The Owner shall pay $360,000 to the County to be used to pay toward road
• ., r■XVAFr r �r .■. ■. r rra r
wadirectly imnpacted by this development. The Owner agrees to make
said payment at the earlier of the issuance of a certificate of occupancy for
a building in the second phase of development as is described herein or at
the time that a road is constructed which intersects with Route 50 at the
location referenced herein.
Carpers Valley Industrial Park February 22, 2019
Proffer Statement
PROFFER STATEMENT
REZONING: RZ. #03-18: R4 to M1
PROPERTY: 122.18 Acres +/-:
Tax Map & Parcels 64-A-86 and 87 (the "Property")
RECORD OWNER: JGR THREE LLC, ELLEN, LLC, LCR, LLC, MDC THREE,
LLC, SUSAN SANDERS, LLC, LIBERTY HILL, L.C., Thomas
A. Dick, Timothy J. Dick and Michael E. Dick
APPLICANT: Hines Acquisitions, LLC
PROJECT NAME: Carpers Valley Industrial Park
DATES
OF
PROFFERS FOR
PREVIOUS REZONINGS: March 24, 2008 (Revised: September 2,2008; October 31, 2008;
December 8, 2008; January 9, 2009; May 1, 2013; June 17, 2013,
July 23, 2013; August 15, 2013; September 6, 2013; September 26,
2013)
DATE OF PROFFERS: August 8, 2018
REVISION DATE: October 12, 2018; November 20, 2018, January 23, 2019, February
22, 2019
The undersigned owners hereby proffer that the use and development of the subject
property ("Property"), as described above, shall be in conformance with the following
conditions, which shall supersede all other proffers that may have been made prior hereto. In the
event that the above referenced rezoning is not granted as applied for by the Owner ("Owner"),
these proffers shall be deemed withdrawn and shall be null and void. Further, these proffers are
contingent upon final rezoning of the Property with "Final Rezoning' defined as that rezoning
that is in effect on the day upon which the Frederick County Board of Supervisors (the "Board")
grants the rezoning.
The headings of the proffers set forth below have been prepared for convenience or
reference only and shall not control or affect the meaning or be taken as an interpretation of any
provision of the proffers. The improvements proffered herein shall be provided at the time of
development of that portion of the Property adjacent to or including the improvement or other
proffered requirement, unless otherwise specified herein. The term "Owner" as referenced
herein shall include within its meaning all future owners, assigns, and successors in interest.
When used in these proffers, the "Generalized Development Plan" shall refer to the plan entitled
"Generalized Development Plan, Carpers Valley Industrial Park" prepared by Pennoni
Associates, Inc., (the "GDP") dated October 2018. The purpose of the GDP is to identify the
general location of the land bays, the general location of the proffered transportation
improvements and the general location of the pedestrian trail system. The Owner hereby
proffers to develop the Property in substantial conformity with the proffered GDP, prepared by
Carpers Valley Industrial Park
Proffer Statement
February 22, 2019
Pennoni Associates, Inc. and dated October 2018. The GDP is recognized to be a conceptual
plan and may be adjusted without the need of new conditional rezoning approval by the Board,
provided that the adjustments do not eliminate, substantially reduce, or substantially relocate the
areas indicated on the proffered GDP.
1. LAND USE
1.1 The Owner intends to develop the Property with a mix of light industrial uses as
allowed under the M -I zoning district provided the maximum daily vehicle trips
do not exceed the Traffic Impact Study — Revision I (as prepared by Pennon
July 2018) of 3,100 vehicle trips per day (VPD). With each Site Plan, the
owner will submit for the property a trip generation estimate per the Institute of
Transportation Engineers (ITE) "Trip Generation Manual)", current edition and
a summary of total trips approved to date to ensure that estimates for the
property do not exceed 3,100 VPD. In order to gain Site Plan approval for any
development that would result in more site trips generated than a total of 3,100
VPD, the Owner shall prepare a new Traffic Impact Analysis, identifying ant
transportation improvements required to mitigate the increased trip volumes,
and reach an agreement with Frederick County and the Virginia Department of
Transportation on improvements necessary to mitigate those impacts.
2. ARCHITECTURE AND SIGNAGE:
2.1 All buildings on the Property shall be constructed using similar architectural
styles and building materials for a more uniform appearance. Site signage shall be
uniform and in compliance with the Frederick County ordinances.
2.2 The Owner agrees to install a screen buffer along the northern property line
(along Route 50) to include planting of deciduous and evergreen trees. Where
possible, the Owner shall retain existing vegetation and incorporate the same into
the buffer in order to create a natural look. Planting and retention of existing
vegetation shall be at the discretion of the Owner.
3. PEDESTRIAN TRAIL SYSTEM
3.1 The Owner shall design and build a public pedestrian -bicycle trail system to
Virginia Department of Transportation standards that links to the adjoining
properties adjacent Coverstone Drive. Said trails shall be in the location generally
depicted on the GDP. Sidewalks shall be constructed on public streets to Virginia
Department of Transportation standards. The combined pedestrian/bicycling trail
shall be 10 feet wide and shall have an asphalt surface.
4. WATER & SEWER:
4.1 The Owner shall be responsible for connecting the Property to public water and sewer.
It shall further be responsible for constructing all facilities required for such connection
at the Property boundary. All water and sewer infrastructure shall be constructed in
accordance with the requirements of the Frederick Water.
Carpers Valley Industrial Park
Proffer Statement
5. CULTURAL RESOURCES:
February 22, 2019
5.1 The Owner shall conduct or cause to be conducted a Phase I Archeological Investigation
of the Property, prior to the approval of the first site or public improvement plan for the
property and shall complete Phase II and III investigations thereof as may be
demonstrated to be necessary by the Phase I study.
