DATE: June 30, 1994
There will be a meeting of the Comprehensive Plans and Programs Committee on July 11,
1994 at 7:30 pm in the Conference Room of the Old County Court House.
Please let me know if you are unable to attend.
AGENDA
1) Discussion of draft text amendment to Comprehensive Plan dealing with corridor studies.
The draft text is enclosed. Certain areas are not yet complete and there may be
others that the Committee feels need to be added. Please try to read through the
draft prior to the meeting so that we can discus it.
We hope to have a "final" draft for the August meeting of the Committee that will
be ready for public meetings.
2) Discussion of date(s), time and place(s) for public meeting(s) on Comprehensive Plan
update.
We need to decide how many meetings we want to hold and general locations.
locations. In the past we have held 2 meetings at opposite ends of the County.
3) Discussion of possible policy change regarding extensions of sewer into RA land.
Commission members will recall a discussion with Mr. White proposing an sewer
extension to accommodate a cluster (rural preservation lots) development of RA
land.
9 North Loudoun Strcct P.O. Bm 001
Winchester, VA 22601 Winchester, VA 21'_604
DRAFT
TEXT ADDITION TO COMPREHENSIVE PLAN
CORRIDOR STUDY AREAS
6/25/94
Business Corridors
In an effort to maintain or in some cases, improve the appearance, function and efficiency of
commercial corridors, the County has developed corridor plans for three of its more prominent
business corridors. The three corridors are Route 7 from the intercha---41, T-+- ,
5� "IL11 111161 sla to 81, east
to Route 660, Route 50, from the 81 interchange, east to the eastern edge of Westview Business
Park, and Route 11, from the Route 37 interchange, south to Stephens City.
While there are other corridors which warrant study, these three were felt to be in the most
immediate need. In the case of Routes 7 and 50, recent new development, in addition to the
commercial development which has been in existence for some time, make these two corridors of
high priority. In the case of Route 11, recent efforts to coordinate planning efforts between
Frederick County and Stephens City (as a result of a request from Stephens City to participate in
the planning for the Route 11 corridor) made this a logical choice for study at this time. Although
the goals and policies included in this section were developed as a result of a focused evaluation
of the three corridors listed, including careful consideration of the characteristics of the particular
areas and the stated desires of their residents, many of the same principles can, and should, be
applied to other business corridors.
Intent
The intent of each corridor study was to evaluate the existing conditions within the delineated
study areas in order to develop land use plans that would result in business corridors that are
efficient, functional and attractive. This process consisted of an examination of existing land use,
zoning, site development, traffic flow, building types, and natural features, within each corridor,
along with a review of current trends and public meetings to solicit public input on the issues and
concerns which exist in each of the areas.
Once the existing conditions and desires of the area residents and business owners had been
assessed, the next step was to formulate a land use plan for each of the three corridors. These
land use plans are intended to be "blueprints" for the corridors in terms of general categories of
use and interconnections between uses. The plans address transportation efficiency in terms of
the need for improvements to existing roads, new connections between existing roads, as well as
the location and spacing of entrances onto collector roads and the required traffic controls.
Location and availability of sewer and water has been examined. Environmental features have
been mapped and considered in planning for the areas. Historical sites have been documented and
efforts to avoid, and or protect, these sites are a part of the plans. Consideration has been given
to appearance of the corridors in terms of landscaping, setbacks, buffering, signage, and
architecture.
It is hoped that these plans will result in the development of efficient, well planned areas. The
road networks which are planned are expected to be capable of handling traffic generated
internally, as well as through trips, for the foreseeable future. Through a combination of
Frederick County
Comprehensive Plan Page January, 1995
Business Corridors
landscaping, setbacks, design standards, and sign controls the corridors themselves should also
have a pleasing appearance.
Route 50 Corridor
The area of the Route 50 corridor which is included in the landuse plan consists of nearly 3,000
acres. The corridor extends from the 81 interchange to the eastern edge of the Westview
Business Centre, a distance of 3.6 miles. The corridor study area also extends south to
encompass the Winchester Regional Airport, the Airport Business Park and surrounding uses.
The largest single zoning category within the study area remains Rural Area (RA) zoning with
approximately 1,300 acres. RA zoning permits general agricultural uses and low density
residential development. The bulk of the remaining acreage (roughly 1,000 acres) is presently
zoned for retail office and or industrial uses . Residential Performance (RP) zoning accounts for
roughly 550 acres. RP zoning allows for residential development at a density of up to ten units
per acre.
Of the corridors which have had land use plans developed, the Route 50 corridor is the largest
and has the greatest potential for additional commercial growth. Its proximity to the Winchester
Regional Airport, in addition to Interstate 81, make it a highly desirable location for many
commercial uses. Of the nearly 3,000 acres in the corridor study area, roughly -- acres are vacant.
