PC 02-05-97 Meeting AgendaAGENDA FREDERICK COUNTY PLANNING COMMISSION The Board Room Frederick County Administration Building Winchester, Virginia FEBRUARY 5, 1997 7:00 P.M. CALL TO ORDER TAB 1) Minutes of December 4, 1996 ........................................... A 2) Bi -Monthly Report .................................................... B 3) Committee Reports ................................................... C 4) Citizen Comments .................................................... D PUBLIC HEARINGS 5) 1997-98 Capital Improvements Plan (CIP) for Frederick County. The CIP is a prioritized list of projects requested by numerous County agencies, to be undertaken in the ensuing five-year period. The plan is created as an informational document to assist in the development of the County's annual budget. The CIP is an advisory document; projects are not necessarily funded because of their inclusion in the CIP. (Mr. Lawrence) ...................................................... E 6) Amendments to Chapter 165, Zoning, Article IV, Supplementary Use Regulations, Section 165-48.5, Adult Care Residences, Assisted Living Care Facilities, and Convalescent or Nursing Homes; Article VI, Residential Performance District, Section 165-60, Conditional Uses; Article X, Business and Industrial Zoning Districts, Section 165-82B, B-2 Business General District Use Regulations; and Article XXI, Definitions, of the Frederick County Code. The proposed amendments will allow adult care residences and assisted living care facilities in the RP, Residential Performance District with a conditional use permit and in the B-2, Business General District as a by -right use, and establishes performance standards for adult care residences, assisted living care facilities, and convalescent or nursing homes that are located in the B-2, Business General District. (Mr. Wyatt)......................................................... F 4 7) Amendment to Chapter 165, Zoning, Article VI, Residential Performance District, Section 165E, Single Family Detached Zero Lot Line, of the Frederick County Code. The proposed amendment eliminates language prohibiting windows on the zero lot line side as a zoning requirement. (Mr. Wyatt)......................................................... G 8) Other Q Sc. � 5 57� ted-►' �co�� _ %a>�� File: KAWP\CMM97C0VERS\PC: AGN MEETING MINUTES OF THE FREDERICK COUNTY PLANNING COMMISSION Held in the Board Room of the Old Frederick County Courthouse in Winchester, Virginia on December 4, 1996. PRESENT: Charles S. DeHaven, Jr., Chairman/Stonewall District; John R. Marker, Vice- Chairman/Back Creek District; Marjorie H. Copenhaver, Back Creek District; John H. Light, Stonewall District; Terry Stone, Gainesboro District; Roger L. Thomas, Opequon District; Robert A. Morris, Shawnee District; Jimmie K. Ellington, Gainesboro District; Robert M. Sager, Board Liaison; and Jay Cook, Legal Counsel. ABSENT: S. Blaine Wilson, Shawnee District; George L. Romine, Citizen at Large; Richard C. Ours, Opequon District; Vincent DiBenedetto, Winchester City Liaison; STAFF PRESENT: Kris C. Tierney, Planning Director; Evan A. Wyatt, Deputy Director; W. Wayne Miller, Zoning Administrator; Eric R. Lawrence, Planner II; and Renee' S. Arlotta, Minutes Recorder. CALL TO ORDER Chairman DeHaven called the meeting to order at 7:00 p.m. BIMONTHLY REPORT Chairman DeHaven accepted the Bimonthly Report for the Commission's information. RA COMMITTEE REPORTS Transoortation Committee -12/03/96 Mtg. Mr. Thomas reported that the Transportation Committee heard a couple of presentations from citizens regarding the addition of Boundary Avenue to the state's system which would require the County to contribute money to have the road upgraded. The Committee took no action, because additional information was needed, and will address the subject again at an upcoming meeting. Discussion Regarding a Baseball Stadium and Softball Complex for James Wood High School Mr. Wyatt said that the School Board has filed a site plan with the County for the layout of a baseball stadium and softball complex for James Wood High School. He said the staff has asked the School Board to make a presentation to the Commission because public funds are being used for the project. Mr. Wyatt introduced Mr. Thomas Malcolm, Superintendent of Frederick County Schools, and Mr. Thomas Sullivan, Assistant Superintendent. Mr. Malcolm and Mr. Sullivan gave the presentation and answered questions from the Commission. It was noted that the projected cost is $1,258,000 and improvements will include a lighted baseball stadium complete with a press box, restroom, and concessions; a lighted softball field complete with restrooms and concessions; a new parking lot that will have an entrance off of Apple Pie Ridge Road (Rt. 739) and will provide 45 additional parking spaces; and the creation of a new multi-purpose field. Questions from the Commission concerned the length of the outfield fence line --they were concerned about balls being hit outside of the field area; the number of available parking spaces; and whether or not the same public use agreement was in affect with the Parks & Recreation Department, like the one at Sherando School, for public use of the facility. Mr. Sullivan stated that in exchange for Parks and Recreation doing outside maintenance and preparation, they would have first use of the facilities when the school is not in operation. No action was required by the Planning Commission. PUBLIC HEARINGS Conditional Use Permit #016-96 of Norris and Kathleen Westover to operate a small commercial bakery. The property is located at 1721 Wardensville Grade (previously Bragg's Market) and is identified with P.I.N. 50-A-51 in the Back Creek District. Action - Recommended Approval Mr. Miller stated that the use would be classified as a cottage occupation since the planned activity will be in an accessory building. He said that staff concurs with the VDOT suggestion that the northern entrance be eliminated because of poor sight distance to the south. He also reported that the Health Department was unable to determine if a suitable septic system was available to service the property. He said that the applicant would need to address this issue and provide whatever system or facilities are required by the Health Department. There were questions from Commission members concerning the undetermined location of, and/or lack of, a suitable disposal system. Mr. Norris Westover, the applicant, said that they previously operated an ice cream machine, an ice machine, and a beef jerky business from this accessory building for about three years and probably used ten times the water that will be used for the bakery. He said that there were never any problems. Mr. Westover said that all he could determine was that a 10 foot deep pit was dug, approximately 6-7 X 6-7', it was filled with stone, and metal plates were placed over the top. He said there was no pipeline. Regarding the northern entrance sight distance issue, Mr. Westover agreed to close the entrance; but, again, he said that during the three years of previous operation, there was never a problem. He said that this will just be a small one-man operation, to make pumpkin rolls for the holidays. Commission members asked for the location of the well and septic system serving Mr. Westover's home. It was also determined that new, commercial ovens were going to be brought in and Commission members inquired if permitting would be required by the Inspections Department and whether review comments would be needed by the Fire Marshal. There were no citizen comments. Commission members had no other outstanding issues with the use proposed and recommended approval with the conditions suggested by the staff. Upon motion made by Mr. Marker and seconded by Mr. Thomas, BE IT RESOLVED, That the Frederick County Planning Commission does hereby unanimously recommend approval of Conditional Use Permit #016-96 of Norris and Kathleen Westover for a Cottage Occupation for a Commercial Bakery with the following conditions: 0 All review agency comments must be complied with at all times. 2. The northern entrance to the facility planned for the use will be eliminated. 3. If deliveries are going to be made to the property and/or customers coning to the location, a commercial entrance must be installed per the VDOT requirement. 