supply is critical to both the natural and built environment, and viable sources
are essential for future economic development in the County….with the exception of
water purchased from the City of Winchester, which comes from the North Fork of the
Shenandoah River, the County is entirely dependent on groundwater sources.
Frederick Water’s Opequon Water Supply Plan (OWSP) initiative, is underway and is
designed to ensure a safe, reliable, and sustainable supply of water to help meet the
community’s projected drinking water needs. By 2035, Frederick Water water
customers may require up to 12 million gallons of drinking water every day, more than
doubling from today’s average of 5.6 million gallons per day. Frederick Water is
prepared to meet this demand through the OWSP. This system expansion will supply
water to the Woodside Business Park area.
The limited capacity of the wastewater transport piping in the Route 11 North corridor
restricts full development of the region. Frederick Water is taking steps to expand
capacity and has developed a long-range wastewater plan that accounts for the
development of the Light property. By adopting this amendment, the Frederick Water
and Comprehensive Plans are aligned in planning for future growth in this area.
Demonstrate how the proposal is internally consistent with other Comprehensive
Policy Plan components that are not the subject of the amendment.
The proposed land use will strengthen the county's financial position, thereby enabling
the county to offset better the costs associated with residential development. This
amendment dovetails with the intent and direction of the 2035 Comprehensive Plan's
Route 11 North recommendations and those for supporting existing industries.
e. What level of service impacts, if any, are associated with the request?
The level of service impact associated with commercial and industrial development is
transportation. The proposed roadway improvements will move traffic to Route 11
quickly and efficiently via the proposed north-south major collector road through the
property. The long-range timing of the Light Property development provides an
excellent planning horizon for VDOT and plan together.
The Winchester & Western railroad is near to the property and can provide rail service
to the industrial businesses locating here.
3. FOR ALL AMENDMENTS
a. Justification of the proposed Comprehensive Policy Plan amendment (provide
attachments if necessary). Describe why the change to the Comprehensive
Policy Plan is being proposed.
This amendment is proposed because the owner sees an opportunity to create and
expand businesses while implementing critical land use and financial goals of the
Comprehensive Plan. He desires to see this area develop into a positive economic
generator for the County. The proximity of the proposed industrial area to the I-81
corridor and the Winchester & Western rail line facilitates the movements of raw
materials and finished goods, and its location next to the new Amazon fulfillment center
provides additional opportunities to attract commercial and industrial entities to the
county.
b. How would the resultant changes impact or benefit Frederick County. Consider,
for example, transportation, economic development, and public facilities.
Positive Impact #1 - The economic benefits to Frederick County through real estate,
business property, and Machinery & Tools revenue without the costs of schools and
other services typically associated with residential development.
Positive Impact #2 - The developer, not the citizens, will bear the development costs
of this land. The proximity of the site to I-81 and the Winchester and Western
railroad makes the location highly attractive to potential industrial users.
Positive Impact #3 - The size of the Light property makes it appropriate for industries
requiring a large site.
Negative Impact #1 - Commercial and industrial land uses create traffic, and there
may be additional traffic in the Route 11 North corridor and its intersections.
Negative Impact #2 - When the development of the site occurs, local roads will be
impacted and will need to be improved or replaced. The improvements required must
be identified and addressed during the rezoning.
Other information may be required by the Director of Planning, the Planning
Commission, or Board of County Supervisors during the review of the initiation request.
The applicant will be notified, in writing, if additional information is required.