Loading...
CPPC 12-09-96 Meeting AgendaTO: FROM: SUBJECT DATE: COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/678-0682 MEMORANDUM Comprehensive Plans and Programs Subcommittee Eric R. Lawrence, Planner II OL Subcommittee Meeting: Monday, December 9, 1996 December 2, 1996 The Frederick County Comprehensive Plans and Programs Subcommittee (CPPS) will be meeting on Monday, December 9, 1996 at 7:30 PM in the Old Frederick County Court House. NOTE: Due to the construction around the Old Court House, parking is limited. I would advise the CPPS to use the Judicial Center parking lot. AGENDA I. Proposed 1997-98 Capital Improvements Plan. II. Request from Fellowship Bible Church to extend sewer service. III. Other. Information concerning the agenda items is attached. Please contact this office if you will be unable to attend. Thank you. Attachment 107 North Kent Street • Winchester, Virginia 22601-5000 Page 2 Comprehensive Plans and Programs Subcommittee Meeting Agenda: December 9, 1996 ITEM I: Proposed 1997-98 Capital Improvements Plan As most Committee members are aware, the Comprehensive Plans and Programs Subcommittee evaluates departmental CIP project requests in the fall of each year. Based on comments that were generated during last month's CPPS meeting, staff has revised the CIP chart and composed the documentation text. The following documents are included for further consideration in understanding the draft Capital Improvements Plan: ► Cost Summary for the draft 1997-98 CIP. ► Project Summary for the draft 1997-98 CIP. This includes a brief outline of the projects included in last years CIP, and those included in the draft 1997-98 CIP. ► The CIP Project Request Evaluation format and results of the evaluation. ► The draft 1997-98 Capital Improvements Plan (CIP). COST SUMMARY The draft CIP contains 22 projects with a total cost of $82,959,886. This figure includes the estimated debt service on all projects except the School Board's Transportation/Maintenance/Warehouse and Administration Building Renovations. (The total does not include Sanitation Authority or Landfill projects which are paid for out of user fees and are made apart of the CIP in the form of addendum. A project proposed for the Regional Jail complex is not included in the CIP, but is included in an addendum. This Regional Jail project should be completed prior to the beginning of Fiscal Year 1997.) Of this amount, $60,114,383 would come from the County's General Fund over a five year period (not including debt service). As presently proposed, projects scheduled in the first year (1997-98 fiscal year) would have a total County cost of $2,007,637, excluding estimated debt service, for all projects. PROJECT SUMMARY The draft 1997-98 CIP consists of 22 project requests from the County's various departments. Of these project requests, 4 are new to the CIP. The remaining 18 were included in the 1996-97 CIP. The new projects consist of. three from the School Board, and one from the Department of Parks and Recreation. These new project requests are indicated in boldface and italic print on the evaluation form. Listed below are the modifications that each county department has made in their project requests for inclusion in the 1997-98 CIP. Please note: the projects which were included in the 1996-97 CIP and again in the 1997-98 CIP are not discussed. Page 3 Comprehensive Plans and Programs Subcommittee Meeting Agenda- December 9, 1996 School Board Projects Projects no longer included in the CIP: 1) New Stonewall Elementary School --- In progress. Fall 1997. 2) Senseny Road Elementary School --- In progress. Fall 1997. Anticipated completion by Anticipated completion by 3) James Wood Middle School Roof Replacement --- Completed. 4) Aylor, Hoover Chiller replacement --- Completed. Projects which are new to the CIP: 1) Third County High School --- Necessary to satisfy projected student enrollment. 2) New Elementary School, Back Creek --- Necessary to satisfy projected student enrollment. 3) New Gainesboro Elementary School --- Necessary to satisfy projected student enrollment. Parks and Recreation Projects Projects no longer included in the CIP: 1) Support Facilities -CB --- Will be considered for inclusion in future CIPs Projects which are new to the CIP: 1) Skateboard Park --- Project to consist of skateboard bowl, half pipe, and open skate area. This project has been included at the request of the community's youth. Handley Library The project request for the 1996-97 CIP will be included in the 1997-98 CIP. Airport Authority Projects no longer included in the CIP: 1) Perimeter Security Fence --- Completed. 2) T -Hanger Preparation --- Completed. 3) Airfield Maintenance Equipment Bldg --- Completed. 4) Transient Apron Expansion, Design and Construction --- Completed. Projects which are new to the CIP: No new project requests were submitted. Page 4 Comprehensive Plans and Programs Subcommittee Meeting Agenda: December 9, 1996 Sanitation Authority Projects Projects no longer included in the CIP: 1) Administration and Maintenance Complex --- Completed. 2) Boundary Lane Water and Sewer Line --- Completed. Projects which are new to the CIP: No new project requests were submitted.. Landfill and Compactors Projects Projects no longer included in the CIP: 1) Landfill Development, Cell "D", Phase I --- Completed. 2) New Compactor Site --- Completed. Projects which are new to the CIP: 1) Landfill Development, Cell "A", Phase II. Necessary to meet demand and extend landfill cell life. 2) Installation of Active gas Management Cells A and B, Phase I --- Necessary during closure of Cells A and B. 1997 FREDERICK COUNTY CAPITAL IMPROVEMENT PROJECTS EVALUATION FORM LISTED BY DEPARTMENT; IN ORDER OF DEPARTMENT PRIORITY CRITERION Conform to Health, Legally Distribute Economic Related Public and Comp. Plan Safety, Required Services Impact to Other Support TOTAL Welfare Projects WEIGHT 3 4 4 2 2 3 3 LIBRARY New Library 2/6 2/8 0/0 4/8 2/4 0/0 3/9 35 SCHOOL SYSTEM New Gainesboro Elementary School 2/6 2/8 0/0 112 2/4 113 113- 26 Administration Building Renovations Transportation/Maintenance/Warehouse 2/6 1/8 6/0 1/2 316 2/6 1/3 31 Third County High School 2/6 2/8 0/0 2/4 3/6 1/3 1/3 30 New ElementarySchoo4Back Creek 2/6 2/8 0/0 3/6 2/4 1/3 1/3 30 PARKS AND RECREATION Bikeway System 4/12 2/8 0/0 1/2 1/2 2/6 2/6 36 Park Land 3/9 114 0/0 4/8 1/2 1/3 2/6 32 Open Play Area - CB 3/9 1/4 0/0 3/6 1/2 1/3 2/6 30 Softball Complex - SP 3/9 1/4 0/0 1/2 1/2 1/3 2/6 26 Baseball Field Renovations - SP 2/6 1/4 0/0 1/2 1/2 1/3 2/6 23 Field House 2/6 1/4 0/0 2/4 1/2 1/3 2/6 25 Tennis/Basketball Complex - CB 3/ 9 1/4 0/0 3/6 1/2 2/6 1/3 30 Indoor Pool Facilities 2/6 1/4 0/0 2/4 1/2 2/6 2/6 28 Soccer Complex - SP 3/9 1/4 0/0 3/6 1/2 1/3 2/6 30 Maintenance Compound - SP 1/3 1/4 0/0 0/0 3/6 3/9 1/3 25 Tennis/Picnic Area - SP 3/9 1/4 0/0 1/2 0/0 2/6 2/6 27 Shelter, Stage Seating - CB 3/9 1/4 0/0 3/6 2/4 2/6 2/ 6 25 Skateboard Park 113 114 0/0 112 112 113 2/6 20 AIRPORT Land Acquisition - South Side RPZ 2/6 2/8 3/12 1/2 2/4 2/6 2/6 44 Land Aquisition, Bufflick Road 2/ 6 2/8 3/12 1/2 2/4 2/6 2/6 44 [Zoute 645 Relocation - Design 2/6 1/4 1/4 0/0 1/2 2/6 1/3 25 Koute 645 Relocation - Construction 2/6 1/4 1/4 0/0 1/2 2/6 1/3 25 FREDERICK COUNTY VIRGINIA Capital Improvements Plan 1997-98 Fiscal Year DRAFT As Recommended by the Frederick County Planning Commission, February xxx, 1997; And Adopted by the Frederick County Board of Supervisors, March XX, 1997. TABLE OF CONTENTS INTRODUCTION ......................................... 