4. Prior to beginning this use, Health Department inspection and approval shall be required. If required for the use, proper facilities to handle waste water must be constructed. The 1997 Update of the Frederick County Comprehensive Policy Plan. Mr. Lawrence, Planner II, presented the proposed update to the 1997 Comprehensive Policy Plan for Frederick County. Mr. Lawrence stated that much of the work consisted of updating statistical information and minor grammatical corrections. He said that the statistical information consisted mainly of school enrollment and population figures. He said that the most significant addition is the text relating to the Route 11 North Land Use Plan. There were no public comments. Commission members endorsed the plan as submitted. Upon motion made by Mrs. Copenhaver and seconded by Mr. Marker, BE IT RESOLVED, That the Frederick County Planning Commission does hereby unanimously recommend approval of the 1997 Update of the Frederick County Comprehensive Policy Plan, PUBLIC MEETING Subdivision Application #007-96 of Eastgate Commerce Center for the division of a 30.97 -acre site into two lots. This property is located on the south side of Route 642, at the proposed Eastgate Drive, and is identified with P.I.N. 76-A-53 in the Shawnee District. Action - Recommended Approval Mr. Stone said that he would abstain from discussion and voting on this application, 5 due to a possible conflict of interest. Mr. Miller said that VDOT has informed the applicant by letter what is required in order to proceed with industrial access funding for VDOT's contracting of the road. He said that sewer and water are available to the site. Regarding Planning and Zoning issues, Mr. Miller said there is no approved master development plan; however, one is being prepared and will be submitted in the near future. Mr. Miller explained that there is an existing client for this location and it is the desire of the County to approve this division to accommodate the client and make the property eligible for industrial access funds, which are available. He said that the industrial access funds will pay for construction of Eastgate Drive 100 feet past the property line dividing Lot 1 and Lot 2. He said that the staff is recommending that the requirement for a master plan be waived. Mr. Charles W. Maddox, Jr. with G. W. Clifford & Associates, Inc., the design engineers for the project, was available to answer questions from the Commission. A member of the Commission asked Mr. Maddox if he felt the two-laned 642 would be able to serve the area in the next 20 years. Mr. Maddox replied that a two-laned road with a modern design of this standard could handle, with appropriate interchange design such as has been done, approximately 12,000-14,000 tpd, which will build over time. He said that as those trips build, other projects will be coming on line and will be required to improve the road. He added that all the major connection interchanges have center turn lanes, right and left turn lanes, etc., to facilitate turning movements. Mr. Maddox was asked if he anticipated a light at Routes 522 and 642 and Mr. Maddox replied that the intersection had already been wired for a light. There were no public comments. The Commission had no outstanding concerns with the subdivision. Upon motion made by Mr. Morris and seconded by Mr. Thomas, BE IT RESOLVED, That the Frederick County Planning Commission does hereby unanimously recommend approval of Subdivision #007-96 of Eastgate Commerce Center for the division of a 30.97 -acre site into two lots with the stipulation that no further subdivision occur until a master development plan is submitted. (Mr. Stone abstained from voting.) ADJOURNMENT No further business remained to be discussed and the meeting adjourned by unanimous vote at 7:45 p.m. Respectfully submitted, Kris C. Tierney, Planning Director Charles S. DeHaven, Chairman BIMONTHLY REPORT OF PENDING APPLICATIONS (printed January 24, 1997) ,., l Application newly submitted. REZONINGS: H. Clay DeGrange Estate (REZ #006-90 Gainesboro 11 51.0540 acres from RA to B2 1 Location: N.W. quadrant of Rt. 50W/ Rt. 37 Intersection Submitted: 10/18/96 PC Review: 11/06/96 tabled; 1-15-97 recommended approval BOS Review: 02/12/97 MASTER DEVELOPMENT PLANS: Woodside H (MDP #1007-96) Opequon 80 SF det. dwellings; 33.2856 acres (RP) Location: West side of Double Church Rd. (Rt. 641), south of Rt. 277 intersection. Submitted: 10/29/96 PC Review: 11/20/96 - recommended approval BOS Review: 12/11/96 -approved Admin. Approved: Pendin completion of review agency comments. Carriebrooke (MDP#008-96) Shawnee Commer./Offices on 20 ac. (B2) Location: Ea. of Macedonia Ch. Rd; So. of I-81/37 intrsctn at Kernstown; No. of Sanitation Authority Hd rtrs. Submitted: 09/23/96 PC Review: 10/16/96 - recommended approval BOS Review: 11/13/96 -approved Admin. Approved: 01/06/97 SUBDIVISIONS: The Summit; Section 1-B (SUB #001-97) (No MDP) Gainesboro Subd. of 2.9 acres into 4 lots (R5) Location: Comer of Lakeview Dr. & South Lakeview Drive PC Review: 02/19/97 BOS Review: 03/12/97 - tentatively scheduled Admin. Approved: Pending Bass Hoover Elem. School (SUB #{011-96) (No MDP) I Opequon I Subd. of 10.007 ac. off of a 33.796 ac. tract (RP) Location: Intersection of A for Rd. & Caroline Ave. PC Review: 01/15/97 BOS Review 02/12/97 - tentatively scheduled Admin. Approved: hendin McGuire Hills, Section VI (SUB #010-96) Stonewall 9 SF Residential Lots on 27.7272 acres Location: Apple Pie Ridge Rd. & Glendobbin Rd. Intersection Submitted: 12/03/96 MDP #014-86 Approved on 02/18/87 Admin. Approved: 01/06/97 Hill Valley, Sect. 1 thr. 4 (SUB #009-96) Stonewall 49 SF Detached Cluster Lots on 1 26.1232 acres (RP) Location: So. of Shenandoah Hills on west side of Greenwood Road Rt. 656 Submitted: 11/22/96 MDP #001-96: Approved on 09/27/96 Admin. Approved: Pending The Village at Sherando Parcel #1 (SUB #008-96) Opequon Subdivision of one 1.14784 acre lot (B2) Location: Corner of Warrior Drive & Ivory Drive Submitted: 11/20/96 MDP #002-92: Approved on 04/27/92 Admin. Approved: Awaiting Recorded Plat Eastgate Commerce Center SUB #007-96) Shawnee Subdivision of 30.97 acres into two lots and r -o -w (Ml) Location: Southside of Rt. 642 at proposed Eastgate Drive Submitted: 11/15/96 PC Review: 12/04/96 - recommended approval BOS Review: 12/11/96 - approved Admin. Approved: 01/06/97 Greenwood Road (SUB #007-95) Shawnee Subdivision of 2.837 ac. into five lots (RP) Location: W. Side of Greenwood Rd (Rt. 656) approx. 1,400' north of Sensen Rd. Rt. 657 intersection Submitted: 07/22/96 PC Review: 08/21/96 - Recommended Approval BOS Review: 09/11/96 - Approved Admin. Approval: 12/27/96 - Plats signed; awaiting copy of recorded plat Valley Mill Estates (SUB) Stonewall 21 SF Trad. Lots (RP) Location: No. Side of Valley Mill Rd. & East of Greenwood Rd. Submitted: 10/23/95 MDP #001-95 Approved 04/26/95 Pending Admin. Approval: Awaiting bonding, signed plats, & deed of dedication Winc-Fred Co. IDC (SUB) Back Creek 1 2 Ml Lots (0.552 acres & 20.285 acres) Location: Southeast side of Development Lane Submitted: 09/08/95 MDP #003-87 Approved 07/08/87 Pendin Admin. Approval Awaiting signed plats. RT&T Partnership (SUB) Back Creek 1 Lot - 29.6 Acres (B2) Location: Valley Pike Rt. 11 So. Submitted: 05/17/95 MDP #003-91 Approved 07/10/91 Pending Admin. Approval: Awaiting submission of signed plat & deed of dedication Briarwood Estates (SUB) Stonewall 20 SF Det. Trad. Lots (RP) Location: Greenwood Rd. Submitted: 01/03/94 MDP #005-93 Approved 12/8/93 Pending Admin. Approval: Being held at applicants request. Abrams Point Phase I (SUB) Shawnee 1 230 SF Cluster & Urban Lots (RP) Location: South side of Rt. 659 Submitted: 05/02/90 PC Review: 06/06/90 - recommended approval BOS Review: 06/13/90 - approved Pending Admin. Approval: Awaiting deed of ded., letter of credit, and signed plat Harry Stimpson (SUB) _22e uon Two B2 Lots Location: Town Run Lane Submitted: 09/23/94 PC Review: 10/19/94 - recommended approval BOS Review: 10/26/94 - approved Pending Admin. Approval: Awaiting signed plat. SITE PLANS: Carriebrooke (SP #{057-96) � Shawnee Offices on 2.5487 acres (B2) Location: East side of Rt. 642 south of I-81/37/642 interchange Submitted: 12/26/96 Approved: Pending Shenandoah Bldg. Supply (SP ##056-96) Gainesboro Warehouse on 5 acres (Ml) Location: 195 Lenoir Drive Stonewall Industrial Park Submitted: 12/16/96 Approved- Pending Alc, Inc. (Eastgate Comm. Cntr. (SP #055-96) Shawnee Mfg./Office on 3.96 ac. of a 20.7559 1 ac. tract (MI) Location: Eastgate Dr., Eastgate Commerce Center off Rt. 642 Submitted: 12/12/96 Approved: Pending Ft. Collier Industrial Pk. Lease Bldg. #3 (SP #053-96) Stonewall 140,880 sf warebse addition to Lease Bldg #3; 5.753 ac. disturb. of 10.946 ac. tract Location: Brooke Road, Ft. Collier Industrial Pk. Submitted: 11/22/96 Approved: Pending Negley Mini -Storage (SP #052-96) Stonewall Mini -Storage on a 3.5704 acre site (113) Location: 127 Mercedes Court Submitted: 11/18/96 Approved: 01/13/97 Northwestern Regional Juvenile Detention Facility Stonewall (SP #051-96) Addition of detention facility to existing regional 'ail facility Location: Intersection of Brooke Rd. & Ft. Collier Rd. Submitted: 11/13/96 Approved: L01/22/97 Virginia Apple Storage (SP #050-96) Shawnee Warehousing on 10.2059 acres (M1) Location: Southeast corner of Victory Lane (Rt. 728) & Independence Drive at Westview Business Center Submitted: 11/06/96 Approved: Pending Appleland Driving Range (SP ##049-96) Back Creek .0861 ac. of a 26 ac. parcel for a golf driving range (RA) Location: U.S. Rt. 11 South of Stephens Cit Submitted • 11/01/96 Approved: 01/08/97 James Wood H. S. Athletic Fields (SP #1047-96) Gainesboro New baseball stadium, softball field, multi-purpose field (RA) Location: 161 Apple Pie Ridge Road Submitted: 10/21/96 Approved: Pending Toan & Assoc. (SP ##046-96) Gainesboro Kraft warehouse addition; 4.6 ac. of 13.8 ac. tract (Ml) Location: 360 McGhee Road Submitted: 10/18/96 Approved: Pending Winchester 84 Lumber (SP ##045-96) Stonewall Storage Shed; 1.19 ac. of a 4.98 ac. tract disturbed (B2) Location: Rt. 839 Submitted: 10/14/96 Approvred• Pending Hilltop House Nursing Home (SP ##044-96) Stonewall 4,409.2 sq. ft. addition to nursing home (RP & B2) Location: Berryville Pike Submitted: 10/08/96 Approved: 01/03/97 Miller Milling East Co. (SP #043-96) Stonewall Bldg. Addition (mill) on 0.91 ac. of a 1 82.136 ac. parcel (Ml) Location: 302 Park Center Drive; Fort Collier Industrial Park Submitted: 09/23/96 Approved: Pending Frederick Veterinary Hospital (SP #037-96) Opequon Veterinary Hospital on .50 ac. of a 1 2.05 ac. site (RP) Location: East side of A for Rd Rt. 642); so. of Westmoreland Dr Submitted: 08/21/96 Approved: Pending Hardees Mobile Oil Conven. Cntr (SP #050-95) Back Creek Conven. Cntr/Rest. on a 1.0727 ac. site 1 (RA) (CUP #011-95) Location: Southeast corner of Rt. 50 W and Ward Avenue Submitted: 12/20/95 Approved: Pending approval of review agency comments Kohls Distribution Facility (SP #034-96) Shawnee Warehouse Distrib; 38 disturbed ac. of 1 53.27 ac. site (Ml) Location: Airport Rd Rt. 645) in the Airport Business Center Submitted: 08/02/96 Pending Approved: Pending Stimpson/Rt. 277 Oil & Lube Service (SP #030-96) Opequon Oil & Lube Serv., Car Wash, Drive - l Thru on 2.97 ac. (B2) Location: 152 Fairfax Pk. hind Red Apple Country Store Submitted: 07/03/96 Approved: Pending wall Mini -Storage (SP #028- Gainesboro Mini -storage on .25 ac. of a 2.56 ac. tract (Ml) on• FApproved: 120 Lenoir Drive tted: 06/20/96 Approved: Pending Flying J Travel Plaza (SP #026- 96) Stonewall Travel Plaza on 15 acres (B3) Location: S.W. corner of the intersection of I-81 & Rt. 669 Submitted: 05/23/96 Approved: Pendine Cedar Creek Center (SP #025-96) Back Creek Museum on 0.485 ac. of a 3.210 acre parcel (B1) Location: 8437 VallePike Rt. 11), Middletown Submitted: 05/16/96 —Approved: Pendin O/House of Gifts (SP 6) Gainesboro Gas Pump Canopy 880 sq. ft. area of a 0.916 acre parcel (RA) n: FApproved: 3548 North Frederick Pike ted: 05/08/96 Pending Pendine Dr. Raymond Fish (SP #023-96) Stonewall ini-Golf Facility on 5,000 sq. ft. of a 6 acre parcel (B2) L1IP ) Location: S.E. Comer of I-81 /Ho ewell Rd. Intersection Submitted: 05/09/96 Approved: Pending American Legion Post #021 (SP #018-96) Stonewall Addition to lodge building on 3.4255 1 acre site (B2) Location: 1730 Berryville Pike Submitted: 04/10/96 Approved: Pending Dominion Knolls (SP #010-96) Stonewall 180 TH on 20.278 ac. (RP) Location: Intersection of Baker Lane and Gordon Street Submitted: 02/21/96 Approved: Pending D.K Erectors & Main-tenance, Inc. (SP #051-95) Gainesboro Indust Sery/Steel Fabrication on a 10 acre site (M2) Location: 4530 Northwestern Pike Submitted: 12/28/95 Approved: Pending r. Wheatlands Wastewater Facility (SP #047-89) Opequon Treatment Facility on 5 Acres (R5) Location: So.West of Double Tollgate; ad'. & west of Rt. 522 Submitted: 09/12/89 Note: Being held atapplicant's request. Flex Tech (SP #057-90) —� Stonewall MI Use on 11 Ac. (MI) Location: East side of Ft. Collier Rd. Submitted: 10/25/90 Note: Being held atapplicant's request. 10 CONDMONAL USE PERMITS -Meiek M -H' ab P -'#00 ............... Location: 187 Middle Lane, Gore Submitted: 01/21/97 PC Review: 03/05/97 BOS Review: 03/26/97 - tentatively scheduled Charles W. Rose, Jr. (CUP #017-96) Gainesboro Automobile repair w/o body repair 1 (RA) Location: 751 Frog Hollow Road Submitted: 12112/96 PC Review: 01/15/97 - approved BOS Review: 02/12/97 VARIANCES: "d 44s eo Location: 1997 Senseny Road Submitted: 01/21/97 BZA Review: 02/18/97 11 COUNTY of FREDERICK Department of Planning and Development 5401665-5651 FAX: 540/678-0682 MEMORANDUM To: Frederick County Planning Commission FROM: Eric R. Lawrence, Planner II0 SUBJECT: Public Hearing— Proposed 1997-98 Capital Improvements Plan DATE: January 23, 1997 Each year the County formulates and reviews project requests for inclusion in the County -s Capital Improvements Plan (CIP). The process begins with the Comprehensive Plans and Programs Subcommittee, which assembles and evaluates departmental Capital Improvements Plan project requests beginning in the fall of each year. The Subcommittee formulates the requested projects in rank order based on established evaluation criteria. During their meeting on December 9, 1996, the Comprehensive Plans and Programs Subcommittee endorsed the plan for the 1997-98 CIP. Materials related to the preparation of this recommendation along with the proposed plan are attached. If the Commission is comfortable with the proposal, a recommendation to the Board would be appropriate. The following documents are attached: ► Cost Summary for the proposed 1997-98 Capital Improvements Plan. ► Project Summary for the proposed 1997-98 Capital Improvements Plan. This includes a brief outline of the projects included in last year's CIP, and those included in the proposed 1997-98 CIP. ► The CIP Project Request Evaluation results. ► The proposed 1997-98 Capital Improvements Plan. Please contact me if you have any questions. Attachment 107 North Kent Street • Winchester, Virginia 22601-5000 pcmemo.47 Page 2 Planning Commission Agenda Meeting Date: February 5, 1997 Public Hearing - 1997-98 Capital Improvements Plan COST SUMMARY The proposed CIP contains 22 projects with a total cost of $82,959,886. This figure includes the estimated debt service on all projects except the School Board's Transportation/Maintenance/Warehouse and Administration Building Renovations. (The total does not include Sanitation Authority or Landfill projects which are paid for out of user fees and are made a part of the CIP in the form of addendum. A project proposed for the Regional Jail complex is not included in the CIP, but is included in an addendum. This Regional Jail project should be completed prior to the beginning of Fiscal Year 1997.) Of this amount, $60,114,383 would come from the County's General Fund over a five year period (not including debt service). As presently proposed, projects scheduled in the first year (1997-98 fiscal year) would have a total County cost of $2,007,637, excluding estimated debt service, for all projects. PROJECT SUMMARY The proposed 1997-98 CIP consists of 22 project requests from the County's various departments. Of these project requests, 4 are new to the CIP. The remaining 18 were included in the 1996-97 CIP. The new projects consist of: three from the School Board, and one from the Department of Parks and Recreation. These new project requests are indicated in boldface and italic print on the evaluation form. Listed below are the modifications that each county department has made in their project requests for inclusion in the 1997-98 CIP. Please note: the projects which were included in the 1996-97 CIP and again in the 1997-98 CIP are not discussed. School Board Projects Projects no longer included in the CIP: 1) New Stonewall Elementary School --- In progress. Anticipated completion by Fall 1997. 2) Senseny Road Elementary School --- In progress. Anticipated completion by Fall 1997. 3) James Wood Middle School Roof Replacement --- Completed. 4) Aylor, Hoover Chiller replacement --- Completed. Projects which are new to the CIP: 1) Third County High School --- Necessary to satisfy projected student enrollment. Page 3 Planning Commission Agenda Meeting Date: February 5, 1997 Public Hearing - 1997-98 Capital Improvements Plan 2) New Elementary School, Back Creek --- Necessary to satisfy projected student enrollment. 3) New Gainesboro Elementary School --- Necessary to satisfy projected student enrollment. Parks and Recreation Projects Projects no longer included in the CIP: 1) Support Facilities -CB --- Will be considered for inclusion in future CIPs Projects which are new to the CIP: 1) Skateboard Park --- Project to consist of skateboard bowl, half pipe, and open skate area. This project has been included at the request of the community's youth. Handley Library The project request for the 1996-97 CIP will be included in the 1997-98 CIP. Airport Authority Projects no longer included in the CIP: 1) Perimeter Security Fence --- Completed. 2) T -Hanger Preparation --- Completed. 3) Airfield Maintenance Equipment Bldg --- Completed. 4) Transient Apron Expansion, Design and Construction --- Completed. Projects which are new to the CIP: No new project requests were submitted. Sanitation Authority Projects Projects no longer included in the CIP: 1) Administration and Maintenance Complex --- Completed. 2) Boundary Lane Water and Sewer Line --- Completed. Projects which are new to the CIP: No new project requests were submitted. Page 4 Planning Commission Agenda Meeting Date: February 5, 1997 Public Hearing - 1997-98 Capital Improvements Plan Landfill and Compactors Projects Projects no longer included in the CIP: 1) Landfill Development, Cell "D", Phase I --- Completed. 2) New Compactor Site --- Completed. Projects which are new to the CIP: 1) Landfill Development, Cell "A", Phase II. Necessary to meet demand and extend landfill cell life. 2) Installation of Active Gas Management Cells A and B, Phase I --- Necessary during closure of Cells A and B. 1997 FREDERICK COUNTY CAPITAL IMPROVEMENT PROJECTS EVALUATION FORM LISTED BY DEPARTMENT; IN ORDER OF DEPARTMENT PRIORITY CRITERION Conform to Health, Legally Distribute Economic Related Public and Comp. Plan Safety, Required Services Impact to Other Support TOTAL Welfare Projects WEIGHT 3 _ 4 4 2 2 3 3 `LIBRARY New Library 2/6 2/8 0/0 4/8 2/4 0/0 3/9 35 SCHOOL SYSTEM New Gainesboro Elementary School 216 219 0/0 112 214 113 113 26 Administration Building Renovations 'Transportation/Maintenance/Warehouse 2/6 218 0/0 1/2 3/6 2/6 1/ 3 31 Third County High School 1/6 2/8 0/0 2/4 3/6 113 113 30 New Elementary School, Back Creek 2/6 2/8 0/0 3/6 2/4 1/3 1/3 30 PARKS AND RECREATION Bikeway System 4/12 2/ 8 0/ 0 1/2 1/2 2/6 2/6 36 Park Land 3/9 1/4 0/0 4/8 112 113 2/6 32 Open Play Area - CB 3/9 1/4 0/0 3/6 1/2 1 /3 2/6 30 1 Softball Complex - SP 3/ 9 1/4 0/0 1/2 1/2 1/ 3 2/6 26 Baseball Field Renovations - SP 2/6 1/4 0/0 1/2 1/2 1 /3 2/ 6 23 Field House 2/6 1/4 0/0 2/4 1/2 1/3 2/6 25 Tenn is/Bas ketbalI Complex - CB 3/9 1/4 0/0 3/6 1/2 2/6 1/ 3 30 Indoor Pool Facilities 2/6 1/4 0/0 2/4 1/2 2/6 2/6 28 Soccer Complex - SP 3/9 1/4 0/0 3/6 1/2 1. 3 21,16 30 Maintenance Compound - SP 1/3 1/4 0/0 0/0 3/6 3/9 1/ 3 25 Tennis/Picnic Area - SP 3/9 1/4 0/0 1/2 0/0 2/6 2/ 6 27 . Shelter, Stage Seating - CB 3/9 1/4 0/0 316 2/4 2/6 2/6 25 Skateboard Park 113 114 0/0 112 112 113 2/6 20 I AIRPORT I Land Acquisition - South Side RPZ 2/6 2/ 8 3/12 1/ 2 2/4 2/6 -2/6 44 Land Aquisition, Bufflick Road 2/6 2/8 3/12 l/ 2 2/4 2/6 2/6 44 Route 645 Relocation - Design 2/6 1/4 1/4 0/0 1/2 2/6 I/ 3 25 Route 645 Relocation - Construction 2/6 1/4 1/4 0/0 1/2 2/6 1! 