Loading...
HomeMy WebLinkAbout04-19 Site PlanConstruction Notes: Virginia Department of Transportation 1. The project consists of the establishment of 12 additional mobile home sites with road access and utilities. Staunton District Recreational Units Required: Rev. January 19, 2013 2. All work and materials shall conform to the current standards of Frederick County, Virginia, the regulations of the Americans with Provided -20' Disabilities Act, where applicable, and all applicable codes. VDOT General Notes 3. The CONTRACTOR shall be responsible for determining the exact location of all utilities before commencing work and for any damages V1. All work on this project shall conform to the current editions of and latest revisions to the Virginia which occur by the failure to locate and preserve these utilities. If the CONTRACTOR should encounter utilities other than those shown on Department of Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and these plans, the CONTRACTOR shall immediately notify the engineer and take the necessary and proper steps to protect the facility and Sediment Control Regulations, and any other applicable state, federal or local regulations. In case of a assure the continuance of service. Call "MISS UTILITY" 0 811 two days prior to any excavation. discrepancy or conflict between the Standards or Specifications and Regulations, the most stringent shall 50' govern. 4. All existing utilities have been shown based upon the best available information. However, there may be existing utilities which are V2. All construction shall comply with the latest U.S. Department of Labor, Occupational Safety and Health not shown and should be located. Therefore, it will be the responsibility of the Contractor to verify the location of all existing utilities Administration (OSHA), and Virginia Occupational Safety & Health (VOSH) Rules and Regulations. prior to construction. Any discrepancies between these plans and the actual field conditions shall be reported immediately to the V3. When working within VDOT right-of-way, all traffic control, whether permanent or temporary, shall be in Engineer, the owner, and the appropriate utility company. accordance with the current edition of VDOT's Work Area Protection Manual. A transportation management plan 5. All proposed utilities shall be installed underground. needs to be submitted for approval and land use permit issued prior to any execution of work within the DIA. VDOT right of way. 6. It shall be the responsibility of the Contractor to obtain all permits necessary for construction prior to the commencement of work. V4 The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic signal An approved set of construction documents shall be present on the site at all times. poles, junction boxes, controllers, etc., owned by VDOT or private / public utility companies. It is the sole 7. Topographic information was derived from a topographic survey performed by Painter -Lewis, P.L.C. A field survey determined the responsibility of the developer to locate and identify utility facilities or items that may be in conflict with the topographic information which has been based on U.S.C. and G.S. datum and a contour interval of one (1) foot has been established proposed construction activity. VDOT approval of these plans does not indemnify the developer from this for this project. Contact Painter -Lewis, P.L.C. at 540-662-5792 to establish vertical control for project construction. responsibility. F.F. V5. Design features relating to field construction, regulations, and control or safety of traffic may be subject to 8. No soils report was prepared for this project. change as deemed necessary by VDOT. Any additional expense incurred as a result of any field revision shall FDC be the responsibility of the developer: 9. All radii designations indicate face of curb, edge of pavement, or edge of stone pavement, where applicable. V6. If required by the local VDOT Land Development Office, a pre -construction conference shall be arranged and F.L.S. held by the engineer and/or developer with the attendance of the contractor (s), various County agencies, The Contractor shall coordinate the relocation of and the connection to the existing utilities with the appropriate utility company, utility companies and VDOT prior to initiation of work. where where applicabplicable. V7. The contractor shall notify the local VDOT Land Development Office when work is to begin or cease for any 11. The CONTRACTOR is to furnish all materials, labor, and equipment to complete the work as shown and intended on these plans. undetermined length of time. VDOT requires and shall receive 48 hours advance notice prior to any required or GV requested inspection. 12. The CONTRACTOR shall have approved construction drawings prior to the start of construction. At least one copy of approved plans V8. The contractor shall notify the Traffic Operations Center at (540) 332-9500 for any traffic control plan that and revisions shall be kept on-site at all times and available for inspections as needed. impacts a VDOT maintained interstate or Primary roadway to provide notification of the installation and removal HDR CURB of the work zone. 13. Blasting is not permitted. V9. The contractor shall be responsible for maintaining a CVDOT permitted temporary construction entrance(s) in 14. The CONTRACTOR shall obtain permission from adjoining property owners prior to conducting any off site construction activities. accordance with Section 3.02 of the Virginia Erosion and Sediment Control Handbook. Furthermore, access to INV other properties affected by this project shall be maintained through construction. 15. All property corner markers disturbed or otherwise obscured by construction are to be replaced and verified by a certified land V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the end of surveyor at the CONTRACTOR's expense. construction. LP V11. All water and sewer lines within existing or proposed VDOT right-of-way shall have a minimum thirty-six LT. (36) inches cover and when possible shall be installed under roadway drainage facilities at conflict points. Erosion and Sediment Control: V12. Any unusual subsurface conditions (e.g., unsuitable soils, springs, sinkholes, voids, caves, etc.) encountered 1. All Erosion and Sediment Control measures shall be installed prior to any land disturbing activities. All work shall be done in during the course of construction shall be immediately brought to the attention of the engineer and VDOT. accordance with the current edition of the of Commonwealth of Virginia Erosion and Sediment Control Handbook. Work shall cease in that vicinity until an adequate design can be determined by the engineer and approved by 2. All work shall be confined to the designated Limits of Clearing and Grading and the property boundaries. VDOT. NDC V13. All fill areas, borrow materialand undercut areas shall be inspected and approved by a VDOT representative 3. The Contractor shall be responsible for the installation and maintenance of all Erosion and Sediment Control measures. All Measures prior placement n fill. W r o to aceme and here CBR testing is required, a VDOT representative shall be resent to insure p p g q , p p shall be inspected daily and after each significant rainfall by the site superintendent or his representative. Any damaged structures shall the sample obtained is representative of the location. When soil samples are submitted to private laboratories be repaired or replaced be the end of that work day. for testing, the samples shall be clearly identified and labeled as belonging to a project to be accepted by N.T.S. VDOT and that testing shall be performed in accordance with all applicable VDOT standards and procedures. 4 Upon completion of construction, all permanent erosion and sediment control measures shall be installed. After stabilization, the V14. All roadway fill, base, subgrade material, and backfill in utility/storm sewer trenches shall be compacted in temporary Erosion Control devices shall be removed, as approved by the Local Inspection Authority. All vegetative cover shall be checked six (6) inch lifts to 95% of theoretical maximum density as determined by AASHTO T-99 Method A, within plus regularly and any damaged areas shall be repaired, fertilized, replanted, and mulched, as needed. POST INDICATOR VALVE PL or minus 2% of optimum moisture for the full width of any dedicated street right-of-way. At the direction of 5. The Contractor shall provide adequate means of cleaning trucks and other construction equipment prior to entering the public R -O -W. VDOT, density tests shall be performed by a qualified independent agency in accordance with VDOT Road and If necessary, a trash rack shall be used as part of the Construction Entrance to help in the control of potential mud generated as part Bridge Specifications. Certified copies of test reports shall be submitted to VDOT daily, unless specified of the development of this site. If it is determined that this is not sufficient, then a wash rack shall be installed, as needed. It is otherwise. the responsibility of the Contractor to maintain clean streets and to allay dust at all times. V15. VDOT Standard CD and UD under drains shall be installed where indicated on these plans and/or as specified R.D. by VDOT. Paving and Concrete: 1. The proposed main drive aisles and parking areas shall receive the minimum pavement sections, as detailed on the plans. All points V16. A post installation visual/video camera inspection shall be conducted by the Contractor on all pipes identified of connection with the existing pavement sections shall be graded as required to provide a smooth transition between the pavement on the plans as storm sewer pipe and a select number of pipe culverts. For pipe culverts, a minimum of one sections. pipe installation for each size of each material type will be inspected or ten percent of the total amount for SEW. each size and material type summarized. All pipe installations on the plans not identified as storm sewer pipe 2. Pavement materials designations refer to VDOT standards. All work shall be done in accordance with standard practices. shall be considered as culvert pipe for inspection purposes. Additional testing may be required as directed by T.B.D. the Area Land Use Engineer or their representative. Excavation and Grading: V17. The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet VDOT 1. Test pits shall be excavated to determine the depths and locations of all of the existing utilities. If conflicts exist, then the existing minimum design standards and is the responsibility of the developer. utilities shall be lowered or moved to promote the construction of the proposed development. V18. Prior to VDOT acceptance of any streets, all required street signage and/or pavement markings shall be 2. All deleterious materials, demolished debris, and cleared and grubbed materials shall be removed and properly disposed of off-site. installed by the developer or, at VDOT's discretion, by VDOT on an account receivable basis following the TEL. Manual On Uniform Traffic Control Devices. 3. All topsoil or vegetative cover shall be excavated to its full depth and stockpiled on-site, if applicable, in the areas as directed by V19. The developer shall provide the VDOT Land Development Office with a list of all material sources prior to the the Owner's representative for future finish grading. start of construction. Copies of all invoices for materials utilized within any dedicated street right-of-way TYP or TYP. must be provided to the local VDOT Land Development Office prior to acceptance of the work. Unit and total 4. All borrow fill material, if necessary, shall be obtained by the Contractor and approved by a Certified Geo -Technical Engineer. All fill prices may be obscured. material shall be placed in lifts of 8" or less and shall be compacted to 95% of ASTM D-698 Maximum Dry Density, or as directed by V20. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader. the Geo -Technical Engineer. Density will be determined using the density control strip in accordance with Section 304 of the VDOT Road �� 5. All landscaped islands, slopes, and lawn areas shall receive a minimum of 4 topsoil obtained off-site or from the topsoil stockpile Specifications n - and Bridge Sec cations a d VTM 10. A certified compaction technician shall perform these tests. Certified g P P on site. The topsoil shall be graded and raked, prior to application of permanent vegetative cover. copies of test reports shall be submitted to VDOT daily, unless specified otherwise. In addition to checking WL stone depths, a VDOT representative shall be notified and given the opportunity to be present during the 6. All disturbed lawn areas shall be stabilized by the establishment of permanent turf gross installed in accordance with generally construction and testing of the density control strip. accepted practices. V21. Asphalt concrete pavements shall be placed in accordance with Section 315 of the VDOT Road and Bridge OWNER / DEVELOPER: ENGINEER /LANDSCAPE ARCHITECT: Specifications. Density shall be determined using the density control strip as specified in Section 315 and TM# 86-A-208 VTM-76. A certified compaction technician shall perform these tests. Certified copies of test reports shall be Jennings Investments, L.L.C. Painter -Lewis, PLC submitted to VDOT daily, unless specified otherwise. A VDOT representative shall be notified and given the PO Box 3830 817 Cedar Creek Grade, Suite 120 opportunity to be present during the construction and testing of the control strip. Winchester, VA 22603 Winchester, VA 22601 V22. In accordance with Section 302.03, the foundations for pipe culverts thirty-six (36) inches and larger shall Contact: Mr. Chris Jennings Contact: John C. Lewis, P.E.,L.L.A. be explored below the bottom of the excavation to determine the type and condition of the foundation. The Tel: 540-722-9395 Tel: 540-662-5792 contractor shall report findings of foundation exploration to the engineer and VDOT for approval prior to placing pipe. Foundation designs shall comply with VDOT Road and Bridge Standard PB -1. Where soft, yielding, PARCEL DATA (OVERALL): or otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation Tax Map Number: 86-A-208 stabilization shall be determined by the engineer and approved by VDOT. Address: 106 Spotswood Court Zoning: MH1-Mobile Home Community District V23. VDOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans in accordance / P P Existing Area: 5.63 acres with VDOT's installation criteria. Final approval of the guardrail layout to be given by VDOT after grading is Existing Use: Residential (17 units) mostly complete. Proposed Use: Residential (29 units) V24. Approval of these plans shall expire three (3) years from the date of the approval letter. Disturbed Area: 2.18 acres V25. VDOT Standard CG -12 Curb Ramps shall be installed where indicated on these plans and as specified by New Impervious Area: 0.95 acres VDOT. Historical Structures and Sites: None V26. The foundations for all box culverts shall be investigated by means of exploratory borings advanced below Wetlands: None proposed foundation elevation to determine the type and condition of the foundation. The contractor shall Flood Plains: FIRM Map Number 51069CO350D shows that the parcel is not submit copies of borehole logs and report findings of foundation exploration to the engineer and VDOT for located in a flood area. approval prior to constructing box. Foundation designs shall comply with VDOT Road and Bridge Standard Steep Slopes: No steep slopes have been identified on the site. PB -1. Contrary to the Standard, where rock is