TC 09-24-18 Meeting Minutes1 TRANSPORTATION COMMITTEE REPORT to the BOARD OF SUPERVISORS Monday, September 24, 2018 8:30 a.m. 107 NORTH KENT STREET, WINCHESTER, VIRGINIA ATTENDEES: Committee Members Present: Gary Lofton Chairman (Voting), Judith McCann- Slaughter (Voting), Gary Oates (Liaison PC/Voting), James Racey (Voting), and Barry Schnoor (Voting) Committee Members Absent: Mark Davis (Liaison Middletown) and Lewis Boyer (Liaison Stephens City). Staff Present: Assistant Director-Transportation John Bishop, Major Steve Hawkins and Kathy Smith, Secretary ITEMS FOR INFORMATION ONLY: 1-Transportation Forum: The Fall Transportation Forum will be held October 25, 2018. There will be refreshments available to Board Members and guests at 5:00 p.m. and doors will open to the public at 6:00 p.m. with an expected conclusion by 8:00 p.m. The Board Room will be unavailable for the meeting. Staff is working on a suitable alternative location. 2-I-81 Corridor Study (See Attached): A brief discussion from the August 27th Transportation Committee meeting regarding the draft resolution that had been sent to the Committee, as well as, the EDA and MPO. The MPO has drafted a few changes. Staff noted some of the changes are in the potential funding areas. Also, included in the MPO draft was that Exit 315 and Exit 317 improvements to widen be extended to the state line. The Committee discussed those improvements. Upon a motion by Judith McCann-Slaughter, seconded by Gary Oates the resolution for the Board of Supervisor to comment on the Interstate 81 Corridor Study to include a separate, Whereas, for the improvements of Exit 315 and Exit 317 to extend to the state line for the Board of Supervisors approval. 3-County Projects Updates: Tevis Street Extension/Airport Road/I-81 Bridge: Comments from VDOT have been addressed and submitted. The right-of-way plats and deeds of dedication are being finalized. Staff attended the September 19, 2018 Finance Meeting to ensure the budget line item is aligned with the final pre-bid cost estimate. The Finance Committee recommended going forward with a Public Hearing. The bid package items are being compiled to be advertised in October. 2 Renaissance Drive: The County’s consultant is working on geotechnical issues regarding the fill requirements under the bridge with VDOT’s material section. 30% of Phase I bridge design has been submitted to VDOT and to CSX for their review. 30% design of the surface street is underway. Also, 30% and an updated cost estimate is expected in October. Northern Y: Currently, 30% design underway. Coverstone Drive: No activity currently. Jubal Early Drive Extension and Interchange with Route 37: No activity currently. 4-Upcoming Agenda Items: October: Capital Improvement Programs, Non-Hard Surface Road paving program, possible. VDOT Traffic Engineer as a guest speaker to discuss the Highway Safety Improvement Program (HSIP). TBD: Oakdale Crossing Traffic Calming Study. 5-Other: Staff discussed to tentatively cancel the Committee Meeting for December due to the holiday. Mr. Bishop also addressed the Committee on upcoming meetings in October, in addition to, the Fall Transportation Forum. The CTB will be holding a Town Hall meeting at the Blue Ridge Community College on Wednesday, October 17, 2018 at 4 p.m. Also, VDOT will be holding the third series of public hearing meeting for the Interstate 81 Corridor Improvement Plan Projects on Thursday, October 18, 2018 at 5:00 p.m. at the Shenandoah University Brandt Student Center. Mr. Bishop updated the Committee on a meeting with the VDOT Traffic Engineering Staff that Lt. Warren Gosnell, Traffic Division of the Sheriff’s Department, attended as well. Several potential area crashes and incidents from recent data was discussed. It was noted that Staff is working to get someone from the Traffic Engineering Department to speak with the Committee on an overview of the Highway Safety Improvement Program. Also, the rail highway crossing applications will be taken at the same time. VDOT’s Traffic Engineering has asked that we coordinate with CSX and Winchester & Western for any concerns they may have. Those are due November 1st.