Loading...
HomeMy WebLinkAbout22-19 CommentsFREDERU CK WATER SITEPLAN REV! J�` t1� '1 ext l'sl t , PO Box 1877. Winchester. VA 22604-8377 315 Tasker Road Stephens City. VA 22.655 Proiect Applicant k, JQ,/ 'y ;N) tj.— 540.'868.1061 v=oice 740.868.1429 tax .. ✓ � � �� . a) One CD (containing all of the above noted sheets) shall be in PDF formai.:Each sheet shall be in its own file and be in landscape orientation. Each file shall be titled with the project name and appropriate sheet number. b) One CD shall be in DWG format; (1) in iViociel Space, (2) instate plane coordinate. system NAD 83, (3) compatible with AutoCAD 2006. c) Each of the two CDs shall be labeled with its format and pre�ject .name. and placed in its own paper CD envelope. EASEMENTS p' Y/N -, f -?/ N 0 0 Date: A copy of the recorder{ onsite FW easement(s) is/are. required. A copy of therecordedoffsite FW easement(s) is/are requircd. The easement document shall contain a plat and both shall be signed by the Frederick `Fater. The Frederick Nater requires specific language in its deed of easement. Visit our website w ww.frederickwaic-r.corn to obtain a copy of' the form. A copy of the recorded deed(s) of easement shall be received before service will be authorized. This project also requires DEQ - Valley Region Office approval. This project also requires VDH - Lexington Field Office approval. This project also requires VDH - Lexington Field Office - Project Summary Report. BY DATE FOR DRAWINGS ABOVE, see VDH website for form Y / N This project has a sewer pump station that FW will own. Title to the pump station site shall be granted to the Frederick Nater in feesimple absolute. Also, (1) a copy of DEQ's Certificate to Construct. (2) a copy of DEQ's Certificate to Operate, and (3) two copies of the FW approved O & M manual are required. These do. uments must be received before service will be authorized. (4) Work cannot commence that would connect to FW facilities or require MV inspections until the contract is returned to this office1, A. "I t f 'err : p.' r} f #s,ari S-.. Wiley - Eogf'_ ser lt> sista.*ti �.. e G b. tJi i,t �3�Srr REVIEW STATUS attention fe{ review number correct &- resubmit approved as noted number of iterns to be corrected -r`approved �. DRAWINGS��� send the by 1. print of sheets ?. two CDs. each disc shall contain the following plan sheets 4 a) One CD (containing all of the above noted sheets) shall be in PDF formai.:Each sheet shall be in its own file and be in landscape orientation. Each file shall be titled with the project name and appropriate sheet number. b) One CD shall be in DWG format; (1) in iViociel Space, (2) instate plane coordinate. system NAD 83, (3) compatible with AutoCAD 2006. c) Each of the two CDs shall be labeled with its format and pre�ject .name. and placed in its own paper CD envelope. EASEMENTS p' Y/N -, f -?/ N 0 0 Date: A copy of the recorder{ onsite FW easement(s) is/are. required. A copy of therecordedoffsite FW easement(s) is/are requircd. The easement document shall contain a plat and both shall be signed by the Frederick `Fater. The Frederick Nater requires specific language in its deed of easement. Visit our website w ww.frederickwaic-r.corn to obtain a copy of' the form. A copy of the recorded deed(s) of easement shall be received before service will be authorized. This project also requires DEQ - Valley Region Office approval. This project also requires VDH - Lexington Field Office approval. This project also requires VDH - Lexington Field Office - Project Summary Report. BY DATE FOR DRAWINGS ABOVE, see VDH website for form Y / N This project has a sewer pump station that FW will own. Title to the pump station site shall be granted to the Frederick Nater in feesimple absolute. Also, (1) a copy of DEQ's Certificate to Construct. (2) a copy of DEQ's Certificate to Operate, and (3) two copies of the FW approved O & M manual are required. These do. uments must be received before service will be authorized. (4) Work cannot commence that would connect to FW facilities or require MV inspections until the contract is returned to this office1, A. "I t f 'err : p.' r} f #s,ari S-.. Wiley - Eogf'_ ser lt> sista.