encountered and cast -in-place box is proposed, the thickness Buffers and Screening: of bedding shall be six (6) inches. Where soft, yielding, or otherwise unsuitable foundation is encountered, the Zoning District Buffers: MH1 against RA: no buffer required foundation design and/or need for foundation stabilization shall be determined by the engineer and approved by VDOT. MH1 ZONING: Existing Use: Residential TRAFFIC IMPACT: UTILITY AND REGULATORY CONTACTS: Proposed Use: Residential Frederick Count Road Classification for Route 636: Minor Road y Residential Density: Allowed: 8 units per acre Proposed: 29/5.63 = 5.2 units acre WATER AND SEWER SERVICE 2014 Existing Traffic Data -Route 636 Hudson Hollow Road Frederick Water per Open Space Requirements: Required: 15%, 0.85 acres AADT=1500 trips P. 0. BOX 1877 Proposed: 16%, 0.90 acres Data Source: ITE Manual, Ninth Edition Stephens City, VA 22655 Open Space shall be planted with appropriate landscaping in areas which have been disturbed, which shall be properly maintained. Land Use 240: Mobile Home Park 540-868-1061Trips Open space which has not been disturbed will remain in its existing vegetated condition. based on Dwelling Units: BUILDING INSPECTIONS Dwelling Units=30 Recreational Units: Required: 1 rec. unit per 30 housing units Frederick County Inspections Department Weekday: 30x5.81=174 trips (50% entering, 50% exiting) 107 North Kent Street Required: 12/30=0.4 rec. units AM Peak Hour: 30xO.44=13 trips (19% entering, 81% exiting) Winchester, VA 22601 Recreational Units will include a the construction of a pavilion in the open space. See chart below. PM Peak Hour: 30xO.52=16 trips (64% entering, 36% exiting) 540-665-5650 Saturday: 30x5.67=197 trips (50% entering, 50% exiting) Parking Requirements: Saturday Peak Hour: 30x1.47=44 trips (54% entering, 46% exiting) EROSION AND SEDIMENT CONTROL Minimum Parking Requirement: 2 spaces per unit; 58 spaces Building Restriction Lines: 29: 17 EX. 12 PROP. Recreational Units Required: Mobile Home Separation Required: 20' Provided -20' Street Setback: 10' Provided -10' Common Area Setback: 10' Provided -10' Parking Lot/Sidewalk Setback: 10' no Perimeter Boundary Setback: 50' Provided -50' Accessory Use Setback: 5' Provided -5' Minimum Lot Size: 4,000 sf Provided -5,200 sf No site lighting is proposed. A new subdivision sign shall be a maximum 8' in height and 32 sf in area. RECREATIONAL UNITS ASSEMBLY Residential Units: 29: 17 EX. 12 PROP. Recreational Units Required: 12/30=0.4 Recreational Unit Value: $32,500 Recreational Units Value: $13,000 Sunday: 30x4.84=145 trips (50% entering, 50% exiting) Frederick County Department of Public Works 107 North Kent Street Winchester, VA 22601 540-665-5643 PUBLIC ROAD IMPROVEMENTS Virginia Department of Transportation 2275 Northwestern Pike Winchester, VA 22603 540-535-1818 FCSA PROJECT INFORMATION WATER AND SEWER DEMAND CALCULATIONS New Mobile homes: 12 units Residential demand per unit= 275 gpd Total Increased Demand: 3,300 gpd Total Demand: 7,975 gpd ABBREVIATIONS ASSY. ASSEMBLY B.F. BASEMENT FLOOR BLK. BLOCK BC BOTTOM OF CURB BML BUILDING MOUNTED LIGHT BP BREAK POINT CG -2 VDOT CURB CG -6 VDOT CURB & GUTTER CIP CAST IN PLACE CONCRETE CL CLASS CMF CONCRETE MONUMENT FOUND CPP CORRUGATED POLYETHYLENE PIPE CMP CORRUGATED METAL PIPE CMPA CORRUGATED METAL PIPE ARCH CO CLEAN OUT DIA. DIAMETER DS DOWNSPOUT EOP EDGE OF PAVEMENT EOG EDGE OF GRAVEL ESMT. EASEMENT EX. EXISTING F.F. FIRST FLOOR F.F.E. FINISHED FLOOR ELEVATION FDC FIRE DEPARTMENT CONNECTION FH FIRE HYDRANT F.L.S. FIRE LANE SIGN F.LT. FLOOD LIGHT Go. GAUGE GM GAS METER GV GAS VALVE or GATE VALVE HCR HANDICAP RAMP HB HOSE BIB HDR CURB 6" HEADER CURB HP HIGH POINT INC INCREASER INV INVERT IPF IRON PIPE FOUND IPS IRON PIPE SET LP LOW POINT LT. LIGHT MLP METAL LIGHT POLE MPD MULTI -PRODUCT DISPENSER MP METAL POST MH MANHOLE NDC NOSE DOWN CURB N.P.S. NO PARKING SIGN NLT NO LEFT TURN NRT NO RIGHT TURN N.T.S. NOT TO SCALE OHE OVERHEAD ELECTRIC OHT OVERHEAD TELEPHONE PIV POST INDICATOR VALVE PL PROPERTY LINE PP POWER POLE PROP. PROPOSED PVMT PAVEMENT RCP REINFORCED CONCRETE PIPE R.D. ROOF DRAIN RED. REDUCER R.O. ROCK OUTCROP SAN. SANITARY SEW. SEWER STD. STANDARD T.B.D. TO BE DEMOLISHED T.B.R. TO BE REMOVED T.B.P. TO BE PRESERVED or PROTECTED TB or T.B. THRUST BLOCK TC TOP OF CURB TEL. TELEPHONE TRB TELEPHONE RISER BOX NRB TELEVISION RISER BOX TYP or TYP. TYPICAL UGE UNDERGROUND ELECTRIC UGG UNDERGROUND GAS UG CATV UNDERGROUND CABLE T.V. UGT UNDERGROUND TELEPHONE XFMR ELECTRIC TRANSFORMER WL WATERLINE WM WATER METER WPP WOOD POWER POLE WTP WOOD TELEPHONE POLE WV WATER VALVE 25'R RADIUS IN FEET *00.00 PROPOSED SPOT ELEVATION x(00.00) EXISTING SPOT ELEVATION HATCHING INDICATES REVERSED PITCH IN THE GUTTER PAN: PITCH TO BE 1/2" PER FOOT. TRANSITION THE GUTTER OVER A 10' LENGTH (TYP). SOILS KEY I D NAM 1B Berks channery silt loam, 3 to 8% slopes 1C Berks channery silt loam, 8 to 15% slopes 41E Weikert-Berks channery silt loam, 25 to 65% slop rnrnrni^ii ^^I i►ir, .11nn1►u♦ VICINITY MAP RESPONSIBLE LAND DISTURBER NAME: CERTIFICATION #: DATE: THE RESPONSIBLE LAND DISTURBER IS THE PARTY RESPONSIBLE FOR CONSTRUCTION & MAINTENANCE OF ALL THE LAND DISTURBING ACTIVITIES AS SET FORTH IN THESE PLANS. o. 1 < ZONAL The applicant requests a site plan in -lieu of a Master Development Plan per Section 165-801.03(A)(5). OWNER DATE APPROVED BY THE SUBDIVISION ADMINISTRATOR DATE SPOTSWOOD MOBILE HOME PARK SITE PLAN #04-19 OPEQUON MAGISTERIAL DISTRICT FREDERICK COUNTY, VA. SOILS MAP PP 100 0 100 I CONSULTING Scale in Feet ENGINEERS PAINTER-LEWIS, P.L.C. 817 Cedar Creek Grade, Suite 120 Winchester, Virginia 22601 Telephone (540) 662-5792 Facsimile (540) 662-5793 Email: off ice0pointerlewis.com JOB NO.: 1511014 SHEET: October 24, 2017 1/14-1 Latest Revision Date: March 28, 2019 LOCATION MAP SCALE: 1"=1,000' LIST OF DRAWINGS: SHEET 1/14: COVER SHEET/LOCATION MAP/PROJECT NOTES SHEET 2/14: EXISTING CONDITIONS PLAN PHASE 1 EROSION & SEDIMENT CONTROL PLAN SHEET 3/14: EROSION & SEDIMENT CONTROL DETAILS SHEET 4/14: SITE LAYOUT PLAN SHEET 5/14: GRADING PLAN ROAD PLAN & PROFILE PHASE 2 EROSION & SEDIMENT CONTROL PLAN SHEET 6/14: SANITARY SEWER PLAN & PROFILE SHEET 7/14: SANITARY SEWER DETAILS SHEET 8/14: WATER LINE PLAN & PROFILE WATER LINE DETAILS SHEET 9/14: ENTRANCE PLAN MAINTENANCE OF TRAFFIC SHEET 10/14: LIFE SAFETY SHEET SIGN PLAN SHEET 11/14: STORMWATER MANAGMENT EXISTING CONDITIONS SHEET 12/14: STORMWATER MANAGEMENT � T 0F WATER QUANTITY PLAN ALx Dr SHEET 13/14: STORMWATER MANAGEMENT WATER QUALITY PLAN SHEET 14/14: LANDSCAPE PLAN U irw1d C%LFwlc a RESPONSIBLE LAND DISTURBER NAME: CERTIFICATION #: DATE: THE RESPONSIBLE LAND DISTURBER IS THE PARTY RESPONSIBLE FOR CONSTRUCTION & MAINTENANCE OF ALL THE LAND DISTURBING ACTIVITIES AS SET FORTH IN THESE PLANS. o. 1 < ZONAL The applicant requests a site plan in -lieu of a Master Development Plan per Section 165-801.03(A)(5). OWNER DATE APPROVED BY THE SUBDIVISION ADMINISTRATOR DATE SPOTSWOOD MOBILE HOME PARK SITE PLAN #04-19 OPEQUON MAGISTERIAL DISTRICT FREDERICK COUNTY, VA. SOILS MAP PP 100 0 100 I CONSULTING Scale in Feet ENGINEERS PAINTER-LEWIS, P.L.C. 817 Cedar Creek Grade, Suite 120 Winchester, Virginia 22601 Telephone (540) 662-5792 Facsimile (540) 662-5793 Email: off ice0pointerlewis.com JOB NO.: 1511014 SHEET: October 24, 2017 1/14-1 Latest Revision Date: March 28, 2019 COUNTY OF FREDERICK DB 440 PG 421 ZONED: RA USE: RECREATION EX. CHAIN LINK FENCE (7 5) (736.9) w �iT �� �� "� h "CO co h �O N (735.4) 736.1 737- (M.9). .37 -._ (738.9) x i& 5 6 ( ' 6) W 1 - .!731.0) ^ 1734.% (735.6) ^ 0 A.2) �1 '� • .�%'� 1�i ' 1 3 . 1 (737.7) x (739.3) x 1736.8) 1735.6) (735.2) (731.6) � ^ 734.9 � x.. �• - - / - - - ,� - ^ `3� �� " rT - Lit. - x(735.3 -735. E x x 736.7 35.8 (738 5) 738.2 t, �6. f r Shed ` 031.7) r / - x l S _ / / / x \ \ x 737.) ( ) (739.5) ( ) 1738.1) . r 739.0 1738 JT) \ x f r x (736.4% l 1736.2) o s -- -- _ x (739.8) F. x x l \ _ _ _.. _._, / `. - 73.. 4 \ (735.7) ^ SZ } EX. t 76.5) i7 7320 1731.7) / 1 __ ✓ " _ x x !737.2) v, 7 9) 736.9) Q' l735.� 34.3E (7328)- 730 7 \ x 733.3). (7 ` x ✓ (733.0 (735.1) 1735.9) / r 739.4) ' (( �. 34.4 x (738.9) a \ x x n^"� x x 7322) x(38.7) ` r'- She x (�3� s) \ \ x (rs6) x1736.5)" z� / 7323 l / x ! 3 } ; x, (739. /, ( 9.3)x ` �� �? J x' 7 s. s r 37 (37 x - �tk ``{731.2]` �5� x ` x( }! 5) ti _ . x _.. x' . x !7 .7) 7 .5 / 1740.8) 740.73 �f) - 32.3)"4. 33 5) x(738.9) x (738.9) >> \ .�- x .� / ,.. ..._ (73 . i<' -_.. --- _._- ---. - m f / x x(739.2) ` FEX. `-. .. x '4'734.6) 3 .5 L (733.1} / .� (736.8) ," r ' / - x ! �) ` \ jl ) x _ (7 � x _ -._._ r x Shed 738.4 734.8 733 9 () 1738. 1, 77) (� 4.0) x(733 5) ✓ '` / / / % (736 d) `7 (' ) ry x s x _ l7ae:s) 7378) _ - f � x~ TS ) ( l „- t r' _ .. \ \ zt 733.3 38.�7)739.5)� '�'� S t F / / r x 1 _... - x - (737.6) ,}� r (738.7) / ( 1.8) \(739.2) (738.9)' ` OPSOIL �\i \ ' x ?i ' \ \ 735.8 x f' J x r' (741.5) x (738.8 x ( ( 4.8) _ ( 740.2 x • 1, o rn ` / (735.5) {737s) / x T OCKPJLE 7s x x (73 .7) a. \ x / - - (73ss) 4r . x I (734.2) L o 38 (736.8) / . ' r' i _ (7 7) x ~ E (735.4) V ` \ x ; x -` 40. ) x 73512) - `" - (73 . 73 x x _. NKOS N NTS, L C i s 3s 5 (73`9. o ti4 \ w r r i x ' - x ( s)f -- Qv ABANDON \ - (739.3) (739.3) (739.9 x (7 ,`(739. ' . 738.9) INSTR, #1 011892 (736.9) / x f (740.5) \ x 7421) . 1740. ( _ . �,�� 5.63�49`A ES x(7 ' 73s.2 v1 Z x 1739. p x? / r /(7 1), / x17405} 7) x x / r x .9) x` EX WELL �7 x W a U (739.0) 4- Ei1 `. 736 / .. _ -1 __ _ . __.. -- r . (7421) x ZONED: ( ) � 739.7 Y T Q x(739.8) l x h`40i� �" ove( x1' / x(741.1) x - t ED:\MH1 USE BILE HOME RK. 739.4 p > / x 3 " : ` (741.7) - Ex. PUMP STA. _ / / 2s Ex. - p ) 37. `T37� EX r _ w.- - - x (740.9) \ TOP 41.5 r' ) 742 740.? Z p W ( 36. / (741.7 - - �'7 �' x l ( I Shed �,. - : / er x 4 . #) (740. \ 739.6 (739.8)x x Panel x!' .8) x N x 9.6 x( ]39.5) X x Z 0(j) x \ Stfed / x \ x lN= 733.97 (7433) x Q 04 . x 739.6)/ 40.5 \ \\ �, �X. X x ( ) /NV OUT= 735.66(740.3) � MOU ed � l \ ( ) x(739. x _ __ ` _ (738.4) (738.1 17381 o El (739.4)" _ �k 11740.0) x(' ) x(740.3) \ \ X38 Shed I (73s. )' - -. Ex. 77s3:4j �. ` / i3) - -- - _x x .� ( 1.3�. �' 74` x ` Dec." a ers 7427 Ex ~ � �, � , � (738.6) (737.8) , Q SheO'6 F, ` 4 •5) / WM S ,..- �/0 - .5)x - x � x) _ W 1 \ (7 0. t) x i s Exl /// (v m .. \ x a WM - __. WM (743.3 x x W f p (' l ( ) \ M S \ : , _ x x x o (740.9) / 1741.7) x 741 5�c (7421) x x'`!713 1) _ \ (741.7) (74 .#}. A y rOX. (740.8) X WATER & $E%i! Z W x (740 7 _ , - . - - - - -� �, -��_ - - . - - , . _ �` o , - -_-_ -r=--- 7 s- - WM xl x - Shelf` - r �bp� �- W .741. -� _. --.� r ,.�- 743` _ - (743 9) ,. x x x 7 ` � (739 9} ._ 9. WM i- - ` - - -�-- - C2�- A J -_ = _ . „-_ -w 742s _- x ESMTx 74o.$) (74f.2) z , , \� Panel ,.x(739 9 , WM (743 3) Wl� WM x (740. y 1 WiA (74 r.7 x x -`-o - - - (, ) �� �X. x pp.. (74O 5) s.$)�cA !740.4) _ -'� INSTR. #0 1 00 1 6545 _ - - x _ / 743.1 741. O / ! r'o Z° � (74f.3)f (742s) �APProx.) r A C x , �W C s 4 (7436}- WM-- Ex.- 1744.31 x ` « --+- ,� - - _ . - - . - _ . __. . � p W N x x by M J' 739.2) Mounted / "' x x Elec. y; _ C ); \ (� �1 t J _ . --�% 2 >1=- C/O f `, x AG Fuel (7435) _ WM (HP � � \ \ I, { x xEX. Ponel7 t �- "" J - ` _ X. r' (744.6) x - 9) - L x x(7#24 k 40.6) 740.0) 74o.sI 11 o x n E/ec. r ,Meter '` ��' Unit Uni i rp �E (744.$) i Stork a x co x o \ Mete / t x(744.5) 43.9 � `� _ 1 741.3) g. o (7 .$) / \ (7 ) �C/Oryovnt�d ?c `, Shed x 9 x\ G- ( x ', x f x .-- " `;,.- 744.8) x - x _ (742.4) (741 9� 740.3) ` Oj (' X + % r, (743.6) m /'Elec.° ��x lea'�43.1) i Elec. �, m (x, Shed m a (741.8) x17421) 74"1.5) x 7448 4 (744.7) rr : --- :. 75 - _ 43.3) i�__ , - / x .._ _ - t v (74Gtt4) (740.7) x I �. r` cn �t `.-- i .r' x r , i x L ) = i �- _ x �. 106-2 1742.3) Ex. _! {� - `� (740.9) Ex. 2" FM �s p m x \ Box �^ c� >> x o 45.1 #106-4 - El o ��(7 �0 6'� 1 x iX (744.4) �. aMeterly eters `74 n o i Ex. MH i (7 .5 i k 1 6�i x ; ! x .r l/ec. (741.5) K ,. ._; TOP=742.4'9 ; i�106 5 Ex. 1 Sty. iT06 3 I (744 # Lean -To ` ; f #106 1 x X - x - Ix ; x W Me r i� x {� 1) \moo sr \ 1743. f o o '�` o x o -- (741.8)1 1 `n I Ex. 1 Sty.' Frame Ex. 1 Sty. C i4s. Ex. 1 Sty. x(742s) - Ex. 1 Sty. (741.e ,p (740.9) (741.0) ., i (741.8) CO i y (741.3 0 0 �` o x s, o� 744.5) `, �o p� (74 X3j (1426) O� xBOX O x , I /NIL 1N=736.49 �) 42.7 Frome x x v 1 x (741.1) x \ o.;j 6 1 / (7431) rn \` _ _. i € = O) ; Frame 45. 9 Frame x - \ �? '1a. -• rn t INV. 1N=735.9 C7 �) Dwellin \ Frame � ) ( �AT Ex. 8 W�L 7! , x(740.5 4 %� ` ' \ '" 1 co 0 (741.4) x x -- - { ) Owellin - - _ 1 I 'x co , m _ % " AG Fuel co'a t. v x 3 (7425)INIL 1N=737. 1(NOTr� i Qwellinnn ` x 7 37 t _.__- 9 `k Ex. Dwelling ( }. (74 (7425) r ` (741.) W s s = o -- _ _ (7x2.2) rn 1 i x x i i x x 7 3 44.5) I �_� , Shed _� -r -- �_! ; (741.1) (741.5) x (741.3) (741. x (7423Zo N ti o Storage io �� �, o o _--� / 3 0 !NV U.7= _ (745.6) C ) -- �a x x (141.8) r x x r x x i x x IIA (7420 ( 3 /� r 3 1 \ m� i3 7433) m rn (7423) ( !�77 1 S L�?1 LAS (7421) \ ..�` 7420) /\ co .� av _` � 3 � l741.8�' _� 7424 x-f7�F4.5 x �- __ (746.7��_y,(74s.6�1 � - l��Z��LOeAT ) SANlTA�27) L-- x J x;'(742. } aD / I / co ,o- x s \ x co ( �i _ x x ) (74s.1) t t � I � , 7472); 744.7)) FW \., s l i "A co \ i 744. �. - R (7426) i (743.5) t (745.) �- --- , X (744.4) 1 �. �4 t (7427) (741.4) W I (744.3) \ x 745.3 (746.6) 74 6 x / . 1744.3) / + x � 1 !�j,,/x Ex. 1 I fp (74T 5) x x ` (741.7) (7422) x 74 ) r X. !7422) (742.5) % 17439 E r',� "� �'\ - \ xt�'1�3 (74 .6) EX. f I- f .1 i \ obi JQ ^_- �/ (744.1) 741.6) x (745.9) J x(746.1) } EX. ( 24} I Shed x % l ( EX. 1745) t EX. ! 1742X1)'GfaVel rav� x x ,` x(744.51 .�Dc Oi160 S �.ti (7, q� x \ x x x(745.8)`' _ x (740. (742) EX, 1 x \8 (� �7 0 4EIeC. x745.9 'I \ 743.3 �V (7426) } (741. X) (7 4416) - - - Gravel x l r lefal Ex• Gravel x (745.a { DecElec. x (7 ) (7 ) / 1 4�) Ped. ) x ( ) Gael v _ 3 / T Ex. i Ex. \Gravelx \ �' Crov l r' -1 Ex. Va �; 47.4) 74 . !7 _� .`, ( 2 7"-z4 .41 (74s.sj x Gravel i Coro x Gravel �_p d. ( \ 1 ( 6 _ 1 7421) II Grovel x(7431) P 45.4) o �' Gravel (744. 743. , Gr elm x r -X. `• 747.E x(,. x /..�7 G Vel �,\ o t j 74 %x K __ ----(7453)~ x744 4 x (741.4) ...L ( \ i . _ - .L x / 1 74 9y (745. s) - ' ay�l.�.(�4i l --) (744.7) -�44 - _.x- ---x �` ;-g j �) (744.7) - x - - Gr �-� 45.6)j9UDSON HOLLOW ROAD ,. x EX. ASPH. ROAD PK N ' (745.8) RTE. N0.636 x. Gravel _-, / 4 '� � �- f .-..,. _.i 'S' 4Q',I11lOF+M4MAR^.D- r Elec. Ped. S SZZ'Ol/�2JB' A' 92715 - �- (745.2 477 %c. _ 6 ' LIMIT s r �, 743,8 UNPOSTED SPEED (73s.o) //.s2�74La,,. -7422_ moo) Dec. ( _ w Brick < E Ped. ,e -red.---(Z45 (745.8) Wall (745.3) (744.5) 744.2)\ ster x(743.7) 17X37)] 7 l (j (747.4) ( (745.9) (745.6) / � EX. 15" CMP , x x 46.6) .' x 747.7) (747.4) 1 N x (743.8) x(744.2) I x x(745.5 x x x( x P 1x44.8)1 x (745.5) ,`' x x x ^ x(746.5) x x �7 I$ f �� / INV IN=742.04 (745.5) (744.1) LIMITS OF �°` `0 S 04*081%67 44.6 a INV OUT=742.83 ELIZABETH ANN RITTER DISTURBANCE x 50 PRIVATE ACCESS ESMT. INSTR. #020000172 ^ � � 69(745' � ! �f / SUBDIVISION SIGN DB 931 PG 1480 EX. STOP SIGN - h 1/ ZONED: RA USE: VACANT EX. ROAD NAME SIGN / X 12" RCP EX. ARROW SIGN I !�� INV IN= 743.54 INV OUT=742.88 I � � 1 I I I EROSION & SEDIMENT CONTROL KEY 40 0 0 6=w" Scale in Feet 3.02 TEMPORARY STONE P -L 0:Z CONSTRUCTION ................ CE :':::: M ENTRANCE SCALE: 3.05 SILT FENCE $F X �X X L-9 LL �7l�. M 3.31 TEMPORARY SEEDING r s _ 3.38 TREE PROTECTION __8 - V) z O V) w ry %I WI Q OIz Z :5 M (L W^ V) V) zQ C),M ^J CL Z Z��O�// O O (, W O Z_ U r cnW x CAI w W Q J + a. H Y � � UQ P -L 0:Z W JOB NO.: M 0QIx SCALE: w 0 //y� O L-9 LL �7l�. M Z~_ 0 gC�U dCL.