HomeMy WebLinkAbout14-19 CommentsHtut1 Vtu
MAY 0 1 ?019
REQUEST FOR SITE PLAN COMMENTS Frederick County
public Work- R InsnPntin
Frederick County Inspections
Department Comment
Mail to:
Frederick County Inspections Department
Attn: Building Official
107 North Kent Street
Winchester, Virginia 22601
Land deliver to:
Frederick County Inspections Dept.
107 North Kent Street, 2nd Floor
Winchester, Virginia 22601
Phone: (540) 665-5650
Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their
review.._.;P.lease attach two (2),couies_of the_Site.Plan.with-this,.sheet.
Applicant's Name: Greenway Enginee(ng, Ina Telephone: 540-662-4185
Email Address: rkepler@greenwayeng.com
Mailing Address: 151 Windy Hill Lane
Winchester, VA 22602
Name of development and description of the request:
Navy Federal Credit Union Building #3
Location of Property:
MAY 2 8 2019
990 Security Drive
Winchester, VA 22602 GREENWAY
FNAINF1PRd Nso a�
Inspections Department Comme`'nts:
eurn nn ez�J PsA& CZY\ -WJ- � Q-Z)C tj all ,L
-FREDERICK COUNTY INSPECTIONS DEPARTMENT USE ONLY -
Date Received .5/,114) Review Number 1 2 3 4 5 (circle one)
Date Reviewed Z
Revision Required Nu :. 'to Aper 6�z
D./�a oved
18
Building shall comply with The Virginia Uniform Statewide Building Code and Section 304, Business
Use Group, of the International Building Code/2012. Other codes that apply are The Virginia Fire Code
2012, ICC/ ANSI Al 17.1-2009 Accessible and Usable Buildings and Facilities and International Energy
Code.
Building shall maintain height and area as required under T503. Building has full NFPA 13 system and
Fire Depart Connection located.
Four story building shall meet Virginia Building Code, Chap 10, for exiting requirements. Exits shall be
continuous from point of entry into the exit to exit discharge. Question on exterior door location at
interior rated stairway. All required egress shall be accessible. Landings shall maintain a maximum 2%
slope and walkways shall be a maximum 5% slope
Question on above grade Walkway if open or enclosed. Question of building required wall and
opening protections as required in IBC Section 705.3 & Section 506 for walkway and generators.
Fire pump room shall be accessible from exterior or be provided with a rated enclosure as required
per NFPA 20; 4.13.2
60% of all entrances shall be accessible
Building overhangs roadway on first floor. The horizontal rating shall be address as required in IBC
Section 506.5, 510.7, and T503.
Handicap Van Parking is required. Minimum width for parking and unloading is 8' w/8' unloading or I V
w/5' unloading. Accessible parking signage for van shall include $500 fine. See USBC Section 1106.8
for Van accessible signage.
Max slope for walkways is 5%. Maximum slope for landings at door and top/bottom of ramps is 2%.
All required egress/exits shall be Accessible per ANSI Al 17.1-09. Walking surface shall meet ANSI
Al 17.1-09 for surface.
Retaining walls shown require building permits and, due to height of unbalanced fill, will require a design
by a Virginia Registered Design Professional.
Please note the requirements in Chapter 17 of BOCA for special inspection requirements on the type of
structure (Soils, concrete etc.) Compaction/soil bearing/soil testing shall be required for placement of
new store.
9/6/17
Walkway shall be separated from new structure as required by the Virginia Building Code. Generators
shall comply with T602/Chap 7 as required. Rated stair enclosure and exits shall meet Chap 10 Virginia
Building Code
2/13/18 Fire Marshal approval required for FDC changes. Changes to water line and conduits shall
comply with the 2012 Virginia Plumbing Code and 2011 National Electrical code
8/10/18 Adding ANSI Accessible Ramp and Retaining walls. Ramp and retaining walls require permits.
Maximum ramp slope 1:12. Maximum length of ramp run 30' (30" rise) before landing is required.
Handrails are required on both sides of ramp. Plans for retaining walls shall be sealed by a Virginia
Registered Design Professional.
5/24/19 rear walkway shall meet ANSI Al 17.1-09 for slopes and surface criteria. Passenger
Loading/unload shall meet ANSI Al 17.1-2009 Section 503.
