Loading...
PC 09-20-95 Meeting AgendaAGENDA FREDERICK COUNTY PLANNING COMMISSION The Old Frederick County Courthouse Winchester, Virginia SEPTEMBER 20, 1995 7:00 P.M. CALL TO ORDER TAB 1) Meeting Minutes of August 16, 1995 .......................... A 2) Bimonthly Report ..................................... B 3) Committee Reports ..................................... C 4) Citizen Comments ..................................... D 5) Informal Discussion Regarding Proposed Additions to James Wood High School and Sherando High School. (Mr. Wyatt) ......................................... E 6) Site Plan #031-95 of God's Glory Land for a religious retreat with lodging and recreational facilities. The property is identified with PINS 37-A-45, 37-A-46, 37 -A -46A, and 37 -A -46B in the Back Creek District. (Mr. Wyatt) ......................................... F 7) Other .................................................G MEETING MINUTES OF THE FREDERICK COUNTY PLANNING COMMISSION Held in the Board Room of the Old Frederick County Court House in Winchester, Virginia on August 16, 1995. PRESENT: Planning Commissioners Present were- Charles S. DeHaven, Jr., Chairman/Stonewall District; John R. Marker, Vice Chairman/Back Creek District; Robert A. Morris, Shawnee District; Richard C. Shickle, Gainesboro District; Terry Stone, Gainesboro District; John H. Light, Stonewall District; Roger L. Thomas, Opequon District; George L. Romine, Citizen at Large; Robert M. Sager, Board Liaison; and Jay Cook, Legal Counsel. ABSENT: S. Blaine Wilson, Shawnee District; Richard C. Ours, Opequon District; Marjorie H. Copenhaver, Back Creek District; Vincent DiBenedetto, Winchester City Liaison. Staff Present:Robert W. Watkins, Director and Secretary; Evan A. Wyatt, Planner II, Jean M. Moore, Planner I; and Kris C. Tierney, Deputy Planning Director. CALL TO ORDER Chairman DeHaven called the meeting to order at 7:00 p.m. Mr. Sager inquired as to why the Wheatlands Wastewater Treatment Facility Site Plan was still active and if it could be removed from the report. Mr. Watkins explained that the County does not have an expiration date for pending applications at this time and that the applicant of this project has requested that it remain active. 2 Chairman DeHaven accepted the Bimonthly Report for the Commission's information. Mr. Romine reported that the EDC is continuing its work on locating new industrial sites with railroad access. Comprehensive Plans & ProUamc Committee ( PP ) - 8/ 14/95 Mtg Mr. Tierney reported that the CPPS met on August 14, 1995 and the findings of that committee meeting would be reported at this evening's worksession. Winchester City Planning Comm' ci n Mr. Shickle reported that he was not able to attend the last City Planning Commission meeting, however, it was his understanding that a final recommendation had been made on outdoor storage and it would be forwarded to the Winchester City Council. Planning Commission Adjourns to Work ec ion There were no other topics or applications that needed to be addressed formally by the Planning Commission, therefore, Chairman DeHaven adjourned the meeting at 7:10 p.m. and invited everyone to stay for the worksession. The topics of discussion for the worksession were the Round Hill Community Plan, the Civil War Battlefield Tour Network, and the WATS Alternative 5.0. Respectfully submitted, Robert W. Watkins, Secretary Charles S. DeHaven, Jr., Chairman BIMONTHLY REPORT OF PENDING APPLICATIONS REZONINGS: Professional Mobile Home Brokers (John Tauber) (REZ) Stonewall -. 