Of this vacant acreage, acres are already zoned for commercial or industrial use. For this
reason, the transportation network within and around the corridor area will be of great
importance. The land use plan for this area shows two connector roads between Routes 522 and
50. The purpose of these connectors would be to both relieve some pressure from the existing
522/50/81 interchange area, as well as, to act as a connector between the various parcels that
would otherwise have to utilize Route 50 as their sole means of ingress and egress.
Frederick County
Comprehensive Plan Page January, 1995
Rzi.vi"ov .v 1 nrr;dnry
INSERT ROUTE 50 CORRIDOR MAP
Frederick County
Comprehensive Plan Page January, 1995
Business Corridors
Another important element of this corridor plan will be a coordinated effort at stormwater
management. The corridor contains a total of _acres of flood plain. The land along Sulphur
Spring has experienced numerous flooding problems over the years. The County will need to
insure that any future development within the study area is done in a manner that will help to
alleviate this problem, not exacerbate it.
- Need to add information on traf is counts -
In addition to floodplain, there is also _ acres of land with slopes in excess of fifteen percent.
These areas need to be avoided and protected when surrounding land is developed.
Route 11 Corridor
The land use plan for the Route 11 corridor encompasses approximately 1,500 acres. The
corridor is roughly three quarters of a mile in length, running from Route 37 south to, and
including, the northern edge of Stephens City. Route 81 forms the eastern terminus of the study
area with the Baltimore and Ohio railroad tracks composing the western boundary. The vast
majority of land within this study area (roughly 1,200 acres) is currently zoned Rural Areas (RA).
There are about 175 acres of Business General (B-2) Zoning within the corridor, all of which is
situated north of Bartonsville. There are also 23 acres of RP zoning and 11 acres zoned Industrial
Transition (B-3).
Perhaps the most outstanding feature of the Route 11 study area is the relatively pristine state of
the southern portion of the corridor. The land from Bartonsville south to the Stephens City limits
is relatively undeveloped. The majority of this segment of the study area (approximately _acres)
is still either used for agriculture or is vacant. Only two, small scale, commercial enterprises are
situated in this portion of the corridor.
Frederick County
Comprehensive Plan Page January, 1995
Business Corridors
INSERT ROUTE 11 CORRIDOR MAP
Frederick County
Comprehensive Plan Page January, 1995
Business Corridors
The land use plan for this corridor calls for the formation of a Historical District around the
Bartonsville area. Current County regulations stipulate that the formation of a Historic District
must be done with the landowner's consent, although a proposal for a historic district can be made
by the County's Historic Resources Advisory Board. In addition to its historical significance,
much of the Bartonsville area is also within the 100 year flood plain, and would therefore, be
otherwise limited in terms of development potential. -
The land immediately adjacent to either side of Route 11, south of Bartonsville, is shown in the
landuse plan as being reserved for buffering Route 11 from the landuses locating along this
portion of the corridor.
- Add traffic count information -
Route 7
The Route 7 corridor study area runs from the Interstate 81 interchange east to Route 660, a
distance of 2.2 miles. The study area extends north of Route 7 to include the Regency Lakes
development and the property owned by the Frederick County School System, and south of
Route 7 to include the residential developments along Valley Mill Road and Abrams Creek.
- Add Traffic Count Info. -
The Route 7 corridor is probably the most limited of the three corridors studied in terms of the
potential for further commercial development. This does not mean that the corridor is not
expected to change dramatically in coming years, rather, the intensity of the change will not be as
great as the Routes 50 or 11 corridors. One reason for this is existing land use. There are only
_ acres of vacant land within the bounds of the corridor study area. The corridor is also
somewhat limited by topography, with nearly — acres of steep slopes.
Frederick County
Comprehensive Plan Page January, 1995
Business Corridors
One of the primary objectives of this corridor plan (as well as the others) is to insure that the
commercial development that does take place within the corridor is of a standard that reflects
favorably on the area.
Goals
The following goals should apply to any designated business corridor
Goal 1- Develop appropriate controls to insure that business corridors develop in a manner which
is attractive and functional and reflects positively on the community.
Goal 2 - Insure that new construction, as well as renovation of existing sites, is done in a fashion
that is sensitive to environmental, visual, and transportation impacts.
Goal 3 - Develop necessary road connections to insure that a satisfactory level of service is
provided along business corridors.
Strategies
The following strategies should be applied to all three of the corridors studied as well as any other
business corridors.
Strategy 1 - Insure that new buildings, signage and site design is of a fashion that will result in a
cohesive appearance along planned corridors minimizing congestion and visual clutter.
