Loading...
CPPC 11-14-05 Meeting AgendaCOUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/665-6395 MEMORANDUM TO: Comprehensive Plans and Programs Subcommittee (CPPS) FROM: Susan K. Eddy, Senior Planner SKE RE: November Meeting and Agenda DATE: November 7, 2005 The Frederick County Comprehensive Plans and Programs Subcommittee (CPPS) will be meeting on Monday, November 14th, 2005 at 7:30 p.m. in the Board of Supervisor's Room of the County Administration Building, 107 North Kent Street, Winchester, Virginia. The CPPS will discuss the following agenda items: AGENDA 2006-2007 Capital Improvements Plan (CIP) 2. Revisions to the Frederick County Eastern Road Plan. 3. Other Please contact our department if you are unable to attend this meeting. SKE/bad Attachments Access is limited during the evening hours. Therefore, it will be necessary to enter the building through the back double doors of the Board of Supervisors Room, located in the rear of the new addition of the county building. I would encourage committee members and interested citizens to park in the County parking lot located in the rear of the building and follow the sidewalk to the back double doors of the Board Room. 107 North Dent Street, Suite 202 • Winchester, Virginia 22601-5000 ITEM #1 2006-2007 Capital Improvements Plan (CIP) The Comprehensive Plans and Programs Subcommittee (CPPS) will be reviewing and discussing the 2006-2007 Capital Improvements Plan (CIP). New capital project requests or modifications to previously endorsed requests have been prepared by the various county agencies and departments. Representatives from the various agencies and departments will be attending the meeting to discuss their requests with the CPPS. The role of the CPPS in this meeting will be to review the project requests in the context of the current Comprehensive Policy Plan to ensure that the requests are consistent with the adopted Plan. For your convenience, the existing Community Facility and Services and Parks and Recreation sections of the Comprehensive Policy Plan have been attached. Attached to this memo is a short summary of this year's CIP and table outlining new and modified proj ect requests. Also attached for your reference are the 2006-2007 CIP draft spreadsheets detailing expenditure estimates and a summary report outlining both new project and project modification requests. Also included with this agenda item are copies of the Individual Project Description and Justification forms that have been submitted by the Fredrick County Department of Public Works, Parks and Recreation Department, Handley Regional Library, Frederick County School Board, Clark-Fauquier- Frederick-Winchester Community Center Corrections Center, Frederick County Fire and Rescue, and the Winchester Regional Airport. Staff has prepared maps of the planned public facility locations. Only those facilities for which there is a specific or generalized location are mapped. The map element, if endorsed by the CPPS and ultimately adopted by the Board of Supervisors, would satisfy the Code of Virginia requirement for the 15.2-2232 Review. In essence, the code states that no public facility shall be constructed unless said facility is a "feature shown" within the comprehensive plan. Of course, proposed facilities that are not mapped would not satisfy the code requirement. Please contact me if you have any questions regarding this information. SUMMARY OF THE PROPOSED 2006-2007- CAPITAL IMPROVEMENTS • The proposed CIP consists of 45 capital projects, an increase over the 43 projects included in the previous CIP. • Of the 36 capital projects that were modified from the 2005-2006 CIP, seven of those projects have changed in priority, in particular, five projects from the public schools have changed in priority. • The proposed CIP includes nine (9) new capital projects, which are as follows: • Seven () new projects from the County public schools: o New Elementary School #12 has been brought forth to deal with residential growth in this area. o Land acquisition for eleven facilities to deal with continued growth in Frederick County o Renovations to the Robinson Educational Center and NREP due to old age, as well as growth. The school administration building previously had submitted similar project proposals, but has since been removed from the CIP. o Frederick County Middle School Renovation includes additional classrooms and upgrades to the heating, electrical, and plumbing systems for more efficient use in years to come. o Indian Hollow Elementary School Renovation will help provide additional classrooms, upgrades to mechanical and waste water treatment plant systems, replacement of windows, and repaving asphalt areas. o New Elementary School #13 is needed to provide for the continuous residential growth in Frederick County. o New Elementary School #14 will be used to relieve current over- crowding. • Two (2) new projects from County Administration: o Public Works: The Gore Refuse Site Expansion will provide a more cost efficient means of trash storage. o Fire & Rescue: Relocation of the Clearbrook Fire Station to better fill the needs of the community and upgrade equipment to better serve the growth in the area. • All of the capital projects included with the previous CIP will be carried over to the proposed 2006-2007 CIP with the exception of, Elementary School #11, the Sherando Park playground, the Greenwood Road Convenience site expansion, the animal shelter, and the CFFW Community Corrections Center. Proposed 2006-2007 Capital Improvements Plan Comparison of New Project Requests and Modification Requests Frederick County Public Schools Project Type of 2005-2006 2006-2007 Difference Request Local Local ($) Expenditure Expenditure Request ($) Request ($) New Gainesboro Modification 17,600,000 17,750,000 150,000 Elementary School Transportation Modification 12,500,000 26,600,000 14,100, 000 Facility New Elementary New N/A 20,451,700 School #12 Robert E. Aylor Modification N/A 18,000,000 Middle School Renovation Land Acquisition New N/A 12,600,000 for Eleven Facilities Robinson Ed. New N/A 15,800,000 Center/ NREP Replacement New Fourth High Modification N/A 55,000,000 School James Wood High Modification N/A 18,000,000 School Renovation Frederick County New N/A 18,000,000 Middle School Renovation Apple Pie Modification N/A 5,000,000 Ridge/Bass Hoover Elementary School Renovations Indian Hollow New N/A 3,000,000 Elementary School Renovation New Fifth Middle Modification N/A 26,000,000 School New Elementary New N/A 20,451,700 School #13 New Elementary New N/A 20,451,700 School #14 Total 30,100,000 277,105,100 247, 005,100 Frederick County Parks and Recreation Project Type Of 2005-2006 2006-2007 Difference Western Frederick Request Local Local ($) County Expenditure Expenditure Maintenance Request ($) Request (S) 336,960 Indoor Pool Modification 9,000,000 13,500,000 4,500,000 Water Slide/Spray Modification 1,000,000 1,114,560 114,560 Ground Clearbrook Open Play Areas- Modification 386,591 444,990 and Sherando Clearbrook Park Park Land in Modification 2,302,737 4,000,000 1,697,263 Eastern Frederick Hockey Park- Countv Sherando Park Park Land in Modification 1,409,549 3,000,000 1,590,451 Western Frederick County Maintenance Modification 205,725 336,960 131,235 Compound- Sherando Park Open Play Areas- Modification 386,591 444,990 58,399 Clearbrook Park Skateboard/In-Line Modification 490,752 454,594 -36,158 Hockey Park- Sherando Park Lake, Trails, and Modification 858,001 1,054,199 196,198 Parking with 2 -MP Fields Softball Complex- Modification 514,922 593,674 78,752 Sherando Park Baseball Complex Modification 1,056,741 1,177,802 121,061 Renovations- Sherando Park Soccer Complex- Modification 1,178,435 1,790,665 612,230 Sherando Park Tennis/Basketball Modification 403,887 449,772 45,885 Complex- Sherando Park Picnic Areas- Modification 649,882 697,280 47,398 Sherando Park Shelter/Stage- Modification 401,254 443,412 42,158 Clearbrook Park Access Road with Modification 829,781 1,075,304 245,515 Parking and Trails- Sherando Park Field House Modification 7,040,000 7,840,800 800,800 Total 27, 728, 257 37, 974, 012 10, 245, 739 County Administration Project Type of 2005-2006 2006-2007 Difference Request Local Local ($) Expenditure Expenditure Request ($) Request $) Public Safety Modification 13,000,000 13,000,000 0 Center Fire & Rescue Modification N/A 3,100,000 N/A Station #22 Round Hill Fire Modification N/A N/A 0 Station Relocation Gainesboro Modification 220,000 250,000 30,000 Convenience Site Relocation Modification 7,000 7,000 0 Gore Refuse Site New N/A 200,000 N/A Expansion Modification 210,000 210,000 0 Clearbrook Fire New N/A 1,530,000 N/A Station- Relocation 600 355, 600 -10, 000 Winchester Regional Airport Project Type of 2005-2006 2006-2007 Difference Request Local Local ($) Expenditure Expenditure Request ($) Request ($) Land Acquisition- Modification 17,300 17,300 0 Parcels 31, 46, & 53 Terminal Building Modification 110,000 100,000 -10,000 Renovation Land Acquisition- Modification 17,300 17,300 0 Parcels 47, 47A, & 48 Upgrade Airfield Modification 4,000 4,000 0 Lights Land Acquisition- Modification 7,000 7,000 0 Parcels 50, 51, & 52 Airfield Maintenance Modification 210,000 210,000 0 Building Total365, 600 355, 600 -10, 000 Handley Regional Library Project Type of 2005-2006 Local 2006-2007 Difference Request Expenditure Local ($) Request ($) Expenditure Request ($) Request ($) Bowman Library- Modification 228,468 228,468 0 Parking Lot & Sidewalk Extension 13,200, 000 N/A Library facility in Modification 1,053,000 1,053,000 0 Northwestern Frederick County. Total 1,281,468 1,281,468 0 Clarke-Fauquier-Frederick-Winchester Community Corrections Center (CCC) Project Type of 2005-2006 2006-2007 Difference Request Local Local ($) Expenditure Expenditure Request ($) Request ($) Secure Detention Modification N/A 13,200,000 N/A Expansion Total 13,200, 000 N/A Department ,�� COUNTY CONTRIBUTION PER FISCAL YEAR Priority County Contributions Notes Interest From Any Debt Service Protects 2006-07 2007-08 2008-04 2009-10 2010-2011 TOTAL COUNTY Total Project 1(PS) Replacement GainesboroElem.School 13,775,000 2,190,000 COSTS Costs 2(PS) Transportation Facility/Central Admin, 12,000,000 11,575,000 17,750,000 N/A 17,750,000 $17,750,000 3(PS) Elementary School 412 1,675,000 13,901,700 4,875,000 26,600,000 N/A* 26,600,000 $26,600,000 4(PS) R.E. Aylor Middle School Renovations 2,500,000 13,275,000 2,225,000 20,451,700 N/A* 20,451,700 $20,451,700 5(PS) Land Acquistion for Eleven Facilities 1,350,000 3,600,000 675,000 1,350,000 5,625,000 18,600,000 12,600,000 N/A* 18,600,000 $18,600,000 6(PS) Robinson Ed. Center/NREP Renovation 500,000 8,300,000 4,000,000 3,000,000 15,800,000 N/A* 12,600,000 $12,600,000 7(PS) Fourth High School 3,750,000 5,000,000 15,000,000 20,000,000 55,000,000 G N/A* N/A* 15,800,000 $15,800,000 8(PS) James Wood High School Renovation 1,000,000 1,000,000 13,500,000 18,000,000 G N/A* 55,000,000 $55,000,000 9(PS) Frederick Middle SchooLRenovation 500,000 6,000,000 9,500,000 18,000,000 G N/A* 18,000,000 $18,000,000 10(PS) Apple Pie Ridge/Bass Hoover Renovation 500,000 3,500,000 1,000,000 5,000,000 18,000,000 $$5,000,000 11 (PS) Indian Hollow Elementary Renovation N/A* 5,000,000 $5,000,000 12(PS) Fifth Middle School 3,150,000 230,000 17,500,000 1,500,000 3,000,000 3,000,000 26,000,000 G N/A* 3,000,000 $3,000,0002,350,000 13(PS) Elementary School 913 1,575,000 1.00,000 13,901,700 4,875,000 20,451,700 N/A* N/A* 26,000,000 $26,000,000 14 PS Element School 914 1,575,000 100,000 13,901,700 20,451,700 G N/A* 20,451,700 $20,451,700 1(PR) Indoor Swimming Pool 13,500,000 20,451,700 $20,451,700 2(PR) Water Slide/Spray Ground (CB, SP) 1,114,560 13,500,000 0 13,500,000 $13,500,000 3 (PR) Park Land Eastern County 4,000,000 1,114,560 0 1,114,560 $1,114,560 4 (PR) Park Land Western County 3,000,000 4,000,000 0 4,000,000 $4,000,000 5 (PR) Maintenance Compound - SP 336,960 3,000,000 0 3,000,000 $3,000,000 6 (PR) Open Play Areas - CB 444,990 336,960 0 336,960 $336,960 7 (PR) Skateboard Park - SP 454,594 444,990 0 444,990 $444,990 8(PR) Lake/Trails/Parking/MPFields -SP 1,054,199 454,594 0 454,594 $454,594 9 (PR) Softball Complex - SP 593,674 1,054,199 0 1,054,199 $1,OS4,194 10 (PR) Baseball Complex Renovation -SP 1,177,802 593,674 0 593,674 $593 ,674 11 (PR) Soccer Complex 1,790,665 1,177,802 0 1,177,802 $$593,802 12 (PR) Tennis BasketballllC Complex - CP 449,772 1,790,665 0 1,790,665 $1,790,665 13 (PR) Picnic Areas - SP 449,772 0 449,772 SL49,772 14 (PR) Shelter/Stage 697,280 697,280 0 697,280 $697,280 15 (PR) Access Road with it h Parking& Trails - SP 443,412 443,412 0 443,412 $443,412 16 PR Field House 1,075,304 1,075,304 0 1,075,304 $1,075,304 1 (CA) Public Safety Center 7,840,800 7,840,800 0 7,840;800 $7,840,800 2 (CA) Annex/Fire & Rescue Station 422 400,000 1,100,000 N/A - PPEA 1,600,000 N/A - PPEA N/A - PPEA 13,000,000 N/A - PPEA 13,000,000 $13,000,000 3 (CA) Relocation of Roundhill Fire & Rescue 3,100,000 C 0 3,100,000 $3,100,000 4(CA) Gainesboro Citizens Convenience Site 20,000 230;000 N/A* D N/A * N/A* N/A* 5(CA) Gore Citizens Convenience Site 20,000 180,000 250,000 0 250,000 $250,000 6 CA Clearbrook Fire Station Relocation 1,530,000 200,000 0 200,000 $200,000 $200,000 1(RA) Land Acquistion - Parcels 31, 46, 53 14,000 3,300 1,530,000 0 1,530,000 $ $865,000 2 (RA) Terminal Building Renovation 100,000 17,300 A,B 0 17,300 3 (RA) Land Acquisition - Parcels 47, 47A, 48 13,000 4,300 100,000 A 0 100,000 $500,000 4 (RA) Upgrade Airfield Lights 1,000 3,000 17,300 A 0 17,300 $865,000 5 (RA) Land Acquisition - Parcels 50, 51, 52 7,,00 4,000 A, B 0 4,000 $200,000 6 RA Airfield Maintenance Building 210,000 7,000 A 0. $350,000 1 (HL) Bowman-Parking Lot/Sidewalk.ExteMion 228,468 210,000 A 0 10000 210,000 $300,00 2 HL New Library 48,000 1,005,000 228,468 1,053,000 E 0 228,468 $228,468 Secure Detention Expansion N/A** N/A** N/A** N/A** N/A** N/A** F 0 N/A ** 1,053,000 $1,053,000 TOTALS $49796028 $61 843 043 $47,808,613 1 $561/75,996 $78 867 500 1 $334,796,180 $0 N/A ** $334,796,180 $13,200,000 $350,720,580 A = Partial funding from Virginia Department of Aviation (VDOA) grants_ .. _ �„��i __._..-.. ......-- -....- „ uepanment Priority Abbreviations: = Partial funding from Federal Aviation Administration (FAA) grants G = Funding goes beyond displayed five (5) years PS = Public Schools C = Partial funding from Virginia Department of Aviation DOA rants CA =County Administration N ) 9 N/A =Not available PR = Parks and Recreation RA = Regional Airport D =Project costs not identified at time of printing N/A' =Project scope not determined CB =Clearbrook Park E = Partial funding from private donations. HL = Handley Library N/A'* = Funding source not determined; debt service uncertain SP = Sherando Park RJ = Regional Jail 2006-2007 Capital Improvements Specific or Approximate Locations 4M Parks and Recreation 1 Sherand0 Park 2 Clearbrook Park 3 Future Eastern Parkland 4 Future Western Parkland County Administration 4 Gainesboro Convenience Site Relocation 5Gore Convenience Site Expansion 6 Clearbrook Fire Station Relocation Airport 4M Library 1 Bowman Library- Parking Lot and Sidewalk Additiol 2 Northern Frederick County Library Branch Jail System 1 Secure Detention Expansion Parcels Primary Roads Secondary Roads DRAFT 2006 - 2007 Frederick County Capital Improvements Plan Tertiary Roads ' 7 W*E Note: 0 12,500 25,000 50,000 75,000 Created by Frederick County Department of Feet Planning 6 Development 2 4 8 12 November 2005 r Map represents the Capital Improvment Requests mit subted by various county departments. Mlles DRAFT COMMUNITY FACILITIES AND SERVICES PARKS5 AN REC REA'T10 2003 COMPRE I=IE NSIV E. POLICY PLAN A N Community Facilities and Services As development continues in Frederick County, there is a need to carefully plan for the facilities and services that will be required. Planned development will effect the expenditures and facilities that will be needed. It will also effect the location and types of facilities that must be provided. There is a need to carefully monitor growth and to plan land use and facilities in a coordinated fashion. This can be accomplished through annual comprehensive planning and capital improvements planning. Schools The Frederick County Public School system is composed of ten elementary schools serving students in grades kindergarten through fifth grade; three middle schools serving grades six through eight; and, two high schools serving grades nine through twelve. The Northwest Regional Education Programs (NREP) is a regional program that provides special education services to students from Frederick and Clarke Counties and the City of Winchester. Approximately 57% of the students attending NREP who receive services are from Frederick County. The Dowell J. Howard Center provides vocational education services for high school students and adults, and is also the location of The Learning Center, a high school alternative program. In addition to the seventeen school facilities, twenty-two modular classrooms are used at six school sites to reduce overcrowding due to increased enrollment and to address the need for additional space due to changes in educational programs. During the past several decades, student enrollment in the school division has increased steadily. The most significant increase has occurred throughout the 1990's with school enrollment growing by 2,318 students. This increase, from 8,223 students in 1990 to 10,408 students in 1999, represents a 28% growth in student enrollment in the school division. Student enrollment in Frederick County has notably exceeded the state average, which was 11.3% for the same period of time. In order to meet the need for additional school space, a number of school construction and renovation projects have occurred throughout the 1990's. Despite the completion of these capital facilities projects, four of the ten elementary schools will exceed 90% of their capacity at the opening of school in the fall of 2000. These schools are Bass -Hoover (96%), Indian Hollow (91 %), Senseny Road (105%) and Stonewall (95%). Construction of classroom additions to Armel and Middletown Elementary Schools, which were completed in the fall of 1998, resulted in an increase in student capacity and a reduction in the percent of practical capacity utilized at each of these sites. Orchard View Elementary School in the Back Creek Magisterial District will open for students in the fall of 2000 and Robinson Elementary will be closed. As students matriculate from elementary school to the middle school and high school levels, the need to provide additional space for the increase in student population and to meet changing educational requirements will necessitate the development of new facilities and the renovation of existing Frederick County 8- 1 Comprehensive Plan Community Facilities and Services facilities. The Capital Improvements Plan reflects the need to address space requirements for middle and high school enrollment that has exceeded 90% of capacity in three of the five schools despite the use of nineteen modular classrooms at five different locations, and the increased use of the Dowell J Howard Center for secondary programs. A major renovation project at James Wood Middle School and the construction of a third county high school on Berryville Pike are two prof ects planned to address the increase in middle and high school student population. During the 1990's, the need to renovate or replace older facilities and provide facilities to accommodate residential growth in the county has resulted in significant allocations for capital facilities costs in the school division. The rate of residential growth continues to impact the school system, particularly in southern and eastern Frederick County as subdivisions are developed in the Urban Development Area (UDA). In addition, careful monitoring of residential growth outside of the UDA, which has accounted for approximately one-third of new residential building permits issued throughout the 1990's, is necessary to accurately predict enrollment trends. Along with growth in student enrollment, the school division is faced with the responsibility of providing instruction in order to prepare students to work and live in the 21s` century. The use of technology as a tool in nearly every facet of education has dramatically changed the way in which instructional services are provided to students. Required technology -related instruction at all levels will continue to necessitate increased expenditures for computer and computer-related hardware and software. Mandates from the federal and state governments, particularly in special education j services, will require localities to expend additional financial resources to meet educational requirements. The requirements associated with technology -related instruction and the provision of appropriate special education services to students will create the need for investment in future capital projects within the school division. Major efforts have been made by the school division and the Board of Supervisors to consolidate services in order to serve the residents of Frederick County more effectively and efficiently. Cooperative agreements have been developed relative to sharing school facilities for recreational use by a wide variety of community organizations; maintenance of school grounds provided by the Department of Parks and Recreation, resulting in a greater utilization of space; and maintenance of the County Office Complex provided by the school division's Building and Grounds Department. Frederick County 8 - 2 Comprehensive Plan Federick Conty Department of Planniug Frederick CountySchools and Development sty, VA ✓ December MOD 2000 School aear Community Facilities and Services Emergency Services The Frederick County Fire and Rescue Department was established in 1990 to provide support and guidance for the eleven volunteer fire and rescue companies that provide fire suppression and emergency medical services to the citizens of Frederick County. Each volunteer fire and rescue company provides fire suppression service, eight provide advanced life support emergency medical service, one provides basic life support emergency medical service, and two provide first responder level medical care. The County Fire and Rescue Companies are as follows: Company 11 - Stephens City Volunteer Fire and Rescue Company Company 12 - Middletown Volunteer Fire and Rescue Company Company 13 - Clearbrook Volunteer Fire and Rescue Company Company 14 - Gore Volunteer Fire and Rescue Company Company 15 - Round Hill Community Volunteer Fire and Rescue Company Company 16 - Gainesboro Volunteer Fire and Rescue Company Company 17 - Star Tannery Volunteer Fire and Rescue Company Company 18 - Greenwood Volunteer Fire and Rescue Company Company 19 - North Mountain Volunteer Fire and Rescue Company Company 20 - Reynolds Store Volunteer Fire and Rescue Company Company 21 - Millwood Station Volunteer Fire and Rescue Company Staffing of the fire and rescue stations is accomplished by volunteers from each of the communities and is supplemented by twenty-four career fire and rescue personnel employed by Frederick County. The volunteers provide 24 hour a day, seven day a week coverage in all of the fire and rescue stations. The career fire and rescue personnel staff nine of the eleven stations, ten hours a day, five days a week as well as providing 24 hour coverage on two advanced life support response vehicles. These vehicles operate from Company 16 and 18. The Fire and Rescue Department office is divided into three Divisions. These Divisions are Operations, Training, and Life Safety. The office is headed by a full-time Director who is employed by the County. The Director is responsible for supervision of all of the Departments operations. This includes the supervision of all career personnel, coordinating the service delivery of the volunteer companies, overseeing emergency services planning, providing volunteer and career training programs, disaster and hazardous material coordination, and managing Department resources. The office also has two full-time support staff personnel, an administrative assistant and a secretary. The Operations Division is divided into three Battalions, having a Fire/Rescue Lieutenant - Field Supervisor to oversee the career fire and rescue personnel. These Field Supervisors also work with the volunteer chiefs to coordinate daily activities within each company. The Life Safety Division is responsible for fire prevention, life safety education programs, fire code enforcement, and fire investigations. The Life Safety Division is headed by a full-time Fire/Rescue Frederick County 8 - 4 Comprehensive Plan Community Facilities and Services Battalion Chief - Fire Marshal employed by the County. The division is supported by a full-time Fire/Rescue Lieutenant - Assistant Fire Marshal. The Fire Marshals are on call on a 24-hour basis to provide fire investigations, technical support to volunteer companies, and to respond to emergencies. The Training Division is responsible for developing, providing and overseeing training programs for the volunteer and career fire and rescue personnel. This Division is headed by a full-time Fire/Rescue Battalion Chief - Training Officer employed by the County. The Training Officer is also the Career Development Advisor, responsible for overseeing the administration of the Career Development Program. Future challenges for the Fire and Rescue Department include meeting fire and rescue equipment needs, maintenance and expansion of current fire and rescue stations, developing water systems for fire protection, meeting training and certification requirements, increasing emergency medical service, improving radio communications, providing service for the regional airport as required by the Federal Aviation Authority regulations, and developing additional fire and rescue stations to meet future growth within the County. The County of Frederick, had a population of 34,150 in 1980 and an estimated population of 57,000 in 1999 according to the University of Virginia Center for Public Services. This was a population increase of 22,850 with no development of new fire and rescue stations. This growth has increased the response time for existing fire and rescue stations and will undoubtedly lead to the need for additional fire and rescue services. Planning for future fire station locations and equipment needs has been accomplished by developing a five-year strategic plan. This plan identifies future station sites and equipment needs based on projected service demands and response times. The plan encourages the dedication of sites for new fire and rescue stations within the identified areas during the rezoning process. A recent response study was conducted and concluded the need for five additional fire and rescue stations in the next five years. These stations are to cover the areas of Green Springs/White Hall Rt. 522 South/Rt. 277 East Middle Road/Cedar Creek Grade Apple Pie Ridge/Route 522 Route 7/Redbud Road The response study justifies the need for new fire and rescue stations. The study indicates that in many areas a ten minute total response time is not being met. Increased calls to each fire station create a situation where the 2nd due station has to cover additional areas while the V due station is still out. Non-residential areas such as retail, office, and industrial require increased fire protection because specialized equipment is necessary to insure safety for these land uses. Other land uses Frederick County 8 - 5 Comprehensive Plan Community Facilities and Services identified as target hazards continue to grow. These include land uses such as schools, nursing homes, daycare centers, and industrial facilities. These land uses have a higher risk of injury due to the specific demographics of persons utilizing these facilities. Existing road conditions; primarily those with gravel or dirt surfaces and horizontal and vertical curvatures, located outside of the county's Urban Development Area (UDA) create longer response times. The greatest factor contributing to the need for new fire and rescue stations is the rapid population growth and increases in dwelling units within and outside of the UDA. The development of new fire and rescue stations could provide an opportunity to extend satellite services provided by other county departments and agencies. Allocation of space could be created within new fire and rescue stations for community services provided by the Sheriff's Office, the Treasurer's Office, the Voter Registrar's Office, and the Commissioner of the Revenue's Office; as well as office space for members of the Board of Supervisors. Airport The Winchester Regional Airport is a 376 -acre, all weather, 24-hour general aviation airport with a 5,500 foot runway located southeast of Interstate 81, Exit 313A. The facility currently has 75 tie down spaces, two 12,000 square foot public clear span hangars, 52 T -hangars and three private corporate hangars. Based aircraft total 80, and range in size from single engine to large cabin class business aircraft. Services available include 24-hour U.S. Customs and Immigrations, 24-hour on call line service, automated weather observation system, computerized weather and flight planning equipment, full instrument landing system, and rental car service. The Winchester Regional Airport Authority was formed by the Virginia General Assembly on July 1, 1987. The Authority consists of representatives from the City of Winchester, Frederick, Clarke, Shenandoah, and Warren counties. Since its formation, the Winchester Regional Airport Authority has embarked on an extensive airport improvement program. Major capital improvements have been accomplished in order to comply with Federal safety and design standards. Completed construction projects include a 1,100 -foot runway extension, pavement resurfacing of the entire runway, relocation of the taxi way and the creation of safety areas at each end of the runway. New buildings constructed under this program include a modern general aviation terminal, a 12,000 square foot clear span hangar, a maintenance hanger with Fixed Base Operator offices, and 42 T -hangar units. Other completed projects include airfield lighting upgrade, installation of a 40,000 gallon above ground fuel storage facility, security fencing of the Airport perimeter, and the installation of a precision instrument approach that provides better all weather access to the Airport. Collaborating with Frederick County and the Virginia Department of Transportation, the Authority has also made improvements to primary access roads to the airport. Sewer and water service has also been established. To date, more than $14 million dollars has been invested in Airport capital Frederick County 8 - 6 Comprehensive Plan Comm unitv Facilities and Services improvements, equipment, and promotions through funding received from the Federal Aviation Administration, Virginia Department of Aviation and the local jurisdictions. Remaining capital projects include the relocation of Airport Road to remove a portion of the road that infringes on controlled airspace and land acquisition along Bufflick Road for noise abatement. Land to accommodate the road relocation project has been acquired by the Airport over the past year in order to provide the Virginia Department of Transportation a one hundred foot right of way. Through the support of the member jurisdictions, the Winchester Regional Airport will continue to evolve into a modern first class air transportation facility which will assist economic development endeavors in the attraction of new industrial and commercial businesses to the region. Handley Library Library service is provided to Frederick County through the Handley Regional Library, which also serves Clarke County and the City of Winchester. Currently, there are 21,107 active registered library card holders in Frederick County. During the 1998 fiscal year, Frederick County residents borrowed 208,988 items from the Handley Library, the Clarke County Library, and the Bookmobile. The regional system supports education, preschool through post -secondary, by providing assistance and research materials for projects and papers, and by being open nights, Saturdays, some Sundays, and during the summer when schools are closed. It is also an important resource for adults seeking to improve their skills and for introducing preschoolers to books and reading. The library also provides the business community and the public with information for their research needs as well as recreational reading. Bookmobile service to the residents of southern and western Frederick County was expanded in July 1996, as the result of an agreement between the library and Trinity Lutheran Church in Stephens City. This agreement has allowed the library to use the church parking lot on Wednesdays and Thursdays as a Bookmobile stop. In addition, Trinity has allowed the library to offer story hours for children in the church social hall. During fiscal year 1998, nearly 1,000 children and adults have attended the story hours. The regional library system continues to be below per capita state standards in the areas of books, square footage, seating, and periodical holdings; however, important steps have been taken to remedy this. The Frederick County Board of Supervisors hired Lukmire Partnership of Arlington, Virginia, to design a 35,000 square foot library for a site at the corner of Tasker Road and Lakeside Drive, just east of Stephens City. Construction of this new facility is anticipated to begin in the fall of 1999 and be open for public use in the fall of 2001. Other capital improvements are proceeding simultaneously, including a complete renovation of the historic Handley Library which involves roof repairs and replacement, and interior renovations. In addition, a volunteer -directed campaign to raise Frederick County 8 - 7 Comprehensive Plan. Community Facilities and Services three million dollars for books for the regional system, which began in November 1997, is more than one-half of the way towards its goal. County Offices In 1996, the County completed construction of a 68,000 square foot building adjacent to the Frederick County Administration Building. Funding for this new building was obtained through the issuance of a bond. The construction incorporated the existing 32,000 square foot Frederick County Administration Building, and provide a county government complex totaling 100,000 square feet. Most of the County's departments and agencies are now housed in this new county government complex in downtown Winchester. In 1998, the County modified the Capital Improvements Plan to provide for a Public Safety Facility for the Sheriff's Department and the Fire and Rescue Department; as well as for Annex Facilities that would situate satellite offices throughout the County for representatives of the Treasurer's Office, the Commissioner ofRevenue's Office, and the Sheriff s Department. The provision of these facilities is intended to improve emergency response time, enhance public safety, and provide more efficient service to County residents. The location of these facilities are envisioned to occur within areas of dense population, as well as along arterial and major collector road corridors. l Refuse Collection, Landfill, and Recycling Twelve refuse collection stations are located throughout Frederick County. Nine refuse collection stations consist of hydraulic compactors with separable roll -off containers and collection facilities for recyclables, and three sites consist of front-end dumpsters only. The County converts dumpster sites to compactor stations when warranted by tonnage levels. Consolidation of sites during the conversion process is also desirable, when practical. Based on research by the Government 12 Student Learning project and staff, the concept of curbside pickup in the densely populated areas of Frederick County that are currently served by public water and sewer was endorsed by a resolution of the Board of Supervisors in August, 1998. The Board may elect to offer curbside refuse and recycling collection anytime after August, 2003. The Frederick County Landfill is a regional facility that receives refuse from Frederick and Clarke Counties and the City of Winchester. The landfill is operated by Frederick County as an enterprise fund and the