2.1514 Acres B2 to B3 Location: Rt. 7; 300 yds. east of Regency Lakes Dr. Submitted: 08/16/95 PC Review: 09/06/95 - Approved BOS Review: 10/11/95 James Carroll Shawnee 2.81 acres RP to B2 (REZ) Submitted: 04/05/95 PC Review: Location: Custer Ave./Pembridge Rd. Submitted: 10/07/94 PC Review: Tabled by PC: 11/02/94 Tabled at Applicant's request: 12/07/94, 03/01/95, 04/05/95, 04/19/95 Next Review Date: 11/01/95 BOS Review: not yet scheduled Wayne Ridgeway (REZ) Gainesboro 2.047 acres RA to B3 Location: Rt. 522 Submitted: 04/05/95 PC Review: Tabled at Applicant's request: 05/03/95, 08/02/95 Next Review Date: 10/04/95 BOS Review: not yet scheduled MASTER DEVELOPMENT PLANS: J.I.C. Ltd. industrial Lots (MDP) Shawnee M1 Lot for metals works & fabrication (8.411 tl. acreage) Location: Arbor Ct. (Rt. 1000) Extension; off Victory Ln. (728) Submitted: 08/11/95 PC Review: 09/06/95 - Approved BOS Review: 10/11/95 Fieldstone Hghts (MI)P) Stonewall 169 SF Det. Trad. Lots (RP) Location: South of Valley Mill Rd. (Rt. 659) Submitted: 04/25/95 PC Review: 05/18/94 Tabled 07/06/94 Approved BOS Review: 08/10/94 Approved Pending Admin. Approval: Awaiting. completion of review agency requirements Battlefield Partnership (MDP) Back Creek 16.3 Acres of B2 Property Location: South of Winchester, between Rts. 11S and I-81 Submitted: 02/21/92 PC Review: 03/18/92 Approved BOS Review: 04/08/92 Approved Pending Admin. Approval: Awaiting completion of review agency requirements James R. Wilkins, III (MDP) Shawnee 76 Apartments & 86 T.H. (RP) Location: South side of Rt. 659 Submitted: 11/02/92 PC Review: 12/16/92 Tabled 02/17/93 Approved BOS Review: - 03/10/93 Tabled 04/14/93 Approved Pending Admin. Approval: Awaiting completion of review agency requirements SUBDIVISIONS: Star Fort, Sect. I (SUB) Stonewall 21 SF lots on 7.5713 total acres (RP) Location: Lauck Drive; east side of Rt. 832 Submitted: 08/28/95 PC Review: 10/04/95 BOS Review: Review not required --Has an approved MDP Maxwell T. Mandel, DVM (SUB) pequon 2 Lots from 0.803 Acres (131) F Location: Southeast corner of Rt. 277 and Highlander Rd. Submitted: 07/28/95 PC Review: 9/06/95 - Approved BOS Review: L09/13/95 J.I.C., Ltd. Industrial Lots Residue of Lot 9-A (SUB) Shawnee 2 Lots - 8.411 total Acres (M1) Location: Arbor Ct. (Rt. 1000), off of Victory Lane (Rt. 728) Submitted: 08/11/95 PC Review: 1 09/06/95 - Approved (pending MDP approval) BOS Review: Review Not Required - If MDP is approved ---]rRT&T Partnership (SUB) Back Creek --TLot - 29.6 Acres (132) Location: Valley Pike (Rt. 11 So.) Submitted: 05/17/95 PC Review: 06/07/95 Approved BOS Review: Review not required --has an approved MDP Pending Admin. Approval: Awaiting submission of signed plat & deed of dedication FiBrianvood Estates (SUB) Stonewall 20 Sr Det. Trad. Lots (RP) Location: Greenwood Rd. Submitted: 01/03/94 PC Review: Review date pending at applicant's request. BOS Review: Review not required --has an approved MDP Abrams Point, Phase I (SUB) Shawnee 230 SF Cluster & Urban Lots (RP) Location: South side of Rt. 659 Submitted: 05/02/90 PC Review: 06/06/90 Approved BOS Review: 06/13/90 Approved Pending Admin. Approval: Awaiting deed of dedication, letter of credit, and signed plat Harry Stimpson (SUB) Opequon Two B2 Lots Location: Town Run Lane Submitted: 09/23/94 PC Review: 10/19/94 Approved BOS Review: 10/26/94 Approved Pending Admin. Approval: Awaiting signed plat. Preston Place (SUB) Shawnee 72 Garden Apartments (RP) Location: North side of Airport Rd. (Rt. 645) Submitted: 10/31/94 PC Review: 11/16/94 Approved BOS Review: Not required --Has an approved MDP Pending Admin. Approval: I Awaiting signed plats. SITE PLANS: Training His Tots Christian PreSchool (SP) Back Creek Shelter Renovation on 2.25 Acres (RA) Location: 4118 Valley Pike; Church of Christ at Mt. View Submitted: 09/01/95 ll_Approved: Pending James Wood High School Addition (SP) Gainesboro School Addition on 0.43 Acres (RA) Location: Apple Pie Ridge Road (Rt. 739) Submitted: 08/31/95 Approved: Pending Southern States Cooperative, Inc. (SP) Back Creek Fuel Storage/Retail Store on 0.60 acres (B2 & M1) Location: 5784 Valley Road Submitted: 08/30/95 Approved: il Pending Payne Well Drilling(SP) Stonewall Storage Bldg. on 1.0 acres (M1) Location: Martinsburg Pike Submitted: 08/24/95 Approved: 09/01/95 Amoco Convenience Center (SP) Gainesboro Convenience Center on 4.0 acres (B2) Location: Southeast corner of Rts. 522/694 Submitted: 08/17/95 Approved: IL Pending Redbud Run Elementary School (SP) Stonewall Public School on 26.65 acres (RA) Location: Rt. 7, approx. 