PC 12-17-03 Meeting AgendaAGENDA
FREDERICK COUNTY PLANNING COMMISSION
The Board Room
Frederick County Administration Building
Winchester, Virginia
December 17, 2003
7:00 P.M. CALL TO ORDER TAB
1) Committee Reports ................................................. (no tab)
2) Citizen Comments ................................................. (no tab)
DISCUSSION
3) Capital Improvements Plan (CIP)
Mrs. Kennedy.......................................................... (A)
4) Other
Interested citizens may appear before the Commission to speak on the above items. A copy of the
agenda will be available at the Handley Library and the Bowman Library approximately one week
before the meeting. Further information may be obtained at the Department of Planning and
Development, 107 North Kent Street, Winchester, Virginia, or by calling (540) 665-5651. You can also
visit us on the web at: www.co.frederick.va.us/PlanningAndDevelopment/PlanningAndDev.htm.
COUNTY of FREDERICK
Department of Planning and Development
540/665-5651
MEMORANDUM
TO: Frederick County Planning Commission
F
FROM: Abbe S. Kennedy, Senior Planner:'
RE: Discussion Item: 2004-2005 Capital Improvements Plan
DATE: December 3, 2003
FAX_- 540/665-6395
On November 10, 2003, the Comprehensive Plans and Programs Subcommittee (CPPS) met with
county department representatives to discuss new project requests and project modification requests
associated with the 2004-2005 Capital Improvements Plan (CIP).
It is requested that the Planning Commission and Board of Supervisors consider the proposed 2004-
2005 CIP as a discussion item prior to the document's advertisement for public hearing. Such
discussion will provide a valuable opportunity for collective review of proposed capital projects
while also allowing members to determine if additional information or analysis is needed in advance
of final CIP consideration.
Please find attached with this agenda item a summary of the proposed 2004-2005 CIP; information
pertaining to new or modified departmental project requests; and a draft copy of the proposed 2004-
2005 CIP. Please contact our department should you have any questions regarding this information.
Early this year the Board of Supervisors directed the Department of Planning and Development
pursued a process revision to the methods used in forming the County's CIP. During the revision
process, it was identified that the role of the CPPS committee in the CIP is to ensure that the various
departmental project requests are supported by the Comprehensive Policy Plan, rather than to engage
in the evaluation and prioritization of departmental projects.
During the CPPS discussion, it was acknowledged that there are areas in the existing policy
language that are outdated and in need of amendment to support the various departmental needs.
Many of the departments provided maps showing their existing and future facility needs. The map
element, if ultimately adopted by the Board of Supervisors would satisfy the review requirement
107 North Kent Street • Wnches±e*; Virginia 22601-5000
of Sec. 15.2-2232 of the Code of Virginia, which states that no public facility shall be constructed
unless said facility is a "feature shown" within a jurisdiction's comprehensive plan.
The committee recommended that planning department staff and the agencies work jointly in an
effort to update the policy language and associated mapping to achieve clear consistency between
the CIP and Comprehensive Plan. This update will be submitted by staff as an amendment to the
Public Facilities chapter of the Comprehensive Plan prior to next years's CIP cycle.
Following discussion, the CPPS supported the departmental prioritization of all projects proposed
for inclusion in the 2004-2005 CIP resulting in the attached spreadsheet*, and forwarded the draft
document out of committee for Planning Commission discussion. Subsequent to the CPPS meeting,
minor revisions in the priority of public school projects have been incorporated into the spreadsheet.
*Note: The scope of CPPS review of capital project requests was limited expressly to an evaluation
ofproject conformance to the Comprehensive Policy Plan. However, projected expenditures are
,included in the proposed CIP as required by the Code of Virginia.
ASK/bad
Attachments
SUMMARY OF THE PROPOSED
2004-2005 CAPITAL IMPROVEMENTS
• The proposed CIP consists of 34 capital projects, an increase over the 30
projects included in the previous CIP.
• County contributions toward capital projects (excluding debt service) are
estimated to be $73.7* million over the upcoming five-year period, an increase
from the $56.9* million in expenditures projected in the previous CIP. With
debt service included, the proposed CIP estimates total County costs for capital
projects to be $101.7* million.
• The proposed CIP includes six (6) new capital projects, which are as follows:
• Three (3) new Winchester Regional airport Authority projects:
• An Updated Master Development Plan- North Side Development
• Land Acquisition along Bufflick Road to meet noise abatement
requirements; parcels 47,47A & 48
• Land Acquisition along Bufflick Road to meet noise abatement
requirements; parcels 50, 51 & 52
• Two (2) new projects from the Clarke-Fauquier-Frederick-Winchester
Regional Jail:
• Community Corrections Center (CCC)- 44,OOOsf, 200 Bed CCC
on 11 ac site adjacent to existing facility.
• Secure Jail Expansion -connected to the existing secure detention
center; to accommodate projected inmate growth.
• One (1) new project form the Frederick County Public Schools:
• R.E. Aylor Middle School Renovations
• All of the capital projects included with the previous CIP will be carried over
to the proposed 2003-2004 CIP with the exception of the James Wood Middle
School Renovation, which will be completed in May of 2004.
• Additionally, the Airport Road's Route 645 Road Relocation project is off the
project list. It is fully funded and should be bid and ready for construction by
early spring 2004. Construction is expected to be completed by the end of the
2004 calendar year.
* Please note that these figures do not include County contributions toward the Public Safety
Center. Figures are not available at this time.