landfill operation is fee sustaining. The management and planning of landfill operations are solely the responsibility of Frederick County, with input from an oversight committee comprised of representatives from Frederick and Clarke counties and the City of Winchester. Closure of the older section of the landfill, which opened in 1976, was completed in 1994. A new 160 -acre tract of adjacent land, purchased in 1986, was opened for landfilling during 1993. Frederick County 8 - 8 Comprehensive Plan Community Facilities and Services Approximately 90 acres of this tract has been permitted for landfilling under the newly adopted Subtitle "D" Solid Waste Regulations. Both the closure of the old section and the construction of the new section have been carried out in accordance with new state regulations that require much more sophisticated environmental protection measures, including composite impermeable liners, a complete leachate collection system, leachate treatment facility, groundwater monitoring and gas monitoring. The current landfill was originally estimated to have adequate capacity for 25 years commencing in October of 1993. The development of a construction debris landfill should extend the life of the current sanitary landfill approximately eight years, resulting in a life of 33 years. A tract of land consisting of 109 wooded acres was purchased from Ryland Carper for the future development of a construction debris landfill. The permitting, design and construction of this new construction/debris landfill was completed in 1998. The County should reevaluate tonnage, revenue, and expenditure trends each year and set fees accordingly. The County should also continue to evaluate new technologies for waste reduction and recycling that would extend the life of the landfill. During the 1990's, the Countyplaced collection boxes for recyclable materials at each ofthe citizens' convenience areas located throughout the County. Through this effort, the County was able to meet the 1995 recycling mandate of 25 percent mandated by the Commonwealth of Virginia. Due to the rapid growth in the County, additional programs have been implemented to enable the County to maintain the 1995 recycling mandate of 25 percent. These programs include brush and yard waste mulching, composting, waste oil recycling, tire shredding, and household hazardous waste collections. New residential developments need to be provided with appropriate means of solid waste collection. Either private collection or new collection stations should be provided by developers. Sewer and Water Facilities The location of public sewer and water lines determines where urban development will occur. The Urban Development Area described by the Frederick County Comprehensive Plan is roughly the same as the service areas for public sewer and water. Because sewer and water facility location determines the location of urban development, great care is needed in planning where such facilities will be provided. The Frederick County Sanitation Authority has the responsibility for the treatment, transmission, and distribution of potable water and the collection and transmission of wastewater. Most of the sewer and water mains and laterals in the County are owned, operated, and maintained by the Sanitation Authority. Frederick County 8 - 9 Comprehensive Plan Communitv Facilities and Services Frederick County and the Sanitation Authority have executed a Facilities Planning Agreement which sets forth procedures for the planning of sewer and water mains in the County. The agreement includes provisions for adopting a water and sewer facilities plan as a part of the Comprehensive Plan, specifying the location of mains over eight inches in size, and includes provisions for review and update of the plan and for including sewer and water facilities projects in the Frederick County Capital Improvements Plan. The City of Winchester owns and maintains sewer and water lines in portions of the County adjacent to the City corporate limits. Such lines have been extended into the County following a previous agreement between the City and the County. The Frederick -Winchester Service Authorityhas the responsibility ofproviding wastewater treatment for the Sanitation Authority and the City of Winchester. The Service Authority currently owns the Opequon Water Reclamation Facility and the Parkins Mills Plant and contracts for their operation. The City operates the Opequon Facility and the Sanitation Authority operates Parkins Mills. Treatment of wastewater generated in the County is provided by two sewage treatment plants: the Opequon Water Reclamation Facility and the Parkins Mills Plant. The Opequon Plant serves the Abrams Creek drainage area and surrounding drainage areas east and north of Winchester, and provides sewage treatment for Winchester. The Parkins Mills plant serves the upper Opequon Creek, Wrights Run, and Stephens Run drainage areas. The Opequon Water Reclamation Facility has a hydraulic capacity of 8.4 millions gallons per day with a biological capacity of 18,000 pounds per day. The OQpequon Water Reclamation Facility Capacity Needs Evaluation Report projects this capacity will meet demands through 2008. The Parkins Mills Plant serves the upper Stephens Run, Wrights Run, and Opequon drainage areas. The rated capacity of this plant is 2.0 million gallons per day. The current average daily flow of this plant is about 1.1 million gallons per day. Frederick County 8-10 Comprehensive Plan AisFrederick County Department of Planning and Development. Winchester, VA November 2000 SEWER & WATER FACILITY PLAN uUmmunity Facilities and Services Frederick County 8- 12 Comprehensive Plan Community Facilities and Services Figure 17 Total New Water and Sewer Connections 1100 1000 900 800 700 N 0 600 U N C C 500 O U 400 300 200 100 0 91 92 93 94 95 96 97 98 99 100 Fiscal Year Frederick County 8- 13 Comprehensive Plan Community Facilities and Services Figure 18: Opequon Treatment Plant; Sewer Flows Versus Capacity 2 F] City FCSA Limit 91 92 93 94 95 96 97 98 99 100 Fiscal Year Certain portions of the Urban Development Area, such as the Apple Pie Ridge area, may not be intended to be sewer and water service areas. Rural Community Centers that are outside of the Urban Development Area may be provided with some form of service, depending on the policies established for each particular center. The intention is that additional extensions of sewer and water service will reflect the boundaries of the Urban Development Area. The extension of mains into areas not included in sewer and water service areas described by the facilities plan will require an amendment to the Comprehensive Plan. In this way, the County will maintain an orderly process of development. All sewer and water mains extended should be publicly owned mains. Frederick County 8-14 Comprehensive Plan Community Facilities and Services Figure 19: Parkins Mill Treatment Plant; Flow Versus Capacity 2 - Flow Limit 1.6 1.4 Fiscal Year Capital Improvements Plan The Capital Improvements Plan (C1P) is the community's plan for public facilities. It provides a list of projects planned for five years and is updated each year as projects are completed and new projects added. In general, projects on the Capital Improvements Plan are relatively expensive, fixed assets that require expenditures that do not recur annually and last for a relatively long time. Frederick County 8- 15 Comprehensive Plan Community Facilities and Services The first year in the Capital Improvements Plan should provide a capital budget for the upcoming fiscal year. The scheduling ofprojects needs to be coordinated with plans for development contained in the Comprehensive Plan. The Comprehensive Plan should be used as a tool to aid in determining priorities among projects, for estimating required funding, and for scheduling projects. The Capital Improvements Plan helps to guide development, to achieve the most efficient use of funds, and to maintain a stable financial program. The County's procedures for reviewing and adopting the CIP need to be improved. The CIP needs to have a direct link to available or projected funds. Projects need to be systematically reviewed against established standards in order to determine priorities. These standards need to be developed and reviewed on a regular basis. The County Finance Department should play an active role in the CTP development process. Facility Cost Impacts Rezoning requests should be evaluated to determine their potential impacts on community facilities. Costs to the County should be estimated in terms of what impact the development, which could result from the proposed rezoning, would have on facilities and infrastructure. These costs are estimated in terms of facility use per unit of development. The estimated facility use is determined through the use of established multipliers which use averages derived from existing development. These multipliers set out such factors as: expected numbers of vehicle trips, school children, gallons of sewer and water usage per dwelling unit, square footage of commercial use, or person. The demand on various facilities resulting from a proposed rezoning can then be estimated based on the projected number of units which could result. Actual cost estimates are then calculated using the costs of facilities listed in the Capital Improvements Plan. Initially, costs are estimated in terms of the actual costs of providing facilities to support the potential development. In 1991, an impact model was developed for Frederick County which has been utilized to project the fiscal impacts of rezonings on public schools, parks and recreation, and fire and rescue services for capital facilities costs. In 1998, a revised impact model was adopted by the Board of Supervisors. The revised model was designed to incorporate additional modules to project the fiscal impacts of rezonings on the sheriff's office, the public library system, county administration facilities, and miscellaneous public facilities, as well as the public agencies that were accounted for in the previous impact model. The impact model projects the gross potential costs of the facilities that would be needed to support a new development using the basic formula described above. Credit is given for the projected revenues that would be generated by the development. Potential revenues are subtracted from the projected gross costs resulting in an actual projected net fiscal impact of the development on the County. The impact model will need to be updated annually by county staff to -ensure that the information used in the model is accurate. In general, negative fiscal impacts for capital facilities costs are realized from residential rezonings, while positive fiscal impacts are realized from commercial and industrial rezonings. Frederick County 8-16 Comprehensive Plan Communitv Facilities and Services No rezoning should be approved unless the net impacts on community facilities are positive, or if the negative impacts can be adequately addressed through proffers or some other means. A request for rezoning may be turned down even though all fiscal impacts appear to be addressed. If there are other impacts which are not addressed or if the request does not conform to this plan, a similar method should be developed for determining the impacts of proposed developments on transportation systems and other public facilities. Issues: ► There is a need to carefully monitor school enrollments and to plan for school capacity to deal with overcrowding, replacement of outdated facilities, and population growth in the County. ► There is a need to continue supportingfire and rescue squads and to develop policies to deal with growing emergency service demands. ► House number efforts should continue in association with improved emergency telephone systems. ► The County should support improvements at the Winchester Regional Airport as a part of the overall economic development efforts. ► The County should continue to monitor refuse collection sites and should make improvements or add sites as needed. ► The County should continue to monitor landfill recycling efforts should be supported. ► The County should maintain a process of careful Capital Improvements Planning coordinated with Comprehensive Planning. • Frederick County and the Frederick County Sanitation Authority need to continue coordinated planning of sewer and water facilities following the procedures described by the Facilities Planning Agreement. ► Additional information is needed on the impacts of new development on community facilities. ► Frederick County and the City of Winchester need to maintain coordinated planning of sewer and water facilities in the County through the Sewer Agreements. Frederick County 8- 17 Comprehensive Pian Community Facilities and Services P. Together with the County and the City, the Frederick -Winchester Service Authority should carefully plan needed sewage treatment capacity based on trends in usage. The Service Authority needs to develop a capital improvements plan that is coordinated with City and County plans. • Water and sewer service should be provided to service areas in the urban development areas through an orderly process following the Facilities Planning Agreement and using the Capital Improvements Plan. Community Facility and Service Policy Strate 1 - Plan sufficient school capacity to meet projected enrollment trends and to meet appropriate facility standards. Strate 2 -Recognize the changes occurring in demand for emergency services and develop policies for dealing with those changes. Strate3 - Support expansion plans for the Winchester Regional. Airport. Strate Qy 4 - Monitor refuse collection and landfill use and continue to develop plans for future improvements. Pursue recycling methods and other methods to extend the life of the landfill. Strate 5 - Carefully monitor sewer and water use and develop up-to-date improvement plans for sewer and water facilities. Strate6 - Develop and maintain formal and regular relationships and procedures between the County and providers of facilities and services, including the Sanitation Authority, the City of Winchester, the Service Authority, the School Board, the Regional Airport Authority, and the Fire and Rescue Squads. C',_-_ 17TT__ +I,- +.,1 T,v,., �V1mnto plan t^ 9-.'.ref'»lly plan rommi�ity, facilitieg and to J LI dLG�' Y ! - r V JG L"%-,. %.aF' Lai I-L"Fl V V11V *,"' 1 coordinate facilities planning with land use plans. Frederick County 8- IS Comprehensive Flan Community Facilities and Services StrateQy 8 - Require that the impacts of new developments on facilities be described and require that the impacts are addressed through proffers and other means. Implementation Methods: 1. Carefully monitor school enrollments and plan facilities according to enrollment and development trends. Update the Capital Improvements Plan each year based on trends. 2. Continue to support fire and rescue squads and plan to increase support according to development in the various service areas.. 3. Develop plans for new emergency service facilities. 4. Continue to convert dumpster sites to compactor sites. Monitor usage. Plan for new refuse collection sites according to use and planned development patterns. 5. Monitor landfill use. Plan for additional landfill capacity on adjacent land. Explore alternative disposal methods. 6. Continue to plan for sewer and water main extensions according to the agreements established with the Sanitation Authority and the City of Winchester. Include planned extensions in the Capital Improvements Plan. 7. Provide for recycling at collection stations and support a regional materials recovery center. 8. Carefully monitor sewer and water use and develop a capital improvements plan to accommodate projected development. 9. Consider means to provide water service to Brucetown. 10. Consider alternative sources of water supply. 11. Minor extensions of sewer and water service to business and industrial uses beyond the service area may be considered if such uses conform with other County standards. Such extensions should be reviewed by the Planning Commission for conformance with the Plan. 12. Require that information be provided with rezoning proposals or, the impacts of development on community facilities. Impacts should be addressed through proffers and other means. No rezoning should be approved unless all impacts are adequately addressed. Frederick County 8- 19 Comprehensive Plan Community Facilities and Services 13. Any sewer or water main six inches in diameter or larger, extended or existing within an area proposed for inclusion within the County's Sewer and Water Service Area or Urban Development Area, should be dedicated as a public line to be owned and maintained by the County Sanitation Authority or City of Winchester when appropriate. 14. Plans for new facilities should be based on demand projections as derived from population projections in the Comprehensive Plan. Frederick County 8-20 Comprehensive Plan r ®a Frederick County Department of Planning e �n and Developmentwmchester,VA Community Facilt1es and Services December 2009 Parks and Recreation The purpose of this chapter is to outline the County's recreational policies and to identify implementation methods for accomplishing recreational facilities, programs, studies, and plans. It is not meant to be a detailed recreation plan, but rather it is a part of the County's continuing planning process and a guide to decision making. Facilities The County currently owns and operates two regional parks. Clearbrook Park, located five miles north of Winchester on Route 11, consists of approximately 55 acres and Sherando Park, located two miles east of Stephens City on Route 277, consists of approximately 330 acres. Both regional parks currently serve the County's population with both active and passive recreational programs and facilities. In addition to these regional parks, five neighborhood parks have been developed which serve a more specific group with more limited facilities than those in the regional parks. The neighborhood parks are located at: Reynolds Store Fire Company and Gainesboro Fire Company in the Gainesboro District, and Round Hill Fire Company in the Back Creek District, and at Frederick Heights subdivision in the Shawnee District. These neighborhood parks consist primarily of playground equipment for young children. The Parks and Recreation Department also maintains two tennis courts at Senseny Road Elementary School for community use. In 1987, master development plans were adopted for both Clearbrook and Sherando Parks. These master plans establish development goals for each park, identify unmet recreational needs, provide unified facility plans, and propose a development program for each park. The master plan for both Clearbrook and Sherando Parks reflect the recommendations of the County residents and national standards as outlined in the Virginia Outdoor Plan. These plans emphasize the development of a swimming pool complex and additional sports, picnic, maintenance, and other support facilities. Funding has been provided to update the Sherando Park Master Plan. The revisions are scheduled to be completed by June 30, 2001. Since the adoption of the master plans, the County has completed the construction of two outdoor swimming pool complexes, four soccer fields, a maintenance building, one shelter, two playground areas, two sand volleyball courts, and two fields of a four field softball complex. The County has also purchased an area to house the maintenance operation for Clearbrook Park. Additional recreational facilities currently provided are athletic fields, playground, and picnic areas with a variety of recreational opportunities such as horseshoes, fishing, paddleboats, and volleyball, open space areas and support facilities. Clearbrook Park, Sherando Park, neighborhood parks and all public school athletic fields and grounds are maintained by the Parks Division of the County Parks and Recreation Department. As a result of a joint operating agreement with the County School Board, the Parks and Recreation Department has use of the following Sherando High School facilities when they are not in use by the high school: lighted football field and track, baseball field, eight outdoor lighted tennis Frederick County 9- 1 Comprehensive Plan Parks and Recreation courts, and four outdoor lighted basketball courts. The Parks and Recreation Department's Community Center, which was built adjoined to Sherando High School, opened in September of 1993 and contains two racquetball courts, a weight room and a multipurpose room. The Residential Performance Zoning regulations require that open space be provided in most types of suburban development. In addition, recreational facilities are required in any residential development which contains lot sizes of less than 5,000 square feet. It is required that such open space and facilities be dedicated to homeowners associations. There is a need to examine recreational and park needs in suburban and urban areas, specifically, the development of a bikeway and trail system. One need that has been identified is the development of a bikeway and trail system. To date, the County has constructed a 2.40 mile bicycle facility to serve several residential areas east of Stephens City. The County has also committed to the construction of a.60 (3,200 Lf.) bicycle facility to serve residential areas on the northern perimeter of Sherando Park. These bicycle facilities will link those residential areas with Sherando Park and Sherando High School. Additional trails would provide residents the ability to travel safely from their homes to schools, stores, work or recreational areas without having to share the overcrowded arterial and collector roads with automobiles. Also, there is a need to examine Residential Performance Zoning regulations to determine whether the recreational needs of the single family homeowner are being met. Programs The Recreation Division of the Frederick County Parks and Recreation Department was created to provide a comprehensive and accessible program of recreational services and activities for the residents of Frederick County. A diverse range of recreational and enrichment programs are provided for all age groups. This broad base of activities includes, but is not limited to, instructional classes, outdoor recreation programs, sports and athletics, health and fitness programs, cultural and special events, and trips and excursions. Programming responsibilities are assigned within the Division's four interest sections --Community Recreation (Children's Programs, Cultural Arts, etc.); Senior Citizens; Aquatics; and Sports and Athletics. Staff members work together to identify, develop and implement those activities which most closely meet the interests and desires of the community. The Division typically implements programs along age group stratifications such as preschool, youth, teen, adult and senior adult; however, a shift in programming emphasis has resulted in the development of broader activities to appeal to family units. In particular, holiday events are planned to include parent and child in a variety of leisure opportunities. The majority of recreation programs offered by the Parks and Recreation Department are held within the 15 public schools in Frederick County and the Parks and Recreation Department's Community Center. Consequently, a wide variety of recreation offerings has maximized use of the county school Frederick County 9 - 2 Comprehensive Plan i Parks and Recreation buildings. The joint efforts of the Frederick County School Board and the Parks and Recreation Commission/Department resulted in the inclusion of recreational facilities within Sherando High School. The Department's Community Center, which was built adjoined to Sherando High School, opened in September of 1993. On August 28, 2000, the Orchard View Community Center is scheduled to open. This facility, which is attached to the Orchard View Elementary School, will have a full-size gymnasium that will be programmed during non -school hours. Citizen Participation Citizen participation and input regarding recreation programs and park development have been actively solicited since the creation of the department in 1971. The Parks and Recreation Commission consists of seven members, including one from each magisterial district, appointed by the Board of Supervisors for four year terms and two at -large members recommended by the Commission and appointed by the Board to serve staggered four year terms. Future Demands To help plan for the future leisure service demands, the Parks and Recreation Department has completed master plans for the County's two regional parks, studied national standards provided in the Virginia Outdoor Plan, and gathered survey information relating to the provision of leisure services. Through the utilization of these and any other available resources, it is projected that the following areas must be addressed if we are to meet future leisure demands: 1. Land acquisition to meet minimum standards 2. Facility development to meet minimum standards 3. Development of recreational centers 4. Increased programming for special populations 5. Increased programming for teens 6. Great diversity of programming so as to better meet the needs of the entire community. 7. Establishment of trail systems and bikeways Frederick County 9 - 3 Comprehensive Plan Parks and Recreation ` Area Standards As suggested by the 1996 Virginia Outdoor Plan, the area standard for local recreation and park sites in Virginia is ten acres of developed park land per thousand population. Frederick County has a population of approximately 57,000 (based on 1999 provisional estimate data provided by the University of Virginia Center for Public Services) and currently maintains 404 acres of park land. Of the 404 acres assigned to the parks, about 240 acres would be considered developed. By the year 2001, using the population projections provided by the Frederick County Planning Department, an additional 166 acres will be needed and by the year 2010, another 130 will be required if we are to keep pace with the recommended standard of the ten acres per thousand. It is estimated by the Department of Parks and Recreation that by the year 2020, Frederick County will need approximately 833 acres of developed park land to adequately serve the County's population. In meeting the ten -acre per thousand minimum standard for park land, it is recommended by the Virginia Outdoor Plan to consider the following types of park development: Frederick County 9 - 4 Comprehensive Plan Parks and Recreation NEIGHBORHOOD PARK Size: 5 - 20 acres Plan at 3 acres/1000 Population Service Area: Approximately 5 - 15 minutes walking distance or'/2 mile to 1 1/2 miles Administrative Responsibility: Local Unit of Government or Homeowners Association Purpose: The primary function of the neighborhood park is to provide limited types of recreation for the entire family within easy walking distance. Facilities should be provided for all age groups. Character: Intensive use and easy access are characteristics of this classification. Ideally, the site would have areas that are level to gently rolling to accommodate the intensive use facilities, with shaded areas for passive recreation. Location: If possible, the neighborhood park should be located near a school and /or the neighborhood center and away from railroads, major streets and other hazardous barriers. Potential Facilities: *playground *badminton courts *ball diamond *swimming pool *basketball courts *volleyball courts *tennis courts *fishing pond *shuffleboard courts *recreation center *picnic facilities *walking trails *horseshoe courts *bikeway *football/soccer field Play fields usually serve a dual purpose is this type of facility. They provide an area for sports and running games and also serve as open space. Intensive use areas (the playground area and hard surfaced courts) are buffered from other activities by passive natural areas and pedestrian access corridors. Programmed activities such as organized athletics are often suitable in neighborhood parks. Although limited parking facilities are provided, site design should encourage pedestrian access to the greatest extent possible. Rural communities may want to consider deleting neighborhood parks and include their function in larger community parks which could better serve the needs of widely dispersed local population. From an economic standpoint, it would be more beneficial for a rural locality to have a few strategically located, well designed, larger facilities than to invest in several small sites and not have the funds to properly develop and maintain them. Frederick County 9 - 5 Comprehensive Plan Parks and Recreation COMMUNITY PARK Size: 20 -50 acres Plan at 3 acres/ 1000 Population Service Area: Approximately 15 minutes driving time Administrative Responsibility: Local Unit of Government Purpose: Community parks should primarily support active recreation activities and be capable of withstanding intensive use, while still containing a fair amount of open space. Character: The site usually varies from relatively flat open space to moderately sloping wooded area. Such a park should be adaptable to a wide variety of recreational activities. Access is gained by auto, bicycles, or walking. Location: Locate when possible near the center of the community with good access and serviced by a public transportation system. Potential Facilities: * playgrounds * tennis courts * horseshoe courts * ball diamonds * volleyball courts * beachlswimming area * picnic facilities * swimming pool * shuffleboard courts * basketball courts * parking area * footballlsoccer fields * trails: walking, hiking, biking, fitness * natural area * fishing lake or stream access * recreation center A multitude of activities must be provided by this intensive -use recreational facility. The recreation center is often the focal point of the park. Organized activities are grouped in the surrounding area. Their location is dependent upon the natural terrain, need for control, and vehicular access. Any existing natural qualities, such as topography, water features, and trees, should be preserved and utilized as natural buffers between activity areas as well as to protect the recreation environment from surrounding, incompatible influences. These natural elements should also be used to provide a space for more passive forms of recreation such as nature walks, picnicking, and fishing. In the rural setting, this park category may take the place of the neighborhood park. It can better serve a widely dispersed population than two or three smaller sites. Community parks, along with neighborhood parks (where applicable), usually meet most of the close -to -home recreation needs of most localities. Frederick County 9 - 6 Comprehensive. Plan Parks and Recreation REGIONAL PARK Size: 50- 150 acres Plan at 4 acres/1000 Population Service Area: 15 - 25 minutes driving time 5 - 15 miles service radius Administrative Responsibility: Local Unit of Government Purpose: Regional Parks should serve the recreational needs of large portions of the local population. They should contain a wide variety of intensively developed areas for day use recreation while providing ample open space with generous buffers between activity areas. Character: The site could vary from flat open space to moderately to steeply sloping topography. It should be capable of supporting a wide variety of activities with ample buffer and natural areas. Sitting on a stream or lake is highly desirable. The regional park needs to be accessible by auto as well as pedestrians and bicycles. Location: When possible, locate the regional park so that it is near the center of the service area. It should be on or near an arterial or major collector road providing good access to the facility. In urban or suburban situations, easy access to mass transit is highly desirable. The site should also be accessible by pedestrians and bicyclists. Potential Facilities: *playgrounds *natural area *ball diamonds *parking areas *recreation centers *swimming pool and/or beach with swimming area *trails *tennis courts * fishing/boating *basketball courts *shuffleboard courts *golf *picnic facilities *lake or stream *horseshoe courts *volleyball courts *football/soccer fields Frederick County 9 - 7 Comprehensive Plan Parks and Recreation RECREATION CENTERS The recreation center may be found at the neighborhood, community, district, and regional parks. At the neighborhood level, the recreation center is usually constructed between 15, 000 and 20,000 square feet. It generally will include multipurpose rooms, an arts and crafts area, game room, kitchen, lounge and lobby, restrooms, and office. If a gymnasium is not available in a neighborhood school, the recreation center may also include a gymnasium and locker room facilities. The recreation center in a large park that serves a community will be considerably larger, from 50,000 -100,000 square feet, and will include several multipurpose rooms, gymnasium, indoor pool, shower and locker rooms, game room, arts and crafts area, an auditorium or areas for performing arts, class or club rooms, kitchen, large meeting room, restrooms, office, lounge or lobby, and some specialized areas such as a ceramics workshop or weight room. An important consideration in all recreation facilities is to provide adequate storage space. Frederick County 9 - 8 Comprehensive Plan Parks and Recreation EXISTING REGIONAL PARK FACILITIES Currently, the Parks and Recreation Department is responsible for operating and maintaining the following facilities: Clearbrook Park Clearbrook Park, covering 55 acres, is located approximately five miles north of Winchester, on Route 11. Clearbrook Park is open 365 days a year, from 8:00 a.m. to dark and includes: *four lighted athletic fields with concessions *paddleboats *playgrounds *outdoor swimming pool *maintenance complex Sherando Park *three -acre lake *fishing *horseshoe pits *volleyball *vintage red caboose *tables & grills *passive areas *picnic shelter Sherando Park is located on Route 277, approximately two miles east of I-81, near Stephens City. The park consists of 330 acres, approximately one-half of which is undeveloped. Sherando Park is open 365 days a year, from 8:00 a.m. to dark and includes: *five -acre lake *model radio airplane facility *seven lighted athletic fields with concessions *four outdoor lighted basketball courts *eighteen -hole disc golf course *outdoor swimming pool *fishing *four soccer fields *horseshoe pits *eight lighted tennis courts *hiking trails *community center facilities *paddleboats *passive areas *volleyball *playgrounds *picnic shelters *tables & grills Based on the demand standards established by the 1996 Virginia Outdoor Plan, Frederick County should use the following recommendations as a guide for future park development. Frederick County 9 - 9 Comprehensive Plan Parks and Recreation Table 15: Facility Needs Based on Minimum Standards Established in the 1996 Virginia Outdoor Plan _ ! a £t k� P t.4F Iny? `�'f �' I'�"L•Y..7'�.'k}�4�Mf .H' SCpi},E7n tit {e yP ^r aI}�- N i}-7 t REM'. v � 4�`a� £t' `-'" F £. - ti` i u�r$�M� �i�x x. ■r'a �r+l �{�' � ' n -" �. ev Archery Range 1/50,000 0 0 1 1 Baseball Diamond 1/6,000 *7 2 3 6 Basketball Court 1/5,000 5 5 7 11 Bicycle Trails 1 mile/1,000 2.4 miles 37.6 57.6 77.6 Soccer Fields 1/5,000 4 6 8 12 Horseshoes 1/10,000 8 -4 -2 0 Softball 1/3,000 **5 12 15 21 Swimming Pools *** 1/10,000 2 3 4 6 Tennis Courts 1/2,000 23 3 7 17 Park Land 10ac./1,000 404 -4 196 396 Ice Skating 1/30,000 0 1 2 2 Picnicking 10/1,000 400 0 200 400 Skateboard Park 1/80,000 0 0 0 1 In -Line Hockey 1/30,000 0 1 2 2 Amphitheater 1/40,000 0 1 1 2 Source: Frederick County Department of Parks and Recreation Because these facilities share time with softball, this figure has been adjusted according to percent of use. ** Because these facilities share time with baseball, this figure has been adjusted according to percent of use. * * * Jr. Olympic Pool Frederick County 9- 10 Comprehensive Plan Parks and Recreation Conclusions As the population of the Winchester -Frederick County area continues to increase, there will undoubtedly be greater emphasis placed on the County's Parks and Recreation Department. As indicated by the standards provided in the 1996 Virginia Outdoor Plan, (referred to in this chapter), there currently exists a need to concentrate on further facility development just to meet present minimum standards, and a greater need to establish a long range capital improvement program to insure the provision of the physical amenities required to meet future leisure demands. At this time, priority should be given to bring our park system up to the recommended minimum standard, but strong consideration should also be given to the acquisition of park land to meet future needs while desirable open space is still available at a reasonable cost. In addition to the facilities that are needed to meet current and future demands, in eastern Frederick County and western Frederick County, the Parks and Recreation Department will also need additional professional staff if the County is to accommodate an already increasing demand for recreational programs. Recreation Policy GOAL.