1) Bimonthly Report ...................................... A
2) Committee Reports .................................. a . B
3) Citizen Comments ..................................... C
4) Discussion Regarding Revised Recommendations for the Capital Improvements
Plan(Mr. Tierney) ..................................... D
5) Informal Discussion with Ralph Gregory; Re: a B2 zoned parcel located on
the west side of Route 11 South. (Mr. Tierney) .................... E
6) Informal Discussion with Bruce Welch; Re: a proposed veterinary hospital on
the east side of Route 647. (Mr. Tierney) ....................... F
7) Other.............................................G
M E M O R A N D U M
TO: Frederick County Planning Commission
FROM: Robert W. Watkins, Secretary
SUBJECT: Bimonthly Report
DATE: January 6, 1995
(1) Rezonin s Pending: (dates are submittal dates
C. L. Robinson
03/30/94
BkCk
RA
to
B3
Brown Lovett, Jr.
09/14/94
Ston
RA
to
M1
James Carroll
10/07/94
Shaw
RP
to
B2
Valley Mill Estates
11/10/94
Shaw
RA
to
RP
(2) Rezonin s A roved:
dates are
BOS meeting
dates
Frederick Mall
12/14/94
Shaw
RA
to
RP
Frederick Mall
12/14/94
Shaw
RA
to
RP
(3) Rezoninas Denied: „(dates are BOS meeting dates)
None
(4) Conditional Use Permits Pending: dates are submittal dates
Mark Anderson & Veterinarian
James Casey 12/08/94 Ston hospital/office
(5) Conditional Use Permits Approved: dates are approval dates
Robin Dassler 12/14/94 Gaines Private Dog Breeding
Kennel
(6) Conditional Use Permits Denied: dates are denial dates
Joe Edmiston 12/14/94 BcCk Kennel
2
(7) Site Plans Pending: (dates are submittal dates)
Wheatlands Wastewater Fac.
Grace Brethren Church
Flex Tech
Lake Centre
Garber
Kraft General Foods
Westminster Canterbury
Federal Express
Bank of Clarke Co.
Lakeview Garden Apartments
09/12/89
Opeq
Trmt.facil
06/08/90
Shaw
Church
10/25/90
Ston
Lgt. Industrial
05/15/91
Shaw
Townhouses
07/26/94
Shaw
Retail Commercial
10/06/94
Ston
Addition
11/16/94
Gaines
Duplex Housing
12/16/94
Shaw
Warehouse
12/16/94
Shaw
New Bank Branch
01/05/95
Shaw
Apartments
(8) Site Plans Approved: (dates are approval dates)
Regency Lakes Sec. C
12/01/94
Ston
Mobile Homes
Taco Bell
12/09/94
Gaines
Restaurant
Preston Place Apt. II
12/09/94
Shaw
Apartments
Amoco Foam
12/09/94
Ston
Outdoor Storage
Cracker Barrell
12/21/94
Shaw
Dining Addition
Shenandoah Valley Baptist
01/05/95
Opeq
Classroom Addition
(9) Site Plans_ Approved: (dates are withdrawn dates)
Red Star Express Lines 01/06/95 Ston
(10) Subdivisions Pending: (dates are submittal dates)
Briarwood Est. 01/04/94
Ston
(11) Subdivisions Pending Final Admin. Approval:(PIC or HOS approval
dates
Abrams Point, Phase I
Lake Centre
Fredericktowne Est., Sec 9
Harry Stimpson
06/13/90
Shaw
06/19/91
Shaw
10/06/93
Opeq
10/26/94
Opeq
(12) PMDP Pending: (dates are submittal dates)
Fieldstone Heights 04/25/94
(13) PMDP Approved:_ (Dates are approval dates)
Ston
Saratoga Meadows 12/16/94 Shaw
3
(14) FMDP Pending Administrative Approval• (dates are BOS approval
dates
Battlefield Partnership
James R. Wilkins III
Star Fort
04/08/92 BaCk
04/14/93 Shaw
09/14/94 Gain
(15) Board of Zoning Appeals Applications Pending: (submit. dates)
Weber's Nursery 11/08/94 Ston
Wilkins Dev. Corp. 12/27/94 Shaw
(16) BZA Applications Approved• (approval dates)
Burger
King
11/23/94
Gain
Burger
King
11/23/94
Gain
Amoco
11/23/94
Gain
Amoco
11/23/94
Gain
Holiday
Inn
11/23/94
Opeq
Holiday
Inn
11/23/94
OPeq
(17) BZA Applications Denied•
Margaret Johnson 11/21/94 BaCk
(18) PLANS REC D. FOR REVIEW FROM CITY OF WINCHESTER
None
1E. PLANNING AND DEVE OPMENT - ACTIVITY REPORT #`72 (Dec. 5-30)
1.
Plan Reviews Approyals, and Site Inspections:
Evan Wyatt reviewed revisions to the Price Club site plan
and revisions to the Shamrock Truck Terminal site plan.
Evan Wyatt met with representatives of various
engineering firms to review preliminary site plan sketches for a
proposed office addition to Seaward International; a proposed
office building for State Farm Insurance; and a proposed
maintenance building at the landfill.
Evan Wyatt conducted site inspections for the new
addition to Southeastern Container and for the Urgent Care
Facility.
2. Meetings
Bob Watkins and Evan Wyatt attended a meeting with County
Administrator John R. Riley,'Jr., Winchester City Manager Ed Daley,
Economic Development Commission Director June Wilmot, and City
Planning Director Tim Youmans to discuss the proposed update to the
Civil War Battlefield Tour Network ISTEA Enhancement application.
Evan Wyatt met with Extension Agent Gary DeOms and John
Stelzl to continue work on the proposed Double Church and Refuge
Church Agricultural and Forestal Districts.
On December 20, Kris Tierney met with Tom Baker and G. W.
Clifford & Associates representatives, Chuck Maddox and Steve
Gyurisin, to discuss buffering for a potential B2 to B3 rezoning
located near the interchange of Route 11 and Route 37 South.
3. GIS
Clay Grant is working on a composite road and road name
map of the County.
Good progress is being made on map conversion to GIS.
Re-establishment of contact with E.S.R.I. has begun to finalize
conversion of tax parcel identification and Camra real estate files
data to ArcInfo (GIS) use.
4. Departmental
Jean Moore and Evan Wyatt completed a draft summary for
streamlining the Frederick County site plan review process.
Jean Moore has begun to collect data for the 1994 Annual
Report.
5. Board of Zoning Appeals
Jean Moore presented seven variance applications and one
violation appeal to the Board of Zoning Appeals.
6. Other
Evan Wyatt began work with Penske Trucking and Leasing
Company regarding a proposed amendment to the M-1 District that
would permit this use.
Evan Wyatt assisted June Wilmot with presentation
graphics for a meeting with the Mid Atlantic Distribution
Corporation.
COUNTY of FREDERICK
Department of Planning and Development
703/665-5651
Fax 703/678-0682
MEMORANDUM
TO: Planning Commission Members
FROM: Kris C. Tierney, Deputy Planning Director
SUBJECT: Proposed 1995-96 Capital Improvements Plan
DATE: January 10, 1995
As most Commissioners are aware, the Comprehensive Plans and Programs Committee
evaluates departmental CIP project requests. The 1995-96 Capital Improvements Plan was
presented to the Planning Commission on January 4, 1995. As a result of recent School
Board changes to their project requests, the CIP has been revised to reflect these changes.
At their January 9, 1995 meeting, the Comprehensive Plans and Programs Committee re-
evaluated and finalized their recommendation for the 1995-96 CIP. Materials related to the
preparation of this recommendation along with the draft are attached.