3 25 I FREDERICK COUNTY VIRGINIA Capital Improvements Plan 1997-98 Fiscal Year PROPOSED Presented to the Frederick County Planning Commission February 5, 1997 for their consideration Endorsed by the Frederick County Comprehensive Plans and Programs Subcommittee December 9. 1996 TABLE OF CONTENTS INTRODUCTION.............................................................1 PROJECT RECOMMENDATIONS ....................... . . . . . School Board .................».... 2 Parks and Recreation.....................................................3 County Administration...................................................3 HandleyLibrary.........................................................3 Airport Authority........................................................4 PublicWorks...........................................................4 Regional Adult Detention Center 4 Sanitation Authority .............................................. . ....... 5 Proposed 1997-98 CAPITAL IMPROVEMENTS PLAN ................ . . . 6 CIP CHART EXPLANATIONS .................................... . ............. 7 PROJECT FUNDING..........................................................8 PROJECT DESCRIPTIONS..................................................... 9 Frederick County Public Schools ....................................... g New Gainesboro Elementary School . . . . ............................... 9 Administrative Building Renovations ....................... . .......... 9 Transportation/ Maintenance/ Central Warehouse Facility ................. 10 Third County High School..........................................10 New Elementary School, Back Creek District .......................... 11 Frederick County Parks and Recreation Department ........... . .. 2 Bicycle Facility..................................................12 Parkland in Western Frederick County ....................... I . , ...... 12 Open Play Area - Clearbrook Park ....................... . . .......... 13 Softball Complex - Sherando........................................ 13 Baseball Field Renovation - Sherando................................ 14 FieldHouse.....................................................14 Tennis/Basketball Complex - Clearbrook .............................. 15 Indoor Pool and Support Facilities ................................... 15 Soccer Complex - Sherando ..................... . .......... . ....... 16 Maintenance Compound and Office - Sherando ......................... 16 Tennis/Picnic Area - Sherando ........................ . . ............ 16 Shelter/Stage Seating - Clearbrook .............. . . ... . .. . ......... . . . 17 Skateboard Park . . ........................ 17 Handley Regional Library ................................................ 18 Frederick County Library .......................................... 18 ADDENDUM...............................................................19 Frederick County Sanitation Authority ...................................... 19 Water Transmission Lines ..................... . .................... 19 Miller Heights Water Distribution Line ......................... 19 Route 50 - Victory Road Water Loop - Project'? . _ ........ 19 Stonewall - Lee Avenue Water Loop ........................... 19 Frederick County Public Works Department ................................. 20 Construction Debris Landfill ........................................ 20 Closure of Cells A and B, Phase I ...................:................ 20 Landfill Development - Cell "A", Phase II - Five Acres ................... 21 Installation of Active Gas Management Cells A and B, Phase I ............. 21 Winchester Regional Airport .............................................. 22 Land Acquisition - South Side RPZ, Phase II ........................... 22 Route 645 Relocation - Design Only .................................. 22 Route 645 Relocation - Construction Phase ............................ 23 Land Acquisition, Bufflick Road, Phase II ............................. 23 Regional Secure Juvenile Detention Center ............................ 24 PROJECT EVALUATION FORM ..........................:.................... 25 PROJECT LOCATIONS MAP .................................................. 26 DEPARTMENTAL SHARE OF EXPENDITURES ..... . .............. . ............ 27 CAPITAL IMPROVEMENTS PLAN FREDERICK COUNTY 1997-98 INTRODUCTION The Code of Virginia assigns the responsibility for preparation of plans for capital outlays to the local planning commissions. The Capital Improvements Plan (CIP) consists of a schedule for major capital expenditures for the County for the ensuing five years. The CIP is updated annually. Projects are removed from the plan as they are completed or as priorities change. The plan is intended to assist the County Board of Supervisors in preparation of the County budget. In addition to determining priorities for capital expenditures, the County must also ensure that projects contained within the CIP conform to the Comprehensive Policy Plan. The annual review process begins with the submission of capital expenditure requests from County departments and relevant agencies in the fall of the year. These requests are evaluated by the Comprehensive Plans and Programs Committee, a subcommittee of the Planning Commission, using a list of seven evaluation criteria. Each criterion is assigned a weight which reflects the relative importance when compared to the other criterion. The Committee then meets with representatives of departments making expenditure requests and determines a recommended priority for the various requests. This recommendation is passed to the Planning Commission which in turn makes a recommendation to the Board of Supervisors. The CIP is strictly advisory. Once adopted, project priorities may change throughout the year based on changing circumstances. It is also possible that particular projects may not be funded during the year that is indicated in the CIP. The status of any project becomes increasingly uncertain the further in the future it is projected. Frederick County Proposed 1997-98 Capital Improvements Plan PROJECT RECOMMENDATION I. School Board Projects Page 2 The old Stonewall School building has been razed, and the new Stonewall Elementary School building is projected to be open for students in the fall of 1997. Student capacity of this new school is approximately 585 pupils. During the past year, underground storage tanks have been removed from the James Wood Middle School facility. The removal of these tanks was necessary to comply with federal regulations regarding underground storage tanks. This project completes the final phase of complying with Federal regulations for the school division. Construction of a baseball/softball/multipurpose field athletic complex at the James Wood High School site is currently underway. These facilities will enable the high school to host interscholastic contests at the school site. Prior to the completion of this project, these contests were held at various sites around the County and within the City of Winchester. The facility will also be available to the County's Parks and Recreation Department for their programing use. In an effort to maintain educational facilities that will handle the student population's projected growth, three new school facilities are proposed for the next five years. These new facilities include: two elementary schools, and a high school. The two elementary schools would be built in the Gainesboro and Back Creek districts. The high school is proposed for the County -owned parcel adjacent to the Redbud Run Elementary School. Funding is being requested for a new transportation/maintenance/central warehouse facility. The project involves building the proposed structure(s) adjacent to the Red Bud Run Elementary School. The existing maintenance facility has reached the point where it is difficult to house all of the school system's buses and still provide service to an increasing number of County vehicles from other departments. Frederick County Proposed 1997.98 Capital Improvements Plan 2. Parks and Recreation Projects 3. County Administration 4. Handley Library Page 3 Several projects are planned in and around Sherando Park. The County was awarded an ISTEA Transportation Enhancement Program grant in 1993 to build a Bikeway System. This 2.45 mile facility will serve several residential areas in southern Frederick County. The bicycle path has been designed to link the residential developments and park land on the north of Route 277 with Sherando Park and Sherando High School. In addition to other improvements at Sherando Park, two projects are planned that will be used by Sherando High School, the proposed softball complex and baseball complex. Several projects are planned for Clearbrook Park including an open play area, tennis/basketball complex, and a shelter with a sound stage and seating. In an effort to reduce the gap in provision of services to the western portion of the County, the Parks and Recreation Department is proposing to purchase park land in western Frederick County. Two additional projects that are planned are a field house and an indoor pool. Locations for the projects have not been determined, although both projects could be built on currently owned County land. Both projects could also be utilized by the County school system. Many of the County's administrative offices have been relocated to the Frederick County Administrative Building. at 107 North Kent Street in Downtown Winchester. An addition has recently been completed that enlarges the Frederick County Administrative