6. FIRE & RESCUE:
6.1 The Applicant shall contribute to the Millwood Fire and Rescue Company in the
sum of $0.10 per building square foot floor area for fire and rescue purposes,
payable prior the issuance of the first occupancy permit for each building.
7. TRANSPORTATION:
7.1 The Owner shall dedicate, design and construct Coverstone Drive, in the general
location shown on the GDP, with reasonable adjustments pennitted for final
engineering, as a full section with raised medians on a minimum 94' right-of-way,
all in accordance with Virginia Department of Transportation specifications,
according to the following phasing schedule:
PHASE 1: Phase I shall consist of a full four lane section including a ten -foot
trail from Point A at its terminus and end of existing right-of-way to
Point B the second proposed entrance as depicted on the GDP. Said
roadway shall be constructed to base asphalt prior to issuance of a
certificate of occupancy for any light industrial building up to 405,000
square feet or greater than 1,500 VPD on the Property.
PHASE 2: Phase 2 shall consist of construction of a full four lane section of
Coverstone Drive, including a ten -foot pedestrian/bicycling trail from
Point B, the second proposed entrance, to Point C, the future
intersection of Tazewell Road, and the construction of Coverstone
Drive as a four -lane section from Point C to Point D as depicted on the
GDP. Said roadway improvements shall be completed prior to
issuance of a certificate of occupancy for any use that would cause the
Property to exceed 405,000 square feet of light industrial building area
or greater than 1,500 VDP. Final top courses of asphalt for
Coverstone Drive from Point A to Point C shall be completed with the
completion of Phase 2.
7.2 The Coverstone Drive public right-of-way shall be dedicated to Frederick County
as part of the Site Plan approval process, consistent with applicable Virginia law.
Right -of -Way dedication shall be provided to adjacent owners in Governors Hill
or another entity if the design, funding and construction Coverstone Drive occurs
prior to Carpers Valley Industrial Park executing the proffered improvements
above.
Carpers Valley Industrial Park
Proffer Statement
February 22, 2019
7.3 All public streets and roads shall be designed in accordance with the Virginia
Department of Transportation specifications, subject to review and approval by
Frederick County and Virginia Department of Transportation.
7.4 The design of off-site road improvements shall be in general conformance with
the plan entitled "Off -Site Improvements Exhibit" Sheets 1-3, as prepared by
Pennoni Associates Inc., dated October, 2018. Off-site improvements shall be
constructed in two (2) phases and correspond as part of Phases 1 and 2 as defined
in Proffer 7.2 above;
Intersection 1: Road improvements as described in "Off -Site Improvements
Exhibit Sheet 1 of 3 Route 522 @ Costello Dr" shall be completed in
Phase 1.
Intersection 2: Road improvements as described in "Off -Site Improvements
Exhibit Sheet 2 of 3 Prince Frederick Drive at Costello Dr" shall be
completed in Phase 1.
Intersection 3: Road improvements as described in "Off -Site Improvements
Exhibit Sheet 3 of 3 Route 50 at Prince Frederick Dr" shall be
completed in Phase 1.
7.5 Public right-of-way of Tazewell Road shall be dedicated to the property lines of
the adjacent parcel with the construction and dedication of the Coverstone Drive
extension Phase 2, to allow further construction of the future roadway by others.
7.6 The Owner shall dedicate an area of approximately 0.6 acres, for the purposes or
regional transportation improvements, all property of PIN# 64A87 south and west
of the Coverstone Drive and Prince Frederick Drive Intersection at the request of
Frederick County or the Virginia Department of Transportation.
7.7 The Owner shall make good faith efforts to obtain any off-site right of way
needed to complete any proffered off-site transportation improvements. In the
event that the Owner is not able to obtain the right of way and, further, the County
and/or State of Virginia do not obtain the necessary right of way in lieu of
constructing the road improvement, the Owner shall provide a monetary
contribution to Frederick County that is equivalent to the estimated construction
cost of those road improvements that could not be implemented. The construction
cost estimate shall be subject to review and approval by Virginia Department of
Transportation. These monetary contributions may be utilized by Frederick
County for transportation improvements within the vicinity of the subject
property.
7.8 The Owner shall contribute $20,000 toward infrastructure improvements for
Coverstone Drive west of Prince Frederick Drive to connect to relocated Route
522, payable prior to the first occupancy permit.
Carpers Valley Industrial Park
Proffer Statement
February 22, 2019
7.9 The Owner shall pay $360,000 to the County to be used to pay toward the road
improvements in the public right-of-way on Route 50 to create an intersection
with Inverlee Way or to be used at the County's discretion, for road
improvements in the Coverstone Drive area. The Owner agrees to make said
payment at the earlier of the issuance of a certificate of occupancy for a building
in the second phase of development as is described herein or at the time that a
road is constructed which intersects with Route 50 at the location referenced
herein.
8. AIRPORT OPERATIONS:
8.1 The Owner shall consult with the Executive Director of the Winchester Regional
Airport with respect to the granting of a reasonable avigation easement to provide
further protection for airport operations, and shall dedicate such easement, as the
Airport and Owner shall mutually agree. Said avigation easement shall be
dedicated prior to issuance of the 1St occupancy permit for the property.
8.2 The Owner shall file an Obstruction Evaluation/Airport Airspace Analysis
(OE/AAA) in accordance with the Code of Virginia, Section 15.2-2294. The
OE/AAA filing shall occur a minimum of 45 days prior to the expected start of
any site plan or public improvement plan construction.