SUMMARY OF NEW PROJECT REQUESTS
AND PROJECT MODIFICATION REQUESTS
December 1, 2003
Frederick County Department of Public Works
Project
Type of Request
2003 Local
2004 Local
Expenditure
Expenditure Request
Request
Request
New Animal Shelter
Modification
1,254,000
1,540,000
Frederick County Parks and Recreation
Project
Type of Request
2003 Local
2004 Local
Expenditure
Expenditure
Request
Request
Lake, Trails, and Parking
Modification
$793,000
838,925
with Two Irrigated Multi -
Purpose Fields - Sherando
Park
Access Road with Parking
Modification
$797,000
811,125
and Trails - Sherando Park
Parkland in Eastern
Modification
$2,196,063
2,250,965
Frederick County
Parkland in Western
Modification
$1,344,252
1,377,858
Frederick County
Softball Complex -
Modification
$491,619
503,345
Sherando Park
Baseball Complex
Modification
$1,007,788
1,032,982
Renovations - Sherando
Park
Soccer Complex -
Modification
$1,146,199
1,151,611
Sherando Park
Open Play Areas -
Modification
$368,699
377,921
Clearbrook Park
Modification !
Expenditure
Skateboard/In-Line
$468,017
479,718 II
Hockey Park
New Middle School
Modification
Tennis/Basketball
Modification
$384,876
394,734
Complex - Clearbrook
6,350,000
#11 New Elementary
Modification
Park
10,500,000
School
Tennis/Picnic Area -
Modification
$619,390
635,211
Sherando Park
10,500,000
Elementary School
Shelter/Stage - Clearbrook
Modification
$380,245
390,833
Park
Not Available
Renovations
Maintenance
Modification
$196,195
201,100
Compound/Office -
Sherando Park
*Note: The modifications requested by the Department of Parks and Recreation are cost revisions
based on an inflation factor of 3.5%.
Frederick County Public Schools
Project
Type of Request
2003 Local
2004 Local
Expenditure
Expenditure Request*
Request*
New Middle School
Modification
$13,435,000
10,440,000
Transportation Facility
Modification
$6,850,000
6,350,000
#11 New Elementary
Modification
10,000,000
10,500,000
School
New Gainesboro
Modification
10,000,000
10,500,000
Elementary School
R.E. Aylor Middle School
NEW
Not Available
Not Available
Renovations
* Note: Cost estimates for Public School projects do not reflect debt service.
See Public Schools request summary form and FY04 CIP spreadsheet for comparison.
Handley Regional Library
Project
Type of Request
2003 Local
2004 Local
Expenditure
Expenditure Request
Request
Bowman Library Safety
Modification
228,468
237,500
Improvements
Modification
15,000
4,000
Library facility in
Modification
98,000
993,000
Northwestern Frederick
County
Winchester Regional Airport
Project
Type of Request
2003 Local
2004 Local
Expenditure
Expenditure Request
Request
Master Plan Update
NEW
N/A
2,332
Upgrade Airfield Lights
Modification
15,000
4,000
Land Acquisition-
NEW
N/A
173,000
Preliminary Phase,Parcels
47,47A, & 48
Land Acquisition-
NEW
N/A
70,000
Preliminary Phase,Parcels
50,51,&52
Land Acquisition -
Modification
$144,275
141,000
Preliminary Phase,Parcels
31,46,&53
Clarke-Fauquier-Frederick-Winchester
Community Corrections Center (CCC)
Project
Type of Request
2003 Local
2004 Local
Expenditure
Expenditure
Request
Request
Community Corrections
NEW
N/A
1,165,320
Center
Secure Jail Expansion
I NEW
I N/A
2,030,246.50 J1
U:\COMMITTEES\CPPS\CIP\2004-2005 CIP\Request Summary.wpd
I17
of
FREDERICK COUNTY
VIRGINIA
Capital Improvements Plan
2004-2005
Fiscal Year
Adopted by the
Frederick County
Board of Supervisors
Febru.,ry XX, ` 004
Recommended by the
Frederick County
Planning Commission
TABLE OF CONTENTS
INTRODUCTION ............................................................. 1
PROJECT RECOMMENDATIONS .............................................. 2
SchoolBoard...........................................................2
Parks and Recreation.....................................................2
County Administration.................................................... 3
Handley Regional Library ................................................. 3
Airport Authority........................................................4
2004-2005 CAPITAL IMPROVEMENTS PLAN ..................................... 5
CIP TABLE EXPLANATIONS ................................. . ............... 6
PROJECT FUNDING ............... ..........................................6
PROJECT DESCRIPTIONS..................................................... 8
Frederick County Public Schools ............................................
8
New Middle School Construction .....................................
8
411 Elementary School Construction ..................................
8
Transportation Facility ..............................................
8
Administration Building Renovation ...................................
9
New Gainesboro Elementary School ...................................
9
Robert E. Aylor Middle School Renovation ............................
10
Frederick County Parks and Recreation Department ............................
10
Field House/Indoor Pool Complex ...................................
10
Parkland in Eastern Frederick County .................................
11
Parkland in Western Frederick County ................................
11
Open Play Areas - Clearbrook Park ...................................
11
Softball Complex Renovation-Sherando Park ...........................
12
Baseball Complex Renovation-Sherando Park ..........................
12
Soccer Complex-Sherando Park .....................................
13
Skateboard Park-Sherando Park ......................................
13
Lake, Trail, and Parking with Irrigated Multi -Purpose Fields - Sherando Park .
13
Tennis/Basketball Complex -Clearbrook Park ...........................
14
Tennis/Picnic Area - Sherando Park ..................................