Building to 100,000 square feet of office space. This addition enables the majority of the county departments to be located at a central location in downtown Winchester. As part of a master plan prepared for the Handley Library by a library consulting firm, it was recommended that a library be built in southeastern Frederick County. A library in this area would enable the Handley Library to provide service to the growing population in southern Frederick County. A library site has been selected, near the Lakeside community. A 34,000 square foot building is proposed which could be expanded, in stages, ultimately to 50,000 square feet. rreaencx county Proposed 1997-98 Capital Improvements Plan 5. Airport Authority 6. Public Works Projects (Not funded by the General Fund) 7. Regional Adult Detention Center Projects Page 4 An updated master plan for the Winchester Regional Airport was adopted in December of 1993. This plan contains recommendations regarding capital improvements to the airport in order to meet federal guidelines for airports the size of the Winchester Regional Airport and to provide better service to airport users. The Airport Authority has included project requests that relate to land acquisition. Land acquisition is the primary goal of the airport as they proceed to satisfy both federal regulations and plan for anticipated growth. Funding for Airport projects is derived through a complex formula where the federal and state government contribute a majority of the funding. The Public Works Department is proposing four projects for the current CIP. They include: • Construction Debris Landfill • Closure of Cells "A" and "B", Phase I • Landfill Development - Cell "A", Phase II • Installation of Active Gas Management Cells A and B, Phase I The landfill development project and the cell closure projects are all projects that the Landfill is required to undertake in order to comply with regulations imposed by the Department of Environmental Quality. Funding for the landfill projects are provided through the Landfill Enterprise Fund. A juvenile detention facility is currently under construction. Located adjacent to the pre-release facility in the Fort Collier Industrial Park, this facility is necessary to meet the needs of the community. When completed, this facility will be capable of housing 32 juveniles. Frederick County Proposed 1997-98 Capital Improvements Plan 8. Sanitation Authority Projects (Not funded by the General Fund) Page 5 The Sanitation Authority is proposing one project. Water Transmission Lines. These lines involve the extension of water service to three areas of the county: Miller Heights, Route 50/Victory Road, and Stonewall - Lee Avenue. The Sanitation Authority Projects will not be funded directly through the CIP. These projects receive their funding through user fees. Frederick County Proposed 1997-98 Capital Improvements Plan County II 12 13 14 15 16 17 18 19 ----PROPOSED---- department Priorityprojects Airport Land Acquisition - Southside RP Airport Land Acquisition - BuPflick Roa FREDERICK COUNTY, VIRGINIA CAPITAL IMPROVEMENTS PLAN 1997-98 COONTY CONTRIBUTION 1997-98 1998-99 1999-2000 2000-01 12,500 10,000 2001-02 County Contributions 12,500 Notes A Interest From Any Debt Service N/A ----PROPOSED---- TOTAL COUNTY COSTS 12,500 Total Project Costs $625.000 1 2 I Bicycle Facility 51,215 10,000 A N/A 10,000 $500,000 1 New Library 489,150 51,215 B N/A 51,215 $318,387 14 Shelter, Stage Seating - CB 489,150 NIA 489,150 $8,041,485326659 2 Park Land 1,154,772 , 326659 , N/A 326,659 $326,659 4 "Transportation begin 1,154,772 N/A 1,154,772 $1,154,772/Maintenance/Warehouse 5 Third County High School New Elementary School - Back Creek 15,600,000 14,900,000 0 32,000,000 C NIA 3,888,513 0 35,888,513 1.)1,500,000 $35,888,513 3 Open Play Area - CB 600,000 416,992 9,100,000 9,700,000 4,581,872 14,281,872 $14,281,872 7 Tennis/Basketball Complex- CB 533,586 416,992 N/A 416,992 $416,992 '. 9 Soccer Complex - SP 533,586 N/A 533,586 $533,586'. 8 Indoor Pool Facilities 1, 127,642 1,127,692 N/A 1,127,692 $1,127,692 11 Tennis/Picnic Area - SP 1,953,200 1,953,200 N/A 1,953,200 $1,953,200 2 New Gaineshoro Elementary School 300,000 8,400,000 612,445 612,495 N/A 612,495 $612,495 4 Softball Complex - SP 422,328 8,700,000 3,958,611 12,658,611 $12,658,611 3 Route 645 Relocation -Design 2,500 422,328 N/A 422,328 $422,328 4 Route 645 Relocation -Construction 28,000 2,, 00 A N/A 2.500 $125,000 10 Maintenance Compound - SP 28,000 A NIA 28,000 $1,400,000 6 Field House168,539 1,542,000 168,539 NIA 168,539 $168,539 5 Baseball Field Renovations - SP 662,755 1,542,000 N/A 1,542,000 $1,542,000 13 Skateboard Park 662,755 N/A 662,755 $662,755200,000 200,000 N/A 200,000 $200,000 TOTALS 1$2,007,637 $9,902,075 $3,588,086 $18,181,200 $26,435,385 i $60,114,383 $12,428,996 A = Partial finding from Federal Airport Improvement Program (FAIP) and State Commonwealth Airport Fund (SC'AF) grants B Patiial funding from State grants and local gifts C = Debt Sen ice is unavailable at time of printing $72,543,3791 $82.959.8 01/04/96 CIP CHART EXPLANATIONS Page 7 The Capital Improvements Plan chart, on the previous page, contains a list of the capital improvement projects proposed for the County over the next five year period. Each column's origination and justification is briefly explained below. County Priority - The project's priority rating, based on all projects included in the CIP. County Priority ratings are the result of the criterion and weight evaluation process and is illustrated on the Evaluation Form. The Evaluation Form is located on page 29 of this booklet. Department Priority - The project's priority rating based on the requesting department's determination. Projects - The name of the capital improvement project. County Contribution - The dollar value from the County's General Fund that will be contributed toward the project's funding. This value is listed by individual fiscal years, and also by total contributions over the five-year period. The total contribution column, located to the right of the fiscal year breakdowns, does not include any debt service projections. Notes - Indicates the footnotes that may apply to a particular project. Interest From Any Debt Service - As applicable, indicates the projected interest for a particular project. These interest projections are provided by individual departments and are based on the most accurate interest rate information available at the time the CIP is assembled. Total County Costs - The total expenditures that the County will contribute for a particular project. This column includes both fiscal year contributions and debt service expenses that may be associated with the projects funding. Essentially, this column represents the total county contributions for a particular project. (County Contributions with Interest) Total Project Costs - Total project costs including county and other funding source contributions. The values in this column are not necessarily contributed entirely by the County. rreuericx county Proposed 1997-98 Capital Improvements Plan PROJECT FUNDING Page 8 The projects included in the 1997-98 Capital Improvements Plan have a total cost of $82,959,886. If all projects are undertaken, Frederick County will contribute $60,114,383 over the five year period of 1997-2002. This total does not include the interest from any debt service. By adding the projected debt service of $12,428,996, the total county contribution of the approved projects comes to $72,543,379. The costs associated with the School Board's request for a Transportation/Maintenance/Central Warehouse facility and Administration Building renovations are not included in any cost summaries. ► School projects are funded through a combination of loans from the Virginia Public School Authority and the Virginia Literary Fund. ► Sanitation Authority projects will be funded by the Sanitation Authority working capital funds and Virginia Resource Authority Revenue Bonds. ► Landfill projects are funded by retained funds generated by the landfill fees and coordinated by the Landfill Enterprise Fund. ► Funding for Parks and Recreation projects will come from the unreserved fund balance of the County. The Bicycle Facility project will be funded through a Recreational Access Fund grant, an ISTEA Transportation Enhancement Program grant, and a 20% match from the general fund. The Parks and Recreation Commission will actively seek private sources of funding or cooperation for projects not funded by the County. Funding for a Frederick County Library could include a contribution from the County general fund. a bond, donation of land, and substantial fund raising efforts by the Library Board. Airport projects will be funded by contributions from the federal, state, and local governments. The local portion may include contributions from Warren, Shenandoah, Clarke, and Frederick Counties. and the City of Winchester. Frederick County Proposed 1997-98 Capital Improvements Plan Page 9 PROJECT DESCRIPTIONS Frederick County Public Schools Project Priority List PRIORITY 1 New Gainesboro Elementary School Description: This project consists of the construction of an elementary school (grades K-5) of approximately 65,000 square feet to serve 550 students. The school is located on a 20 acre site. Capital Cost: $8,700,000 Debt Service: $3,958,611 Justification: This project will serve approximately 550 students in grades K-5. The Frederick County School Board purchased 20 acres of land in the Gainesboro district in 1990 in anticipation of the future need to provide space for increased student enrollment. Construction Schedule: Begin in FY -98 and complete in FY - 1999. PRIORITY 2 Administrative