PC 11-03-10 Meeting AgendaAGENDA
FREDERICK COUNTY PLANNING COMMISSION
The Board Room
Frederick County Administration Building
Winchester, Virginia
November 3, 2010
7:00 P.M. CALL TO ORDER TAB
1) Adoption of Agenda: Pursuant to established procedures, the Planning Commission
should adopt the Agenda for the meeting................................................................ (no tab)
2) Committee Reports.................................................................................................. (no tab)
3) Citizen Comments.................................................................................................... (no tab)
PUBLIC HEARING
4) Rezoning #01-10 of Busy Beez Daycare, submitted by Greenway Engineering, to revise
proffers associated with Rezoning 405-01 for 1.324 acres of land zoned B3 (Industrial
Transition) District to B3 with revised proffers and 0.567 acres zoned B3 to B2 (General
Business) District with revised proffers, totaling 1.89 acres. The properties are located on
the west side of Martinsburg Pike (Route 11), approximately 2,000 feet south of Interstate
81 Exit 323, in the Stonewall Magisterial District, and are identified by Property
Identification Numbers 33-A-92 and 33-A-93.
Mrs. Perkins..................................................................................................................... (A)
5) Waiver Request — Telecommunications Tower — A request by AT&T, submitted by
Greenway Engineering, to allow a 120 foot lattice -type telecommunication tower in lieu of a
120 foot monopole -type telecommunication tower as approved within Conditional Use
Permit #05-10. The properties are located on the east side of Martinsburg Pike (Route 11
North), approximately 1/4 mile northeast of Interstate 81, Exit 317, and are identified with
Property Identification Numbers 43-A-130 and 43-A-132 in the Stonewall Magisterial
District.
Mr. Cheran....................................................................................................................... (B)
6) Ordinance Amendment — Chapter 165 Zoning, Article II Supplementary Use
Regulations, Parking; Buffers; and Regulations for Specific Uses, Part 202 Off -
Street Parking, Loading and Access, 165-202.01 Off -Street Parking; Parking Lots —
Revision to the curb and gutter requirements for parking areas.
Mrs. Perkins..................................................................................................................... (C)
7) Other
FILE COPY
•
C�
REZONING APPLICATION 901-10
BUSY BEEZ DAYCARE
Staff Report for the Planning Commission
Prepared: October 18, 2010
Staff Contact: Candice E. Perkins, AICP, Senior Planner
Reviewed Action
Planning Commission: 11/03/10 Pending
Board of Supervisors: 11/10/10 Pending
PROPOSAL: To revise the proffers for 1.324 acres of land zoned B3 (Industrial Transition) and to
rezone 0.567 acres of land from the B3 District to the B2 (Business General) District with revised
proffers, totaling 1.89 acres. The total 1.89 acres was originally zoned with proffers to the B3 District
with Rezoning 405-01.
LOCATION: The properties are located on the west side of Martinsburg Pike (Route 11),
approximately 2,000 feet south of Interstate 81 Exit 323.
EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 11/03/10 PLANNING
COMMISSION MEETING:
This is an application to revise the proffers for 1.324 acres of land zoned 133 (Industrial Transition) and
to rezone 0.567 acres of land from the 133 District to the B2 (Business General) District with revised
proffers, totaling 1.89 acres. The 1.89 acre property was originally rezoned in 2001 to the B3 District
with proffers. This rezoning seeks to allow for the addition of SIC 8351 (child day-care facilities) only
on the 0.567 acre portion seeking the B2 Zoning; all other uses are consistent with the 2001 rezoning.
The land uses proposed in this application are consistent with the business designation of the Northeast
Land Use Plan (NELUP) and the application has addressed all of staff's concerns.
Following the required public hearing, a recommendation regarding this rezoning application to
the Board of Supervisors would be appropriate. The applicant should be prepared to adequately
address all concerns raised by the Planning Commission.
Rezoning #01-10 Busy Beez Daycare
October 18, 2010
Page 2
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
application. It may also be useful to others interested in this zoning matter. Unresolved issues
concerning this application are noted by staff where relevant throughout this staff report.
Reviewed Action
Planning Commission: 11/03/10 Pending
Board of Supervisors: 11/10/10 Pending
PROPOSAL: To revise the proffers for 1.324 acres of land zoned B3 (Industrial Transition) and to
rezone 0.567 acres of land from the B3 District to the B2 (Business General) District with revised
proffers, totaling 1.89 acres. The total 1.89 acres was originally zoned with proffers to the B3 District
with Rezoning #05-01.
LOCATION: The properties are located on the west side of Martinsburg Pike (Route 11),
approximately 2,000 feet south of Interstate 81 Exit 323.
