Loading...
CPPC 11-12-96 Meeting AgendaCOUNTY of FREDERICK Department of Planning and Development 5401665-5651 FAX: 540/678-0682 MEMORANDUM TO: Comprehensive Plans and Programs Subcommittee FROM: Eric R. Lawrence, Planner I 4U "/ SUBJECT: November Subcommittee Meeting DATE: November 4, 1996 The Frederick County Comprehensive Plans and Programs Subcommittee (CPPS) will be meeting on Tuesday, November 12, 1996 at 7:30 PM in the conference room of the Old Frederick County Court House. PLEASE NOTE: The meeting will be on a Tuesday. AGENDA I. Discussion with Department Heads concerning project requests for inclusion in the 1997-98 Capital Improvements Plan. Each department that submitted a project request will be invited to discuss their project submissions. II. Review of the 1997-98 CIP project evaluations. Six new projects have been submitted for inclusion in the 1997-98 CIP. Staff has conducted a preliminary evaluation of these projects. Projects that were previously included in the 1996- 97 CIP have maintained their evaluation rankings from the last year. The Evaluation Form is attached. The CPPS will have the opportunity to review and modify the projects Evaluation Form. III. Other. Please contact this office if you will be unable to attend. Thank you. Attachment ERL\bah FREDERICK COUNTY CAPITAL IMPROVEMENT PROGRAMMING PROJECT EVALUATION PROCESS The attached forms were used to evaluate requested Capital Improvement Projects. The first form contains a list of seven evaluation criteria. Each criterion has.been assigned a weight which reflects its relative importance when compared to the other criterion. The second form was used to record the rating which was given to each project. The projects are listed by department: Each project was reviewed against all of the criterion and was given a rating between zero and four. A score of four being the highest, indicating that the project most appropriately fits the criterion. The rating was then entered in the corresponding cell. The numeric figure to the right of the rating is the result of the rating being multiplied by the weight and the resulting score entered in this same cell. The scores which were given to the projects for each of the seven criteria were then totaled across the table and the total entered in the far right hand column. Only the resulting scores after the ranking is multiplied by the weight was totaled. These total scores were then used to assist in ranking projects. The higher the score, the greater the priority the project is given. Below is an example showing the total score derived for a hypothetical request for a new elementary school. The weights corresponding to the criteria are shown beneath the criterion. The ranking given to projects for each criterion has been entered to the left in the corresponding cell. The score (the rating multiplied by the weight) has then been entered to the right of the cell. The total score of 39 was arrived at by adding up the scores (the number to the right of each cell) for each individual criterion. PUBLIC WORKS New Compacror Sire 1996 FREDERICK COUNTY CAPITAL IMPROVEMENT PROJECTS EVALUATION FORM LISTED BY DEPARTMENT; IN ORDER OF DEPARTMENT PRIORITY CRITERIONLC,,formltoHealth, Legally Distribute Economic Related Public andSafety, Required Services Impact to Other Support TOTAL WelfareProjectsWEIGHT4 4 2 2_ 3— 3- 4112 218 0/0 316 112 1 /3 FREDERICK COUNTY CAPITAL IMPROVEMENT PROGRAMMING PROJECT EVALUATION CRITERIA TOPIC DESCRIPTION WEIGHT 1 Conformance to Does the Project conform to, or contribute to Comprehensive Plan the attainment of goals/objectives of the Comprehensive Plan? Is the Project consisten 3 with established policies? 2 Public Health, Safety or Does the Project improve conditions affecting Welfare health safety or welfare? Does it eliminate a 4 clear health or safety risk? 3 Legal Requirement Is the Project required in order to meet a State or Federal mandate or some other legal 4 requirement? 4 Equitable Distribution of Does the Project meet a special need of some Services segment of the population that has been identified as needing assistance? Would the 2 Project provide equivalent services to a population group that is currently under served relative to other areas of the county? 