SIGNATURES APPEAR ON THE FOLLOWING PAGES
Carpers Valley Industrial Park
Proffer Statement
JGR THREE, LLC
By:
By:
CONIMONWE,ALTH OF VIRGINIA, AT LARGE
/City of I.V ►'1 C-!1� �� , To -wit:
February 22, 2019
19 The forgoing instrument was acknowledged before me this '�� day of �C%n {)
by )hn of JGR THREE, LLC.
My commissi exp 'es Q �i =LIND S1�Totary Public �inia
Carpers Valley Industrial Park
Proffer Statement
ELLEN, LLC
By:
By:
February 22, 2019
CONEXIONWKALTH OF VIRGINLA,, AT LARGE
/City of %t i��Cyie5 ��,/ , To -wit.
The fore ing instrument was acknowledged before me this j�
�o "� day- of l��ll i C �1 , 20K
by ti7nC; - 4��5 1 —
Ty of ELLEN, LLC.
My commissi.o xpires `` j ;/ � LINDETTA F WILLIAMS
Notary Publicfr� / NOTARY PUBUC
i Ll �Q Commonwealth of Virginia
Reg. # 184319
Carpers Valley Industrial Park
Proffer Statement
LCR, LLC
COMMONWEALTH OF VIRGIN TIA, AT LARGE
F m /City of Lo -) ci-i P S +/ To -wit:
February 22, 2019
The foregoing instrumen i C1
vas acknowledged before me this day of Mar , 20 .9,
by K LS S E -, of LCR, LLC.
My commissio epir (f3 C LINQETTA F. WILLIAMS
Public NOTARY PUBLIC
Notary � Commonwealth of Virginia
Reg. # 184319
Carpers Valley Industrial Park
Proffer Statement
MDC THREE, LLC
CO> IAIONWEALTH OF VIRGINIA, AT LARGE
-Eaorrt -/City of j j -.inches- e -y' -3TO-wit.
February 22, 2019
r� 19
The foregoing instrument was acknowledged before me this /� day of �,1,'�,Ci� , 2Qkg
by S S Nf. I 7jr of MDC THREE, LLC..
My commissio pires 1(� ] LiNDETTA F. WILLIAMS
Notary Public NOTARY NOTARY PUBLIC
Commonwealth of Virginia
Reg. # 184319
Carpers Valley Industrial Park
Proffer Statement
SUSAN SANDERS, LLC
By:
By:
COMMONWEALTH OF VIRGINIA, AT I.-ARGE
9/City- of W i : l ►f'S y' , To -wit:
February 22, 2019
The foregoing instrument was acknowledged before me this 1� day of MtgC '- , 20 3'
by h n G. -IRas5e-i I TT -1 of SUSAN SANDERS, LLC.
My commis expir, s -3 j DC3 g LINDETTA F. WILLIAMS
NOTARY PUBLIC �
I
Notary Public Commonwealth of Virginia
Reg. # 184319
Carpers Valley Industrial Park
Proffer Statement
LIBERTY HILL, L.C.
By:
By:
AT LARGE
County/City of , To -wit:
February 22, 2019
The foregoing instrument was acknowledged before me this Zday of VkE,?,v_.)1J , 201 �, j
by of LIBERTY HILL, L.C.
My commission expires / 17
Notary Public
Carpers Valley Industrial Park
Proffer Statement
MICHAEL E. DICK
f�i�f7"�t�tgF CJ�vsir�i c�
February 22, 2019
Clllvl �c�aJscrrr�r mLr nr rm �iiv ii i, AT LARGE
County/City of , To -wit:
The foregoing instrument was acknowledged before me this / day of 1liZC , 201,
by MICHAEL E. DICK.
My commission expires / // / �J
Notary Public Z/Zf
Carpers Valley Industrial Park February 22, 2019
Proffer Statement
TIMOTHY J. DICK
I % ; //,a
70o1�_
AT LARGE
County/City of , To -wit:
The foregoing instrument was acknowledged before me this I day of u� , 201,
by TIMOTHY J. DICK.
M commission expires
/
Y P
Notary Public �y _
Carpers Valley Industrial Park February 22, 2019
Proffer Statement
THOMAS A. DICK
—�X, 4�;�
COMMONWEALTH OF VIRGINIA, AT LARGE
County/City of ����� (` , To -wit:
The foregoing instrument was acknowledged before me this V� day of �L� 204$;
by THOMAS A. DICK.
��uuiurruii
�A. LYN
My couffifission e ices \ i �� ``���'G 'MMo �;�•,
Notary Public : RF Fy• O
=' m =
07/371.p p�REs
i 9 • 9GINI. '
yrPU BIL
Proffer Comparison
REZONING:
PROPERTY:
RECORD OWNER:
APPLICANT:
PROJECT NAME:
ORIGINAL DATE OF
PROFFERS:
PROFFER STATEMENT
RZ. #10-08: R4 and RA to R4
278.0 Acres +/-:
Tax Map & Parcels 64-A-83, 83A, 84, 85, 86, and 87 (the
"Property")
Carpers Valley Development, LLC and Governors Hill
LLC
Carpers Valley Development, LLC and Governors Hill
LLC
Governors Hill
March 24, 2008
REVISION DATE: September 2, 2008; October 31, 2008; December 8, 2008;
January 9, 2009; May 1, 2013; June 17, 2013, July 23,
2013; August 15, 2013; September 6, 2013; September 26,
2013; September 18, 2014
The undersigned owners hereby proffer that the use and development of the
subject property ('Property"), as described above, shall be in conformance with the
following conditions, which shall supersede all other proffers that may have been made
prior hereto. In the event that the above referenced rezoning is not granted as applied for
by the Applicant ("Applicant"), these proffers shall be deemed withdrawn and shall be null
and void. Further, these proffers are contingent upon final rezoning of the Property with
"Final Rezoning" defined as that rezoning that is in effect on the day upon which the
Frederick County Board of County Supervisors (the "Board") grants the rezoning.