The following documents are attached:
► Cost Summary for the draft 1995-96 CIP.
► Project Summary for the draft 1995-96 CIP. This includes a brief outline of the
project included in last years CIP, and those included in the draft 1995-96 CIP.
► The 1995-96 Capital Improvements Plan (CIP) as recommended by the
Comprehensive Plans and Programs Committee at their meeting on January 4, 1995.
Please contact myself or Eric Lawrence if you have any questions
COST SUMMARY
The proposed CIP contains 27 projects with a total project cost of $54,087,136. This figure
includes the estimated debt service on all projects except the County Offices. The total does
not include Sanitation Authority or Landfill projects which are paid for out of user fees and
are made a part of the CIP in the form of addendum. Of this amount, $30,728,806 would
come from the County's General Fund over a five year period (not including debt service).
As presently proposed, projects scheduled in the first year (1995-96 fiscal year) would have a
total County cost of $13,037,950 excluding any debt service.
PROJECT SUMMARY
The draft 1995-96 CIP consists of 27 project requests from the County's various
departments. Of these project requests, only five are new to the CIP. The remaining 26
were included in the 1994-95 CIP. The five new projects are: JW & Sherando High
School Renovations, New Stonewall Elementary School, Administration Building
Renovations, and Transportation/Maintenance/Central Warehouse facility requests from
the School Board, and a Landfill Development Phase I, Cell D request from the Public
Works Department.
Listed below are the modifications that each county department has made in their project
requests for inclusion in the 1995-96 CIP. Please note: the projects which were included in
the .1994-95 CIP and again in the 1995-96 CIP are not discussed.
School Board Projects
Projects no longer included in the CIP:
1) Senseny Road Elementary School Roof Replacement -- Completed.
2) Frederick County Middle School Window Replacement and Air
Conditioning -- Completed.
3) James Wood Middle School Partial Air Conditioning -- Completed.
4) James Wood Middle School Partial Roof Replacement -- Completed.
Projects which are new to the CIP:
1) JW & Sherando High School Renovations. This project includes the
construction of additions to James Wood and the Sherando High Schools,
2) New Stonewall Elementary School. This project involves the demolition of
the existing building, and the construction of a new Stonewall School on the
site.
3) Administration Building Renovations. This project involves the renovations
of the Administration building so that it may be used as an elementary school.
4) Transportation/Maintenance/Central Warehouse facility. This project
involves the construction of a facility on the Route 7 property to serve the
School Board and the Frederick County needs.
Parks and Recreation Projects
All project requests for the 1994-95 CIP will be included in the 1995-96 CIP.
Handley Library
All project requests for the 1994-95 CIP will be included in the 1995-96 CIP.
Airport Authority
Projects no longer included in the CIP:
1) Taxiway Relocation -- Completed.
2) Construct T -Hanger Taxiway -- Completed.
Sanitation Authority Projects
Projects no longer included in the CIP:
1) Expansion of Parkins Mills Wastewater Treatment Plant -- Under
Construction. Anticipated completion date: October 1996.
2) Frederick County Water Treatment Plant -- Complete.
3) Water Storage Tank at Authority Headquarters Site -- Completed.
4) Water Transmission Lines
a) Route 522 Transmission Line I -- Completed.
b) Route 522 Transmission Line II -- Completed.
c) Route 50 Connector Line -- Completed.
d) Stonewall Industrial Park / Lee Avenue Water Loop -- Completed.
Landfill and Compactors Projects
Projects no longer included in the CIP:
1) Landfill Closure, Existing 20 Acre Site -- Completed.
2) Landfill Development, 10 Acres -- Completed.
Projects which are new to the CIP:
1) Landfill Development, Phase 1, Cell. This project was not included in the
1994-95 CIP.
FREDERICK COUNTY
CAPITAL L"FROVEMENT PROGRAADIING
PROJECT EVALUATION PROCESS
The attached forms were used to evaluate requested Capital Improvement Projects. The first form
contains a list of seven evaluation criteria. Each criterion has been assigned a weight which reflects
its relative importance when compared to the other criterion.
The second form was used to record the rating which was given to each project. The projects are listed
by department. Each project was reviewed against all of the criterion and was given a rating between
zero and four. A score of four being the highest, indicating that the project most appropriately fits the
criterion. The rating was then entered in the corresponding cell. The numeric figure to the right of
the rating is the result of the rating being multiplied by the weight and the resulting score entered in this
same cell. The scores which were given to the projects for each of the seven criteria were then totaled
across the table and the total entered in the far right hand column. Only the resulting scores after the
ranking is multiplied by the weight was totaled. These total scores were then used to assist in
ranking projects. The higher the score, the greater the priority the project is given.
Below is an example showing the total score derived for a hypothetical request for a new elementary
school. The weights corresponding to the criteria are shown beneath the criterion. The ranking given
to projects for each criterion has been entered to the left in the corresponding cell. The score (the
rating multiplied by the weight) has then been entered to the right of the cell. The total score of 39 was
arrived at by adding up the scores (the number to the right of each cell) for each individual criterion.
FREDERICK COUNTY
CAPITAL IMPROVEMENT PROJECTS
EVALUA'T'ION FORM
LISTED BY DEPARTMENT; IN ORDER OF DEPARTMENT PRIORITY
CRITERION Conform to
Health,
Legally
Distribute
Economic
Related
Public
and Comp. Plan
Safety,
Required
Services
Impact
to Other
Support TOTAL
Welfare
Projects
WEIGHT 3
4
4
2
2
3
3
SCORE= RATING
x WEIGHT
SCHOOL SYSTEM
New Elementary School 2/6
2/8
2/8
3/6
1/2
113
2/6 39
FREDERICK COUNTY
CAPITAL IMPROVEMENT PROGRANEM11ING
PROJECT EVALUATION CRITERIA
TOPIC
DESCRIPTION
WEIGHT
1
Conformance to
Does the Project conform to, or contribute
Comprehensive Pian
to the attainment of goals/objectives of the
Comprehensive Plan? Is the Project
3
J1
consistent with established policies?
2
Public Health, Safety or
Does the Project improve conditions
Welfare
affecting health safety or welfare? Does it
4
eliminate a clear health or safety risk?
3
Legal Requirement
Is the Project required in order to meet a
State or Federal mandate or some other
4
legal requirement?
4
Equitable Distribution of
Does the Project meet a special need of
Services
some segment of the population that has
been identified as needing assistance? 2
Would the Project provide equivalent
services to a population group that is
currently under served relative to other
areas of the county?
5
Economic Impact
Is the Project essential to, or would it
encourage some form of economic
development? Would the Project improve 2'
the tax base, reduce operating expenses,
produce revenue, or otherwise have a
positive effect on the local economy?
6
Coordination with other
Is the Project necessary for the successful
Projects
completion of other projects? Is the Project 3
part of a larger project?
7
Public Support
Are county residents fully informed and
supportive of the proposed Project? 3
1995 FREDERICK COUNTY
CAPITAL IMPROVEMENT PROJECTS
EVALUATION FORM
LISTED BY DEPARTMENT; IN ORDER OF DEPARTMENT PRIORITY
CRITERION
Conform to
Health,
Legally
Distribute
Economic
Related
Public
35
and
Comp. Plan
Safety,
Required
Services
Impact
to Other
Support
TOTAL
rySchool
216
Welfare
0/0
214
112
Projects
319
32
WEIGHT
3
4
4
2
2
3
3
32
�Y Renovations
3/9
2/8
0/0
2/4
_ .
