a) One CD (containing all of the above noted sheets) shall be in PDF formai.:Each sheet shall be in its
own file and be in landscape orientation. Each file shall be titled with the project name and appropriate
sheet number.
b) One CD shall be in DWG format; (1) in iViociel Space, (2) instate plane coordinate. system NAD 83, (3)
compatible with AutoCAD 2006.
c) Each of the two CDs shall be labeled with its format and pre�ject .name. and placed in its own paper CD
envelope.
EASEMENTS
p' Y/N
-,
f -?/ N
0
0
Date:
A copy of the recorder{ onsite FW easement(s) is/are. required.
A copy of therecordedoffsite FW easement(s) is/are requircd.
The easement document shall contain a plat and both shall be signed by the Frederick `Fater.
The Frederick Nater requires specific language in its deed of easement.
Visit our website w ww.frederickwaic-r.corn to obtain a copy of' the form.
A copy of the recorded deed(s) of easement shall be received before service will be authorized.
This project also requires DEQ - Valley Region Office approval.
This project also requires VDH - Lexington Field Office approval.
This project also requires VDH - Lexington Field Office - Project Summary Report. BY DATE FOR
DRAWINGS ABOVE, see VDH website for form
Y / N This project has a sewer pump station that FW will own. Title to the pump station site shall be granted
to the Frederick Nater in feesimple absolute. Also, (1) a copy of DEQ's Certificate to Construct. (2) a
copy of DEQ's Certificate to Operate, and (3) two copies of the FW approved O & M manual are
required. These do. uments must be received before service will be authorized. (4) Work cannot
commence that would connect to FW facilities or require MV inspections until the contract is returned
to this office1, A. "I
t f 'err : p.' r} f
#s,ari S-.. Wiley - Eogf'_ ser lt> sista.*ti �..
e G
b.
tJi i,t �3�Srr
REVIEW STATUS
attention
fe{
review number
correct &- resubmit approved as noted number of iterns to be corrected
-r`approved
�.
DRAWINGS���
send the by
1. print of sheets
?. two CDs. each
disc shall contain the following plan sheets
4
a) One CD (containing all of the above noted sheets) shall be in PDF formai.:Each sheet shall be in its
own file and be in landscape orientation. Each file shall be titled with the project name and appropriate
sheet number.
b) One CD shall be in DWG format; (1) in iViociel Space, (2) instate plane coordinate. system NAD 83, (3)
compatible with AutoCAD 2006.
c) Each of the two CDs shall be labeled with its format and pre�ject .name. and placed in its own paper CD
envelope.
EASEMENTS
p' Y/N
-,
f -?/ N
0
0
Date:
A copy of the recorder{ onsite FW easement(s) is/are. required.
A copy of therecordedoffsite FW easement(s) is/are requircd.
The easement document shall contain a plat and both shall be signed by the Frederick `Fater.
The Frederick Nater requires specific language in its deed of easement.
Visit our website w ww.frederickwaic-r.corn to obtain a copy of' the form.
A copy of the recorded deed(s) of easement shall be received before service will be authorized.
This project also requires DEQ - Valley Region Office approval.
This project also requires VDH - Lexington Field Office approval.
This project also requires VDH - Lexington Field Office - Project Summary Report. BY DATE FOR
DRAWINGS ABOVE, see VDH website for form
Y / N This project has a sewer pump station that FW will own. Title to the pump station site shall be granted
to the Frederick Nater in feesimple absolute. Also, (1) a copy of DEQ's Certificate to Construct. (2) a
copy of DEQ's Certificate to Operate, and (3) two copies of the FW approved O & M manual are
required. These do. uments must be received before service will be authorized. (4) Work cannot
commence that would connect to FW facilities or require MV inspections until the contract is returned
to this office1, A. "I
t f 'err : p.' r} f
#s,ari S-.. Wiley - Eogf'_ ser lt> sista.*ti �..
