Loading...
CPPC 12-12-05 Meeting MinutesNotes of CPPS Meeting December 12, 2005, 7:30 p.m. Senior Planner Susan Eddy distributed a memo from Steve Kapocsi, Administrative Assistant to the School Superintendent, on school site selection criteria. Item 1— UDA Study — Double Tollgate Triangle Deputy Director Mike Ruddy reviewed the agenda packet, which contained information on the Double Tollgate Triangle Area. Mr. Ruddy reminded the committee that the Board of Supervisors had directed them to study the triangle area as part of the UDA study. Mr. Ruddy went over statistics on land use, parcels, transportation and the environment. Mr. Ruddy noted the comments from Wendy Jones with the Sanitation Authority on sewer capacity north and south of Wright's Run. Member DeHaven suggested that the parallel road south of Route 277, as previously discussed by the CPPS, be studied in depth as part of this triangle study. Staff will need to further investigate topography, MPO modeling and other issues. Members discussed the need for public facilities, especially a fire and rescue station, in this area. A school site might be needed on the far western end of the triangle area. There was much support from members for designating land for industrial use. A discussion of industry v. distribution v. office use took place. The meeting ended at 9:30 pm. SKE