1 mi. east of I-81 Submitted: 08/01/95 Approved: IL Pending Wheatlands Wastewater Facility (SP) Opequon Treatment Facility on 5 Acres (115) Location: So.West of Double Tollgate; adj. & west of Rt. 522 Submitted: 09/12/89 Note: I Being held at applicant's request. Flex Tech (SP) Stonewall MI Use on 11 Ac. (M1) Location: East side of Ft. Collier Rd. Submitted: 10/25/90 11 Note: g Being held at applicant's request. God's Glory Land, Inc. (SP) Back Creek Church Retreat on 26.45 acres (RA) Location: N.W. side of Rt. 704, approx. 3 1/4 mi. so. of Rt. 50 Submitted: 08/08/95 Approved: 11 Pending Regency Lakes Estates, Sect. D (SP) Stonewall HCMF Development Corp. Stonewall Addition on 1.6 Acres (RP) (Van Gilder's Nursing Submitted: Home) (SP) Approved: Location: 1011 Pennsylvania Avenue Submitted: 05/30/95 Approved: 11 Pending Regency Lakes Estates, Sect. D (SP) Stonewall Manufactured SF Homes on 30.1 Acres (MH1) Location: Regency Lakes Drive Submitted: 06/07/95 Approved: 1 Pending Dawsons Investments Inc., Lot 5 (SP) Back Creek Warehouse on 1.91 Acres (M1) Location: N.W. Corner of Industrial Dr. & Development Lane Submitted: 06/27/95 Approved: 11 Pending Winchester Electric (SP) Stonewall Warehouse on 2.05 Acres (M1) Location: 120 Fort Collier Rd. Submitted: 07/10/95 Approved: 08/30/95 Redland United Methodist Church (SP) Cainesboro Church on 5.0 Acres (RA) Location: Intersection of No. Frederick Pk. (Rt. 522) & Cross Junction Rd. (Rt. 693) Submitted: 06/08/95 Approved: 09/06/95 Macedonia United (SP) Methodist Church Addition Shawnee Church on 5+ Acres (RA) Location: 1941 Macedonia Church Rd., White Post Submitted: 07/31/95 Approved: I Pending CONDITIONAL USE PERMITS: Vito & Carrie Angelone (CUP) Back Creek F3O-Run Dog Kennel w/ Storage (RA) Location: 376 Gough Road (Rt. 618) Submitted: 08/15/95 PC Review: 09/06/95 - Approved w/ Conditions BOS Review: 10/11/95 Charles W. Goff (CUP) Gainesboro Gun & Small Engine Repair (RA) Location: 10998 North Frederick Pk., Cross Junction Submitted: 08/08/95 PC Review:09/06/95 - Approved w/ Conditions BOS Review: 10/ 11/95 VARIANCES: James & Nannette Kirby Stonewall .5' west side yard for existing (VAR) dwelling (RP) Location: 121 O'Brien's Circle Submitted: 08/22/95 BZA Review: 09/19/95 Winchester Countertop Stonewall 4' side yard variance for addition of compressor room Location: 183 Imboden Drive Submitted: 08/23/95 BZA Review: 09/19/95 Timothy & Deana Dayhuff Stonewall 10.4' side yard variance (RA) Location: 117 Panarama Drive, Winchester Submitted: 08/04/95 BZA Review: 09/19/95 IE. PLANNING AN DEVELOPMENT - A IVIT% REPORT #88 (Aug, -15-31) 1. Transportation Bids for construction of the Route 642 realignment project were received by VDOT. The successful bidder is expected to begin work this fall. Bob Watkins and Evan Wyatt attended a VDOT meeting in Culpeper to review information for the completion of the ISTEA Enhancement Agreement for the Grim Farm. Evan Wyatt and Ed Strawsnyder inspected various roads in the Gainesboro District with VDOT representatives to assess potential improvements. Evan Wyatt prepared the 1996-1997 Frederick County Secondary Road Improvement Plan. Public hearings will be held for this update at the Transportation Committee, Planning Commission, and Board of Supervisors levels. 2. Battlefield Preservation Bob Watkins met with Darcy Spencer from the Northern Virginia Daily to discuss battlefield preservation. Bob Watkins met with Bob Carter of VDHR, Chuck Johnston of Clarke County, and Tom Christoffel to discuss battlefield preservation issues. 3. Historic Issues Bob Watkins attended the meeting of the Heritage Tourism Subcommittee of the Lord Fairfax Planning District Commission. 