1/2
113
..,.
113
29
ntce/Wareh....
2/6
21:8
D/U
1/2<.
21,J
4X13
113:
26
Closure of Cells A,B, Phase I
4/12
4/16
4/16
3/6
1/2
3/9
0/0
61
Landfill developmenthrrse�,e11 D
41G
4116
x:116:
. 2f. 4 `
I /2
319
Landfill Development Phase II Cell A
P
4 / 12
4 / 16
4/16
2/4
1/2
3 / 9
0 / 0
_.
59
-Now:,Coil pactorSite- ..
4 / I2
.
21;8
Q / 0
3 ! 6'i
1:/ 2 , ....1
f 3
1 t 3
34
Library
Stonewall
Road I
2/6 0/0 0/0 4/8 1/2 0/0 3/9 1 25
Aylor, Hoover Chiller Replacement 2/6 2/8 0/0 0/0 0/0 0/0 2/ 6 20
liltcewaySystem
3/9
2/8
0/0
2/4
1/2
1/3
3/9
35
�ehoolRenovntions
2/6
21;8.
f'1Q
214:;:
12
1 /3
319 "
32;
rySchool
216
218
0/0
214
112
113
319
32
Renovations ..:.
2J6
2%i8
Q.10:'
2/4
1:/2..
113...':.319...:1
2 f 6
32
�Y Renovations
3/9
2/8
0/0
2/4
_ .
1/2
113
..,.
113
29
ntce/Wareh....
2/6
21:8
D/U
1/2<.
21,J
4X13
113:
26
Aylor, Hoover Chiller Replacement 2/6 2/8 0/0 0/0 0/0 0/0 2/ 6 20
liltcewaySystem
4/12
2/8
0/0
1/2
1/2
2/6
2/6
36
Tentris/Basketbal Complex CB
3 f 9
1 f.4
0'{ fl
3 / 6.'
1 {;;2
2161:
I / 3.
30:
Open Play Area at Water Tower - CB
3/9
1/4
0/0
2/4
1/2
2/6
2/6
31
Softball C6mpleY; � SP
3 / 9
0 /.0
010
1 12
1 ! 2
.2./ 6
2 f 6
25 :::
Ball Field Renovations
2/6
0/0
0/ 0
1/2
1/2
2/6
2/ 6
22
4 >: Pla .IArea 4 CB
1 y
3 /.9..
! 1 / 4
0/O
316 .
1I<2
216
2/6
33
Support Faculties - CB
2/6
2/8
0/0
1/2
0/0
2/6
1/3
25
Soccer Complex ;
31 ,;
0 ! 0
0'I 4
3.16
112:
2<f 6
Tennis/PicnicArea - SP
3/9
0/0
0/0
1/2
0/0
2/6
2/6
23
Sh iter, Stage Seating - CB
:3 / 9 :
0 TO
0 / 0
3.) 6
3 I' 6
::216, 6
2 16
33
Park Land
3/9
0/0
0/0
4/8
1/2
1/3
2/6
28
Maintenance Compound''
l/ 3
I/ 4
0/ 0
0/ 0
1 12
1` f 3
i/ 3
15
P
EAlxnercise/Oper Play - CB
3/9
1/4
0/0
2/4
1/2
2/6
2/6
31
P
3/90/0
010
3/6
31;5
.0/0
216
27
Nature Center
3/9
0/0
0/0
4/8
0/0
1/3
2/6
26
Land Acquisition
2/6
1/4
2/8
1/2
3/6
3/9
2/ 6
41
Aircraft Storage Hanger
216
0 / 0':
01 /; 0
4 / 8
4 /'8
2'/ 6
3 19
29'
Upgrade Terminal Apron Lights
P�' P g
2/ 6
2/ 8
0/ 0
3/6
3/6
1/3
2/6
29
FREDERICK COUNTY,
VIRGINIA
DRAFT
Capital Improvements Plan
1995-96
Fiscal Year
As Recommended by
Comprehensive Plans and
the Frederick County
Programs Committee.
Table of Contents
INTRODUCTION ............................................ 1
PROJECT RECOMMENDATIONS .. 2
School Board 2
Parks and Recreation ............................ .......... 2
County Administration ..................................... 3
Handley Library ...................................... . . 3
Airport Authority ............. . . .. .... ......... ...... . . .. 3
Sanitation Authority . ........... ................ ..... . .... 4
Landfill and Compactor ..... 4
DRAFT 1995-96 CIP ............................... . .......... 5
PROJECT FUNDING ............... . .............. . .......... 6
APPENDIX: PROJECT DESCRIPTIONS .. .. ....... .. .
Frederick County Sanitation Authority ..... .. , , , , , ,
, 7
Water Transmission Lines
7
Water and Sewer Lines ...........
7
Frederick County Public Works Department ..... , , ... ...
, 9
Closure of Cells A and B, Phase I ............. . .. . ........
9
Landfill Development: Phase I, Cell D . . ...... . ... .... . ... .
. 9
Landfill Development: Phase II, Cell A ............ .......
, 9
New Compactor Site ........................... ... . .
10
Construction of Leachate Treatment Facility ............... . . .
10
Composting/Waste Inspection Facility .. ........... . . ..... . .
10
Expansion of Citizen's Convenience Area .......... . . ..... ..
11
Frederick County Public Schools .. ....... ...............
12
Eastern Frederick County New Elementary School ..............
4 12
Senseny Road Elementary School Air Conditioning/Renovations ... . ..
12
Robinson Elementary School Air Conditioning/Renovations ...... .. ,
12
Stonewall Elementary School Air Conditioning/Renovations ..... ...
13
Buildings and Grounds Department Additions/Renovations ...... ...
13
Frederick County High School III .... ............. . ..
13
New School Transportation Garage .............. ..... ..
14
Robert E. Aylor Middle School and Bass Hoover Elementary School
Chiller Replacement ............................
14
Frederick County Parks and Recreation Department .... .... ...... ..
15
Bicycle Facility ......... ...... ....................
15
Tennis/Basketball Complex ..... .......................
15
Open Play Area at Water Tower ..... ........ . ..... ....
15
Softball Complex
.......................... .......
16
Baseball Field Renovations . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16
Open Play Area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
16
Support Facilities . . . . . . .
17
. . . . . . . . . . . . . . . . . . . . . . . . . . .
Soccer Complex
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Tennis/Picnic Area
17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Shelter/Stage Seating
17
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
ParkLand
18
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
18
Maintenance Compound and Office . . . . . . . . . . . . . . . . . . . . . . .
18
Exercise/Open Play/Picnic Complex . . . . . . . . . . . . . . . . . . . . . . .
18
Amphitheater . . . . . . . . . . . . .
19
. . . . . . . . . . . . . . . . . . . . . . . .
Nature Center/Picnic Area
19
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Handley Regional Library
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Frederick County Library
20
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20
CAPITAL IMPROVEMENTS PLAN
FREDERICK COUNTY
1995-96
INTRODUCTION
The Code of Virginia assigns the responsibility for preparation of plans for capital outlays to
the local planning commissions. The Capital Improvements Plan (CIP) consists of a schedule
for major capital expenditures for the County for the ensuing five years.
The CIP is updated annually. Projects are removed from the plan as they are completed or
as priorities change. The plan is intended to assist the County Board of Supervisors in
preparation of the County budget. In addition to determining priorities for capital
expenditures, the County must also ensure that projects contained within the CIP conform to
the Comprehensive Policy Plan.