1 PROJECT RECOMMENDATIONS............................................... 2 SchoolBoard...........................................................2 Parks and Recreation.....................................................3 County Administration ....................................... . ........... 3 HandleyLibrary .................. ......................................3 Airport Authority........................................................4 PublicWorks...........................................................4 Regional Adult Detention Center ........................................... 4 Sanitation Authority...................................................... 5 Draft 1996-97 CAPITAL IMPROVEMENTS PLAN ...................... . ........... 6 CIP CHART EXPLANATIONS.................................................. 7 PROJECT FUNDING ................................ 8 PROJECT DESCRIPTIONS..................................................... 9 Frederick County Public Schools ............................ . . ......... . . . 9 New Gainesboro Elementary School ................................... 9 Administrative Building Renovations .................................. 9 Transportation/ Maintenance/ Central Warehouse Facility ................. 10 Third County High School..........................................10 New Elementary School, Back Creek District .......................... 11 Frederick County Parks and Recreation Department ........................... 12 Bicycle Facility..................................................12 Parkland in Western Frederick County ................................ 12 Open Play Area - Clearbrook Park ................................... 13 Softball Complex - Sherando........................................ 13 Baseball Field Renovation - Sherando................................ 14 FieldHouse.....................................................14 Tennis/Basketball Complex - Clearbrook .............................. 15 Soccer Complex - Sherando........................................ 16 Maintenance Compound and Office - Sherando ......................... 16 Tennis/Picnic Area - Sherando...................................... 16 Shelter/Stage Seating - Clearbrook ................................... 17 SkateboardPark..................................................17 Handley Regional Library ................................................ 18 Frederick County Library .......................................... 18 ADDENDUM...............................................................19 Frederick County Sanitation Authority ...................................... 19 Water Transmission Lines .......................................... 19 Miller Heights Water Distribution Line ......................... 19 Route 50 - Victory Road Water Loop - Project 2 .................. 19 Stonewall - Lee Avenue Water Loop ........................... 19 Frederick County Public Works Department ................................. 20 Construction Debris Landfill ........................................ 20 Closure of Cells A and B, Phase I .................................... 20 Landfill Development - Cell "A", Phase II - Five Acres ................... 21 Installation of Active Gas Management Cells A and B, Phase I ............. 21 Winchester Regional Airport .............................................. 22 Land Acquisition - South Side RPZ, Phase II ........................... 22 Route 645 Relocation - Design Only .................................. 22 Route 645 Relocation - Construction Phase ............................ 23 Land Acquisition, Bufflick Road, Phase II ........................... 23 Regional Secure Juvenile Detention Center ............................ 24 PROJECT EVALUATION FORM ............................................... 25 CAPITAL IMPROVEMENTS PLAN FREDERICK COUNTY 1997-98 INTRODUCTION The Code of Virginia assigns the responsibility for preparation of plans for capital outlays to the local planning commissions. The Capital Improvements Plan (CIP) consists of a schedule for major capital expenditures for the County for the ensuing five years. The CIP is updated annually. Projects are removed from the plan as they are completed or as priorities change. The plan is intended to assist the County Board of Supervisors in preparation of the County budget. In addition to determining priorities for capital expenditures, the County must also ensure that projects contained within the CIP conform to the Comprehensive Policy Plan. The annual review process begins with the submission of capital expenditure requests from County departments and relevant agencies in the fall of the year. These requests are evaluated by the Comprehensive Plans and Programs Committee, a subcommittee of the Planning Commission, using a list of seven evaluation criteria. Each criterion is assigned a weight which reflects the relative importance when compared to the other criterion. The Committee then meets with representatives of departments making expenditure requests and determines a recommended priority for the various requests. This recommendation is passed to the Planning Commission which in turn makes a recommendation to the Board of Supervisors. The CIP is strictly advisory. Once adopted, project priorities may change throughout the year based on changing circumstances. It is also possible that particular projects may not be funded during the year that is indicated in the CIP. The status of any project becomes increasingly uncertain the further in the future it is projected. Frederick County 1997-98 Capital Improvements Plan Page 2 PROJECT RECOMMENDATIONS 1. School Board Projects The old Stonewall School building has been razed, and the new Stonewall Elementary School building is projected be open for students in the fall of 1997. Student capacity of this new school is approximately 585 pupils. During the past year, underground storage tanks have been removed from the James Wood Middle School facility. The removal of these tanks were