�Y o�Z� Nj0 J Or W 0 O o a. 13-L a (n O V C.I.: P -L Jo DRAWN BY: JOB NO.: P -L 1511014 SCALE: n 0 N M E r- 0)U N� :3 (0 (n N Lo L ) I N 1 3 N N N c0 00� J �' �L® � � U a) O O 0 O to N L 4- E O W�= Q�1- a°i c U ?i 2 v +- W Z Fes- 00 a a AyTH OF �rvP o A J0 EWIS %P' U o. 021621 kl�IONAL SURVEY: C.I.: P -L 2' DRAWN BY: JOB NO.: P -L 1511014 SCALE: DATE: SHOWN 10/24/17 SHEET: 2/14 EROSION & SEDIMENT CONTROL KEY 3.02 TEMPORARY STONE CONSTRUCTION ENTRANCE ............................... O 3.05 SILT FENCER Ib/ac 3.30 TOPSOILING TO 3.31 TEMPORARY SEEDING Rye 3.32 PERMANENT SEEDING ps 3.35 MULCHING rru 3.38 TREE PROTECTION - 'Aug 31: DIVERSION RIDGE REQUIRED WHERE GRADE EXCEEDS 2% 2 OR GREATER EXISTING PAVED _ I I -_ 00 _ _ ROADWAY - III=III-III III -I I I_I I I' 1 l- -111.- FILTER FABRIC SECTION A - A NOTE: SPILLWAY USE DRAGS, STRAW BALES SEDIMENT BARRIER OR HER APPROVED METHODS (STRAW BALE TYPE SHOWN) TO HANNELIZE RUNOFF TO BASIN AS EQUIRED. SUPPLY WATER TO WASH WHEELS IF NECESSARY. Q Ly, O FWW 0 w > 0- A O O 0_ C� Z I- V) X w DIVERSION RIDGE 70' MIN. PLAN NOTES: 1. THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO PUBLIC RIGHTS- OF-WAY. THIS MAY REQUIRE TOP DRESSING, REPAIR AND/OR CLEANOUT OF ANY MEASURES USED TO TRAP SEDIMENT. 2. WHEN NECESSARY, WHEELS SHALL BE CLEANED PRIOR TO ENTRANCE ONTO PUBLIC RIGHT-OF-WAY. 3. WHEN WASHING IS REQUIRED, IT SHALL BE DONE ON AN AREA STABILIZED WITH CRUSHED STONE THAT DRAINS INTO AN APPROVED SEDIMENT TRAP OR SEDIMENT BASIN. • EXTRA STRENGTH FILTER FABRIC NEEDED WITH WIRE SUPPORT STEEL OR WOOD POST FLOV 71,0V VLOV _ -- ri=1 I 110 FT MAX. SPACING WITH IRE SUPPORT FENCE PONDING HT_ PONDING HT_ STEEL OR I WIRE & FILTER FABRIC WPPD POST ATTACH SECURELY 36 �� 36 HIGH MAX TO UPSTREAM SIDE OF POST. RUNOFF RUNOFF 9" MAX. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT z T N 12" MIN. 4"x6" TRENCH WITH COMPACTED BACKFILL (RECOMMENDED) STORAGE HT. -� .a 12" MIN L STANDARD DETAIL ALTERNATE DETAIL TRENCH WITH NATIVE BACKFILL TRENCH WITH GRAVEL NOTE: 4. SET POSTS AND EXCAVATE A 4"x4" 1. INSPECT AND REPAIR FENCE AFTER EACH TRENCH UPSLOPE ANLONG THE LINE STORM EVENT AND REMOVE SEDIMENT WHEN OF POSTS. NECESSARY. 5. STAPLE WIRE FENCING TO THE POSTS. 2. REMOVED SEDIMENT SHALL BE DEPOSITED 6. ATTACH WIRE FILTER FABRIC TO THE WIRE TO AN AREA THAT WILL NOT CONTRIBUTE FENCING AND EXTEND IT INTO THE TRENCH. SEDIMENT OFF-SITE AND CAN BE PERMANENTLY STABILIZED. 7. BACKFILL AND COMPACT THE EXCAVATED 3. SILT FENCE SHALL BE PLACED ON SLOPE SOIL. CONTOURS TO MAXIMIZE PONDING EFFICIENCY. SILT FENCE DETAIL WITH WIRE SUPPORT NOT TO SCALE ADDAPTED FROM: 1992 VA E&S CONTROL HANDBOOK 3.05 EROSION AND SEDIMENT CONTROL NARRATIVE: Project Description This project consists of expanding an existing mobile home park by increasing the number of mobile home units within the property boundary. The existing infrastructure will be improved to support the additional units. Proposed Improvements will be installed during the winter and summer of 2019. Existing Site Conditions The project site is located within a 5.63 acre parcel located in Frederick County, Virginia. Flood Plain The parcel contains no floodplain. Soils The USGS Soils map shows the predominant soil types on the site are 1B, Berks channery silt loam, 1C, Berks channery silt loam, and 41E, Weikert-Berks channery silt loam. These soils are generally moderately deep (20"-40") to weathered shale and sandstone. The soils are generally well -drained and are identified with Hydrologic Soils Group "B". Adjacent Areas The adjacent properties to the north and west are lands of Sherando Park. The adjacent properties east and south are low density residential uses. Off-site Areas There will be no off-site disturbance. Critical Areas No critical areas where slopes are greater than 3:1 are present on site. The limits of clearing and grading area is approximately 2.18 acres. PHASE 1 EROSION AND SEDIMENT CONTROL MEASURES 3.02 A 12'w by 70'1 temporary stone construction entrance will be constructed into the site from the right of way. The entrance shall be maintained in a condition which will prevent tracking or flow of mud onto the public rights-of-way. This may require periodic top dressing with additional stone or the washing and reworking of existing stone as conditions demand and repair and/or cleanout of any structures used to trap sediment. All materials spilled, dropped, washed, or tracked from vehicles onto roadways or into storm drains must be removed immediately. The use of water trucks to remove materials dropped, washed, or tracked onto roadways will not be permitted under any circumstances. 3.05 Silt fence will be installed in selected locations downstream from the construction areas as a first measure of construction. Silt fence will be installed around the downstream side of any topsoil stockpiles. Silt fences shall be inspected after each rainfall and at least daily during prolonged rainfall. Any required repairs shall be made immediately. Damaged, decomposed or otherwise ineffective silt fence shall be replaced. Sediment deposits should be removed after each storm event. They must be removed when deposits reach approximately one-half the height of the barrier. Any sediment deposits remaining in place after the silt fence is no longer needed shall be dressed to conform with the existing grade and stabilized. 3.31 Temporary seeding in accordance with the E & S Std & Spec 3.31 will be applied to the topsoil stock pile and all areas which will not be brought to final grade within 30 days. Embankment or excavated slopes denuded for a period of greater than 30 days shall be temporarily seeded and mulched. All temporary seeding areas will be mulched in accordance with the schedule included herein. 3.38 Trees within designated open space areas will be preserved to the extent practicable. See the Landscape Plan for additional information. Temporary Seeding SEED TYPE RATE MIN. PURITY(%) MIN. GERM.(%) Sept 1 - Feb 15: Annual Ryegrass 50 Ib/ac 98 85 Winter Rye 50 Ib/ac 98 85 May 1 - 'Aug 31: 120 Ib/ac 97 85 Red clover German Millet 50 Ib/ac 98 85 or Ib/ac 98 85 Mulch: 1.5 ton/ac small grain straw Feb 16 - Apr 30: 10-10-10 first being filtered or otherwise treated to remove sediment. m c (D .C) Annual ryegrass 75 Ib/ac 98 85 Mulch: 1.5 ton/ac small grain straw a Fertilizer: 1000 Ib/ac 10-10-10 PHASE 2 EROSION AND SEDIMENT CONTROL MEAUSRES 3.30 Replacement of topsoil will generally occur throughout the work site where vegetation is to be reestablished. Topsoil will be uniformly spread and rolled to a minimum depth of 4". Topsoil shall not be placed while in a frozen or wet condition. 3.32 All disturbed areas will be stabilized by permanent seeding in accordance with the schedule included herein. The anticipated time for construction is winter through summer 2018. 3.35 All seeded areas will be mulched in accordance with the schedule included herein. Permanent Stabilization The contractor shall stabilize all denuded land within 7 days after the end of construction. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The contractor is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. No soil testing is required. The contractor shall establish vegetation on all areas not otherwise stabilized according the following specification: Seedbed Preparation: Ib/ac 98 a. Scarify top 1 " to 2" of soil after final grades have been achieved. b. Add 3 tons per acre pulverized agricultural limestone(1401b/1000sf).ng a SEED TYPE RATE MIN. PURITY(%) MIN. GERM.(%) Tall fescue 120 Ib/ac 97 85 Red clover 8 Ib/ac 95 65 Ladino clover 8 Ib/ac 95 65 Nurse Grass -(season dependent) Sept 1 - Feb 15: Annual Ryegrass 12 Ib/ac 98 85 Winter Rye 12 Ib/ac 98 85 May 1 - Aug 31: > Z 8. Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, German Millet 12 Ib/ac 98 85 or a slope face, adequate drainage or other protection shall be provided. CL � Feb 16 - Apr 30: are made operable during construction shall be protected so that sediment -laden water cannot enter Annual ryegrass 12 Ib/ac 98 85 Mulch: 1.5 ton/ac small grain straw that sediment -laden Fertilizer: 1000 Ib/ac 10-10-10 first being filtered or otherwise treated to remove sediment. m c 1. The VESCP Authority must be notified one week prior to the preconstruction conference, one week prior to the commencement of land disturbing activity, and one week prior to the final inspection. 2. Work on the project (grading, excavation, construction) shall not commence until the appropriate erosion and sediment controls are in place as specified on the plan and as approved by the VESCP Authority. 3. The approved site plan must be kept on the work site and shown on request. 4. Prior to commencing land disturbing activities in areas other than indicated on these plan (including, but not limited to, off-site borrow or waste areas), the contractor shall submit a supplementary erosion and sediment control plan to the VESCP Authority for review and approval 5. The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and sedimentation as determined by the VESCP Authority. 6. All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site development until final stabilization is achieved. SEQUENCE OF CONSTRUCTION PHASE 1 1. Install construction entrance. 2. Install silt fence along downstream perimet r of work areas. 3. Strip, stockpile and stabilize topsoil in location shown on the Site Erosion and Sediment Control Plan. 4. Perform rough grading to accommodate new access road and mobile homes. PHASE 2 5. Install utilities. 6. Complete exterior site improvements. 7. Perform final grading and topsoil redistribution. 8. Install landscape P a e Ian ts. 9. Remove temporary controls after all work areas have been stabilized. 9VAC25-840-40. MINIMUM STANDARDS 1-19: A VESCP must be consistent with the following criteria, techniques and methods: 1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 140 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. 2. During construction of the project, soil stockpiles and borrow areas shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site. 3. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosic 4. Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land -disturbing activity and shall be made functional before upslope land disturbance takes place. 5. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin. V) Z O rn UJ D_ Z O D_ U V) UJ 0 a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap shall only control drainage areas less than three acres. b. Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area. The outfall system shall, at a minimum, maintain the structural integrity of the basin during a 25 -year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. Q o > Z 8. Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume or slope drain structure. N N 1vi 1N 3 p Z 7. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. > Z 8. Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume or slope drain structure. N N 1vi 1N 3 Z ~ 9. Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. CL � 10. All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. LO W W O Li- 10. All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. m c (D .C) 11. Before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of nonerodible material shall be provided. 14. All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15. The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16. Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: a. No more than 500 linear feet of trench may be opened at one time. b. Excavated material shall be placed on the uphill side of trenches. c. Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off-site property. d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e. Restabilization shall be accomplished in accordance with these regulations. f. Applicable safety regulations shall be complied with. 17. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well as to larger land -disturbing activities. 18. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the VESCP. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. 19. Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following standards and criteria. Stream restoration and relocation projects that incorporate natural channel design concepts are not man-made channels and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels: a. Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate natural or man-made receiving channel, pipe or storm sewer system. For those sites where runoff is discharged into a pipe or pipe system, downstream stability analyses at the outfall of the pipe or pipe system shall be performed. b. Adequacy of all channels and pipes shall be verified in the following manner: (1) The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is one hundred times greater than the contributing drainage area of the project in question; or (2) (a) Natural channels shall be analyzed by the use of a two-year storm to verify that stormwater will not overtop channel banks nor cause erosion of channel bed or banks. (b) All previously constructed man-made channels shall be analyzed by the use of a ten-year storm to verify that stormwater will not overtop its banks and by the use of a two-year storm to demonstrate that stormwater will not cause erosion of channel bed or banks; and (c) Pipes and storm sewer systems shall be analyzed by the use of a ten-year storm to verify that stormwater will be contained within the pipe or system. c. If existing natural receiving channels or previously constructed man-made channels or pipes are not adequate, the applicant shall: (1) Improve the channels to a condition where a ten-year storm will not overtop the banks and a two-year storm will not cause erosion to the channel bed or banks; or (2) Improve the pipe or pipe system to a condition where the ten-year storm is contained within the appurtenances; (3) Develop a site design that will not cause the pre -development peak runoff rate from a two-year storm to increase when runoff outfalls into a natural channel or will not cause the pre -development peak runoff rate from a ten-year storm to increase when runoff outfalls into a man-made channel; or (4) Provide a combination of channel improvement, stormwater detention or other measures which is satisfactory to the VESCP authority to prevent downstream erosion. d. The applicant shall provide evidence of permission to make the improvements. e. All hydrologic analyses shall be based on the existing watershed characteristics and the ultimate development of the subject project. f. If the applicant chooses an option that includes stormwater detention, he shall obtain approval from the VESCP of a plan for maintenance of the detention facilities. The plan shall set forth the maintenance requirements of the facility and the person responsible for performing the maintenance. g. Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipators shall be placed at the outfal of all detention facilities as necessary to provide a stabilized transition from the facility to the receiving channel. h. All on-site channels must be verified to be adequate. i. Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent property shall be diverted to a stable outlet, adequate. channel, pipe or pipe system, or to a detention facility. j. In applying these stormwater management criteria, individual lots or parcels in a residential, commercial or industrial development shall not be considered to be separate development projects. Instead, the development, as a whole, shall be considered to be a single development project. Hydrologic parameters that reflect the ultimate development condition shall be used in all engineering calculations. k. All measures used to protect properties and waterways shall be employed in a manner which minimizes impacts on the physical, chemical and biological integrity of rivers, streams and other waters of the state. 