S:ISite Plan comments\2012\Business Navy Bld 3.doc
Date Received
512!2019
Frederick £'rpt nij,
Department nf'Fire and Rescue
Office of the Firm Jlarshal
1080 Covemtone DrjLt- lGrfa'1 e-,fcr, 1-1122602
(540)665-6350 Fax: (540)678-4739 L'rraihfmoayeir_us
Plan Review & Comments
Plan{Peri-%it Type Site Plan Rev. #6 05-02-19
Name Navy Federal Credit Union
Ad ,r, -&s 190 Security DR Winchester
Project Varne
Applicant Name & Number
RE#
Permit Number
Emergency Vehicle Access=
Hydrant Location:
Siamese Lot ation!
Fire Lames Rt;gjired.
Plan Approval S:atuS
NICU Building 3 0001760
Greenway Engineering 540-662-4185
Permit #1760-2017
Adeq,rat Inadc-grrate
Ade.late lnadectu.jtc
A-deae Inadequate
Ye Nil
Approve
Comments
Blacked out area on fire lane shall NOT be stripped
Signature..; -
Reviewed By: Kenneth Scott, Jr.
Title-
Date Reviewed
511512019
VA 22602
May 9, 2019
Mr. Kevin Seward, PE
Greenway Engineering
151 Windy Hill Lane
Winchester, Virginia 22602
COUNTY of FREDERICK
ICK
Department of Public Works
540/665-5643
FAX: 540/678-0682
RE: Revised Site Plan Comments — Navy Federal Credit Union Building #3
Dear Mr. Seward:
Upon review of the revised site plan dated April 26, 2019, we recommend approval of the
subject plan.
Joseph W. Johnson, P.E.
Civil Engineer
JCW/kco
cc: Planning and Development
file
Sincerely,
r}
' �• 4�i+gf a..
Joe C. Wilder
Director of Public Works
107 North Kent Street, Second Floor, Suite 200 • Winchester, Virginia 22601-5000
FREDERICK WATER
FREDERICK
PO Box 1577_ Winchester, VA 22604-8377
315 Tasker Road, Stephens City, VA 22655
Project
Applicant
540.868.1061 Voice
540.868.1 129 fax
REVIEW STATUS jLattention jll�!-W
review number
I i
correct & resubmit approved as noted number of items to be corrected
approve
DRAWINGS
send me by
1. print of sheets V /
2. two CDs: each disc shall contain the following plan sheets ,/� �k
a) One CD (containing all of the above noted sheets) shall he in PDF format. Each sheet shall he in its
own file and be in landscape orientation. Each file shall he titled with the project name and appropriate
sheet number.
b) One CD shall he in DWG format: Min Model Space, (2) instate plane coordinate system NAD 83.(3)
compatible with AutoCAD 2006.
c) Each of the two CDs shall he labeled with its format and project name, and placed in its own paper CD
envelope.
EASEMENTS
Y / T A copy of the recorded onsite FW easement(s) is/are required.
Y N A copy of the recorded offsite FAV easements) is/are required.
o The easement document shall contain a plat and both shall he signed by the Frederick Nater.
o The Frederick Nater requires specific language in its deed of easement.
o Visit our website www.frederickwater.com to obtain a copy of the firm.
o A copy of the recorded deed(s) of easement shall be received before service will be authorized.
OTHER
YC No This project also requires DEQ- Valley Region Office approval.
Y /� This project also requires VDH — Lexington Field Office approval.
Y This project also requires VDH — Lexington Field Office — Project Summary Report. BY DATE FOR
DRAWINGS ABOVE, see VDH website for form
Y®r�This project has a sewer pump station that FNV will own. Title to the pump station site shall he granted
to the Frederick Water in fce simple absolute. Also. (1) a copy of DEQ's Certificate to Construct. (2) a
copy of DEQ's Certificate to Operate. and (3) tw•o copies of the F%N' appr,-}edFQ c4r N;I ,manual ga
required. These documents must he received before service will be authkruEd, N& A C'�nrijIMN
t
commence that would connect to FNV facilities or require FAV inspections urietltlit�ttrrtiact is"reino
tot is office.
.; .
Date: _ ZL % . Gv,
Earl W. Wiley — Efneering Assistant r 'I,''' r '
C;n'rir"
EON EIAIN