Building Renovations Description: This project is contingent upon the School Board offices being relocated to the Frederick County Administrative Building. This project involves the renovation of the school administrative office to an elementary school. Renovations will enable the building to be converted back to an elementary school of approximately 58,000 square feet. Amenities included in this renovation will bring the school to a level of amenities similar to other county elementary schools. Capital Cost: To be determined. Justification: The renovated school will handle 550 students. T he elementary school will serve students in grades K-5. Construction Schedule: Begin and complete in FY -98. Frederick County Proposed 1997-98 Capital Improvements Plan PRIORITY 3 PRIORITY 4 Page 10 Transportation/ Maintenance/ Central Warehouse Facility Description: This project is contingent upon agreement with numerous County agencies. The project involves the construction of a central location for the County's transportation and maintenance facility. The Proposed facility would provide a combined facility for the transportation/ maintenance/ central warehouse facility needs of the school division and various other county departments. To be located on County owned property, adjacent to the Redbud Run Elementary. Capital Cost: To be determined. Justification: This project will serve numerous County agencies, at a central location. The Buildings and Grounds Department provides maintenance and repair services for all county school facilities which serve over 9,000 students, in addition to vehicle fleet maintenance for other County departments.. Construction Schedule: Not available. Third County High School Description: The project involves the construction of a high school for grades 9-12 to serve 1,500 students. The school will occupy approximately 70 acres and consist of a facility containing approximately 240.000 square feet. The site selected for the project is part of a 128 -acre site owned by the school division which was purchased for a future high school. It is located adjacent to Redbud Run Elementary School, and approximately 1.5 miles from the intersection of Route 7 and Interstate 81. Capital Cost: $32.000.000 Debt Service: $3.888.513 Justification: The school will provide space for 1.500 students in grades 9-12, to satisfy projected student population increases. Construction Schedule: Begin planning in FY -99, complete construction in FY -2002. Frederick County Proposed 1997-98 Capital Improvements Plan Page 11 PRIORITY 5 New Elementary School, Back Creek District Description: The project involves the construction of an elementary school for approximately 550 students in grades K-5 on a 15-20 acre site. At this time, the exact location of this proposed school has not been determined. Capital Cost: $9,700,000. Debt Service: $4,581,872. Justification: The project will serve 550 students in grades K-5 who reside in the Back Creek district. The project will provide additional classroom space for increased student enrollment. Construction Schedule: Begin planning in FY -2000. Frederick County Proposed 1997-98 Capital Improvements Plan Page 12 Frederick County Parks and Recreation Department Project Priority List PRIORITY 1 Bicycle Facility Description: A 2.45 mile bicycle facility to serve several residential areas in southern Frederick County. This bicycle facility has been designed to link the developments and park land on the north side of Rt. 277 with Sherando Park and the high school on the south side of Rt. 277. Capital Cost: $318,387 Justification: The initial trail development will provide a direct benefit for 642 planned or completed housing units, with the potential future expansion of the trail system impacting over 3,669 housing units. Sherando Park and Sherando High School represents a focal point of activity for the residents living in the urban development area of southern Frederick County. The proposed bicycle facility appears to be an excellent way to provide safe access to and from these facilities for pedestrians and bicyclists. Construction Schedule: Begin and complete in FY -97. PRIORITY 2 Parkland in Western Frederick County Description: Parkland acquisition in the western portion of the County. Capital Cost: $1,154,772 Justification: This project would be used by the entire Frederick County population. The parkland acquisition would reduce the gap between the amount of existing parkland and the amount of parkland needed to meet the minimum standard for our the Frederick County service area. Construction Schedule: Begin and complete in FY -97. Frederick County Proposed 1997-98 Capital Improvements Plan PRIO,JRITY 3 PRIORITY 4 Page 13 Open Play Area - Clearbrook Park Description: This project consists of an assortment of facilities to compliment the existing Clearbrook Park. It includes two areas within the Clearbrook Park site. First, the area on the Southside of the lake includes: parking, repairs to existing shelters, access paths, and landscaping. Second, the area adjacent to the water tower includes: parking, picnic shelter, 6 horseshoe pits, croquet turf, shuffleboard, volleyball court, and refurbishing the existing concession stand. This project was listing in previous years as two separate projects. Capital Cost: $416,992 Justification: These facilities will provide recreational opportunities for the Clearbrook Park service area, reducing the gap between the number of existing passive recreational areas and the number which is needed to meet the minimum standards for our service area. Clearbrook Park, currently owned by Frederick County, offers the best location for this development. Construction Schedule: Begin and complete in FY -98. Softball Complex - Sherando Description: This project consists of an assortment of athletic facilities to compliment the existing Sherando Park facilities. It includes: 2 softball fields, an access road, parking spaces, and landscaping. Capital Cost: $422,328 Justification: This facility would provide recreational opportunities for the entire Frederick County area. In addition to its use as a recreational facility, it will be used by the Frederick County school system. Presently, there are ten softball/baseball fields within the county's regional park system. Eight of the existing fields must serve a dual purpose of facilitating youth baseball as well as youth and adult softball programs. With the increased usage of these fields. it has become increasingly difficult to facilitate these programs. This project is needed in order for the Parks and Recreation Department to accommodate the existing demand for youth baseball and adult softball programs. Construction Schedule: Begin and complete in FY -98. Frederick County Proposed 1997-98 Capital Improvements Plan Page 14 PRIORITY 5 11 Baseball Field Renovation - Sherando Description: This project consists of an assortment of athletic facilities to compliment the existing Sherando Park facilities. It includes: the renovation of 4 existing ball fields, renovation of existing restrooms, and access roads and walks. Capital Cost: $662,755 Justification: This facility, presently serving as both youth baseball and adult softball fields, and would be used by the "Little League" programs within the Sherando Park service area. In addition to its use as a recreational facility, the athletic complex will also be used by the Frederick County school system. This project cannot be completed until the Softball Complex - Sherando is completed. Construction Schedule: Begin and complete in FY -98. PRIORITY 6 Field House Description: The 29,900 square foot Athletic Field House would include an office and storage area, locker rooms, parking lot, and a 25,000 square foot multipurpose area. This facility would be located on property owned by the county and would cover five to seven acres. The multipurpose area would have three basketball/volleyball courts, a walking track, a tennis wall, and provide the opportunity to offer a wide range of activities and special events for all ages and interest groups. The location has not been determined; best location for this facility may be within one of the County's existing parks. Could possibly be built in concert with the Indoor Pool project. Capital Cost: $1,542,000 Justification: Since the inception of the Parks and Recreation Department, the department has relied solely on the use of the county public schools to house our program offerings. During the early years, the department offered a small number of programs that required limited facility use. Currently, the department offers over 500 programs annually and, at the same time, space within the schools has been more difficult to secure. This has created a situation where the department no longer has the ability to meet the demands of the county residents. Having a facility such as this would also assist the area in its effort to attract new business to the community. This facility would be be to all area residents. Construction Schedule: Begin and complete in FY -99. Frederick County Proposed 1997-98 Capital Improvements Plan PRIORITY 7 PRIORITY 8 Page 15 Tennis/Basketball Complex - Clearbrook Description: This project consists of an assortment of athletic facilities to compliment the existing Clearbrook Park facilities. It includes: 8 tennis courts, 2 racquetball courts, 2 basketball courts, a shelter, parking, and landscaping. Capital Cost: $533,586 Justification: Located in Clearbrook Park, these facilities would be available to all county residents. Currently, there are no tennis, racquetball, or basketball courts in the Clearbrook Park area, and with over 150,000 park visitors annually, these