The headings of the proffers set forth below have been prepared for convenience
or reference only and shall not control or affect the meaning or be taken as an
interpretation of any provision of the proffers. The improvements proffered herein shall
be provided at the time of development of that portion of the Property adjacent to or
including the improvement or other proffered requirement, unless otherwise specified
herein. The term "Applicant" as referenced herein shall include within its meaning all
future owners, assigns, and successors in interest. When used in these proffers, the
"Master Development Plan" shall refer to the plan entitled "Master Development Plan,
Governors Hill" prepared by Patton. Harris Rust & Associates, (the "MDP") dated March
2008 revised January 9, 2009,
MWANIXIMM
1.1 The project shall be designed to establish interconnected mixed-use
residential and commercial/employment Land Bays in general
conformance with the MDP, and as is specifically set forth in these
Page 1 of 12
proffers subject to minor modifications as necessary upon final
engineering including but not limited to intersection alignments.
The Carpers Valley Industrial Park will continue to be in general conformance with the MDP associated with Rezoning 05-13.
1.2 All development, including street landscaping, shall be accomplished in
general conformance with the "Governors Hill, Design and
Development Standards", prepared by PHR&A attached hereto and
incorporated herein by reference (the "Design and Development
Standards"). While this requirement would continue to apply the remaining Governors Hill
parcels. Carpers Valley Industrial Park would not be subject to these requirements.
1.3 Residential uses shall be prohibited in the area identified as Land Bay 2
on the MDP. Furthermore, Land Bay 2 shall be restricted to those uses
permitted in the General Business (B-2) zoning district as specified in
the Frederick County Code Article X, §165-82B(1).
This Proffer only applies to Governors Hill Land Bay 2 and therefore would not affect the Governors Hill Land Bay 1.
1.4 Except as modified herein, areas of residential development on the
Property shall be limited to Land Bay 1 and shall be developed in
conformance with the regulations of the Residential Planned Community
("R4") zoning district, including permissible housing types set forth in
the Frederick County Code Article VII, §165-67 through §165-72, as
cross-referenced to Article VI, §165-58, through §165-66. Unit types
and lot layouts within residential Land Bays may comprise any of the
permitted unit types as set forth in the Design and Development
Standards, and authorized for the R4 district, and these Proffers.
This Proffer does not currently apply to Governors Hill Land Bay 2 (proposed Carpers Valley Industrial Park)
1.5 Residential development on the Property shall not exceed 550 dwelling
units, with a mix of housing types permitted in the R4 district. Multi-
family units, as defined by the Design and Development Standards, shall
not exceed 50% of the total number of dwelling units developed in the
project. No residential structures shall be closer than 2000 feet from the
centerline of the existing Winchester Airport runway.
The proffer does not currently apply to Governors Hill Land Bay 2 (proposed Carpers Valley Industrial Park)
1.6 Prior to the Property exceeding 1,285,000 square feet of commercial
building floor area, the Applicant shall submit to the County a revised
Traffic Impact Analysis (TIA) for the Property. The total permitted
commercial building floor area may increase provided that the Applicant
completes a revised traffic impact analysis which identifies the impacts
of trips for commercial development in excess of 45,815 Average Daily
Trips (ADT) and mitigation, if necessary for said impacts is provided by
the Applicant in a form that is acceptable to the County and VDOT.
The proffer only applies to Governors Hill Land Bay 2 and therefore would not affect the Governors Hill Bay 1.
2. CONSTRUCTION OF A UNIFIED DEVELOPMENT
2.1 The Property shall be developed as one single and unified development
in accordance with applicable ordinances and regulations for the R4
zoning district, the MDP as approved by the Board, and this Proffer
Statement.
While this requirement would continue to apply the remaining Governors
Hill parcels, Carpers Valley Industrial Park would not be subject to these
requirements.
Page 2 of 12
3. ACCESS TO ARMORY PARCEL
3.1 The Applicant has designed and constructed a two lane public roadway,
identified on the MDP as Pendleton Drive, from Arbor Court to the
entrance of the Armory Site (TM 64-A-82). At such time that Tazewell
Road is constructed as depicted on the MDP, the Applicant shall extend
Pendleton Drive to connect with Tazewell Road.
As this improvement has been completed, there is no affect on either Governors Hill Land Bays.
4. PHASING OF RESIDENTIAL DEVELOPMENT
4.1 Building permits for Land Bay I of the Property shall be issued on the
following phasing schedule:
Year 1 (Months 1 -12) -
Year 2 (Months 13-24):
Year 3 (Months 25-36):
Year 4 (Months 37-48):
140 building permits
140 building permits
140 building permits
130 building permits
The above identified phasing schedule is taken from the Date of Final
Rezoning (DFR). Any building permits not issued within any given year
may be carried over to the following year, however the Applicant shall not
make application for more than 200 residential building permits in any given
year.
This proffer only applies to Governors Hill Land Bay 1 and therefore does not affect the Governors Hill Land Bay 2.
4.2 Commercial and employment uses may be constructed at any time.
This proffer is not affected by the proposed rezoning.