4. GIS/Mannins Eric Lawrence researched the benefits associated with providing the Internet to the Department. This information was presented to the department staff, who agreed with its productivity benefits. Page 2 BOS Activity Report #88 August 15 - 31 S. Plan Reviews. Al2pmvals. and Site Insnec inns Evan Wyatt reviewed a site plan for God's Glory Land located along Back Creek Road, as well as revisions to the Winchester Electric site plan located in the Fort Collier Industrial Park and the Moxon Timbers site plan located in the IDC Industrial Park. A site plan was approved for the new Winchester Electric facility located in the Stonewall Industrial Park. Evan Wyatt conducted site inspections for the F & M Bank Branch located at Country Park Plaza; the Carlyle and Anderson facility located along Berryville Pike; the Rosedale Baptist Church located along Northwestern Pike; the Carroll Construction facility located along Ebert Road; the Lenoir City warehouse located in the Stonewall Industrial Park; the Preston Place II Apartment complex located along Airport Road; and the Shenandoah Valley Christian Academy located along Valley Pike. Eric Lawrence reviewed the site plan for Payne Well Drilling in the Stonewall District. Following an on-site meeting with Mr. Payne, the site plan was approved. Wayne Miller visited several properties of persons applying for conditional use permits and subdivisions and then prepared the staff summaries for the Planning Commission's agenda. Mr. Miller also reviewed and signed nine building permit applications. 6. Meetings Bob Watkins and Jean Moore met with John Shelley to discuss business expansion. Bob Watkins and Wayne Miller attended a meeting on August 25 with Mr. Jim Wilson, Board Chairman Richard Dick, and County Administrator John Riley, concerning land development options along Aylor Road in the Stephens City area. Kris Tierney had a number of conversations with a group regarding an application for rezoning. The applicant wishes to establish a major business at an Interstate 81 interchange in Frederick County. An application is assembled and should go before the Planning Commission in October. Kris Tierney met with Henry Buettner, with Rainbow Group Inc., to discuss the Page 3 BOS Activity Report #88 August 15 - 31 preparation of a master development plan for roughly 50 acres of Industrial Transition (B-3) land. We anticipate the submission of an application for the October Planning Commission meeting. Kris Tierney met with a representative for Mr. Jim Wilson to discuss the preparation of a rezoning application for two parcels along Aylor Road. Mr. Wilson wishes to rezone from Neighborhood Business (B-1) to Business General (B-2). An application is being developed. Evan Wyatt participated in a Technical Review Committee (TRC) meeting on August 24, 1995. The TRC considered a proposed site plan for the removal and installation of new retail fuel tanks at the Southern States facility located along Valley Pike; the proposal for the creation of a new administration building at the Timber Ridge School for the Leary Educational Center; and a proposal for the construction of six apartment buildings adjacent to the Dowell J. Howard Vocational Center. Evan Wyatt met with a representative of a group to discuss site plan requirements associated with the development of a major business at an Interstate 81 interchange in Frederick County. Evan Wyatt met with Dr. Bruce Welch to discuss site plan requirements associated with a new veterinary clinic located along Aylor Road. Evan Wyatt met with Fred Ash of the Shockey Company and other designers to discuss a proposal to develop Flex Tech office and warehouse space in the Westview Business Center. Evan Wyatt met with Greg Elliott, with the Winchester Church of God, to discuss recreational improvements for the day care operation. Evan Wyatt met with Jess Moffett of the City of Winchester to discuss the site plan requirements associated with the construction of a new water storage tank on the Solenberger property just west of Route 37 and north of Northwestern Pike. Wayne Miller met with Potomac Edison Company representative, Rosalie Cornwell, on September 1 concerning site plan issues involved in the building of a new power distribution station adjacent to the existing one just north of Middletown. Page 4 BOS Activity Report #88 August 15 - 31 also approved four plats for RA land division. 