necessary to comply with federal regulations regarding underground storage tanks. This project completes the final phase of complying with Federal regulations for the school division. Construction of a baseball/softball/multipurpose field athletic complex at the James Wood High School site is currently underway. These facilities will enable the high school to host interscholastic contests at the school site. Prior to the completion of this project, these contest were held at various sites around the County and within the City of Winchester. The facility will also be available to the County's Parks and Recreation Department for their programing use. In an effort to maintain educational facilities that will handle the student population's projected growth, three new school facilities are proposed for the next five years. These new facilities include: two elementary schools, and a high school. The two elementary schools would be built in the Gainesboro and Back Creek districts. The high school is proposed for the County owned parcel adjacent to the Redbud Run Elementary School. Funding is being requested for a new transportation/maintenance/central warehouse facility. The project involves building the proposed structure(s) adjacent to the Red Bud Run Elementary School. The existing maintenance facility has reached the point where it is difficult to house all of the school system's buses and still provide service to an increasing number of County vehicles from other departments. Frederick County 1997-98 Capital Improvements Plan Page 3 2. Parks and Recreation Several projects are planned in and around Sherando Park. The Projects County was awarded an ISTEA Transportation Enhancement Program grant in 1993 to build a Bikeway System. This 2.45 mile facility will serve several residential areas in southern Frederick County. The bicycle path has been designed to link the residential developments and park land on the north of Route 277 with Sherando Park and Sherando High School. In addition to other improvements at Sherando Park, two projects are planned that will be used by Sherando High School, the proposed softball complex and baseball complex. Several projects are planned for Clearbrook Park including an open play area, tennis/basketball complex, and a shelter with a sound stage and seating. In an effort to reduce the gap in provision of services to the western portion of the County, the Parks and Recreation Department is proposing to purchase park land in western Frederick County. Two additional projects that are planned are a field house and an indoor pool. Locations for the projects have not been determined, although both projects could be built on currently owned County land. Both projects could also be utilized by the County school system. 3. County Administration Many of the County's administrative offices have been relocated to the Frederick County Administrative Building, at 107 North Kent Street in Downtown Winchester. An addition has recently been completed that enlarges the Frederick County Administrative Building to 100,000 square feet of office space. This addition enables the majority of the county departments to be located at a central location in downtown Winchester. 4. Handley Library As part of a master plan prepared for the Handley Library by a library consulting firm, it was recommended that a library be built in southeastern Frederick County. A library in this area would enable the Handley Library to provide service to the growing population in southern Frederick County. A library site has been selected, near the Lakeside community. A 34,000 square foot building is proposed which could be expanded, in stages, ultimately to 50,000 square feet. Frederick County 1997-98 Capital Improvements Plan 5. Airport Authority, 6. Public Works Projects (Not funded by the General Fund) 7. Regional Adult Detention Center Projects Page 4 An updated master plan for the Winchester Regional Airport was adopted in December of 1993. This plan contains recommendations regarding capital improvements to the airport in order to meet federal guidelines for airports the size of the Winchester Regional Airport and to provide better service to airport users. The Airport Authority has included project requests that relate to land acquisition. Land acquisition is the primary goal of the airport as they proceed to satisfy both federal regulations and plan for anticipated growth. Funding for Airport projects is derived through a complex formula where the federal and state government contribute a majority of the funding. The Public Works Department is proposing four projects for the current CIP. They include: • Construction Debris Landfill • Closure of Cells "A" and "B", Phase I • Landfill Development - Cell "A", Phase 11 • Installation of Active Gas Management Cells A and B, Phase I The landfill development project and the cell closure projects are all projects that the Landfill is required to undertake in order to comply with regulations imposed by the Department of Environmental Quality. Funding for the landfill projects are provided through the Landfill Enterprise Fund. A juvenile detention facility is currently under construction. Located adjacent to the pre-release facility in the Fort Collier Industrial Park, this facility is necessary to meet the needs of the community. When completed, this facility will be capable of housing 32 juveniles. Frederick County 1997-98 Capital Improvements Plan 8. Sanitation authority Projects (Not funded by the General Fund) Page 5 The Sanitation Authority is proposing one project, Water Transmission Lines. These lines involve the extension of water service to three areas of the county: Miller Heights, Route 50Nictory Road, and Stonewall - Lee Avenue. The Sanitation Authority Projects will not be funded directly through the CIP. These projects receive their funding through user fees. Frederick County 1997-98 Capital Improvements Plan FREDERICK COUNTY, VIRGINIA ----DRAFT---- CAPITAL IMPROVEMENTS PLAN 1997-98 County Priorit Department Priorit Proiects $625,000 COUNTY CONTRIBUTION 51,215 $318,387 County $8,041,485 interest From I 1 Airport Land Acquisition - Southside RP 1997-98 12,500 1998-99 1999-2000 2000-01 2001-02Contributions $14,281,872 Notes Debt Servi 533,586 2 Airport Land Acquisition - B.utilick Road10,000 $1,127,692 1,953,200 $1,953,200 612,495 $612,495 12»500 A N/A $422,328 I Bicycle Facility 51,215 $1,400,000' 168,539 $168,539, 1,542,000 14,000 A N/A 200,000 1 New Library 489,154 S 1,$15 B N/A489,150 14 Shelter, Stage Seating - CB NIA 2 Park Land 1,154,772 326,659 326,659 N/A 7 4 Transportation/Maintenance/Warehouse begin 1»154,772 N/A 8 9 5 Third County High School New Elementary School - Back Creek 1,500,000 15,600,000 14,900;000 4 32,000;000 C N/A 3,888,513 