14
Shelter/Stage Seating - Clearbrook Park ...............................
14
Maintenance Compound and Office - Sherando Park .....................
15
Access Road with Parking and Trails - Sherando Park ...................
15
County Administration...................................................
15
Public Safety Center ...............................................
15
New Frederick County Animal Shelter ................................
16
Annex Facilities..................................................16
Relocation of Round Hill Fire/Rescue Station ........................... 17
Winchester Regional Airport .............................................. 18
Master Plan Update .............................................. 18
Airfield Lighting Upgrade .......................................... 18
Land Acquisition - Bufflick Road .................................... 18
Airfield Maintenance Building ...................................... 19
Land Acquisition-Bufflick Road, parcels 47, 47A and 48 .................. 19
Land Acquisition-Bufflick Road, parcels 50, 51 and 52 ................... 19
Handley Regional Library ................................................ 20
Bowman Library Improvements ..................................... 20
Northern Frederick County Library Branch - Land Acquisition ............. 20
CFFW Regional Jail.....................................................21
Community Corrections Center ...................................... 21
Secure Detention Expansion ........................................ 21
DEPARTMENTAL SHARE OF EXPENDITURES .................................. 22
CAPITAL IMPROVEMENTS PLAN
FREDERICK COUNTY
'100432005
INTRODUCTION Section 15.2-2239 of the Code of Virginia assigns the
responsibility for preparation of plans for capital outlays to the
local Planning Commissions. The Capital Improvements Plan
(CIP) consists of a schedule for major capital expenditures for the
county for the ensuing five years.
The CIP is updated annually. Projects are removed from the plan
as they are completed or as priorities change. The plan is intended
to assist the Board of Supervisors in preparation of the county
budget. In addition to determining priorities for capital
expenditures, the county must also ensure that projects contained
within the CIP conform to the Comprehensive Policy Plan.
Specifically, the projects are reviewed with considerations
regarding health, safety, and the general welfare of the public.
The annual review process begins with the submission of capital
improvement requests from county departments and relevant
agencies in the fall of the year. In February of 2003, the Board
directed the planning staff to pursue a process revision to the
methods used in forming the CIP. The result of the revised
process eliminates the evaluation of project requests by the
Comprehensive Plans and Programs Subcommittee (CPPS), given
that each department currently has methods for establishing and
quantifying their priorities. The goal of the CPPS is to ensure that
the established needs of each department are identified and
appropriately accommodated by the Comprehensive Policy Plan.
Ultimately, the cross -functional alignment of departmental
requests should lead to a more structured and comprehensive
review of the CIP. This year, the CPPS committee is working
jointly with planning department staff and the agencies to update
the policy language and associated mapping to achieve clear
consistency between the CIP and Comprehensive Policy Plan.
The CIP is strictly advisory; it is intended for use as a capital
facilities planning document, not for requesting funding
allocations. Once adopted, project priorities may change
Frederick County 2004-2005 Capital Improvements Plan
PROJECT
RECOMMENDATIONS
1. School Board
2. Parks and Recreation
Page 2
throughout the year based on changing circumstances. It is also
possible that particular projects may not be funded during the year
that is indicated in the CIP. The status of any project becomes
increasingly uncertain the further in the future it is projected.
In an effort to maintain educational facilities that will handle the
growing student population, the construction of a new middle
school and two new elementary schools is recommended.
Additionally, renovations to Robert E. Aylor Middle School are
added to this year's plan which are intended to extend the life of
the facility. The renovation of James Wood Middle School will be
completed in May 2004, and therefore, was removed from the list
of projects.
Funding is also being requested for the construction of a new
central transportation maintenance facility which will house all of
the school system's buses and provide service to county vehicles
from other departments.
The majority of the recommended projects are planned for the
county's two regional parks. Eight projects are planned for
Sherando Park: a softball complex, a soccer complex, tennis courts
and picnic areas, renovations to the existing baseball fields, a
skate/in-line hockey park, maintenance compound, lake with
associated trails and parking, and two irrigated multi-purpose
fields with associated trails and parking. Three projects are
planned for Clearbrook Park including a new open play area, a
tennis and basketball complex, and a new shelter and stage.
Also planned is an indoor pool/field house complex. The scope
and location of this project have not been determined. Various
options for the development of this project are being explored,
including a public-private partnership.
The Parks and Recreation Department has proposed to acquire
land in both the eastern and western portions of the county for the
development of future regional park systems. This proposal calls
for the acquisition of 150-200 acres of land for each regional park
Frederick County 2004-2005 Capital Improvements Plan
Page 3
system to accommodate the recreational needs of the growing
population.
3. County Administration In an effort to improve service to the citizens throughout the
county and meet current and future space needs, the Frederick
County Sheriff's Office is exploring the feasibility of acquiring
land in a strategic location for the development of a new Public
11 Safety Center.
The development of a 9,500 -square -foot animal shelter is
proposed to replace the existing Esther Boyd Animal Shelter. The
existing shelter is expected to be displaced in approximately three
years due to continued development of the Municipal Solid Waste
landfill. The animal shelter would serve Frederick County and
accommodate growth of the animal population. This shelter could
be located on the same site as the Public Safety Center, as space
allows.
Long-range service enhancements are recommended to provide
annex satellite facilities in strategic locations throughout the
county that will house representatives of the Frederick County
Sheriff's Office, the Frederick County Treasurer's Office, and the
Commissioner of Revenue's Office. The Department of Fire &
Rescue has recommended a new fire/rescue station along Fairfax
Pike (Route 277) that would potentially house such satellite
offices. The fire/rescue facility would serve areas in southeast
Frederick County between Route 522 and Route 277.