7. Zoning Violations Wayne Miller investigated two zoning violations on August 18 for an inoperative vehicle in an RP Zoning District and an illegal and unpermitted sign in the B2 Zoning District. Subsequent zoning violation letters were prepared and mailed. 8. Professional Development Karen Clark, Beth Hall, Renee' Arlotta, Evan Wyatt, Jean Moore, Wayne Miller, and Kris Tierney attended a DOS Computer Training Seminar given by Bob Watkins on August 22. 9. Other Eric Lawrence began the annual update to the Rezoning Impact Model. This update is necessary to ensure that all variables involved in the rezoning impact modeling process are accurate. Wayne Miller completed the contract with the Wayside Inn for the Planning Commission's Annual Retreat to be held on February 3, 1996. COUNTY of FREDERICK Department of Planning and Development 703/665-5651 FAX 703/678-0682 MEMORANDUM TO: Frederick County Planning Commission FROM: Evan A. Wyatt, Planner II RE: Informal Discussion Regarding Proposed Additions to James Wood High School and Sherando High School DATE: September 6, 1995 Representatives of the Frederick County School Board have requested an opportunity to present preliminary development plans for the. proposed expansion of James Wood High School and Sherando High School. The proposed improvements will allow each high school to increase its .,,capacity from 1,250 students to 1,500 students. James Wood High School will be increased by <an additional 18,000 square feet to provide for additional classroom and cafeteria space, while TSherando High School will be increased by 15,000 square feet for additional classroom space only. Representatives of the Frederick County School Board will provide visual displays during the meeting that depict these improvements, as well as handouts for your records. This discussion is for your information and does not require a recommendation or other action. However, staff will report all comments or concerns of the Planning Commission to the Board of Supervisors when they discuss this item. 107 North Kent Street P.O. Box 601 Winchester, VA 22601 Winchester, VA 22604 P/C Review Date: 09/20/95 SITE PLAN ##031-95 GOD'S GLORY LAND LOCATION: This property is located on the northwest side of Back Creek Road (Route 704), 3.3 miles southwest of Gore. MAGISTERIAL DISTRICT: Back Creek PROPERTY ID NUMBER: 37-A-45, 37-A-46, 37 -A -46A, and 37 -A -46B PROPERTY ZONING & PRESENT USE: Zoned RA (Rural Area); Land Use -Vacant ADJOINING PROPERTY ZONING & _PRESENT USE: North: Zoned RA (Rural Areas) Land Use - Agricultural and Vacant South: Zoned RA (Rural Areas) Land Use - Agricultural and Vacant East: Zoned RA (Rural Areas) Land Use - Agricultural and Vacant West: Zoned RA (Rural Areas) Land Use - Residential (Finger Lake Estates) PROPOSED USE: Religious retreat with lodging and recreational facilities REVIEW EVALUATIONS: Virginia Department of Transportation: The Department of Transportation has approved the engineered site plan and will allow construction of all entrances contingent upon a land use permit being applied for and issued. Inspections Department: The Building Official has approved the engineered site plan contingent upon the applicant meeting all structural requirements of the BOCA National Building Code/1993 and all site development requirements of Title III of the Americans with Disabilities Act. Page 2 God's Glory Land SP #031-95 REVIEW EVALUATIONS (Continued): Public Works: The County Engineer issued a Land Disturbance Permit in October 1994 to allow for rough grading of this site. Final approval of the engineered site