Idl
VS I VOR S(TL PLAN co.'%I-%j I-
I-rederick
4N!'0a11.1 Comment
Milli! dv!ivur
P' "I. Buil
Drivl-
V'irginia 2-2602
1-2601-
540) 665-63 50
,
I(Eflflicanlit:I,lutr;,h,llt LO f,1r11pIL![o Ais
lx
1-,:, I.AV Plu.1, o orl hwll !,-, L!LCl-jp rEu
.� L)
in -
VA
Ifft'l I tildl.,o po r
"AW: ,RoUf� 8,631 in Stmi lnduW-
oll Flow
cn 15
EDE M VIRE- MARMAL I- S E f) NL Y.
C19 1 4 5
Onl(` Apprk)
P1
Frealerick Count,,
Department of Fire Wid Rescue
Ofjice of the Firellarshal
MISO cpl'ercuome Winn b", I, r. I
(549) 665-63-50 Fax. (540) 6,7`8-4739
Plan le, & Comments
Date Recehec!
512912019
Name B & B 0mrs, LLC
A d, dr e s s Tyson DR
Applicanr Win -to & Numbf,-
RE#
Permit NU1Tf1A.!F
Emergency VOw-1iu Axccss:
Hydrant Lo-C-11--ttion.
Siamese
Plan Ap�.'r"vi'4!
SjAe Plan 05-293-19
Winchester
Ske Plan 05-29-19
Greywolfo, Inc 540-667-2001
Coamir-fits
Area hi lighted in oran.ge shall have a No Parking Fire Lane sign Inutalied
Area hi lighted In yellow shall I>e stripped in yellow
Signature-.
Revieviod By: Kenneth Scott, Jr.
f�i
7i
"'�
Date ROVieWP(l
61T/2019
VA 22603
Ade bate Inaderjuato
NIA
Ade ate Inaccriule
WA
Approve
Coamir-fits
Area hi lighted in oran.ge shall have a No Parking Fire Lane sign Inutalied
Area hi lighted In yellow shall I>e stripped in yellow
Signature-.
Revieviod By: Kenneth Scott, Jr.
f�i
7i
"'�
Date ROVieWP(l
61T/2019
VA 22603
Subject: B & B Omps - VDOT Comments to Site Plan
Date: 7/11/2019 7:53:25 AM Eastern Standard Time
From: Rhonda. Funkhouser(it)vdot.virginia.gov
To: greywolfeinc@aol.com
Cc: mcheran@fcva.us, tklein@feva.us, matthew.smith@vdot.virginia.gov,
Lloyd.Ingram@vdot.virgima.gov
DEPARTMENT OF TRANSPORTATION
Edinburg Land Development
14031 Old Valley Pike
Edinburg, VA 22824
Mr. Oates,
A VDOT review has been conducted for the B & B Omps site plan dated June 24, 2019. Based on the review of
the drawings, all VDOT requirements are addressed and the site plan is approved by our office. Please ensure
that all applicable agencies have the most recent set of approved drawings. We offer the following general
comments:
0 Our review and comments are general in nature. Should details be overlooked during plan review or
conditions in the field exist such that additional measures are warranted, such measures shall be
completed to the satisfaction of the department.
• Materials used and methods of construction shall adhere to the current observed VDOT Road and
Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and Land
Use Permit Special Provisions.
• A preconstruction conference shall be held by the engineer and/or the developer with the
attendance of the contractor, various County agencies, utility companies, and VDOT prior to initiation of
work.
• All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe
or drainage easement.
• Any construction related changes to the approved plan must come through the design engineer to
VDOT for approval. Please allow a minimum of 5 business days for VDOT review.
• A Land Use Permit shall be obtained before any work is performed on the State's right-of-way. The
permit is issued by this office and may require application fees, the salary & expenses of a State
assigned inspector, and surety bond coverage.
If you have any questions or need fiirther information, do not hesitate to contact me.
Sincerely,
Lloyd A. Ingram I Land Development Engineer
Virginia Department of Transportation
Clarke, Frederick, Shenandoah & Warren Counties
14031 Old Valley Pike
Edinburg, VA 22824
voice: 540/984-5611
fax: 540/984-5607
e-mail: �H V r9r .