1. Any plan approved prior to July 1, 2014, that provides for stormwater management that addresses any flow rate capacity and velocity requirements for natural or man- made channels shall satisfy the flow rate capacity and velocity requirements for natural or man-made channels if the practices are designed to (i) detain the water quality volume and to release it over 48 hours; (ii) detain and release over a 24-hour period the expected rainfall resulting from the one year, 24-hour storm; and (iii) reduce the allowable peak flow rate resulting from the 1.5, 2, and 10 -year, 24-hour storms to a level that is less than or equal to the peak flow rate from the site assuming it was in a good forested condition, achieved through multiplication of the forested peak flow rate by a reduction factor that is equal to the runoff volume from the site when it was in a good forested condition divided by the runoff volume from the site in its proposed condition, and shall be exempt from any flow rate capacity and velocity requirements for natura or man-made channels as defined in any regulations promulgated pursuant to 62.1-44.15:54 or 62.1-44.15:65 of the Act. m. Forlans approved p pp ed on and after July 1, 2014, the flow rate capacity and velocity requirements of 62.1-44-15:52A of the Act and this subsection shall be satisfied by compliance with water quantity requirements in the Stormwater Management Act (62.1-44.15:24 et seq. of the Code of Virginia) and attendant regulations, unless such land disturbing activities are in accordance with 9VAC25-870-48 of the Virginia Stormwater Management Program (VSMP) Regulations. n. Compliance with the water quality standards set out in 9VAC25-870-66 of the Virginia Stormwater Management Program (VSMP) Regulations shall be deemed to satisfy the requirements of subdivision 19 of this subsection. w J tz F- W J Qa W W Q • Z O V) O W Y W �. U Q Q ■ J SHOWN Z ■ co Q X > Z -� w W�W� N N 1vi 1N 3 Z ~ 0:5- N N CL � Y W U 3:: H Z jLJ ~ ami >LO LO W W O Li- V) v d JOB NO.: 1511014 SCALE: ■ J SHOWN 10/24/17 ■ o ., (D CD E 0)a) o r LO N N 1vi 1N 3 � N O O N N W ami >LO LO v U)0 L N L .E O W°) m c (D .C) U I•- L- W Z� 111111111M 00 a a w� wo vp0 NA���� `sSl0 L 1' SURVEY: P -L C.I.: 2' DRAWN BY: P -L JOB NO.: 1511014 SCALE: DATE: SHOWN 10/24/17 SHEET: �/ TYPICAL PARKING DIMENSIONS PROVIDE 2 WHEEL STOPS 0 N 34"'W26 " E 974.12' AT EACH UNIT 0 4 7- 7+010:'1:'1::"._ 00 v +00 0 T.. 2.00,1 PR 11% 0 1.1824 oC'V �0 _W 0.6752 TOTAL GREEN SPACE 0 0.8981 0 00 2.879 -j 00- V — j TOTAL 35 fV nz N One .40 f "V Ltj 3 0 /0 44j Cf) 0 V) 0 Q Lu 44U TA 4 1. REMOVE OC. P STATION TO OINV A:VPR. LLI 4'k- < 2"0 SERV. LI R IN= 4NV OUT EX. V .9 Por I 135. Mou ' ted CL LZ WA4 Panel (0 0 Mounted Dec. Io /4"o WAT. Elec. Meter (TYP.) all j.5 Meters STV. 0. S Elec, 'A W. j 0 wmete RELOCATE EX. #106-15 w yo 0 C:1 AND ASSOCIATED #15 UTILITIES AS REQUIRED 420 0 co r) u 41 \Lj EX. LL E9. Gravel Ex. �-'yetol Ex 'R 2 PR. 45' BENDS�O+_ 00 BW -­Orovel ✓ RELOCATE EX.-/ Dec. METAL CARPORT --Fed— — — — — —7-/ GRASS SHOULDER r1i 50' PRIVATE ACCESS ESMT DB 931 PG 1480 —30' 19' of 1/4":1' _ I GRASS SHOULDER PRIME AND DOUBLE SEAL TREATMENT 8" COMPACTED GRAVEL, TYPE 21-B COMPACTED SUBGRADE TYPICAL PRIVATE ROAD SECTION NOT TO SCALE VIFA 0 EXTEND ROAD SURFACE TO PROVIDE 2 PARKING SPACES(TYP) -0 4+ 13+00 bo' T 00 fV A COUNTY OF FREDERICK DB 440 PIS 421 ZONED: RA USE: RECREATION t� v 0 0 T.. 2.00,1 PR 11% 0 1.1824 oC'V �0 _W 0.6752 TOTAL GREEN SPACE 39,121 0.8981 REMAINDER 125,416 2.879 -j 00- V — j TOTAL 35 5.6348 N One .40 C) W)1 Ltj 3 0 a. LL_ Cf) 0 V) 0 Q Lu P Top= TA 4 1. REMOVE OC. P STATION TO OINV LLI coNNEcr TO EX 2" .6 R IN= 4NV OUT EX. V .9 Por I 135. Mou ' ted CL �7 CO I Efqc. W/j du -a77 (Approx.) WA4 AIC . Unit ExPanel _-C/O �Ex� U0b77M5d Elec. , "7- �ill D�____ Elec. Elec. Shed Box ',_A Meter Meters Elec. t rtzkk Box ((:31 (b G Fuel mm, Storage � k a 1 J 7 2 - Ex. _E )7, Grovel x. GrovelEx. Dec Ex. Gravel Grove_l -EL + + + 0. Im— 7/— Grav; Elec. Ped._5 562-01 W N' 92-715'77 w/ Brick Ex. Wall Dumpster ELIZABETH ANN RITTER INSTR. #020000172 ZONED: RA USE: VACANT T --b WM Ex. AG Fuel :: I Uni L_C/o _2 Ex. Storage ,o Shed 0 Lx. MH 1106-4 ___j7_06:::J7 X -if 0 I Sty. rn TOP= 742.49 . Ex. I Sty. wEx. 1 INV. IN=736.49 Ex. Frome INV. IN=735.97 1 Frame Dwelling FromeSty. Lin q 3INV. IN= 73 Z 2 1 (No -wel LOCATE Ub INV OUT=735.77 TO PROVIDEr—, r SPACI �ACEN U raEx Alailboxes Dec Ex. STOP SIG rav vt el Ped. Ex. as Gravel Grp - X — 6 C 0 0 W 1-- — 0— — _I-*- DESK ­+ WATER ESMT. -EX ASPH. ROAD + +I=, a" Ov CURVE ARC LENGTH RADIUS DELTA ANGLE CHORD BEARING CHORD LENGTH C1 87.46' 55.00' 91*06'30" S 7734'41" W 78.53' C2 86.39' 155.00' 190*00'00" S 12*58'34" E 77.78' PR. PAVILION JENNINGS INVESTMEqTS, LLC I NSTR. #150011802 5.6349 ACRES-" ZONED: MH1 USE: MOBIL&OME PARK W Ex. 2" FW (3) —S SSY. ry 2" T_ --Oppm" INM 40 0 40 PR. 2"0 200 PSI PE TUBE WL TO -REPLACE EX. 2" WL Scale in Feet CONNECT TO EX. 2" WL GENERALLY AS SHOWN. CONNECT ALL METERS X*IWATER & SEW ESMT. �INSTR. /010016545 1106-2 Ex. 1106-1 2LWI`�s— Ex. 1 St y. Lean -To Ex. I Sty. Frame WATER Fratne R. 8_� EX WL D� ng CONNECT TO EX. 8" WL 1 1'1_j i --"—I __�weq�_ VAULT L Shed . 8x8 TEE. S- GV_ 8X61__ FIELD LOCATE EX. SANITARY L --.-j REDUCER, 6" GV TO SEWER LATERALS PR. NEW FH RESTRAIN EX. PIPE BACK TO EX. TEE Ex. I _1 Gravel PR. 30' FREDERICK WATER ESMT I vel -+-22 _BERN b 0 04 Efec, Ped. S 04*0856" Jr 53.69' EX STOP SIGN EX ROAD NAME SIGN EX ARROW SIGN EX. 12" RCP INV IN=743.54 INV OUT=742.88 Ex. 2" FM Ex 8' YZL HUDSON HOLLOW ROAD RTE. NO. 636 AQ_yV0&M1WR ROAD— 7-- UNPOSTED SPEED LIMIT X. 15" CMP INV IN= 742.04 INV OUT=742.83 (DAMAGED) -EX SUBDIVISION SIGN SEE SHEET 9 FOR ENTRANCE IMPROVEMENT PLAN NOTES: 1. FREDERICK WATER EASEMENTS ARE EXCLUSIVE. 2. COORDINATE WATER SERVICE REPLACEMENT ON PRIVATE SIDE OF EXISTING METER VAULT WITH FREDERICK WATER'S INSPECTOR. 3. FIELD LOCATE AND SHOW EXISTING FORCE SEWER BALL VALVE NEAR PROPERTY LINE. 4. VERIFY THAT THE EXISTING WATER METER IS SIZED PROPERLY. METER CALIBRATION WILL BE REQUIRED AT THE OWNER'S EXPENSE WITHIN THREE MONTHS OF THIS APPROVAL. COORDINATE METER CALIBRATION WIT FREDERICK WATER'S CUSTOMER SERVICE DEPARTMENT. 5. FREDERICK WATER, AT THEIR DISCRETION, MAY REQUIRE AS—BUILT DRAWINGS. AREA TABLE AREA SQ. FT. ACRES NEW MOBILE HOME LOTS 51,506 1.1824 NEW ROAD R.O.W. 29,414 0.6752 TOTAL GREEN SPACE 39,121 0.8981 REMAINDER 125,416 2.879 0 C,4 j TOTAL 245,457 5.6348 V) z 0 LLJ fl� Iffisl V) F_ U) Z Z :2 Ld Z 0 w :� 0 0 0 U) z Ld LL, cl 0) 0) Ld 00 00 d C.I.: CL Lr Z Lu JOB NO.: P -L � Q 0 DATE: a) 6 L_Ljj �*k IAJ Z M D Z 0 0 C,4 CL 0 0 LLi 0 0 II­—zW — ch 0 Lu C) D a a L.Li Ltj 3 0 a. LL_ Cf) 0 d C.I.: P -L NA DRAWN BY: JOB NO.: P -L 0 C14 SCALE: DATE: a) 04 P�f) E 0') 0)o U) V) C-4 04 C,4 *C LID (0 Lu0 C -&'-"_-,C 0 '. C) 0 0 a - (D L� 4- (D C: LTZ V) 0 0 E 0 Lu L. E Z LLI R CL T H OF C. LEWIS ic. No. 021621 k4�10NAL SURVEY: C.I.: P -L NA DRAWN BY: JOB NO.: P -L 1511014 SCALE: DATE: SHOWN 10/24/14 SHEET: 4/14_ — —'-----N — '� —�—r— X501 X25" 3 994.L2' �"'� /��'� — i t `PIMP flATION� 1 , t 14 ��f r'/ ! !! _ _ .4t_� e ` oo. Uj may$ N� 4� \ \ ' tl• '� v % 4! ^7v V i�Ofit/ .� 1 � Ex. PUM STA. Ex,, o rr / 4� o /ir P&. 2"s>s�W T. Q �o ri o r TOP 41.5 - ` g Z Sged ���`_ / t SERV. LI 4 ! IN 33.9 - /NV OUT 735. ` 2' 743 \ / _ J16 I y 1=_-- - - ;_ 1 �tiy WM -p WR 77x. -:F "-Wj_rr — -. -' }� I� 6 r -- -- r / j, WM tApprox.) i W� 4 , - Y'1W d 17 / t /4'0 WAT,I _CE/O N. Ob X) / S RV.T. ,) 1 4 \,tR F r ` LLI �. �✓ ( 1 #15 t [ � 420 ,1 0 kk\ Am YA Sh -�- — (21RR. 45' \ BENDS+- + 0 1 T- + 0= % RELOCATE EX. ! S' ami O1��rBAl a>/ 929:15' �. f L ML CARPORT � \ l �Q \ PAVILtpN _ 1 qVE �ci ECT ToEx 2• Ex.y —738, STATION CONN TO �R: 6' PNC Shed .eti 21 7�A — — — —-rox.WAt'\ H ASSY.Lam_ 1 . — — — WM = _"Ex. — _ — f' Ia ( —• CSO , WM v -PPTD ' _ - \ . LL 2 f Ex. MH i .� _ •� \ - = I _ TOP=742. INV.1N=7 ':9; INV IN= 715 INV. 1N=7,37.21(`NOfr USQ_ I ___y INV X735.77 _ i __ 1 I ILL "j 7---' F7ELD LOCATE EX. SANITARY i /r SEWER LATERALS 7LL 4 _"l 30' FREDERICK ATER FZSMjT. PR _BE "- __. - o ,' • P `. 0ER1CK WATER ESMT. f/ - r M- T , `8" ��u N- ._ _ Z- -- S 04'081587 Jr 53.80' 40 0 40 Scale in Feet f SANITARY SEWER LATERAL I1 PROFILE 745 _________._. __ __ SCA ___ _-_�._. II (H) 1 " 50' __ ._� �..-_ --------- __ _E cw-E-® cL 745 _____ _. II M Oa�Y - —. _--- -- _ _._ ___ __ __ _ _____ WW a V— 740 -- -- ___ 745 ________ _-_ _.____...___ CL __._� _ -- 745 O) U U Wa= � -C Q(- 4. O jIiiIIiiiiiiii U ?i II W Z -_ ___ _ _._ _.� EX 2"-_ FM __ 740 735 �_ 740 740 -_- __ ___.__ — 735 740 II COVER 735 I ____ __ __. _ __ ___-.____�_.__ 735 730 ��__ I _PGC _ �____- 730 _– ___________ 0 - _-- -- 730 -__�___________ __.__________ . 730 SEE SA SEWER _ITARY A_ L_f1 LATERAL-fl- PROFILE PROFIL FOR CON I N 0 - -- 730 _ ;_ ,-- 730 4 V 1 7:t7 0 �n d 116Uj LLZ 00af Q + �..__ + + Li 10+00 11+00 0 U o Wof aZ r 00 Ld o CL & ®w Q_Z W J U :2Z ® Uw 0~i d W< CL af Q C, d cli d st W J F- U M Z 0 U)LLI WO CLwQ a_ O a p J - W W f LL Q �- Ljj + W W O _. O + v ��- 10+00 11+00 Ld no O o w In Ld a.Z O) 04 Inix In M In PM ►� N 00 ui NO o Of .- aZ W J U omw of 5-< Q - cp X W J H U �Z omw, OfXD W (D ____0____ _______ to + +U + 10+00 11+00 J 00 J 00 O ® p Ow W W CID`° It M n 0n Ow Of a- > Z N V) M Nj M > z w J U W J I- U Z ® � Z OFF_ X~® a- W Q O r X O W of d emSCH 44 SANITARY SEWER LATERAL 92 PROFILE 745 _________._. __ __ SCA ___ _-_�._. ES: _ (H) 1 " 50' __ ._� �..-_ --------- __ _E cw-E-® cL 745 _____ _. 740 M Oa�Y - —. _--- -- _ _._ ___ __ __ _ _____ WW a V— 740 -- -- ___ 745 ________ _-_ _.____...___ CL __._� _ -- 745 O) U N C U Wa= N O -C Q(- 4. O jIiiIIiiiiiiii U ?i 0C) W W Z -_ ___ _ _._ _.� EX 2"-_ FM __ 740 735 �_ 740 740 -_- __ ___.__ — 735 740 COVER 735 ���-.____— ____ __ __. _ __ ___-.____�_.__ 735 730 ��__ �v0- _PGC _ �____- 730 _– ___________ 735 - _-- -- 730 -__�___________ __.__________ . 730 SEE SA SEWER _ITARY A_ L_f1 LATERAL-fl- PROFILE PROFIL FOR CON I N 0 - -- 730 _ ;_ ,-- 730 4 V 1 7:t7 0 �n d 116Uj LLZ 00af Q + �..__ + + Li 10+00 11+00 0 U o Wof aZ r 00 Ld o CL & ®w Q_Z W J U :2Z ® Uw 0~i d W< CL af Q C, d cli d st W J F- U M Z 0 U)LLI WO CLwQ a_ O p J - W W f LL Q �- Ljj + W W O _. O + v ��- 10+00 11+00 Ld no O o w In Ld a.Z O) 04 Inix In M In PM ►� N 00 ui NO o Of .- aZ W J U omw of 5-< Q - cp X W J H U �Z omw, OfXD W SANITARY SEWER FORCE MAIN Q #3 PROFILE SCALES: (H) 1" � ' H 1 "= 0' _j> OLL� W ic. M Z�0 wx �QU M Oa�Y - —. _--- -- FnDa N SURVEY: w O WW a V— a +� 0 745 --_ . GRAD __CL-�___�_� CL 745 745 O) U N C U Wa= N O -C Q(- 4. O jIiiIIiiiiiiii U ?i 0C) W W Z F2 _._ EX 2"-_ FM __ 740 _ 740 740 -_- 3C M1N. 740 COVER 735 ���-.____— ____ __ __. _ __ ___-.____�_.__ 735 ��__ �v0- _PGC _ �____- _– ___________ 735 - _-- -- 730 -__�___________ __.__________ . 730 SEE SA SEWER _ITARY A_ L_f1 LATERAL-fl- PROFILE PROFIL FOR CON I N 0 - -- 730 _ ;_ ,-- 730 4 V 1 7:t7 0 �n d 116Uj LLZ 00af Q + �..__ + + Li 10+00 11+00 0 U o Wof aZ + 0 00 Ld o CL & ®w Q_Z W J U :2Z ® Uw 0~i d W< CL af Q C, d cli d st W J F- U M Z 0 U)LLI WO CLwQ a_ SANITARY SEWER LATERAL Q #3 PROFILE We � SCALES: H 1 "= 0' _j> OLL� W ic. M Z�0 wx �QU M Oa�Y - —. _--- -- FnDa N SURVEY: w O WW a V— a +� 0 -__ --_ ._DE __CL-�___�_� DATE: 745 10/24/17 O) U N C U Wa= N O -C Q(- 4. O jIiiIIiiiiiiii U ?i 0C) W W Z F2 _._ 740 _ - _� 740 ��__ 735 _ �____- _– ___________ 735 730 _ ;_ ,-- 730 4 V 1 7:t7 Q O - w ______-. z_. Ld X (D ____0____ _______ to + +U + 10+00 11+00 J 00 J 00 O ® p Ow W W CID`° It M n 0n Ow Of a- > Z N V) M Nj M > z w J U W J I- U Z ® � Z OFF_ X~® a- W Q O r X O W of d z _o Nom_ L.L U V) w 0 wl Q 01 Z 0*6 Z g V) W J W V- N I/ �a. IxQ Z w J F_ F_ Y � � U Q Q Z We � L 0 � I _j> OLL� W ic. M Z�0 wx �QU M Oa�Y V) N o�zW FnDa N SURVEY: w O WW a V— a +� 0 ■ � r ° J .o a HN C. LEWIS a ic. NME 0)0-, o wx o I V) N I 13 '� O SURVEY: P -L Lu DRAWN BY: 0 0 0 1511014 SCALE: DATE: SHOWN 10/24/17 O) U N C U Wa= N O -C Q(- 4. O jIiiIIiiiiiiii U ?i 0C) W W Z F2 00 a (DV) z af J w W U) 3 Eggs (_) O w 'tiTx of � r ° HN C. LEWIS a ic. No. 021621 �1�pOA wx SSIONAL SURVEY: P -L 2' DRAWN BY: JOB NO.: P -L 1511014 SCALE: DATE: SHOWN 10/24/17 SHEET: 6� 14 200 ° 200 PRIVATE SANITARY SEWER FORCE MAIN EXHIBIT Scale in Feet SCALE: 1 "=200' CONTOUR INTERVAL=5' LEVEL CONTROL MTG. 2" GATE VALVES WET WELL SALUM. ACCESS DOOR ST FLOAT BRACKET 2" VENT TOP RAIL SUPPORT (BOLTS TO COVER FRAME) z s i7 DISCHARGE PIPING DISCHARGE FLANGE CHECK VALVE INLET HUB (FIELD INSTALLED BY CONTRACTOR) QST LIFTING CHAIN �—MODEL GRP37/3 SUBMERSIBLE PUMP LIFT -OUT ASSY. :1 4 ;. SECTION FIBERGLASS UFT STATION 2.4 YARDS OF CONCRETE ANTI -FLOATATION SPOT WOM PFICIPERTY PUNIP STAT t P€JkfP flEAD WORKSHUT .. SANITARY SEWER PUMP STATION DETAIL NOT TO SCALE PUMP STATION SPECIFICATION IS PROVIDED BY TRIPLE "D" PUMP COMPANY. 3301 COTTON, WACO 76712 254-772-7623 Rated Capacity: 22 GPM Rated Head: 62' TDH Electrical Service: 230 Volt, 3 PH Wet Well Sue: 48' Diameter x 12` Deep 2 CRP 16/3,1.5 HP, 230 Volt, 3 PH, 34501 RPM; 30' Cord, Submersible Grinder Pumps, Homa 2 Autocvuplings 1 48" Diameter x 12' Deep Fiberglass Basin, 3" Top Flange, Anti -Floatation Bottom, (3) Galvanized Lifting Lugs Duplex Pump Studs 1 54" Aluminum Cover with 26" x 36" Access Hatch, 2" Vent Coupling, 316 SST Hardware, 300 PSF Load Ratir 2Upper Guide Rail Brackets, 304 SST 4 1" Guide Rails, 304 SST 1 2' Discharge Pipe Package, SCH 80 PVC 2 2' Gate Valve, Brass 2 2" Swing Check Valve, Brass T Duplex Alternating Control Panel Complete with Red High' Water Alarm Light, Nema 4X FRP Enclosure 4 Float Switches, Mercury, 30' Cord I Float Switch Bracket, 304 SST 2 3/16" x 14' Lifting Chains, 304 SST 1 2" Vent Assembly wkh Screen, Galvanized 1 Item of Fasteners, 304 SST 1 Item of Assembly 1 Item of Delivery Technical Information GRP16/3 Operating data 22 US g.p.m.US g.p.m. Motor housing Flow 22 US g.p.m. !! ' • Head �■ 111111 I A ■ VIII I) �. •, 1.05 hp [ Pump efficiency 29,2% £ (BOLTS TO COVER FRAME) z s i7 DISCHARGE PIPING DISCHARGE FLANGE CHECK VALVE INLET HUB (FIELD INSTALLED BY CONTRACTOR) QST LIFTING CHAIN �—MODEL GRP37/3 SUBMERSIBLE PUMP LIFT -OUT ASSY. :1 4 ;. SECTION FIBERGLASS UFT STATION 2.4 YARDS OF CONCRETE ANTI -FLOATATION SPOT WOM PFICIPERTY PUNIP STAT t P€JkfP flEAD WORKSHUT .. SANITARY SEWER PUMP STATION DETAIL NOT TO SCALE PUMP STATION SPECIFICATION IS PROVIDED BY TRIPLE "D" PUMP COMPANY. 