Relocation of the existing Round Hill Fire Station is also
requested. This would involve the relocation and building of a
22,000 square foot facility for fire and rescue activities along with
the building of a 10,000 square foot community center for fund-
raising and other activities.
4. Handley The Handley Regional Library has recommended two projects.
Regional Library The library proposes to acquire three to four acres of land in the
Gainesboro Magisterial District for a future branch library. A
project request for improvements at the existing Bowman Library
'Frederick County 2004-2005 Capital Improvements Plan
Page 4
is also proposed. More parking at the Bowman Lihra,-y is needed
to accommodate the growing number of users of the library. A
sidewalk extension is needed for safer access from adjoining
neighborhoods to the library.
5. Airport Authority An updated master plan for the Winchester Regional Airport was
adopted in December 1993. Since that time, much of the proposed
development has been completed, yet the demand for airport
services and development have increased beyond that currently
shown on the Master Plan.
The Airport Authority has three new project requests. They have
determined a need to revisit and update the Master Plan to identify
additional areas for future development on the north side of the
airfield. There are two new requests to acquire additional parcels
along Bufflick Road which are required to meet noise abatement
requirements. Carried over are the request to construct a new
airfield maintenance building, and a request to upgrade the airfield
lighting system to enhance safety for aircraft use of the facility.
Funding for airport projects is derived through a complex formula
where the federal and state governments contribute a majority of
the funding, with Frederick County and the City of Winchester
providing the remaining funding.
6. CFFW Regional Jail The Clarke-Fauquier-Frederick-Winchester Regional Jail Board
proposes to construct and operate, in accordance with the Public -
Private Education Facilities and Infrastructure Act of 2002, a
44,000 square foot, 200 -bed Community Corrections Center on an
11.4 acre site adjacent to the eastern boundary of its property
located at 141 Fort Collier Road.
Additionally, the CFFW is planning for a Secure Detention
expansion which will be connected to the existing Secure
Detention Center. The purpose of this project is to accommodate
projected growth in inmate population.
Frederick County 2004-2005 Capital Improvements Plan
Page 6
The Capital Improvements Plan table, on the previous page,
contains a list of the capital improvement projects proposed for the
ensuing five years. A description of the information in this table
is explained below.
THE CIP TABLE: Department Priority - The priority rating assigned by each
CONTENT department for their requested projects.
DESCRIPTIONS
Project Description - The name of the capital improvement
projects.
County Contribution - The estimated dollar value that will be
contributed for each project. This value is listed by individual
fiscal years and by total contributions over the five-year period.
The total contribution column, located to the right of the fiscal year
columns, does not include debt service projections.
Notes - Indicates the footnotes that apply to additional funding
sources for particular projects.
Interest From Any Debt Service - The projected interest that will
be incurred for a particular project. Debt service projections are
provided by individual departments and are based on the most
accurate interest rate information available at the time the CIP is
assembled.
Total County Costs - The total estimated expenditures that the
county will incur for a particular project. This column includes
both fiscal year allocations and debt service expenses associated
with each project. Essentially, this column represents the total
county contributions for each particular project.
Total Project Costs - The cost for each project, including county
allocations and other funding sources.
PROJECT FUNDING The projects included in the 2003-2004 Capital Improvements
Plan have a total project cost of $106,913,961. If all projects are
undertaken, the county will contribute $73,777,727 over the
ensuing five years, excluding the interest from any debt service.
By adding the projected debt service of $27,900,000, the total
county contribution of the approved projects comes to
$101,677,727. Costs associated with the Public Safety Center, the
Frederick County 2004-2005 Capital Improvements Plan
Page 7
Field House Complex, the new County Administration Annex
facilities (Treasurer, Commission. of Revenue, Sheriff, and the
Fairfax Pike Fire Station), and the relocation of the Round Hill
Fire Station are not included in these figures.
• School projects are funded through a combination of loans
from the Virginia Public School Authority and the Virginia
Literary Fund.
• Funding for Parks and Recreation Department projects will
come from the unreserved fund balance of the county. The
Parks and Recreation Commission will actively seek grants
and private sources of funding for projects not funded by
the county.
• Airport projects will be funded by contributions from the
federal, state, and local governments. The local portion
may include contributions from Frederick, Clarke,
Shenandoah, and Warren Counties, and the City of
Winchester.
• Regional jail projects will be requesting 50%
reimbursement by the State of Virginia. Reimbursement
may be "lump sum" or over a period of time specified by
contract. The local share is based on the percentage of
jurisdictional use averaged for the most recent 3 years for
Frederick County.
Frederick County 2004-2005 Capital Improvements Plan
Page 8
PROJECT
DESCRIPTIONS
Frederick County
Public Schools
Project Priority List
PRIORITY 1
New Middle School Construction
Description: This project involves the construction of a middle
school in eastern Frederick County on 30.5 acres south of
Winchester off Route 522. The facility is designed for a student
body of 850 members 80 staff.
Capital Cost*: $26,600,000
Debt Service: $ 13,200,000
Justification: The construction of a fourth middle school is
necessary to provide space for the increase in middle school age
population. Construction of the new school will decrease the over
crowding at James Wood Middle School and accommodate future
growth within the student population.
Construction Schedule: Open in Fall 2005.
*$16,160, 000 borrowed prior to 7/01104, resulting in total capital
cost of $26,600, 000 (not including debt service).
