HomeMy WebLinkAbout26-19 ApplicationSITE PLAN APPLICATION
Office Use Only -
Date Application Received: l 7 Application #: �` 01
Fees Received: (
� � Receipt #: , �( l �s Initials:
1. Project Title: Graystone Industrial Center Phase 1
2. Project Description: The project development will consist of the construction of two
(2) industrial warehouses, with related utilities, parking, and roadways.
3. Location of Property: North side of Snowden Bridge Blvd. near intersection of Milburn Road
(Street address) Not yet determined
4. Applicant/Designer:
Name: Greenway Engineering, Inc.
Telephone: 540-662-4185
Primary Point of Contact: Trenton Caudill, P. E.
Address: 151 Windy Hill Lane; Winchester, VA 22602
5. Property Owner (if different than above):
Name: Graystone Corporation
Address: P.O. Box 2530, Winchester, VA 22604
6. Property Information:
a. Property Identification Number:
b. Total acreage of the parcel to be developed:
C. Total disturbed area of the parcel:
d. Present Use:
e. Proposed Use:
f. Magisterial District(s)
8
email: tcaudillCa)greenwayeng.com
Telephone: 540-667-7700
44-A-25 & 44-A-26 & 44-A-31 A
80.44 Acres
37.87 Acres
Vacant/Agricultural
Warehouse Building
Stonewall
7. Site Plan Type:
a. Is this an original or new site plan? Yes I r l No
b. Is this a revised site plan? Yes wl No
If yes provide all previous site plan numbers:
C. Is this a minor site plan? Yes II No J]
If yes provide all previous site plan numbers:
8. Zoning Information:
a. Current Zoning: M1
b. Was this property Rezoned? Yes Fy(] No
C. If yes provide the rezoning number for this property: #03-12 & #09-09
d. Are there any proffers for this property? Yes V I No
e. Has a MDP been approved for this property? Yes IV I No F1
f. If yes provide the MDP number for this property: #01-15
9. Adjoining property zoning and use:
USE ZONING
North Vacant RA
East Residential/Vacant RA & R4
South Vacant M1
West Vacant OMRA & M1
I have read the material included in this package and understand what is required by the Frederick County Planning
Department. I also understand that all required material will be complete prior to the submission of my site plan.
Signature:
Name (Printed):
Trenton Caudill, P.E.
r 1
Date:
E