Loading...
HomeMy WebLinkAbout03-18 Impact Analysis StatementIMPACT ANALYSIS Carpers Valleylndu6trial Park Impact Analysis Statement CARPERS VALLEY INDUSTRIAL PARK — INDUSTRIAL REZONING IMPACT ANALYSIS STATEMENT October 2018 A. Introduction This report has been prepared for the purpose of assessing the impact on Frederick County by the conditional rezoning of two parcels totaling approximately 122 acres, which are owned by JGR Three, LLC ETALS. The parcels are identified as 64-A-86 and 87. The subject acreage is located on the south side of Millwood Pike (Route 50/17) across from The Ravens and Miller Heights subdivisions, and adjacent to the JIC Industrial Park, Winchester Regional Airport, and the U.S. Army Corps of Engineers Transatlantic Division Headquarters facility. The site is currently zoned R4. This application proposes the rezoning of the +/- 122 -acre assemblage to the M1 (Light Industrial) District. The site is a portion of a commercially zoned R4 land use intended as an employment center. Employment uses targeted through the current Frederick County 2035 Comprehensive Plan will continue to be achieved with the conversion of the subject property from the current permitted B-2 land uses to the proposed M-1 (Light Industrial) land uses as specified with in this application. The employment uses and supporting proffered transportation network improvements of this application will enhance the economic vitality and desired commercial development within the county. The Comprehensive Policy Plan identifies the planned use of the site as a mix of business/office and transitional land uses. The commercial/light industrial employment center concept proposed with this rezoning is consistent with this land use vision. The Applicants believe that the proposed rezoning includes proffers that will appropriately and effectively mitigate the impacts of its development program and assure its completion in the manner envisioned by the Applicants and by the County. The employment center land use envisioned for the site is compatible with the surrounding community and consistent with the land use policies of the 2035 Comprehensive Plan. As such, the Applicants submit that this rezoning request merits favorable consideration and approval. B. Comprehensive Policy Plan The properties included with this rezoning request are all located within the boundaries of the Senseny/Eastern Frederick Urban Area Plan. The properties are located wholly within the Urban Development Area (UDA), and Page 1 of 6 8/1/18 Carpers Valley Industrial Park Impact Analysis Statement the Sewer and Water Service Area (SWSA). The Senseny/Eastern Frederick Urban Area Plan envisions the area comprised by the subject parcels as developing with business/office and transitional land uses. The proposed employment and light industrial land uses is in keeping with the business development goals of the comprehensive plan through the expansion of desirable business and industrial land uses in an area already zoned for commercial development. The Comprehensive Plan has targeted light industrial land use as a strategy to achieve fiscal balance and maintain a desirable 25/75 ratio between commercial/industrial and residential land uses respectively. Furthermore, the proposed development compliments the existing Corps of Engineers, Winchester Regional Airport and the Frederick County Public Safety Building facilities adjacent the subject property. The proposed employment use will thus ensure the establishment of the commercial and industrial land use encouraged within the 2035 Comprehensive Plan adjacent to the Winchester Regional Airport. The applicable land use policies of the Comprehensive Plan promote the establishment of commercial and industrial land uses on the subject parcels. The proposed rezoning of the site to the M1 district is intended to permit the development of an employment center which is an effective transition and complimentary to the land uses adjacent to the Winchester Regional Airport. C. Suitability of the Site 1. Site Background and History The subject property was rezoned with the Board of Supervisors approval of RZ#11-05 on August 12, 2005 to the R4 (Residential Planned Community) District with proffers. The property was again subject to rezoning with the approval of RZ#10-08 by the Board of Supervisors on January 9, 2009. The subject property was again rezoned on November 13, 2013 with the Board of Supervisors approval of RZ#05-13 with revisions to the "Transportation Enhancements" of the proffers. 2. Location and Access The subject property is located on the south side of Millwood Pike (Route 50/17 East) across from The Ravens and Miller Heights subdivisions and adjacent to the Prince Frederick Office Park and the Winchester Regional Airport. The VDOT functional classification system identifies Millwood Pike as a major arterial roadway. The land uses abutting the subject site to the west is industrial and office, to the east is vacant R4 commercial and residential, Page 2 of 6 8/1/18 Carpers Valley Industrial Park Impact Analysis Statement with the Winchester Regional Airport adjacent to the south and single-family residential uses located across Millwood Pike to the north. The site is currently accessible via Coverstone Drive. 3. Site Suitability The subject parcels contain identified environmental features to include areas of flood plain, wetlands, and steep slopes. But such features are minimal and manageable through the zoning and site engineering process. In all cases, disturbance will be limited in accordance with applicable regulatory standards. Flood Plain Flood plain data for the subject parcels is delineated on the Flood Insurance Study Map for Frederick County prepared by the U.S. Department of Housing and Urban Development, Community Panel #510063-0115B, effective date September 2, 2009. The majority of the site is located in Flood Zone C, which denotes areas of minimal flooding outside of the 100 -year flood plain. Flood Zone A, 100 -year flood plain, exists coincident with Sulfur Spring Run, which traverses the frontage of the site, roughly parallel to Route 50. This portion of the site is not planned for development thereby ensuring limited impact to the identified flood plain area. Wetlands The National Wetlands Inventory Map identifies four wetland features on the site, all of which are man-made ponds associated with the former golf course use. Any disturbance will be limited in accordance with applicable regulatory standards. Soils and Steep Slopes The General Soil Map of the Soil Survey of Frederick County Virginia indicates that the soils comprising the subject parcels fall under the Weikert- Berks-Blairton soil association, which is the predominant association on