PRIORITY 2
Elementary School # 11
Description: This project involves the construction of a new
elementary school to accommodate a practical capacity of 550
students. This project has moved up to the number 2 priority for
the Frederick County School Board.
Capital Cost*: $10,800,000
Debt Service: $ 5,400,000
Justification: This project is needed to accommodate growth
patterns in the County's Urban Development Area.
Construction Schedule: Open in Fall 2006.
PRIORITY 3a
Transportation Facility
Description: This project involves the site acquisition and
Frederick County 2004-2005 Capital Improvements Plan
Page 9
development of a new transportation facility for the public school
system. The facility would also provide support services to other
county agencies such as Sheriff's Department, and Parks and
Recreation.
Capital Cost: $8,400,000
Debt Service: $4,100,000
Justification: The facility will accommodate administrative
offices, support staff offices, driver training areas, driver and staff
meeting area, and will be utilized for the repair, inspection, and
service of schools buses, and cars and trucks within the public
school system.
Construction Schedule: Open in December 2005
*$2, 000, 000 borrowed prior to 7/01/04, resulting in total capital
cost of $8,400, 000 (not including debt service).
PRIORITY 3b Administration Building Renovation and Addition
Description: This project involves remodeling the existing
administration building to address energy conservation; to provide
adequate restroom and storage facilities; and to upgrade the fire
protection, electrical, and security systems. The project would also
include additional space for information technology needs and the
space needs of other departments.
Capital Cost: To Be Determined
Debt Service: To Be Determined
Justification: The carrying capacity of the building for staff office
space and records space has been exceeded. The building also
lacks adequate facilities to meet the needs of the school division.
Construction Schedule: The project is estimated to take one year
to complete and is scheduling is yet to be determined.
PRIORITY 4 New Gainesboro Elementary School
Description: This project involves the construction of an
elementary school (grades K-5) of approximately 75,000 square
feet to serve 550 students. The school is located on a 20 -acre site.
Capital Cost: $10,500,000.
Debt Service: $ 5,200,000
Justification: This project will serve approximately 550 students
in grades K-5. The Frederick County School Board purchased 20
Frederick County 2004-2005 Capital Improvements Plan
Page 10
Frederick County 2004-2005 Capital Improvements Plan
acres of land in the Gainesboro District in 1990 in anticim inn of
the future need to provide space for increased student enrollment.
Construction Schedule: Open Fall 2008
PRIORITY 5
Robert E. Aylor Middle School Renovation
Description: This is a new project request for the 2004-2005
CIP. The scope of this project has not been determined. The
Frederick County School Board is exploring various options for
the necessary renovations of the R.E. Aylor Middle School.
Capital Cost: To be determined.
Frederick County
Parks and Recreation
Project Priority List
PRIORITY 1
Field House/Indoor Pool Complex
Description: The scope of this project has not been determined.
The Parks and Recreation Department is exploring various
options for the development of the field house complex, including
a public/private partnership. The Field House and Indoor Pool
Complex would be approximately 118,000 square feet and include
a 25 -yard x 50 -meter indoor swimming pool, a 200- meter indoor
track, a fitness center, multipurpose rooms, locker rooms, offices,
and four basketball courts that would be designed with in -floor
sleeves and partitions to allow the courts to be utilized for indoor
soccer, baseball, softball, wrestling, volleyball, tennis, badminton,
and special events such as dances, music festivals, and garden,
home, or craft shows.
Capital Cost: To be determined.
Justification: Since the inception of the Parks and Recreation
Department, the department has relied solely on the use of the
county public schools to house programs. This arrangement was
adequate when the department first started out; however, now that
the department offers more than 750 programs annually, space
within the schools is more difficult to secure and scheduling is
more difficult. This has created a situation where the department
can no longer meet the programming and facility needs of the
county residents. Additionally, there are no indoor pools in
Frederick County; therefore, the provision of this facility within
the Field House Complex would enable the department to meet
Frederick County 2004-2005 Capital Improvements Plan
Page 11
citizen programming and instructional demands and would provide
the area with a facility that would attract new business to the
community. This facility would be available to all area residents.
Construction Schedule: The Parks and Recreation department
requests that the project be funded and completed in FY 05-06.
PRIORITY 2 Parkland in Eastern Frederick County
Description: Parkland acquisition in the eastern portion of the
county.
Capital Cost: $2,250,965
Justification: A new 150-200 acre regional park would be located
within the Urban Development Area to provide recreational
opportunities to this most actively growing part of the county.
Acquisition of additional parkland would assist in meeting the
minimum facility needs of future county residents as
recommended by the 1996 Virginia Outdoor Plan. The location of
a regional park in this portion of the county would also reduce
traffic burdens in other areas by providing recreational facilities
and services in closer proximity to the residents within this area.
Construction Schedule: Acquisition in FY 05-06.
PRIORITY 3 Parkland in Western Frederick County
Description: Parkland acquisition in the western portion of the
county.
Capital Cost: $1,377,858
Justification: A new 150-200 acre regional park would be
utilized by the entire county population. Acquisition of additional
parkland would assist in meeting the minimum facility needs of
county residents as recommended by the 1996 Virginia Outdoor
Plan. Currently, this facility need is 558 acres based on 1998
population projections for Frederick County. The county owns
404 acres of parkland at this time.
Construction Schedule: Acquisition in FY 05-06.