- C"ontribu_te to the Phys iCai, rneirtral, rxr d cu turrzl'�h ?� Qf file commuhij% its;e"cahoin- c an asocial c,,,n 1 its ,•ens& (if civic Tr iled so i' l � c�,���r?�z�s'h it y thrbugh,a.voinptet program bf jvarlcs iand c-cieua'ion. Strategy I - Insure that appropriate open space and facilities are provided with new development. Strategy 2 - Identify the recreational, parks, and open space needs of the County. Strategy 3 - Make available a wide range of year-round recreational opportunities. Strate 4 -Seek alternative funding methods for the provision of existing and identified recreational needs. Strategy 5 - Encourage cooperative efforts with private, semi-public, and public providers of recreational opportunities. Frederick County 9- 11 Comprehensive Plan Parks and Recreation Implementation Methods: 1. Prepare a County -wide recreation plan which identifies recreational, park, and open space needs. 2. Continue to solicit public opinion in planning parks and recreation. 3. Continue to encourage the participation and financial support of civic groups, businesses, and other organizations and individuals for recreational needs. 4. Continue to utilize State and Federal grants and loans for financing and programming County recreational needs and especially for major capital projects. 5. Continue to expand our cooperative relationship with the Frederick County School Board jointly meeting identified County recreational needs. 6. Continue to cooperate with the private sector, the semi-public sector, and other public providers of recreation in meeting identified recreational needs. iC71f'r�' 4 rift > � ��} GOAL - C'c�t ttn zf e +p Count s reg c nr p rr a,]+ r o�z � o rec�ea#onol- �y t fLZ I' Z�� .ZXtZd a_ rLyI�EC�S Strategy 1 - As finances are available, improvements to the Sherando and Clearbrook Parks should take place according to the adopted master plans. Implementation Methods: 1. Use the capital improvements planning process to provide improvements to the regional parks. 2. Seek alternative sources of funding for park improvements. Frederick County 9-12 Comprehensive Plan Parks and Recreation GOAL-Insure.thdfgp;;.nate open', pp �c 4c rand revreatk,nal f ar� prvvt'ded zn urban and rural areas,: . Strategy 1 -Insure that appropriate open space and recreational facilities are provided in association with new urban development. Strate 2 - Provide for suitable recreational opportunities for all portions of the County. Strategy 3 - Provide for a trail system and bikeway plan. Implementation Methods: L Use a County -wide recreation plan to develop standards for open space and recreational facilities in new urban developments. 2. Use a County -wide recreation plan to identify the recreational needs of residents in all portions of the County. 3. Identify recreational needs associated with the Rural Community Centers. 4. Review land development regulations to insure that appropriate standards are provided for open space and recreational facilities in new developments. GOAL Provide recreation rl "`rT-aMs and activities based on, identified needs" and availahte funo�g . Strate 1 - Identify recreational program needs. StratePy 2 - Solicit public opinion on recreational programs to be provided. Strategy 3 - Coordinate with Frederick County School Board, the public sector, the semi-public sector, and private organizations for the provision of recreational program funds, services, and facilities. Frederick County 9-13 Comprehensive Plan Parks and Recreation Implementation Methods: 1. Prepare a County -wide recreation plan identifying program needs. 2. Develop and maintain citizen participation in the identification of recreational program and facility needs. 3. Actively solicit contributions for the provision of recreational programs and program facilities, from all segments of the community, both public and private. 4. Structure the provision of all program facilities, such as indoor community centers, to recognize land use decisions and policies. 5. Actively utilize public, semi-public, and private facilities for the provision of recreational programs. Frederick County 9-14 Comprehensive Plan r REDERIC K CC 11TT � PUBLIC SCHOOLS 2006-2007 FREDERICK COUNTY CAPITAL IMPROVEMENTS PLAN Departmental Requests Individual Description and Justification Forms For New and Carry Over Project Requests July 12, 2005 Department of Planning and Development Approved October 18, 2005 by the Frederick County School Board Frederick Cc ., School Board 2006-2011 Capital Improvement Plan Dept. Project 7/1/06- 7/1/07- 7/1/08- 7/1/09- 7/1/2010 �- Estimated Priority Title 6/30/2007 6/30/2008 6/30/2009 6/30/2010 6/30/2011 y Pro' Cost 1 Replacement Gainesboro Elementary Begin Open Fall 2007 $17.8m• School. Construction Transportation Facility/ Administration Begin Open Dec. 2007 $26.6m Building Construction < 3 12t` Elementary School Begin Open Fall 2008. _ $20.5m Construction - 4 Robert E. Aylor Renovation Begin Complete Fall $18.0111 Construction 2008 5* Land Acquisition for: - $12.6m .12`" elemental ............................. 15 acres........_.._... ..13w.elementarx ............................... .. ..... 15 acres............... 4 Yh middle 0 acres 4� h - ................................................. ....... - .... .................... 50 acres............... ........................ -14s' elementarx ............................... 15 acres................................ .................. 150, elementary ................ _............ .. ..... ..... ............................ ........................ 15 acres................ 6s' middle30 ...................... acres ........................ .50k h!lri.............................................. ............................ ........................... ............................ _......... ............................ 50 acres................ elementarx............................... .......................... ..... .... ..... _.... . ................ ... ..... ............................ . 15 acres................ ....... .. 7`h middle30 ...................................... ............................ .................... ...... acres ........-.---- 17* elementary .......................... ............................. .. - ... 15 acres. 6** Robinson Ed. Center/NREP Begin Complete $15.8m Replacement/Renovation Construction Fall 2010 7 4s' High School Begin Open Fall 2011 $55.0m Construction 8 James Wood High School Renovation Begin Complete $18.01n Construction Fall 2011 9*** Frederick County Middle School Begin Complete $18.0m Renovation Construction Fall 2011 10 Apple Pie Ridge/Bass-Hoover Elem. Begin Complete Fall ;. z -; $5.01n School. Renovations Construction 2010 Mme, `: �� ��= 11 Indian Hollow Elem. School Renovation Begin Complete Fall $3.Om Construction 2011 12 5' Middle School Begin Open Fall 2010 �_, ;_ - 3 $26.0m Construction< ��r 13 13a' Elementary School Begin Open Fall 2010 $20.5m Construction Open Fall 2011 14 14s` Elementary School Begin $20.5m Construction " Using an estimated $45,000 per acre cost (current dollar value) ** Would consider expansion of facilities by renovating current administration building *"" Frederick County Middle School replacement under consideration. • C: 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Replacement Gainesboro Elementary School Date Prepared: 10/20/05 Agency Contact Person: Steve Kapocsi Location of Project: On the East side of 522, North of Winchester, and immediately North Agency: Frederick County Public School Phone Number: (540) 662-3889 Magisterial District: Gainesboro of the intersection of Chestnut Grove Rd & Route 522 Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. This is a single story elementary school with a floor area of approximately 96,300 square feet. The facility will be designed to accommodate a student membership of 750. The outdoor facilities will include three pods of grade level appropriate playground equipment, one asphalt play area, one softball field, and one physical education field. This facility will meet or exceed all Virginia Department of Education new construction requirements for K-5 Elementary Schools. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Planning, design, property assessment, and construction should take approximately 24 months. 2005-2006 Capital Improvements Plan Project Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A Project Priority: 1 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: With the completion of the 111h Elementary School, the replacement of Gainesboro Elementary School will move up to number one. Estimated Cost (in 2005 dollars): PROPOSED EXPENDITURES Element FY 1st god 3rd 4th 5th Beyond Total 2005/06 FY FY FY FY FY FY 2006/07 2007 2008 2009 2010 2011 /08 /09 /10 /11 /12 Planning, Surveying, & 735,000 735,000 Design Land Acquisition Site Preparation 50,000 50,000 & Improvements Construction 1,000,000 12,500,000 1,855,000 15,355,000 Furniture and 1,375,000 Equipment 1,275,000 100,000 Other (opening 235,000 235,000 day collection) TOTAL 1,785,000 13,775,000 2,190,000 17,750,000* *Partnerships with other county departments are not considered in the above "facility" costs. 2005-2006 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element FY V FY 2nd FY 3rd FY 4d' FY 5h FY Beyond 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 FY TOTAL 2011/12 General Fund Other Fund State Brants Bonds and 1,785,000 13,775,000 2,190,000 17,750,000 Debts Other Fund- raising TOTAL 1,785,000 13,775,000 2,190,000 1117,750,000* Partnerships with other county departments are not considered in the above "facility" costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The facility will serve 750 students. Please describe the need for this project. The current site is too limited to justify renovating the facility to meet the building standards of today.. The building lacks air conditioning, an adequate library, physical education facilities, and support special education facilities. There are other health and safety concerns that are inherent in the age and design of the building. Please describe and justify the proposed location of the project. The school board owns property within 3 miles of the current site in the Gainesboro Elementary School attendance zone. Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. Public Health, Safety, or Welfare.- Does elfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk This school will assist the school division and county government in meeting the community needs for the citizens and elementary students in the Gainesboro District. 2005-2006 Capital Improvements Plan Project Requests Page 4 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to -student ratios, assist in providing necessary services to special needs populations, and assist in accommodating students and staff with disabilities. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age population of Frederick County in meeting their individual educational needs. Economic Impact: Is the project essential toy or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No /-vvD-/-vvo capital Improvements Plan Project Requests Page 5 Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 6 C� • • 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Transportation Facility/Central Administration Complex Date Prepared: 10/20/05 Agency Contact Person: Steve Kapocsi Location of Project: TBD Agency: Frederick County Public School Phone Number: (540) 662-3889 Magisterial District: TBD Project Description: Give a brief1-2 ( )paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. A transportation/administration facility on approximately 45 acres that will accommodate a Transportation Facility that would house driver training areas, driver and staff meeting area, mechanical service and repair bays, inspection bay, wash bay, and fueling bays. The Administration Building would accommodate administrative offices and workspace for the departments of student services, special services, instruction, testing, human resources, finance, and information services, along with common staff work areas and long term record storage. The location of the facility should be close to major transportation arteries and as close to the largest number of schools as possible. The facility will also need secure parking for the bus and vehicle fleet, as well as adequate parking for visitors, staff and drivers. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Planning, design, property assessment, and construction should take approximately 24 months. improvements Fian Froject Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A Project Priority: 2 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The Transportation/Administration facility will be combined and would be listed as number two under project priority. Estimated Cost (in 2005 dollars): PROPOSED EXPENDITURES Element FY ist 2nd 3rd 01 5th Beyond Total 2005/06 FY FY FY FY FY FY 2006/07 2007 2008 2009 2010 2011 /08 /09 /10 /11 /12 Planning, 1,000,000 1,000,000 Surveying, & Design Land Acquisition 2,025,000 2,025,000 Site Preparation 1,000,000 1,000,000 & Improvements Construction 11,000,000 8,575,000 19,575,000 Furniture and 2,500,000 2,500,000 Equipment Other (opening 500,000 500,000 day collection) TOTAL 13,025,000 12,000,000 11,575,000 26,600,000* *Partnerships with other county departments are not considered in the above "facility " costs. 2005-2006 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSRD FillVi YNG cnlTurF.c Element FY is[ FY 2nd FY 3`d FY 4th FY 5th FY Beyond 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 FY TOTAL 2011/12 General Fund Other Fund State Grants Bonds and 3,025,000 12,000,000 11,575,000 26,000,000 Debts Other Fund- raising TOTAL 7025,000 12,000,000 11,575,000 26,000,000* 1 *Partnerships with other county departments are not considered in the above "facility " costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The transportation department provides a student transportation system to support a division membership of over 12,000 students and over 2,000 full and part-time employees. The transportation department also supports other county agencies such as the Parks & Recreation Department, the Sheriffs Department, etc. The administration building houses approximately 110 administrative, instructional, and support personnel. Please describe the need for this project. The current transportation site has outgrown the current facilities and there is not sufficient area to expand those facilities. The increase in student membership, coupled with the stringent laws and regulations that govern the operation and maintenance of school transportation vehicles, requires a much larger and upgraded transportation facility. All available building space in the current administration building is being utilized to its fullest potential. In addition to the use of closets and part of the original coal bin and boiler room for office space, a modular office provides space for human resources new employee processing. Additional space is needed to provide a safe and adequate work place for employees. �W ■ Please describe and justify the proposed location of the project. The location of this facility has not yet been determined. Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. 2005-2006 Capital Improvements Plan Project Requests Page 4 Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk This proposed project will directly impact the transportation department's ability to operate and maintain the school division's school bus fleet, the vehicle fleet, and the direct transportation support of other county agencies and departments. As for the administration portion of the project it will address ADA inadequacies, relieve overcrowding, and plan for future expansion. Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? This proposed project will assist the transportation department as well as the administration staff in its ability to maintain compliance with Federal and State laws and regulations that govern the transportation of students and also assist in maintaining compliance with building code and fire regulations. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Student transportation is provided to all eligible residents of Frederick County. Students that have a verified special need for special services transportation are provided those services. 1005-2006 Capital Improvements Plan Project Requests Page 5 Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools facilities assist in attracting favorable types of business and industries into Frederick County. It takes adequate facilities and well-managed programs to maintain quality public schools. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 6 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: New Elementary School #12 Date Prepared: 10/20/05 Agency Contact Person: Steve Kapocsi Location of Project: TBD Agency: Frederick County Public School Phone Number: (540) 662-3889 Magisterial District: TBD Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. This is a single story elementary school with a floor area of approximately 96,300 to 106,000 square feet located on 15 acres. The facility will be designed to accommodate a student membership of 750 or 850. The outdoor facilities will include three pods of grade - level appropriate playground equipment, one asphalt play area, one softball field, and one physical education field. This facility will meet or exceed all Virginia Department of Education new construction requirements for K-5 Elementary Schools. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Planning, design, property assessment, and construction should take approximately 24 months. 2005-2006 Capital Improvements Plan Project Requests Page ] Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A a. Project Priority: 3 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The New Elementary School #12 would be listed as number three on the project list. Estimated Cost (in 2005 dollars): PRnPngF.D F,XPENDITURES Element FY 1st 2nd 3rd 4th 5th Beyond Total 2005 FY FY FY FY FY FY /06 2006/07 2007/08 2008/09 2009 2010/ 2011/12 /10 11 Planning, Surveying, & 900,000 900,000 Design Land Acquisition 675,000 675,000 Site Preparation 100,000 & Improvements 100,000 Construction 12,901,700 4,000,000 16,901,700 Furniture and 1,000,000 600,000 1,600,000 Equipment 275,000 275,000 Other (opening day collection) TOTAL 1,675,000 13,901,700 4,875,000 MJ 12(,451,700* *Partnerships with other county departments are not considered in the above "facility " costs. 2005-2006 Capital Improvements Plan Project Requests rage 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES *Partnerships with other county departments are not considered in the above "facility " costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds 2005-2006 Capital Improvements Plan Project Requests Page 3 4n, Beyo Element FY 2005 1®' FY 2nd FY 3rd FY FY 5th FY nd FY TOTAL /06 2006/07 2007/08 2008109 2009/ 2010/11 10 2011 /12 General Fund Other Fund State Grants Bonds and Debts 1,675,000 13,901,700 4,875,00 20,451,700 Other Fund- raising TOTAL 1,675,000 13,901,700 4,875,000 20,451,700* *Partnerships with other county departments are not considered in the above "facility " costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The facility will serve 750 or 850 students. Please describe the need for this project. Significant residential growth in Frederick County has resulted in the schools having student enrollments exceeding their program capacity. Please describe and justify the proposed location of the project. This school will be located in an area to relieve current overcrowding and to accommodate the projected new housing development in the areas served by these elementary school attendance zones. Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk This school will assist the school division and county government in meeting the community needs for the citizens and elementary students of Frederick County. 2005-2006 Capital Improvements Plan Project Requests Page 4 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to -student ratios, assist in providing necessary services to special needs populations, and assist in accommodating students and staff with disabilities. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age population of Frederick County in meeting their individual educational needs. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. a Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No 2005-2006 Capital Improvements Plan Project Requests Page 5 Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 6 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Retum to: Department of Planning and Development Frederick County, VA Project Name: Robert E. Aylor Middle School Renovation Date Prepared: 10/20/05 Agency Contact Person: Steve Kapocsi Location of Project: 901 Aylor Road Stephens City, VA Agency: Frederick County Public Schools Phone Number: (540) 662-3889 Magisterial District: Opequon Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Robert E. Aylor Middle School is located at 901 Aylor Road Stephens City VA and opened for students in 1969 and has served as a middle school since that time. The school contains 113,643 square feet and has a program capacity of 850 students. Currently the building serves grades 6, 7, and 8. The building is in good condition however, several major areas need to be addressed in a renovation. Major areas to be included in this renovation project are additional classroom and storage space; a complete replacement of fire alarm and, communication systems, plus roof replacement; upgrade of electrical and plumbing; and complete replacement of mechanical systems. Others areas to be addressed would include: security, repaving of asphalted areas, and the installation of an emergency power system. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. An architectural/engineering study will need to be conducted to determine the scope of work to be undertaken and provide preliminary cost estimates for the project. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A 2005-2006 Capital Improvements Plan Project Requests Page 1 Project Priority: 4 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The renovation of Robert E. Aylor is number four on the project priority list. This project moves up due to the Admiral Richard E. Byrd Middle School project being completed and the 11`h Elementary School project being under construction and removed from the project list. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th 5th Beyond Total 2006/07 2007/08 2008/09 FY FY FY 2012 2009 20010 /10 /11 Planning, 500,000 500,000 Surveying, & Design Laud Acquisition Site Preparation & Improvements Construction 2,000,000 12,000,000 2,025,000 16,025,000'-... Furniture and 1,275,000 100,000 1,375,000 Equipment Other (opening 100,000 100,000 day collection) TOTAL 2,500,000 13,275,000 2,225,000 18,000,000* *Partnerships with other county departments are not considered in the above "facility " costs. Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2005-2006 Capital Improvements Plan Project Requests Page 2 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2006107 2007108 2008/09 2009/10 2010/11 FY 2012 General Fund Other Fund State Grants Bonds and 2,500,000 13,275,000 2,225,000 18,000,000 Debts Other Fund- raising TOTAL 2,50000 13,275,000 2,225,000 18,000,000 Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The renovation of Robert E. Aylor Middle School will serve 850 students in grades 6, 7, & 8. Please describe the need for this project. Robert E. Aylor Middle School is soon to be 37 years of age and renovations are needed to a number of areas to insure the economical and efficient operation of the school for the years to come. 2005-2006 Capital Improvements Plan Project Requests Page 3 Please describe and justify the proposed location of the project. N/A Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. ■ Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? This project will assist the school division and county government in meeting the community needs for the citizens and middle school students in the Robert E. AyIor Middle School attendance zone. Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to - student ratios, assist in providing necessary services to special needs populations, and assist in accommodation students and staff with disabilities. 2005-2006 Capital Improvements Plan Project Requests Page 4 Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age populations of Frederick County in meeting their individual educational needs. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 5 J C7 • 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Land Acquisition for Eleven Facilities Date Prepared: 10/20/05 Agency Contact Person: Steve Kapocsi Location of Project: TBD Agency: Frederick County Public School Phone Number: (540) 662-3889 Magisterial District: TBD Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. From FY06 to FY17 growth trends illustrate the impact of eleven new schools to Frederick County. This impact will include six elementary schools (numbers 12 thru 17), two middle schools (number 5 and 6), and two high schools (numbers 4 and 5). As our community continues to grow and land becomes more difficult to get and more expensive to buy it is prudent to acquire land for this growth. Schedule: If the project will take several years to complete, outline the schedule here. Be sreu to include any work that might have been done in previous years, including studies or other planning. Over the next five years land should be acquired for the next eleven facilities that growth trends illustrate even thou the next seven only fall under the scope of this CIP. As our community continues to grow and land becomes more difficult to get and more expensive to buy it is prudent to acquire land for this growth... 2uuD-Luub Uapital Improvements Plan Project Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A Project Priority: 5 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Land acquisition for the next eleven facilities would be listed as number 5 on the project list. Estimated Cost (in 2005 dollars): PROPOSED EXPRNDITURF,. Element is` 2nd 3rd 4`h 5th Beyond Total FY FY FY FY FY FY 2006/07 2007/08 2008/09 2009/10 2010/11 2011 Planning, Surveying; & Design Land Acquisition 1,350,000 3,600,000 675,000 1,350,000 5,625,000 12,600,000 Site Preparation & Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL 1,350,000 3,600,000 675,000 1,350,000 5,625,000 12,600,00* *Partnerships with other county departments are not considered in the above "facility " costs. 2005-2006 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOWD FTTNDFNV 4Z"TT12r1a c rtuule scups with other county departments are not considered in the above "facility" costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds ww-wuo t-apnai improvements Plan Project Requests Page 3 � V JJIJ Element 1St FY 2nd FY 3rd FY 4"' FY 5th FY Beyond 2006/07 2007/08 2008/09 2009110 2010/11 FY TOTAL 2011 General Fund Other Fund State Grants Bonds and 1,350,000 3,600,000 675,000 1,350,000 5,625,000 12,600,000 Debts Other Fund- raismg TOTAL 1,350,000 3,600,000 675,000 1,350,000 r5,625,000 F,600,000*�J rtuule scups with other county departments are not considered in the above "facility" costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds ww-wuo t-apnai improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The land acquisition will supply land for the next six elementary schools, two middle schools, and two high school facilities. The elementary school facilities will serve 644 students, middle school facilities will serve 850 students and high school facilities will serve 1,250 students. Please describe the need for this project. Significant residential growth in Frederick County has resulted in the schools having student enrollments exceeding their program capacity. Please describe and justify the proposed location of the project. This land acquisition will occur in areas that will relieve current overcrowding and to accommodate the projected new housing development in the areas served by these elementary school attendance zones. Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This land acquisition project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk This land acquisition project will assist the school division and county government in meeting the community needs for the citizens and elementary students of Frederick County. 2005-2006 Capital Improvements Plan Project Requests Page 4 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to -student ratios, assist in providing necessary services to special needs populations, and assist in accommodating students and staff with disabilities. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age population of Frederick County in meeting their individual educational needs. w. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: � Is the project necessary for the successful completion of other projects? Is the project part of a larger proj ect? No 2005-2006 Capital Improvements Plan Project Requests Page 5 MM Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 6 :7 • • 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Robinson Ed. Center/NREP Replacement/Renovation Date Prepared: 10/20/05 Agency: Frederick County Public School Agency Contact Person: Steve Kapocsi Location of Project: TBD Phone Number: (540) 662-3889 Magisterial District: TBD Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. The current Northwestern Regional Educational Program (NREP) is conducted in three facilities one located at 860 Smithfield Ave. Winchester that opened for students in 1960, this being the original NREP facility; the second facility being Robinson Educational Center located at 2400 Roosevelt Blvd., Winchester that opened in 1957; and the third being the Douglas Community Learning Center (DCLC) at 598 North Kent Street, Winchester. Currently the program at the Smithfield Ave. facility serves the ED program and long term suspension program for three school divisions. The Robinson Educational Center serves pre-school special education for Frederick County Public Schools and Winchester City Public Schools and severe disabilities for three school divisions. DCLC houses five classrooms of pre-school special education classes for Frederick County Public Schools and Winchester City Public Schools. The Frederick County buildings on Smithfield Ave. and Roosevelt Blvd. are in need of several major upgrades in building systems. Areas such as roof replacement; HVAC, electrical, and plumping systems at the Roosevelt Blvd. facility and at the Smithfield Ave. facility plumping, and electrical systems, along with total window replacement will be needed. Program space is also a major concern due to recent and projected growth. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. An architectural/engineering study will need to be conducted to determine the scope of work to be undertaken and provide preliminary cost estimates for the project. To accommodate the growth in the programs the study would include the renovation of both facilities and the renovation of the administration building located at 1415 Amherst Street 2005-2006 Capital Improvements Plan Project Requests Page 1 Winchester, with the replacement of the new Transportation Facility/Central Administration Complex. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. The Replacement/Renovation of the facilities that house programs at the Robinson Educational Center and the Northwestern Regional Educational Program facility would be dependent on the replacement of the current Transportation Facility/Central Administration Complex. The NREP facility would utilize the previous administration building located at 1415 Amherst Street. Project Priority: 6 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The Robinson Educational Center/Northwestern Regional Educational Program replacement/renovation would be listed as number six on the project list. Estimated Cost (in 2005 dollars): PRnP0SFn FXPFNDITURES Element FY 1s` 2nd 3rd 4th 5th Beyond Total 2005 FY FY FY FY FY FY /06 2006 2007 2008 2009 2010 2011 /07 /08 /09 /10 Ill /12 Planning, 500,000 100,000 600,000 Surveying, & Design Land Acquisition Site Preparation 200,000 200,000 & Improvements Construction 8,000,000 3,000,000 2,000,000 13,000,000 Furniture and 1,000,000 900,000 1,900,000 Equipment Other (opening 100,000 100,000 day collection) TOTAL 500,000 8,300,000 4,000,000 3,000,000 15,800,000* *Partnerships with other county departments are not considered in the above "facility " costs. 2005-2006 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES *Partnerships with other county departments are not considered in the above "facility " costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds 2005-2006 Capital Improvements Plan Project Requests Page 3 FY 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Element FY TOTAL 2005/06 2006/07 2007/08 2008/09 2009/10 2010/11 2011/12 General Fund Other Fund State Grants Bonds and Debts 500,000 8,300,000 4,000,000 3,000,000 15,800,000 Other Fund- raising TOTAL 500,000 8,300,000 4,000,000 3,000,000 15,800,000* *Partnerships with other county departments are not considered in the above "facility " costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds 2005-2006 Capital Improvements Plan Project Requests Page 3 NNNNNNNN��� Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The facility that houses the ED and Long Term Suspension programs will serve from 70 to 80 students. The facility that houses the pre-school special education program serving 120-180 students. . Please describe the need for this project. Significant residential growth in Frederick County has resulted in the schools having student enrollments exceeding their program capacity. s Please describe and justify the proposed location of the project. The use of the administration building located at 1415 Amherst Street for programs assigned to the NREP would permit the use of facilities and programs housed at the James Wood Middle School location. It would also place the facility close to the Winchester Medical Center. Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk This school will assist the school division and county government in meeting the io���muni y needs for the citizens and elementary students of Frederick County. 2005-2006 Capital Improvements Plan Project Requests Yage 4 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to -student ratios, assist in providing necessary services to special needs populations, and assist in accommodating students and staff with disabilities. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age population of Frederick County in meeting their individual educational needs. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No 2005-2006 Capital Improvements Plan Project Requests Page 5 Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 6 C� • 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: New Fourth High School Date Prepared: 10/20/05 Agency Contact Person: Steve Kapocsi Location of Project: TBD Agency: Frederick County Public Schools Phone Number: (540) 662-3889 Magisterial District: TBD Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. The fourth high school project will have a program capacity of 1,250 students and serve grades 9 -12. This projects location has yet to be determined but will have a floor area of approximately 242,000 square feet and be located on approximately 50 acres of land. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Purchase of property, property assessment, planning, design and construction should take approximately 36 to 40 months. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. No Project Priority: 7 If previously included in the Capital Improvements Plan, please indicate previous priority and ciirrent statim of project' The new Fourth High School is listed as number 7 on the priority list. 2005-2006 Capital Improvements Plan Project Requests Page 1 Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element ls` 2nd Std 4t' 5th Beyond Total FY FY FY FY FY FY 2006 2007/08 2008/09 2009/10 2010/11 2011/12 /07 Planning, 1500,000 1,500,000 Surveying, & Design Land Acquisition 2,250,000 2,250,000 Site Preparation 3,000,000 3,000,000 & Improvements Construction 2,000,000 15,0007000 17,000,000 10,250,000 44,250,000 Furniture and 3,000,000 1,000,000 4,000,000 Equipment Other (opening day collection) TOTAL 3,750,000 5,000,000 15,000,000 20,000,000 11,250,000 550-00,000* *Partnerships with other county departments are not considered in the above "facility " costs. Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2005-2006 Capital Improvements Plan Project Requests Page 2 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL FY 2007/08 2008/09 2009/10 2010/11 FY 2011 2006 /07 General Fund Other Fund State Grants Bonds and 3,750,000 5,000,000 15,000,000 20,000,000 11,250,000 55,000,000 Debts Other Fund- raising TOTAL 3,750,000 5,000,000 15,000,000 20,000,000 .11,250,000 55,000,000* *Partnerships with other county departments are not considered in the above "facility " costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The fourth high school would have a program capacity of 1,250 students in grades 9-12. 2005-2006 Capital Improvements Plan Project Requests Page 3 Please describe the need for this project. This project will address continued growth in student enrollment in the school division over the next five years. It is anticipated that student enrollment will increase at all levels. A three year rolling migration projects the following student enrollment in the high schools by the fall of 2010 to be 4,120. Based on this projection along with Weldon Cooper population projections it will be necessary to construct the fourth high school in Frederick County. Please describe and justify the proposed location of the project. The location of this project has yet to be determined. ■ Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? This school will assist the school division and county government in meeting the community needs for the citizens and high school students in Frederick County. 2005-2006 Capital Improvements Plan Project Requests Page 4 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to -student ratios, assist in providing necessary services to special needs populations, and assist in accommodating students and staff with disabilities. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age population of Frederick County in meeting their individual educational needs. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. M Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No 2005-2006 Capital Improvements Plan Project Requests Page 5 ■ Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 6 • C-: 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: James Wood High School Renovation Date Prepared: 10/20/05 Agency Contact Person: Steve Kapocsi Location of Project, 161 Apple Pie Ridge Rd Winchester, VA Agency: Frederick County Public School Phone Number: (540)-662-3889 Magisterial District: Gainesboro Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. James Wood High School is located at 161 Apple Pie Ridge Rd Winchester, VA opened for students in 1980 school year and has served as a high school since that time. The school contains 234,095 square feet and has a program capacity of 1400 students. Currently the building serves grades 9 —12. The building is in good condition however, several major areas need to be addressed in a renovation. Major areas to be included in this renovation project include increased electrical service and distribution to support technology; technology cabling, hardware, and its installation; upgrade of plumbing and mechanical systems; and modification of instructional areas to support instructional delivery. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. An architectural/engineering study will need to be conducted to determine the scope of work to be undertaken and provide preliminary cost estimates for the project. The study is estimated to begin during the FY09 with construction scheduled to begin FY10 with completion Fall 2011. 2005-2006 Capital Improvements Plan Project Requests Page 1 i Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A Project Priority: 8 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The renovation of James Wood High School is number 8 on the project priority list. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element Tt 2nd 3rd FY 4th FY 5th FY Beyond Total FY FY 2008/09 2009/10 20010/11 FY 2012 2006 2007 /07 /08 Planning, 1,000,000 1,000,000 Surveying, & Design Land Acquisition Site Preparation 500,000 500,000 & Improvements Construction 500,000 12,000,000 1,500,000 14,000,000 Furniture and 1,500,000 500,000 2,000,000 Equipment Other (opening 500,000 500,000 day collection) TOTAL 1,000,000 1,000,000 13,500,000 2,500,000 18,000,000* *Partnerships with other county departments are not considered in the above "facility " costs. 2005-2006 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) I Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1" FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006/ 2007/08 2008/09 2009/10 20010/11 FY 2012 07 General Fund Other Fund State Grants Bonds and 1,000,000 1,000,000 13,500,000 2,500,000 18,000,000 Debts Other Fund- raising TOTAL 1,000,000 1,000,000 13,500,000 2,500,000 1118,000,000* *Partnerships with other county departments are not considered in the above "facility " costs. Please describe the source of funding (i.e. type of grant); Virginia Public School Authority Bonds 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The renovation of James Wood High School will serve 1,250 students in grades 9 —12. Please describe the need for this project. James Wood High School is soon to be 26 years of age and renovations are needed to a number of areas to insure the economical and efficient operation of the school for the years to come. tee■■■�...�■ ■ Please describe and justify the proposed location of the project. N/A Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. - Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? This project will assist the school division and county government in meeting the community needs for the citizens and high school students in the James Wood High School attendance zone. 2005-2006 Capital Improvements Plan Project Requests Page 4 Legal Requirement: Is the project required in order to meet a State or Federal.mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to -student ratios, assist in providing necessary services to special needs populations, and assist in accommodation students and staff with disabilities. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age populations of Frederick County in meeting their individual educational needs. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 5 r1 u 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Frederick County Middle School Renovation Date Prepared: 10/20/05 Agency Contact Person: Steve Kapocsi Location of Project: 441 Linden Drive Winchester, VA Agency: Frederick County Public Schools Phone Number: (540) 662-3889 Magisterial District: Winchester City Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Frederick County Middle School is located at 441 Linden Drive Winchester, VA and opened for students in 1965 and has served as a junior and middle school since that time. The school contains 99,293 square feet and has a program capacity of 730 students. Currently the building serves grades 6, 7, and 8. The building is in good condition however, several major areas need to be addressed in a renovation. Several of the major areas to be.. included in this renovation project are additional classroom space; security, a replacement of fire alarm system, and roof; up -grades to the heating, electrical and plumbing systems. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. An architectural/engineering study will need to be conducted to determine the scope of work to be undertaken and provide preliminary cost estimates for the project. The study is estimated to begin during the FY09 with construction scheduled to begin FY10 with completion Fall 2011. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A 2005-2006 Capital Improvements Plan Project Requests Page 1 Project Priority: 9 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The renovation of Frederick County Middle School is number nine on the project priority list. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st 2nd 3rd FY 4th FY 5th FY Beyond Total FY FY 2008/09 2009/10 20010/11 FY 2012 2006 2007 /07 /08 Planning, 500,000 500,000 Surveying, & Design Land Acquisition Site Preparation & Improvements Construction 6,000,000 8,000,000 2,000,000 16,000,000 Furniture and 1,500,000 1,500,000 Equipment Other (opening day collection) TOTAL 500,000 6,000,000 9,500,000 2,000,000 18,000,000* *Partnerships with other county departments are not considered in the above "facility " costs. 2005-2006 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st 2nd 3rd FY 4th FY 5th FY Beyond TOTAL FY FY 2008/09 2009/10 2010/11 FY 2012 2006 2007 107 /08 General Fund Other Fund State Grants Bonds and 500,000 6,000,000 9,500,000 2,000,000 18,000,000 Debts Other Fund- raising TOTAL 500,000 6,000,000. 9,500,000 2,000,000 118,000,000* *Partnerships with other county departments are not considered in the above "facility " costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The renovation of Frederick County Middle School will serve 850 students in grades 6, 7, & 8. Please describe the need for this project. Frederick County Middle School is soon to be 41 years of age and renovations are needed to a number of areas to insure the economical and efficient operation of the school for the years to come. Please describe and justify the proposed location of the project. N/A Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? This project will assist the school division and county government in meeting the community needs for the citizens and middle school students in the Frederick County Middle School attendance zone. 2005-2006 Capital Improvements Plan Project Requests Page 4 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to - student ratios, assist in providing necessary services to special needs populations, and assist in accommodation students and staff with disabilities. Equitable Distribution of Services: 1 Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age populations of Frederick County in meeting their individual educational needs. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 5 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Apple Pie Ridge Bass Hoover Elementary School Renovations Date Prepared: 10/20/05 Agency: Frederick County Public Schools Agency Contact Person: Steve Kapocsi Phone Number: (540) 662-3889 Magisterial District: Gainesboro/Opequon Location of Project: Apple Pie Ridge Elementary School 349 Apple Pie Ridge Road Winchester, VA Bass Hoover Elementary School 471 Aylor Road Stephens City, VA Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Apple Pie Ridge Elementary Schools is located at 349 Apple Pie Ridge Road Winchester, VA and opened for students in 1974 and has served as an elementary school since that time. The school contains 65,120 square feet and has a program capacity of 563 students. Bass Hoover Elementary School is located at 471 Aylor Road Stephens City, VA and opened for students in 1975 and has served as an elementary school since that time. The school contains 64,630 square feet and has a program capacity of 662 students. Currently the buildings serve grades K - 5. The buildings are in good condition however, several major areas need to be addressed in a renovation. Several of the major areas to be included in this renovation project are additional classroom space; roof replacement at Apple Pie Ridge Elementary School, security, and upgrades of fire alarm, electrical, plumbing and mechanical systems. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. An architec±■.:rallengineering s±udy will Saeed to be conducted to determine the scope of work to be undertaken and provide preliminary cost estimates for the project. The study is 2005-2006 Capital Improvements Plan Project Requests Page 1 estimated to begin during the FY09 with construction scheduled to begin FY10 with completion Fall 2010. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A Project Priority: 10 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The renovation of Apple Pie Ridge/Bass Hoover Elementary Schools is number ten on the project priority list. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st 2nd FY 3rd FY 4th FY 5th FY Beyond Total FY 2007/08 2008/09 2009/10 20010/11 FY 2006 2012 /07 Planning, Surveying, & 500,000 500,000 Design Land Acquisition Site Preparation & Improvements Construction 3,000,000 1,000,000 4,000,000 Furniture and Equipment 500,000 500,000 Other (opening day collection) TOTAL 500,000 3,500,000 1,000,000 5,000,000* *Partnerships with other county departments are not considered in the above "facility " costs. 2005-2006 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2006/07 2007/08 2008/09 2009/10 2010/11 FY 2012 General Fund Other Fund State Grants 500,000 3,500,000 1,000,000 5,000,000 Bonds and Debts Other Fund- raising 500,000 3,500,000 1,000,000 5,000,000* TOTAL *Partnerships with other county departments are not considered in the above "facility " costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds 2005-2006 Capital Improvements Plan Project Requests Page 3 ■ Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The renovation of Apple Pie Ridge/Bass Hoover Elementary Schools will serve at Apple Pie Ridge 563 students and Bass Hoover will serve 662 students in grades K-5. Please describe the need for this project. Apple Pie Ridge Elementary School is soon to be 32 years of age and Bass Hoover Elementary School is soon to be 31 years of age and renovations are needed to a number of areas to insure the economical and efficient operation of the school for the years to come. Please describe and justify the proposed location of the project. N/A ter.,■. � Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? This project will assist the school division and county government in meeting the community needs for the citizens and elementary school students in the Apple Pie Ridge Elementary School and Bass Hoover Elementary School attendance zones. 2005-2006 Capital Improvements Plan Project Requests Yage 4 Legal Requirement: ■ Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to - student ratios, assist in providing necessary services to special needs populations, and assist in accommodation students and staff with disabilities. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age populations of Frederick County in meeting their individual educational needs. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: ■ Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No 2005-2006 Capital Improvements Plan Project Requests Page 5 Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 6 • J 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Indian Hollow Elementary School Renovation Date Prepared: 10/20/05 Agency: Frederick County Public Schools Agency Contact Person: Steve Kapocsi . Phone Number: (540) 662-3889 Location of Project: 1548 North Hayfield Road Magisterial District: Gainesboro Winchester, VA Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc, Indian Hollow Elementary School is located at 1548 North Hayfield Road Winchester, VA and opened for students in 1988 and has served as an elementary school since that time. The school contains 59,073 square feet and has a program capacity of 528 students. Currently the building serves grades K - 5. The building is in good condition however, several major areas need to be addressed in a renovation. Several of the major areas to be included in this renovation project are additional classroom space, security, and upgrades to mechanical and waste water treatment plant systems, replacement of windows and repaving of asphalted areas. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. An architectural/engineering study will need to be conducted to determine the scope of work to be undertaken and provide preliminary cost estimates for the project. The study is estimated to begin during the FY10 with construction scheduled to begin FYI I with completion FY 2012. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A 2005-2006 Capital Improvements Plan Project Requests Page 1 Project Priority: 11 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The renovation of Indian Hollow Elementary School is number eleven on the project priority list. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 16` 2nd 3rd 4th FY 5th FY Beyond Total FY FY FY 2009/10 20010/11 FY 2012 2006 2007/ 2008 /07 08 /09 Planning, Surveying, & 230,000 230,000 Design Land Acquisition Site Preparation & Improvements 1,500,000 770,000 2,270,000 Construction Furniture and 500,000 500,000 Equipment Other (opening day collection) 230,000 1,500,000 1,270,000 3,000,000* TOTAL *Partnerships with other county departments are not considered in the above "facility " costs. 2005-2006 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. N you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2006/07 2007/08 2008/09 2009/10 2010/11 FY 2012 General Fund Other Fund State Grants Bonds and 230,000 1,500,000 1,270,000 3,000,000 Debts Other Fund- raising TOTAL 230,000 1,500,000 1,270,000 3,000,000* *Partnerships with other county departments are not considered in the above "facility " costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The renovation of Indian Hollow Elementary School will serve 528 students in grades K-5. 2005-2006 Capital Improvements Plan Project Requests Page 3 Please describe the need for this project. Indian Hollow Elementary School is soon to be 18 years of age and renovations are needed to a number of areas to insure the economical and efficient operation of the school for the years to come. Please describe and justify the proposed location of the project. N/A Conformance to the Comprehensive PIan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health'or safety risk? This project will assist the school division and county government in meeting the community needs for the citizens and elementary school students in the Indian Hollow Elementary School attendance zone. Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to - student ratios, assist in providing necessary services to special needs populations, and assist in accommodation students and staff with disabilities. 2005-2006 Capital Improvements Plan Project Requests Yage 4 Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age populations of Frederick County in meeting their individual educational needs. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No I Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 5 �� u 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: New Fifth Middle School Date Prepared: 10/20/05 Agency Contact Person: Steve Kapocsi Location of Project: TBD Agency: Frederick County Public Schools Phone Number: (540) 662-3889 Magisterial District: TBD Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. The new fifth middle school project will have a program capacity of 850 students and serve grades 6 -8. This projects location has yet to be determined but will have a floor area of approximately 166,000 square feet and be located on approximately 30 acres of land. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Purchase of property, property assessment, planning, design and construction should take approximately 24 to36 months. 2005-2006 Capital Improvements Plan Project Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. No Project Priority: 12 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The new fifth middle school is listed as number twelve on the priority list. s. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 15` 2nd 3rd 4th 5th Beyo Total FY FY FY FY FY nd 2006 2007/08 2008/09 2009/10 2010/11 FY /07 2011 /12 Planning, Surveying, & 1,000,000 1,000,000 Design 1,350,000 1,350,000 Land Acquisition 1,000,000 13000,000 Site Preparation & Improvements 2,150,000 15,000,000 2,000,000 19,150,000 Construction Furniture and Equipment 2,500,000 500,000 31000,000 Other (opening 500,000 500,000 day collection) TOTAL 2,350,000 3,150,000 17,500,000 3,000,000 26,000,000* *Partnerships with other county departments are not considered in the above "facility " costs. 2005-2006 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL FY 2007/08 2008/09 2009/10 2010/11 FY 2006 2011 /07 General Fund Other Fund State Grants Bonds and 2,350,000 3,150,000 17,500,000 3,000,000 26,000,000 Debts Other Fund- raising 2,350,000 3,150,000 17,500,000 3,000,000 26,0001000* TOTAL *Partnerships with other county departments are not considered in the above "facility " costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The fifth middle school would have a program capacity of 850 students in Grades 6-8. Please describe the need for this project. This project will address continued growth in student enrollment in the school division over the next rive years. It is anticipated that student enrollment will increase at all levels. A rolling migration projects the following student enrollment in the middle schools by FY11 to be 3,387. Based on this projection along with Weldon Cooper population projections it will be necessary to construct the fifth middle school in Frederick County. Please describe and justify the proposed location of the project. The location of this project has yet to be determined. Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. 2005-2006 Capital Improvements Plan Project Requests Page 4 Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? This school will assist the school division and county government in meeting the community needs for the citizens and high school students in Frederick County. Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to -student ratios, assist in providing necessary services to special needs populations, and assist in accommodating students and staff with disabilities. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age population of Frederick County in meeting their individual educational needs. ■rte Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. 2005-2006 Capita] Improvements Plan Project Requests Yage � Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 6 C� • 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: New Elementary School #13 Date Prepared: 10/20/05 Agency Contact Person: Steve Kapocsi Location of Project: TBD Agency: Frederick County Public School Phone Number: (540) 662-3889 Magisterial District: TBD ■� Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. This is a single story elementary school with a floor area of approximately 96,000 to 106,000 square feet located on 15 acres. The facility will be designed to accommodate a student membership of 750 or 850. The outdoor facilities will include three pods of grade - level appropriate playground equipment, one asphalt play area, one softball field, and one physical education field. This facility will meet or exceed all Virginia Department of Education new construction requirements for K-5 Elementary Schools. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Planning, design, property assessment, and construction should take approximately 24 months. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A 2005-2006 Capital Improvements Plan Project Requests Page 1 Project Priority: 13 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The New Elementary School #13 would be listed as number thirteen on the project list. Estimated Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 15t 2°d 3A 40' 5th Beyond Total FY FY FY FY FY FY 2006/07 2007/08 2008/09 2009/10 2010/ 2011 11 /12 Planning, 900,000 900,000 Surveying, & Design Land Acquisition 675,000 675,000 Site Preparation & Improvements 100,000 100,000 Construction 12,901,700 4,000,000 16,901,700 Furniture and 1,000,000 600,000 1,600,000 Equipment Other (opening 275,000 275,000 day collection) TOTAL 1,575,000 100,000 13,901,700 4,875,000 20,451,700* ��� �■� *Partnerships with other county.departments are not considered in the above "facility " costs. Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received nI .eliT""lar` " estimate, g. no other basis for estimate, 1--, Other (please explain) 2005-2006 Capital Improvements Plan Project Requests Page 2 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES *Partnerships with other county departments are not considered in the above "facility " costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The facility will serve 750 or 850 students. Please describe the need for this project. Significant residential growth in Frederick County has resulted in the schools having student enrollments exceeding their program capacity. 2005-2006 Capital Improvements Plan Project Requests Page 3 15t FY 2nd FY 3rd FY 4cn FY 5`" FY Beyond Element 2006/07 2007/08 2008/09 2009/10 2010/11 FY TOTAL 2011/12 General Fund Other Fund State Grants Bonds and 1,575,000 100,000 13,910,700 4,875,000 20,451,700 Debts Other Fund- raising TOTAL 1,575,000 100,000 13,901,700 4,875,000 20,451,700* *Partnerships with other county departments are not considered in the above "facility " costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The facility will serve 750 or 850 students. Please describe the need for this project. Significant residential growth in Frederick County has resulted in the schools having student enrollments exceeding their program capacity. 2005-2006 Capital Improvements Plan Project Requests Page 3 Please describe and justify the proposed location of the project. This school will be located in an area to relieve current overcrowding and to accommodate the projected new housing development in the areas served by these elementary school attendance zones. Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk This school will assist the school division and county government in meeting the community needs for the citizens and elementary students of Frederick County. _■� sem® Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to -student ratios, assist in providing necessary services to special needs populations, and assist in accommodating students and staff with disabilities. 2005-2006 Capital Improvements Plan Project Requests Page 4 Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age population of Frederick County in meeting their individual educational needs. u Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 5 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: New Elementary School #14 Date Prepared: 10/20/05 Agency Contact Person: Steve Kapocsi Location of Project: TBD Agency: Frederick County Public School Phone Number: (540) 662-3889 Magisterial District: TBD Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. This is a single stogy elementary school with a floor area of approximately 96,300 to 106,000 square feet located on 15 acres. The facility will be designed to accommodate a student membership of 750 or 850. The outdoor facilities will include three pods of grade - level appropriate playground equipment, one asphalt play area, one softball field, and one physical education field. This facility will meet or exceed all Virginia Department of Education new construction requirements for K-5 Elementary Schools. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Planning, design, property assessment, and construction should take approximately 24 months. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A 2005-2006 Capital Improvements Plan Project Requests Page 1 r Project Priority: 14_ If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: The New Elementary School #14 would be listed as number fourteen on the project list. Estimated Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st 2nd 3rd 4th 5th Beyond Total FY FY FY FY FY FY 2006 200 2608/09 2009/10 2010/11 2011 /07 7/08 /12 Planning, 900,000 Surveying, & 900,000 Design Land Acquisition 675,000 675,000 Site Preparation 100,000 & Improvements 100,000 Construction 12,901,700 4,000,000 16,901,700 Furniture and 1,000,000 600,000 1,600,000 Equipment Other (opening 275,000 275,000 day collection) TOTAL 1,575,000 100,000 13,901,700 4,875,000 20,451,700* BI *Partnerships with other county departments are not considered in the above "facility " costs. 2005-2006 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 16f FY 2006/ 2nd FY 3�d 4cn 5" FY Beyond FY TOTAL 07 2007 2008/09 2009/10 2010/11 2011/12 /08 General Fund Other Fund State Grants Bonds and 1,575,000 100,000 13,901,700 4,875,000 20,451,700 Debts Other Fund- raising TOTAL 1,575,000 100,000 13,901,700 1 4,875,000 20,451,700* *Partnerships with other county departments are not considered in the above "facility " costs. Please describe the source of funding (i.e. type of grant): Virginia Public School Authority Bonds 2005-2006 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. The facility will serve 750 or 850 students. Please describe the need for this project. Significant residential growth in Frederick County has resulted in the schools having student enrollments exceeding their program capacity. Please describe and justify the proposed location of the project. This school will be located in an area to relieve current overcrowding and to accommodate the projected new housing development in the areas served by these elementary school attendance zones. Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project contributes to improving educational services to Frederick County students. This project is consistent with established policies and procedures of the Frederick County School Board. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk This school will assist the school division anal county government in meeting the community needs for the citizens and elementary students of Frederick County. 2005-2006 Capital Improvements Plan Project Requests Page 4 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Completion of this project will assist in maintaining recommended teacher -to -student ratios, assist in providing necessary services to special needs populations, and assist in accommodating students and staff with disabilities. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Frederick County Public Schools serves all segments of the school age population of Frederick County in meeting their individual educational needs. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Quality public schools assist in attracting favorable types of business and industries into Frederick County. Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No 2005-2006 Capital Improvements Plan Project Requests Page 5 Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Business of the school board is conducted in an open public forum with an open invitation for the public to address the board with citizen comment. 2005-2006 Capital Improvements Plan Project Requests Page 6 -AL'EEI'I Vii) I' T ` PARKS AND RE REATION DEPARTMENT FREDERICK COUNTY PARKS 0 4 8 12 16 Miles Frederick County Schools ® Elementary Schools p Middle Schools = �< p High Schools Fire Stations .. Reynolds Store Fire Co. .� Urban Development Area 12 Roads N Primary s z Secondary Nmotif Terciary R� Y Parks Parcels r M Citv / Town Y _... ..: 0 4 8 12 16 Miles 2006-2007 Departmental Request Prioritization Summary Department: Parks and Recreation Department Annroved bv: Dept. Project FY FY FY FY FY TOTAL Priority Title 2006/07 2007/08 2008/09 2009/10 2010/11 CIP Cost Cost Cost Cost Cost Cost 1 Indoor 13,500,000 1.3,500,000 Pool 2 Water 1,114,560 1,114,560 Slide/ Spray Ground Clearbrook Sherando Parks 3 Park Land 4,000,000 4,000,000 East FC 4 Park Land 3,000,000 3,000,000 West FC 5 Mainten- 336,960 336,960 ance Compound Sherando 6 Open Play 444,990 444,990 Areas - Clearbrook 7 Skateboard 454,594 454,594 8 Lake/Trails/ Parking 1,054,199 1,054,199 (708,925) with 2 multi- purpose fields irrigated (130,000) 9 Softball 593,674 593,674 Complex Sherando 2006-2007 Departmental Request Prioritization Summary Department: Parks and Recreation Department Approved by: Dept. Project FY FY FY FY FY TOTAL Priority Title 2006/07 2007/08 2008/09 2009/10 2010/11 CIP Cost Cost Cost Cost Cost Cost 10 Baseball 1,177,802 1,177,802 Complex Renovation Sherando 11 Soccer 1,790,665 1,790,665 Complex 12 Tennis/ 449,772 449,772 Basketball Complex Clearbrook 13 Picnic 697,280 697,280 Areas Sherando 14 Shelter/ 443,412 443,412 Stage - Clearbrook 15 Access Road with 1,075,304 1,075,304 Parking and Trails 16 Field 7,840,800 7,840,800 House TOTAL 14,614,560 9,290,743 4,011,913 2,215,996 7,840,800 37,974,012 • J • 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Tntinor qwimming Pon] Date Prepared: 09/07/05 Agency: Parks anti RPrreation Agency Contact Person: Tames M Doran Phone Number: 665-5678 Location of Project: Sherandn Park Magisterial District: _Opeclunn Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. This facility would house a leisure and competitive lap swimming pool with an office, storage and locker rooms. This facility should be located on property owned or proffered to the County and would utilize approximately 10-12 acres with parking. Facility to be designed to accommodate the addition of Field House amenities listed as project number 16 of this report. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2006-07 fiscal year. 2006-2007 Capital Improvements Plan Projects Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is planned with the construction of the Field House Project. The Indoor Swimming Pool facility would be constructed to allow for the addition of the Field House. When both are completed, they will share the same property and parking. Project Priority: 1 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #l. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd 3rd FY 4th FY 5th FY Beyond Total 2007 FY 2009 2010 2011 FY 2011 2008 Planning, Surveying, & Design Land Acquisition Site Preparation & Improvements Construction 13,500,000 13,500,000 Furniture and Equipment Other (opening day collection) TOTAL 13,500,000 0 0 0 1 0 011 13,500,000 2006-2007 Capital Improvements Plan Projects Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2007 2nd FY 2008 3rd FY 2009 4th FY 2010 5th FY 2011 Beyond FY 2011 TOTAL General Fund 13,500,000 13,500,000 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 13,500,000 0 0 0 0 0 13,500,000 Please describe the source of funding (i.e. type of grant): Presently, there are no federal or state grant monies available for this project. As a result, this project would need to be funded through the County Capital Improvement Fund, through donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2006-2007 Capital Improvements Plan Projects Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be, served or the units of service to be provided by the project. Since its inception, the Parks and Recreation Department has relied solely on the use of the county public schools to house our programs. This arrangement was adequate when the department first started out, but now the department offers over 750 programs annually and at this same time, space within the schools is more difficult to secure. This has created a situation where the department can no longer meet the programming and facility needs of the county residents. Additionally, there are no indoor pools in Frederick County. By constructing the indoor pool, it would permit the department to meet citizen programming demands, provide an instructional facility, as well as provide the area with a facility that would attract new businesses to the community. This facility would be available to all area residents. Please describe the need for this project. As stated above, the Department and the community have outgrown the use of school facilities for programming. In the past four years, the Department has experienced a fifty-four percent increase in program offerings. The construction of this project will provide a facility the Department will be able to offer year round recreational programming to the residents of Frederick County. Please describe and justify the proposed location of the project. The Indoor Pool facility should be located in an area convenient to the major transportation corridors of the county on a county proffered site. However, as an alternative, one of the two county regional parks could be used to house the facility, since these locations are already identified as centers for recreation programs and activities. 