land located east of Interstate 81. As per map sheet #36 of the Soil Survey, the site is comprised of nine distinct soil types. With the exception of a pit area containing fill materials, all of the soil types identified on the site are suitable for development. It is noted that the Weikert-Berks-Blairton soil association presents some limitations to site development due to a seasonal high-water table, depth to bedrock, and slope. These characteristics and any implications for site development are manageable through the site engineering process. Page 3 of 6 8/1/18 Carpers Valley Industrial Park Impact Analysis Statement Steep slopes (areas of 50% slope or greater) exist along the frontage of the site and adjacent to two ravines that drain the site to Sulphur Spring Run. Some disturbance of these areas may be necessary to implement the stormwater management system. D. Transportation The Hines — Governors Hill project will be served by a transportation network designed to safely and efficiently accommodate automobile and truck traffic. The external road system serving the site is comprised of Millwood Pike (Route 50/17 East), Prince Frederick Drive (Route 781), Coverstone Drive. Millwood Pike is a four -lane major arterial roadway, Coverstone Drive is planned as a four -lane major collector and Prince Frederick Drive is a two- lane minor collector road. The Applicants have addressed these external system requirements by proffering off-site improvements as specified in Proffer Statement. These off-site improvements will occur at the Millwood Pike/Prince Frederick Drive intersection, the Route 522/Costello Drive intersection and the Prince Frederick/ Costello Drive intersection and the partial extension of Coverstone Drive for site access. The transportation improvement program proffered with this application will improving existing off-site transportation shortfalls identified within the TIA prior to the inclusion of the proposed development impacts to the transportation network. The implementation of this program will occur in phase 1 of the development, as specified by the Proffer Statement (see attached). The transportation proffers included with the application mitigate all impacts of the proposed rezoning including the extension of Coverstone Drive through to the adjacent developments beyond the access needs of the project. A traffic impact analysis (TIA) was prepared for this application using current traffic counts. Using trip generation figures from the I.T.E. Trip Generation Manual, 10th Edition, the TIA projects that the proposed development will reduce vehicle trips greater than 50% from the commercial uses assumed in the transportation studies from the RZ#10-08 rezoning approval. The TIA further indicates that study area roads and intersections have the capacity to accommodate the trips generated by this project at acceptable and manageable level of service conditions with the construction of the proffered improvements. The internal transportation improvement program proffered by the Applicants will effectively tie the project into the existing external system and provide the framework for future inter -parcel access and mobility. A major collector road (Coverstone Drive) is proposed to be extended from its current terminus to Page 4 of 6 8/1/18 Carpers Valley Industrial Park Impact Analysis Statement the project extents. This collector road will consist of four travel lanes within a 90 -foot right of way and will be developed in two principal phases corresponding with development of the planned land bay. Right-of-way will be extended to the property limits to allow further construction of future roadways by others when needed. E. Sewage Conveyance and Water Supply The rezoning of the subject property does not result in a significant change to the impact to sewage conveyance and water supply with the eventual development of the property. Sewer and water service will be provided by Frederick Water via an existing 8" sewer line that ties into the 12" sewer main located on the south side of Millwood Pike along the frontage of the site. This infrastructure will be expanded pursuant to Frederick Water requirements to serve the entire site and enable gravity flow to the existing main. A 12" water main currently extends through the central portion of the site. This water main will be rerouted as necessary with the final engineering associated with the site development. This infrastructure will be expanded pursuant to Frederick Water requirements. Sufficient water capacity exists to serve the domestic and fire protection demands of the project. The proposed land uses have an estimated flow of 280,000 GPD based on +/- 25 acres of light industrial land use and +/- 75 acres of warehouse land use. Actual water and sewerage flows will be determined at the time of final site engineering. Development of the property as proposed is expected to result in a reduction to overall impact to the water demand and to the sanitary sewer discharge which may result from a retail/commercial development. F. Site Drainage The rezoning of the subject property does not result in a significant change to the impact to site drainage with the eventual development of the property. The site generally drains north to Sulphur Spring Run via several pronounced drainage divides. It is anticipated that low impact development techniques together with good erosion control practice will mitigate adverse stormwater discharge impacts. Actual specification of temporary and permanent facilities will be provided with final engineering and will comply with all County, State and Federal regulations. Page 5 of 6 8/1/18 Carpers Valley Industrial Park Impact Analysis Statement G. Solid Waste Disposal Facilities The rezoning of the subject property does not result in a significant change to the impact to solid waste disposal facilities with the eventual development of the property. Solid waste from the project will be deposited in the Frederick County landfill following collection via private carrier(s) contracted by the individual commercial/employment users. H. Historic Sites and Structures The rezoning of the subject property does not result in a significant change to the impact to historic sites and structures which may result from a retail/commercial development. Impact on Community Facilities The rezoning of the subject property does not result in a significant change to the impact on community facilities which may result from a retail/commercial development. Impacts to the transportation network have been mitigated with the proffered transportation improvements as specified in Section 7 "Transportation" the Proffer Statement. J. Modifications No zoning modifications are proposed. Page 6 of 6 8/1/18