10 3 Open Play Area - CB 416,992 600,000 9,100,000 9,700,000 4,581,872 11 7 Tennis/Basketball Complex - CB 533,586 416,992 N/A 12 9 Soccer Complex - SP 533,586 N/A 13 8 Indoor Pool Facilities 1,127,692 1,127,692 NIA 14 11 Tennis/Picnic Area - SP 1,953,200 1,953,200 N/A 15 2 New Gainesboro Elementary School 300,000 8,400,000 612,495 612,495 NIA 16 4 Softball Complex - SP 422 328 8,700,000 3,958,611 17 3 Route 645 Relocation - Design 2,500 422,328 N/A 18 4 Route 645 Relocation - Construction 2,500 A N/A 19 10 Maintenance Compound - SP 28,040 28, 000 ,000 A N/A 20 6 Field House 1,542,000 168539 , 16 N/A 21 5 Baseball Field Renovations - SP 662,755 1»542,000 N/A 12 13 Skateboard Park 662,755 N/A 200,000 200;000 N/A TOTALS 1$2,007,637 $9,902,075 $3,588,086 $18,181,200 $26,435,385 $60,114,383 $12,428,996 A = Partial funding from Federal Airport Improvement Program (FAIP) and State Commonwealth Airport Fund (SCAF) grants B = Patial funding from State grants and local gifts C = Debt Service is unavailable at time of printing ----DRAFT---- TOTAL COUNTY I Total Project _ COSTS Costs 12,500 $625,000 10,000 $500,000 51,215 $318,387 489,150 $8,041,485 326,659 $326,659 1,154,772 $1,154,772 0 ? 35,888,513 $35,888,513 14,281,872 $14,281,872 416,992 $416,992 533,586 $533,586 1,127,692 $1,127,692 1,953,200 $1,953,200 612,495 $612,495 12,658,611 $12,658,611 422,328 $422,328 2,500 $125,000 28,000 $1,400,000' 168,539 $168,539, 1,542,000 $1,542,000 662,755 $662,755 200,000 $200,000 $72,543,379' $82,959,886 12/02/96 CIP CHART EXPLANATIONS Page 7 The Capital Improvements Plan chart, on the previous page, contains a list of the capital improvement projects proposed for the County over the next five year period. Each column's origination and justification is briefly explained below. County Priority - The project's priority rating, based on all projects included in the CIP. County Priority ratings are the result of the criterion and weight evaluation process and is illustrated on the Evaluation Form. The Evaluation Form is located on page 29 of this booklet. Department Priority - The project's priority rating based on the requesting department's determination. Projects - The name of the capital improvement project. County Contribution - The dollar value from the County's General Fund that will be contribute toward the project's funding. This value is listed by individual fiscal years, and also by total contributions over the five year period. The total contribution column, located to the right of the fiscal year breakdowns, does not include any debt service projections. Notes - Indicates the footnotes that may apply to a particular project. Interest From Any Debt Service - As applicable, indicates the projected interest for a particular project. These interest projections are provided by individual departments and are based on the most accurate interest rate information available at the time the CIP is assembled. Total County Costs - The total expenditures that the County will contribute for a particular project. This column includes both fiscal year contributions and debt service expenses that may be associated with the projects funding. Essentially, this column represents the total county contributions for a particular project. (County Contributions with Interest) Total Project Costs - Total project costs including county and other funding source contributions. The values in this column are not necessarily contributed entirely by the County. Frederick County 1 1997-98 Capital Improvements Plan PROJECT FUNDING Page 8 The projects included in the 1997-98 Capital Improvements Plan have a total cost of $82,959,886. If all projects are undertaken, Frederick County will contribute $60,114,383 over the five year period of 1997-2002. This total does not include the interest from any debt service. By adding the projected debt service of $12,428,996, the total county contribution of the approved projects comes to $72,543,379. The costs associated with the School Board's request for a Transportation/Maintenance/Central Warehouse facility and Administration Building renovations are not included in any cost summaries. ► School projects are funded through a combination of loans from the Virginia Public School Authority and the Virginia Literary Fund. ► Sanitation Authority projects will be funded by the Sanitation Authority working capital funds and Virginia Resource Authority Revenue Bonds. ► Landfill projects are funded by retained funds generated by the landfill fees and coordinated by the Landfill Enterprise Fund. ► Funding for Parks and Recreation projects will come from the unreserved fund balance of the County. The Bicycle Facility project will be funded through a Recreational Access Fund grant, an ISTEA Transportation Enhancement Program grant, and a 20% match from the general fund. The Parks and Recreation Commission will actively seek private sources of funding or cooperation for projects not funded by the County. Funding for a Frederick County Library could include a contribution from the County general fund, a bond, donation of land, and substantial fund raising efforts by the Library Board. Airport projects will be funded by contributions from the federal, state, and local governments. The local portion may include contributions from Warren, Shenandoah, Clarke, and Frederick Counties, and the City of Winchester. Frederick County 1997-98 Capital Improvements Plan PROJECT DESCRIPTIONS Frederick County Public Schools Project Priority List PRIORITY 1 PRIORITY 2 Page 9 New Gainesboro Elementary School Description: This project consists of the construction of an elementary school (grades K-5) of approximately 65,000 square feet to serve 550 students. The school is located on a 20 acre site. Capital Cost: $8,700,000 Debt Service: $3,958,611 Justification: This project will serve approximately 550 students in grades K-5. The Frederick County School Board purchased 20 acres of land in the Gainesboro district in 1990 in anticipation of the future need to provide space for increased student enrollment. Construction Schedule: Begin in FY -98 and complete in FY - 1999. Administrative Building Renovations Description: This project is contingent upon the School Board offices being relocated to the Frederick County Administrative Building. This project involves the renovation of the school administrative office to an elementary school. Renovations will enable the building to be converted back to an elementary school of approximately 58,000 square feet. Amenities included in this renovation will bring the school to a level of amenities similar to other county elementary schools. Capital Cost: To be determined. Justification: The renovated school will handle 550 students. The elementary school will serve students in grades