Strategy 2 - Develop necessary road plans to accommodate anticipated traffic demand. These
plans should include both new roads and improvements to existing roads.
Strategy 3 -Formulate a general land use plan that will aid in the implementation and success of
the overall area plan.
Strategy 4 - Ensure that measures are put in place that will provide the necessary protection for
historic and environmentally sensitive areas.
Strategy 5 - Insure that business and industrial uses that locate within the study area are
appropriate in terms of scale and compatibility with surroundings.
Frederick County
Comprehensive Plan Page January, 1995
Business Corridors
TRANSPORTATION
Implementation Method 1 - Work to implement the recommendations of the Winchester Area
Transportation Plan and insure that adequate road networks are provided with needed road
interconnections.
Implementation Method 2 - Strive to locate and obtain the needed right-of-way for Route 37.
Implementation Method 3 - Formulate design standards for shared business entrances that will
minimize interruptions to the dominant flow of traffic.
Implementation Method 4 - Plan for major entrances and intersections that are appropriately
located and signalized.
Implementation Method 5 - Encourage vehicular access to adjoining parcels through the use of
inter -parcel connections at the rear of sites.
Implementation Method 6 - Require development along road frontages to make
accommodations for pedestrian and bicycle traffic. Plan for interconnected bicycle and pedestrian
networks.
Implementation Method 7 - Strive for traffic safety through traffic controls, sight distance,
posted speeds and entrance design and location.
Implementation Method 8 - Develop corridor -wide plans for stormwater management and
insure that individual site design conforms to the overall area plan.
APPEARANCE
Implementation Method 1 - Revise setback, buffering, signage and parking requirements to
minimize the negative visual impact of development along corridors.
Implementation Method 2 - Develop improved landscaping requirements for business uses
along street frontages which result in planting within the setbacks.
Implementation Method 3 - Develop minimum standards for building materials in order to
provide for a cohesive appearance along corridors.
Frederick County
Comprehensive Plan Page January, 1995
Business Corridors
LAND USE
Implementation Method 1 - Review buffering requirements to insure that adequate screening is
provided between conflicting uses.
Implementation Method 2 - Require the location and intensity of proposed uses to conform to
the overall general land use plan for the corridor.
Implementation Method 3 - Develop standards that will insure that site design takes into
account appearance in addition to customary safety, transportation, and drainage concerns.
Implementation Method 4 - Insure that sufficient sewer, water,
and stormwater management facilities are in place or planned for construction at the time of plan
review.
Frederick County
Comprehensive Plan Page January, 1995
March 31, 1994
Mr. Kris Tierney
Deputy Planning Director
County of Frederick
Winchester, Virginia 22601
Dear Mr. Tierney:
With reference to our discussion of March 30, 1994, I request an opportunity
to discuss my proposal with the Planning Commission at the April 20th meeting.
To recap; I own 78 acres of land with 1,090 feet of frontage on West Parkins
Mill Road, approximately 2,200' east of the Parkins Mill sewage treatment plant.
I plan to subdivide this property into 12-15, 2 to 8 acre parcels in accordance
with paragraph 165-54 of the zoning code for Frederick County. No zoning change
requested nor needed.
I presently have approval for 3 alternate facilities, sand filtration or
mechanical for 3 of the lots, however, the Health Department, as well as, the
builder would rather I supply a pumping station and high pressure line to the
Parkins Mill Plant. I discussed this with Mr. Wendy Jones, Frederick County
Department of Sanitation and he concurrs subject to Planning Commission
approval. Additionally I have approval from Mr. Eugene Grove, the owner of
the property between the plant and my property.
I recognize that this property is outside of the master development plan,
however, I am not requesting a zoning change. The high pressure line would
follow the Opequon Creek at the back of the property with the required pumping
station as noted on the enclosure.
The houses will range in price from $250,000.00 to $350,000.00 with a state
approved road, 3 board fencing and entrance decor. If approved, this plan
will greatly enhance the area, create additional tax revenue and be
environmentally friendly with no septic or alternate treatment systems.
Once again, I wish to present and discuss this proposal with the Planning
Commission at their scheduled April 20th meeting.
Very truly your
Edwin E. White
copy: Dave Conrad, Apex Builders
Eugene Grove
a
0
p
6
p
S14°36'11"E - l
N 15' 25,23- W
498.35' _
3� 9�
NOTE; THE INFORMATION SHOWN ON THIS PLAT
HAS BEEN OBTAINED EXCLUSIVELY FROM PUBLIC
RECORD. NO SURVEY HAS BEEN PERFORMED BY
ME ON THE GROUND, AND NO REPRESENTATION
IS MADE AS TO THE ACCURACY OF INFORMATION
SHOWN HEREON.