2006-2007 Capital Improvements Plan Projects Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? is the project consistent with established policies'! The Indoor Pool project meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Continues to develop the County's regional parks as a major source of recreational facilities and activities. • Supports a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, and programs, as well as supporting economic development in the County through the support of businesses and the travel and tourism industry. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The Indoor Pool project addresses the need for an indoor recreational facility in Frederick County. The construction of this facility will provide the community with a public facility that could be used for not only recreational pursuits, but rehabilitation and wellness programs. In addition, the development of this project would assist in reducing overcrowding in the school facilities and provide a new outlet to expand the existing scholastic activities programs within the schools. 2006-2007 Capital Improvements Plan Projects Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? In initial stages of planning, the Indoor Pool project is projected to potentially serve over 150 community organizations and groups. This assistance would be provided in either facility or programming provisions within the facility. There is currently no other similar facility located within the County. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Projects Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The Indoor Pool project is not dependent upon another project. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The Indoor Pool project has been identified by the Recreation Commission and the County's Capital Improvements Plan. A Parks and Recreation Commission sub -committee has been formed to determine the final size and content of the facility. In addition, the Commission has prepared a user survey to solicit input from community organizations who would benefit from the facility. 2006-2007 Capital Improvements Plan Projects Requests Page 7 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Date Prepared: 09/07/05 Agency: Parks and Recreation Agency Contact Person: Tames M Doran Phone Number: _ 665-5679 Location of Project: C'learhrook/4heranrin Parks Magisterial District: Stonewall/Opf-L1rinn Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Upgrade the outdoor swimming pools at both Clearbrook and Sherando Parks. Upgrade would involve the removal of the diving boards and the installation of one 50' water slide and one 75' water slide at each pool. The upgrade would also include the addition of a spray ground with 10- 12 features at each pool. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project will take approximately 8 months to complete. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2006-07 fiscal year. 2006-2007 Capital Improvements Plan Projects Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project. Project Priority: 2 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #3 Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd 3rd FY 4th FY 5th FY Beyond Total 2007 FY 2009 2010 2011 FY 2011 2008 Planning, 82,560 82,560 Surveying, & Design Land Acquisition Site Preparation & Improvements Construction 1,032,000 1,032,000 Furniture and Equipment Other (opening day collection) TOTAL 1,114,560 0 0 0 0 0 1,114,560 2006-2007 Capital Improvements Plan Projects Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2007 2nd FY 2008 3rd FY 2009 4th FY 2010 5th FY 2011 Beyond FY 2011 TOTAL General Fund 1,114,560 1,114,560 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 1,114,560 0 0 0 0 0 1714,560 Please describe the source of funding (i.e. type of grant): Presently, there are no federal or state grant monies available for this project. As a result, this project would need to be funded through the County Capital Improvement Fund, through donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2006-2007 Capital Improvements Plan Projects Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided vy IuvJ�. To provide recreational opportunities for the Clearbrook Park and Sherando Park service area. Please describe the need for this project. Currently, we have two outdoor swimming pools at the County's regional parks. These facilities are 15 years old and were constructed with two diving boards as the main feature for each pool. Over the past 5 years, swimming pool attendance has been flat and users are requesting that we add different water features. The addition of two water slides and a spray ground to each pool facility will increase pool attendance by an estimated 30%. With the increase in fees to comparable facilities, the County could realize an additional 65,000 in revenue annually. Please describe and justify the proposed location of the project. Clearbrook and Sherando Parks, currently owned by Frederick County offers the best site and location for the development of this facility. With the upgrade to the existing swimming pool facilities, the County would not have to incur costs for property acquisition or infrastructure development. 2006-2007 Capital Improvements Plan Projects Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan9 is the project consistent with established policies? The upgrading of the swimming pool facilities meets the County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the County. Additionally, the project is identified in the Master Plan for Sherando Park completed in 2001. w. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The upgrading of the swimming pool facilities will mean more active participation options for all swimming pool users, especially school aged participants. 2006-2007 Capital Improvements Plan Projects Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The project would upgrade the existing swimming pool facilities and would be available to all citizens of Frederick County. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Projects Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? This project, at both Clearbrook and Sherado Parks is not dependent upon any other planned project. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvement Plan. The swimming pool facilities have been identified as part of the Master Development Plan for both Clearbrook and Sherando Parks. 2006-2007 Capital Improvements Plan Projects Requests Page 7 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Date Prepared: 09/07/05 Agencv'_Parks-and Recreation Agency Contact Person: iame.c M Doran Phone Number: _ 665-567R Location of Project: Fasterrn Frederick County Magisterial District: Eastern Fred Co Project Description: Give a brief (1-2) paragraph description of what the project includes Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Acquisition of Parkland; 150-200 acres Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. The Parks and Recreation Commission is requesting that this project be funded and completed in FY 2007-08. 2006-2007 Capital Improvements Plan Project Requests Page l Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. Project Priority: 3 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #4. r Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2007 2008 2009 2010 2011 FY 2011 Planning, Surveying, & Design Land 4,000,000 4,000,000 Acquisition Site Preparation & Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL 17 0 4,000,000 0 0 0 01f 4,000,000 2006-2007 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received X "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2007 2008 2009 2010 2011 FY 2011 General Fund 4,000,000 4,000,000 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 4,000,000 0 0 0 Q 4,000,000 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available they will be actively pursued by this department. 2006-2007 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This project would be located in the primary growth center of Frederick County, within the existing urban development area and the approved Southern Frederick Land Use Plan, which consists of 1,200 acres of new residences. The project could be used by the entire Frederick County area, but the principal users would be from the eastern Frederick County area. The location of this project in eastern Frederick County will also serve to reduce the traffic burden in other areas by providing facilities and services in closer proximity to the residents. Please describe the need for this project. To reduce the gap between the amount of existing parkland and the amount of parkland needed to meet the minimum standard for our service area, as recommended by the Virginia Outdoors Plan. Please describe and justify the proposed location of the project. Potential acreage for parkland would be located in the eastern portion of Frederick County. The location of this project would provide parkland which could be developed to create more accessible recreational facilities and opportunities to the residents of eastern Frederick County. 2006-2007 Capital Improvements Plan Project Requests Page 4 Conformance to the Comprehensive Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Pian? is t1levroJect consistentwith established policies? The Parkland acquisition in eastern Frederick County meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • ldentify and protect important natural resources. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, insuring that adequate and appropriate open space and recreational facilities are provided, as well as supporting economic development and the travel and tourism industry in the county. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The acquisition of Parkland in eastern Frederick County ensures the adequate provision of open space, and will provide the citizens of the county with an area that will contribute to their physical and mental well being, as well as improving the quality of life in Frederick County. 2006-2007 Capital Improvements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The acquisition of parkland in eastern Frederick County would service the needs of the citizens of the entire county, but the residents in the urban development area would be provided services that only exist at Clearbrook and Sherando Parks. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Project Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The acquisition of Parkland in eastern Frederick County is not dependent upon another project. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The acquisition of Parkland in eastern Frederick County has been identified by the Parks and Recreation Commission. 2006-2007 Capital Improvements Plan Project Requests Page 7 2006-2007 Capital Improvements Plan Project Requests Page 8 • • J 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Agency Contact Person: Tames M Domn Phone Number: 665-5679 Location of Project: Western Frederick County Magisterial District: West Fred Co Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Acquisition of Parkland; 150-200 acres Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. The Parks and Recreation Commissions is requesting that this project be funded and completed in FY 2007-08. 2006-2007 Capital Improvements Plan Project Requests Page l Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. Project Priority: 4 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #5. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2007 2008 2009 2010 2011 FY 2011 Planning, Surveying, & Design Land 3,000,000 3,000,000 Acquisition Site Preparation Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL 3,000,000 0 0 0 0 3,000,000 2006-2007 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received X "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY BeyondTOTAL 2007 2008 2009 2010 2011 FY 2011 General Fund 3,000,000 3,000,000 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 3,000,000 0 0 0 0 3,000,000 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available they will be actively pursued by this department. 2006-2007 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the prOject. This project would be used by the entire Frederick County area. Please describe the need for this project. To reduce the gap between the amount of existing parkland and the amount of parkland needed to meet the minimum standard for our service area, as recommended by the Virginia Outdoors Plan. Please describe and justify the proposed location of the project. Potential acreage for parkland would be located in the western portion of Frederick County. The location of this project would provide parkland which could be developed to create more accessible recreational facilities and opportunities to the residents of western Frederick Count 2006-2007 Capital Improvements Plan Project Requests Page 4 i Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? is the project consistent with established policies? The Parkland acquisition in Western Frederick County project meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. Continue to develop the County's regional parks as a major source of recreational facilities and activities. 0 Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Identify and protect important natural resources. Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, insuring that adequate and appropriate open space and recreational facilities are provided, as well as supporting economic development and the travel and tourism industry in the county. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The acquisition of Parkland in Western Frederick County ensures the adequate provision of open space, and will provide the citizens of the county with an area that will contribute to their physical and mental well being, as well as improving the quality of life in Frederick County. 2006-2007 Capital Improvements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The acquisition of parkland in western Frederick County would service the needs of the citizens of the entire county, but directly the Back Creek and Gainesboro Districts, who currently have to drive to either Clearbrook or Sherando Parks. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Project Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The acquisition of Parkland in Western Frederick County is not dependent upon another project. Public Support: M Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The acquisition of Parkland in Western Frederick County has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, in 1996 public hearings were held to discuss the project and the acquisition of property. 2006-2007 Capital Improvements Plan Project Requests Page 7 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Maintenanca- Compound and Office -Shernncln Agency Contact Person: James M Doran Phone Number: 665-5678 Location of Project: Sberando Park Magisterial District: Opennnn Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Office - 1200 SF. Storage Sheds - 4000 SF. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Sherando Park which was completed in 1987. The Parks and Recreation Commission is requesting that this project be funded and completed during fiscal year 2007-08. 2006-2007 Capital Improvements Plan Project Requests Page I Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. This project was planned as one element of the Master Development Plan for Sherando Park to satisfy existing recreational needs. Project Priority: 5 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as 415. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2007 2008 2009 2010 2011 FY 2011 Planning, 24,960 24,960 Surveying, & Design Land Acquisition Site Preparation Improvements Construction 312,000 312,000 Furniture and Equipment Other (opening day collection) TOTAL 0 336,960 0 0 336,960 2006-2007 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2007 2nd FY 2008 3rd FY 2009 4th FY 2010 5th FY 2011 Beyond FY 2011 TOTAL General Fund 336,960 336,960 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 336,960 0 0 0 336,960 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2006-2007 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This facility will enable the county to maintain its equipment and facilities in a more responsible and effective manner. Please describe the need for this project. To provide an adequate maintenance facility to maintain county equipment and facilities in a responsible and effective manner. Also, with the additional responsibility of maintaining all outdoor facilities at Sherando High School, Robinson Learning Center, Armel Elementary School, Orchard View Elementary School, Bass -Hoover Elementary School, Middletown Elementary School, R. E. Aylor Middle School, Admiral Byrd Middle School and the new I I 1 Elementary School, there is a need for more storage, maintenance and office space. Please describe and justify the proposed location of the project. Sherando Park, currently owned by Frederick County, will provide the best location for the development of this maintenance facility. Since the maintenance equipment, staff and facility is needed to serve as a maintenance function for Sherando Park's grounds and facilities, this project should be located at Sherando Park. 2006-2007 Capital Improvements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: MM Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? is the project consistent with established policies? The Maintenance Compound and Office development at Sherando Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park completed in 1987. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The project will provide the park with a facility to enable the County to maintain its equipment and facilities in a safe, efficient and responsible manner. 2006-2007 Capital Improvements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project will permit the park to continually comply to OSHA requirements for the provision of a safe work environment. In addition, it is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the Master Plan for Sherando Park completed in 1987. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The project would provide support facilities for not only the maintenance of Sherando Park, but also the eight school sites currently cared for by the Sherando Park maintenance staff. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies -have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Project Requests Page 6 Coordination with other projects: Im Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The project is not dependent upon any other planned project. It is one element of the Master Plan for Sherando Park completed in 1987. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project is part of the Master Plan for Sherando Park completed in 1987 to satisfy existing recreational demands and needs of the residents. 2006-2007 Capital Improvements Plan Project Requests Page 7 2006-2007 Capital Improvements Plan Project Requests Page 8 C� • • 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Date Prepared: 09/07/05 Agen"- Parke anal Recreation Agency Contact Person: Tamp-, M Doran Phone Number: 665-567R _ Location of Project. Clearbronk Park __ Magisterial District: Stonewall Project Description: Give a brief (1-2) paragraph description of what the project includes Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Open Play Areas on South side of Lake: Parking - 64 spaces; asphalt paved with curbed islands and concrete wheel stops; line markings and 4 security lights. Existing Shelters (5) - Repair, cleaning, painting, and restroom rehab. One signage refurbish, 5 picnic shelters, 1 restroom. Landscaping - 11 shade trees; 8 evergreens. Peripheral Work - General turf (2 acres): miscellaneous signage. (Cont'd) Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Clearbrook Park which was completed in 1987. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2007-2008 fiscal year. 2006-2007 Capital Improvements Plan Project Requests Page 1 Open Play Area - Clearbrook (cont'd) Open play at water tower: Parking - 73 spaces; asphalt paved with curbed islands and concrete wheel stops; line markings and 6 security lights. Picnic shelter - 30'x 55'; 18 tables, wood deck floor; wood frame and asphalt shingles. Horseshoe pits (6) - sand base; 12 steel bars; 8" x 8" timber edge. Croquet - turf surface Shuffleboard - concrete base, regulation court, tournament style. Volleyball court (1) - 50'x 80' sand court. Existing concession - cleaning, repair, refurbish, rehab., paint. Landscaping - 14 shade trees Peripheral work - general turf (2.0 acres); miscellaneous signage. 2006-2007 Capital Improvements Plan Project Requests Page 2 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. This ,,,�;A�r ;x, s ply„ ,eu as one t. �.,� element of the Master Development Plan for Clearbrook Park to satisfy existing recreational needs. Project Priority: 6 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #6. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2007 2008 2009 2010 2011 FY 2011 Planning, Surveying, & Design 32,962 32,962 Land Acquisition Site Preparation & Improvements Construction 4121-028 412,028 Furniture and Equipment Other (opening day collection) TOTAL 0 444,990 0 0 0 0 444,990 2006-2007 Capital Improvements Plan Project Requests Page 3 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2007 2nd FY 2008 3rd FY 2009 4th FY 2010 5th FY 2011 Beyond FY 2011 TOTAL General Fund 444,990 444,990 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 444,990 0 0 0 1 0 444,990 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2006-2007 Capital Improvements Plan Project Requests Page 4 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. To provide recreational opportunities for the Clearbrook Park service area. Please describe the need for this project. To reduce the gap between the number of existing passive recreational areas and the number which is needed to meet the minimum standards for our service area. Please describe and justify the proposed location of the project. Clearbrook Park, currently owned by Frederick County, offers the best location for this development. With the county already having ownership of the property, one aspect of the cost of this project has already been completed. This project, being located at Clearbrook Park, is necessary to meet the needs of our service area. 2006-2007 Capital Improvements Plan Project Requests Page 5 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The development of the Open Play Area at Clearbrook Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Clearbrook Park which was completed in 1987. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? Development of the Open Play Area at Clearbrook Park will provide the facility with additional parking, provide paved pathways and renovate existing structures to improve the accessibility and appearance of the park. 2006-2007 Capital Improvements Plan Project Requests Page 6 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The project would relieve some of the existing pressure on the facility, as well as provide additional outlets for recreational opportunities. The project is being developed in accordance to the Master Plan for Clearbrook Park which was completed in 1987. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical a. -Lid mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Project Requests Page 7 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The Open Play Area project at Clearbrook Park is not dependent upon any other planned project. It is one element of the adopted Master Plan for Clearbrook Park. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Clearbrook Park since 1987 to satisfy existing recreational needs of the residents. 2006-2007 Capital Improvements Plan Project Requests Page 8 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: 4katehnard Park Date Prepared: n9/07/05 Agency- Agency Contact Person: Jnmes M Doran Phone Number: 665-5678 Location of Project: Sheranda Park Magisterial District: 013e quern Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. 1 Bowl, 1 half pipe and open skate area Parking - 30 spaces; asphalt paved with curb islands, wheel stops; line markings and security lights Access road Fencing Landscaping/access paths Signage Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2007-08 fiscal year. 2006-2007 Capital Improvements Plan Project Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other planned project. This project was identified in the Master Development Plan for the County's regional parks completed in 2001. The project has been included at the request of the citizenry of Frederick County. Project Priority: 7 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #7. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2007 2008 2009 2010 2011 FY 2011 Planning, 33,674 33,674 Surveying, & Design Land Acquisition Site Preparation Improvements Construction 420,920 420,920 Furniture and Equipment Other (opening day collection) TOTAL 0 454,594 0 0 0 0 454,594 2006-2007 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element Ist FY 2nd FY 3rd FY 4th FY 5th FY Beyondr454,594 2007 2008 2009 2010 2011 FY 2011 General 454,594 Fund Other Fund State Grants Bondsand Debts Other Fund- raising TOTAL 0 454,594 0 0 0 454,594 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2006-2007 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. To provide recreational opportunities to the citizens of Frederick County. Please describe the need for this project. Requested by the community to provide additional recreational facilities for the youth of Frederick County at Sherando Park. This project is not mandated by state or federal requirements, but it is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the 2001 Master Development Plan for Sherando Park. Please describe and justify the proposed location of the project. The location of this project would be at Sherando Park in the open field.area at the intersection of Lake View Drive and Splash Ave. This location has been identified in the 2001 Master Development Plan for Sherando Park. 2006-2007 Capital Irnprovements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The Skateboard Park project meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The Skateboard Park will provide a facility dedicated to the safety of the participants. It will provide participants with a facility where they can pursue this recreational avenue, without interfering with vehicular or pedestrian traffic on public and private properties. 2006-2007 Capital Improvements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Currently, there are no facilities within Frederick County to accommodate skateboarding. This project is needed to provide a safe facility to meet the recreational demands of the community. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Project Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? This project is not dependent upon any other planned project. This project has been included on the 2001 Master Plan Development for Sherando Park. The project has been included at the request of the citizens of Frederick County. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Requested by the community to provide a dedicated public recreational facility, this project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. 2006-2007 Capital Improvements Plan Project Requests Page 7 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Date Prepared: _p2/07/05 Agency Contact Person: James M T)nran Location of Project: Sherandn Park In jlt Willi 1 111''111 Phone Number: Magisterial District: Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. 1. Development of a 12 acre lake on the north side of Rt. 277 in Sherando Park. 2. 1.5 Mile trail system around the lake. 3. 800 L.F. of access roadway. 4. Parking lot/lighted with 125 spaces. 5. Development of two irrigated 70 x 120 yd. multi-purpose fields. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the master development plan for Sherando Park, which was completed in 2001. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2007-2008 fiscal year. 2006-2007 Capital Improvements Plan Project Requests Page l Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon or is being planned in conjunction with any other project. This project is planned as one element of the master development plan for Sherando Park. Project Priority: 8 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #8. 2006-2007 Capital Improvements Plan Project Requests Page 2 Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY BeyondTotal 2007 2008 2009 2010 2011 FY 2011 Planning, 78,089 78,089 Surveying, & Design Land Acquisition Site Preparation & Improvements Construction 976,110 976,110 Furniture and Equipment Other (opening day collection) TOTAL 0 1,054,199 0 0 0 0 1,054,199 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2006-2007 Capital Improvements Plan Project Requests Page 3 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2007 2nd FY 2008 3rd FY 2009 4th FY 2010 5th FY 2011 Beyond FY 2011 TOTAL General Fund 1,054,199 1,054,199 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL �01 ,054,199 0 0 0 0 1,054,199 Please describe the source of funding (i.e. type of grant): We are currently utilizing the TEA -21 grant program for the trail facilities. In addition, recreation access grant monies through the Virginia Department of Transportation may be available for entrance and access roadways. If these grant programs are not funded, this project would need to be funded through the county capital improvements program, by donations, or by funds generated through the collection of proffers. 2006-2007 Capital Improvements Plan Project Requests Page 4 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This facility would provide recreational opportunities for the Sherando Park service area and the entire Frederick County community. Please describe the need for this project. To reduce the needs gap between the number of existing passive recreational areas and the number needed to meet the minimum standards required for our service area. This project will provide trails with walking and jogging opportunities which ranks as #1 in the 2002 Virginia Outdoors Plan survey. This project will also provide multi -use playfields for adult and youth programs. Please describe and justify the proposed location of the project. Sherando Park, currently owned by Frederick County, offers the best location for this development. With the County currently having ownership of the property, one aspect of the cost of this project has already been completed. This project, being located at Sherando Park, is necessary to meet the needs of our service area. 2006-2007 Capital Improvements Plan Project Requests Page 5 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The development of the lake with trails and parking and two multi-purpose fields at Sherando Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park completed in 2001. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The development of the lake with trails and parking will provide recreational opportunities in an undeveloped portion of Sherando Park which is adjacent to adjoining housing subdivisions. 2006-2007 Capital Improvements Plan Project Requests Page 6 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the Master Plan for Sherando Park completed in 2001. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? This project would provide passive recreational services in the County's urban development area and is being developed in accordance with the Sherando Park Master Plan which was completed in 2001. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of pari{ and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Project Requests Page 7 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The lake with trails and parking and two multi-purpose fields is not dependent upon any other planned project. It is one element of the adopted master development plan for Sherando Park. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Sherando Park completed in 2001 to satisfy existing recreational demands and needs of the residents. 2006-2007 Capital Improvements Plan Project Requests Page 8 • C • 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Softball Complex - Sherando Date Prepared: 09/07/05 Agency' Parks and Recreation Agency Contact Person: Tames, M Daran Phone Number: _ 665-5678 Location of Project: Sherando Park Magisterial District: _Qlacqnon Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Softball fields (2) - 300' radius, fully fenced, backstop, four 50 person bleachers per field, lighted concrete poles 30/20 FC, concrete deck. Access Road - 500 LF. Parking - 153 spaces, asphalt paved with curbed islands and drop off; line markings and 6 security lights. Landscaping - 100 shade trees; pine screen. Peripheral Work - General seeding - 1 acre; miscellaneous signage. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Sherando Park and a site development plan has also been completed for these facilities. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2008-09 fiscal year. 2006-2007 Capital Improvements Plan Projects Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them'and indicate the relationship between the projects. Once this project has been completed, we will be able to retrofit the existing baseball/softball complex at Sherando Park for youth baseball use. Project Priority: 9 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #9. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2007 2008 2009 2010 2011 FY 2011 Planning, 43,976 43,976 Surveying, & Design Land Acquisition Site y^ Preparation & Improvements Construction 549,698 549,698 Furniture and Equipment Other (opening day collection) TOTAL 0 0 593,674 0 0 0 593,674 2006-2007 Capital Improvements Plan Projects Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2007 2nd FY 2008 3rd FY 2009 4th FY 2010 5th FY 2011 Beyond FY 2011 TOTAL General Fund 593,674 593,674 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 0 593,674 0 0 0 593,674 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2006-2007 Capital Improvements Plan Projects Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This facility would provide recreational opportunities for the entire Frederick County area. In addition to its use as a recreational facility, it will be used by the Frederick County school system. Please describe the need for this project. Presently, there are ten softball/baseball fields within the county's regional park system. Eight of ten existing fields must serve a dual purpose of facilitating youth baseball as well as youth and adult softball programs. With the increased usage of these fields, it has become more difficult to facilitate these programs. This project is needed in order for the Parks and Recreation Department to accommodate the existing demand of youth baseball and adult softball programs. Please describe and justify the proposed location of the project. Sherando Park, currently owned by Frederick County, represents the very best site for softball field development. The fact that the County will not have to acquire property for this facility means that the most costly aspect of this development has already been completed. Sherando Park also provides a location that is situated in the fastest growing area of the county and is adjacent to Sherando High School. Joint use of facilities between the park and school system has been approved, and , as a result, these fields will facilitate school activities as well as recreation programs. 