Loading...
HomeMy WebLinkAbout26-19 ApplicationSITE PLAN APPLICATION Office Use Only - Date Application Received: l 7 Application #: �` 01 Fees Received: ( � � Receipt #: , �( l �s Initials: 1. Project Title: Graystone Industrial Center Phase 1 2. Project Description: The project development will consist of the construction of two (2) industrial warehouses, with related utilities, parking, and roadways. 3. Location of Property: North side of Snowden Bridge Blvd. near intersection of Milburn Road (Street address) Not yet determined 4. Applicant/Designer: Name: Greenway Engineering, Inc. Telephone: 540-662-4185 Primary Point of Contact: Trenton Caudill, P. E. Address: 151 Windy Hill Lane; Winchester, VA 22602 5. Property Owner (if different than above): Name: Graystone Corporation Address: P.O. Box 2530, Winchester, VA 22604 6. Property Information: a. Property Identification Number: b. Total acreage of the parcel to be developed: C. Total disturbed area of the parcel: d. Present Use: e. Proposed Use: f. Magisterial District(s) 8 email: tcaudillCa)greenwayeng.com Telephone: 540-667-7700 44-A-25 & 44-A-26 & 44-A-31 A 80.44 Acres 37.87 Acres Vacant/Agricultural Warehouse Building Stonewall 7. Site Plan Type: a. Is this an original or new site plan? Yes I r l No b. Is this a revised site plan? Yes wl No If yes provide all previous site plan numbers: C. Is this a minor site plan? Yes II No J] If yes provide all previous site plan numbers: 8. Zoning Information: a. Current Zoning: M1 b. Was this property Rezoned? Yes Fy(] No C. If yes provide the rezoning number for this property: #03-12 & #09-09 d. Are there any proffers for this property? Yes V I No e. Has a MDP been approved for this property? Yes IV I No F1 f. If yes provide the MDP number for this property: #01-15 9. Adjoining property zoning and use: USE ZONING North Vacant RA East Residential/Vacant RA & R4 South Vacant M1 West Vacant OMRA & M1 I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Signature: Name (Printed): Trenton Caudill, P.E. r 1 Date: E