4.3 Improvements including a 3,000 square foot community center, 3,500
square feet of neighborhood swimming pools, and a dog park shall be
constructed in conjunction with residential development in Land Bay 1
and the land therefor shall be dedicated upon completion of the
improvements to the Property Owners Association. The location thereof
shall be depicted on final subdivision plans for such residential
development. These recreational amenities shall serve to meet the
requirement of 1 recreation unit per 30 dwellings. These improvements
shall be completed prior to the issuance of the 281st residential building
permit.
This proffer only applies to Governors Hill Land Bay 1 and therefore does not affect the Governors Hill Land Bay 2.
5. ARCHITECTURE, SIGNAGE, AND LANDSCAPING:
5.1 All buildings on the Property shall be constructed using compatible
architectural styles. The Applicant shall establish one or more Architectural
Review Boards through the required Property Owner Association to be
created to enforce and administer a unified development plan in general
conformity with the Design and Development Standards.
While this requirement would continue to apply to the remaining Governors Hill parcels,
Carpers Valley Industrial Park would not be subject to these requirements. The Carpers
Valley Industrial Park proffer does however include a note that its buildings shall be
compatible in style and materials.
Page 3 of 12
5.2 All signage within the Property shall be in substantial conformity with a
comprehensive sign plan that meets the requirements of the Zoning
Ordinance for signage, which shall be submitted in conjunction with the
first final site or subdivision plan for the Property.
While this requirement would continue to apply the remaining Governors Hill parcels, Carpers Valley Industrial Park would not be
subject to these 6. PEDESTRIAN TRAIL SYSTEM AND RECREATION AREAS
requirements.
6.1 The Applicant shall design and build a public pedestrian -bicycle trail
system to Virginia Department of Transportation standards that links
residential and commercial areas within the development. Said trails shall
be in the locations generally depicted on the MDP. To the extent that such
trails are not depicted on the MDP at the time of Final Rezoning, such
trails shall be connected with or linked to the internal street and sidewalk
network. Sidewalks shall be constructed on public streets to VDOT
standards, and a minimum of four -foot sidewalks shall be constructed on
private streets. All combined pedestrian/bicycling trails shall be 10 feet
wide, and shall have an asphalt surface. While this requirement would continue to apply to
the remaining Governors hill parcels. The Carpers Valley Industrial Park proffer does however include a requirement that a
7. FIRE & RESCUE: hiker biker trail and sidewalks will be provided along Coverstone Drive.
7.1 The Applicant shall contribute to the Board the sum of $422 per dwelling
unit for fire and rescue purposes, payable upon the issuance of a building
permit for each dwelling unit.
This proffer only applies to Governors Hill Land Bay 1 and therefore not affect the Governors Hill Land Bay 2.
7.2 Following Final Rezoning, the Master POA to be created in accordance
herewith shall contribute annually, on or before July lst of each year, the
sum of $100 per constructed residential unit, and $100 per 1000 square
feet of constructed commercial (not including any land in public use), to
the fire and rescue company providing first response service to the
Property. Such contribution shall be monitored and enforced by the
master POA, and the Board may require an accounting of such payments
at such times and upon such conditions as it may determine necessary.
Said monetary contribution shall cease at such time that the fire and rescue
company providing first response service is no longer a volunteer
operation or should the County adopt a fee for service plan to provide fire
and rescue services.While this requirement would continue to apply the remaining Governors
Hill Parcels, Carpers Valley Industrial Park would not be subject to these requirements. The Carpers Valley -Industrial Park
8. SCHOOLS: proffer does however include a requirement that a donation to Millword Fire and
Rescue Company in the amount of $15,000.
8.1 The Applicant shall contribute to the Board the sum of $1,714 per dwelling
unit for educational purposes, payable upon the issuance of a building permit
for each dwelling unit.
This proffer only applies to Governors Hill Land Bay 1 and therefore does not affect the Governors Hill Land Bay 2.
Page 4 of 12
9. PARKS & OPEN SPACE:
9.1 The Applicant shall contribute to the Board the sum of $343 per dwelling
unit for recreational purposes, payable upon the issuance of a building
permit for each dwelling unit.
This proffer only applies to Governors Hill Land Bay 1 and therefore not affect the Governors Hill Land Bay 2.
10. LIBRARIES:
10.1 The Applicant shall contribute to the Board the sum of $79 per dwelling
unit for library purposes, payable upon the issuance of a building permit
for each dwelling unit.
This proffer only applies to Governors Hill Land Bay 1 and therefore not affect the Governors Hill Land Bay 2.
11. ADMINISTRATION BUILDING:
11.1 The Applicant shall contribute to the Board the sum of $79 per dwelling
unit upon issuance of a building permit for each dwelling unit to be used
for construction of a general governmental administration building.
This proffer only applies to Governors Hill Land Bay 1 and therefore not affect the Governors Hill Land Bay 2.
12. CREATION OF PROPERTY OWNERS' ASSOCIATION:
12.1 The Master Property Owners Association to be created in accordance
herewith shall be created contemporaneously with the first final site or
subdivision plan submitted for the Property. While this requirement would continue to apply the
remaining Governors Hill parcels. Carpers Valley Industrial Park would not be subject to these requirements.
12.2 The Applicant shall establish a Master Property Owners' Association
(hereinafter "Master POA") for Governors Hill, in its entirety, that shall,
among other things, have responsibility for assuring compliance with
design guidelines and standards, signage requirements, landscape
maintenance, and similar matters. Any homeowners' or property owners'
associations created for commercial or residential uses individually shall act
as a subset of the Master POA. There would be no facilities or maintenance shared
between the Carpers Valley Industrial Park and Governors Hill Land Bay 1 and therefore no Master POA is required.
