Loading...
HomeMy WebLinkAbout06-19 ApplicationSITE PLAN APPLICATION - Office Use Only - Date Application Received: Application #: Fees Received: 31 OD OD Receipt #: `/�1a q k W'YInitials: 1. Project Title: Middletown Data Center 2 3 n Project Description: Site plan revising parking lot layout and building outline. Site will include installation of concrete pads for equipment operation and storage. Location of Property: 8209 Valley Pike, Middletown VA 22645 (Street address) Applicant/Designer: Name: JCL Consulting, LLC Primary Point of Contact: Eric Duvall Address: 4460 Brookfield Corporate Drive, Suite K Chantilly, VA 20151 5. Property Owner (if different than above): Name: Middletown Data Center, LLC Address: 1330 Lynchburg Turnpike Salem, VA 24153 6. Property Information: a. Property Identification Number: b. Total acreage of the parcel to be developed: C. Total disturbed area of the parcel: d. Present Use: e. Proposed Use: f. Magisterial District(s) 8 Telephone: 703-488-9877 email: eduvall@jciconsultingllc.com Telephone: 804-787-0867 90 -A -58C 6.15 acres 2.06 acres Data Center w/ communication dish Data Center w/ communication dish Back Creek 7. Site Plan Type: a. Is this an original or new site plan? Yes II No b. Is this a revised site plan? Yes ID No EL If yes provide all previous site plan numbers: C. Is this a minor site plan? Yes F1 No J� If yes provide all previous site plan numbers: 8. Zoning Information: a. Current Zoning: M-1 Light Industrial b. Was this property Rezoned? Yes F-1 No EL C. If yes provide the rezoning number for this property: N/A d. Are there any proffers for this property? Yes No X e. Has a MDP been approved for this property? YesR No X f. If yes provide the MDP number for this property: N/A 9. Adjoining property zoning and use: North East South West USE Vacant Industrial Interstate 81 Industrial ZONING M-1 M-1 M-1 I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also derstand that all required material will be complete prior to the submission of my site plan. Signature: Name (Printed): Eric Duvall Date: 2/21/2019 9