*ti �.. Idl VS I VOR S(TL PLAN co.'%I-%j I- I-rederick 4N!'0a11.1 Comment Milli! dv!ivur P' "I. Buil Drivl- V'irginia 2-2602 1-2601- 540) 665-63 50 , I(Eflflicanlit:I,lutr;,h,llt LO f,1r11pIL![o Ais lx 1-,:, I.AV Plu.1, o orl hwll !,-, L!LCl-jp rEu .� L) in - VA Ifft'l I tildl.,o po r "AW: ,RoUf� 8,631 in Stmi lnduW- oll Flow cn 15 EDE M VIRE- MARMAL I- S E f) NL Y. C19 1 4 5 Onl(` Apprk) P1 Frealerick Count,, Department of Fire Wid Rescue Ofjice of the Firellarshal MISO cpl'ercuome Winn b", I, r. I (549) 665-63-50 Fax. (540) 6,7`8-4739 Plan le, & Comments Date Recehec! 512912019 Name B & B 0mrs, LLC A d, dr e s s Tyson DR Applicanr Win -to & Numbf,- RE# Permit NU1Tf1A.!F Emergency VOw-1iu Axccss: Hydrant Lo-C-11--ttion. Siamese Plan Ap�.'r"vi'4! SjAe Plan 05-293-19 Winchester Ske Plan 05-29-19 Greywolfo, Inc 540-667-2001 Coamir-fits Area hi lighted in oran.ge shall have a No Parking Fire Lane sign Inutalied Area hi lighted In yellow shall I>e stripped in yellow Signature-. Revieviod By: Kenneth Scott, Jr. f�i 7i "'� Date ROVieWP(l 61T/2019 VA 22603 Ade bate Inaderjuato NIA Ade ate Inaccriule WA Approve Coamir-fits Area hi lighted in oran.ge shall have a No Parking Fire Lane sign Inutalied Area hi lighted In yellow shall I>e stripped in yellow Signature-. Revieviod By: Kenneth Scott, Jr. f�i 7i "'� Date ROVieWP(l 61T/2019 VA 22603 Subject: B & B Omps - VDOT Comments to Site Plan Date: 7/11/2019 7:53:25 AM Eastern Standard Time From: Rhonda. Funkhouser(it)vdot.virginia.gov To: greywolfeinc@aol.com Cc: mcheran@fcva.us, tklein@feva.us, matthew.smith@vdot.virginia.gov, Lloyd.Ingram@vdot.virgima.gov DEPARTMENT OF TRANSPORTATION Edinburg Land Development 14031 Old Valley Pike Edinburg, VA 22824 Mr. Oates, A VDOT review has been conducted for the B & B Omps site plan dated June 24, 2019. Based on the review of the drawings, all VDOT requirements are addressed and the site plan is approved by our office. Please ensure that all applicable agencies have the most recent set of approved drawings. We offer the following general comments: 0 Our review and comments are general in nature. Should details be overlooked during plan review or conditions in the field exist such that additional measures are warranted, such measures shall be completed to the satisfaction of the department. • Materials used and methods of construction shall adhere to the current observed VDOT Road and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and Land Use Permit Special Provisions. • A preconstruction conference shall be held by the engineer and/or the developer with the attendance of the contractor, various County agencies, utility companies, and VDOT prior to initiation of work. • All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or drainage easement. • Any construction related changes to the approved plan must come through the design engineer to VDOT for approval. Please allow a minimum of 5 business days for VDOT review. • A Land Use Permit shall be obtained before any work is performed on the State's right-of-way. The permit is issued by this office and may require application fees, the salary & expenses of a State assigned inspector, and surety bond coverage. If you have any questions or need fiirther information, do not hesitate to contact me. Sincerely, Lloyd A. Ingram I Land Development Engineer Virginia Department of Transportation Clarke, Frederick, Shenandoah & Warren Counties 14031 Old Valley Pike Edinburg, VA 22824 voice: 540/984-5611 fax: 540/984-5607 e-mail: �H V r9r . J my 11, 2019 Mr. Gary R. Oates, LS -B, PE GreyWolfe, Inc. 1073 Redbud Road Winchester, Virginia 22603 RE: Site