5 Economic Impact Is the Project essential to, or would it encourage some form of economic developme t? Would the Project improve the tax base, redu e 2 operating expenses, produce revenue, or otherwise have a positive effect on the local economy? 6 Coordination with other Is the Project necessary for the successful Projects completion of other projects? Is the Project 3 part of a larger project? 7 Public Support Are county residents fully informed and supportive of the proposed Project? 3 1997 FREDERICK COUNTY CAPITAL IMPROVEMENT PROJECTS EVALUATION FORM LISTED BY DEPARTMENT; IN ORDER OF DEPARTMENT PRIORITY CRITERION I Conform to Health. and Comp. Plan Safety, Welfare WEIGHT i !LIBRARY Library SCHOOL SYSTEM JW High, Bas ebaWoftb all Fields New Gainesboro Elementary School Administration Building Renovations Transportation/Maintenance/Warehouse Third County High School New Elementary School, Back Creek PARKS AND RECREATION 3 4 Legally Distribute Economic Related Public I I Required Services Impact — to Other — Support TOTAL I Projects 4 2 2 3 3 2/6 2/8 0/0 4/8 2/4 0/0 3/9 1 35 2/6 1/4 0/0 3/6 2/4 1/3 3/9 32 2/6 2/8 0/0 1/2 1 2/4 I/3 1/3 26 .2/6 2/8 010 1/2 2/4 1/3 1/3 26 2/6 2/8 0/0 2/4 3/6 1/3 1/3 30 2/6 2/8 0/0 3/6 214 1/3 1/3 30 Bikeway System ... 2 /6 4/12 2/8 0/0 1/2 1/2 2/6 2/6 36 Park Land _ 2/8 3/'9 '.:0/0' 0,1`0 r.. 4/8 1f2 1/3 2/6 28 Open Play Area -CB3/9 1/ 4 0/'0 1/4 0/0 3/6 1/2 1/3 2/6 30 Softball Complex - SP 0/0 3/9 0/0 010 1/2 1/2 1/3 2/6 22 Baseball Field Renovations - SP 2/6 0/0 0/0 1/2 1/2 1/3 2/6 19 Field House 216 1/4 0/0 2/4 112 1/3 2/6 25 Tennis/Basketball Complex - CB 3/9 1/4 0/0 3/6 1/2 2/6 1/3 30 Indoor Pool Facilities 2/6 1/4 '0/0 2/4 1/2 2/6 2/6 28 Soccer Complex - SP 3/9 0/0 0/0 3/6 1/2 1/3 2/6 26 Maintenance Compound - SP 113 1/4 0/0 0/0 1/2 1/3 113 15 Tennis/Picnic Area - SP 3/9 0/0 0/0 1/2 0/0 2/6 2/6 23 Shelter, Stage Seating - CB 3/9 0/0 0/0 3/6 3/6 2/6 2/6 33 Skateboard Park 113 114 0/0 112 112 113 2/6 20 Land Acquisition - South Side RPZ 2 /6 218 3/12 1/2 2/4 2/6 2/6 44 Land Aquisition, Bufflick Road 216 2/8 3/12 1/2 2./4 2/6 2/6 44 Route 645 Relocation - Design 2/6 1/4 1/ 4 0/'0 1/ 2 2/6 1/ 3 25 Route 645 Relocation - Construction 2/6 1/4 -- 1/4 0/0 1/2 2/6 1/3 25 FREDERICK COUNTY, VIRGINIA ----DRAFT---- CAPITAL IMPROVEMENTS PLAN 1997-98 ----DRAFT---- t ount5 I't iuril 'Department Priority COUNTY _ .....N. CONTRIBUTION County Interest From Any TOTAL COUNTI' Total I'u,irct it Projects 1997-98 1498-99 1999-2000 2000-01 2001-02 Contributions Notes Debt Service COST'S C o'k 1 Airport Land Acquisition - Southside RP 12,500 12,500 A N/A 2 Airport Land Acquisition - Buftlick Road10,000 A N/A 12,500 Sit25.nun + I Bicycle Facility 51,215 .10000 51,215 B N/A 10,000 $500310o 1 I New Library 489,150 489,150; N/A 51,215 5318.38 III Shelter, Stage Seating - 03 489,150 58,0=11,485 6 1 JW High, Baseball/Softball Field 1,300,000 326,659 .326,659 1,300,000 N/A 792,073 326,659 7 N 5 Third County High School 1,500,000 15 600 000 14,900,000 32,000,000 3,888,513 2,092,074 35,888,513 $2,1192,1►74 $9,888,513 ") New Elementary School -Back Creek 600,000 ..9,100,000 9~700,000 4,581,872 14,281,872 S14,281,872 3 Open flay Area - CB 'tennis/Basketball 416,992 -416,992 N/A 416,992 $416.99., 10 7 Complex - CB 533,586 533,586 N/A 533,586 $533.586 I I 112 2 8 Park Land Indoor Pool Facilities 1,154,772 1,154,772 N/A 1,154,772 $1.123.31') 2 New Gainesboro Elementary School 300,000 8,400,000 1,953,2017 8,900,000 NIA' 3,958,611 1,453,20 0 S1.953.2001;953,200 113 14 4 4 Transportation/Maintenance/Warehouse begin 12,658,20 $12,658,61 1 116 '15 9 6 Soccer Complex - SP Field House 1,096,920 0 1,046,920 D N/A N/A p 1,096,920 , $1.090,9201 3 Route 645 Relocation - Design ,542;000 2,500 ,542,000 2,500 N/A 1,542,000 $1,500.000' 117 18 4 Route 645 Relocation - Construction1 28,000 28,000 A A N/A N/A 2,500 $ 125_n0u' 19 1 I Tennis/Picnic Area - SP 612,495 _ 612,495 N/A 28,000 $1,400.0no, �2t► 4 13 Softball Complex -SP 1,127,692 1,127,692 '' -NIA 612,495 19127,692 S612.49' $1,127.692] '21 z2 