12.3 The residential portion of the development shall be made subject to one or
more Property Owners' Association(s) (hereinafter "Residential POA")
that shall be responsible for the ownership, maintenance and repair of the
community center, walking trails in Land Bay 1, swimming pools, all
common areas, including any conservation areas that may be established
in accordance herewith not dedicated to the County or others, and
stormwater management facilities not dedicated to public use in Land Bay
1, for each area subject to their jurisdiction, and shall be provided such
other responsibilities, duties, and powers as are customary for such
associations or as may be required for such Residential POA herein.
This proffer only applies to Governors Hill Land Bay 1 and therefore not affect the Governors Hill Land Bay 2.
12.4 In addition to such other duties and responsibilities as may be assigned, a
Residential POA shall have title to and responsibility for the following in
Land Bay 1: (i) all common open space areas not otherwise dedicated to
public use, (ii) common buffer areas located outside of residential lots;
(iii) private streets serving the residents who are members of such
Page 5 of 12
association; (iv) common solid waste disposal and recycling programs,
including curbside pick-up of refuse by a private refuse collection
company, and (v) responsibility for the perpetual maintenance of any
street, perimeter, or road buffer areas, all of which buffer areas shall be
located within casements to be granted to the Residential POA if platted
within residential or other lots, or otherwise granted to the Residential
POA by appropriate instrument.
This proffer only applies to Governors Hill Land Bay 1 and therefore not affect the Governors Hill Land Bay 2.
12.5 The Residential POA shall be so established that it possesses all necessary
powers to set and revise fees and dues in sufficient sums to perform the
responsibilities assigned to it hereunder and under the Declaration to be
recorded creating such Association. In addition, upon any conveyance of
a residential unit from the builder thereof to a home purchaser, there shall
be a fee paid by the home purchaser to the Residential POA in an amount
equal to three times the then -current monthly residential dues applicable to
the unit so conveyed.
This proffer only applies to Governors Hill Land Bay 1 and therefore not affect the Governors Hill Land Bay 2.
12.6 Any commercial portion of the development (with the exception of any
property owned or leased by the United States, or Frederick County) shall
be made subject to one or more Property Owners' Association(s)
(hereinafter "Commercial POA"). Such Commercial POA(s) shall be
responsible for the ownership, maintenance and repair of all common
areas in Land Bay 2, including any conservation areas that may be
established in accordance herewith not dedicated to the County or others,
and stormwater management facilities (under common (open space)
ownership) not dedicated to public use for each area subject to their
jurisdiction, and shall be provided such other responsibilities, duties, and
powers as are customary for such associations or as may be required for
such Commercial POA herein. While this requirement would continue to apply the remaining
Governors Hill parcels. Carpers Valley Industrial Park would not be subject to these requirements.
12.7 In addition to such other duties and responsibilities as may be assigned, a
Commercial POA, in Land Bay 2, shall have title to and responsibility for
(i) all common open space areas not otherwise dedicated to public use, (ii)
common buffer areas located outside of commercial lots; (iii)
responsibility for the perpetual maintenance of any street, perimeter, or
road buffer areas, all of which buffer areas shall be located within
easements to be granted to the Commercial POA if platted within
commercial or other lots, or parcels, or otherwise granted to the
Commercial POA by appropriate instrument. While this requirement would continue to apply
the remaining Governors Hill parcels. Carpers Valley Industrial Park would not be subject to these requirements.
13. WATER& SEWER:
13.1 The Applicant shall be responsible for connecting the Property to public
water and sewer. It shall further be responsible for constructing all
facilities required for such connection at the Property boundary. All water
and sewer infrastructure shall be constructed in accordance with the
requirements of the Frederick County Sanitation Authority.
This proffer is not affected by the proposed zoning.
Page 6 of 12
14. ENVIRONMENT:
14.1 Stormwater management and Best Management Practices (BMP) for the
Property shall be provided in accordance with the Virginia Stormwater
Management Regulations, First Ed. 1999, Chapter 2, Table 2-3.
This proffer is not affected by the proposed zoning.
14.2 The Applicant shall provide notice in all sales literature, in covenants,
conditions and restrictions for any Property Owners' Associations, of the
adjacency of the Winchester Regional Airport. The Applicant shall
provide noise attenuation treatment for all residential units.
15. TRANSPORTATION: This proffer is not affected by the proposed zoning.
15.1 The major roadways to be constructed on the Property shall be constructed
in the locations depicted on the MDP, with reasonable adjustments permitted
for final engineering. This proffer is not affected by the proposed zoning.
15.2 Excluding 300,000 square feet of office uses which may be developed at
any time utilizing access to the existing completed portion of Coverstone
Drive, the Applicant shall design and construct Coverstone Drive as a full
section with raised medians on a minimum 90' right-of-way, utilizing the
following phasing schedule:
PHASE 1: Phase I shall consist of the full four lane section including a
ten -foot trail from Millwood Pike to the first intersection on
Coverstone Drive as depicted on the MDP from Point A to
Point B. Said roadway shall be constructed to base asphalt
prior to issuance of a certificate of occupancy for any
commercial building for the Property and/or prior to issuance
of a building permit for any residential units, excluding model
homes, located in Land Bay 1. Phase 1 improvements shall
consist of all necessary improvements, including signalization
when warranted by VDOT, to create a four way intersection at
the existing intersection of Inverlee Way and Millwood Pike as
shown on the MDP.
As the Carpers Valley Industrial Park does not require the
connection of Coverstone Drive to Millwood Ave, this proffer only
applies to Governor's Hill Land Bay 1 and therefore would not
affect the Carpers Valley Industrial Park.