plan is pending review of the drainage analysis and its relationship to the design of the on-site stormwater detention facility. Fire Marshal: The Fire Marshal has approved the engineered site plan. The applicant has provided two means of ingress/egress, a road system capable of supporting emergency equipment, and a dry hydrant located adjacent to a pond that will provide a water supply for fire fighting purposes. Health Department: The Health Department has advised the applicant that a permit will need to be applied for and issued prior to the establishment of camp sites at this site for recreational vehicles. The Health Department will also monitor food service and general sanitation through their TES Program for tourist establishments. Department of Environmental Quality_ The Department of Environmental Quality (DEQ) has approved and issued Virginia Pollution Discharge Elimination System (VPDES) Permit No. VA0088871 to the applicant for sewage discharge. The issuance of this permit requires the applicant to provide information to DEQ periodically for monitoring purposes. Planning Department.: 1) Project History Conditional Use Permit #001-94 for God's Glory Land was approved by the Frederick County Board of Supervisors on May 26, 1994. Nine conditions were placed on this permit, of which, three warrant discussion with the Planning Commission. Condition #1 requires the applicant to receive approval of the engineered site plan through a formal review process; Condition #2 requires the applicant to receive approval of the phasing plan; and Condition #4 restricts the use of the wastewater treatment plant to one specific parcel of land. Page 3 God's Glory Land SP #031-95 REVIEW EVALUATIONS (Continued),• 2) Facility Design: The overall design of the religious retreat meets the intent of the Conditional Use Permit, as well as the requirements of the review agencies. The applicant has met with the review agencies to ensure that the engineered site plan is in conformance with the various regulations. At this time, the only review agency that has not formally approved the engineered site plan is the County Engineer. The County Engineer is working with the project engineer to ensure that the proposed stormwater management facility is properly designed and constructed. 3) Floodplain Disturbance: Section 165-3113(1) of the Frederick County Zoning Ordinance states that; "The Zoning Administrator, with the approval of the Planning Commission, may allow disturbance of small areas in the floodplain for purposes of recreation, conservation, utilities or stornnwater management. The Administrator may allow the construction of recreational facilities or roads in the floodplain." The engineered site plan calls for the disturbance of 0.35 acres (or 15,250 square feet) of area defined as floodplain for the purposes of constructing the stormwater management facility and the fire service road to access the dry hydrant. Staff recommends that the Planning Commission provide the Zoning Administrator with the authority to allow this disturbance to ensure that these improvements are located in the appropriate areas. 4) Wastewater Treatment Facility The applicant has received a VPDES Permit for the use of this facility as required by DEQ. However, condition #4 limits the use of this facility to one parcel. The proposed site plan indicates that there are four parcels which comprise the land area for this facility. A plat of consolidation has been prepared and signed -off by the Subdivision Administrator. The applicant will proceed with recordation once all reviews have been satisfied and the Planning Commission has recommended approval of this plan. STAFF RECOMMENDATION FOR 9/20/95 PLANNING COMMISSION MEETING: Approval, provided that all comments and concerns of the Planning Commission are adequately addressed, that the applicant legally record the plat of consolidation, and that all review agency requirements are addressed on the site plan.