3301 COTTON, WACO 76712 254-772-7623 Rated Capacity: 22 GPM Rated Head: 62' TDH Electrical Service: 230 Volt, 3 PH Wet Well Sue: 48' Diameter x 12` Deep 2 CRP 16/3,1.5 HP, 230 Volt, 3 PH, 34501 RPM; 30' Cord, Submersible Grinder Pumps, Homa 2 Autocvuplings 1 48" Diameter x 12' Deep Fiberglass Basin, 3" Top Flange, Anti -Floatation Bottom, (3) Galvanized Lifting Lugs Duplex Pump Studs 1 54" Aluminum Cover with 26" x 36" Access Hatch, 2" Vent Coupling, 316 SST Hardware, 300 PSF Load Ratir 2Upper Guide Rail Brackets, 304 SST 4 1" Guide Rails, 304 SST 1 2' Discharge Pipe Package, SCH 80 PVC 2 2' Gate Valve, Brass 2 2" Swing Check Valve, Brass T Duplex Alternating Control Panel Complete with Red High' Water Alarm Light, Nema 4X FRP Enclosure 4 Float Switches, Mercury, 30' Cord I Float Switch Bracket, 304 SST 2 3/16" x 14' Lifting Chains, 304 SST 1 2" Vent Assembly wkh Screen, Galvanized 1 Item of Fasteners, 304 SST 1 Item of Assembly 1 Item of Delivery Technical Information GRP16/3 Operating data 22 US g.p.m.US g.p.m. Motor housing Flow 22 US g.p.m. Pump housing Head 62 ft Cast Iron ASTM A48;CI.40B Shaft power P2 1.05 hp [ Pump efficiency 29,2% £ Required pump NPSH AISI 304 Stainless Steel 7 Pumpe type Single pump Fluid No. of pumps 1 C Fluid Wastewater 62.31 Ib/fto Kin. viscosity 1.077E-5 4 Pump hp Explosion protection Pump Code GRP16/3 Rated speed Impeller Vane impeller with cutter sys. 1 Impeller size 51/s" 75.0 % % % Solid size Rated current 6.2 /3,1 A Starting current, direct starting Discharge port 2"M [o Suction port 0,76 3 Starting mode Directly Power cable 2 Control cable 1 Motor Type of power cable [hl Rated voltage 2301460V Frequency 60 Hz 1' Rated power P2 1.5 hp 0 - Rated speed 3450 rpm 0. Number of poles 2 Efficiency 75% Rated current 6.2 / 3,1 A Materials 22 US g.p.m.US g.p.m. Motor housing Cast Iron ASTM A48;CI.406 Motor bearing cover Cast Iron ASTM A48;C1.408 Pump housing Cast Iron ASTM A48;CI.40B Impeller Cast Iron ASTM A48;CI.40B Cutting system Hardened Stainless Stall HRC55 Motor shaft AISI 430 F Stainless Steel O -Rings Nitrile Rubber Bolts AISI 304 Stainless Steel Mechanical seat on medium side Sic i Sic Shaft seal (motor side) Nitrile Rubber Lower Bearing Double row angular ball bearing Upper Bearing Deep Groove Ball Bearing P M.P E W M t T S Y S T E M Testnorm; HI Standard Seca. 14.6.3.4.1 Wet well installation with coupling kit 2Z (GRP10...21) Dimensions in mm [inch], letters see table , -i F .se Upper Me rad bracket i' -.1n - - n vn r" eo j {ia ,o mi ,,troy >a _ SM 1. U r � 70 SO 90 [US g.p. Table Dimensions ( inch ) Project Project no.: Created by;Page: Date: 2017.10-26 Technical Data GRP16/3 1iMVill 1; P uM PE N M I T S Y S r E Ai Flow 22 US g.p.m.US g.p.m. Head 62 ft ft Shaft power P2 1.0 hp Static head 0 ft Pump efficiency 29.2 % Required pump NPSH Vane impeller with cutter sys. Flow Max. it Pumpe type Single pump No. of pumps 1 Hz Fluid Wastewater Temperature 68 -F Density 62.31 Ib/fto Kin. viscosity 1.077E-5 ft'/s Motor housing Cast Iron ASTM A48;CI.40B Motor shaft AISI 430 F Stainless Steel Pump housing Cast Iron ASTM A48;CI.40B Bolts AISI 304 Stainless Steel e Motor bearing cover Cast Iron ASTM A48;CI,40B 6 -Rings Nitrite Rubber m Impeller Cast Iron ASTM A48;CI.40B Cutting system Hardened Stainless Stell HR 55 a Weight aggregat 57.319 lb 0 Project Project no.: Created by:Page: Date:. 4 2017-10-26 File: SI\Frederick Water\1 TRENCH AND BEDDING,pdf S ]or invalid reference spigot by Basketed bell 45' bend 2 minimum Basketed pipe and fittings 8"x 4" gesketed bell wye sokrent weld cep Property lire finished grade 3s"I in � Icover treated n 4" with . top 8- palmed green All pipe and fittings shall be SDR 35/26. GRAVITY SEWER LATERAL FOR MAIN WITH COVER 15 FT OR LESS -22- Panella Model PA4SV-CSK (41 cast iron cleanout cap with standard gasket and brass plug having a countersunk square head — finished grade 1r sanitary ore sewer main Purttp Motor bearing cleanouttlamphde frame Pump Code GRP1613 Speed 3450 rpm Suction port Discharge port Max. Head 2" M Min.. 86.8 2,8 ft It Impeller type Vane impeller with cutter sys. Flow Max. 90:3 US g:p.m. Solid size inch Pump efficiency max, 38.9 Hz Impeller @ 5.04 inch Required rated power max. P2 1.5 hp Motor housing Cast Iron ASTM A48;CI.40B Motor shaft AISI 430 F Stainless Steel Pump housing Cast Iron ASTM A48;CI.40B Bolts AISI 304 Stainless Steel e Motor bearing cover Cast Iron ASTM A48;CI,40B 6 -Rings Nitrite Rubber m Impeller Cast Iron ASTM A48;CI.40B Cutting system Hardened Stainless Stell HR 55 a Weight aggregat 57.319 lb 0 Project Project no.: Created by:Page: Date:. 4 2017-10-26 File: SI\Frederick Water\1 TRENCH AND BEDDING,pdf S ]or invalid reference spigot by Basketed bell 45' bend 2 minimum Basketed pipe and fittings 8"x 4" gesketed bell wye sokrent weld cep Property lire finished grade 3s"I in � Icover treated n 4" with . top 8- palmed green All pipe and fittings shall be SDR 35/26. GRAVITY SEWER LATERAL FOR MAIN WITH COVER 15 FT OR LESS -22- Panella Model PA4SV-CSK (41 cast iron cleanout cap with standard gasket and brass plug having a countersunk square head — finished grade 1r sanitary ore sewer main Capitol Foundry of VA, Inc traffic Motor bearing cleanouttlamphde frame LJ Motor design Submersible motor concrete skid pad Insulation class 24" die. x 6" deep H Motor name AM120TM.2,4/2/3 �ILI.Lr. Degree of protection 0 IP 68 Frequency 60 Hz Temperature class UJ T4 Rated power P1 2.0 hp NEMA code W W F Rated power P2 1.5 hp Explosion protection W0 0c0 Rated speed 3450 rpm Efficiency 0 at rated power h 100% 75% 50% 75.0 % % % Rated voltage 230 1460 V 3- Rated current 6.2 /3,1 A Starting current, direct starting 248 112,4 A cos phi at % rated power 100% 75% 50°/ 0,76 Starting current, star -delta A Starting mode Directly Power cable 6G1,5 Control cable Type of power cable H07RN8-F PLUS Type of control cable Cable length 32.809 ft Service factor 1.15 Shaft seal Mechanical seal on medium Shaft seal (motor side) side Sic / Sic Nitrile Rubber Bearing Lower Bearing Upper Bearing Double row angular ball bearing Deep Groove Ball Bearing Remarks Motor housing Cast Iron ASTM A48;CI.40B Motor shaft AISI 430 F Stainless Steel Pump housing Cast Iron ASTM A48;CI.40B Bolts AISI 304 Stainless Steel e Motor bearing cover Cast Iron ASTM A48;CI,40B 6 -Rings Nitrite Rubber m Impeller Cast Iron ASTM A48;CI.40B Cutting system Hardened Stainless Stell HR 55 a Weight aggregat 57.319 lb 0 Project Project no.: Created by:Page: Date:. 4 2017-10-26 File: SI\Frederick Water\1 TRENCH AND BEDDING,pdf S ]or invalid reference spigot by Basketed bell 45' bend 2 minimum Basketed pipe and fittings 8"x 4" gesketed bell wye sokrent weld cep Property lire finished grade 3s"I in � Icover treated n 4" with . top 8- palmed green All pipe and fittings shall be SDR 35/26. GRAVITY SEWER LATERAL FOR MAIN WITH COVER 15 FT OR LESS -22- Panella Model PA4SV-CSK (41 cast iron cleanout cap with standard gasket and brass plug having a countersunk square head — finished grade 1r sanitary ore sewer main 45' bend 6" stone All pipe and fittings shall be SDR 35/26. GRAVITY SEWER CLEANOUT -24- FEB 09 FEB 09 Z O U) > UJ 01 Z 0 F- D_ U In w 0 wl0 OIZ J D W3 CJ N } Z Q N Y � d Capitol Foundry of VA, Inc traffic Q bearing cleanouttlamphde frame LJ and cover, ham No. VBQ*S 2 concrete skid pad SCALE: 24" die. x 6" deep ...... ....... t'. 45' bend 6" stone All pipe and fittings shall be SDR 35/26. GRAVITY SEWER CLEANOUT -24- FEB 09 FEB 09 Z O U) > UJ 01 Z 0 F- D_ U In w 0 wl0 OIZ J D W3 CJ N } Z Q N Y � d � U Q Q ■ J LJ LI 2 %JJ Lr— SCALE: T- J, 2 /�y w W �ILI.Lr. M 0 M gQU t3 (D Cp 41 UJ O �^ 11-- Z VI S /' (n Q Or UJ W O O W W ,C^ Y / a- O ■ d P -L ■ J DRAWN BY: JOB NO.: ■ 0 .- SCALE: DATE: O 04 E LO In Cn� cc (n N In In to sltst� N N N CV C0 t3 (D Cp 41 W 0 L- •& U —, , Q p v J �' L0�@ (D U C: C � W r .E o W0 0c0 o - Fm ( DC: L) 2 U 0 H li- Z W - 00 a a ,1;,Tx of J . LEWIS a c. No. 021621 L As `sSI ONAL e.V SURVEY: P -L 2. DRAWN BY: JOB NO.: P -L 1511014 SCALE: DATE: SHOWN 10/24/17 SHEET: V J4 �- -V1 &a ff JV74.1,11V - - - - FREDERICK WATER \ 3 \c r CONSTRUCTION NOTES � 1. The Frederick Water Water and Sewer Standards and - - _ x• , Specifications are available at www.frederickwater.com. � ~ \ ` �� °' 2. The contractor shall adhere to Frederick Water's standards ` -� - 40 0 40 and specifications in effect at the time of construction. \ o o > o - _ ^� - ✓ oo / FFA LF Ho ?9 4 1 PR. PAVIL19N - �-1 3. The contractor shall coordinate with and arrange for % O \ et _73'3 / ro O� / % f� SF -g Z ry��, o z N��, N �v o r f moo • r ,q�q � - ,.\ � �-- - _- � Scale I n Feet .inspection by Frederick Water. zo ��` m o 1` E.Y LL to `,qcr 73S Q zo %. moo / /` �o oo � ..._. -,_ ai � � o s �,,.. -- o �o Q �o ri• � �.. • � / v � / ., ._.e �,�� s ivo f , _ o� 4o u / m� / ® - 4. The contractor shall connect a new sewer line to an existing > av � r mer p (v 4Z ori \ \ f ^� r` m �\ Q m Ex. PUM STA. / f / °' \ F_x.. - 7 - PR. 2"0 200 PSI PE TUBE WL TO manhole b core drillin the manhole. L' A rbc ri Ex, Ori / Q�oo a ori PS, �"0 W T. Q ri 2°om r TOP 41.5 - - _ / �` / \ 38 - REPLACE EX. 2" WL y g ' ~ \�'� Sled ��� ,° � -- '��` SERV. LI `�, 4� l IN 733.9 > '` \ � \ Shed "_ _..1,--��__., u \ _ Po / ° �> q r? \ !7j CONNECT TO EX. 2" WL GENERALLY 5. A new water (or forced sewer) main shall be connected to Ex. t f= � OUT 735. Mo d-- '� `° AS SHOWN. CONNECT ALL METERS b Shed �f� ed \ v win's - /o --Dec. Exp 2 - - - - - -\ (3)' - an existing main by a wet tap. Frederick Water shall furnish all Xx - (Appprox.)- - \ Ms -I - needed material and make the tap. X. WATER & SEW. r' - ` HjM' - - - f -� -�t'-�y �� - - a �-- - - - - - - H ASSY. - -- - a =�-,_ ESMT. a. An Application for Wet Tap shall be submitted and the Wi1;1 - ' -t - - - - - - 6 \�� Panel / f r (win W/Gf \ t . W -� ° -Win-- Ex. - - - - ' -' _ "� = - - - - - - �- • - app /NSTR. 010016545 initial fee aid before the to is made. Mounted /...�,/ DecFZ _ - _..iApprox.) AIC � ti� l C , 13 - C/o AG Ft�eL w W_)M P r _. -- _ TApPro 1 P - M� 1J Dec. /4"0 WAT/ - 1 Meter / ` Unit Ex. Poneh � �\tom . Uni j �1 � �Ex. r \\ -'Storage `v ' e C\ �c o f -,- x n g.>� �•� Oti `� Meters SRV. �AT. , TYP.) t Dec.t '� __ f_M rted� ` �, ` Ex. 11" shed j > � _ / � --- = - 6. Exact locations of water and sewer services on new lines are \F s '+ - ° m leo.'" \ Dec.m Shed i , "`` I - - -- i to be coordinated with Frederick Water's inspector. �oC c� f f`s 1T1 x Box F\ \cit x J �'` - . i o ( \Cr 1 -- `\ �W1/s P o X06 �X x x Me er �x 1 ` . 2 ; Ex. MH V 1 106-5� #106-4 Ti r 06=3. ;E Ex. y� i 106-1 - (nom Meters 1 i �./eC �4 Q o _i I Ex. 1 St � f: w 106-2 Leon -To j i� ( Ex. 2" FM j w .� 1' - ,� rn TDP=742.4 Ex. 1 St y' Ex. 1 St ' I Ex. 1 St - � . ,° • o o o o i / o �' Box , -' ( rn I j INV. IN=7, 6.4 y' Frame / ! \ y' y' -� Ex. 1 Sty. w - - Ex. 8 W L - 7. Frederick Water's maintenance division shall furnish and install I ; o� o o' / o o' 1s.rn o >so vo\ I Frome y a rn _ v °t is rn 1 rn i = °' G _ °' I INV. IN=735.9 Dwelling Frame , _ 3F Frame Fro e PR. 8"0 WL " _ _ _ - r �. q,rn_ ( m �k. I o n,,, �F 1 ! wellin \ ( I cx� Dwelling Ex. I Dwe in T _ CONNECT TO EX. 8" WL ' 0 W ` (D �' .SCO -- AG Fue/ fO ' -'! cA vi, 3 INv. IN=7 7. 1(NO�- -� -r �- -- I....__.. ! j�_ _g all water meters though 2 inch in size. It is the contractor's w �" o\ z o =�` \ = 1 Z m I I I ► Shed C a 8x8 TEE. 8" GV, 8xs Storage i INv 377_ r_ -� _�-� ,� \ I -� r-- FIELD LOCATE EX. SAN/TARP L --- J + I REDUCER. 6" GV To responsibility to have the meter box assembly installed correctly. 3� m \� rn \ _ _� m 1 / I I __ I/ 1 U.rr SEWER LATERALS _�� f PR. k NEW FH Before a permanent meter IS installed: f r 7 W RESTRAIN Ex. PIPE a. The meter box, with its frame and cover, must be Ex. + 1 1 7cv J L \ \ ' Gravel t Ex.` \ � E/ec. °� 1` ,�ilbo*es \ Ex. properly aligned with the yoke bar. 1 She \ Ex. Grove/ 1 Ex. / l t _ l ' ` _ _ _ b. The frame and cover shall be set to final grade. t Ex. / Ex. (r �fal Ex. Grave! �GraveJ \ Elec. _ f ' J + Ped_ ^� t I Gravel PR- - - Ex. v -Goa - a Ex. ->rlrov G Ex. - / - 30' FREDERICK WATER SMT_ 2 j{ fes, _ ; 744= c. The distance between the top of the cover and the G, t- rpeF� - Gravel PR AT,="R-L1l --- 4\ - GryYe%t t V GrE� _ - _ vel �- _ - -yoke bar shall be between 20 and 23 inches. - - - t f fes_ d. All components of the meter box assembly shall be in ,. (2)PR. 45• \ o o o o / P .`8x8 0 BENDS d \ l % + + e` B€RICK WATER ESMT. o� EX. A PH. ROAD , - / TEE, 15- G�� -- J +pX \ / proper working order. _ `'� _ �- Ex� raver4 _moo / 4 � � � � -4"- c� -r ` -_ / l �-�- - _ 'ter--- - vP �eC - - �--1 y ,` 8. For services that connect to existing lines: RELOCATE EX. s 7,- \.-Elec. Ped. S J2'�26 V 927.15 ` l a. Frederick Water shall furnish and install Dec. METAL CARPORT w/ Brick a <\�'/E)f. \ f 1 ! Ped. 1� --red- �- / t X. 15 CMP 1 • all 78x3/4 3/4 1 ", 1}�" and 2" water Services. I Wal! Dumpster r • Ib � INV 1N=742.04 2. all sewer services. S U�'A195B� \ _ �.� `� ' /� INV OUT=742.83 w' ao�eo % ° b. The owner/developer shall: 1. coordinate (or have the contractor coordinate) the PROPOSED WATERLINE 10+00 - 19+15 PROPOSED WATERLINE 10+00 - 10+90 location of the service lateral with Frederick Water's engineering. SCALES: (H) 1"=50' _ ALES: (H) 1"=50' assistant. V i„ _.�� _ V 1"=5' - 2. submit an Application for Service and pay the -____U �_ � _ _ _ _ _._ . _ v �.�.__ - - required fees. 755 _� _. ___. �_. __._._. ___ �_ _-______�__ _ _ _ __ _ ___�______ v __. _ _____ __.______. __.. _._ __ _ "755 755 ___ ______ __ _________ _ _ ___ ___ _ �_____ 755 9. All water service lines must have a backflow prevention P assembly (double check valve or RPZ, as required). The assembly must meet ASSE standard number 1015 or 1013. . __..__ _. �___ ___.... _ �� �_-__ _- _ ----__-- 10. All fire lines must have backflow prevention assembly (detector double check valve of RPZ, as required). The assembly shall meet ASSE standard number 1048 or 1047. Any privately 750 __ �_.._ _�_ __ __ _ __ _ r__. -__ �� __ _ ____ __ _._.� _.______ ______. _ _ _ __.__ _ 750 7501---------- 750 owned fire line, interior or exterior, shall also have a fire service HP Protectus III meter. This assembly Ex GRADE f>� shall be installed immediately before the backflow prevention CL � �w EX. GRADE _ ._ .� ------ --- - unit. Radio read remotes are required. 0 CL 745 __ - __ ^� w __ _ - - - - _ __ 745 745 745 11. Frederick Water shall review the mechanical plan(s) for design and material approval of a building's: a. domestic water meter and its backflow prevention MI .__._ 48" MIdevice, and/or its N, CLEAR b. fire service line's backflow prevention device. 740 ____ -_.__ ___ __� -. ___ _ _ _ ___ ______.__._ __ _____ _ _ _ _..___. - _ 740 740 74,0 12. DEQ must also approve sewer pump stations. Frederick Water requires a copy of DEQ's Certificate to Operate and a copy o e station's approved 0&M manual These documents must be received before substantial completion is Issue and water meters released. PR. 909'-8 0 CL 52 735 __ ___ -__ _ __ F_ _�__ 735 735 --__.___._____.__ _ _-_ __ ___ _ ---- .-- 735 DIP WATER CL52. DIP > LL 730 � ___ __..._._ _ �._ � ®._-__ J _ _.�_.____ _____.___ __.__ -.__ ___ �� __ ____ __...._____...__ ___._ __._ ._.___._._�___ _ _ __ ..__ _ _ __ __ _ ____._. __ _ __._ 730 730 _._ _ �__ W ._.__________ __.____ �� _ ____ _________ 730 o , Z M (� N x w Q N UJI = UJ _ 2a J 00 FW- > > Op a_______ _ a ___ _ __ _ ___._-.-_. 00 > - __. w V) W -_.- + 1 1 +IM o _ ___ r+-1______1 __________ + + 171 1 ILA 10+00 11+00 12+00 13+00 14+00 15+00 16+00 17+00 18+00 19+00 10+00 11+00 1 NOWIMOM concrete pad 118•dis. x6"deep= --finished grade 6"dia. schedule 40 steel pipe filled with oorlcrete 3' and painted yellow finished P grade 2 S S 18"dia. ••. concrete encasement r BOLLARD DETAIL NOTE: Weep holes shall not be subject to being submerged. t installation is in an area having a high groundwater table, the Authod" engineer shall be contacted for hydrant relocation. stone to be L minimtrn of (r _ - pad V-6" dia. x Wdeep 6 screw type adjustable valve box valve boor adaptor _locator marker mechanical joint swivel tee with 6" branch APR 09 Opposite Side 12 gauge solid insulated - copper wire for line tracing, taped at 10 foot intervals treated 2'k 4" with top 6" painted blue 11" coupling (PJ X FIP) and MIP plastic plug on 6 tail piece Same Side INSTALLATION NOTES: 1. Exact location of meter boot assembly to be approved prior to installation. 