K-5. Construction Schedule: Begin and complete in FY -98. Frederick County 1997-98 Capital Improvements Plan PRIORITY 3 PRIORITY 4 Page 10 Transportation/ Maintenance/ Central Warehouse Facility Description: This project is contingent upon agreement with numerous County agencies. The project involves the construction of a central location for the County's transportation and maintenance facility. The Proposed facility would provide a combined facility for the transportation/ maintenance/ central warehouse facility needs of the school division and various other county departments. To be located on County owned property, adjacent to the Redbud Run Elementary. Capital Cost: To be determined. Justification: This project will serve numerous County agencies, at a central location. The Buildings and Grounds Department provides maintenance and repair services for all county school facilities which serve over 9,000 students, in addition to vehicle fleet maintenance for other County departments.. Construction Schedule: Not available. Third County High School Description: The project involves the construction of a high school for grades 9-12 to serve 1,500 students. The school will occupy approximately 70 acres and consist of a facility containing approximately 240,000 square feet. The site selected for the project is part of a 128 acre site owned by the school division which was purchased for a future high school. It is located adjacent to Redbud Run Elementary School, and approximately 1.5 miles from the intersection of Route 7 and Interstate 81. Capital Cost: $32,000,000 Debt Service: $3,888,513 Justification: The school will provide space for 1,500 students in grades 9-12, to satisfy projected student population increases. Construction Schedule: Begin planning in FY -99, complete construction in FY -2002. Frederick County 1997-98 Capital Improvements Plan PRIORITY 5 Page 11 New Elementary School, Back Creek District Description: The project involves the construction of an elementary school for approximately 550 students in grades K-5 on a 15-20 acre site. At this time, the exact location of this proposed school has not been determined. Capital Cost: $9,700,000. Debt Service: $4,581,872. Justification: The project will serve 550 students in grades K-5 who reside in the Back Creek district. The project will provide additional classroom space for increased student enrollment. Construction Schedule: Begin planning in FY -2000. Frederick County 1997-98 Capital Improvements Plan Frederick County Parks and Recreation Department Project Priority List 14-11tuty'" Val PRIORITY 2 Page 12 Bicycle Facility Description: A 2.45 mile bicycle facility to serve several residential areas in southern Frederick County. This bicycle facility has been designed to link the developments and park land on the north side of Rt. 277 with Sherando Park and the high school on the south side of Rt. 277. Capital Cost: $318,387 Justification: The initial trail development will provide a direct benefit for 642 planned or completed housing units, with the potential future expansion of the trail system impacting over 3,669 housing units. Sherando Park and Sherando High School represents a focal point of activity for the residents living in the urban development area of southern Frederick County. The proposed bicycle facility appears to be an excellent way to provide safe access to and from these facilities for pedestrians and bicyclists. Construction Schedule: Begin and complete in FY -97, Parkland in Western Frederick County Description: Parkland acquisition in the western portion of the County. Capital Cost: $1,154,772 Justification: This project would be used by the entire Frederick County population. The parkland acquisition would reduce the gap between the amount of existing parkland and the amount of parkland needed to meet the minimum standard for our the Frederick County service area. Construction Schedule: Begin and complete in FY -97. Frederick County 199'-98 Capital Improvements Plan PRIORI T Y 3 PRIORITY 4 Page 13 Open Play Area - Clearbrook Park Description: This project consists of an assortment of facilities to compliment the existing Clearbrook Park. It includes two areas within the Clearbrook Park site. First, the area on the southside of the lake includes: parking, repairs to existing shelters, access paths, and landscaping. Second, the area adjacent to the water tower includes: parking, picnic shelter, 6 horseshoe pits, croquet turf, shuffleboard, volleyball court, and refurbishing the existing concession stand. This project was listing in previous years as two separate projects. Capital Cost: $416,992 Justification: These facilities will provide recreational opportunities for the Clearbrook Park service area, reducing the gap between the number of existing passive recreational areas and the number which is needed to meet the minimum standards for our service area. Clearbrook Park, currently owned by Frederick County, offers the best location for this development. Construction Schedule: Begin and complete in FY -98. Softball Complex - Sherando Description: This project consists of an assortment of athletic facilities to compliment the existing Sherando Park facilities. It includes: 2 softball fields, an access road, parking spaces, and landscaping. Capital Cost: $422,328 Justification: This facility would provide recreational opportunities for the entire Frederick County area. In addition to its use as a recreational facility, it will be used by the Frederick County school system. Presently, there are ten softball/baseball fields within the county's regional park system. Eight of the existing fields must serve a dual purpose of facilitating youth baseball as well as youth and adult softball programs. With the increased usage of these fields, it has become increasingly difficult to facilitate these programs. This project is needed in order for the Parks and Recreation Department to accommodate the existing demand for youth baseball and adult softball programs. Construction Schedule: Begin and complete in FY -98. Frederick County 1997-98 Capital Improvements Plan Page 14 PRIORITY 5 11 Baseball Field Renovation - Sherando Description: This project consists of an assortment of athletic facilities to compliment the existing Sherando Park facilities. It includes: the renovation of 4 existing ball fields, renovation of existing restrooms, and access roads and walks. Capital Cost: $662,755 Justification: This facility, presently serving as both youth baseball and adult softball fields, and would be used by the "Little League" programs within the Sherando Park service area. In addition to its use as a recreational facility, the athletic complex will also be used by the Frederick County school system. This project