J my 11, 2019
Mr. Gary R. Oates, LS -B, PE
GreyWolfe, Inc.
1073 Redbud Road
Winchester, Virginia 22603
RE: Site Plan Comments — B&B Omps, LLC
Dear Mr. Oates:
"of FREDERICK
tv t tnt ant a'l'� a.bl:ic° Works
Upon review of the site plan dated May 1, 2019, we off the following comment:
Plan approved for 0.95 acres of disturbance. Please note that a VSMP permit will be
required should the disturbed acreage exceed one (1) acre."
We offer no additional comments and recommend approval of the subject plan.
Joseph W. Johnson, P.E.
Civil Engineer
JC W/kco
cc: Planning and Development
file
Sincerely,
v
Joe C. Wilder
Director of Public Works
107 North lent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000
5401665-:5643
RECEIVED
MAY 2 8 2019
Ff@dYffok County
REQUEST FOR SITE PLAN COMMENTS
Y"
r rMier ick Coun, —ty- I'vispectJOUIS
Department Comment
Mail to:
Frederick County Inspections Department
Attn: Building Official
107 North Kent Street
Winchester, Virginia 22601
Hand deliver to:
Frederick County Inspections Dept.
107 North Kent Street, 2nd Floor
Winchester, Virginia 22601
Phone: (540) 665-5650
I-* V-1 � I -d -mob
Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the Sitc.Plan with this sheet.
Applicant's Name: GreyWolfe, Inc. - Gary R. Qa1es,LS-B,PE Telephone: (540) 667-2001
Fmail Address: GreyWolfelnc@aol-com
Mailing Address: _1073 Redbud Road, Winchester, VA 22603
Name of development and description of the request:
B & B Omps, LLC
Location of Property:
End of Tyson Drive.(Route 863) in Stonewal Industrial Park
Comments:
-FREDERICK COUNTY INSPECTIONS DEPARTMENT USE ONLY -
Date Received Review Number 16 3 4 5 (circle one)
Date Reviewed __b/
Revision Required Date Approved 25 1 C1
Signature & Date: M"'t,
I'd
** Please Return Form to Applicant"
18
Buildings shall comply with The Virginia Uniform Statewide Building Code and Sections 311, S
Storage) and Section 304, B -Business of the International Building Code/2015. Other Code that
applies are the Virginia Mechanical Code for air change, the ICC ANSI Al 17.1-3-09 Accessible
and Usable Buildings and Facilities, 2015 Virginia Energy Code and 2015 International Fire
Code.
Building shall comply with height and area as allowed per T503 with the applicable increases.
Building shall comply with IBC/USBC 903.2.9 for sprinkler requirements.
Group S-1 fire areas used for the storage of commercial trucks where the f re area exceed 5000
sq_ft, as well as, S-1 fire areas in excess of 5,000K sq ft and used for commercial truck repair
garage shall be provided with an NEPA sprinkler system
Quantity of hazardous material quantities and limitations shall be as required/limited under
T307.1(1) to prevent the structure from falling into an H -Hazardous use group
Fire Barrier placed on the plans to reduce fire area.
Question to the location of the water oil separator.
At least one parking area is required to be a Van Accessible space as required in USBC Sec
1106. Accessible parking and unloading requires a minimum of 8' parking, and a minimum of
8' of'striped unloading area. Unloading area shall have a maximum 2% slope. Van accessible
signage is provided as required per USBC Sec 1106.8.
Accessible route to main entrance shall not exceed 5% (1:20) slope. At least 60% of all
entrances shall be accessible. Landings at doors shall not exceed 1:48 slope and thresholds shall
not exceed All required exits shall be accessible and meet the requirements of VBC Section
1007. Office occupants shall meet the common path of travel distance or a second exit will be
required.
Building shall comply with 2015 International Energy Code. All systems shall be included in the
evaluation of the building performance.
All structural plans submitted for permit application shall be sealed by a VA Design Professional.
Please note the requirements in Chapter 17 of the IBC for special inspections for this type of
structure. (so] 1, concrete, bolts, etc.)
6/25/19 no additional comments