The annual review process begins with the submission of capital expenditure requests from
County departments and citizens in the fall of the year. These requests are evaluated by the
Comprehensive Plans and Programs Committee, a subcommittee of the Planning
Commission, using a list of seven evaluation criteria. Each criterion is assigned a weight
which reflects the relative importance when compared to the other criterion. The Committee
then meets with representatives of departments making expenditure requests and determines a
recommended priority and amount for the various requests. This recommendation is passed
to the Planning Commission which in turn makes a recommendation to the Board of
Supervisors.
The CIP is strictly advisory. Once adopted, project priorities may change throughout the
year based on changing circumstances. It is also possible that particular projects may not'be
funded during the year that is indicated in the CIP. The status of any project becomes
increasingly uncertain the further in the future it is projected.
Frederick County 1995-96 Capital Improvements Plan
FA
PROJECT RECOMMENDATIONS
1. School Board Projects
The renovation of the James Wood Middle School air conditioning, in addition to its roof
replacement, were completed during the summer of 1994. The replacement of the Senseny
Road Elementary School roof was completed during the 1994-95 fiscal year. Renovations to
Frederick County Middle School's windows, and the installation of air conditioning were
completed during the 1994-95 fiscal year.
The School Board proposes to build a Elementary School on the recently purchased Route 7
property. This school will have a capacity of approximately 700-750 students. Additions to
James Wood and Sherando High Schools for approximately 300 students are also proposed.
This project will replace the new county high school which had been planned in previous
CIPS.
A new school building is planned for the Stonewall School. Previously, the Stonewall
School project was to include air conditioning/renovations. After further evaluations, the
School Board proposes to close the existing school, and build a new school on the site.
Renovations are proposed for Senseny Road elementary school. This project was included in
past year CIPS, but was delayed due to budget considerations.
Funding is being requested for a new transportation/maintenance/central warehouse facility.
The project involves building the proposed structure(s) on the recently purchased property
along Route 7. The existing maintenance facility has reached the point where it is difficult to
house all of the school system's buses and still provide service to an increasing number of
County vehicles from other departments, in particular the Sheriff's Office, as well as vehicles
from Planning, Building, and Parks and Recreation.
2. Parks and Recreation Projects
Master Plans for the Clearbrook and Sherando parks were adopted in 1987, which describe a
complete program for park improvements. These Master Plans reflect the recommendations
of County residents and conforms to national standards as outlined in the Virginia Outdoor
Plan.
Several projects are planned in and around Sherando Park. The County was awarded an
ISTEA Transportation Enhancement Program grant to build a Bikeway System. This 2.45
Frederick County 1995-96 Capital Improvements Plan
3
mile facility will serve several residential areas in southern Frederick County. The bicycle
path has been designed to link the residential developments and park land on the north of
Route 277 with Sherando Park and Sherando High School. In addition to other
improvements at Sherando Park, two projects are planned that will be used by Sherando
High School, the proposed soccer complex and softball complex.
Several projects are planned for Clearbrook Park including a tennis/basketball facility, an
open play area, support facilities that include landscaping and renovation of the existing
entrance road, an exercise/picnic area, and a shelter with a sound stage and seating.
In an effort to reduce the gap in provision of services to the western portion of the County,
the Parks and Recreation Department is proposing to purchase park land in western Frederick
County that will be the site of a nature center/picnic area.
3. County Administration
The County's Administrative offices have been relocated to the Courthouse Associates
building at 107 North Kent Street. This temporary relocation was necessary in order for the
County to comply with the Americans with Disabilities Act. While the decision to remain
within the City of Winchester's Downtown Historic District has been made, a permanent
location for the County's Administrative offices has not been determined.
4. Handley Library
As part of a master plan prepared for the Handley Library by a library consuitanting firm, it
was recommended that a library be built in southeastern Frederick County. A library in this
area would enable the Handley Library to provide service to the growing population in
southern Frederick County. The Library would need a minimum of 4.5 acres of land. A
34,000 square foot building is proposed which could be expanded, in stages, ultimately to
50,000 square feet.
S. Airport Authority
An updated master plan for the Winchester Regional Airport was adopted in December of
1993. This plan contains recommendations regarding capital improvements to the airport in
order to meet federal guidelines for airports the size of the Winchester Regional Airport and
to provide better service to airport users.
Construction is underway for two projects included in the 1994-95 Capital Improvements
Plan. These projects, Taxiway Relocation and T -Hanger Taxiway, were required in order
for the airport to meet federal design standards.
Frederick County 1995-96 Capital Improvements Plan
4
The projects that the Airport Authority are proposing for the immediate future include a land
acquisition of 34 acres which is needed to enhance aircraft operational safety during approach
to the airport, construction of a 16 -unit T -Hanger, and upgrading the terminal apron lights.
6. Sanitation Authority Projects
The Sanitation Authority is proposing two projects. They include four Water Transmission
Lines and two Water and Sewer Lines. The Water Transmission lines will include providing
service to Miller Heights, Bufflick Heights, Westview subdivision, and Route 50/Victory
Road. The Water and Sewer Line project will provide service to a portion of Route 522
South and Boundary Lane. The Sanitation Authority Projects will not be funded directly
through the CIP. These projects receive their funding through user fees.
7. Landfill and Compactor Projects
The Public Works Department is proposing seven projects. They include:
Closure of Cells A and B, Phase I
Landfill Development - Cell D, Phase I
Landfill Development - Cell A, Phase II
New Compactor Site
Leachate Treatment Facility
New Composting/Waste Inspection Facility
Expansion of Citizen's Convenience Area
The Landfill project and the two cell development projects are all projects that the Landfill is
required to undertake in order to comply with regulations imposed by the Department of
Environmental Quality. The New Compactor Site project will be funded through the CIP.
Funding for the six remaining Landfill projects are provided through the Landfill Enterprise
Fund.
rrederick County 1995-96 Capital f mprovements PIan
FREDERICK COUNTY, VIRGINIA
DRAFT CAPITAL IMPROVEMENTS PLAN
1995-96
County
Priority
Department
Priority
Protects
COUNTY CONTRIBUTION
—1995-96 1996-97 1997-98 1998 99 1999-2000 InteDebt Service est From ny
18.75Q
B
29,000 -.
A
6 5(111000
Contributions Total Project
l `
Z
3
l s
1
1
Airport Land Acjuisition;;
Bikeway System
New Elei ientaiy-School :
18;750
29,000
750,Q00
65,000
TOTALS 13,037,950 13,608,000 1,284,000 1,717,856 1,081,000 15,393,580 46,122,386 54,087,136
A = Partial funding from Federal and State grants B — Partial funding from Federal Airport Improvement Program (FAIP) and State Commonwealth Airport Fund. (SCAF) grants
C = Partial funding from ":ommonwealth Airport Fund (SCAF) grants D = Partial funding from State grants and local gifts E= Debt Sery tavailable at time of printing.
New Compactor Site
60,000
70Q;000
4,668 674.<
11,86$674
1 I , 868,674
-
6:
open Play Area ;CB60,000
206,000
60,000
10
Shelter Stage Seating CB
303 000
20Er;000
206,000:
2 <
rVV & Sherando High School Renovations
5,000,4100
303,000
303,000
3
New Stonewall Elementary School
6,000,000
3' 'S63'
8,26(3;863
8;260,863
4; _.
Admuiis#rattoiil3uildin Renovations
g ::
3 784 aaQ..
3,888,513
9 888,513
9888513
10
3
Open Play Area at Water Tower - CB
.
188,000
425 Sa8
6 2a�<50$
-
6 �a9,508
131:
Exereis610 en I'1a iCIi1C. ArearC
P Y
0
8
12
2
Tennis/Basketball Complex CB
505 000
-8I,000
28100:0.