2006-2007 Capital Improvements Plan Projects Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? ?s the pr ect consistent with established policies`% The completed development of the Softball Complex at Sherando Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The Softball Complex at Sherando Park will provide a safe facility to meet the needs of the county's growing softball program for both adults and youth. 2006-2007 Capital Improvements Plan Projects Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the Master Plan for Sherando Park. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The project would relieve some of the existing pressure on the Sherando Park with the continual demand for field space in southern Frederick County. The facility could also be used by the Frederick County school system. Economic Impact: Is the project essential to, or would it encourage some form of, economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Projects Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a Larger project? The Softball Complex at Sherando Park project is not dependent upon any other planned project, however, once completed it will allow the existing baseball/softball complex at Sherando Park to be retrofitted for youth baseball use. The project is one element of the adopted Master Plan for Sherando Park. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Sherando Park to satisfy existing recreational demands and needs of the residents. 2006-2007 Capital Improvements Plan Projects Requests Page 7 • C • 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: BasebaComplex omplex Renovation - Sherando Date Prepared: 09/07/05 Agency- _Par_ks and Recreation Agency Contact Person: lames M Doran Phone Number: 6615-5678 Location of Project: Sherando Park Magisterial District: Onecmon Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Renovate existing ball fields (4) - Grading, seeding, infield renovation; partial fencing and new backstops; new lighting 50/30 FC (required by Little League, Inc.); drainage control and upgrade support facilities. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Sherando Park which was completed in 1987. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2008-09 fiscal year. 2006-2007 Capital Improvements Plan Project Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. Renovation of this facility cannot be completed until the softball complex on the north side of Rt. 277 has been completed. Project Priority: 10 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #10. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th Beyond Total 2007 2008 2009 2010 FY FY 2011 2011 Planning, 87,245 87,245 Surveying, & Design Land Acquisition Site Preparation Improvements Construction 1,090,557 1,090,557 Furniture and Equipment Other (opening day collection) TOTAL 0 0 1,177,802 0 0 0 1,177,802 2006-2007 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2007 2008 2009 2010 2011 FY 2011 General 1,177,802 4177,802 Fund Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 0 1,177,802 0 0 0 1,177,802 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2006-2007 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This facility, presently serving as both youth baseball and adult softball fields, would be used by the "Little League" programs within the Sherando Park service area. In addition to its use as a recreational facility, the athletic complex will also be used by the Frederick County school system. Please describe the need for this project. In its present design, the four field complex does not provide adequate diamond configuration or grading scheme to facilitate youth baseball programs. The renovation of this complex would correct these problems and bring those fields up to the recommended standards. Please describe and justify the proposed location of the project. The project location would be at Sherando Park which is currently owned by Frederick County. Presently, Sherando Park has six baseball/softball fields. This project would involve the renovation of the existing ball field complex. With the site of the new county high school being adjacent to Sherando Park, there will be a joint use of these facilities and with the renovation of the fields, athletic programs can be more effectively facilitated. 2006-2007 Capital Improvements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The renovation of the Baseball Complex at Sherando Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park completed in 1987. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The renovation of the Baseball Complex at Sherando Park will provide a safe facility to meet the demands of the county's growing baseball program. 2006-2007 Capital Improvements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the Master Plan for Sherando Park completed in 1987. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The project would correct original design problems for the facility and provide a facility to meet the demands of the growing youth baseball program in the County. Additionally, the renovation of the facility will permit more efficient use of the site. The facility would also be used by the school system. r Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Project Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The renovation of the Baseball Complex at Sherando Park cannot be completed until the softball complex on the north side of Route 277 has been completed. The project is part of the adopted Master Plan for Sherando Park completed in 1987. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Sherando Park completed in 1987 to satisfy existing recreational demands and needs of the residents. 2006-2007 Capital Improvements Plan Project Requests Page 7 • C • 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: 'Soccer Cni-n4alex •- .... Date Prepared:1. 1 1-• ..• Recreation Agency Contact Person: James M T)nran Location of Project: ghi-.randn Park Phone Number: 665-567R Magisterial District: D=.unn Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Soccer field (2) - 450' x 450' artificial grass surface with goals pads. Access paths - 1500 LF; 10' wide; asphalt paved. Restroom/concession - 820 SF; masonry with concrete roof deck; full concession hookup Plaza - 22,000 SF; 50% paved/50% planted; kiosk. Picnic shelters (1) - 24'x 24': 6 picnic tables each; concrete pad; wood frame structure; asphalt shingles. 12 sets of bleachers. Landscaping - 90 shade trees. Lighting - 1 field (450'x 450') Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Sherando Park which was completed in 1987. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2008-09 fiscal year. 2006-2007 Capital Improvements Plan Project Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. This project was planned as one element of the Master Development Plan for Sherando Park to satisfy existing recreational needs. Project Priority: I 1 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #11 Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2007 2008 2009 2010 2011 FY 2011 Planning, 132,642 132,642 Surveying, & Design Land Acquisition Site Preparation Improvements Construction 1,658,023 1,658,023 Furniture and Equipment Other (opening day collection) TOTAL 0 0 1,790,665 0 0 0 1,790,665 2006-2007 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2007 2nd FY 2008 3rd FY 2009 4th FY 2010 5th FY 2011 Beyond FY 2011 TOTAL General Fund 1,790,665 1,790,665 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 0 1,790,665 0 0 0 1,790,665 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2006-2007 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This facility would be used by the entire Frederick County area. In addition to its use as a recreational facility, the soccer complex will also be used by the Frederick County school system. Please describe the need for this project. To reduce the gap between the number of existing soccer fields and the number of fields which are needed to meet the minimum standard for our service area. ■ Please describe and justify the proposed location of the project Sherando Park, currently owned by Frederick County, represents the very best location for soccer field development. The fact that the county will not have to acquire property for this facility means that the most costly aspect of this development has already been completed. Sherando Park also provides a location that is situated in the fastest growing area of the county and is adjacent to the new county high school. With joint use of facilities between the park and school system, the construction of additional soccer fields will benefit both agencies. 2006-2007 Capital Improvements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The Soccer Complex at Sherando Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park completed in 1987. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The Soccer Complex at Sherando Park will provide a safe facility to meet the demands of the county's growing youth and adult soccer programs. 2006-2007 Capital Improvements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the Master Plan for Sherando Park completed in 1987. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The project would be used by the entire Frederick County area to meet the demands for additional soccer fields for the growing youth and adult soccer programs within the County. The fields will not only serve the recreational needs of the community, but will also be used by the Frederick County school system. w � Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Project Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The Soccer Complex at Sherando Park is not dependent upon any other planned project. The project is one element of the Master Plan for Sherando Park completed in 1987. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Sherando Park completed in 1987 to satisfy existing recreational demands and needs of the residents. 2006-2007 Capital Improvements Plan Project Requests Page 7 s �: • 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Date Prepared: 09/07/05 Agf-n"- Par1cs-and'Rpc-rf-,qtio-n Agency Contact Person: Iatmies M T)Qzan Phone Number: 665-5678 Location of Project: Clearbrook Park Magisterial District: Stonewall Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Tennis courts (4) - 2 sets of 2 courts each; fully fenced, chain link vinyl clad, lighted, 30 FC. Basketball courts (2) - 85'x 65' asphalt with color coating; 2 backboards each court; player benches, lighted, concrete poles, 30 FC. Shelter deck (1) - 30'x 30' octagonal shelter concrete pad, wood frame, cedar shingles, 6 picnic tables. Parking - 25 spaces; asphalt paved with curbed islands and concrete wheel stops; line markings and 2 security lights. Landscaping - 39 shade trees. Peripheral work - general turf (8 acres); miscellaneous signage. Access paths - 1000 LF; 10' wide, asphalt paved. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Clearbrook Park which was completed in 1987. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2008-09 fiscal year. 2006-2007 Capital Improvements Plan Project Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. This project was planned as one element of the Master Development Plan for Clearbrook to satisfy existing recreational needs. Project Priority: 12 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #12. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2007 2008 2009 2010 2011 FY 2011 Planning, 33,316 33,316 Surveying, & Design Land Acquisition Site Preparation Improvements Construction 416,456 416,456 Furniture and Equipment Other (opening day collection) TOTAL 0 0 449,772 0 449,772 2006-2007 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2007 2008 2009 2010 2011 FY 2011 General Fund 449,772 449,772 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 0 449,772 0 449,772 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2006-2007 Capital Improvements Plan Project Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. Because Clearbrook Park is a regional facility, these facilities will be available to all county residents. Currently, there are no tennis or basketball courts in the Clearbrook Park area and, with over 180,000 park visitors annually, these facilities are needed. Please describe the need for this project. Presently, there are no tennis or basketball courts located in the Clearbrook Park area and, with park visitation over 180,000 annually, these facilities are needed. This project will reduce the gap between the number of existing tennis and basketball courts and the number of courts needed to meet the minimum standards for our service area. Development of this project will also provide this department with facilities for recreational programs. Please describe and justify the proposed location of the project. Clearbrook Park, currently owned by Frederick County, provides the very best location for tennis and basketball court development. Since the county will not have to acquire property for this facility, the most costly aspect of this development has already been completed. 2006-2007 Capital Improvements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The development of the Tennis/Basketball Complex at Clearbrook Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Clearbrook Park which was completed in 1987. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The development of the Tennis/Basketball Complex at Clearbrook Park will provide the citizens with a facility to improve their physical and mental well being. Additionally, the project will provide Clearbrook Park with additional parking, provide paved pathways and renovate existing structures to improve the accessibility and appearance of the park. 2006-2007 Capital Improvements Plan Project Requests Page 5 r Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? There are currently no tennis, basketball or racquetball courts in the Clearbrook area. The development of the Tennis/Basketball Complex at Clearbrook Park will provide the residents of northern Frederick County with facilities similar to those found at Sherando Park. The project is being developed in accordance to the Master Plan for Clearbrook Park which was completed in 1987. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Project Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The Tennis/Basketball Complex project at Clearbrook Park is not dependent upon any other planned project. It is one element of the adopted Master Plan for Clearbrook Park completed in 1987. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Clearbrook Park since 1987 to satisfy existing recreational needs of the residents. 2006-2007 Capital Improvements Plan Project Requests Page 7 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Picnic Area - Sheran(ln Agency Contact Person: Tames M Doran Phone Number: 665-5678 Location of Project: Sheranrin Park Magisterial District: _Opepon ■m Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Restroom/concession - 625 SF masonry and wood with asphalt shingles; limited concession hookup; 1500 SF plaza. Picnic shelter (4) with plaza - 24' x 24'; 6 picnic tables each; concrete pad, wood frame structure; cedar shingles, skylights, stain, electric and water outlets. Playground area. Access paths - 1000 LF; 10' wide; asphalt paved. Access road - 50 LF; 24' wide Parking - 94 spaces; asphalt paved with curbed islands and concrete wheel stops; line markings and 4 security lights. Landscaping - 15 shade trees. Peripheral work - general turf (3 acres); miscellaneous signage. 2006-2007 Capital Improvements Plan Project Requests Page I Page Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Sherando Park which was completed in 1957. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2009-10 fiscal year. 2006-2007 Capital Improvements Plan Project Requests Page 2 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. This project was planned as one element of the Master Development Plan for Sherando Park to satisfy existing recreational needs. Project Priority: 13 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #13. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond[-51,650 Total 2007 2008 2009 2010 2011 FY 2011 Planning, 51,650 Surveying, & Design Land Acquisition Site Preparation Improvements Construction 645,630 645,630 Furniture and Equipment Other (opening day collection) TOTAL 0 0 0 697,280 0 0 697,280 2006-2007 Capital Improvements Plan Project Requests Page 3 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element Ist FY 2007 2nd FY 2008 3rd FY 2009 4th FY 2010 5th FY 2011 Beyond FY 2011 TOTAL General Fund 697,280 697,280 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 0 0 697,280 0 0 697,280 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2006-2007 Capital Improvements Plan Project Requests Page 4 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. These facilities would be used by the Sherando Park service area and the southwestern part of Frederick County. With the growth in this area of the county and being deficient in passive recreational opportunities at Sherando Park, the Commission is recommending this project be included. Please describe the need for this project. Presently, there are only five (5) picnic areas (shelters) within Sherando Park. This development is needed to reduce the gap between the number of existing facilities and the minimum standards for the Sherando Park service area and southeastern Frederick County. With over 300,000 visitors annually, five picnic shelters do not accommodate the demand. Please describe and justify the proposed location of the project. Since Sherando Park is owned by Frederick County and the acquisition of property will not be necessary, the most costly aspect of this development has been completed. Sherando Park also provides a site which is situated in the fastest growing area of the county. 2006-2007 Capital Improvements Plan Project Requests Page 5 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Pla��. is the pr ect consistent :=pith established policies? The Picnic Area project at Sherando Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park completed in 1987. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The development of the Picnic Area project will provide the citizens with a facility to improve their physical and mental well being. Additionally, the project will provide Sherando Park with additional parking, provide paved pathways and additional facilities to improve the accessibility and availability of recreational opportunities within the park. 2006-2007 Capital Improvements Plan Project Requests Page 6 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the Master Plan for Sherando Park completed in 1987. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? These facilities will provide Sherando Park with picnic areas available for general use. In addition, the project will provide much needed facility development within the park to meet the recreational demands of the citizens of Sherando Park service area. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Project Requests Page 7 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The project is not dependent upon any other planned project. It is one element of the Master Plan for Sherando Park completed in 1987. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project is part of the Master Plan for Sherando Park completed in 1987 to satisfy existing recreational demands and needs of the residents. 2006-2007 Capital Improvements Plan Project Requests Page 8 r u 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Shelter/Stage Seating - Clearbrook Date Prepared: 09/07/05 A•-• ' .•. •• Agency Contact Person: Tnmec M Doran Phone Number: 665-5678 Location of Project: C'lenrbronk Park Magisterial District: Stonewall Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Existing restrooms - clean, repair, paint and refurbish, signage. Access paths - 1000 LF; 10' wide; asphalt paved. Shelter/Stage - sound stage; sound system; lighting; 6300SF; wood decking, stairs and miscellaneous site development. Peripheral work - general turf (1 acre); miscellaneous signage. Lake Renovation Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the Master Plan for Clearbrook Park which was completed in 1987. The Parks and Recreation Commission is requesting that this project be funded and completed during fiscal year 2009-10. 2006-2007 Capital Improvements Plan Project Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon any other project planned. This project was plamied as one element of the Master Development Plan for Clearbrook Park to satisfy existing recreational needs. Project Priority: 14 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #14. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2007 2008 2009 2010 2011 FY 2011 Planning, 32,845 32,845 Surveying, & Design Land Acquisition Site Preparation Improvements Construction 410,567 410,567 Furniture and Equipment Other (opening day collection) TOTAL 0 0 0 443,412 0 0 443,412 2006-2007 Capital Improvements Plan Project Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2007 2nd FY 2008 3rd FY 2009 4th FY 2010 Sth FY 2011 Beyond FY 2011 TOTAL General Fund 443,412 443,412 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 0 0 443,412 0 0 443,412 Please describe the source of funding (i.e. type of grant): There are presently no federal or state grant monies available. As a result, this project would need to be funded through the County Capital Improvement Fund, by donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2006-2007 Capital Improvements Plan Project Requests Page 3 ■ Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This facility would be used by the entire Winchester -Frederick County area. Please describe the need for this project. Presently, there are no facilities to accommodate cultural programs within the county's park system. This project is needed to provide a facility for cultural activities. Please describe and justify the proposed location of the project. Clearbrook Park, currently owned by Frederick County, represents the very best location for facilitating cultural events. The fact that the county will not have to acquire property for this project means that a significant cost has already been completed. Clearbrook Park, with its existing park characteristics and cultural features also provides the best location for our service area. 2006-2007 Capital Improvements Plan Project Requests Page 4 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The Shelter/Stage Seating project at Clearbrook Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Clearbrook Park which was completed in 1987. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The project provides facilities to enhance the physical and mental well being of the citizens of Frederick County. In addition, the project renovates existing facilities and improves the accessibility and appearance of the park. 2006-2007 Capital Improvements Plan Project Requests Page 5 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement! The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. In addition, the project is part of the Master Plan for Clearbrook Park which was completed in 1987. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Currently, there are no facilities to accommodate cultural programming within the county's park system. This project is needed to provide a facility for development of cultural arts programming to meet the recreational demands of the community. In addition, the project is being developed in accordance to the Master Plan for Clearbrook Park which was completed in 1987. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Project Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? This project not dependent upon any other planned project. It is one element of the adopted Master Plan for Clearbrook Park. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Clearbrook Park since 1987 to satisfy existing recreational needs of the residents. 2006-2007 Capital Improvements Plan Project Requests Paac 7 C7 • �7 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Access Rnad/Parkin anal Trails Date Prepared: 09/07/05 Aaenc�z. Parksand RPc,1-catinn Agency Contact Person: Tames M Daran _ Phone Number: . 665-5678 Location of Project: ghernnrin Park Magisterial District: Q equon Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Access Road/Parking and Trails at Sherando Park north side of Rt. 277 and Wrights Run. 1. Entrance and access road (1,800 L.F.) off of Warrior Drive 2. Parking - 100 spaces 3. Trails - 2.8 Miles Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. This project is reflected in the master development plan for Sherando Park, which was completed in 2001. The Parks and Recreation Commission is requesting that this project be funded and completed during the 2009-2010 fiscal year. 2006-2007 Capital Improvements Plan Project Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. This project is not dependent upon or is being planned in conjunction with any other project. This project is planned as one element of the master development plan for Sherando Park. Project Priority: 15 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #16. 2006-2007 Capital Improvements Plan Project Requests Page 2 Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2007 2008 2009 2010 2011 FY 2011 Planning, 79,652 79,652 Surveying, & Design Land Acquisition Site Preparation Improvements Construction 995,652 995,652 Furniture and Equipment Other (opening day collection) TOTAL 0 0 0 1,075,304 0 0 1,075,304 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engincer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2006-2007 Capital Improvements Plan Project Requests Page 3 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2007 2nd FY 2008 3rd FY 2009 4th FY 2010 5th FY 2011 Beyond FY 2011 TOTAL General Fund 1,075,304 1,075,304 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 0 0 1,075,304 0 0 1,075,304 Please describe the source of funding (i.e. type of grant): We are currently utilizing the TEA -21 grant program for the trail facilities. In addition, recreation access grant monies through the Virginia Department of Transportation may be available for entrance and access roadways. If these grant programs are not funded, this project would need to be funded through the county capital improvements program, by donations, or by funds generated through the collection of proffers. 2006-2007 Capital Improvements Plan Project Requests Page 4 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This facility would provide recreational opportunities for the Sherando Park service area and the entire Frederick County community. Please describe the need for this project. To reduce the needs gap between the number of existing passive recreational areas and the number needed to meet the minimum standards required for our service area. This project will provide trails with walking and jogging opportunities which ranks as #1 in the 2002 Virginia Outdoors Plan survey for all outdoor recreational activities. Please describe and justify the proposed location of the project. Sherando Park, currently owned by Frederick County, offers the best location for this development. With the County currently having ownership of the property, one aspect of the cost of this project has already been completed. This project, being located at Sherando Park, is necessary to meet the needs of our service area. 2006-2007 Capital Improvements Plan Project Requests Page 5 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the l�l�'lllplehenslVe Plan? is L11 pI%JJ L Colas'.S Lea ll Y�Tlth estab11S11ed po 1-S. The development of an entrance off of Warrior Drive and an access road with parking and trails at Sherando Park meets the following County comprehensive planning goals: • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Ensure that appropriate open space and recreational facilities are provided in urban and rural areas. • Continue to develop the County's regional parks as a major source of recreational facilities and activities. • Support a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, as well as supporting economic development and the travel and tourism industry in the county. Additionally, the project is identified in the Master Plan for Sherando Park completed in 2001. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The development of an entrance and access road with parking and trails will provide recreational opportunities in an undeveloped portion of Sherando Park which is adjacent to adjoining housing subdivisions. 2006-2007 Capital Improvements Plan Project Requests Page 6 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development and completes one element of the Master Plan for Sherando Park completed in 2001. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? This project would provide passive recreational services in the County's urban development area and is being developed in accordance with the Sherando Park Master Plan which was completed in 2001. ■ Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary -consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Project Requests Page 7 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The entrance and access road with parking and trails is not dependent upon any other planned project. It is one element of the adopted master development plan for Sherando Park. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The project has been identified by the Parks and Recreation Commission and the County's Capital Improvements Plan. Additionally, the project has been identified as part of the Master Plan for Sherando Park completed in 2001 to satisfy existing recreational demands and needs of the residents. 2006-2007 Capital Improvements Plan Project Requests Page 8 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM return to: Department of Planning and Development Frederick County, Virginia Project Name: Date Prepared: 09/07/05 Agency: Parks anri'Recr Agency Contact Person: Tame-, M Dnran Phone Number:-(5-S67R Location of Project: _ __ Sherando Park Magisterial District: Opequon Project Description: Give a brief (1-2) paragraph description of what the project includes Provide basic information, such as the location, size, acreage, floor area, capacity, etc. The Field House project would be approximately 44,000 square feet and include an indoor area large enough to accommodate a 1/16 mile meter track and a minimum of two basketball courts. This court area would also be designed for utilization by indoor soccer, baseball, softball, wrestling, volleyball, tennis and badminton with the installation of in -floor sleeves and drop curtains or partitions. This area could also be used for special events such as dances, proms, music festivals, garden and home, outdoor, craft, antique, quilt, or boat shows, thus providing a flexible facility for a multitude of activities to take place at one time. The facility would also house a fitness center, multipurpose rooms, office, storage, and locker rooms. This facility would be attached to the Indoor Swimming Pool. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. The Parks and Recreation Commission is requesting that this project be Winded and completed during the 2010-11 fiscal year. This project is planned with the construction of the Indoor 2006-2007 Capital Improvements Plan Projects Requests Page 1 Swimming Pool project. The Field House would attach to the Indoor Swimming Pool facility and would share the same exterior amenities (i.e., parking),. Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. In previous years, the Field House and Indoor Swimming Pool were two separate projects, but citizen input and cost analysis has lead the Parks and Recreation Commission to recommend the two projects be combined into one. Project Priority: 16 If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously listed as #17 and has been separated from the Indoor Swimming Pool Project. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2007 2008 2009 2010 2011 FY 2011 Planning, 580,800 580,800 Surveying, & Design Land Acquisition Site Preparation & Improvements Construction 7,260,000 7,260,000 Furniture and Equipment Other (opening day collection) TOTAL 11 0 0 0 0 7,840,800 011 7,840,800 2006-2007 Capital Improvements Plan Projects Requests Page 2 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2007 2nd FY 2008 3rd FY 2004 4th FY 2010 5th FY 2011 Beyond FY 2011 TOTAL General Fund 7,840,800 7,840,800 Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL 0 0 1. 0 0 7,840,800 0 7,840,800 Please describe the source of funding (i.e. type of grant): Presently, there are no federal or state grant monies available for this project. As a result, this project would need to be funded through the County Capital Improvement Fund, through donations or by funds generated through the collection of proffers. If federal, state or any other grant monies become available, they will be actively pursued by this department. 2006-2007 Capital Improvements Plan Projects Requests Page 3 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. Since its inception, the Parks and Recreation Department has relied solely on the use of the county public schools to house our programs. This arrangement was adequate when the department first started out, but now the department offers over 750 programs annually and at this same time, space within the schools is more difficult to secure. This has created a situation where the department can no longer meet the programming and facility needs of the county residents. By constructing the Field House facility, it would permit the department to meet citizen programming demands, provide an instructional facility, as well as provide the area with a facility that would attract new businesses to the community. This facility would be available to all area residents. Please describe the need for this project. As stated above the Department and the community have outgrown the use of school facilities for programming. In the past four years, the Department has experienced a fifty-four percent increase in program offerings. The construction of this project will provide a facility the Department will be able to offer year round recreational programming to the residents of Frederick County. Please describe and justify the proposed location of the project. The Field House facility should be located in an area convenient to the major transportation corridors of the county on a county proffered site. However, as an alternative one of the two county regional parks could be used to house the facility, since these locations are already identified as centers for recreation programs and activities. Additionally, locating the facility on property already owned by the county would reduce development costs. 2006-2007 Capital Improvements Plan Projects Requests Page 4 r Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The Field House project meets the following County comprehensive planning goals. • Contribute to the physical, mental, and cultural needs of the community, its economic and social well-being, and its sense of civic pride and social responsibility through a complete program of parks and recreation. • Provide recreational programs and activities based on identified needs and available funding. • Continues to develop the County's regional parks as a major source of recreational facilities and activities. • Supports a business climate conducive to economic activity and orderly economic growth. • Provide support to travel and tourist related activities. • Facilities and services should be carefully planned to meet projected needs. The project meets policy recommendations for the development of parks and recreation facilities, and programs, as well as supporting economic development in the County through the support of businesses and the travel and tourism industry. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The Field House project addresses the need for an indoor recreational facility in Frederick County. The construction of this facility will provide the community with a public facility that could be used for not only recreational pursuits, also wellness programs. In addition, the development of this project would assist in reducing overcrowding in the school facilities and provide a new outlet to expand the existing scholastic activities programs within the schools. 2006-2007 Capital Improvements Plan Projects Requests Page 5 Page Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The project is not mandated by state or federal requirements, but is in compliance with the adopted County Comprehensive Plan for recreational facility development. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? In initial stages of planning, the Field House project is projected to potentially serve over 150 community organizations and groups. This assistance would be provided in either facility or programming provisions within the facility. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Studies have shown that the provision of park and recreational facilities and programs are a primary consideration when locating or expanding business development within a community. The financial investment in recreation projects and services pay dividends throughout the community equating to a higher return than the original outlay. Parks and recreation services contribute to the physical and mental well being of the citizens, provide for a more productive work force and preventative health services, as well as serving as a catalyst for the tourism and travel industry. 2006-2007 Capital Improvements Plan Projects Requests Page 6 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? The Field House project is not dependent upon another project. However, when this facility is constructed adjoining the indoor pool facility, development and construction costs would be reduced. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The Field House project has been identified by the Recreation Commission and the County's Capital Improvements Plan. A Parks and Recreation Commission sub -committee has been formed to determine the final size and content of the facility. In addition, the Commission has prepared a user survey to solicit input from community organizations who would benefit from the facility. 2006-2007 Capital Improvements Plan Projects Requests Page 7 I+ R.E, DERICK COUNTY ADARNISTFATION 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Public Safety Center Date Prepared: October 12, 2005 Agency: Sheriff's Department Agency Contact Person: Robert Williamson Phone Number: Location of Project: Magisterial District: Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. The public safety center would be a 60,000 square foot building that accommodates the Sheriff's Department, the Department of Fire and Rescue, the 911 Communication Center and the EOC (Emergency Operations Center). It would be located on a 9 acre site in the eastern part of the County where there is a large concentration of people and businesses. The estimated cost for the project is $13,000,000. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Project to begin in 2006-2007. 2006-2007 Capital Improvements Plan Project Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Previously #1 County Administration priority. Still #1 County Administration priority. 2006-2007 Capital Improvements Plan Project Requests Page 2 Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 15` FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006/07 2007/08 2008/09 2009/10 2010/11 FY 2011 Planning, Surveying, & Design Land Acquisition Site Preparation & Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL $13,000. 000 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2006-2007 Capital hnproveinents Plan Project Requests Page 3 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2006/07 2007/08 2008/09 2009/10 2010/11 FY 2011 General Fund Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL Please describe the source of funding (i.e. type of grant): PPEA 2006-2007 Capital Improvements Plan Project Requests Page 4 ■ Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. Please describe the need for this project. The Frederick County Sheriff's Office currently has 80 employees that occupy space in the Winchester -Frederick County Joint Judicial Center (JJC). When this space was first occupied, there were 36 employees in the office. Representatives of the JJC have indicated that additional space is required for court officers and other arms of the judicial branch. Development of a new facility in the county will enhance the response time for emergency service in the safest possible manner. The current location of the Sheriff's Office in the JJC increases emergency response time due to congested streets and heavily populated areas, thus compromising safety to persons and property. Please describe and justify the proposed location of the project. 2006-2007 Capital Improvements Plan Project Requests Page 5 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? Yes Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? Yes 2006-2007 Capital Improvements Plan Project Requests Page 6 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? 2006-2007 Capital Improvements Plan Project Requests Page 7 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. 2006-2007 Capital Improvements Plan Project Requests Page 8 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County; VA Project Name: Frederick County Fire & Rescue Station 22 Date Prepared: September 1, 2005 Agency: Fire and Rescue Department Agency Contact Person: Gary A. DuBrueler Phone Number: 540-665-5618 Location of Project: Fairfax Pike East Magisterial District: Opequon Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as. the location, size, acreage, floor area, capacity, etc. Construct a two bay Fire and Rescue Station with satellite Sheriff's office and County office space for treasure, commissioner of the revenue, and BOS office with meeting room. The station will be located in the area of Fairfax Pike east of White Oak Road to provide service for the heavy growth area east of Stephens City. An approximate three -acre site will be needed to accommodate this facility. The fire station will be approximately a 10,000 sq ft facility to house an engine and ambulance. Those who would occupy the facility will determine the size of the satellite offices. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. N/A 2006-2007 Capital Improvements Plan Project Requests page l Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. Satellite office space for Sheriff's office, Treasure, Commissioner of the Revenue, and BOS office. Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Listed #3 under County Administration. No progress on project at this point. 2006-2007 Capital Improvements Plan Project Requests Page 2 Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element lst FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006/07 2007/08 2008/09 2009/10 2010111 FY 2011 Planning, 50,000 50,000 Surveying, & Design Land Acquisition 300,000 300,000 Site Preparation 50,000 50,000 & Improvements Construction 1,100,000 1,100,000 Furniture and 600,000 600,000 Equipment Other (opening 1,000,000 1,000,000 day collection) TOTAL 400,000 1,100,000 1 1,600,000 3,100,000 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received X "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2006-2007 Capital Improvements Plan Project Requests Page 3 0 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2006/07 2007/08 2008/09 2009110 2010/11 FY 2011 General 100,000 1,100,000 1,600,000 2,800,000 Fund Other Fund 300,000 300,000 State Grants Bonds and Debts Other Fund- raising TOTAL 400,000 1,100,000 1,600,000 3,100,000 Please describe the source of funding (i.e. type of grant): There is a possibility of proffers in the form of cash and/or property. State EMS Grant funds Federal Fire Grant funds 2006-2007 Capital Improvements Plan Project Requests Page 4 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. This development is scheduled to be an active adult resort gated community with age restrictions on 80% of the homes above 55 and the other 20% above 45. The developer's master plan will allow for 2130 individual dwelling units using a mix of housing types. Please describe the need for this project. This project would serve the rapidly growing southeastern Frederick County. One of the main requirements for this facility is the development of the Shenandoah project at Lake Frederick. The site work for this development was started in the early part of 2005. With the Stephens City fire and rescue service area population the largest in the County the increase in population and demographics brought about by the development will far exceed the resources available to provide adequate protection in this area of the County. Please describe and justify the proposed location of the project. The project would be located in the eastern area of Fairfax Pike east of White Oak Road. This location would allow the necessary response to all entrances of the Shenandoah project as well as to other locations of high growth from Stephens City to Front Royal Pike. 2006-2007 Capital Improvements Plan Project Requests Page 5 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project is incorporated into the County's Comprehensive Plan to meet the goals and objectives of emergency services to the residents and visitors of Frederick County. This will be the first facility project of this type to be constructed in the County by the Fire and Rescue Department. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? This project would greatly improve fire and emergency medical responses to the southeastern area of Frederick County and provide assistance to surrounding response areas. This has a positive effect on the health, safety, and welfare of our citizen's and visitors 2006-2007 Capital Improvements Plan Project Requests Page 6 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? The jurisdiction having authority is responsible for providing the necessary fire and emergency medical service to its citizens. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? The project would provide for a decreased response time to the citizens in the immediate area thus increasing service to that segment of the population. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? A cost effect could be realized by home and business owners in the area in a decrease in insurance premiums. 2006-2007 Capital Improvements Plan Project Requests Page 7 Page Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? This project is not necessary for the completion of other projects but is part of a proposed County satellite office project. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. No official information has been disseminated to the general public to support or not support the project. It was the intention of the Shenandoah development to have a fire and rescue station in or near its project due to the age restrictions within the community. Further discussions have taken place in planning commission meetings about a fire station being needed east of 181 during development talks because of the traffic situation at Fairfax Pike and 18 1. 2006-2007 Capital Improvements Plan Project Requests Page 8 2006-2007 Capital Improvements Plan Project Requests Paue 9 • C • 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Round Hill Co. 15 Fire Station Relocation Date Prepared: October 6, 2005 Agency: Fire and Rescue Department Agency Contact Person: Gary A. DuBrueler Phone Number: 540-665-5618 Location of Project: Round Hill Community Magisterial District: Back Creek Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Project includes the relocation and building of an approximately 22,000 sq. ft. facility to accommodate ten or more pieces of emergency equipment. This facility will also be able to accommodate living and sleeping quarters. A community center is also planned with this project and will be approximately 10,000 sq. ft. accommodating 400 persons for holding fundraising events. The entire project will be relocated to an area of 3 to 5 acres. This information is submitted on behalf of the Round Hill Community Volunteer Fire and Rescue Company. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Currently in planning phase. 2006-2007 Capital Improvements Plan Project Requests Page 1 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. We Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Number 4 under County Administration No progress on project. 2006-2007 Capital Improvements Plan Project Requests Page 2 Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1St FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006/07 2007/08 2008/09 2009/10 2010/11 FY 2011 Planning, Surveying, & Design Land Acquisition Site Preparation & Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) X Other (please explain) No Cost estimates done 2006-2007 Capital Improvements Plan Project Requests Page 3 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2006/07 2007/08 2008/09 2009/10 2010/11 FY 2011 General Fund Other Fund State Grants Bonds and Debts Other Fund- raising TOTAL Please describe the source of funding (i.e. type of grant): 2006-2007 Capital Improvements Plan Project Requests Page 4 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. First due population for the 2000 tenses was 8,089. The continued growth in the area has brought additional commercial development (Walmart, hotels, and planned development by the hospital, shopping and restaurants). The area includes a high school and elementary school. Please describe the need for this project. There is a dire need to replace the existing 50+ -year-old facility that does not meet the needs of the department and is not structurally sound. Please describe and justify the proposed location of the project. The facility will be located in the Round Hill community to serve their citizens. 2006-2007 Capital bnprovements Plan Project Requests Page 5 C'onformanee to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? Project is a Round Hill Volunteer Fire and Rescue Project. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? As an established fire and rescue company within Frederick County, our mission is continued and improved service to the citizens and visitors of the County. 2006-2007 Capital Improvements Plan Project Requests Page 6 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Jurisdiction having authority is responsible to provide fire and EMS service to its citizens. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Will provide services that may effect insurance rates for the home owners and businesses of the community. 2006-2007 Capital Improvements Plan Project Requests Page 7 1 Coord;nation with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Not determined 2006-2007 Capital Improvements Plan Project Requests Page 8 2006-2007 Departmental Request Prioritization Summary New and Carry Over (Modified and Unmodified) Project Requests Department: Public Work s Approved By: Dept. Priority Project Title FY 2006/07 Cost FY 2007/08 Cost FY 2008/09 Cost FY 2009/10 Cost FY 2010/11 Cost TOTAL CIP Cost 1 Gainesboro 2 3 4 5 6 7 8 9 10 11 TOTAL 20 230 250 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Gainesboro Refuse Site Relocation Date Prepared: August 31, 2005 Agency: Public Works Agency Contact Person: H. E. S t r a w s n y d e r, 8Jffane Number: 665-5643 Location of Project: Gainesboro Refuse S it Magisterial District: Back Creek Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. The relocation of the Gainesboro site will take place following the closing of the current Gainesboro School. A fenced two -acre site will be constructed behind the buildings located on the property. This project would require several months to complete and include fencing, earthwork, retaining walls, electric and paving. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Design work wil take place during 07/08 for the relocation of the Gainesboro site. Construction is anticipated for FY 08/09. 2006-2007 Capital Improvements Plan Project Requests Page I Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. The actual construction of a new Gainesboro site will begin only after the closing of the elementary school at Gainesboro. Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: 2006-2007 Capital Improvements Plan Project Requests rage Estimate Cost (in 2005 dollars): PROPOSER EXPENDITURES Element Ist FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006/07 2007/08 2008/09 2009/10 2010/11 FY 2011 Planning, Surveying, & 20 20 Design Land Acquisition Site Preparation & Improvements 230 230 Construction Furniture and Equipment Other (opening clay collection) TOTAL 20 230 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2006-2007 Capital Improvements Plan Project Requests Page 3 Source of Funding: Indicate the projected amouJit for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2006/07 2007/08 2008/09 2009/10 2010/11 FY 2011 General Fund 20 230 250 Other Fund State Grants Bondsand Debts Other Fund- raising TOTAL 20 230 250 Please describe the source of funding (i.e. type of grant): 2006-2007 Capital Improvements Plan Project Requests Page 4 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. Approximately 2,000 persons are served by the facilities at Gainesboro. Please describe the need for this project. The project is necessary to provide adequate trash disposal service for citizens living in the Gainesboro area. The existing site is completely inadequate and cannot be expanded to provide for safe ingress and egress and fencing in order to prevent illegal dumping. Please describe and justify the proposed location of the project. Acquiring property on whihc to locate a convenience center is difficult at best. The best option for the county is to locate sites on county—owned property whenever possible. The proposed site is less than a mile from the existing one. 2006-2007 Capital Improvements Plan Project Requests Page 5 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The proposal conforms to the department's and county's 90al Of improving services to residents. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The current site is a health hazzard for those using the site. It is also orrun by rodents and snakes due to its proximity to Back Creek. It is also dangerous for vehicles entering and leaving the site since it is much to small to properly accommodate traffic. It is the department's desire to provide expanded and improved service for residents and improve worker conditions and safety. 2006-2007 Capital hnprovements Plan Project Requests Page 6 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? No. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? No. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? No. 2006-2007 Capital Improvements Plan Project Requests Page 7 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. A fenced, expanded site would not only better serve Gainesboro area residdents, but also reduce illegal dumping. The current site is rather remote and unfenced. Therefore, illegal dumping has been an ongoing problem. 2006-2007 Capital Improvements Plan Project Requests Page 8 Regional Solid Waste N'-kqpgq�,li, c Plano 2015 N Laid Fairfax PDC Map & Data Center Landfills ;?. New Landfill Waste Transfer Durripsters Recyding/Drop-( Interstate HighvirGY,7 !'rimary Roads Shenandoah River rT= Tows December, 19W cu ty ��Iruru, r�q__ i�� [oto ",Serving local governments of the northern Shenandoah Valley. " C • • 2006-2007 Departmental Request Prioritization Summary New and Carry Over (VorGfied and Unmodifred) Project Requests Department: Public Works Approved By: Dept. Priority P,rpject 'title FY 2006/07 Cost FY 2007/08 Cost FY 2008/09 Cost FY 2009/10 Cost FY 2010/11 Cost TOTAL CIP Cost 1 Gore n 90 2 3 200 4 5 b 7 8 9 10 11 TOTAL 20 180 200 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Gore Refuse Site Expansion Date Prepared: August 31, 2005 Agency: Public Work s Agency Contact Person: H. E. S t r a w s n y d e r, ,Phone Number: 6 6 5— 5 6 4 3 Location of Project: Gore Refuse Site Magisterial District: Back Creek Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. The project will expand the capacity of the existing Gore refuse site by installing a trash compactor now in use at the landfill. With the relocation of the landfill site and purchase of new equipment, the present compactor will be surplus. Installation of this compactor at Gore will drive down collection costs at the site where trash is now collected in 8 -yard boxes. In order to accomplish this and account for traffic flow, the site will be expanded to approximately one acre which is contingent upon a revised lease agreement with the property owner. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. Design work is anticipated for FY 06/07 for the expansion of the Gore site with construction during the following fiscal year. 2006-2007 Capital Improvements Plan Project Requests pave I Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. The landfill compactor will become available during the 06/07 fiscal year. Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: 2006-2007 Capital Improvements Plan Project Requests Page 2 Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element l `t FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006/07 2007/08 2008/09 2009/10 2010/11 FY 2011 Planning, Surveying, & 20 20 Design Land Acquisition Site Preparation & Improvements 180 180 Construction Furniture and Equipment Other (opening dap collection) TOTAL 20 180 2�� Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. X Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2006-2007 Capital lnlprovements Plan Project Requests Page 3 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2006/07 2007/08 2008/09 2009/10 2010M FY 2011 General Fund 20 180 200 Other Fund State Grants Bondsand Debts Other Fund- raising —7 TOTAL 20 180-7 1 IF 200 Please describe the source of funding (i.e. type of grant): 2006-2007 Capital Improvements Plan Project Requests Page 4 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project, . 2025 population in the Gore community according to the regional planning district commission (or about 767 dwellings) Please describe the need for this project. This project would pay for itself in lower refuse collection costs for those living inthe Gore area. It would also provide needed capacity for heavy flow times such as duirng the holidays. Please describe and justify the proposed location of the project. Site is existing. Intent is to make the best use of existing equipment while lowering operational costs in the Gore service area. 2006-2007 Capital Improvements Plan Project Requests Page 5 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? The proposal conforms to the department's and county's goal of reducing operational costs whenever possible. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? The project would improve conditions at the Gore refuse collection site in the sense that all refuse would be compacted and contained in one can, reducing the potential for odor and blowing litter. 2006-2007 Capital Improvements Plan Project Requests Page 6 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? M Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? No. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? The project would reduce operational costs by compacting trash before it is hauled away to the landfill. 2006-2007 Capital Improvements Plan Project Requests Page 7 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project`? No. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The department believes that the public is supporetive anytime better use can be made of tax dollars. 2006-2007 Capital Improvements Plan Project Requests Page 8 A -At • i C 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Fire Station 13 Relocation Date Prepared: August 31, 2005 Agency Contact Person: Lloyd C. Winters Location of Project: Clear Brook, VA Agency: Clear Brook Vol. Fire and Rescue Phone Number: 540-667-9300 Magisterial District: Stonewall Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic .information, such as the location, size, acreage, floor area, capacity, etc. At the present time the Clear Brook Vol. Fire & Rescue has outgrown the existing building with the equipment on hand, the call volume, the staffing of 24 hour personnel and the traffic at the existing location. We are proposing a new facility to be located on Rt. 11 either North or South of Brucetown Road. The building is to be six (6) drive through bays, administration, eating and sleeping facilities along with a dining hall. The estimated size of the structure is to be approximately 28,000 square feet. This upgrade of the facility will help to provide the needed space for Fire and EMS services for the community of Clear Brook. Administration, Day Kitchen, 6 Drive Through Bays Social/Dining Hall Day Room, Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. N/A 2006-2007 Capital Improvements Plan Project Requests Page I Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: N/A 2006-2007 Capital Improvements Plan Project Requests Page 2 Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element is, FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006/07 2007/08 2008/09 2009/10 2010/11 FY 2011 Planning, 60,000 60,000 Surveying, & Design Land Acquisition Site Preparation 50,000 50,000 & Improvements Construction 1,400,000 1,400,000 Furniture and 20,000 20,000 Equipment Other (opening day collection) TOTAL 1,530,000 1,530,000 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2006-2007 Capital Improvements Plan Project Requests Page 3 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element Ist FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2006/07 2007/08 2008/09 2009/10 2010/11 FY 2011 General County 80,000 85,000 85,000 90,000 90,000 510,000 Fund 80,000 Other Fund State Grants Bonds and Debts Other 52,000 55,000 57,500 60,000 65,000 70,000 359,500 Fund- raising TOTAL 71132,000 135,000 142,500 145,000 155,000 160,000 869,500 Please describe the source of funding (i.e. type of grant): The company has an annual yard party, fund drive letter and monthly pancake breakfast that yields approximately $52,000 (yard party - $20,000, pancake breakfast - $12,000, fund drive letter - $30,000). The County EMS and Fire contribution is approximately $80,000.00. 2006-2007 Capital Improvements Plan Project Requests Page 4 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. At present time the Clear Brook Vol. Fire and Rescue serves the northern Frederick County area, 66 square miles. We have two (2) industrial parks, four (4) trailer parks, two (2) large truck stops, one (1) school, eight (8) churches and a number of small businesses. We also at this time house the County ladder truck. 6,789 2000 Census Please describe the need for this project. To enlarge, update the building we would be able to better fill the needs of our community, have a larger site for emergency relief to shelter during emergencies, upgrade our equipment as the need arises for the community growth, i.e., additional subdivisions: Stephenson Village, Green Spring Acres, Gordon Dale — east side, Apple Glenn, Glenn Dobbin, Semples Development, and additional homes along routes that are single family; increased traffic on 1-81, industrial at I-81 and Exit 323. Please describe and justify the proposed location of the project. The Route 11 location would allow for better access and quicker response, better geographic location during emergencies and allow for possible growth, if required. 2006-2007 Capital Improvements Plan Project Requests Page 5 i Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? In accordance to the comprehensive plan, will not change but to update existing services to be provided. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? It provides a greater margin of safety and removes the risk of accidents at the intersection of Rt. 11 and Brucetown Road. The new station is necessary to provide and enhanced service to the community and the industrial areas. 2006-2007 Capital Improvements Plan Project Requests Page 60 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? No Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? Yes, this would meet all of the needs of the population and growth of the Community. Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Value increases of the services would possibly decrease the insurance premiums based on the ISO rating system. 2006-2007 Capital Improvements Plan Project Requests Page 7 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? No. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. The Clear Brook community, through viable contact, has indicated that the station needs to be larger and located to better serve the community. 2006-2007 Capital Improvements Plan Project Requests Page 8 R-EG-It.-),N,AL Aln"PO-K 2006-2007 FREDERICK COUNTY CAPITAL IMPROVEMENTS PLAN Departmental Requests Individual Description and Justification Forms For New and Carry Over Project Requests July 12, 2005 Department of Planning and Development 2006-2007 Capital Improvements Plan Project Requests Page I Winchester Regional Airport Through coordinated efforts between the Counties of Frederick, Clarke, Shenandoah and Warren, and the City of Winchester, it was determined major capital improvements would be needed in order to develop Winchester Municipal Airport into a modern first class airport. The Winchester Regional Airport Authority was formed on July 1, 1987 by the Virginia General Assembly and consists of representatives from the Counties of Frederick, Clarke, Shenandoah and Warren and the City of Winchester Since its formation, the Winchester Regional Airport Authority embarked on an extensive airport capital improvement program in order to comply with Federal Aviation Administration safety and design standards to accommodate business/corporate aircraft. The Winchester Regional Airport is now a 376 -acre, all weather, 24-hour general aviation airport with a 5,500 foot asphalt runway. It is conveniently located southeast of Interstate 81, Exit 313 and lies between State Routes 50 east and 522 south. Completed construction projects include a 1,100 -foot runway extension, pavement resurfacing of the entire runway, relocation of the taxiway and the creation of safety areas at each end of the runway. New buildings constructed under this program include a modern general aviation terminal, a 12,000 square foot clear span hangar, a 9,000 square foot aviation maintenance hangar office complex, and 61T -hangar units. Other improvements include airfield lighting upgrade, installation of a 41,000 gallon above ground fuel storage facility, security fencing of the Airport perimeter, the installation of a precision instrument approach system that provides all weather access to the Airport, and the relocation of Airport Road State Route 645 to meet FAA standards which will also allow room for future expansion to accommodate additional corporate hangars. Private and business aircraft based at Winchester total over 100, and range in size from small single engine aircraft to large cabin class business aircraft and business jets. Numerous aviation business located at the airport provide airframe and engine maintenance, flight schools, aircraft rentals, parts brokering, aircraft rides, air ambulance service, and aircraft charter services. Collaborating with Frederick County and the Virginia Department of Transportation, the Authority has also made improvements to primary access roads to the airport. Water and sewer service was also established within the Route 522 South area affording the opportunity to many Frederick County residents to access this needed utility. To date, more than $19 million K8rsve been invested in Airport capital improvements, equipment, andns through funding received from the Federal Aviation Administration, Virginia Department of Aviation, the Virginia Department of Transportation and the supporting local jurisdictions. Important amenities include 24-hour U.S. Customs and Border Protection (formerly 2005-2006 Capital Improvements Plan Project Requests Page 46 U.S. Customs and Immigrations), 24-hour on call line service, air cargo handling, automated weather observation system (AWOS 111), computerized weather and flight planning equipment, full instrument landing system and rental car/limousine services. In December 1993, the Winchester Regional Airport Authority updated its 1987 Twenty - Year Master Plan which is near completion with only a few projects remaining. They include the relocation of Airport Road to remove a section of the road that infringes on regulated airspace, land acquisition along the northern side of Bufflick Road for noise abatement and a modified master development plan for the north side of the runway. Land to accommodate the road relocation project was acquired by the Airport over two years ago and the design phase is complete. In working with the Virginia Department of Aviation and the Federal Aviation Administration, approximately three parcels a year along Bufflick Road will be processed for acquisition in accordance with the current Master Plan. Due to the limitations on space on the south side, the Airport Authority is in the process of creating a development plan for the north side of the runway. With continuing increased air space restrictions within the Dulles/Washington area, the Winchester Airport has experienced a steady increase in business traffic. In addition to increased operations, the sizes of aircraft used for business travel have become larger and with the growing demand in air cargo service the airport has seen the introduction of DC -9 air freight service. Requests by owners of larger aircraft to lease land to build hangars currently cannot be met due to limited available building space. This is a loss of potential revenue by the Airport in lease fees along with the loss of tax revenue by Frederick County. A modified master plan for development on the north side will be completed in the fiscal year 2005. While details are not yet completed it is known that a parallel taxiway with a minimum 400 foot separation from the centerline of the runway will have to be constructed. This setoff distance will safely accommodate the larger aircraft and will also provide a means to access ramps and hangars on the north side. Members of the Federal Aviation Administration and the Virginia Department of Aviation often use the Winchester Regional Airport as a role model airport for planning and development. This recognition was achieved through the solidarity of the Winchester Regional Airport Authority. Through the continued support and dedication of its member jurisdictions, the Winchester Regional Airport will enhance its role as a vital economic development asset in the attraction of new commercial and industrial businesses to this region while serving the needs of existing businesses. 2005-2006 Capital Improvements Plan Project Requests Page 47 2006-2007 Departmental Request Prioritization Summary New and Carry Over (Modified and Unmodified) Project Requests Department: Winchester Airport Approved By: Dept. Project FY FY FY FY FY TOTAL Priority Title 2006/2007 2007/2008 2008/2009 2009/2010 2010/2011 CIP Cost Cost Cost Cost Cost Cost 1 Land Parcel 31, $700,000 $165,000 $865,000 46,53 2 Terminal Bldg $500,000 $500,000 Renovation 3 Land Parcel 47, $65,000 $800,000 $865,000 47A, 48 4 Upgrade Airfield $50,000 $150,000 $200,000 Lights 5 Land Parcel 50, $50,000 $300,000 $350,000 51,52 6 Airfield Maint Bldg $300,000 $300,000 7 8 9 10 11 TOTAL $1,315,000 $1,115,000 $350,000 $300,000 $3,080,000 2006-2007 Capital Improvements Plan Project Requests Page 2 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Land Acquisition — Preliminary Phase Parcels 31, 46 & 53 Date Prepared: September 26, 2005 Agency: Winchester Regional Airport Agency Contact Person: Serena R. Manuel Phone Number: (540) 662-5786 Location of Project: Bufflick Road Magisterial District: Shawnee w� Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Preliminary work to acquire three parcels along Bufflick Road identified on the Airport Property Map as parcels 31, 46 & 53 was completed in FY 2005 and funding for fee simple acquisition is budgeted in FY 2006. Actual acquisition of properties will carry over into FY 2006. Property is included in the current Twenty -Year Master Plan and is to be acquired for noise abatement. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. FY 2003 — 2004 Preliminary Costs (Surveys, appraisals, EDDA, etc.) Completed FY 2005 FY 2004 — 2006 Actual land acquisition costs may carry over with an increase into FY 2006 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A 2004-2005 Capital Improvements Plan Project Requests Page 17 Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: Phase I of this project is in included in the CIP and is rated as four under the County Priority system. Funding grant through the Virginia Department of Aviation was awarded August 2004. Estimate Cost (in 2005 dollars): PROPOSF11 EXPENDITURES Element I5` FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006/2007 2007/2008 2008/2009 2009/2010 2010/2011 FY 2011 Planning, Surveying, & Design Land Acquisition $700,000 $165,000 $865,000 Site Preparation & Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL $700,000 $165,000 5865,000 ■ M Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2004-2005 Capital Improvements Plan Project Requests Page 18 i Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element I" FY 2006/2007 2nd FY 2007/2008 3rd FY 2008/2009 4th FY 2009/2010 5th FY 2010/2011 Beyond FY 2011 TOTAL General Fund $14,000 $3.300 $17,300 Other Fund Federal Grant State Grants $665,000 $21,000 $156,750 $4,950 $821,750 $25,950 Bondsand Debts Other Fund-raising $700,000 ---FTOTAL $165,000 I $865,000 Please describe the source of funding (i.e. type of grant): FY 2004 Local Share State Grant — Virginia Department of Aviation Federal Grant — Federal Aviation Administration FY 2005 Local Share State Grant — Virginia Department of Aviation Federal Grant — Federal Aviation Administration FY 2006 Local Share State Grant — Virginia Department of Aviation Federal Grant — Federal Aviation Administration $1,000(2%) $4,000(8%) $45,000 (90%) $14,000 (2%) $21,000 (3%) $665,000 (95%) $3,300(2%) $4,950(3%) $156,750 (95%) In FY 2006, funding reimbursement from the Federal Aviation Administration is anticipated to be received for expenditures in FY 2005 and FY 2006 resulting in refunds to the County for monies advanced on this project. 2004-2005 Capital Improvements Plan Project Requests Page 19 ■ Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. N/A Please describe the need for this project. For several years, development requiring land acquisition at the Winchester Regional Airport has focused on the Runway 32 (southwest) end. With that land acquisition project complete, several parcels within the Runway 14 (northeast) end also need to be acquired. Acquisition is necessary because many of the identified parcels are located within the Airport's FAR Part 77 primary surface and/or approach surface. In addition, several of the residential parcels are located in side the FAA's projected DNL 65 noise contour. The FAA considers residential use within the noise contour non -compatible with airport operations and encourages airport to resolve the non - compatibility through acquisition fee simple where feasible. M Please describe and justify the proposed location of the project. N/A 2004-2005 Capital Improvements Plan Project Requests Yage LU Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project is within the Airport's Twenty Year Master Development Plan and is within the Airport Support Area identified on Frederick County's Comprehensive Plan. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? Parcels 31 and 46 are located adjacent to Runway 14-32. Parcel 31 is located within the FAR Part 77 primary surface. In addition, terrain and other features on both parcels are obstructions the to FAR Part 77 transitional surface. Parcel 53 is located under the western corner of the Runway 14 Runway Protection Zone (RPZ). It is the recommendation of the FAA and the Airport's desire to own in fee simple all land within their RPZ's. These acquisitions will help to clear the approach surfaces for Runway 14 and structures, trees, etc. will be removed as part of this project. 2004-2005 Capital Improvements Plan Project Requests Page 21 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Yes, under the federal Aviation Administration's Part 77 Surface Requirements, the Airport is required to own fee simple property within the Primary Surface. This requirement is also include in the Code of Virginia 15.2. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? N/A Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Safe and efficient approach systems into the airport are essential in attracting business traffic into this region especially during adverse weather conditions that could produce more revenue for the regional and additional operating revenue for the airport to help the airport be more self- sustaining. 2004-2005 Capital Improvements Plan Project Requests Page 22 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? Project is within the Airport's Twenty Year Master Plan. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Residents living along the northern side of Bufflick Road that have property identified for acquisition were immediately notified upon completion of the Master Plan Update in 1993. They were each provided a copy of an estimated timetable outlining when acquisition proceedings would proceed. Each property owner involved seems to e supportive of the project. Prior to beginning any actual proceedings, each owner involved will be fully advised and met with individually in accordance with Federal Land Acquisition Regulations. 2004-2005 Capital Improvements Plan Project Requests Page 23 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Terminal Building Renovations, Phase II Date Prepared: September 26, 2005 Agency: Winchester Regional Airport Agency Contact Person: Serena R. Manuel Phone Number: (540) 662-5786 Location of Project: Winchester Regional Airport Magisterial District: Shawnee Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. The General Aviation Terminal building was constructed in 1992. Over the past 12 years, new and existing companies, State, Federal and local agencies, and the public have used the terminal building extensively. The building is beginning to show several areas of wear that need to be addressed including the delaminating of the exterior surface and leaking of the roof. In addition, the existing HVAC system is approaching the end of its useful life and needs to be replaced. There are places within the public lobby of the terminal building that leak rather badly and several areas of the ceiling have actually fallen down after becoming soaked with rainwater. Ceiling tiles are constantly being replaced within the office areas. The roof replacement is scheduled and budgeted for FY 2006. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. An evaluation of the facility is being conducted in FY 2006. A qualified architect will determine the condition of all components of the building and a priority schedule for addressing renovations along with cost estimates and recommendations on what renovation efforts would be most beneficial. Realizing that such renovations are relatively expensive, the project will likely have to be completed over time once the evaluation and recommendations are completed. FY 2006 — Evaluation of Facility FY 2007 — Renovation of Facility (May carry over to FY 2008) 2005-2006 Capital Improvements Plan Project Requests Page 38 Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. An evaluation of the terminal building and its components, is funded in FY 2006 budget and a State grant has been received for $40,000 Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: N/A 2005-2006 Capital Improvements Plan Project Requests Page 39 Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1s` FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006/2007 2007/2008 2008/2009 2009/2010 2010/2011 FY 2011 Planning, Surveying, & Design Land Acquisition Site Preparation & Improvements Construction $500,000 $500,000 Furniture and Equipment Other (opening day collection) TOTAL $500,000 $500,000 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2005-2006 Capital Improvements Plan Project Requests Page 40 0 Source of Funding: Indicate the projected amount for each funding source. Element 1St FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 2006/2007 2007/2008 2008/2009 2009/2010 2010/2011 FY 2011 General $100,000 $100,000 Fund Other Fund State Grants $400,000 $400,000 Bonds and Debts Other Fund- raising TOTAL $500,000 $500,000 PROPOSED FUNDING SOURCES Please describe the source of funding (i.e. type of grant): FY 2007 Local Share — Local Jurisdictions State Grant — Virginia Department of Aviation $100,000 (20%) $400,000 (80%) 2005-2006 Capital Improvements Plan Project Requests Page 41 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. N/A Please describe the need for this project. The terminal building is over twelve years old and is in need of renovation in order to prevent further deterioration and to protect the local jurisdictions and the State's investment. The flat roof needs to be repaired in order to prevent the interior of this building from further damage. Funds to construct the terminal building were received by the State Department of Aviation in 1989 and it is the responsibility to maintain and preserve this facility under conditions of the original grant. Mr® i Please describe and justify the proposed location of the project. N/A 2005-2006 Capitalprovements Plan Project Requests Page 42 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? N/A Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? There are several areas within the building that sections of tile or drywall from the ceiling have fallen when wet. Leaks are repeatedly fixed however, it has been determined that there are also structural improvements that must be made in order to prevent further damage and deterioration. 2005-2006 Capital Improvements Plan Project Requests Page 43 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? As a condition to receiving funding from a State Grant, there is an obligation to maintain the facility constructed with State funds. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? N/A Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? The terminal building serves as the front door to this community with a positive impression made on businesses and travelers arriving at the Winchester Regional Airport. It is a valuable asset used to promote this region to enhance economic development and tourism. 2005-2006 Capital Improvements Plan Project Requests Page 44 ®o Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? Phase I for an evaluation to determine the scope of the renovation is in the FY 2006 budget. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. N/A 2005-2006 Capital Improvements Plan Project Requests Page 45 • C� • 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Land Acquisition — Preliminary Phase Parcels 47, 47A & 48 Date Prepared: September 26, 2005 Agency: Winchester Regional Airport Agency Contact Person: Serena R. Manuel Phone Number: (540) 662-5786 Location of Project: Bufflick Road Magisterial District: Shawnee Project Description: Give a brief (1-2) paragraph description of what the project includes Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Preliminary work to acquire three parcels along Bufflick Road identified on the Airport Property Map as parcels 47, 47A & 48. Property is included in the current Twenty -Year Master Plan and must be acquired to meet noise abatement requirements. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. FY 2005 — 2006 Preliminary Costs (Surveys, appraisals, EDDA, etc.) (May carry over to FY 2007) FY 2006 — 2007 Actual land acquisition costs Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. 2004-2005 Capital Improvements Plan Project Requests Page 24 Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: This project was rated as number 6 in the County CIP_ Estimate Cost (in 2004 dollars): PROPOSED EXPENDITURES Element 15` FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006/2007 2007/2008 2008/2009 2009/2010 2010/2011 FY 2011 Planning, $651000 $65,000 Surveying, & Design Land $800,000 $800,000 Acquisition Site Preparation Improvements Construction Furniture and Equipment Other (opening day collection) TOTAL $65,000 $800,000 $865,000 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2004-2005 Capital Improvements Plan Project Requests Page 25 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1" FY 2006/2007 2nd FY 2007/2008 3rd FY 2008/2009 4th FY 2009/2010 5th FY 2010/2011 Beyond FY 2011 TOTAL General Fund $13,000 $160,000 ($155,700) $17,300 Other Fund Federal Grant State Grants $52,000 $640,000 $821,750 ($666,050) $821,750 $25,950 Bondsand Debts Other Fund-raising TOTAL $65,000 $8001000 $-0- $865,000 Please describe the source of funding (i.e. type of grant): FY 2006 Local Share $52,000 (20%) State Grant — Virginia Department of Aviation $13,000 (80%) FY 2007 Local Share $160,000 (20%) State Grant — Virginia Department of Aviation $640,000 (80%) In FY 2008 funding reimbursement from the Federal Aviation Administration is anticipated to be received for expenditures in FY 2006 & FY 2007 resulting in the local share being reduced from (20%) to (2%) with a refund due to the County on the local share in the amount of $155,700 2004-2005 Capital Improvements Plan Project Requests Page 26 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. N/A Please describe the need for this project. For several years, development requiring land acquisition at the Winchester Regional Airport has focused on the Runway 32 (southwest) end. With that land acquisition project complete, several parcels within the Runway 14 (northeast) end also need to be acquired. Acquisition is necessary because many of the identified parcels are located within the Airport's FAR Part 77 primary surface and/or approach surface. In addition, several of the residential parcels are located in side the FAA's projected DNL 65 noise contour. The FAA considers residential use within the noise contour non -compatible with airport operations and encourages airport to resolve the non - compatibility through acquisition fee simple where feasible. Please describe and justify the proposed location of the project. M 2004-2005 Capital Improvements Plan Project Requests Page 27 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project is within the Airport's Twenty Year Master Development Plan and is within the Airport Support Area identified on Frederick County's Comprehensive Plan. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? Parcels 47, 47A and 48 are located adjacent to Runway 14-32 within the FAR Part 77 primary surface. In addition, terrain and other features on both parcels are obstructions to the FAR Part 77 transitional surface. It is the recommendation of the FAA and the Airport's desire to own in fee simple all land within their RPZ's and primary surfaces. These acquisitions will help to clear the approach surfaces for Runway 14 and structures, trees, etc. will be removed as part of this proj ect. 2004-2005 Capital Improvements Plan Project Requests Page 28 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal requirement? Yes, under the federal Aviation Administration's Part 77 Surface Requirements, the Airport is required to own fee simple property within the Primary Surface. This requirement is also include in the Code of Virginia 15.2. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? N/A Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Safe and efficient approach systems into the airport are essential in attracting business traffic into this region especially during adverse weather conditions that could produce more revenue for the regional and additional operating revenue for the airport to help the airport be more self- sustaining. 2004-2005 Capital Improvements Plan Project Requests Page 29 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? Project is within the Airport's Twenty Year Master Plan. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. Residents living along the northern side of Bufflick Road that have property identified for acquisition were immediately notified upon completion of the Master Plan Update in 1993. They were each provided a copy of an estimated timetable outlining when acquisition proceedings would proceed. Each property owner involved seems to e supportive of the project. Prior to beginning any actual proceedings, each owner involved will be fully advised and met with individually in accordance with Federal Land Acquisition Regulations. 2004-2005 Capital Improvements Plan Project Requests Page 30 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Upgrade Airfield Lighting Date Prepared: September 26, 2005 Agency: Winchester Regional Airport Agency Contact Person: Serena R. Manuel Phone Number: (540) 662-5786 Location of Project: Winchester Regional Airport Magisterial District: Shawnee Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Upgrade Medium Intensity Runway Lighting (MIRL) to High Intensity Runway Lighting (HIRL) and upgrade 2 -Box Precision Approach Path Indicator (PAPI) to 4 -Box PAPI. 1® Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. The design phase is scheduled for FY 2007 with the construction phase scheduled for FY 2008 depending upon available State/Federal funding. ■ Coordination: If the project is dependent upon or is being planned in conjunction with any other project(s), identify it/them and indicate the relationship between the projects. N/A 2006-2007 Capital Improvements Plan Project Requests Page 3 Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: This project is included in the current CIP rated as number 3 under the County Priority System. This project will be delayed until Federal funding becomes available. Estimate Cost (in 2005 dollars): PRnPnCFD EXPENDITURES Element 1st FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006/2007 2007/2008 2008/2009 2009/2010 2010/2011 FY 2011 Planning, $50,000 $50,000 Surveying, & Design Land Acquisition Site Preparation & Improvements Construction $150,000 $150,000 Furniture and Equipment Other (opening day collection) TOTAL$50,000 $150,000 $200,000 Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2006-2007 Capital Tmprovements Plan Project Requests Page 4 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1st FY 2006/2007 2nd FY 2007/2008 3rd FY 2008/2009 4th FY 2009/2010 5th FY 2010/2011 Beyond FY 2011 TOTAL General Fund $1,000 $3,000 $4,000 Other Fund Federal Grants State Grants $45,000 $4,000 $135,000 $12,000 $180,000 $16,000 Bonds and Debts Other Fund-raising TOTAL $50,000 $150,000 $200,000 Please describe the source of funding (i.e. type of grant): Local Share — Local Jurisdictions State Grant — Virginia Department of Aviation Federal Grant — Federal Aviation Administration $4,000(2%) $16,000 (8%) $180,000 (90%) 2006-2007 Capital Improvements Plan Project Requests Page 5 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. N/A Please describe the need for this project. Recent improvements at the airport have enhanced all-weather and nighttime operations capability. Included in these improvements was the recent installation and commissioning of the airport's precision instrument landing system that has increased use of the airport by jet aircraft. FAA in Advisory Circular No. 150/5340-24 recommends that runways with precision approaches have high intensity runway edge lights (HIRLs) installed and that a 4 -Box visual approach aid be installed on runways with jet operations. Please describe and justify the proposed location of the project. N/A 2006-2007 Capital Improvements Plan Project Requests Page 6 Conformance to the Comprehensive Plan: Does the project conform to, or contribute to the attainment of the goals and objectives of the Comprehensive Plan? Is the project consistent with established policies? This project is within the Airport's Twenty -Year Master Development Plan. Public Health, Safety, or Welfare: Does the project improve conditions affecting health, safety, or welfare? Does it eliminate a clear health or safety risk? Upgrade of the airfield lighting system will enhance the approach system into the Winchester Regional Airport providing pilots with faster traveling aircraft the ability to see the airport from a further distance out. 2006-2007 Capital Improvements Plan Project Requests Page 7 Legal Requirement: Is the project required in order to meet a State or Federal mandate or some other legal reauirement? Although not mandated, this project will meet the FAA's design standards and recommendation for airport with the type of precision instrument landing system in place at Winchester Regional Airport. Equitable Distribution of Services: Does the project meet a special need of some segment of the population that has been identified as needing assistance? Would the project provide equivalent services to a population group that is currently under served relative to other areas of the County? N/A Economic Impact: Is the project essential to, or would it encourage some form of economic development? Would the project improve the tax base, reduce operating expenses, produce revenue, or otherwise have a positive effect on the local economy? Approach systems at an airport that are safe and efficient could attract more business traffic to this region especially during adverse weather or nighttime operations. An increase in traffic could also produce more operating revenue for the airport. 2006-2007 Capital Improvements Plan Project Requests Page 8 Coordination with other projects: Is the project necessary for the successful completion of other projects? Is the project part of a larger project? This project will complete the entire precision instrument land system already installed. Public Support: Are county residents fully informed and supportive of the proposed project? List the methods used to determine public support. N/A 2004-2005 Capital Improvements Plan Project Requests Page 9 • • J 2006-2007 CAPITAL IMPROVEMENTS PLAN INDIVIDUAL DESCRIPTION AND JUSTIFICATION FORM Return to: Department of Planning and Development Frederick County, VA Project Name: Land Acquisition — Preliminary Phase Parcels 50, 51 & 52 Date Prepared: September 26, 2005 Agency: Winchester Regional Airport Agency Contact Person: Serena R. Manuel Phone Number: (540) 662-5786 Location of Project: Bufflick Road Magisterial District: Shawnee Project Description: Give a brief (1-2) paragraph description of what the project includes. Provide basic information, such as the location, size, acreage, floor area, capacity, etc. Preliminary work to acquire three parcels along Bufflick Road identified on the Airport Property Map as parcels 50, 51 & 52. Property is included in the current Twenty -Year Master Plan and is to be acquired to meet noise abatement requirements. Schedule: If the project will take several years to complete, outline the schedule here. Be sure to include any work that might have been done in previous years, including studies or other planning. FY 2007 — 2008 Preliminary Costs (Surveys, appraisals, EDDA, etc.) FY 2009 — 2010 Actual land acquisition costs Coordination: If the project is dependent upon or is being planned in conjunction with any other project's), identify iVthem and indicate the relationship between the projects. On., 2004-2005 Capital Improvements Plan Project Requests Page 31 Project Priority: If previously included in the Capital Improvements Plan, please indicate previous priority and current status of project: This project was rated as number 7 in the County's CIP. Estimate Cost (in 2005 dollars): PROPOSED EXPENDITURES Element 1" FY 2nd FY 3rd FY 4th FY 5th FY Beyond Total 2006/2007 2007/2008 2008/2009 2009/2010 2010/2011 FY 2011 $50,000 Planning, $50,000 Surveying, & Design $300,000 $300,000 Land Acquisition Site Preparation & Improvements Construction Furniture and Equipment Other (opening day collection) $50,000 $300,000 $350,000 TOTAL Basis of Cost Estimates: Check one of the following. If you want to provide more detailed information on the estimate, please do so in the space provided. Cost of comparable facility or equipment X From cost estimate provided by an engineer, architect, or vendor From bids received "Preliminary" estimate, (e.g. no other basis for estimate, guesstimate) Other (please explain) 2004-2005 Capital Improvements Plan Project Requests Page 32 Source of Funding: Indicate the projected amount for each funding source. PROPOSED FUNDING SOURCES Element 1s`' FY 2nd FY 3rd FY 4th FY 5th FY Beyond TOTAL 11 2006/2007 2007/2008 2008/2009 2009/2010 2010/2011 FY 2011 General Fund $10,000 $60,000 ($63,000) $7,000 Other Fund Federal Grant $332,500 $332,500 State Grants $40,000 S240,000($269,500) ($269,500) Bonds and Debts Other Fund-raising TOTAL $50,000 $300,000 $-0- $350,000 Please describe the source of funding (i.e. type of grant): FY 2009 Local Share $10,000 (20%) State Grant — Virginia Department of Aviation $40,000 (80%) FY 2010 Local Share $60,000 (20%) State Grant — Virginia Department of Aviation $240,000 (80%) In FY 2011 funding reimbursement from the Federal Aviation Administration is anticipated to be received for expenditures in FY 2009 & FY 2010 resulting in the local share being reduced from (20%) to (2%) with a refund due on the local share of $63,000 2004-2005 Capital Improvements Plan Project Requests Page 33 Project Justification: Please project the number of persons, dwellings, students, or units to be served or the units of service to be provided by the project. N/A Please describe the need for this project. For several years, development requiring land acquisition at the Winchester Regional Airport has focused on the Runway 32 (southwest) end. With that land acquisition project complete, several parcels within the Runway 14 (northeast) end also need to be acquired. Acquisition is necessary because many of the identified parcels are located within the Airport's FAR Part 77 primary surface and/or approach surface. In addition, several of the residential parcels are located in side the FAA's projected DNL 65 noise contour. The FAA considers residential use within the noise contour non -compatible with airport operations and encourages airport to resolve the non - compatibility through acquisition fee simple where feasible. Please describe and justify the proposed location of the project. Mn 2004-2005 Capital Improvements Plan Project Requests Page 34 • C • ITEM #2 Revisions to the Eastern Road Plan As you are aware, the Metropolitan Planning Organization (MPO) has recently adopted their 2030 Transportation Plan for new and improved transportation corridors in Winchester and the urban portion of Frederick County. Staff has been comparing the County's Eastern Road Plan to the MPO plan. Staff also compared the Eastern Road Plan to the County's Small Area Land Use Plans. Attached you will find staffs comparison. This road plan reflects a clearer vision of the MPO's plan as well as the County's comprehensive plan. Staff is seeking comment from the CPPS regarding the new changes and updates to the Eastern Road Plan. Staff is seeking a recommendation from the CPPS to forward to the Planning Commission. It is important to note that the road plan will be part of a comprehensive review of the UDA of the County's Comprehensive Policy Plan. This may involve a complete update of the road plan. Including the information mentioned above, pleasefind attached a copy of the draft Eastern Road Plan update, including a staff prepared map showing new roadway corridors and major road improvements. Revisions: Eastern road Plan Northeast Land Use Plan • Addition of the Carroll Industrial Park "Loop Road." This new major collector road will begin at US Route 11, north of Exit 317, and then terminate at Ebert Road, which will be designated as an improved major collector road. This has been identified in the Land Use Plan and the Carroll Industrial Park Master Development Plan (MDP). • Addition of Cross Cannon Blvd., from Stephenson Road south to US Route 11. This has been identified in the Win -Fred MPO 2030 Transportation Plan (MPO) and the Stephenson Village MDP. • Addition of a new major collector road, extending east from Rest Church Road and US Route 11, then south to Woodbine Road. This has been identified in the Land Use Plan and the Semples Rezoning. • Reconfiguring Woodbine Road as a new major collector road. This has been identified in the Semples Rezoning • Removing the "kinks" out of northeast segment of State Route 37. The MPO has classified this segment as a "managed access" highway, therefore creating flexibility for possible additional access points along Route 37, between Interstate 81 and Route 7. e Addition of the Brooke Road extension from US Route 11 to US Route 522. This has been identified in the Winchester Area Transportation Study (WAIS) and by the MPO. • Addition of a southbound on-ramp from Lenoir Drive to Route 37. This has been identified in the MPO plan. • Reclassify US Route Il between the West Virginia state line and Exit 317 as an improved major collector. This is identified in the MPO plan. 37 West Land Use Plan • Addition of the Long Green Lane extension from US Route 522 south to US Route 50. This has been identified in the Land Use Plan. • Addition of the Apple Pie Ridge extension from US Route 522 to Long Green Lane. This has been identified in the Land Use Plan. • Addition of the Campus Blvd. extension across Route 37 from the Winchester Medical campus to Long Green Lane. This has been identified in the Land Use Plan, and the Winchester Medical Center MDP. Round Hili Land Use Plan + Addition of the WWW MDP and Winchester Medical Center MDP major and minor collector road networks. These have been identified in the Land Use Plan and both the WWW and Winchester Medical Center MDPs. • Addition of a flyover of Medical Center Drive, from Hospital Drive across Route 37, to Perennial Drive. This has been identified in the Winchester Medical Center MDP. • Realignment of the Round Hill Road and US Route 50 intersection. This has been identified in the WWW MDP. Western Jubal Early Land Use Plan • Addition of the Jubal Early Drive extension from the Winchester city limit to Route 37 with a new interchange at the Merrimans Lane flyover. This has been identified in both the Land Use Plan and the MPO plan. • Addition of a new major collector road running from the future Jubal Early Drive extension south to Cedar Creek Grade. This has been identified in both the Land Use Plan and the MPO. Route 11 South Corridor Land Use Plan • Addition of the Stephens City by-pass major collector road from the relocated I-81 exit 307 to the Springdale/Shady Elm intersection. This has been identified in the Land Use Plan, WATS, and the MPO. • Addition of Shady Elm Road as an improved major collector from Apple Valley Road to the future intersection of the Stephens City by-pass and Springdale Road, with a new interchange at Route 37. This has been identified in WATS and the MPO. • Addition of Prosperity Road extending to Soldiers Rest Lane and Shady Elm Road as a new major collector road. This has been identified in the Land Use Plan, WATS, and the MPO. • Addition of the Tasker Road extension from Lakeside Drive, across I-81, to the future Stephens City by-pass as a new major collector road. This has been identified in the Land Use Plan, WATS, and the MPO. • Addition of the Squirrel Lane extension from Marlboro Road / Fairfax Street to the future Tasker Road extension as a new minor collector road. This has been identified in the Land Use Plan, WATS, and the MPO. • Addition of a new minor collector road from US Route 11, roughly across from Shenandoah Valley Baptist Church & Academy, east to the future Squirrel Lane extension. This has been identified in the Land Use Plan and the MPO. 2 • Addition of US Route 11 as an improved major collector running from Shawnee Drive to just north of the Bartonsville Historic District. This has been identified in the Land Use Plan. • Addition of a new minor collector road running from Stickley Drive and connecting it to Aylor Road. This has been identified by WATS and the MPO. e Addition of the Warrior Drive extension as a new major collector road, running south from Fairfax Pike to Double Church Road, then west to Town Run Lane, connecting with the future Stephens City by-pass and yet -to -be relocated Exit 307. This has been identified in the Meadows Edge MDP, Southern Hills MDP, and the MPO plan. Southern Frederick Land Use Plan • Realignment of Papermill Road at its intersection with US Route 17/522 south to Justes Drive. Also, Papermill's crossing of I-81 will be realigned with Battaile Drive with a new interchange with I-81. This has been identified in the Land Use Plan and the MPO plan. • Addition of a new major collector road, extending from Tasker Road and Route 37 north to Evendale Lane, and continuing to Papermill Rd. This has been identified in the Land Use Plan, the Crosspointe Rezoning, and the MPO plan. • Addition of a new minor collector road extending from Caldwell Lane to the future northern extension Tasker Road. This has been identified in the Crosspointe Rezoning. • Continuation of Justes Drive as a major collector road extending to Victory Road and Airport Road. This has been identified in the Land Use Plan and the MPO. • Addition of a new major collector road extending from Longcroft Road and US Route 17/522 west to future Warrior Drive. This has been identified in the Land Use Plan. • Reclassify a new major collector road running east to west through the Crosspointe project as a new minor collector road. This has been identified in the Crosspointe Rezoning. • Addition of a new minor collector road extending south from Chinkapin Drive to future Tasker Road. This has been identified in the WATS plan. • Addition of a new minor collector road extending north from Chinkapin Drive to a proposed minor collector road in the Crosspointe project. This has been identified in the Land Use Plan. • Reclassify current Chinkapin Drive to an improved minor collector road. • Realigning future East and West Parkins Mill Road to cross US Route 17/522 north of its current intersection. This has been identified in the Land Use Plan. 3 • Addition of a new minor collector road connecting US Route 17/522, through Canter Estates, Phase 5, to future West Parkins Mill. This has been identified in the Land Use Plan, and the Canter Estates V MDP. • Addition of a new minor collector road connecting Macedonia Church Road to Marcel Drive. This has been identified in the Tasker -Woods Land Use Plan. Route 50 East Corridor Land Use Plan • Addition of a new major collector road extending west from Airport Road and US Route 17,522 to future Warrior Drive. This has been identified in the Land Use Plan, WATS, and the MPO. • Addition of a new major collector road extending south from US Route 50 and Prince Frederick Drive to US Route 17/522, and then across 1-81 to the Tevis Street alignment in the City of Winchester. This has been identified in the Land Use Plan, WATS, and the MPO. • Addition of a new major collector road extending east from future US Route 17/522 to Arbor Court. This has been identified in the Land Use Plan, and the Carpers Valley Rezoning. • Addition of a new major collector road extending south from Inverlee Way to the proposed Carpers Valley collector road. This has been identified in the Land Use Plan, and the Carpers Valley Rezoning. • Extending a major collector road from Channing Drive and Sulphur Spring Road to the Independence Dr / US Route 50 intersection. This is not on any of the current plans, but was identified by the CPPS as an important link. • Addition of a new minor collector road extending east from future Inverlee Way to Greenwood Road. This is not on any of the current plans, but was identified by staff as an important link. Route 7 East Corridor Land Use Plan ® Remove improved minor road status on Valley Mill Road from Brookland Lane to Route 7, and creating a new intersection with Route 7 and the new Winchester Gateway shopping center. Other ® Future interchanges have been added to the Eastern Road Plan to better coordinate the upcoming growth in Frederick County. 4