Page 7 of 12
PHASE 2: Phase 2 shall consist of construction of a two lane section of
Coverstone Drive from Point B to Point C as depicted on the
MDP. Said roadway improvements shall be completed prior to
issuance of a certificate of occupancy for any use that would
cause the Property to exceed 400,000 square feet of
commercial building area.
This proffer only applies to Governors Hill Land Bay 2 and therefore not affect the Governors Hill Land Bay 1.
PHASE 3: Phase 3 shall consist of construction of the remaining two lane
section of Coverstone Drive from Point B to Point C as
depicted on the MDP. Said roadway improvements shall be
completed prior to issuance of a certificate of occupancy for
any use that would cause the Property to exceed 800,000
square feet of commercial building area.
This proffer only applies to Governors Hill Land Bay 2 and therefore not affect the Governors Hill Land Bay 1.
PHASE 4: The Applicant shall design Coverstone Drive Extended as a four -
lane section from Prince Frederick to Relocated Route 522 as
depicted from Point D to Point E or for a maximum distance of
800 feet when the alignment of Relocated 522 has been
determined by VDOT, and the right of way for this segment of
Coverstone Drive has been acquired by VDOT or Frederick
County. In the event that the alignment for relocated Route 522
has not been determined or if the right of way for Coverstone
Drive Extended is not secured by June 30, 2018 then the
Applicant shall pay to the County $20,000 for transportation
improvements within the vicinity of the Property in lieu of
designing said portion of Coverstone Drive. The Applicant
shall further pay to the County $1,000 for each permitted
residential unit as a contribution towards the future
construction of Coverstone Drive Extended, but if the
conditions above have not been met by June 30, 2018 then
these funds may be used for other projects in the vicinity of the
Property that have a rational nexus to the Property. Such funds
shall be paid at the time of building permit issuance for each of
the permitted residential units. As the Carpers Valley Industrial Park does not
require the connection of Coverstone Drive to Rte 522, this provision does not affect the Carpers Valley Industrial Park.
15.3 Notwithstanding any other provisions of these proffers, the
Applicant shall construct Coverstone Drive as a full four -
lane section as required in Proffer 15.2 from Millwood
Pike to Prince Frederick Drive prior to November 1, 2025.
A median break and eastbound left turn lane shall be
constructed at the existing Millwood Pike and Inverlee
intersection prior to November 1, 2015.
As the Carpers Valley Industrial Park does not require the
connection of Coverstone Drive to Millwood Ave, this proffer only
applies to Governor's Hill Land Bay 1 and therefore would not
affect the Governor's Hill Land Bay 2.
Page 8 of 12
15.4 The Applicant shall design and construct Tazewell Road as shown on the
MDP as a minimum two lane roadway within a variable width right of
way with a maximum right of way width of 60' to provide access to
residential uses within Land Bay 1 and other commercial areas of Land
Bay 2. Said Wright of way width shall be required for Tazewell Road
between Coverstone Drive and Pendleton Drive. The right of way and
road width shall decrease for the remaining portions of Tazewell Road.
Said roadway shall be constructed in phases as needed for future
subdivision plans. Furthermore, no certificate of occupancy for any
residential dwelling that is served by Tazewell Road, excluding model
homes, shall be issued until such time that access to Land Bay 1 from
Millwood Pike is provided via Coverstone Drive and Tazewell Road.
This proffer only applies to Governors Hill Land Bay 1 and therefore does not affect the Governors Hill Land Bay 2.
15.5 The Applicants shall pay to the County the amount of $75,000 for
signalization or other road improvements at the intersection of Millwood
Pike (CJS Route 50) and Victory Road (Route 728). Such funds shall be
paid within sixty (60) days of the issuance of the first residential building
permit in Land Bay 1.
This proffer only applies to Governors Hill Land Bay 1 and therefore does not affect the Governors Hill Land Bay 2.
15.6 The Applicants shall pay to the County the amount of $175,000 for
signalization or other road improvements at the intersection of Costello
Drive and Prince Frederick Drive. Such funds shall be paid within sixty
(60) days of receiving written request from the County and VDOT after
acceptance of Phase 2 Coverstone Drive Improvements per Proffer 152
into the State highway system. Carpers Valley Industrial Park is undertaking improvements
to intersections on Prince Frederick Drive. Governors Hill Land Bay 1 may be responsible for further improvements
15.7 Access to Millwood Pike shall be limited to Coverstone Drive as shown
on the MDP with the exception of the private driveway currently serving
TM 64 -A -83B. The Applicant shall close said driveway once access is
provided to TM 64 -A -83B via the internal residential street network as
depicted on the MDP. Additionally, the Applicant shall close the existing
crossover previously used for access to the golf course concurrent with
Phase I improvements as provided by Proffer 15.2.
This proffer is not affected by the proposed zoning.
15.8 All public right-of-ways shall be dedicated to Frederick County as part of
the subdivision approval process, consistent with applicable Virginia law.
This proffer is not affected by the proposed zoning.
15.9 All public streets and roads shall be designed in accordance with the
Virginia Department of Transportation specifications, subject to review
and approval by Frederick County and VDOT.
This proffer is not affected by the proposed zoning.
15.10 All private streets and roads shall be constructed in accordance with the
current Virginia Department of Transportation structural standards, and as
may be modified by the County, and shall be owned and maintained by the
Property Owners Association served by such streets or roads.
This proffer only applies to Governors Hill Land Bay 1 and therefore does not affect the Governors Hill Land Bay 2.