2. Water service crossing street: a. Encase in 3" diameter SCH40 PVC or SDR21 pipe. The piping shell nun from one foot beyond sidewalk, across the street, to one foot beyond sidewalk b. Install 12 gauge solid insulated copper wire (for line tracing) from corporation stop to into the meter box [wrap wire around corporation stop; wire to be taped to top of PET at 10 foot intervals; come up into meter boot wrap around bottom of angle ball valve; terminate with 12" tail piece]. THIS WATER SERVICE CONFORMS TO THE UNIFORM STATEWIDE BUILDING CODE %"XV,VAND1" METER INSTALLATION -8- FEB 09 CertainTeed Rexus 24" W concrete wedge manhole cover no. CDRU60EH anchor bolt - 4 ea. 2" adjustment ring with finished grade of butyl joint sealant on top pavement or earth and bottom as necessary brace for sewer D 1 6" 1 8" 12" 16" 18" 20"24" L = restrained length of brace for water L (it) D1 standard 3' cone 0 �\ sewer .' section for 4' \ c ,.._._........._._....... .. valve diameter manhole $. brass nipple ' FIP X FIP lever ball web a brass nipple water \� _ valve Z :2 2" MIP X FIP corp stop •. saddle �/ 1 LL, =J> O 8"x 8"x 16" solid block (as required •• , per pipe size) C) , - I j.. .: -. .. .. . - ...' - ... :'.:.. ZOO O NOTES: 1. All piping shall be 2" diameter 2. For forced sewer 4" or less in diameter install tee in main (no saddle) U 3. Ouick disconnect (cam and groove) coupling U a. coupling to be polypropylene �ZU b. FIP X male adapter mates with, O c. female coupler X MIP 4. Valve shall be H -Tech, Inc. (n O w a. water - Model 993 w/2" NPT connection N b. sewer - Model 986 steel body w/2• NPT connection w 5. Brace shall be 1-1/21 X 1-1/2" X 3/16" aluminum angie w/u-boll a around elbow of valve a COMBINATION AIR RELEASE a AND VACUUM -VALVE VAULT O _11- D1 F�L� D2 Bath joints of the fitting shall be restrained. In addition, all joints within the specified length on the large side of the reducer shall be restrained. L = restrained length of pipe (PVC or DIP) D = pipe diameter D2 D 1 6" 1 8" 12" 16" 18" 20"24" L = restrained length of valve bwc location madae�,A7. L (it) D1 jol r �� 'Q Z $. w Forced Sewer SCALE: DATE: LLJ N Z :2 Z :2 p 1 LL, =J> O W C) C) M ZOO O U V) U U O �ZU O w REDUCER atone � L --� �L I �L� ° In addition to restraining the connection, any joint that falls within the specified length shall be restratnled. MAR 18 VALVE, DEAD END RESTRAINED JOINTS FOR REDUCER, GATE VALVE AND DEAD END -3- FEB 09 screw type adjustable valve boor D 1 6" 1 8" 12" 16" 18" 20"24" L = restrained length of valve bwc location madae�,A7. Pipe (PVC or DIP) jol L (it)60 60 100 120 120 140 180 D = pipe diameter MAR 18 VALVE, DEAD END RESTRAINED JOINTS FOR REDUCER, GATE VALVE AND DEAD END -3- FEB 09 screw type adjustable valve boor I valve bwc location madae�,A7. 48" min jol strained jt=: �� 'Q -18" to 24"--J 1-- 8'k 87r 18" solid block for 12"Vale 6", 8" and 12" concrete pad 18"dia. 48" min SN 8'k 16" solid block grade Water 16-,18',2(r and 24" GATE VALVE -5- .9w1ei rn rn 00 00 \ Iw00- O Z J_ LL. OV) Q Z � gLLICL Z J IJJ Ix Z LJ J Q W L;jQ J I- F_ Y � to main 8'k 81k 18" 'Q Z $. w Forced Sewer SCALE: DATE: LLJ N Z :2 Z :2 p 1 LL, =J> O W C) C) M ZOO O U V) U U O �ZU O w (n O w 0 N w ~o a o a CL IL. rn rn 00 00 \ Iw00- O Z J_ LL. OV) Q Z � gLLICL Z J IJJ Ix Z LJ J Q W L;jQ J I- F_ Ur V) Z J Li'l _jw Z O Z ELL (_) LL1 concrete pad 1&' dia. x 6" deep ���A•r,,TH OF 6" stone) 24" min. o screw type adjustable ►t Nate: valve shall t, J . LEWIS 9 valve boot be spur gear adaptor type c NO 021621 valve Y � to main 8'k 81k 18" 'Q sola bixin $. P -L 1511014 Forced Sewer SCALE: DATE: LLJ N APR 09 SHEET: Q/ 14 V Oa 1 =J> O W J�*hwj M ZOO x:55 �a'�Y O �ZU O (n O w N w ~o wX o CL IL. a N O V J o 04 N M E (_ - a) a) 00 :3(D U) L j cit cV 1 I 3 N C -4N O W 0°'oo0 o O WCl U) L NL •E O -CQ•�- �0 �0a LILI � 47 a Ur V) Z J Li'l _jw Z O Z ELL (_) LL1 concrete pad 1&' dia. x 6" deep ���A•r,,TH OF 6" stone) 24" min. o screw type adjustable ►t Nate: valve shall t, J . LEWIS 9 valve boot be spur gear adaptor type c NO 021621 valve sSIONAL restrained to main 8'k 81k 18" sola bixin $. P -L 1511014 Forced Sewer sSIONAL SURVEY: P -L 2' DRAWN BY: JOB NO.: P -L 1511014 SCALE: DATE: SHOWN 10/24/17 APR 09 SHEET: Q/ 14 V Page 6H-52 Typical Traffic Control Lane Closure on a Two -Lane Roadway Using Flaggers (Figure TTC-23.1) NOTES April 2015 Guidance: 1. Sign spacing distance should be 350'-500' where the posted speed limit is 45 mph or less, and 500'-800' where the posted speed limit is greater than 45 mph. 2. Care should be exercised when establishing the limits of the work zone to insure maximum possible sight distance in advance of the flagger station and transition, based on the posted speed limit and at least equal to or greater than the values in Table 6H-3. Generally speaking, motorists should have a clear line of sight from the graphic flagger symbol sign to the flagger. Option. 3. Where Right -of -Way or geometric conditions prevent the use of 48" x 48" signs. 36" x 36" signs may be used. Standard: 4. Flagging stations shall be located far enough in advance of the work space to permit approaching traffic to reduce speed and/or stop before passing the work space and allow sufficient distance for departing traffic in the left lane to return to the right lane before reaching opposing traffic (see Table 6H-3 on Page 611-5). 5. All flaggers shall be state certified and have their certification card in their possession when performing flagging duties (see Section 6E.01, Qualifications for Flaggers). 6. Cone spacing shall be 7. A shadow vehicle with at least one high intensity amber rotating, , ,g oscillating light shall be parked 80'-120' in advance of the first work crew. Option: 8. A supplemental flagger may be required in this area to give advance warning of the operation ahead by slowing approachingtrafficprior to reaching the flagger station or queued traffic. Guidance: 9. lithe ueue o tra is reaches�th PREPARED TO STOP (W3-4) sign then the signARMNiM r should be readjusted at greater distances. 10. When a highway -rail crossing exists within or upstream of the transition area and it is anticipated that queues resulting from the lane closure might extend through the highway -rail grade crossing, the temporary traffic control zone should be extended so that the transition area precedes the highway -rail crossing (see Figure 7TC-56for additional information on highway -rail crossings). Standard: 11. At night, flagger stations shall be illuminated, except in emergencies (see Section 6E.08). Option: 12. Cones may be eliminated when using a pilot vehicle operation or when the total roadway width is 20 feet or less. 13. 1=a Posted S eed 36 - 55 mph PTRS Spacing Center to Center 8 Feet 1: Revision 1- 4/1/2015 Temporary Traffic Control Plan for Hudson Hollow Road General Notes 1. This project is classified as a Traffic Management Category I project. Work during the project will include (1) the closure of the southbound turn lane on Route 636 to permit the construction of a new entrance Temporary Traffic Controls for the closure of the lane will generally conform to TTC 23.1 as directed by VDOT. 2. The project is located at the intersection of Route 636 and a private lane serving 30 lots in Frederick County. Route 636 is a minor road with a traffic volume of 1,500 vehicles per day, and an unposted speed limit. Route 636 at the site consists of one southbound lane and one northbound lane. 3. Work in Route 636 consists of milling and overlay of the existing road to accommodate a wider entrance into the development. The work will rerquire the closure of the southbound lane. 4. Work will be in accordance with the requirements of the Virginia Work Area Protection Manual (VWAPM) and the Manual of Uniform Traffic Control Devices (MUTCD). 5. VDOT Lane Closure Work Hours Shoulder Closure: Monday to Thursday Friday Friday to Saturday 9:30 AM to 3:00 PM 9:30 AM to 2:00 PM 10:00 PM to 9:00 AM 10:00 PM to 5:00 AM Saturday to Sunday Sunday to Monday 10:00 PM to 8:00 AM 10:00 PM to 5:00 AM Lane Closure: Monday to Thursday Friday Friday to Saturday 10:00 PM to 5:00 AM Not allowed until 11:00 PM 11:00 PM to 5:00 AM Saturday to Sunday Sunday to Monday 11:00 PM to 6:00 AM 11:00 PM to 5:00 AM The work hours may be extended to insure that excavations are made safe at the end of the work day. 6. The contractor shall provide an intermediate level Work Zone Safety Coordinator to develop the work zone and at least a basic level Work Zone Safety Coordinator to monitor and maintain the work zone. 7. The contractor shall maintain adequate access and sight distance to all properties. Emergency Vehicles and Postal Vehicles shall have access to properties at all times. Appropriate barriers will be installed along the edge of the lane as required (see plans). 8. All equipment and material storage shall be located outside of the clear zone. The clear zone for this project is 20' beyond the edge of the existing pavement, between the existing curb and the right of way lane. 9. Public Communications Plan a. The Contractor shall notify the VDOT Project Manager/Residency Administrator of scheduled work plans and traffic delays a minimum of seven (7) days prior implementation of the work. VDOT will provide project information to the District Public Affairs in advance of the start of construction and weekly updates by noon on Thursday for the following week's work. Changes in the work plans shall be made immediately known to VDOT. b. The Contractor shall notify the VDOT Project Manager/Residency Administrator of any unscheduled traffic delays immediately upon knowing the change to the work schedule. SEQUENCE OF CONSTRUCTION 1. Route 636 TTC-23.1 Closure of the Southbound Lane Perform work including: -demolition of existing entrance -regrading of adjacent slope to proposed grades -installation of new entrance -extension of culvert -milling and overlay of existing pavement -sign relocation April 2015 Page 6H-5 Table 611-2, Taper Length (L) Table 6H-3, 9: Revision 1-41112015 1 WP -2 1 -.- � ti F i 4 j , 50' TAPER Jv EXTEND EX. 12" RCP­-_'_f_� 8'-12"0 RCP ® 2% INV=743.70 RELOCATE STOP SIGN ' RELOCATE ROAD NAME SIGN RELOCATE ARROW SIGN I I I I I I I I EDGE OF EXISING PAVEMENT (AS DETERMINED IN FIELD) } M I a - z I Z o_ V) o W � o DE &LOPMENT SIGN w R OCATE ARROW - - - - - - 0_ HUDSON HOLLOW ROAD RTE. N0.636 A0_W0l;rmwoR ROAD-- 0 o UNPOSTED SPEED LIMIT +/ 2.100' TO ROUTE 277 _ CG -11 SIGHT DISTANCE=840' MODERATE VOLUME 250' TO ADJACENT DRIVEWAY COMMERCIAL ENTRANCE x-12" WIDE WHITE STOP BAR LIMITS OF MILL AND OVERLAY / StXET 9 FOR ENTRANCE IMPROVEMENT PLAN 4;� 2 a cr o I �N -7-- 40 0 40 Scale in Feet ENTRANCE IMPROVEMENT PLAN SCALE: SHOWN SHADING INDICATES LIMITS OF NEW PAVEMENT SECTION: 1 " OF SM -9.5 2" OF BM -25.0 - - ---6"-OF 21-B-- - - TACK COAT THE PROPOSED CONSTRUCTION JOINT EXISTING _ _ ASPHALT LAYERS PROPOSED ASPHALT LAYERS - _ _ _ _ -- _EXISTING SUBBASE PROPOSED SUBBASE -- T COMPACTED SUBGRADE CONSTRUCTION JOINT DETAIL REMOVE EXISTING ASPHALT LAYERS TO EXISTING SUBBASE AND REPLACE WITH PROPOSED ASPHALT WIDENING LAYERS ® PROPOSED MINIMUM 1 V INCH THICK ASPHALT SURFACE COURSE (SEE NOTE 5) x MINIMUM 12 INCHES, OR GREATER AS NECESSARY TO ABUT THE FULL THICKNESS OF EXISTING ASPHALT LAYERS AS DETERMINED BY CORES (SEE NOTE 3) NOTES: 1. ASPHALT PAVEMENT WIDENING SHALL HAVE A PAVEMENT DESIGN IN ACCORDANCE WITH CURRENT VDOT PROCEDURES AND BE APPROVED BY THE ENGINEER. 2. THE PAVEMENT DESIGN FOR ASPHALT PAVEMENT WIDENING SHALL MEET OR EXCEED THE DEPTHS AND TYPES OF THE LAYERS OF EXISTING PAVEMENT. SUBSURFACE DRAINAGE OF THE EXISTING AND PROPOSED PAVEMENT SHALL BE ADDRESSED IN THE PAVEMENT DESIGN, 3. A MINIMUM OF THREE CORES SHALL BE TAKEN ALONG THE CENTER OF THE ADJACENT TRAVEL LANE TO DETERMINE THE TYPE AND THICKNESS OF EXISTING PAVEMENT LAYERS. THESE CORES SHALL BE SPACED NO MORE THAN 500 FEET APART. 4. THE ADJACENT TRAVEL LANE SHALL BE MILLED A MINIMUM DEPTH OF 1V INCHES AND REPLACED WITH AN ASPHALT SURFACE COURSE TO MATCH THE PROPOSED PAVEMENT WIDENING SURFACE COURSE, UNLESS WAIVED BY THE ENGINEER. 5. THE ENGINEER MAY REQUIRE THE MILLING DEPTH OF THE EXISTING PAVEMENT TO BE ADJUSTED TO ACHIEVE AN ACCEPTABLE PAVEMENT CROSS -SLOPE AND EFFECTIVE SURFACE DRAINAGE. OV 6. EXISTING PAVEMENT MARKINGS AND MARKERS WITHIN THE PROJECT LIMITS SHALL BET RESTORED SUBJECT 0 THE APPROVAL OF THE ENGINEER. 7. FINAL TRANSVERSE PAVEMENT TIE-IN SHALL CONFORM TO THE REQUIREMENTS OF SECTION 315.05(c) OF THE SPECIFICATIONS EXCEPT THAT ALL JOINTS AT TIE-IN LOCATIONS SHALL BE TESTED USING A 10 FOOT STRAIGHTEDGE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 315.07(a) OF THE SPECIFICATIONS. XVQOTASPHALT PAVEMENT WIDENING SPECIFICATION EE ROAD AND BR�GE STANDARDS SHEET 1 OF 1 REVISION DATE FOR WIDENING SUBJECT TO TRAFFIC S15 303.02 VIRGINIA DEPARTMENT OF TWSPORTATION COMMERCIAL ENTRANCE PROFILE 1 I— 50' TAPER Jv EXTEND EX. 12" RCP­-_'_f_� 8'-12"0 RCP ® 2% INV=743.70 RELOCATE STOP SIGN ' RELOCATE ROAD NAME SIGN RELOCATE ARROW SIGN I I I I I I I I EDGE OF EXISING PAVEMENT (AS DETERMINED IN FIELD) } M I a - z I Z o_ V) o W � o DE &LOPMENT SIGN w R OCATE ARROW - - - - - - 0_ HUDSON HOLLOW ROAD RTE. N0.636 A0_W0l;rmwoR ROAD-- 0 o UNPOSTED SPEED LIMIT +/ 2.100' TO ROUTE 277 _ CG -11 SIGHT DISTANCE=840' MODERATE VOLUME 250' TO ADJACENT DRIVEWAY COMMERCIAL ENTRANCE x-12" WIDE WHITE STOP BAR LIMITS OF MILL AND OVERLAY / StXET 9 FOR ENTRANCE IMPROVEMENT PLAN 4;� 2 a cr o I �N -7-- 40 0 40 Scale in Feet ENTRANCE IMPROVEMENT PLAN SCALE: SHOWN SHADING INDICATES LIMITS OF NEW PAVEMENT SECTION: 1 " OF SM -9.5 2" OF BM -25.0 - - ---6"-OF 21-B-- - - TACK COAT THE PROPOSED CONSTRUCTION JOINT EXISTING _ _ ASPHALT LAYERS PROPOSED ASPHALT LAYERS - _ _ _ _ -- _EXISTING SUBBASE PROPOSED SUBBASE -- T COMPACTED SUBGRADE CONSTRUCTION JOINT DETAIL REMOVE EXISTING ASPHALT LAYERS TO EXISTING SUBBASE AND REPLACE WITH PROPOSED ASPHALT WIDENING LAYERS ® PROPOSED MINIMUM 1 V INCH THICK ASPHALT SURFACE COURSE (SEE NOTE 5) x MINIMUM 12 INCHES, OR GREATER AS NECESSARY TO ABUT THE FULL THICKNESS OF EXISTING ASPHALT LAYERS AS DETERMINED BY CORES (SEE NOTE 3) NOTES: 1. ASPHALT PAVEMENT WIDENING SHALL HAVE A PAVEMENT DESIGN IN ACCORDANCE WITH CURRENT VDOT PROCEDURES AND BE APPROVED BY THE ENGINEER. 2. THE PAVEMENT DESIGN FOR ASPHALT PAVEMENT WIDENING SHALL MEET OR EXCEED THE DEPTHS AND TYPES OF THE LAYERS OF EXISTING PAVEMENT. SUBSURFACE DRAINAGE OF THE EXISTING AND PROPOSED PAVEMENT SHALL BE ADDRESSED IN THE PAVEMENT DESIGN, 3. A MINIMUM OF THREE CORES SHALL BE TAKEN ALONG THE CENTER OF THE ADJACENT TRAVEL LANE TO DETERMINE THE TYPE AND THICKNESS OF EXISTING PAVEMENT LAYERS. THESE CORES SHALL BE SPACED NO MORE THAN 500 FEET APART. 4. THE ADJACENT TRAVEL LANE SHALL BE MILLED A MINIMUM DEPTH OF 1V INCHES AND REPLACED WITH AN ASPHALT SURFACE COURSE TO MATCH THE PROPOSED PAVEMENT WIDENING SURFACE COURSE, UNLESS WAIVED BY THE ENGINEER. 5. THE ENGINEER MAY REQUIRE THE MILLING DEPTH OF THE EXISTING PAVEMENT TO BE ADJUSTED TO ACHIEVE AN ACCEPTABLE PAVEMENT CROSS -SLOPE AND EFFECTIVE SURFACE DRAINAGE. OV 6. EXISTING PAVEMENT MARKINGS AND MARKERS WITHIN THE PROJECT LIMITS SHALL BET RESTORED SUBJECT 0 THE APPROVAL OF THE ENGINEER. 7. FINAL TRANSVERSE PAVEMENT TIE-IN SHALL CONFORM TO THE REQUIREMENTS OF SECTION 315.05(c) OF THE SPECIFICATIONS EXCEPT THAT ALL JOINTS AT TIE-IN LOCATIONS SHALL BE TESTED USING A 10 FOOT STRAIGHTEDGE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 315.07(a) OF THE SPECIFICATIONS. XVQOTASPHALT PAVEMENT WIDENING SPECIFICATION EE ROAD AND BR�GE STANDARDS SHEET 1 OF 1 REVISION DATE FOR WIDENING SUBJECT TO TRAFFIC S15 303.02 VIRGINIA DEPARTMENT OF TWSPORTATION COMMERCIAL ENTRANCE PROFILE Q I— DRAWN BY: SCALES: (H) 1"=50' _ _ J> _ N E M (V� 1 "'5' Y_ U If) to Z D (n 0 :5 a'� N N Y O ~ Z � N 0 0 W CYW 3 O O a LL1 W_ 1"i CL _ d 0 N O- (D U a� 4- 0 E o W0C: 4)0C) 0 H W W Z 00 a CL 745 GRADE 745 740 740 7351 735 it W U + 10+00 11+00 W Q A U W Z 0- LL W 0 Z W Z �- <C Z Z WW z Q w J Y � � U Q Q I— DRAWN BY: JOB NO.: ■ aC14 O _ J> SHOWN N E M W Y_ U If) to Z D (n 0 :5 a'� N N Y O ~ Z � N 0 0 W CYW 3 O O a LL1 W_ 1"i CL _ d 0 ■ C.I.: P -L ■ DRAWN BY: JOB NO.: ■ aC14 O SCALE: DATE: SHOWN N E M �/�� V O U If) to ♦ to N N N N .2 lU W CD °' o o v J-.e LO U-)® N O- (D U a� 4- 0 E o W0C: 4)0C) 0 H W W Z 00 a CL CD {n Z 0_ JW W (n O Z MLLM (_) LLI VcNoC OFLEWIS1621 47 kl� ZONAL _ SURVEY: C.I.: P -L NA DRAWN BY: JOB NO.: P -L 1511014 SCALE: DATE: SHOWN 1/8/19 SHEET: 9/14 PEAK RUNOFF RATE TABULATION EXISTING CONDITIONS-PREDEV (HATCHED AREAS INDICATE IMPERVIOUS SURFACE) DA1 DA2 DA3 1 YR cfs 0.17 0.34 0.12 DRAINAGE AREA 2 2YR cfs 0.40 0.84 0.33 DRAINAGE AREA 1 3.18 ACRES 10YR cfs 1.34 2.88 1.20 DRAINAGE AREA 3 I 2.29 ACRES 1.43 ACRES Tc FLOW PATH=720' Tc FLOW PATH=562' Tc FLOW PATH=536' IMPERVIOUS AREA=0.32 AC IMPERVIOUS AREA=0.52 AC IMPERVIOUS AREA=0.14 AC TURF AREA=1.97 AC TURF AREA=2.66 AC TURF AREA=1.29 AC EX CtWN LINK FENCE e�I�/ 737 •--`_ t�•r D ^ ,yh /� v • w ^ _ �/ITVIR (Ff \- WAE Shed s ` ` I , ■ \ \ f \ ` \ '� `\'' \ - ) \ 7ZT4- \ -74,1 ✓ / ` \ ®/ `738. " 1 I-� a. \ / / r' / Pone! \ / er / : r / --743- Meters �� f €lac' Mete �Y o \ ,� Pune! 1 \ / Elea. - A/C e / A/C t --o r - AG`tTrel .. tistorage"'_ OE _ `^ 2 Haunted - - ✓ Unit Paneh Unit / / �~ �. wv Elec. jMeter Mounte� \ Ex. ( hed / Mettew` Elec. 1 C. Elec. j Shed 106-1 Elec. \ 1 / I Box Meier )4eters lac. 7 i I ; _ Leon -To _..