13
5
Senseny Road Element :Reno .
.
1500000
505,000
5 0
14
2
Aircraft Storage Hanger
_ ... .::...
.:.:
250 000
97;8,450.:;
2,47$;450
_ .
2478,45.x'
15
3 ?
> Tpgrade Terniinal Apron Lights
1;200
0,000
250,000
16
11
Park Land
C
:
17
141
.,.
Am hitheater
1093,00
0
91093000
1 036,000
18
6
Transportation/ tenance/Warehouse
663;000
s �
663,000
P3
I5 :
,am
Mature Center
begin
E
0
1
....:,
New Library
41$:x00
418;000
4-1.8;000
1
4..
Softball (vmplex:- SP
455OQ0
46. 856
D
465,856
7,658,556
22
7
Support Facilities - CB
90 000
455NO
455,000
23
$ :
SvEcer Complex <"
-;
604 a(3Q
403,0043'
24
9
Tennis/Picnic Area SP
578,000
10 07aa0
I ,aq.7,00a
25'
S -1
Bali Field Renovations
199,(1(30
578,000
578,000
26
7
Aylor, Hoover Chiller Replacement
..
275,000
-
27.-...12
:<:
Maintenance Compound
171572
446 ,572
446,5 2
7
i 59,000:.::
j` 159 xQQ
4159000
TOTALS 13,037,950 13,608,000 1,284,000 1,717,856 1,081,000 15,393,580 46,122,386 54,087,136
A = Partial funding from Federal and State grants B — Partial funding from Federal Airport Improvement Program (FAIP) and State Commonwealth Airport Fund. (SCAF) grants
C = Partial funding from ":ommonwealth Airport Fund (SCAF) grants D = Partial funding from State grants and local gifts E= Debt Sery tavailable at time of printing.
M
PROTECT FUNDING
► The projects included in the 1995-96 Capital Improvements Plan have a total cost of
$54,087,136 of which Frederick County will contribute $30,728,806 over the next
five year period of 1995-2000. This total does not include the interest from any debt
service. By adding the projected debt service of $15,393,580, the total county
contribution of the approved projects comes to $46,122,386. This total does not
include any costs associated with the School Board's request for a
Transportation/Maintenance/Central Warehouse facility.
► Proposed funding for the new County Offices will be obtained either through a moral
obligation bond or general obligation bond.
► School projects are funded through loans from the Virginia Public School Authority.
► Sanitation Authority projects will be funded by the Sanitation Authority working
capital funds and Virginia Resource Authority Revenue Bonds.
► Landfill projects are funded by retained funds generated by the landfill fees and
coordinated by the Landfill Enterprise Fund.
► Funding for Parks and Recreation projects will come from the unreserved fund
balance of the County. The Bicycle Facility project will be funded through a
Recreational Access Fund grant, an ISTEA Transportation Enhancement Program
grant, and a 20% match from the general fund. In order to carry out the remaining
Parks and Recreation projects in this plan, the Parks and Recreation Commission
needs to actively seek private sources of funding or cooperation.
► Funding for a Frederick County Library will involve a contribution from the County
general fund, a bond, donation of land, and substantial fund raising efforts by the
Library Board.
Frederick County 1995-96 Capital Improvements Plan
7
APPENDIX: PROJECT DESCRIPTIONS
Frederick County Sanitation Authority
Sewer and Water Project Priority List
PROJECT 1 Water Transmission Lines
A) Miller Heights Water Distribution Line
Description: Install 3,800 linear feet of eight -inch water line.
Estimated Costs: $72,000
Construction Schedule: Contingent on availability of funds
B) Bufflick Heights Water Distribution Line
Description: Install 2,000 linear feet of eight -inch water line.
Estimated Cost: $60,000
Construction Schedule: Begin and complete in FY -95.
C) Westview Water Distribution Line
Description: Install 1,100 linear feet of eight -inch water line.
Estimated Cost: $33,000
Construction Schedule: Begin and complete in FY -95.
D) Route 50 - Victory Road Water Loop
Description: Install 5,500 linear feet of twelve -inch water main.
Estimated Costs: $140,000
Construction Schedule: Begin and complete in FY -95.
PROJECT 2 Water and Sewer Lines
A) Route 522 South Sewer
Description: Installation of approximately 14,300 linear feet of
eight -inch pipe, 11,200 linear feet of twelve -inch pipe, 1,200
linear feet of six-inch force main, and 50 manholes.
Estimated Cost: $72,000
Construction Schedule: Begin and complete in FY -96.
B) Boundary Lane Water and Sewer Line
Description: Install 1,400 linear feet of eight -inch water line
Frederick County 1995-96 Capital Improvements Plan
E'3
and 1,100 linear feet of eight -inch sewer line.
Estimated Cost: Water $45,4000
Sewer $47,750
Total $92,250
Construction Schedule: Contingent on availability of funds.
rreaenck county 1995-96 Capital Improvements Plan
E
Frederick County Public Works Department
Landfill Project List
PROJECT 1 Closure of Cells A and B, Phase I
Description: This project encompasses the closure of Cells A and B,
Phase I. This closure will be performed in accordance with the details
and guidelines set forth in Permit #529.
Capital Cost: $1,400,000
Justification: Required by the Department of Environmental Quality.
Construction Schedule: Begin in FY -96 and may carry over into FY -
97.
PROJECT 2 Landfill Development: Phase 1, Cell D
Description: This project includes the development of approximately
five acres of sanitary landfill space as outlined in permit #529, Phase I
- Cell D.
Capital Cost: $1,000,000
Justification: Required by the Department of Environmental Quality.
The project will serve the citizens of Frederick and Clarke Counties as
well as the City of Winchester fnr annrnvimatal., tk,A. tr. �,,,r .
W -- ---- `... ..1.,.1... .,....a.a... �.,.� ,.... .. w 1VU, �eala.
Construction Schedule: Begin in FY -95 and may carry over into FY -
96.
PROJECT 3 Landfill Development: Phase I1, Cell A
Description: This project includes the development of approximately
five acres of sanitary landfill space as outlined in permit #529.
Capital Cost: $1,000,000
Justification: Required by the Department of Environmental Quality.
The project will serve the citizens of Frederick and Clarke Counties as
well as the City of Winchester for approximately three to four years.
Construction Schedule: Projected to begin in FY -98.
Frederick County 1995-96 Capital Improvements Plan
10
PROJECT 4 New Compactor Site
Description: This project includes the construction of a compactor site
in the vicinity of the intersection of Middle Road and Marlboro Road to
replace the container site on Middle Road. The development of a
compactor site includes site grading, paving, construction of a concrete
pad and a concrete retaining wall, and the installation of a trash
compactor. In addition, it is anticipated that the site will be fenced and
landscaped.
Capital Cost: $51,000
Justification: This existing container site off of Middle Road is
continuously being overrun causing an excessive amount of litter on
adjacent property. This site is also experiencing a great amount of
illegal dumping from contractors and citizens outside of Frederick
County. The installation of a compactor site would afford the Landfill
the opportunity to monitor the inflow of refuse, control illegal dumping
and eliminate the unnecessary litter.
Construction Schedule: Completion in FY -95.
PROJECT 5 Construction of Leachate Treatment Facility
Description: This project includes the construction of a treatment
facility to treat and discharge leachate which is currently being
collected and transported to Parkins Mill Treatment Plant for treatment.
The facility would include an additional holding pond for biological
treatment as well as a chemical processing station prior to discharge
into the Opequon.