5 Skateboard Park Baseball Field Renovatiogs - SP 662,755 200,000 200,000 ' NIA 200,000 $2011,000 23 10 Maintenance Compound - SP 662,755 N/A 662,755 $662,755 168,539 168,539 N/A 168,539 $168.530, TOTALS S3 307 637 9479 $ , ,747 $3,588,086 $18,181,200 527,532,305 562,088,975 513,221,069 $75,310,045 $59.653.099 \ Pa1tial funding from Federal Airport Improvement Program (FAIP) and State Commonwealth Airport Fund (SCAF) grants B - Partial finding from Federal and State grants Partial funding from State Commonwealth Airport Fund (SCAF) grants D = Debt Service is unavailable at time of printing E = Partial funding from State grants and local gifts 1997-98 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION -AND JUSTIFICATION FORM RETURN TO: DEPARTMENT OF PLANNING AND DEVELOPMENT FREDERICK COUNTY, VIRGINIA Project Name: Skateboard Park"' Date Prepared: 9/11/96 Agency: Parks and Recreation Agency Contact Person: Phone Number: 665-5678 Location of Project: To be Determined ^_ Magisterial District: To be Determined Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. 1 Bowl, 1 half pipe and open skate area Parking - 20 spaces; asphalt paved with curb islands, wheel stops; line markings and security lights Access road Fencing Landscaping/access paths Signage Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2001-02 fiscal year. 1997-98lspital fmpru�eiri`nt f'1 irk f�ri;=�[ Rya";>a_� ' Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any, -other planned project. This project is not included on the Master Development Plan for the County's regional parks. The project has been included -at the request of the citizenry of Frederick County. Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: This is the first year of inclusion on the Department's Capial Improvement Program. Estimate Cost (in 1996 dollars): punp�cFn t; Yp>r �rnr•r°rrRFc Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 1997-98 1998-99 1999-00 2000-01 2001-02 FY 5 Planning, Surveying, & 2 000 21000 Design ; Land Acquisition Site Preparation & Improvements 98,000 98,000 Construction 100,000 100,000 Furniture and Equipment Other (opening da'y collection) TOTAL71� 7 200,0001 200,000 1997-08 L'apit.il mint-o�cmcivs Pl;in Projcct Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. rXUrVb ) YUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 97-98 98-99 99-2000 2000-01 2001-02 FY 5 General Fund 200,000 200,000 Other Fund State Grants Bonds and Debts Other Fundraising TOTAL 200 ,000 200,000 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 100 --os C.T11.11 Plan Project Rcquest�, ':_ Project Justification: Please project the number of persons, dwellings,'students, or units to be served or the units of service to be provided by the project. To provide recreational opportunities to the citizens of Frederick County. Please describe the need for this project. Requested by the community to provide additional recreational facilities for the youth of Frederick County. Please describe and justify the proposed location of the project. The location of this project has not been determined. 1907-08 C.iplt:11 Improxeinent; f Lui Pr�)ject RCyUcS[> P;1_c 997-98 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND .JUSTIFICATION FORM RETURN TO: DEPARTMENT OF PLANNING AND DEVELOPMENT FREDERICK COUNTY, VIRGINIA Project Name: New Gainesboro Elementary School Date Prepared: October 1, 1996 Agency: Frederic County School Board Agency Contact Person: Thomas Sullivan Phone Number: ( 540) 662-3888 Location of Project: Route 522 North Magisterial District: Gainesboro Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. nle project consists of the construction of an elementary school (grades K-5) Of approximately 65,000 square feet to serve 550 students. The school is located on a 20 acre site. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. planning for the project will begin in 1998. The beginning date of construction of the project will depend on continued increases in student enrollment at the elementary level. At this time, it is anticipated the school will open for the 1999-2000 school year. f9l)7-aS `,ioiial lmpnw�ements Plan Prolecr Rcquesrs P,._ Coordination: If the project is dependent upon or is being planned in conjunction with anv other project(s), identify it/them and indicate the relationship between the projects. Not applicable. Project Priority: 2 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: New project. Not previously included in Capital Improvements Plan. Estimate Cost (in 1996 dollars): $8.7 million PROP(ICFn FYPFNn1TTTPFC Element 1st FY 2nd FY 3rd FY 4th FY nth FY Beyond Total 1997-98 1998-99 1999-00 2000-01 2001-02 FY 5 Planning, Surveying, & rM Design 300,000 50, OOC 350,000 Land Acquisition Site Preparation & Improvements 1, 200, OOC 1,200,000 Construction 6, 000, OOC 6,000,000 Furniture and Equipment 1,150, 00C 1,150, 000 Other (opening clue coilecrion) TOTAL II -I I I I I lt_ 3UU , QQd8 , 400 , 0QJ- i I I II 8 , 700 , 0001 1Q0 --0S l,11'1i;ll Nlin Pro ccr 1`,�gticsis �::= Basis of Cost Estimates: Check one of the following. If you want to provide more detailed J information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PR()P(')g1WTl VTTNT1TNf' CnTrI)f-1 c Element 1st FY 97-98 2nd FY 98-99 3rd FY 99-2000 4th FY 2000-01 5th FY 2001-02 Beyond FY 5 TOTAL General Fund Other Fund State Grants Bonds and Debts 1300,000 8,400,000 8,700,00 Other Fundraising TOTAL 300,000 8, 400, 000 I 8, 700, 00 Please describe the source of funding (i.e. type of grant): Funding for the project will be secured through applications for a Literary L -an and the �N �- iiyiiiici rll>,7ii.c Sciioois Authority (VPSA) , Project Justification: Please project the number of persons, dxvellings, students, or units to be served, or,t�te units of service to be provided by the project. The project will serve approximately 550 students in grades K-5. Please describe the need for this project. The project will provide additional classrocsn space for increased student enrollment in grades K-5 in the Gainesboro district. Please describe and justify the proposed location of the project. The Frederick County school Board purchased 20 acres of land in the Gai.nesboro district in 1990 in anticipation of the future need to provide space for increased student enrollment. !`)q _')� �.ipi[ I lmnr,���. tints f'!.ui �rujc�t R.yu�;ti f�;•-• _ 1997-98 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM RETURN TO: DEPARTMENT OF PLANNING AND DEVELOPMENT FREDERICK COUNTY, VIRGINIA Project Name: New Elementary School, Back Creek District Date Prepared: October 1, 1996 Agency: Frederick County School Board Agency Contact Person: Thomas Sullivan Phone Number: (540) 662-3888 Location of Project: Back Creek District Magisterial District: Back Creek Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. The project involves the construction of an elementary school for approximately 550 students in grades K-5 on a 15-20 acre site. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. It is anticipated at this time that planning for a new elementary school in the Back Creek district would begin in the year 2000. 194;-4S C;ioit;il Impro%cmrnts Plan Projrct RCyursts P:_ Coordination: If the project is dependent upon or is being planned in conjunction 1vith any ■ other project(s), identify it/them and indicate the relationship benveen the projects. Not applicable. Project Priority: 6 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: New project. Not included in previous Capital Improvements Plan. Estimate Cost (in 1996 dollars): $9.7 million ■ PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 1997-98 1998-99 1999-00 2000-01 2001-02 FY:5 Planning, 400,000 400,000 Surveying, & Design Land Acquisition 200,000 200,000 Site Preparation & , 300, 000 1,300,000 Improvements Construction 6,500,000 6,500, 000 Furniture and Equipment ,300,000 1,300,000 Other collection) TOTAL 600,000 ,100,000 �9,700,0001 191 -AS C'Irl[:11 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PRoPo.czvn 1'TTNTITN!'