� R E 1 Sty. ' / W Meter Xx j / E Frame f � ' J � ,•,! �,'/ ry ...,, � ��- Ex. � � ? Dwelling f` AG Fuel t -' ` �� , Shed Storage l J Elec.� ilboiyes . \ `' Ex. P 1 Ex � � r ) `�. Elec ~'"� ,! 1" Ped.�e a >- : C Grave �_ - - 1 t f Gr ! PBd C -7 / f _. . _ 74•'4- � � `4 '' � Masi - ��• � oval - � Ped S $8'Y1 w lI i�1.J6' ` = 1 - _ j f Ped. k EX. i ♦ NN DRAINAGE DIVIDE 50' PR ACCES SMT. J� \ Ex. sroP OB 931 PG f / � � Tc FLOW PATH � � 931 s�GN `I EX. ROAD NAME SIGN / Tc FLOW PATH ` ' Ex. ARROW SIGN) I Tc FLOW PATH / 50 0 50 09 kale in Feet ♦ ♦ l / / I no PRE DEV -SPOTS MOOD Type t! 244r 2 YR R'eudel't-2.88" Prepared 6y Pan 9, P.L.C, Printed 1U725=17 it oCA[ 1000 15 I= 08A84 0 2016 HvdroC+tD Sotlware Solutions LLC EM s Summary for Subcatcluviort is VAI Runoff = 0.40 cfs @ 12-% hrs, Volume= 0.087 af, Depth - 0.35" Runoff by SCS TR -20 method, UH -SCS. Wei d-GiV, Time Span= 5.00,20.00 hm, dt= 0.05 in Type 11 244i 2 YR R9t1fs11 2 r 0.300 61 >75% Grass cover, Good. HSG 8 96 Unconnected paywinent, HSG B 14.85% impeivious Area 0.340 83,339E Pervious Area 100.00% Uncorrected Te Length Mope velocity capacity Description fry -in) {feet) (fVR-) ttth;ec) ccfst Woods: Light underbrush rr-- 0.400 P2= 2.87" 27-0 100 0.0216 0.08 Sheet glow, SHEET' FLOW AB Shallow Corttsrdated Flow, SHALLOW FLOW SC cn O Woods: Light underbrush n= 0.400 P2= 2:87" 24.3 400 0.0030 0.21 Shallow Concentrated Flow, SHALLOW FLOW BC 80806 3:69 Shallow Concentrated Flow, SHALLOW FLOW CO Woodland Kv- 5.0 fps 1.0 220 0.0613 3.71 6tatilow Concentrated Flow, SHALLOW FLOW CD 25.7 we Taal Grossed Waterway Kv=15.0 fos 47.3 720 Total Surnmaryfor moment 2S: DA2 Runoff = 0.84 cfs o 12,28 hrs, Volume— 0.094 of. DepDb 0.3W Runoff by SCS TR -20 melhod. UH=SCS, Welghled-CN, Time Span= 5.00-20.00 hm dl-- 0.06 las Type 1124 -hr 2 YR Rainfall=2.88" Ares (Sol CN Adl CDesortotim 2.650 0.5m 61 >75% Grass cover, Good. HSG 8 96 Unconnected paywinent, HSG B 3.180 67 64 Weighted Average, Ul Adjusted 2.850 83,339E Pervious Area 0,530 16.6794 impervious Area 0.530 100-00% Unconnected Te Length Slope Velocity Gspacity Description 22.0 100 0.0216 0,06 Street Flow, SHOUT FLOW AS Woods: Light underbrush n= 0.400 R2= 2,87' 2.5 230 0.0108 1:56 Shallow Concentrated Flaw, SHALLOW CONC SC Grassed Watowayr Kv=15,0 fps 1.2 232 0.0438 3.14 Shallow Concentrated Flow, SHALLOW FLOW CO Gassed Waterway Kv=15,0 foo 25.7 562 TOW Ruoff aexcon Ill NNI, Vdwfw= ilt. 010111, SSC` iiKmoif by'ON Tl%b ilnid, U&SM � � SP1," L*" 1111%t� L" kill ` y" 11 � 2 Y7t 11rtf nw 0.9410 91.106 t Mals Q1� 1WJ nth f>x Lam am &I mum 1 sulk w6manomad 1pl 1.0 oil GAM IM amsm"Wilaw,04; DRAINAGE DIVIDE DRAINAGE DIVIDE i .._ , rw it Mir toVR1% POW sum"MytiW 1m" I* OM Rlwair i a > vl ., CIY09L ave t�raroiR lir � i14��if1Mllod.lJPWr � iris! � �14 d� ��:1f4 �# Ir 10 YR 1.1iF' fe.3 400 %am ON 1.0 210 AMS SM piaommy lair subsom"Maid 31k PASO a 2M eke am am warwo MW or 01111111W `lam RurdF br11 TR,lSClrf Ul l t39, liiils fir- SOMM bk dim SM h* t U M 090 I AW 12 zu cam &iw Summary for Subcatchment 38: DA3 Runoff 1.20 cfa ® 12.22 hre, Volume= 0.107 of, Depths 0.W Runoff by SCS TR 20 method, UH=S(S, W ekht9d-GN, Time Span= 5.00.20.0 in, dt= 0.05 hre Type li 24 -hr 10 YR Rainfa1=4.1W Te (min;) Length fleet) Slope 001 Velocity Capacity ftttsw 1 Description (de) 22.0 100 0.0216 0.08 Sheet Flaw,; SLIM FLOW AS W J 46 6L WZ M 7 n? Woods: Light underbrush rr-- 0.400 P2= 2.87" 2-7 205 0.0073 1;28 Shallow Corttsrdated Flow, SHALLOW FLOW SC cn O d Grassed Watatway Kv= 15,0 fps 1.0 231 80806 3:69 Shallow Concentrated Flow, SHALLOW FLOW CO C LO N V1 j� 1 �■aa� N C-4 N Grassed Waterway Kv=1&0fps 25.7 we Taal J LO@ u 1s' INV !NV dtli;, 1 (DAMAGED, / SUBDIVISION 12" RCP INV lN=743.54 ' l INV OUT=742.88 J I 11 I C_ V) Z O V) W Of Y X H U Q C Z W MT_ rnoL _ J> 0 �- Z � W J 46 6L WZ M 7 n? .r z O CL Of U (f) w 0 W a O Z 0a. �QU 0 Lu 0 �- Z � 3FnD0 Or W LLJ a.L_ O a cn O d J 0 N ■` N E 0 +� O r- U C LO N V1 j� 1 �■aa� N C-4 N W 0 000 J LO@ u N N N U U 0N 4-- N L E O W°L Q-•6)- � c Q)v U ~ W w Z MENEM 00 a 0 to Z fr J W :D(10W O 299 Z O W �yTH Op c' J C. LEWIS a ic. No. 021621 Ap OA rONAL E0 SURVEY: P -L 2'/5' DRAWN BY: JOB NO.: P -L 1511014 SCALE: DATE: SHOWN 10/24/17 SHEET: 1 1 / 1 �• �• is • Yap • 19 VA- - - \� � � � � `'-.-�. � ` � `'moi '� �,�, . " � � � ;,� �- � • �► POST DEV-SPOTSMO Type 1124 -hr 2 YR Ratnf 211 POST DEV-SPOTSWOOD Type H 244V 10 YR Fiainlail4, fa" Prepared by Painter -Lewis, P.L.C. Printed 114=17 Prepared by PaintekAwis, P.L.C. Printed 1102017 HvdroCA06 10 DO 15 sfi 08884 D 2015 HvdtaCAD Software Solutions LLC titrdnaCAD®10.00.15 stn 08884 02015 WdMCAD Stdlwave Soludons LLC Summary for SubcaWhment IS: DA1 Summary for Subcatchmont IS: DA9 Runoff = OAS de a 12.57 hm Volume= 0.473 of Depths 038" Runoff 1.44 of& Q 12.51 fire, Volume= 0.169 af, Depths 0.99" Staloff by SCS TR -20 inethad, UH=SCS,1Neighted-GN, Time Span= 6.00-20.00 hm dt= 0.05 tits Runoff by SGS TR -20 method,. UH=SCS, Vint -CN, Time Spelt- 6.00-20.00 hrs, dt= 0.05 has Type 1124 -hr 2 YR Rainfall -2.88" Typo li 244ir 10 YR RainfaNa4.1ir Area (w) CN Adi Desai t�M Area (ac) CN Adi QgSdINM 1.780 61 >75% Grates cover, Good, HSG B 1.780" 61 >73% Grass cover, Good, HSG B %= 98 Unconne(•ed roofs HSG`B 015V 98 uncorttter•ed rods, FISC B 2.290 70 65 Weighted Average, UI Adjusted 2.290 70 65 Average, UI Adjusted 1.760 76.86% Pervious Area =hied 1.760 78.88% Pervious Area 0.5330 23.14% Impervious Area O.Sw 23.14% impervious Ara 0.530 100.00% Uncannedeed 0.530 100,00% Unconnected To Length Slope Velocity Capacity Description n Te Lengtlt Slope Velocity Capacity Description (min) (teat) (ftlft) 111010c) (ds) Amin) -LetL_ (IM (fV$W) (cfs) 22.0 100 0.0216 0.08 Sheet Flow, SHEET FLOW AS 22.0 100 0.0216 0.08 Sheet Floor, SHEET FLOW AB Woods: Light underbrush m0..400 P2= 2.8r Mods: Light underbrush t'►= 0.400 P2= 2.87" 24.3 400 0.0030 0.27 Shallow Concentrated Floor, SHALLOW FLOW SC 24.3 400 0.0030 0.27 Shallow Concentrated Flaw, SHALLOW FLOW SC Woodland K%- 5.0 fps Woodland Kv- 5.0 fps 1.0 220 0.0513 $.71 Shallow Concentrated Flow, SHALLOW FLOW CD 1.0 220 0.0813 3.71 ShallowConcontle Flow, SHALLOW FLOW CD Grassed Waterway Kv=15.0 fps Grassed WatenMa� Kv=15.0 UR 47.3 720 Total 41.3 720 Total :. awwwyf4wswxmwhmmltm DM Summary kw Subcstdmient 25: DA2 nuaw I." db 0 111$4 hoc MANOP 93" at 01011P &W Runoff 3,52 QCs a 12.21 tits, VWumem 0.297 af, Depth, 1;12" !heronffi1S Tl llt4009L �I.ZM UPOW l J*qX l hMdl. &W hr■: tl $ Rwofi by SCS TR -20 method, UH --SCS, Weighted -CN, Thee Sperw 5.00-20.00 hrs, On 0.05 bra Type lI 244v 10 YR RalnWoMW 'to LOW 11•X* C111111111111V 0141104M wacd6 , 1111 1rne , nE t> c1 Mr- x r 25 210 4m Se � Is.s•edli•ielt siLq xmcom'w 0111 ■i d Ml�lt�F it ' uta 11OLOOM 314 UMIkWG rQdl bVbdl9aa4 t•MIM �easat 11Y�eEe■tr �:114iae 2LT I TOM ilolr ttunatf IlM llsih VWurnr• 90111111, 0111pfflp Wr londf tiff 9CS Ttih�Ganlltlledr � yvrgjtleea Ttesl $parr iit,SD�Ipil6lDlra, tdt■ Q.a61•r 1� r S11,1tr rl" YfR LM =1111%haporwkwArm OX0 UOAM M wal•Qud t* F Me Uod wtdarfitAK rtr L4W M* Z&r agm lit tilbdkw lOi%SNAU MI1F1,1SM t3nvow vA" , sS KW IS4 40 12 nt lima• • t'o111aoliadvimmuL Dl PLM Tc (min) Length (feet) Slope alma velocity fftlsac� Capacity Description (ds) 22.0 100 MOM 0.08 Shsst Flow, SHEET FLOW AS inpkc oat• Woods: Light underbrush rw OAW P2= 2.8r 27 205 0.0073 Wo odrs: Light underbrush n=0.400 P2= 28r 2.5 230 0.0108 1.56 15hallow Concontrol d Flow, SHALLOW CONN BC 1.0 231 0.0806 389 Shallow Concentnrtsd Fluor. SHALLOW FLOW CD Grasesd Wasenwy Kv=15.0 fps 1.2 232 0;0439 3.14 Shallow Conceronted Flow, SHALLOW FLOW CD Critical Depth 0.02 ft Critical Slope 0-045410 tuft Grassed Watery Kv= 15.0 fos 26.7 662 TOW) Summary for SubcaCchment 3S: OM Runoff 1.39 cis Q 12.22 his, Villurte 0.120 ad, Depths 1.00` Rtmoff by SCS TR -20 me0t4d, UHgSGS; Weigtlad-GN, Time SpaAr 6.00.2D.W hrs. dtm 0.05 his Type It 244v 10 YR-Rainiel1-4.18" Area NO CN 1.110 61 >75% Gran cover, Good, HSG S 8.330 98 Uretecled roofs. HSG B 1.430 69 65 Wetghtsd Average, Ul Adiustied 1.110 77.62% Pervious Area 0.320 22.38% hilpervicus Area 0.320 100.00% Unconnected To Length slope Velocity Capacity Description - (min) (feet) (ltlfta ("W) (of$) 22.0 100 0.0216 0,08 Sheat Flaw, SHM FLOW AS Salve For Channel Depth inpkc oat• Woods: Light underbrush rw OAW P2= 2.8r 27 205 0.0073 1.26 shallow 'CmtgrMnrfsdFlow,SHALLOW FLOW SC s000m Vtreiti+ 24,00 ft Discharge Grassed Waterway Kim 15.0 fps 1.0 231 0.0806 389 Shallow Concentnrtsd Fluor. SHALLOW FLOW CD Flow Ares 0.3 ft' Wooed Peft, Grassed Waterwav Kv=15.0 foe 25.7 530 Total t / /1100' - DRAINAGE DIVIDE ' 1 - / B 80 BV / STORMWATER MANAGEMENT NARRATIVE DRAINAGE AREA C 1.43 ACRES Tc FLOW PATH=536' IMPERVIOUS AREA=0.32 AC TURF AREA=1.11 AC i i ! EX. CHAIN LINK D - L T7 �.4 / pp � J k\ 73TN e7 / Z '--,.38 I l 4 - - I Leon -T~ _ 106-1 L . Ex. 1' Sty. i I Frame Ex. Dwe ing i Shed _moi Wt i Ex. C ' ` Grovel j `� w, Ped. IN S2!2.04 (DAMAGED) SUB MSION SIGN EX. STOP SIGN _-I EX. ROAD NAME SIGN / 12" RCP EX. ARROW SIGN ✓� IWOUT8743,54 Tc FLOW PATH INV ' I/ i DRAINAGE DIVIDE I 11 t I C_ I DA1 SHEET FLOW CALCULATION m WorksheetforRectangular Channel' Protea Descrioden trrbrerael worksheet DAI LEVEL SPF Flow Element Rectangular Chs Method Manning's Form, Salve For Channel Depth inpkc oat• nsN"111•stirM•k Manning$ ra•nx 0.030 Channel Slope 330DOO IM s000m Vtreiti+ 24,00 ft Discharge 0.43 cts Result FlexA■ar Dept 0.01 ft Flow Ares 0.3 ft' Wooed Peft, 24.D3 ft Top Wdth 2040 ft Critical Depth 0.02 ft Critical Slope 0-045410 tuft Velocity 1112 fl!A VetocfHead 0.04 fl Spectlic Eneq 0.05 ft Fmude Numb 2,48 Flow Type iuperrsitk al Cross Section Cross Section for Rectangular Channel 0.0) ft �_....20-00fl QM SH JET FLM CALCUrATMU •odt Re P In aid" tChannw CPM 8eetlon �+'e0■M l�ttMt 1� �iil'k•1flltttD� D" T At CN0AAyrM V for u1■r M:hilttitr trrbrerael � LPIiEt. 8Pf FSeNil�nt Few eleerr.d Moto ttisreinWa FMTO 801se Far c uum io V4" t» 11"ollie nsN"111•stirM•k '0.l1'il• Waw maw now" P41Xrp10W 410 ft ' 1:9'1 40 ROOM onflik #,tali'• FlexA■ar A.7 r Isill M! Peft 41.•• fi TarPAW 42W it affillth A* ft illblia aOCM volow 1AA 4Vlaofy Head am R 4 F W? 8 110611tilirrm 286 1�7gpe owsmaw _ CPM 8eetlon �+'e0■M l�ttMt 1� �iil'k•1flltttD� D" T At CN0AAyrM V for u1■r M:hilttitr S OF FLOW Cttois ftmon 1W a oni'•itmtti(lii Water Quantity This site is linear. Runoff discharges onto Sherando Park property in the form of sheet flow. The proposed road will be constructed such that a level area will be located at the anticipated point of discharge for each of the three identifiable drainage areas. The Peak Runoff Rate Tabulation on this sheet shows the calculated Q Velocity for each of the three drainage areas. Supporting calculations are also shown on this sheet for Rectangular Channels. There are no defined drainage channels which receive runoff directly from the site. Due to Hydrologic Soils Group "B" site soils and no change to the time of concentration due to construction, there is only a small increase that can be calculated in the Post Development condition when compared to the Pre Development condition. These differences are tabulated and shown on this sheet along with supporting calculations for the Post Development conditions. Since there are no offsite receiving channels to analyze, and since runoff from the site will be maintained as sheet flow, Section 9VAC25-870-66.D will be adhered to in order to address water quantity requirements. "D. Increased volumes of sheet flow resulting from pervious or disconnected impervious areas, or from physical spreading of concentrated flow through level spreaders, must be identified and evaluated for potential impacts on down -gradient properties or resources. Increased volumes of sheet flow that will cause or contribute to erosion, sedimentation, or flooding of down gradient properties or resources shall be diverted to a stormwater management facility or a stormwater conveyance system that conveys the runoff without causing down -gradient erosion, sedimentation, or flooding. If all runoff from the site is sheet flow and the conditions of this subsection are 'met, no further water quantity controls are required." CHAR V1 H:1 NTS � U Q Vftdw" no Few eleerr.d Aae5tas0iller an 2 Z 300M cow" ago 11"ollie w 11"We Caft Cl® t^,.trirrel8l�e 'r1iQI� i� rfltttrrr 1t)Ol� rt t 4 O da fa■er1• Ono "t is JFkwAaw U VMeMipaeoft 106AM a T"Ma 100100 S WX CL LL_ am ft t'.4lisad iAN i amm fa 110411141110 am ft V101111101111►1. ° U O0 s iywlde umb F- TWO kilemulls S OF FLOW Cttois ftmon 1W a oni'•itmtti(lii Water Quantity This site is linear. Runoff discharges onto Sherando Park property in the form of sheet flow. The proposed road will be constructed such that a level area will be located at the anticipated point of discharge for each of the three identifiable drainage areas. The Peak Runoff Rate Tabulation on this sheet shows the calculated Q Velocity for each of the three drainage areas. Supporting calculations are also shown on this sheet for Rectangular Channels. There are no defined drainage channels which receive runoff directly from the site. Due to Hydrologic Soils Group "B" site soils and no change to the time of concentration due to construction, there is only a small increase that can be calculated in the Post Development condition when compared to the Pre Development condition. These differences are tabulated and shown on this sheet along with supporting calculations for the Post Development conditions. Since there are no offsite receiving channels to analyze, and since runoff from the site will be maintained as sheet flow, Section 9VAC25-870-66.D will be adhered to in order to address water quantity requirements. "D. Increased volumes of sheet flow resulting from pervious or disconnected impervious areas, or from physical spreading of concentrated flow through level spreaders, must be identified and evaluated for potential impacts on down -gradient properties or resources. Increased volumes of sheet flow that will cause or contribute to erosion, sedimentation, or flooding of down gradient properties or resources shall be diverted to a stormwater management facility or a stormwater conveyance system that conveys the runoff without causing down -gradient erosion, sedimentation, or flooding. If all runoff from the site is sheet flow and the conditions of this subsection are 'met, no further water quantity controls are required." CHAR V1 H:1 NTS 11 Z Q Q W Q Q Or O w J F•- f - Y � � U Q /Q. 1..1. m� �/ ■ V 2 Z ■ a 0 SHOWN w W:qkI� J_ I_? N M 0 0�QV _ '�' O r- a.. 0Z O�Z� N � W w Q 0 WX CL LL_ CL N � cNp O O �. (D U) ° U O0 t3 Z L) Cr.0 � N � U O .0 N C U N H 0W W Z WOMEN! 00 N a � 11 Z Q Q W Q Q Or O w J F•- f - Y � � U Q /Q. 1..1. m� �/ ■ V 2 0 LT- ■ a 0 SHOWN w W:qkI� J_ I_? N M Z cnO 0�QV _ '�' O r- a.. 0Z O�Z� N � W w Q 0 WX CL LL_ CL N � ■ C.I.: P -L 2'/5' ■ JOB NO.: P -L 1511014 ■ a 0 SHOWN 10/24/17 SHEET: 12/14 N M E _ '�' O r- O �%�■' V / V) N N I N I 3 N � cNp O O �. (D W ° U O0 t3 1 L) Cr.0 � N � 0 O Wvs .0 N C U N H 0W t3 Z WOMEN! 