LAND OF
EDWIN E. WHITE
D.B. 559, P. 673
D.B. 765, P. 691
SHAWNEE DISTRICT
FREDERICK COUNTY
VIRGINIA
JANUARY /994
L ALLEN EBERT
PRCIFESSiONAL LAK1 SURYD
75 M. BOSPWEX ST.
wrx"ESTER M 22601
?w 663 3273
COUNTY of FREDFR IC'K
Department of Planning and Development
703 / 665-5651
Fax 703/678-0682
TO: Comprehensive Plans and Programs Committee Members
FROM: Kris C. Tierney, Deputy Planning Directo��
RE: Informal Discussion with Edwin E. White
DATE: June 29, 1994
As those of you on the Planning Commission will recall, Mr. White went before the
Commission for an informal discussion regarding a desired extension of a sewer line to a 78 acre
parcel of land which is zoned Rural Areas (RA) and lies beyond the limits of both the Urban
Development Area and the Sewer and Water Service Area. The parcel is located approximately
one half mile east of the Parkins Mill Plant on the south side of Route 644, West Parkins Mill
Road.
Mr. White told the Commission that he wished to develop the property under the Rural
Preservation Lot provision within the RA zone. Attached you will find a letter from Mr. White
discussing his proposal, a copy of the USGS quad sheet showing the general location of the
parcel, and a design sketch showing the proposed lot layout. The Commission felt that this was
a matter that should be considered by this Committee.
BACKGROUND
When the rural preservation lot provision was adopted it was seen as preferable to the traditional
five acre lot development style. We suspect that the difficulty in locating drainfields on the
smaller lots, in all but the best soils, has been a hinderance to the utilization of the cluster
provision.
The Comprehensive Plan states that:
"The intention is that additional extensions of sewer and water service will reflect
the boundaries of the Urban Development Area. The extension of mains into
areas not included in the sewer and water service areas described by the facilities
plan will require an amendment to the Comprehensive Plan. "
9 North Loudoun SH -CCI P_0. Box 001
Winchester, VA 2-1601 Winchester, VA 21260-4
Page 2
E. E. White Memo
June 29, 1994
It is clear that this proposal does not fall within the provisions of the Comprehensive Policy
Plan, as it is currently written.
It is conceivable that the general area of this proposal would be included within the Urban
Development Area at some point in the not too distant future. At that point, we would anticipate
that the land would be developed to a typical urban use and/or density.
Some factors to consider with this proposal are whether it would be preferable to have the parcel
in question developed at a RA density now, thereby precluding a more intense development at
some point in the future, and whether it would be preferable to have the proposed lots developed
with connections to a central sewer system (and other lots similarly situated), or with a series
of alternative and conventional treatment systems. The down side is that there is a tremendous
amount of RA land adjacent to the existing UDA and Sewer and Water Service Area. Nearly
the entire perimeter of the UDA is bounded by RA land. So the potential impact of allowing
sewer extension to serve RA land could be significant.
There are obviously a number of policy questions and implications to be addressed if this
proposal is to be given serious consideration. The immediate question to be addressed is
whether the County is willing to consider providing sewer to RA land to accommodate clustered
residential development. If so, we would need to establish a policy specifically for RA cluster
developments which addresses the areas and conditions under which such extensions would be
considered.
The staff feels that if the Commission wishes to consider this request, it should be referred to
the Comprehensive Plans and Programs Committee to be considered as part of the annual up-
date of the Comprehensive Policy Plan.
A
,.f7
14
j8BJ1 15
95
94A \-
94
IMM
5
4
4
e 3
99
2 1 r
101 100
W
136A
641, 131
130A *41
1308 0
97A
130
r 89 U1q\�` � r1
103B
S�
31 A 8B129
103
87 86 2181 Sacred Heart
$0 1M0 nastery
78
��83 SCALE IN �T
�3 32 Mac Dania 49D 11 7577 coo 0 600 +300 tow 2400
34 Chur 84 ooa
Edwin E, White PIN 76—A-97B/97C
Sewer Extension
•
�1/1 y
i/
!�r
`1
90A
Armel ■
Elementary
95
94A \-
94
IMM
5
4
4
e 3
99
2 1 r
101 100
W
136A
641, 131
130A *41
1308 0
97A
130
r 89 U1q\�` � r1
103B
S�
31 A 8B129
103
87 86 2181 Sacred Heart
$0 1M0 nastery
78
��83 SCALE IN �T
�3 32 Mac Dania 49D 11 7577 coo 0 600 +300 tow 2400
34 Chur 84 ooa
Edwin E, White PIN 76—A-97B/97C
Sewer Extension