_ Q(ITTVrVC Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 97-98 98-99 99-2000 2000-01 2001-02 FY General Fund Other Fund State Grants Bondsand Debts 600,000 9,100,000 ,700,000 Other Fundraising TOTAL 500,000 9,100,0000 ,700,000 Please describe the source of funding (i.e. type of grant): Funds for the project to be secured through an application for VPSA or Literary Loan if not available frau local sources. Project Justification: Please project the number of persons, dwelling_ s, students, or units to be served or the units of service to be provided by the project. The project will serve 550 students in grades K-5 who reside in the Back Creek district. Please describe the need for this project. The project will provide additional classroom space for increased student enrolltttent. Please describe and justify the proposed location of the project. At this time, the exact location of the school proposed for the Back Creek district has not been determined. 1997-98 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM RETURN TO: DEPARTMENT OF PLANNING AND DEVELOPMENT FREDERICK COUNTY, VIRGINIA Project Name: Third County High School Date Prepared: October 1, 1996 Agency: Frederick County School Board Agency Contact Person: Thcmas Sullivan Phone Number: (540) 662-3888 Location, of Project:'- s ' Bast Magisterial District: Stonewall Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. The project involves the construction of a high school for grades 9-12 to serve 1,500 students. The school will occupy approximately 70 acres and consist of a facility containing approximately 240,000 square feet. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. It is anticipated planning for the project will take place in 1999, and the school would open for students in the fall of 2002. (n:rro%emc::ts P I a n Pro jcct RCQLICSI, o,,. Coordination: If the project is dependent upon or is being planned in conjunction with any other pro'ect(s), identify it/them and indicate the relationship between the projects. The construction of a_third countf high school will take place on land owned by the school division which`s occupied by an existing elementary school and also is the proposed"site for a future transportation/maintenance/central warehouse facility. Construction of the high school and support facilities will be coordinated with other facilities existing or planned for the site. Project Priority: 5 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: New project. Not included in previous Capital Improvements Plan. Estimate Cost (in 1996 dollars): $32 million PROPOSFD FXPFNDlTIIRFS Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 1997-98 1998-99 1999-00 2000-01 2001-02 FY 5 Planning, Surveying, & Design ,500,000 100,000 1,600,000 Land ?acquisition Site Preparation & Improvements , 500,000 500,000 4,000,000 Construction 1 000 000 2 000 00) 24,000,000 Furniture and Equipment 2,400,000 2,400,000 Other (openin- din - collection) TOTAL II 1 L b00 000 16 600 0000.4 900 00 102,000,0001 100 --Os \ ,1C1f;1l M:lfl ).! 11 __ _ Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment » . X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Cost estimate provided by engineer. Source of Funding: Indicate the projected amount for each funding source. PROPOC n 171iNT11 TI -2 QnYTDi-177 Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 97-98 98-99 99-2000 2000-01 2001-02 FY 5 General Fund Other Fund State Grants Bonds and Debts 1,500,000 5,000,00 4,900,00 2,000,000 Other Fundraising, TOTAL 1 500 000 5 600 Please describe the source of funding (i.e. type of grant): Funding for the project will be secured through applications for a Literary Loan and the Virginia Public Schools Authority (VPSA). Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The school will provide space for 1,500 students in grades 9-12. Please describe the need for this project. The project is needed to provide classroom space for increased student enrollment is grades 9-12. Please describe and justify the proposed location of the project. The site selected for the project is part of a 128 acre site owned by the school division which was purchased for a future high school. It is located adjacent to Route 7 East and approximately 1.5 miles from the intersection of Route 7 East and Interstate 81. --44 1997-98 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM RETURN TO: DEPARTMENT OF PLANNING AND