Loading...
HomeMy WebLinkAbout01-19 ApplicationSUBDIVISION APPLICATION FREDERICK COUNTY, VIRGINIA / � - Office Use Only - Date: l_G (P Application #: 0 ` l q MDP: des If no, has the MDP requirement been waived by the Planning Director? _yes no If the MDP has been waived, fill in the following public meeting dates for the final plats: PC Meeting Date BOS Meeting Date 1. Applicant: Name: Greenway Engineering, Inc. no Telephone: 540-662-4185 Address: 151 Windy Hill Lane Winchester, VA 22602 Email Address: 2. Property Owner (if different than above) Name: Brookfield Stephenson Village, LLC Telephone: 571-581-4791 Address: 3201 Jermantown Road, Suite 150 Fairfax, VA 22030 3. Please list names of all owners, principals, and/or majority stockholders: James T. Devine - VP 4_ Contact person if other than above Name: Kurt Pennington, Greenway Engineering, Inc. 5. Name of Proposed Subdivision: 6 7 Telephone: 540-662-4185 Snowden Bridge, Sections 15 & 16 Subdivision Number of Lots: 69 - Single (Detached), 54 - Townhouse/Multiplex Total Acreage: 33.05 Acres 8. Property Location: off Old Charles Town Road (VA Route 761) -turn onto Snowden Bridge Boulevard (Give State Route # and name, distance and direction from intersection) 0 9. Magisterial District: Stonewall 10. Property Identification Number (P.I.N.): 44 - ((AA)) - 31 B, 44 - ((A)) - 292A, 44 ((A)) - 293 (Parent Tract) 11. Property zoning and present use: R4 Residental - Vacant 12. Adjoining property zoning and use: USE ZONING North Section 7 R4 East vVacant R4 South vacant R4 West vacant (sec. 13&14) R4 Has a Master Development Plan been submitted for this project? X Yes If yes, has the final MDP been approved by the Board of Supervisors? X Yes What was the Master Development Plan title? Snowden Bridge Revised MDP - Rev #6 Does the plat contain any changes from the approved MDP? Yes X No If yes, specify what changes: No 18. Minimum Lot Size (smallest lot): SF - 6720 SF, TH - 1900 SF, TH - 1900 SF, MP - 12,000 SF 19. Number and types of housing units in this development: Sec. 15 - 69 SF Sec. 16 - 42 TH, 12 - MP No I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: Date: 10