Page 9 of 12
15.11 The design of off-site road improvements shall be in general conformance
with the plan entitled "Governors Hill Road Improvements" Sheets 1-2, as
prepared by Patton Harris Rust and Associates, dated October 30, 2008.
Excluding 300,000 square feet of office uses which may be developed at
any time utilizing access to the existing completed portion of Coverstone
Drive, off-site improvements shall be constructed in three phases as
depicted on the aforementioned pians as follows:
As the Carpers Valley phase A:
Industrial Park does not require
the connection of Coverstone
Drive to Millwood Ave, this
proffer only applies to
Governor's Hill Land Bay 1.
Phase 13:
Carpers Valley Industrial Park
is proposing improvements at
these intersections as
required by the impacts
identified by the TIA.
Phase A improvements shall consist of improvements at the
intersection of Millwood Pike/Inverlee Way/Coverstone Drive
and shall be completed coincident with Phase 1 Coverstone
Drive construction per Proffer 15.2.
Phase B improvements shall consist of improvements at the
intersections of Millwood Pike/Prince Frederick Drive and
Prince Frederick Drive/Costello Drive. Phase B improvements
shall be completed coincident with Phase 2 Coverstone Drive
construction per Proffer 15.2.
As the Carpers Valley Phase C: Phase C improvements shall consist of improvements at the
Industrial Park does not intersection of Millwood Pike/Sulphur Spring Road. Phase C
require improvements at improvements shall be completed coincident with Phase 3
this intersection, this p p
proffer may only apply to Coverstone Drive construction per Proffer 15.2.
Governors Hill Land Bay 1.
15.12 The Applicant shall make good faith efforts to obtain any off-site right of
way needed to complete any proffered off-site transportation
improvements. In the event that the Applicant is not able to obtain the
right of way and, further, the County and/or State of Virginia do not obtain
the necessary right of way, in lieu of constructing the road improvement,
the Applicant shall provide a monetary contribution to Frederick County
that is equivalent to the estimated construction cost of those road
improvements that could not be implemented. The construction cost
estimate shall be subject to review and approval by VDOT. The monetary
contribution shall coincide with the commercial area threshold that
triggers the off-site road improvement as identified in Proffer 15.11.
This proffer is not affected by the proposed zoning.
15.13 Any future transportation analyses which may be required for the
Property, shall utilize Code 820 "Retail" per the I.T.E. Trip Generation
Manual 7th Edition for any commercial use other than office use.
With the Carpers Valley Industrial Park Rezoning,this proffer no longer applicable.
Page 10 of 12
15.14 In the event any proffered off-site road improvements are constructed by
others, the Applicant shall provide a monetary contribution to Frederick
County that is equivalent to the estimated construction costs of those
proffered road improvements not installed by the Applicant. The
construction cost estimate shall be subject to review and approval by
VDOT. The monetary contribution shall coincide with the commercial area
threshold that triggers the offsite road improvements as identified in
Proffer 15.11. This proffer is not affected by the proposed zoning.
16. CULTURAL RESOURCES INVESTIGATION AND PRESERVATION
The Applicant shall conduct or cause to be conducted a Phase I Archaeological
Investigation of the Property, prior to the approval of the first final site or
subdivision plan for the Property, and shall complete Phase 11 and III
investigations thereof as may be demonstrated to be necessary by the Phase I
study. This proffer is not affected by the proposed zoning.
17. ESCALATOR CLAUSE
17.1 In the event any monetary contributions set forth in the Proffer Statement
are paid to the Frederick County Board County Supervisors ("Board")
within 30 months of October 12, 2005, as applied for by the Applicant,
said contributions shall be in the amounts as stated herein. Any monetary
contributions set forth in the Proffer Statement which are paid to the Board
after 30 months following October 12, 2005 shall be adjusted in
accordance with the Urban Consumer Price Index ("CPI -U") published by
the United States Department of Labor, such that at the time contributions
are paid, they shall be adjusted by the percentage change in the CPI -U
from that date 30 months after October 12, 2005 to the most recently
available CPI -U to the date the contributions are paid, subject to a cap of
5% per year, non -compounded. This proffer is not affected by the proposed zoning.
18. SEPTEMBER 18, 2014 PROFFER REVISION
18.1 The revisions dated September 18, 2014 apply only to tax parcels 64-A-86
and 64-A-87 and do not apply to the other properties subject to the Proffer
Statement dated September 26, 2013. These modifications increase from.
200,000 to 300,000 the square footage of office floor space which may be
developed, on any or all of the properties subject to the Proffer Statement
dated September 26, 2013, utilizing access from the completed portion of
Coverstone Drive. This increase in floor space is indicated in Sections 15.2
and 15.11 of this Proffer Statement. This proffer only applies to
Governors Hill Land Bay 2 and
therefore does not affect the
SIGNATURES APPEAR ON THE FOLLOWING PAGES Governors Hill Land Bay 1.
The Carpers Valley Industrial Park
TIA demonstrates less traffic
generation than the approved
300,000 square
footage of office floor space would
generate.
Page 11 of 12
JGR Three L.L.C.
JPG Three L.L.C. Managing Member
hard Dick, Malager
STATE OF VIRGINIA, AT LARGE
T -wit:
�,; r� ►r+C� 5
The fore ing insU-um nt as a kno ledged before me this ra 4day of
2014, by+C.1plS�`CjL
My co sio fres j 3 >< S
Notary Public `
,"1{1111/lf/'tfI
`�i�'v�•',S" MIV
' •. '�`'t/� iii
NOTARY ` .•. �`
PLfsLIC
ik
-REG, #138 8
MY COMMISSION r
' EXPIRES
If�JI 111 !!!11\l
Page 12 of 12