PRIORITY 4 Open Play Areas - Clearbrook Park
Description: This project has moved up from number 7 to
number 4 in department priority. This project includes the
Frederick County 2004-2005 Capital Improvements Plan
Page 12
development of a picnic shelter; six horseshoe pits; a volleyball
Icourt; croquet turf; shuffleboard; parking; refurbishing the existing
concession stand; and renovations to existing shelters_, access
paths, and parking areas on the south side of the lake.
Capital Cost: $377,921
Justification: These facilities will provide recreational
opportunities for the Clearbrook Park Service Area which will
lessen the disparity between the number of passive recreational
areas needed to meet the minimum standards for this service area.
Clearbrook Park offers the best location for this development.
Construction Schedule: Begin and complete in FY 05-06
PRIORITY 5 Softball Complex - Sherando Park
Description: This project includes two softball fields; an access
road; parking spaces; and landscaping.
Capital Cost: $503,345
Justification: This facility would provide recreational
opportunities for the entire county population, as well as the
Frederick County School System. Presently, there are ten softball
and baseball fields within the county's regional park system. Eight
of the existing fields must serve a dual purpose of facilitating
youth baseball, as well as adult softball programs. With the
increased usage of these fields, it has become increasingly difficult
to facilitate these programs. This project is needed in order for the
Parks and Recreation Department to accommodate the existing
demand for youth baseball and adult softball programs.
Construction Schedule: Begin and complete in FY 05-06
PRIORITY 6 Baseball Complex Renovations - Sherando Park
Description: This project includes an upgrade to the lighting
system; the renovation of four existing ballfields; and renovations
of existing restrooms, access roads, and walkways.
Capital Cost: $1,032,982
Justification: This facility, presently serving as both youth
baseball and adult softball fields, would be used by the Little
League Programs within the Sherando Park service area. In
addition to its use as a recreational facility, the athletic complex
will also be used by the Frederick County School System. This
Frederick County 2004-2005 Capital Improvements Plan
Page 13
project cannot be completed until the Sherando Softball Complex
is completed.
Construction Schedule: Begin and complete in FY 06-07.
PRIORITY 7 Soccer Complex - Sherando Park
Description: This project includes the development of two soccer
fields; one picnic shelter; access paths; restrooms; concession;
landscaping; and lighting.
Capital Cost: $1,151,611
Justification: This facility will serve the entire county population
and will be utilized by the Frederick County School System.
Construction Schedule: Begin and complete in FY 06-07.
PRIORITY 8 Skateboard/In-Line Hockey Park
Description: This project recommends the development of a
skateboard bowl; a half pipe; an open skate area; two in-line
hockey rinks; vehicle parking; an access road; fencing; and
landscaping. Sherando Park is the proposed location of this
facility
Capital Cost: $479,718
Justification: This facility will enable the county to provide a
recreational facility that has been requested for the community's
youth.
Construction Schedule: Begin and complete in FY 07-08.
PRIORITY 9 Lake, Trails, and Parking with Two Irrigated Multi -Purpose
Fields - Sherando Park
Description: This project priority has moved up from number 13
to number 9 on the Parks and Recreation priority list. This project
involves the development of a 12 acre lake; 1.5 mile trail system
around the lake; 800 linear feet of access roadway; lighted parking
lot with 125 spaces; and development of two irrigated 70 x 120
yard multi-purpose fields.
Capital Cost: $838,925
Justification: This facility will provide recreational opportunities
for the Sherando Park service area and the entire Frederick County
community. The development of this facility will reduce the needs
Frederick County 2004-2005 Capital Improvements Plan
Page 14
gap between the number of existing passive recreational areas and
the number required to meet the minimum standards established
for the service area.
Construction Schedule: Begin and complete in FY 07-08.
PRIORITY 10 Tennis/Basketball Complex - Clearbrook Park
Description: This project includes the development of four tennis
courts; two basketball courts; a shelter; parking; and landscaping.
Capital Cost: $394,734
Justification: These facilities will be available to all county
residents. Currently, there are no tennis courts or basketball courts
in the Clearbrook Park Service Area. Clearbrook Park is utilized
by over 150,000 visitors annually; therefore, these facilities are
needed.
Construction Schedule: Begin and complete in FY 07-08.
PRIORITY 11 Tennis/Picnic Area - Sherando Park
Description: This project includes the development of three
tennis courts; a playground area; four picnic shelters; restrooms;
a concession area; access road; access paths; parking; and
landscaping.
Capital Cost: $635,211
Justification: These facilities would be used by the residents of
southern Frederick County. Although tennis courts have been
included at Sherando High School, the department feels that it is
important to include three tennis courts on park property for
general use while the school courts are being used for school
activities.
Construction Schedule: Begin and complete in FY 08-09.
PRIORITY 12 Shelter/Stage Seating - Clearbrook Park
Description: This project includes the development of a shelter
with a performance stage; refurbishing existing restrooms and
access paths; and renovations to the lake.
Capital Cost: $390,833
Justification: This facility would be used by the entire county
population. Presently, there are no facilities to accommodate
cultural programs within the county's park system. This project is
needed to provide a facility for cultural activities.
Frederick County 2004-2005 Capital Improvements Plan
Page 15
Frederick County 2004-2005 Capital Improvements Plan
Construction Schedule: Begin and complete in FY 08-09.
PRIORITY 13
Maintenance Compound and Office - Sherando Park
Description: This project involves the construction of a 1,200 -
square -foot office and a 4,000 -square -foot storage shed for
operations at Sherando Park.
Capital Cost: $201,100
Justification: This facility will enable the county to maintain
equipment and facilities in a more responsible and effective
manner. The additional responsibility to maintain the outdoor
facilities at Sherando High School increases the need for more
storage, maintenance, and office space.