cannot be completed until the Softball Complex - Sherando is completed. Construction Schedule: Begin and complete in FY -98. PRIORITY 6 Field House Description: The 29,900 square foot Athletic Field House would include an office and storage area, locker rooms, parking lot, and a 25,000 square foot multipurpose area. This facility would be located on property owned by the county and would cover five to seven acres. The multipurpose area would have three basketball/volleyball courts, a walking track, a tennis wall, and provide the opportunity to offer a wide range of activities and special events for all ages and interest groups. The location has not been determined; best location for this facility may be within one of the County's existing parks. Could possibly be built in concert with the Indoor Pool project. Capital Cost: $1,542,000 Justification: Since the inception of the Parks and Recreation Department, the department has relied solely on the use of the county public schools to house our program offerings. During the early years, the department offered a small number of programs that required limited facility use. Currently, the department offers over 500 programs annually and, at the same time, space within the schools has been more difficult to secure. This has created a situation where the department no longer has the ability to meet the demands of the county residents. Having a facility such as this would also assist the area in its effort to attract new business to the community. This facility would be available to all area residents. Construction Schedule: Begin and complete in FY -99. Frederick County 1997-98 Capital Improvements Plan Page 15 PRIORITY 7 II Tennis/Basketball Complex - Clearbrook Description: This project consists of an assortment of athletic facilities to compliment the existing Clearbrook Park facilities. It includes: 8 tennis courts, 2 racquetball courts, 2 basketball courts, a shelter, parking, and landscaping. Capital Cost: $533,586 Justification: Located in Clearbrook Park, these facilities would be available to all county residents. Currently, there are no tennis, racquetball, or basketball courts in the Clearbrook Park are, and with over 150,000 park visitors annually, these facilities are needed. Construction Schedule: Begin and complete in FY -99. PRIORITY 8 Indoor Pool and Support Facilities Description: This project consists of a six lane, 25 yard indoor swimming pool designed for competitive and recreational use. Locker rooms, office and a reception area are also included in the proposal. The location has not been determined; best location for this facility may be within one of the County's existing parks. Could possibly be built in concert with the Field House project as they would compliment one another Capital Cost: $1,953,200 Justification: Currently, there are no indoor pools in Frederick County. This facility would be available to all county residents for recreational use and to the student population for physical education instruction and competitive swim teams. The general public has made several inquires as to the possibility of the development of in indoor pool to serve the county's residents. There are no indoor pools in Frederick County. This facility will offer all county residents the opportunity to take advantage of year-round recreational swimming and enable this department to offer valuable programming to county residents. Also, county high schools would be able to use this facility for instruction and competitive swimming. Construction Schedule: Begin and complete in FY -2000. derick County 1997-98 Capital Improvements Plan Page 16 PRIORITY 9 Soccer Complex - Sherando Description: T his project consists of an assortment of athle is facilities to compliment the existing Sherando Park facilities. It includes: 3 soccer fields, access paths, restrooms/concession, 2 picnic shelters, landscaping, and lighting. Capital Cost: $1,127,692 Justification: This facility will be used by the entire Frederick County area. In addition to its use as a recreational facility, the facility will also be used by the Frederick County school system. Construction Schedule: Begin and complete in FY -2001. PRIORITY 10 Maintenance Compound and Office - Sherando Description: This project will consist of a 1,200 square foot office and 4,000 square foot storage sheds for the Sherando Park operations. Capital Cost: $168,539 Justification: This facility will enable the county to maintain its equipment and facilities in a more responsible and effective manner. The additional responsibility to maintain the outdoor facilities at Sherando High School also increases the need for more storage, maintenance and office space. Construction Schedule: Begin and complete in FY -2001. PRIORITY 11 Tennis/Picnic Area - Sherando Description: This project consists of an assortment of athletic facilities to compliment the existing Sherando Park facilities. It includes: 3 tennis courts, 4 racquetball courts, restrooms / concession area, 4 picnic shelters, a playground area, access paths, and parking. Capital Cost: $612,495 Justification: These facilities would be used by the Sherando Park service area and the residents of southwestern Frederick County. Although tennis courts have been included at Sherando High School, the department feels that it is important to include three tennis courts on park property for general use while the school courts are being used for school activities. Construction Schedule: Begin and complete in FY -2001 Frederick County 1997-98 Capital Improvements Plan PRIORITY 12 PRIORITY 13 Page 17 Shelter/Stage Seating - Clearbrook Description: This project consists of an assortment of athletic facilities to compliment the existing Clearbrook Park facilities. It includes: refurbishing existing restrooms, access paths, development of a shelter with performance stage, and lake renovations. Capital Cost: $326,659 Justification: This facility would be used by the entire Winchester -Frederick County area. Presently, there are no facilities to accommodate cultural programs within the county's park system. This project is needed to provide a facility for cultural activities. Construction Schedule: Begin and complete in FY -2001. Skateboard Park Description: This project will consist of: a skateboard bowl, half pipe and open skate area, and vehicle parking. The facility's location has yet to be determined. Capital Cost: $200,000 Justification: This facility will enable the county to provide additional recreation opportunities to its citizens; a recreational facility that has been requested for the community's youth. Construction Schedule: Begin and complete in FY -2001. Frederick County 1997-98 Capital Improvements Plan Handley Regional Library PROJECT Page 18 Frederick