Capital Cost: $150,000
Justification: The landfill is currently collecting the leachate in a 1.5
million gallon lined lagoon. The leachate is then pumped and hauled to
Parkins Mills Treatment Plant for treatment. The projected economic
analysis (25 year life) indicates that a treatment facility would provide a
more economical treatment alternative after leachate production reaches
a constant 3,000 gallons per day.
Construction Schedule: Completion in FY -97.
PROJECT 6 Composting/Waste Inspection Facility
Description: This project will include the construction of a pole
bunditig, approximately 60'x!20' in dimension to accommodate sludge
1-recterick County 1995-96 Capital Improvements Plan
11
composting and required random waste inspections. It is anticipated
that the project will include a wood pole building, a 6 -inch concrete
floor and an underlying leachate collection system. The project will be
constructed on landfill property to take advantage of the existing
leachate collection system.
Capital Cost: $85,000
Justification: This project is considered necessary for the following
reasons:
1) Composting sewage sludge would provide an economical
source of needed topsoil used to cover closure areas. The
landfill is currently maintaining 60 acres of closed landfill and
anticipates an additional 90 acres over the life of the new
expansion. Composting sewage sludge will assist us in meeting
recycling mandates imposed by the Department of
Environmental Quality.
2) the proposed composting facility can also be used for the
random waste inspections required by the landfill's new permit.
Construction Schedule: Completion FY -96
PROJECT 7 Expansion of Citizen's Convenience Area
Description: This project will include an expansion area to
accommodate an additional 50 cubic yard open top container. This
expansion will include an extension of the existing retaining wall and
concrete slab, relocation of existing fencing, minor grading and paving.
Capital Cost: $25,000
Justification: This expansion is needed to accommodate the increased
influx of bulky items such as furniture, construction debris, and other
wood products. Currently, there is a 50 cubic yard container which is
continuously being overrun on weekends and holidays.
Construction Schedule: Completion in FY -96.
Frederick County 1995-96 Capital Improvements Plan
12
Frederick County Public Schools
Project Priority List
PRIORITY 1 Eastern Frederick County New Elementary School
Description: The construction of an 585 student capacity elementary
school in eastern Frederick County will be needed to provide increased
school capacity due to continued growth in the elementary school-age
population. In addition, this facility would be helpful in eliminating the
need for the current and any additional modular classrooms that may be
needed at Stonewall and Senseny Road Elementary Schools through the
adjustment of attendance zone boundaries.
Capital Cost: $7,200,000
Justification: The proposed elementary school in eastern Frederick
County will serve a student population of 585 students from
kindergarten through the fifth grade.
Construction Schedule: Begin in FY -95 and complete in FY -96.
PRIORITY 2 Additions to James Wood and Sherando High Schools
Description: This project involves the construction of additions to
James Wood and Sherando High Schools for approximately 300
students each.
Capital Cost: $5,000,000
Justification: The construction of these additions would replace the
need for an entirely new county high school. The additions will serve
the population of Frederick County by increasing the capacity of each
county high school to 1500 students.
Construction Schedule: Begin in FY -95 and complete in FY -97.
PRIORITY 3 New Stonewall Elementary School
Description: This project includes the closing of Stonewall school at
the end of the 1995-96 school year; demolition of the current Stonewall
School; and the construction of a new Stonewall Elementary School on
the current site. The new structure is proposed to have approximately
58,000 square feet of space.
Capital Cost: $6,000,000
Justification: This project will serve a total of 585 students in grades
Frederick County 1995-96 Capital Improvements Plan
13
K-5.
Construction Schedule: Begin in FY -96 and complete in FY -97.
PRIORITY 4 Administrative Building Renovations
Description: This project involves the renovation of the school
administrative office to an elementary school. Renovations will enable
the building to be converted back to an elementary school of
approximately 58,000 square feet. Amenities included in this
renovation will bring the school to a level of amenities similar to other
county elementary schools.
Capital Cost: $3,784,000
Justification: The renovated school will handle 550 students. The
elementary school will serve students in grades K-5.
Construction Schedule: Begin and complete in FY -96.
PRIORITY 5 Senseny Road Elementary School Air Conditioning/Renovations
Description: This project involves the installation of air conditioning
and renovations at Senseny Road Elementary School.
Capital Cost: $1,500,000
Justification: This project will serve a total of 595 students in grade
K-5.
Construction Schedule: Begin in FY -96 and complete in FY -97.
PRIORITY 6 Transportation/Maintenance/Central Warehouse Facility
Description: The Proposed facility would provide a combined facility
for the transportation/maintenance/central warehouse facility needs of
the school division and Frederick County.
Capital Cost: no cost figures
Justification: The Buildings and Grounds Department provides
maintenance and repair services for all county school facilities which
serve over 9,000 students.
Construction Schedule: Begin and complete in FY -97.
Frederick County 1995-96 Capital Improvements Plan
14
PRIORITY 7 Robert E. Aylor Middle School and Bass Hoover Elementary School
Chiller Replacement
Description: This project involves the replacement of the aging chiller
systems. The chillers should be replaced because the current
refrigerate (R-11) will no longer be manufactured and it will be more
expensive to convert the existing chillers to handle the new required
refrigerant than to replace these units.
Capital Cost: $275,000
Justification: The new chillers will be more efficient which will
result in a significant energy savings to the school division.
Construction Schedule: Begin and complete in FY -96.
Frederick County 1995-96 Capital Improvements Plan
15
Frederick County Parks and Recreation Department
Project Priority List
PRIORITY 1 Bicycle Facility
Description: A 2.45 mile bicycle facility to serve several residential
areas in southern Frederick County. This bicycle facility has been
designed to link the developments and parks land on the north side of
Rt. 277 with Sherando Park and the high school on the south side of
Rt. 277.
Capital Cost: $65,000
Justification: The initial trail development will provide a direct benefit
for the 642 planned or completed housing units, with the potential
future expansion of the trail system impacting over 3,000 housing units.
Construction Schedule: Begin in FY -95.
PRIORITY 2 Tennis/Basketball Complex
Description: This project consists of an assortment of athletic facilities
to compliment the existing Clearbrook Park. It includes: 8 lighted
tennis courts, 2 racquetball courts, -2 basketball courts, picnic shelter,
and parking.
Capital Cost: $505,000
Justification: Because Clearbrook Park is a regional facility, these
facilities will be available to all county residents. Currently, there are
no tennis, racquetball, or basketball courts in the Clearbrook Park area.
Construction Schedule: Begin and complete in FY -95.
PRIORITY 3 Open Play Area at Water Tower
Description: This project consists of an assortment of athletic facilities
to compliment the existing Clearbrook Park. It includes: parking
spaces, picnic shelter, 6 horseshoe pits, croquet, shuffleboard,
volleyball court, and landscaping.
Capital Cost: $188,000
Justification: This play area will be available to all Frederick County
residents and reduce the gap between the number of existing play areas
and the number needed to meet minimum standards.
Frederick County 1995-96 Capital Improvements Plan
16
Construction Schedule: Begin and complete in FY -95.
PRIORITY 4 Softball Complex
Description: This project consists of an assortment of athletic facilities
to compliment the existing Sherando Park facilities. It includes: 2
lighted softball fields, parking, and landscaping.
Capital Cost: $455,000
Justification: This facility would provide recreational opportunities for
the entire Frederick County area. In addition to its use as a
recreational facility, it will be used by the Frederick County school
system.
Construction Schedule: Begin and complete in FY -95.