facilities are needed. Construction Schedule: Begin and complete in FY -99. Indoor Pool and Support Facilities Description: This project consists of a six -lane, 25 -yard indoor swimming pool designed for competitive and recreational use. Locker rooms, office and a reception area are also included in the proposal. The location has not been determined; best location for this facility may be within one of the County's existing parks. Could possibly be built in concert with the Field House project as they would compliment one another. Capital Cost: $1,953,200 Justification: Currently, there are no indoor pools in Frederick County. This facility would be available to all county residents for recreational use and to the student population for physical education instruction and competitive swim teams. The general public has made several inquires as to the possibility of the development of an indoor pool to serve the county's residents. This facility will offer all county residents the opportunity to take advantage of year-round recreational swimming and enable this department to offer valuable programming to county residents. Also, county high schools would be able to use this facility for instructional and competitive swimming. Construction Schedule: Begin and complete in FY -2000. Frederick County Proposed 1997-98 Capital Improvements Plan Page 16 PRIORITY 9 II Soccer Complex - Sherando Description: This project consists of an assortment of athletic facilities to compliment the existing Sherando Park facilities. It includes: 3 soccer fields, access paths, restrooms/concession, 2 picnic shelters, landscaping, and lighting. Capital Cost: $1,127,692 Justification: This facility will be used by the entire Frederick County area. In addition to its use as a recreational facility, the facility will also be used by the Frederick County school system. Construction Schedule: Begin and complete in FY -2001. PRIORITY 10 Maintenance Compound and Office - Sherando Description: This project will consist of a 1,200 square foot office and 4,000 square foot storage sheds for the Sherando Park operations. Capital Cost: $168,539 Justification: This facility will enable the county to maintain its equipment and facilities in a more responsible and effective manner. The additional responsibility to maintain the outdoor facilities at Sherando High School also increases the need for more storage, maintenance and office space. Construction Schedule: Begin and complete in FY -2001. PRIORITY 11 Tennis/Picnic Area - Sherando Description: This project consists of an assortment of athletic facilities to compliment the existing Sherando Park facilities. It includes: 3 tennis courts, 4 racquetball courts, restrooms / concession area, 4 picnic shelters, a playground area, access paths, and parking. Capital Cost: $612,495 Justification: These facilities would be used by the Sherando Park service area and the residents of southwestern Frederick County. Although tennis courts have been included at Sherando High School, the department feels that it is important to include three tennis courts on park property for general use while the school courts are being used for school activities. Construction Schedule: Begin and complete in FY -2001 Frederick County Proposed 1997-98 Capital Improvements Plan PRIORITY 12 PRIORITY 13 Page 17 Shelter/Stage Seating - Clearbrook Description: This project consists of an assortment of athletic facilities to compliment the existing Clearbrook Park facilities. It includes: refurbishing existing restrooms, access paths, development of a shelter with performance stage, and lake renovations. Capital Cost: $326,659 Justification: This facility would be used by the entire Winchester -Frederick County area. Presently, there are no facilities to accommodate cultural programs within the county's park system. This project is needed to provide a facility for cultural activities. Construction Schedule: Begin and complete in FY -2001. Skateboard Park Description: This project will consist of. a skateboard bowl, half pipe and open skate area, and vehicle parking. The facility's location has yet to be determined. Capital Cost: $200,000 Justification: This facility will enable the county to provide additional recreation opportunities to its citizens; a recreational facility that has been requested for the community's youth. Construction Schedule: Begin and complete in FY -2001. Frederick County Proposed 1997-98 Capital Improvements Plan Handley Regional Library PROJECT Page 18 Frederick County Library Description: A library in Frederick County will enable the Handley Regional Library to provide service to the growing population in southern Frederick County and to provide adequate books, services, and seating for the population served by the regional system. On a lot of 7 acres, the building will be 34,000 square feet and will be expanded in stages ultimately up to 50,000 square feet. The consulting firm hired by the Handley Library Board to provide a master plan for the library through the year 2010 has estimated the construction, not including land or library materials costs but including furniture and equipment, would cost approximately $4,659,000. (This estimate was generated in 1993. A 5% inflation factor has been added, bringing the current estimate to $4,891,950.) Books and other library materials for an adequate opening day collection of around 80,000 items would cost almost $3,150,000. A site has been designated by the Board of Supervisors at the intersection of Macedonia Church Road and Lakeside Drive. Capital Cost: $8,041,485 Justification: The Handley Library currently has over 14,500 registered users from Frederick County. Frederick County residents checked out 59.06% of all library materials during the month of July 1996. This number would rise dramatically with a new, convenient location. In order to meet the educational needs and the business information needs of the area and to continue to foster literacy and reading among the citizens it serves, the Handley Library needs more space for books, children's programs. and seating for children and adults. The library is well below state standards in the areas of books per capita, in square footage per capita, in seating per capita, and in periodicals per capita. The current Handley Library building cannot contain enough books and seating to meet state standards. A library in the County will contribute to the welfare of the population by providing a place for children to read, study. and prepare projects when schools are closed as well as serve senior citizens. mothers with young children, and individuals seeking health and consumer information. Frederick County Proposed 1997-98 Capital Improvements Plan ADDENDUM Frederick County Sanitation Authority Sewer and Water Project Priority List (Not funded by the General Fund) PROJECT 1 Page 19 Water Transmission Lines A) Miller Heights Water Distribution Line Description: Install 2,640 linear feet of eight -inch water line. Estimated Costs: $81,000 Justification: Provide potable water and fire protection to seventeen existing residences. Construction Schedule: Begin December 1996. B) Route 50 - Victory Road Water Loop - Project 2 Description: Install 2,900 linear feet of twelve -inch water main. Estimated Costs: $90,000 Construction Schedule: Contingent on availability of funds. C) Stonewall - Lee Avenue Water Loop Description: Install 7,900 linear feet of twelve -inch water line connecting Stonewall Industrial Park and Lee Avenue. Estimated Costs: $330,000 Justification: Provide water service and fire protection to commercial and industrial land on the west side of Route 11 between Lee Avenue and Stonewall Industrial Park. The line will provide a loop between the water storage tank in the Stonewall Industrial Park and Lee Avenue and Fort Collier Industrial Park. Construction Schedule: Contingent on availability of funds. Frederick County Proposed 1997-98 Capital Improvements Plan Frederick County Public Works Department Landfill Project List (Not funded by the General Fund) PROJECT 1 PROJECT 2 Page 20 Construction Debris Landfill Description: This project will include the development of a construction debris landfill adjacent to the existing sanitary landfill. The permitting and design are ongoing. The Public Works Department expects to receive a permit on or about May 1997. It is anticipated that development of three to five acres of construction debris landfill space will occur in FY -96 to extend the life of the existing Municipal Solid waste landfill. Capital Cost: $800,000 Justification: The project will serve the citizens and businesses located in Frederick County, Clarke County, and the City of Winchester. The project is necessary to extend the life of the MSW (Municipal Solid Waste) landfill. Construction Debris (CD) landfill requirements are less stringent than Municipal Solid Waste landfill requirements, hence, the project will create additional CD capacity. Construction Schedule: Begin in FY -96 and carry over into FY -97. Closure of Cells A and B, Phase I Description: This project encompasses the closure of Cells A and B, Phase I. This closure will be performed in accordance with the details and guidelines set forth in Permit #529. Capital Cost: $1,400,000 Justification: Required by the Department of Environmental Quality. The project will serve the citizens of Frederick and Clarke Counties as well as the City of Winchester for approximately three to four years. Construction Schedule: This project may be initiated in FY -96 to close out Cell A. The closure of Cell B will be initiated in FY -96. Construction schedules will be dependent upon the actual life of Cell B. Frederick