County Library Description: A library in Frederick County will enable the Handley Regional Library to provide service to the growing population in southern Frederick County and to provide adequate books, services, and seating for the population served by the regional system. On a lot of 7 acres, the building will be 34,000 square feet and will be expanded in stages ultimately up to 50,000 square feet. The consulting firm hired by the Handley Library Board to provide a master plan for the library through the year 2010 has estimated the construction costs, not including land or library materials costs but including furniture and equipment, would cost approximately $4,659,000. (This estimate was generated in 1993. A 5% inflation factor has been added, bringing the current estimate to $4,891,950.) Books and other library materials for an adequate opening day collection of around 80,000 items would cost almost $3,150,000. A site has been designated by the Board of Supervisors at the intersection of Macedonia Church Road and Lakeside Drive. Capital Cost: $8,041,485 Justification: The Handley Library currently has over 14,500 registered users from Frederick County. Frederick County residents checked out 59.06% of all library materials during the month of July 1996. This number would rise dramatically with a new, convenient location. In order to meet the educational needs and the business information needs of the area and to continue to foster literacy and reading among the citizens it serves, the Handley Library needs more space for books, children's programs, and seating for children and adults. The library is well below state standards in the areas of books per capita, in square footage per capita, in seating per capita, and in periodicals per capita. The current Handley Library building cannot contain enough books and seating to meet state standards. A library in the County will contribute to the welfare of the population by providing a place for children to read, study, and prepare projects when schools are closed as well as serve senior citizens, mothers with young children, and individuals seeking health and consumer information. Frederick County 1997-98 Capital Improvements Plan Page 19 ADDENDUM Frederick County Sanitation Authority Sewer and Water Project Priority List (Not funded by the General Fund) PROJECT 1 Water Transmission Lines A) Miller Heights Water Distribution Line Description: Install 2,640 linear feet of eight -inch water line. Estimated Costs: $81,000 Justification: Provide potable water and fire protection to seventeen existing residences. Construction Schedule: Begin December 1996. B) Route 50 - Victory Road Water Loop - Project 2 Description: Install 2,900 linear feet of twelve -inch water main. Estimated Costs: $90,000 Construction Schedule: Contingent on availability of funds. C) Stonewall - Lee Avenue Water Loop Description: Install 7,900 linear feet of twelve -inch water line connecting Stonewall Industrial Park and Lee Avenue. Estimated Costs: $330,000 Justification: Provide water service and fire protection to commercial and industrial land on the west side of Route 11 between Lee Avenue and Stonewall Industrial Park. The line will provide a loop between the water storage tank in the Stonewall Industrial Park and Lee Avenue and Fort Collier Industrial Park. Construction Schedule: Contingent on availability of funds. Frederick County 1997-98 Capital Improvements Plan Page 20 Frederick County Public Works Department Landfill Project List (Not funded by the General Fund) PROJECT 1 Construction Debris Landfill Description: This project will include the development of a construction debris landfill adjacent to the existing sanitary landfill. The permitting and design are ongoing. The Public Works Department expects to receive a permit on or about May 1996. It is anticipated that development of three to five acres of construction debris landfill space will occur in FY -96 to extend the life of the existing Municipal Solid waste landfill. Capital Cost: $800,000 Justification: The project will serve the citizens and businesses located in Frederick County, Clarke County, and the City of Winchester. The project is necessary to extend the life of the MSW (Municipal Solid Waste) landfill. Construction Debris (CD) landfill requirements are less stringent than Municipal Solid Waste landfill requirements, hence, the project will create additional CD capacity.. Construction Schedule: Begin in FY -96 and carry over into FY -97. PROJECT 2 Closure of Cells A and B, Phase I Description: This project encompasses the closure of Cells A and B, Phase 1. This closure will be performed in accordance with the details and guidelines set forth in Permit #529. Capital Cost: $1,400,000 Justification: Required by the Department of Environmental Quality. The project will serve the citizens of Frederick and Clarke Counties as well as the City of Winchester for approximately three to four years. Construction Schedule: This project may be initiated in FY -95 to close out Cell A. The closure of Cell B will be initiated in FY -96. Construction schedules will be dependent upon the actual life of Cell B. Frederick County 1997-98 Capital Improvements Plan Page 21 P ROJFCT 3 Landfill Development - Cell "A", Phase II - Five Acres Description: This project includes the development of approximately five acres of sanitary landfill space as outlined in Permit #529, Phase II- Cell A. It is anticipated that this development will have a life between two to three years in combination with the existing Cell "D" of Phase II. Capital Cost: $1,000,000 Justification: Required by the Department of Environmental Quality. The project will serve the citizens of Frederick and Clarke Counties as well as the City of Winchester for approximately three to four years. Construction Schedule: Begin in FY -98. The commencement of this construction will depend on the actual life of Cell "D", Phase I. PROJECT 4 Installation of Active Gas Management Cells A and B, Phase I Description: This project encompasses the installation of an active gas management system in conjunction with the closure of Cells A and B. The proposed system may be limited to recovery wells and candle flares or may be expanded to include a total recovery system connected to a generator or boiler system. Capital Cost: $500,000 Justification: This project will serve the citizens and businesses located in Frederick and Clarke Counties, and the City of Winchester. It is required to meet the Federal Clean Air Act standards. Construction Schedule: this project may be initiated in FY -97 in conjunction with the closure of Cells A and B. Frederick County 1997-98 Capital Improvements Plan Page 22 Winchester Regional Airport Project List (Funded by contributions from