DEVELOPMENT FREDERICK COUNTY, VIRGINIA Project Name: James Wood High School Baseball /Softba 11 / z1 ti Pu=se Fi P1 d Athletic Date Prepared: October 1, 1996 Agency: Frederick County School Board Complex Agency Contact Person: This Sullivan Phone Number: (540) 662-3888 Location of Project: 161 Apple Pie Ridge Road Magisterial District: Gainesboro Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. The project involves the construction of a baseball stadium, multipurpose athletic field and upgrading an existing softball field. The project will encompass approximately 10 acres of land. The baseball stadium will be lighted and fenced, and contain seating for approximately 400 spectators. The playing surface of the multipurpose field will measure 360' x 1951. The existing practice softball field located at James Wood High School will be upgraded by re -grading the playing surface, installation of lighting, and the addition of seating for 200 spectators. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. The project is scheduled to be advertised for bids in October of 1996, and construction to begin in November of 1996 if funding is secured. 00--ls Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify Wthem and indicate the relationship between the projects. No direct relationship exists with anv other project. However, in the planning and develoFn-ent of the project, personnel from the Frederick County Parks and Recreation Department have provided input for use in the design of the facility and the new facilities will be available for camiunity use when not in use by students from James Wood High School. Project Priority: 1 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: New project. Not included in previous Capital Improvements Plan. Estimate Cost (in 1996 dollars): $1.3 million PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 1997-98 1998-99 1999-00 2000-01 2001-02 FY 5 Planning, Surveying, & Design 150,000 150,000 Land Acquisition - Site Preparation & Improvements 650,000 650,000 Construction 450,000 450,000 Furniture and Equipment 50,000 50,000 Other (openin- dor collection) - TOT.a L 300 000 1 1 1 1 1,300,0001 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate. please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PP0P0gVn FTTNTnTN!_ CnYTDrVc Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 97-98 98-99 99-2000 2000-01 2001-02 FY 5 General Fund* 1 300,000 1 300 00 Other Fund State Grants Bonds and Debts * 1 300,000 1,300, 00 Other Fundraising, TOTAL* 1 hoo, 000 11,300,00d Please describe the source of funding (i.e. type of grant): * Funds to begin the project to be secured either through direct funding from the Frederick County Board of Supervisors or through an advance of funds from the Frederick County Board of Supervisors which will be paid back to the county at a later date. Due to borrowing limitations in 1996, the school board is not able to apply for funding through the sale of Virginia Public School Authority bonds until the spring of 1997. Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The project will provide additional athletic facilities to the students of Jarrees Wood High School. In addition, the proposed facilities will be available for use by the Frederick County Parks and Recreation Department when not in use by James Wood High School to provide needed recreational facilities to the residents of northern and western Frederick County. Please describe the need for this project. As a result of not having baseball or softball fields which are suitable for the playing of interscholastic contests, various softball and baseball teams from James Wood High School have had to use facilities located in other areas of Frederick County and the City of Winchester for games. The completion. of this project will provide the students of James Wood High School with facilities comparable to Sherando High School. Please describe and justify the proposed location of the project. The proposed baseball field and multipurpose field is located on land located below James Wood High School and adjacent to Apple Pie Ridge Elementary School (see attached sketch).