PRIORITY 5 Baseball Field Renovations
Description: This project consists of an assortment of athletic facilities
to compliment the existing Sherando Park facilities. It includes:
renovation to 4 existing ball fields, renovation of the existing
restrooms, access walks, and access road.
Capital Cost: $199,000
Justification: This facility, presently serving as both youth baseball and
adult softball fields, would be used by the "Little League" programs
within the Sherando Park Service area. In addition to this use as a
recreational facility, the athletic complex will also be used by the
Frederick County school systein.
Construction Schedule: Begin and complete in FY -96.
PRIORITY 6 Open Play Area
Description: This project consists of an assortment of athletic facilities
to compliment the existing Clearbrook Park facilities. It includes:
parking, the renovation of 5 picnic shelters, access paths, and
landscaping.
Capital Cost: $206,000
Justification: To provide recreational opportunities for the Clearbrook
Park service area.
Construction Schedule: Begin and complete in FY -96.
rredenck County 1995-96 Capital Improvements Plan
17
PRIORITY 7 Support Facilities
Description: This project consists of an assortment of athletic facilities
to compliment the existing Clearbrook Park facilities. It includes:
landscaping and the renovation of the exiting entrance road at the ball
field complex.
Capital Cost: $90,000
Justification: This facility would be used by the residents of Frederick
County.
Construction Schedule: Begin and complete in FY -96.
PRIORITY 8 Soccer Complex
Description: This project consists of an assortment of athletic facilities
to compliment the existing Sherando Park facilities. It includes: 3
soccer fields, access paths, restrooms, plaza, 2 picnic shelters,
landscaping, and the lighting of 5 fields.
Capital Cost: $1,007,000
Justification: This facility would be used by the entire Frederick
County area. In addition to its use as a recreational facility, the facility
will also be used by the Frederick County school system.
Construction Schedule: Begin and complete in FY -95.
PRIORITY 9 Tennis/Picnic Area
Description: This project consists of an assortment of athletic facilities
to compliment the existing Sherando Park facilities. It includes: 3 tennis
courts, 4 racquetball, restrooms, 4 picnic shelters, access road and
paths.
Capital Cost: $578,000
Justification: These facilities would be used by the Sherando Park
service area and the southwestern part of Frederick County. Although
tennis courts are being included at Sherando High School, the
Commission feels that it is important to include three tennis courts on
park property for the general public use while school courts are being
used for school activities.
Construction Schedule: Begin and complete in FY -97.
Frederick County 1995-96 Capital Improvements Plan
PRIORITY 10 Shelter/Stage Seating
Description: This project consists of an assortment of athletic facilities
to compliment the existing Clearbrook Park facilities. It includes:
renovate existing restrooms, access paths, shelter/stage, and lake
renovations.
Capital Cost: $303,000
Justification: This facility would be used by the entire Winchester -
Frederick County area.
Construction Schedule: Begin and complete in FY -97.
PRIORITY 11 Park Land
Description: Park land acquisition.
Capital Cost: $1,093,000
Justification: This project would be used by the entire Frederick
County area.
Construction Schedule: Begin and complete in FY -98.
PRIORITY 12 Maintenance Compound and Office
Description: This project is necessary to create an office and storage
sheds in Sherando Park,
Capital Cost: $159,000
Justification: This facility will enable the county to maintain its
equipment and facilities in a more responsible and effective manner.
Construction Schedule: Begin and complete in FY -99.
PRIORITY 13 Exercise/Open Play/Picnic Complex
Description: This project consists of an assortment of athletic facilities
to compliment the existing Clearbrook Park facilities. It includes: an
exercise area, 2 sand volleyball courts, 4 picnic shelters, a shelter deck,
a mega playground, and access paths.
Capital Cost: $281,000
Justification: This project would be used by the residents of Frederick
County.
Construction Schedule: Begin and complete in FY -99.
Frederick County 1995-96 Capital Improvements Plan
19
PRIORITY 14 Amphitheater
Description: This project consists of an assortment of athletic facilities
to compliment the existing Sherando Park facilities. It includes: an
amphitheater, lighting, sound system, access paths, parking, and
landscaping.
Capital Cost: $663,000
Justification: This facility would be used by the entire Winchester -
Frederick County area. It would be available to Sherando High School
for their use.
Construction Schedule: Begin and complete in FY -99.
PRIORITY 15 Nature Center/Picnic Area
Description: This project will be located in western Frederick County
and will consist of picnic shelters, play areas, a volleyball court, a
nature center, nature trails, and parking.
Capital Cost: 418,000
Justification: This facility will be used by all of Frederick County.
Development of these facilities will be contingent upon the acquisition
of park land in western Frederick County.
Construction Schedule: Begin and complete in FY -99.
rredernck County 1995-96 Capital Improvements Plan
20
Handley Regional Library
Project List
PROJECT Frederick County Library
Description: A library in Frederick County will enable the Handley
Regional Library to provide service to the growing population in
Southern Frederick County and to provide adequate books, services,
and seating for the population served by the regional system. On a lot
of 7 acres, the building will be 34,000 square feet and will be expanded
in stages ultimately up to 50,000 square feet. The consulting firm
hired by the Handley Library Board to provide a master plan for the
library through the year 2010 has estimated the construction costs, not
including land or library materials costs but including furniture and
equipment, would cost approximately $4,659,000. Books and other
library materials for an adequate opening day collection of around
80,000 items would cost almost $3,000,000. The recommended site of
the Frederick County Library is in the area east of Interstate 81 and
between Route 522 and Route 277.
Capital Cost: $465,856
Justification: The Handley Library currently has over 14,000
registered users from Frederick County. This number would rise
dramatically with a new, convenient location.
Construction Schedule: Begin planning and design activities in 1998-
1999, site preparation and construction for 1999-2000, and opening day
2000-2001.
rredenck County 1995-96 Capital Improvements Plan
COUNTY of FREDERICK
Department of Planning and Development
703 / 665-5651
Fax 703 / 678-0682
TO: Planning Commission Members
FROM: Kris C. Tierney, Deputy Planning Directok�
RE: Informal Discussion with Mr. Ralph Gregory
DATE: January 6, 1995
Attached is a letter from Mr. Gregory requesting time on the Commission's agenda to
discuss a parcel currently zoned B-2 (Business General) which is situated on the west side
of Route 11 just south of the Route 37 interchange. The surrounding property is all zoned
B-2 except to the west which remains RA (Rural Areas).
Mr. Gregory and his partners have a prospective purchaser for a lot near the rear (western
portion) of their B-2 business park (which is currently vacant). The prospective user
requires B-3 zoning and desires visibility from Route 11. If the parcel in question is rezoned
to B-3 to accommodate the proposed use, then a category "B" buffer would be required
where the parcel adjoins B-2 zoning.
A "B" buffer requires either a 50 foot distance buffer with full landscape screen (includes
a six foot high opaque fence wall or berm), a 100 foot buffer with a landscaped screen
(same planting requirements as a full screen, but no fence required), or a 200 foot distance
buffer with no visual screen.
Because the user wants to be visible from Route 11 they do not wish to put in a visual
screen along the eastern edge of the site. They could avoid this by placing a 200 foot
distance buffer along the eastern side of the site, however, they feel this is excessive.
Attached is a copy of the site layout along with a vicinity map.
Please let me know if you have any questions.
KCT/laf
Attachments
9 North Loudoun Street P.O. Box 601
Winchester, VA 22601 Winchester, VA 22604
of cyOry s 11Vi-. ItL NO.