Plan Comments — B&B Omps, LLC Dear Mr. Oates: "of FREDERICK tv t tnt ant a'l'� a.bl:ic° Works Upon review of the site plan dated May 1, 2019, we off the following comment: Plan approved for 0.95 acres of disturbance. Please note that a VSMP permit will be required should the disturbed acreage exceed one (1) acre." We offer no additional comments and recommend approval of the subject plan. Joseph W. Johnson, P.E. Civil Engineer JC W/kco cc: Planning and Development file Sincerely, v Joe C. Wilder Director of Public Works 107 North lent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000 5401665-:5643 RECEIVED MAY 2 8 2019 Ff@dYffok County REQUEST FOR SITE PLAN COMMENTS Y" r rMier ick Coun, —ty- I'vispectJOUIS Department Comment Mail to: Frederick County Inspections Department Attn: Building Official 107 North Kent Street Winchester, Virginia 22601 Hand deliver to: Frederick County Inspections Dept. 107 North Kent Street, 2nd Floor Winchester, Virginia 22601 Phone: (540) 665-5650 I-* V-1 � I -d -mob Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the Sitc.Plan with this sheet. Applicant's Name: GreyWolfe, Inc. - Gary R. Qa1es,LS-B,PE Telephone: (540) 667-2001 Fmail Address: GreyWolfelnc@aol-com Mailing Address: _1073 Redbud Road, Winchester, VA 22603 Name of development and description of the request: B & B Omps, LLC Location of Property: End of Tyson Drive.(Route 863) in Stonewal Industrial Park Comments: -FREDERICK COUNTY INSPECTIONS DEPARTMENT USE ONLY - Date Received Review Number 16 3 4 5 (circle one) Date Reviewed __b/ Revision Required Date Approved 25 1 C1 Signature & Date: M"'t, I'd ** Please Return Form to Applicant" 18 Buildings shall comply with The Virginia Uniform Statewide Building Code and Sections 311, S Storage) and Section 304, B -Business of the International Building Code/2015. Other Code that applies are the Virginia Mechanical Code for air change, the ICC ANSI Al 17.1-3-09 Accessible and Usable Buildings and Facilities, 2015 Virginia Energy Code and 2015 International Fire Code. Building shall comply with height and area as allowed per T503 with the applicable increases. Building shall comply with IBC/USBC 903.2.9 for sprinkler requirements. Group S-1 fire areas used for the storage of commercial trucks where the f re area exceed 5000 sq_ft, as well as, S-1 fire areas in excess of 5,000K sq ft and used for commercial truck repair garage shall be provided with an NEPA sprinkler system Quantity of hazardous material quantities and limitations shall be as required/limited under T307.1(1) to prevent the structure from falling into an H -Hazardous use group Fire Barrier placed on the plans to reduce fire area. Question to the location of the water oil separator. At least one parking area is required to be a Van Accessible space as required in USBC Sec 1106. Accessible parking and unloading requires a minimum of 8' parking, and a minimum of 8' of'striped unloading area. Unloading area shall have a maximum 2% slope. Van accessible signage is provided as required per USBC Sec 1106.8. Accessible route to main entrance shall not exceed 5% (1:20) slope. At least 60% of all entrances shall be accessible. Landings at doors shall not exceed 1:48 slope and thresholds shall not exceed All required exits shall be accessible and meet the requirements of VBC Section 1007. Office occupants shall meet the common path of travel distance or a second exit will be required. Building shall comply with 2015 International Energy Code. All systems shall be included in the evaluation of the building performance. All structural plans submitted for permit application shall be sealed by a VA Design Professional. Please note the requirements in Chapter 17 of the IBC for special inspections for this type of structure. (so] 1, concrete, bolts, etc.) 6/25/19 no additional comments s:\site plan comments\2015\s-1 storage; commercial vehicles omps.doc