County Proposed 1997-98 Capital Improvements Plan PROJECT 3 PROJECT 4 Page 21 Landfill Development - Cell "A", Phase II - Five Acres Description: This project includes the development of approximately five acres of sanitary landfill space as outlined in Permit #529, Phase 1I- Cell A. It is anticipated that this development will have a life between two to three years in combination with the existing Cell "D" of Phase II. Capital Cost: $1,000,000 Justification: Required by the Department of Environmental Quality. The project will serve the citizens of Frederick and Clarke Counties as well as the City of Winchester for approximately three to four years. Construction Schedule: Begin in FY -98. The commencement of this construction will depend on the actual life of Cell "D", Phase I. Installation of Active Gas Management Cells A and B, Phase I Description: This project encompasses the installation of an active gas management system in conjunction with the closure of Cells A and B. The proposed system may be limited to recovery wells and candle flares or may be expanded to include a total recovery system connected to a generator or boiler system. Capital Cost: $500,000 Justification: This project will serve the citizens and businesses located in Frederick and Clarke Counties, and the City of Winchester. It is required to meet the Federal Clean Air Act standards. Construction Schedule: This project may be initiated in FY -97 in conjunction with the closure of Cells A and B. Frederick County Proposed 1997-98 Capital Improvements Plan Winchester Regional Airport Project List (Funded by contributions from the federal, state, and local governments. Local contributors may include Frederick, Warren, Clarke, Shenandoah Counties, and the City of Winchester.) PROJECT 1 PROJECT 2 Page 22 Land Acquisition - South Side RPZ, Phase II Description: Acquire approximately 15 acres of land along the south side of Route 645 to complete Runway Protection Zone required by the Federal Aviation Administration for an Instrument Landing Slope Approach. Capital Cost: $625,000 90/8/2 - FAA/State/Local Justification: Provides land required to establish Obstruction Free Area for the Instrument Landing System installed in FY - 95. Provides additional land for the relocation of Route 645 as part of the Airport Master Plan implemented in 1992. Construction Schedule: Phase I began in FY -95. This phase of land acquisition will continue through FY -98. Route 645 Relocation - Design Only Description: The design for the relocation of Route 645 will enable the airport to move forward with its plans for activating a precision approach to Runway 32. The relocation of Route 645 will remove the final obstruction from the approach. Capital Cost: $125,000 90/8/2 - FAA/State/Local Justification: By removing this obstruction (Route 645), the approach minimums can be lowered enabling the airport to handle aircraft in almost all weather conditions. Construction Schedule: Initiate and complete the relocation designs in FY -98. r-reaencx county Proposed 1997-98 Capital Improvements Plan Page 23 PROJECT 3 Route 645 Relocation - Construction Phase Description: The construction of Route 645 relocated. Capital Cost: $1,400,000 90/8/2 - FAA/State/Local Justification: By removing this obstruction (Route 645), the approach minimums can be lowered enabling the airport to handle aircraft in almost all weather conditions. Construction Schedule: Initiate and complete the construction phase in FY -99. PROJECT 4 Land Acquisition, Bufflick Road, Phase II Description: The acquisition of land along Bufflick Road to further advance the airport's compliance with FAA compatible land use criteria. Capital Cost: $775,000 90/8/2 - FAA/State/Local Justification: This acquisition is anticipated to bring all land uses within the airport environment into FAA compatible land use criteria. Construction Schedule: Initiate and complete acquisition in FY -99. Frederick County Proposed 1997-98 Capital Improvements Plan Regional Adult Detention Center Project List (Not entirely funded by the General Fund) PROJECT 1 Page 24 Regional Secure Juvenile Detention Center Description: The Clarke -Frederick -Winchester Regional Jail Board proposes to construct a 32 bed regional juvenile detention facility. It shall be constructed adjacent to the pre- release facility, located in Fort Collier Industrial Park, adjacent to Brook Road and Fort Collier Road. The property and facility shall be owned by the CFW Regional Jail Board, however, it shall be operated by a regional juvenile detention commission, consisting of representative from Clarke County, Frederick County, the City of Winchester, Page County, Shenandoah County, and Warren County. Capital Cost: $4,031,377 Justification: Review of needs assessment indicates that a regional juvenile detention facility is necessary. Construction Schedule: Complete in FY -96. Freaerick County Proposed 1997-98 Capital Improvements Plan 1997 FREDERICK COUNTY CAPITAL IMPROVEMENT PROJECTS EVALUATION FORM LISTED BY DEPARTMENT; IN ORDER OF DEPARTMENT PRIORITY CRITERION Conform to Health. Legally Distribute Economic Related Public and Comp. Plan Safety, Required Services Impact to Other Support TOTAL Welfare Projects WEIGHT 3 4 4 2 2 3 3 LIBRARY New Library 2/6 2/8 0/0 4/8 2/4 0/0 3/9 35 SCHOOL SYSTEM New Gainesboro Elementary School 2/6 2/8 0/0 112 2/4 113 113 26 Administration Building Renovations Transportation/Maintenance/Warehouse 2/6 2/8 0/0 1/2 3/6 2/6 1/3 31 Third County High School 2/6 2/8 0/0 2/4 3/6 113 113 30 New Elementary School, Back Creek 2/6 2/8 0/0 3/6 2/4 113 113 30 PARKS AND RECREATION Bikeway System 4/12 2/8 0/0 1/2 1/2 2/6 2/6 36 Park Land 3/9 1 /4 0/0 4/8 1/2 113 2/6 32 Open Play Area - CB 3/9 1/4 0/0 3/6 1 /2 1 l3 2/6 30 Softball Complex - SP 3/9 1/4 0/0 1/2 1/2 1/3 2/6 26 Baseball Field Renovations - SP 2/6 1/ 4 0/0 1/2 1/ 2 1; 3 2/6 23 Field House 2/6 1/4 0/0 2/4 1/2 1 /3 2/6 25 Tennis/Basketball Complex - CB 3/9 1/ 4 0/0 3/6 1/ 2 2/6 1/ 3 30 Indoor Pool Facilities 2/6 1/4 0/0 2/4 1/2 2/6 2/6 28 Soccer Complex - SP 3/9 1/4 0/0 3/6 1/2 1/3 2/6 30 Maintenance Compound - SP 1/3 1/4 0/0 0/0 3/6 3/9 113 25 Tennis/Picnic Area - SP 3/9 1/4 0/0 1/2 0/0 2/6 2/6 27 Shelter, Stage Seating - CB 3/9 1/4 0/0 3/6 2/4 2/6 2/6 25 Skateboard Park 113 114 0/0 112 112 113 216 20 AIRPORT Land Acquisition - South Side RPZ 2/6 2/8 3 / l2 1/2 2/4 2/6 2/6 44 Land Aquisition, Bufflick Road 2/6 2/8 3/12 1/2 2/4 2/6 2/6 44 Route 645 Relocation - Design 2/6 1/4 1/4 0/0 1/2 2/6 1/3 25 Route 645 Relocation - Construction 2/6 1/4 1/4 0/0 1/2 2/6 1/3 25 Winchester Regional Airport 1. 2, 17. 18 r � r 8benandoab Coney Scale in Feet 0 12000 24000 36000 48000 Clearbrook Park 5, 10, 11 P4 7, 8 E Sherando Park 2. 12. 14, 16, 19. 21 Frederick County 1997-98 Capital Improvements Plan Project Locations (in order of prioritization) 1 Airport Land Acquisition 2 Airport Land Acquisition 3 Bicycle Facility 4 New Library 5 Shelter. Stage Seating — CB 6 Park Land 7 Transportation/ Maintenance/ Warehouse 8 Third County High School 9 New Elementary School —Back Creek 10 Open Play Area — CB 11 Tennis/ Basketball Complex — CB 12 Soccer Complex — SP 13 Indoor Pool Facilities (location to be determined) 14 Tennis/ Picnic Area — SP 15 New Gainesboro Elementary School 16 Softball Complex — SP 17 Route 645 Relocation — Design 18 Route 645 Relocation — Construction 19 Maintenance Compound — SP 20 Field House (location to be determined) 21 Baseball Field Renovations — SP 22 Skateboard Pork (location to be determined) Frederick County p1&nnMg A. pevttopntnt Vinchester, WOW* ._S§ 4F December 1996 1997-98 Capital Improvements Plan Departmental Shares of Proposed Project expenditures School Board $62,828,996 Library X489,150 -ks and Recreation $9,172,233 Airport Authority $51,000 Shares are based on expenditures for the ensuing 5 -year period M �.< COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAX: 540/678-0682 MEMORANDUM TO: Frederick County Planning Commission FROM: Evan A. Wyatt, Deputy Director Lys RE: Single Family Zero Lot Line Design Standards DATE: January 22, 1997 During the January 15, 1997 Planning Commission meeting, staff presented a request to amend Section 165-65E of the Zoning Ordinance. This section of the Zoning Ordinance provides dimensional and design standards for single family detached zero lot line developments. Specifically, the request is to eliminate a design standard which prohibits windows on the zero lot line of the dwelling unit. The Planning Commission felt that this language was not necessary, as requirements in the CABO One and Two Family Dwelling Code prohibit openings in building walls that are within three feet of a property line. The Planning Commission also felt that duplicate language in the building code and zoning ordinance may complicate matters if a property owner desired to go through the appeals process for relief from this requirement. The Planning Commission directed staff to advertise the revised language as a public hearing item. Included with this memorandum is the proposed amendment to Section 165-65E of the Zoning Ordinance for consideration. Staff asks that the Planning Commission forward a recommendation to the Board of Supervisors for final resolution. 107 North Kent Street • Winchester, Virginia 22601-5000 ARTICLE VI RP Residential Performance District 165-65E. Single-family detached zero lot line. A "single-family detached zero lot line residence" shall be a single-family residence on an individual lot. The building is set on one (1) of the side property lines, with a maintenance easement on the adjoining lot. * Note* The following sentence has been eliminated: Windows are prohibited on the lot line side.