Construction Schedule: Begin and complete in FY 08-09.
PRIORITY 14
Access Road, Parking, and Trails - Sherando Park
Description: This project involves the development of an
entrance and 1,500 linear feet of access roadway from Warrior
Drive; a 50 space parking area; and 2.8 miles of trails.
Capital Cost: $811,125
Justification: This facility will provide recreational opportunities
for the Sherando Park service area and the entire Frederick County
community. The development of this facility will reduce the needs
gap between the number of existing passive recreational areas and
the number required to meet the minimum standards established
for the service area.
Construction Schedule: Begin and complete in FY 08-09.
County Administration
Project Priority List
PRIORITY 1
Public Safety Center
Description: This project recommends the development of a
Frederick County 2004-2005 Capital Improvements Plan
Page 16
35,000 -square -foot facility for the Frederick County Sheriff's
Office and Fire and Rescue Services. This will allow the Frederick
County Sheriff's Office to vacate the Winchester -Frederick County
Joint Judicial Center.
Capital Cost: To be determined.
Justification: The Frederick County Sheriff's Office currently has
80 employees that occupy space in the Winchester -Frederick
County Joint Judicial Center (JJC). When this space was first
occupied, there were 36 employees in the office. Representatives
of the JJC have indicated that additional space is required for court
officers and other arms of the judicial branch. Development of a
new facility in the county will enhance the response time for
emergency service in the safest possible manner. The current
location of the Sheriff's Office in the JJC increases emergency
response time due to congested streets and heavily populated areas,
thus compromising safety to persons and property.
Construction Schedule: To be determined.
PRIORITY 2 New Frederick County Animal Shelter
Description: This project involves the development of an 8,500
square -foot building with parking and fencing. This project could
be constructed on the same property as the Public Safety Center.
Capital Cost: $1,540,000
Justification: This project will replace the existing Esther Boyd
Animal Shelter which will be displaced by development of the
MSW Landfill within the ensuing five years.
Construction Schedule: Initiate and complete design in 2004;
complete construction in FY 04-05.
PRIORITY 3 Annex Facilities
Description: This project will consist of several facilities located
at strategic locations throughout the county to house employees of
the Sheriff's Office, the Treasurer's Office, and the Commissioner
of Revenue's Office. A fire station would be included with offices
located in the Fairfax Pike area.
Capital Cost: $465,000 for Treasurer's Office Satellite Office;
other estimates not available at time of printing.
Justification: The development of satellite facilities along major
transportation networks and in areas of dense population will
provide ease of access for citizens and will improve services to the
Frederick County 2004-2005 Capital Improvements Plan
PRIORITY 4
Page 17
county. The county continues to experience a significant rate of
growth; therefore, it is important to provide services within these
areas instead of requiring citizens to confront congestion, limited
parking, and accessibility in the City of Winchester.
Construction Schedule: Phase 1 -Site acquisition and
construction FY 04-05; construction completion FY 05-06.
New Fairfax Pike Fire/Rescue Station (coordinated with Annex
Facilities request)
Description: This project involves the construction of a new
fire/rescue facility in southeast Frederick County between
Stephen's City and Route 522, along the Route 277 (Fairfax Pike)
corridor, which would also house satellite facilities for the Sheriff,
Treasurer, and Board of Supervisors District Office. The fire and
rescue component of the facility would involve an engine and
rescue company. A five to seven acre tract of land would be
needed for this project.
Capital Cost: Not yet determined.
Justification: The need for a new station is in response to present
and anticipated future growth ("Shenandoah" development of Lake
Frederick) in this area of the County. The new station would
reduce fire and EMS response time to the population of
southeastern Frederick County.
Construction Schedule: Completion FY 03-04.
Relocation of Round Hill Fire/Rescue Station
Description: This project includes the relocation and building of
a 22,000 -square -foot facility to accommodate ten or more pieces
of emergency equipment and to house living and sleeping areas for
staff. A community center of approximately 10,000 square feet,
with a capacity of 400 people, is also planned; it would be used
for fund raising events and other activities. The proj ect would need
a parcel of three to five acres.
Capital Cost: Not yet determined
Justification: The existing facility serving the Round Hill area is
50 years old and not large enough to accommodate the equipment
needed to serve Round Hill community. This community includes
approximately 9,000 households, three schools, and the
Winchester Medical Center.
Construction Schedule: Not yet determined
Frederick County 2004-2005 Capital Improvements Plan
Winchester Regional
Airport
Project Priority List
PRIORITY 1
PRIORITY 2
PRIORITY 3
Page 18
Master Plan Update - North Side Development
Description: With the current master plan is maturing and the
development around the airport increasing, there is a need to
update the Master Plan to identify additional areas for future
development on the north side of the airfield.
Capital Cost: $116,000 State/Federal/Local
Local Share: $2,320.
Justification: As air congestion and restrictions increase in the
Dulles/Washington area, the Airport has seen significant
increases in the number of operations of larger aircraft. The
airport has received inquiries for basing aircraft and
constructing facilities that could only be accommodated on the
north side.
Construction Schedule: N/A
Airfield Lighting Upgrade
Description: The project involves the upgrade of the existing
medium intensity runway lighting to high intensity runway
lighting and the upgrade of the two -box precision approach path
indicator (PAPI) to a four -box PAPI.
Capital Cost: $200,000 State/Federal/Local
Local Share: $4,000.
Justification: This project is necessary to accommodate the
increase in aircraft that utilize the Winchester Regional Airport.