the federal, state, and local governments. Local contributors may include Frederick, Warren, Clarke, Shenandoah Counties, and the City of Winchester.) PROJECT 1 Land Acquisition - South Side RPZ, Phase II Description: Acquire approximately 15 acres of land along the south side of Route 645 to complete Runway Protection Zone required by the Federal Aviation Administration for an Instrument Landing Slope Approach. Capital Cost: $625,000 90/8/2 - FAA/State/Local Justification: Provides land required to establish Obstruction Free Area for the Instrument Landing System installed in FY - 95. Provides additional land for the relocation of Route 645 as part of the Airport Master Plan implemented in 1992. Construction Schedule: Phase I began in FY -95. This phase of land acquisition will continue through FY -98. PROJECT 2 Route 645 Relocation - Design Only Description: The design for the relocation of Route 645 will enable the airport to move forward with its plans for activating a precision approach to Runway 32. The relocation of Route 645 will remove the final obstruction from the approach. Capital Cost: $125,000 90/8/2 - FAA/State/Local Justification: By removing this obstruction (Route 645), the approach minimums can be lowered enabling the airport to handle aircraft in almost all weather conditions. Construction Schedule: Initiate and complete the relocation designs in FY -98. Frederick County 1997-98 Capital Improvements Plan PROJECT 3 PROJECT 4 Page 23 Route 645 Relocation - Construction Phase Description: The construction of Route 645 relocated. Capital Cost: $1,400,000 90/8/2 - FAA/State/Local Justification: By removing this obstruction (Route 645), the approach minimums can be lowered enabling the airport to handle aircraft in almost all weather conditions. Construction Schedule: Initiate and complete the construction phase in FY -99. Land Acquisition, Bufflick Road, Phase II Description: The acquisition of land along Bufflick Road to further advance the airport's compliance with FAA compatible land use criteria. Capital Cost: $775,000 90/8/2 - FAA/State/Local Justification: This acquisition is anticipated to bring all land uses within the airport environment into FAA compatible land use criteria. Construction Schedule: Initiate and complete acquisition in FY -99. Frederick County 1997-98 Capital Improvements Plan Regional Adult Detention Center Project List (Not entirely funded by the General Fund) PROJECT 1 Page 24 Regional Secure Juvenile Detention Center Description: The Clarke -Frederick -Winchester Regional Jail Board proposes to construct a 32 bed regional juvenile detention facility. It shall be constructed adjacent to the pre- release facility, located in Fort Collier Industrial Park, adjacent to Brook Road and Fort Collier Road. The property and facility shall be owned by the CFW Regional Jail Board, however, it shall be operated by a regional juvenile detention commission, consisting of representative from Clarke County, Frederick County, the City of Winchester, Page County, Shenandoah County, and Warren County. Capital Cost: $4,031,377 Justification: Review of needs assessment indicates that a regional juvenile detention facility is necessary. Construction Schedule: Complete in FY -96. Frederick County 1997-98 Capital Improvements Plan Page 6 Comprehensive Plans and Programs Subcommittee Meeting Agenda: December 9, 1996 ITEM II: Request from Fellowship Bible Church to extend sewer service. Members of the Fellowship Bible Church have requested that sewer service be extended to their facility. The attached letter was submitted to our department on November 18, 1996. There are a few significant issues that staff feels may be applicable to this request. First. This property is presently located outside of the County's Sewer and Water Service Area (SWSA). Because of this location, current policy would not permit sewer service without an expansion to the SWSA. Second. In recent months, the CPPS has been asked to review similar requests made by two other churches. While similar in nature, the requests are actually quite different. This request will require the sewer to be extended at least 1/4 mile. Previous requests involved the sewer crossing the street. Third. The sites' location is adjacent to the Grim Farm property. During recent court hearings concerning the future of the farm, County officials stated that sewer service was presently not available to the farm. It was also commented that the County's Comprehensive Plan indicates that the SWSA does not include portions of the farm located in the County. These are a few of the issues that staff feels may be important for the CPPS to consider. Members of the Church will be in attendance to address any concerns the committee may have. A map of the property's location is attached. Staff is interested in gaining the CPPS' guidance and/or recommendation as appropriate. Ralph L. Herring 1533 Meadow Branch Avenue Winchester, VA 22601 November 18, 1996 Mr. Kris C. Tierney, A.I.C.P., Director County of Frederick Department of Planning and Development 107 North Kent Street Winchester, VA 22601 Dear Mr. Tierney: Ref.: Fellowship Bible Church 3217 Middle Road Winchester, VA 22602 Subject: Sewer Extension from Westridge H Development to Fellowship Bible Church We respectfully request you, Mr. Tierney, to represent the Fellowship Bible Church with the Board of Supervisors to connect into the sewer system at the Westridge H development to install a forced main sewer system for the Fellowship Bible Church on Middle Road. We are requesting the sewer requirements to serve a church body at any one period of the day. 1500 adults/200 teenagers/500 children. We make this request for sewer since we cannot extend the drain fields further, according to our soils engineer. A master plan is in the process to build an 800 seat sanctuary expandable to 1200 seats, additional classrooms and office space over a 5 year period. This written request is the result of your speaking with Mr. Charlie Richardson on November 5, 1996. We are ready to issue a contract to Gilbert W. Clifford and Associates, Inc. to design a pumping station with a forced main to comply with the County of Frederick, V.D.H. and code to handle a church body as specified. Ralph L. Herring Page 2 November 18, 1996 We sincerely appreciate your willingness to represent Fellowship Bible Church with the Board of Supervisors, your time and your expertise in giving us the facts and procedures required to make an installation in accordance with the County of Frederick Code requirements. Please call me at 540 722-0399 if you need any additional information. Sincerely, '/ �_ 1-eLL Ral h L. Herring �� Representing Fellowship Bible Church SEWER EXTENSION REQUEST PIN: 63—A-14 Fellowship Bible Church