00 a J C. LEWIS a No. 021621 w� Ssj ONAI, F'� SURVEY: C.I.: P -L 2'/5' DRAWN BY: JOB NO.: P -L 1511014 SCALE: DATE: SHOWN 10/24/17 SHEET: 12/14 U.LIMITS OF CLEARING GRADINGto3 I�a ,i =7 7":Shed r ; ! % M Ex. 7j7 Ott J6__0 , - ig \ 9E \ iG `--738 _Bec. 737, Meter `\s One/ Meters m \ ` -7` ®r- t o \ T Panel / i' l ASC is t q/C-(-�fl r f "` AG Fuel - �_'~ ,r. f sL -Meantsd / \% f MerElec * ` -' r Unit Pone �� L i Unite �� 1 Ex. { i / Storage ` L k t' J'' 1� r /\ {s - I Dec. Mounteda t £x. t i i Shed i / _,.L ✓� Ob �' Meters Dec.,` 1 m r �+ crt �E/ec.. Elec. , v, ; Shed x �'� 1 �106 \ X106-4 J Leon -To s. �` 7 0 " i i `� i - 111 106-2 �, 106-1 �o / xBoxo M` er �c \Meters 4p o106=3' 1 c X06 1 �tLL ? A �, � lec. °+ � E. 1 Sty s Ex. 1 Sty 1� i Ex. 1 Sty. \ Ex. 1 Sty. I Ex. 1 Sty. v ik / a� / ; 0 1 Fiome ( b L Frame C Fiome r 3e \ e Tr ; \o 0 0 0 \; \ s o Box cr o Frame I Frome `6.0, v o, g 1 - M f 0 ( Dwelling ` \ � Dlve9' Ex � ! ( Dwelling w t I o I r 1 Qwellt'np,.__I L� !+elfin JJ } I j Shed AG Fuel =o=o im r `: o i } �r Lr Storage \ 3 3 1 \ j 3 Y �t �✓ r \ �� - Grove Gravel i �E �! \ l �" 1 Elec. �r o f'es \ l Grave! t \ / -FMYcwrL• --` Ex. (' \ Elea _ % J \ ( Ped - ' E.- f eta E. ` G oven , \ Ex. - - Grove �'�rP�{ Grovel. Ems-,,,_. Grove G%Qv= Grevg - `74 -a / - - rr EX. A$PH. Ra4D dravet TO- _�=4 flt E -f Ele Ear r a87:Ja' Ped.11. � Elec. PedV. , 15" CMP Elec. w/ Brick =�I - umster !NV IN=742.0 4 Wall INV OUT=742.83 N LAND COVER AREAS ^ jr mm' � � � (DAMAGED) 50' PRIVATE ACCESS ESMT. EXISTING -PRE DEV SUBDMSION SIGN DB 931 PG 1480 TOTAL DISTURBED AREA=2.18 ACRES Ex. sroP SIGN TURF AREA=2.1 1 ACRES Ex. ROAD ROW SlIGG�Nl % t2" RCP r' INV 1N=743.54 1W OUT- 742.88 IMPERVIOUS AREA=0.07 ACRES(HATCHED AREAS) ' 50 0 50 / PRE DEVELOPMENT LAND COVER AREA MAP SCALE. 1 -20 Scale in Feet � } DL CHAIN LINK FENCE LIMITS OF CLEARING & GRADING4, Ngto h N 737_ 4 Ex.�v 1 ��--7--34-, 7 ` Shed 'ti „ t t �r i�+Q', `( '! � 34 ``' \ EX. \, A'x� I / Ile 1 ' ` M eer \ \ -- f / / '' / -'743-- \ - / e_ M / `` 4 I - "• r - ^.",_ e.. l - - ;� /aq,.O: �n t / 1 A/C 7 --- -o r 4 Fuel - \ • E, Panel .r r A C r \ Unit /' Storage -- a / / Elea i / Z - sT . Mounted r I i r _ \ Unit ! j R r� j ^� JEx. { ,s . B At or Dec. i y Mete Mounte� 1 i �t i Shed } f r jsEg71 \\\ � > Elea t m os= vE. /tos-1 o of 6.a'!+, Met�re� l x Box !' �^ - Elec ��\,,_E/ec. t X \ }Shed x o'rcl ? I ->.' X106-4 Ij 106-2 Leon -To Meter^ �Ifeters s 1 ' r 174p• 106-5 E. t Sty. "1 } } Ex. 1 sty. Ex. 1' Sty. I o �: �� < 'lk L ' f ; \ ec. � rn y Frame / Ex. 1 Sy j k Mite, �a Tr j o o �; \ ; �'"` t o u Ex. t Sty. Fiome Frame _ } W ( ; o o `• 1 o Box c o . ! Frome �r _ y o o \ o� o \ o i= a Frame ! ;,g I Dwells o i y o a. rn v rn v or o, !` o L Owelh pwellin _! Ex. ✓' / c ^ a rn s. % �_ ie rn / n 1 -' _ 1 e!lia� 1 --- T J r -� I I y - 9 J i '_. w \ m \ 1 r v 1 3 .^ \ --I , . _ Shed �we in % 'a m AG Fuel o\ m x o i i L_ PJ =N' Storage o \ o r o o _ } i r- J; }- L J i o o%w ! -- �I l 1 '14 / 1Ex. I� yy- f '< ' �! V Ex. --3' Ej i "� i1 ai T >ies ` % Ex. / t 1 SIGN - - �� Grovel 1 _RE i t E. E.� i 1 rave f �Ex.l j 1t t Pled. I` �� �- , Or I o i1CPEftTR Gravel \ fx. ?K-- e*/ Ex. l Grovel o Ex. 1XGraveL__ �� Elec•.��' 4 -� ro 1 - \ �E- �r E� - `®- - - - vel- �- arperl` lrcvel f Gtave/ v \ 'd•�...� � .._--..-�, _ \ ' "• j _._ �- ` _E7G A PH. ROAD 1 w , v y- �r flec I Elec. Ped. 8 W/ *"Vs, _ � I Elec. w/ Brick Ej / Ped -7Vd. � I Wall DumQster N w LAND COVER AREAS ^ ^° 50' PRIVATE ACCESS ESMT. PROPOSED CONDITIONS -POST DEV DB 931 PG 1480 TOTAL DISTURBED AREA=2.18 ACRES TURF AREA=1.23 ACRES IMPERVIOUS AREA=0.95 ACRES(HATCHED AREAS) TOTAL AREA IN ROOF70PS=0.341 ACRES POST DEVELOPMENT LAND COVER AREA MAP 50 0 50 SCALE: 1 "=20' Scale in Feet STORMWATER MANAGEMENT NARRATIVE Water Quality osdr I 15" CMP . This site is linear. Runoff discharges onto Sherando Park property in the form of sheet flow. There are no defined drainage channels on the site and no logical locations for the collection and treatment of stormwater. A credit of 0.34 pounds/year can be derived from "Rooftop Disconnect to B Soils". The area of roofs include the 12 new mobile homes and the pavilion. In lieu of treatment systems, the ;owner will purchase nutrient credits to offset other water quality impacts. The worksheet shows that the total P removal requirement is 1.35 pounds/year. An availability letter from the Virginia Nutrient Bank shows that 1.69 pounds have been reserved for purchase. The final purchase amount will be determined after review by Frederick County. D.A. O DA. E AREA CHECK Mair J4r"-ii. el�,t,.+�w+ti,�A Lr�ir.a�HR tv '7* TAPER 8' - EX. STOP LOCATE R REMCA,� ' REOOAABB�` N RELOCATE ARROW SIGN eaoara �,.a:a4�Mn e. ta: E�ao s,.nh: h, �ri3 osdr I 15" CMP . M 11fai cro $ s't 3 Pi.a F•fiisT / G-11 INV 1N=74204 s�.��nusuV1 MW 1,�r se ses� LvrA c Elm nc,� CO ERCIAL €D) / 2" WIDE WHITE &#DMS10N SIGN AM10"ONCRILL AND OVERLAY o INV /N=743.54 6 '7* TAPER 8' - EX. STOP LOCATE R REMCA,� ' REOOAABB�` N RELOCATE ARROW SIGN eaoara �,.a:a4�Mn e. ta: E�ao s,.nh: h, �ri3 taR.,.� .<ws{�.e� N•...y. �.,� 4+rw,e.x w,.�Rr. i.,. es3.Rsq era• w,•ut. e. Iu tiar s.....ah.. i.ta.�a..,p ,[�_. ASalt ■sMIb Cirr>< osdr I 15" CMP . M 11fai cro $ s't 3 Pi.a F•fiisT / G-11 INV 1N=74204 s�.��nusuV1 MW 1,�r se ses� LvrA c ERATE VOL EOUT-7 742.E nc,� CO ERCIAL €D) / 2" WIDE WHITE &#DMS10N SIGN AM10"ONCRILL AND OVERLAY o INV /N=743.54 6 !NV OUT=742.88 ' . r Site Results (Water Quality P 3FnD0 H aW 21 Area Checks DA. A DA B ,h taR.,.� .<ws{�.e� N•...y. �.,� 4+rw,e.x w,.�Rr. i.,. es3.Rsq era• w,•ut. e. Iu tiar s.....ah.. i.ta.�a..,p ,[�_. ASalt ■sMIb Cirr>< osdr �irt+stiloy+w�.astr +�.. �a.eas� ; e M 11fai cro $ s't 3 Pi.a F•fiisT s�.��nusuV1 MW 1,�r se ses� LvrA c ax nc,� ffx =434 � Z(/)0 o :5v^ 6 N -v Lu Site Results (Water Quality Compliance) 3FnD0 H aW 21 Area Checks DA. A DA B D.A c D.A. O DA. E AREA CHECK FORESTIOPEN SPACE (at) `+' DAD 090 "OO6 0.96 :°O -0Q" ON. IMPERMus COVER I-) FBF FitY.:vl pYa +14e3.>w4CVNtaree t 9.00 0.*JO OD - ON. DAPERVRNb CCNER TREATED(- ^� F>�i .DAD OAD. OOG `�i1i90 ON. MANAGaEDTURF AREA( :';. Y23. 09D" CLOG ,; 00O ';-`""YL9D ' OIL. MANAGEDTIRF AREA TREATED {atj =, F "tldiDa' ' . " 496" 04714 'II4O �.� �;=¢.00 OIL AREA O4EC( OIL OR. OIL Or. Or. Site Treatment Volume (ft'{ Runoff Reduction vokune and TP By Drainage Area QA. A DAB D.A. c DAD DA. E I TOTAL RUNOFF REDUCTUN VOLUME AOOEVED (its) 0 7P LOAD AVAILABLE FOR REMOVAL (b[yr) '77' 7- 490 099 0o0 TPLOADREDUCr1ONAWEVED (b/yr -', ,,p +(: DAD `- DOD:, ' DOD °>;0W ,; IE'Ir. ,• - TPLOAD REMNMNG (b/rl •'^ r"" . "CLOD ",40D NnTR06EN LOAD REWLTDN A011EV@ (bJW) x:.'=K, •OW 'h' .. 'U.OD" 0:00 �•`iLOO •• ;•7».06:,=, , TOW Phosphors RNAL POST-DEVEIOPMENTTP LOAD (b/,, 1 TP LOAD REDt1.nON REgU4RED TPIDAOREDUCrKM ACHIEVED (blrj 4 TP LOAD REMNMWOb/ye REMXMNG TP LOAD REDUCTION REQUIRED Qb/v,} 135 Tom Nitrogen (Far InfamTaBDn Purposes) ' POST4WALOPMENTLOAD (b/yrj `rs I MTROCENIOADREDUCTIONAOREVED ib/Wj REHWlr1r00POST4)EVELOPMENTMTROGENLOAD(Ib/yrJ taR.,.� .<ws{�.e� N•...y. �.,� 4+rw,e.x w,.�Rr. i.,. es3.Rsq era• w,•ut. e. Iu tiar s.....ah.. i.ta.�a..,p ,[�_. ASalt ■sMIb Cirr>< osdr �irt+stiloy+w�.astr +�.. �a.eas� ; e M 11fai cro $ s't 3 Pi.a F•fiisT �aa..ar tTK.::e� Ern tv*,T 3sa�s x . W .� W � Z(/)0 o :5v^ 14MAC Styr' T r�sah m Tal &IA zi al1 3dr4 ��eta: 1AI tm :a:o�ces�.^�rst3aze�ateAa.�•:.Lef�P i� -le:�nervl�aia CaN iy E�CarlF3as+rbrr�W ITS rSeD nHi.}v. rri Lases ;y� • , :. V DRAWN BY: '411 2 J' w X W .� W � Z(/)0 o :5v^ 6 N -v Lu O HZx 3FnD0 H aW 21 ILLJ Q_ i.mv.ssmu Nr4^� s.cts aY �.v _ L0 Q N U (D U 0 L_ 0) L E O W c TMrtnaidb S k td Cas FBF FitY.:vl pYa +14e3.>w4CVNtaree t OD49? -, di�tT"x'.�i4i ,'773 :3i satTP i9wd;. C. I.: • , :. V DRAWN BY: '411 2 J' w X W .� W � Z(/)0 o :5v^ 6 N -v Lu O HZx 3FnD0 H aW W O O ILLJ Q_ i.mv.ssmu Nr4^� s.cts aY �.v _ L0 Q W Q Ii E��tt H Z Ljt , ` a. vh'tz ,yz, r°'s J w CY 3' Fn�ilktiikl�. 4 E *� ` o 3:: w f � . Ful,U11F+'►.�rilet tF �.. tFun?I€+�t. gg� Y � Q U Q W t,wd 4odre�n IP Loud Pbdwdm R ,a 50 &14 n•wkd S. Atay. iA?A - F-VIRGNIA NUTRIENT BANK P.O. Box 142 Penn Laird, VA 22846 . (540) 908-1679 • www.Viririni�NutrientBank.con7 November 1, 2017 John Lewis Painter -Lewis, PLC. 817 Cedar Creek Grade, Suite 120 Winchester, VA 22601 Re: Nutrient Credit Availability - Spotswood Mobile Home Park - Frederick County Mr. Lewis, The Virginia Nutrient Bank (VNB) is pleased to reserve approximately 1.69 pounds per year of phosphorus offsets (nutrient credits) for the site plan at 106 Spotswood Court, located in the County of Frederick VA. VNB has approval from the Virginia Department of Environmental Quality (VDEQ) for Nonpoint Source Offset Generation Certification. VNB is approved to transfer nutrient credits in accordance with the Chesapeake Bay Watershed Nutrient Credit Exchange Program (VA Code 62.1-44.19:14 et seq). These offsets are also transferable in accordance with the Virginia stormwater offset program (VA Code 62.1- 44.15:35) and the Virginia Soil and Water Conservation Board's Guidance Document on Stormwater Nonpoint Nutirent Offsets approved on July 23, 2009, to those regulator entities qualifying for nutrient offsets. VNB manages the Berryville Nutrient Bank located in Clarke County that will generate 46.13 pounds of phosphorus reduction and 613.37 pounds of nitrogen reduction per year. VNB as of the date of this letter has capacity at the Berryville Nutrient Bank site, pending an imminent letter from DEQ. Upon final approval and closing, VNB will retire 1.69 pounds of phosphorus credits in accordance with the Nutrient Offset Certification regulations. Respectfully, Virginia Nutrient Bank, LLC 400,4�. X"K Nathan W. Blackwell, PE Manager 540-908-1679 a. C. I.: �°'oILL. V DRAWN BY: JOB NO.: 2 J' w X W .� W � Z(/)0 o :5v^ 6 N -v Lu O HZx 3FnD0 H aW W O O ILLJ Q_ d V 0 ■ 6 C. I.: P -L J DRAWN BY: JOB NO.: C04 O SCALE: DATE: SHOWN r,, E SHEET: U) N N -v C N N c0 L �o .g cn WC: Y L0 Q N U (D U 0 L_ 0) L E O W c Q•�- a� v 0 U'S v F2- W W 00 a 4�A�'TH � Dj o2 � C. EWIS a No. 021621 ZONAL _ SURVEY: C. I.: P -L 2'/5' DRAWN BY: JOB NO.: P -L 1511014 SCALE: DATE: SHOWN 10/24/17 SHEET: 13/14 NOTE: CONTRACTOR TO REGRADE, SOD OR HYDROSEED AND STRAW MULCH ALL AREAS DISTURBED AS A RESULT OF THEIR WORK. (2) UPRIGHT STAKES TO BE USED ON TREES UP TO 12' HGT. LARGER TREES TO BE GUYED. TREE WRAP MAIN TRUNK RUBBER HOSE 2"x2" HARDWOOD GUY STAKE — 2 PER TREE 12 GAUGE GALVANIZED WIRE—DOUBLE STRAND TWISTED 4" MULCH 3" SAUCER AROUND TREE EXISTING GRADE E161IWIEI COMPACTED MOUND TO PREVENT TREE FROM SETTLING — 6" MIN. HGT. UPRIGHT STAKES EXTENDED FIRM BEARING REMOVE TOP 1/3 OF ALL BURLAP ROPE FROM ROOT BALL. TREE PLANTING SECTION NOTE: PLANT SPACING VARIES—(SEE PLANS)— PRUNE ALL BROKEN, DISEASED, AND WEAK BRANCHES. ALL SHRUB BEDS TO BE COMPLETELY: EXCAVATED OF ALL EXISTING SOIL TO REQUIRED DEPTH AND BACKFILLED W/ REQUIRED SOIL MIX. _ MULCH TO BE 3" DEPTH COMPLETELY REMOVE ALL STRINGS, RIBBONS, AND TAGS FROM PLANT. REMOVE TOP 1/3 OF ALL BURLAP FABRIC AROUND ROOT BALL. SCARIFY ROOTS ON POT -r BOUND PLANTS. COMPACT SOIL TO 85% AT OPTIMUM MOISTURE CONTENT SHRUB PLANTING BED SECTION t r I i 40 0 40 Scale in Feet LANDSCAPE NOTES CALCULATIONS 1. Common Area Landscaping: per 165-403.04(B) Open areas are shown on the plan. The existing tree canopy will be preserved. 2. Ornamental Landscaping: Similar to Lot Type G. H. and I: Ornamental Shrubs, 2 per unit Total Number of Units: 12 Ornamental Shrubs Provided: 24 Ornamental Trees, 1 per unit Ornamental Trees Provided: 12 3. Zoning District Buffers: MH1 against RA: No Buffer Required. 4. All planting shall conform with Section 165-203.01B of the Frederick County Zoning Ordinance. Any plant substitutions must be approved in writing by the Frederick County Planning Department. 5. No trees or shrubs shall be placed on Frederick Water easements. PLANT LIST KEY LANDSCAPE INSTALLATION: 1. Confirm the locations of any utilities above or below ground prior to commencing work. Contact the Landscape BOTANICAL NAME Architect in the event that utilities or any other structure conflicts with the layout shown on the plan. —r 2. Verify the quantities shown on the plant list with totals indicated on the plan. Contact the Landscape Architect in ' the event that discrepancies exist. Supply unit prices to the Owner at time of bidding. 12 3. All materials are subject to approval by the Owner or Owner's representative. Provide the Owner with a tag from Downy Serviceberry each plant species and a list of the plant suppliers. Where any requirements are omitted from the Plant List, use + f plants which meet the normal requirements for the variety according to the American Association of Nurserymen. PJ 4. Plants shall be sound, healthy, vigorous, well branched, free of disease, insect eggs and larvae, and shall have 3) adequate root systems. i 5. Sizes specified in the Plant List are minimum sizes against which the plants will be judged. Failure to meet I = minimum size on any plant will result in rejection of that plant. O 6. Groups of shrubs shall be placed in a continuous mulched bed with smooth, continuous edges as shown on the H plan. All mulched beds shall be curvilinear in shape following the contour of the plant mass. Apply a minimum of 3 CL O inches of mulch uniformly over beds. Trees located within four feet of any shrub bed shall share the same bed. Grade finished planting beds so as not to impede surface drainage. 0 0 7. Locate trees a minimum of 3 feet from walls or walks, if possible. J 8. Stake and guy all trees according with standard practice and/or the suppliers recommendations. At a minimum, .� all deciduous trees shall be double—guyed with 72" hardwood stakes driven firmly into the ground. Secure tree to 1 stakes with #9 galvanized wire guys with rubber hose connections. Stakes shall be 2" x 2" x 72". aD 9. Use shredded hardwood bark mulch in all planting beds. 10. Remove all tags, twine and containers from installed plants. Roll back burlap one third on all B&B plants. 0 .E 11. Plant substitutions are permitted with consent from the Landscape Architect and Frederick County. UJ 12. Prepare the soil in all bedding areas by mixing into the top six inches of soil one cubic yard of manure, peat c - N O and 10-6-4 granular fertilizer per 100 square feet of area. Remove any turf, weeds or other vegetation completely prior to installation. I— W 13. Plant all materials in their appropriate season. The Contractor shall guarantee all plant materials and Z workmanship for a period of one year from time of installation. 14. All existing plant materials shall remain unless otherwise noted on the Site Plan. 15. No trees or shrubs shall be placed on FCSA easements. PLANT LIST KEY QTY. BOTANICAL NAME COMMON NAME SIZE SPACING REMARKS AA 12 Amelanchier arborea Downy Serviceberry 2" cal, see plans Shade PJ 24 Pieris japonica Japanese pieris 36" height see plans Shrub ALL SIZES INDICATE PLANT HEIGHT AT TIME OF PLANTING AREA TABLE AREA SQ. FT. ACRES NEW MOBILE HOME LOTS 51,506 1.1824 NEW ROAD R.O.W. 29,414 0.6752 TOTAL GREEN SPACE 39,121 0.8981 REMAINDER 125,416 2.879 Cn(n N 13 TOTAL 245,457 5.6348 V) Z O_ V) W W' QZ J a. W CL Q U Z R Y � � U Q Q a. MZ W 3/28/19 SHEET: �QLr- ■ O 04 Z W=Fr� J, Q w O mZ~_� (/) Cn(n N 13 Q_ 0 2Y O HZx Aja H CL O W X O LL_ O � ■ JOB NO.; 1511014 SCALE: DATE: ■ J 3/28/19 SHEET: 14/14 ■ O 04 O I\ � E o Cn(n N 13 vi N .O N N (0 O (0 cD N O � 0 0 v J Y'�Lc .� 1 > aD v L N 0 .E O UJ 0 c - N O 0 N c U I— W Z W 00 Q TH OF VV0 1 1. . kll U y c. No. 021621 vp 4 .o0 C~1�� ' IS, ZONAL ' Z O o' U N W 0 W a 0 O Z SURVEY: C. I.: P—L NA DRAWN BY: P—L JOB NO.; 1511014 SCALE: DATE: SHOWN 3/28/19 SHEET: 14/14