Construction Schedule: FY 2005
Land Acquisition - Bufflick Road - Parcels 31, 46, & 53
Description: Acquisition ofthree parcels located along Bufflick
Road.
Capital Cost: $750,000 State / Federal Grant - $609,000
Local Share: $141,000*
Justification: This project is necessary as the identified parcels
Frederick County 2004-2005 Capital Improvements Plan
Page 19
are located within both the Airport's FAR Part 77 Primary
Surface and/or approach surface and the FAA's projected DNL
65 noise contour. The FAA considers residential land use within
the noise contour to be incompatible with airport operations and
encourages airports to resolve such incompatibility through land
acquisition. Moreover, under the FAA's Part 77 Surface
Requirements and the Code of Virginia, the Airport is required
to assume fee simple ownership of property located within the
Primary Surface.
Construction Schedule: Begin process FY 04-05; complete
acquisition FY 05-06.
*Funding reimbursement from the FAA is anticipated to be
received for expenditures in FY 2005 resulting in the local share
being reduced from (20%) to (2%) with a refund due on the local
share of $126, 000.
PRIORITY 4 Airfield Maintenance Building
Description: Construction of a 3,800 -square -foot facility to
accommodate the airport's maintenance equipment and
maintenance work activities.
Capital Cost: 300,000 State/Local
Local Share: 210,000
Justification: This project is necessary to accommodate
maintenance activities at the airport
Construction Schedule: FY 2005
PRIORITY 5 Land Acquisition - Bufflick Road - Parcels 47,47A, & 48
Description: Acquisition of three parcels located along Bufflick
Road. Property is included in the 20 Year Master Plan.
Capital Cost: $865,000 State Grant -VDA $692,000
Local Share: $173,000
Justification: This project is necessary as the identified parcels
are located within the Airports FAR Part 77 primary surface
and/or approach surface. In addition, several of the residential
parcels are located in side the FAA's projected DNL 65 noise
contour. The FAA considers residential use within the noise
contour non -compatible with airport operations.
PRIORITY 6 Land Acquisition - Bufflick Road - Parcels 50, 51, & 52
Description: Acquisition of three parcels located along Bufflick
Road. Property is included in the 20 Year Master Plan.
Frederick County 2004-2005 Capital Improvements Plan
Page 20
Capital Cost: $350,000 State Grant -VDA $280,000
Local Share: $70,000
Justification: This project is necessary as the identified parcels are
located within the Airports FAR Part 77 primary surface and/or
approach surface. In addition, several of the residential parcels are
located in side the FAA's projected DNL 65 noise contour. The
FAA considers residential use within the noise contour non-
compatible with airport operations
Handley Regional Library
Project Priority List
PRIORITY 1 Bowman Library Parking Lot and Sidewalk Extension
This proposal is to expand the parking lot on the Lakeside Drive
side of the library from 101 to 221 parking spaces, and to provide
a sidewalk that will extend approximately 400-500 feet beyond the
sidewalk that now borders the parking lot. This brings the sidewalk
to a point on Lakeside Drive to connect with the existing sidewalk
at the library.
Capital Cost: $ 237,500
Justification: The parking lot expansion is needed to relieve
overcrowding and to accommodate library patrons. The sidewalk
is necessary to provide safe access for pedestrians to the library.
Planning consideration for alternative modes of transportation such
as bicycle connectivity should also be considered.
Construction Schedule: FY 2004
PRIORITY 2 Northern Frederick County Library Branch
Description: Request to acquire three to four acres of land for a
future branch library along 522 North near Cross Junction. The
library proposes a 7,000 -square -foot branch with the possibility of
expansion to 10,000 square feet. Parking would accommodate up
to 35 vehicles.
Capital Cost: $1,043,000
Justification: There is no library in this area of the county to
serve residents. The residents of the Gainesboro District comprise
Frederick County 2004-2005 Capital Improvements Plan
Page 21
the largest population group the greatest distance from a library.
The library would serve members of the population from toddlers
Frederick County 2004-2005 Capital Improvements Plan
to senior citizens.
Construction Schedule: Land Acquisition FY 07-08;
Construction proposed for FY 07-08 with library opening in FY
09-10.
`CFFW Regional Jail
Project Priority List
PRIORITY 1
Community Corrections Center (CCC)
Description: The Clarke-Fauquier-Frederick-Winchester Regional
Jail Board proposes to construct and operate in accordance with
the Public -Private Education Facilities and Infrastructure Act of
2002, a 44,000 square foot, 200 -bed Community Corrections
Center on an 11.4 acre parcel of land adjacent to the eastern
boundary of its property located at 141 Fort Collier Road.
Capital Cost: $7,200,000
Local Share: $2,330,640*
Justification: The Regional Adult Detention Center has a capacity
of 265 inmates/ Current population exceeds 470 during the week
and reaches nearly 500 on the weekends.
Construction Schedule. FY 2005
* The Regional Jail will be requesting a 50% state reimbursement.
PRIORITY 2
Secure Detention Expansion
Description: A 44,000 sq. ft., 120 bed facility which will be
connected to the existing secure detention center to accommodate
growth in inmate population. The expansion will be partiall
designed for direct supervision housing. It will also include a
segregation unit, and classification and negative air flow facilities.
Capital Cost: NA
Local Share: $4,060,493*
Justification: The core facilities were designed to support the
expansion and land was acquired during the initial construction.
Construction Schedule: FY 2007
* The Regional Jail will be requesting a 50% state reimbursement
Frederick County 2004-2005 Capital Improvements Plan