January 5, 1995
jan. �:),yt Lti:it, r-.uz,
GREGORY INVESTMENTS
P. 0. BOX 520
STEPHENS CITY, VA_ S2655
703--869-3500
Mr. Kris Tierney
Fred. CO- Planning & Development
9 N. Loudoun St.
Winchester, Va_ 2:2601
Dear Kris;
Per aur 'phone conversation of January 4, 1995, I would
like to request: an informal discussion with the planning
commission at their January 18th meeting, to discuss the
zoning requirements on the site located in the Kernstown
Business Park.
Since this Constitutes ordinance change, I would like to
know whether your department will support this change or
not. If you are in support of this request, please send roe
a note confirming such.
Sincerely,
Ralph Gregory
j 1 A °� \ �<
1B 5`
e 1 \
7 *>
2 D �/// 10
c� 2 A �
11 C
15,
26 1
6M T40 l�
/
2A
2CO11
71 /16
14
86C /
e
x,9,36 19 % B
6 �0 21 M /
sir a 86
R
3 �' 5
2S 229-254
\ 2� �i ?? 9 86A
WA �¢ BARTON SVILLE/
Location Map f or PIN: 75-A-21)
PC Agenda
-V W
WHITE PINE SCREENING
JAMES RIVER EQUIPMENT
Site Development Plan
FREDERICK COUNTY VIRGINIA
Equipment Display Area
Low Evergreen Shrubs (2-3')
section "A -A"
Not to Scale
25' 30'
L
6' 'total
Section
Not to Scale
3- 30'
--------------
6' 0 a ue Fence
0
c
J
s' 3
1 Plant ever 10' v
IU
Section "C -C"
Not to Scale
COUNTY of FREDERICK
Department of Planning and Development
703 / 665-5651
Fax 703 / 678-0682
n�n�a�triii�i.
TO: Planning Commission Members
FROM: Kris C. Tierney, Deputy Planning Directo�
RE: Informal Discussion Regarding Possible B-2 Rezoning for Veterinary Hospital
DATE: January 6, 1995
Attached is a letter form Mr. Bruce Welch, DVM discussing his desire to establish a
veterinary hospital on the east side of Route 647. The property where Mr. Welch would
like to locate is currently zoned RP (Residential Performance). B-2 (Business General)
zoning would be required.
Mr. Welch mentions that he would proffer out uses other than veterinary hospitals in
pursuing a rezoning.
The parcel in question is surrounded on three sides by RP zoning with B-2 zoning across
Aylor Road.
A plat of the parcel and location map are attached.
Please let me know if there are any questions regarding this item.
9 North Loudoun Street
Winchester, VA 22601
P.O. Box 601
Winchester, VA 22604
Planning Commission Members
P.O. Box 601, 9 North Loudoun St.
Winchester, VA 22601
Bruce E. Welch, DVM
1904 Double Church Road
Stephens City, VA 22655
(703) 869-3559
January 5, 1995
Dear Planning Commission,
My goal is to open a Veterinary Hospital offerring progressive medical
and surgical care on a property at 689 Aylor Road (647) near Stephens
City. While the property currently consists of 2.046 acres, I am
interested in utilizing approximately .7 acres that will require rezoning to
B-2. The purpose of appearing before the commission is to informally
introduce my project and discuss relevant concerns and questions we may
both need to consider.
The property is located on Aylor Road just past Fredericktown drive,
(between R. E. Aylor and Bass -Hoover) and has an exsisting 1 112 story
brick and shingle dwelling constructed in the 1g50's. My hope is to
construct an animal hospital beside this house which would be
approximately 50-60 feet in width and 40-50 feet in depth. It will be
single -story in design and have a professional appearance which will "fit
in" with the surrounding homes and will likely staff two veterinarians. I
have n o intentions of offerring boarding or kennel services. I also wish to
proffer the rezoned property for veterinary utilization to insure the
county and neighbors that the use of this property will remain constant
and have minimal affects upon traffic, outdoor lighting, and appearance of
this community.
I have enclosed a 5/13/91 survey map with an estimated location of
the affected area and would welcome the commissions opinions, ideas,
questions, and concerns. Thank you for your time and consideration.
Bruce E. Welch, DVM
6
7
�s
e 35
0 �,
�j174
173
� 1 `, a-`- 172,
3
10
5 4 8 13/ 16
18 6 7 12/ 6 17
�SQ 200 —�/[Bass Hoover
199 —71 ementer
zoo los y
198.School
P 1P 203 206
�Q� 197 202
L r10
20 213 �{�
1 201 214 Geo`° 1 215
2 208� 212 `j 216
3 209 211 217
�
3 8 4 210
5 171 172 173 174 J i 75j 176
oQ � 6
� S 6 �R 7 10 170 1 188 189 190 191
�-�% �
1681196 195 194
19
!�o� t sr
Q
14
166
Q� 139 15�165
\
4 22 21 20 1 \x ��,� /%%z 1617
��•
Frederektowne ts6) ' 18
// : r(
�Q 1 � / � •fes \\ \ --S ��� �
60
37
4� �_� A / 1bKA5 C-1
'� 5
rol
36 P '' \ ,� 113
1 63
48 f f _1H S \ 1 79 I 6i
71 I" 80 64 6
Location Map for PIN: 75-A-38
PC Agenda
m
T;
M
C"
0
to
ti
>a
to
Lot 1 1 Fredericktowne, 1 Section
Lot 2
Lot 3
TVC Box `J TVC Box` i Lo
Telephone
lr Bac
S _•.
Lot r '
TV Cable Bac
j Telephone
/
Telephone Bac 0° 24' 44" E
431.00''
f
Telephone BoxNOTES
i. No Title Report Furnished,
The property shown on this plat is that
same property conveyed by Ernest W.
Creek and Carolyn J. Creek, his
•1 Story
'M° ..,
wife,
to Wade E. Lautzenheiser and Karen
D. Lautzenheiser, his
Brick $ Shingle Siding
_; 8
wife, by a deed
dated September 30, 1985 and
Res./5012
:,
recorded
in D.B.602, P.413. -
Pole —"— ed
{ x
�1
4
u
� c
3. The property therm on this plat It looted
in Zone •C",
Porch2.2'S
aC„
-
as them on N9i0 Flood Inssnncs
Rate Fite, Con "Ity-Panel
o ,.-Deck
i
I
dom
au
n
Nu*er 610063
X00 8. eftect(ve date of July 17, 1976•
f , 'O I-
d • iv+
2.046 ACRES
i
V
4• This property. is shown on Frederick Coact
Tax
m
Assesafent Na No, .
T 5- A -Perp 1 38.
6aa't. Ent.
I
=
$ W
LTH ®�,6
Poreh •1' .3' fWeu
Frame Bldg.
W,
.
Walk 192.2'
-41 Tee Walk-)Garakge
36.2'
Elliott Rltchfe. Jr
D►,
N
�•
LICENSE No
' i_
_ 1314
Lot I N14B•
26' 1T"
L
of 2 Lot 3 SUR
301 s .•Orainaye Eas�asn
= HOUSE LOCATION
�FrederieklaKne, Section one — — — _ — — — �--. -t' _ PROPERTY OF
"This is to certify that on May 13, 1991,1 Wade E. _ Lautzellheiser
made an accurate surrey of the premises O P E Q U O N DISTRICT
shown hereon and that there are no easements
or encroachments visibia of the ground other
FREDERICK COUNTY, Y I R 61 N I A
than those shown hereon.* SCALE : 1 " = 5 0 ' • MAY 13, lift
RITCHIE SURVEYS
F R E D E R I C K ..R 0 A D WINCHESTER,' VIRGINIA
CertIII:d Correct To: Kevin J. A Pamela B. Mullen '