MAGISTERIAL DISTRICT: Stonewall
PROPERTY ID NUMBERS: 33-A-92 and 33-A-93
PROPERTY ZONING: B3 (Industrial Transition) District
PRESENT USE: Auto Repair Facility and Church
ADJOINING PROPERTY ZONING & PRESENT USE:
North:
RA (Rural Areas) District
Use:
Vacant
South:
RA (Rural Areas) District
Use:
Residential
East:
RA (Rural Areas) District
Use:
Residential
West:
N/A
Use:
Interstate 81
Rezoning #01-10 busy Beez Daycare
October 18, 2010
Page 3
REVIEW EVALUATIONS:
Virginia Dept. of Transportation: The documentation within the application to rezone this property
appears to have little measurable impact on Route 11. This route is the VDOT roadway which has been
considered as the access to the property. VDOT is satisfied that the transportation proffers offered to
the Busy Beez Daycare rezoning application dated August 19, 2010 address transportation concerns
associated with this request. Before development, this office will require a complete set of construction
plans detailing entrance designs, drainage features and traffic flow data from the I.T.E. Trip Generation
Manual, Seventh Edition for review. VDOT reserves the right to comment on all right-of-way needs,
including right-of-way dedications, traffic signalization, and off-site roadway improvements and
drainage. Any work performed on the State's right-of-way must be covered under a land use permit.
This permit is issued by this office and requires an inspection fee and surety bond coverage.
Fire Marshal- Plan approval recommended.
Public Works Department: 1. Refer to page 7 of the Impact Analysis under Site Drainage: Any
subsequent site plans should verify that the existing stormwater detention facility was constructed in
accordance with the approved plans for parcel 33-A-92. In addition, the site plan design should confirm
that the existing detention facility will accommodate the proposed development of parcel 33-A-93. 2.
Refer to page 8 of the Impact Analysis under Solid Waste Disposal: The current waste load at the
regional landfill has decreased to any average of 150,000 tons per year. 3. Refer to page 3 of the Proffer
Statement under paragraph C: l Structural Development Limitation: Correct the parcel description to
33-A-9-3.
Department of Inspections: No comment required at this time. Shall comment at the time of site
plan review.
Sanitation Authority: Water and sewer are available. There is sufficient water capacity and pressure
to serve this parcel. There is sufficient sewer capacity to serve this parcel.
Service Authority: No comments regarding request.
Winchester Regional Airport: The proposed rezoning should not impact operations at the Winchester
Regional Airport. However, because of the location of the property, the owners should be advised that
they could experience flyover noise from medevac operations in transit through that corridor.
Frederick County Attorney: Please see attached letter dated September 7, 2010, from Roderick B.
Williams, County Attorney.
Planning Department: Please see attached letter dated September 2, 2010, Candice E. Perkins,
AICP, Senior Planner.
Rezoning #01-10 Busy Beez Daycare
October 18, 2010
Page 4
Planning & Zoning:
1) Site History
The original Frederick County Zoning Map (U.S.G.S. Inwood Quadrangle) depicts the zoning of
the two parcels as A-2 (Agricultural General) District. The County's agricultural zoning
districts were subsequently combined to form the RA (Rural Areas) District upon adoption of an
amendment to the Frederick County Zoning Ordinance on May 10, 1989.
In 2001, the Board of Supervisors approved Rezoning 405-01, which rezoned the two properties
(total of 1.89 acres) to the B3 (Industrial Transition District) with proffers. The rear property
(33-A-92) contains an automotive repair facility and the front property (33-A-93) contains a
structure currently being utilized as a church.
2) Comprehensive Policy Plan
The Frederick County Comprehensive Policy Plan is an official public document that serves as
the community's guide for making decisions regarding development, preservation, public
facilities and other key components of community life. The primary goal of this plan is to
protect and improve the living environment within Frederick County. It is in essence a
composition of policies used to plan for the future physical development of Frederick County.
[Comprehensive Policy Plan, p. 1-1]
Land Use.
The subject properties are within the limits of the Sewer and Water Service Area (SWSA). The
Sewer and Water Service Area defines the general area in which more intensive forms of
planned commercial, and industrial development will occur. The properties are also within the
limits of the North East Land Use Plan. The plan shows this area with a business land use
designation. The applicant is requesting a rezoning to the B2 (Business General) and the B3
(Industrial Transition) Zoning Districts and, therefore, this requested zoning is in general
conformance with the Comprehensive Policy Plan.
Site Access.
The property will be served by the existing commercial entrance on Martinsburg Pike (U.S.
Route 11) and the applicant has proffered to dedicate ten foot of right-of-way along the frontage
of the site.
3) Proffer Statement — Dated May 9, 2001 with latest revision October 1, 2010
A) Allowed Uses:
The following uses shall be permitted within the B3 District on tax map parcel 33-A-92:
• SIC 15, 16 & 17 — Office and storage facilities for building construction contractors,
heavy construction contractors and special trade contractors.
• SIC 48 — Communication facilities and offices, including telephone, telegraph, radio,
television and other communications.
• SIC 73 — Business Services.
• SIC 75 — Automotive repair, service and parking.
Rezoning #01-10 Busy Beez Daycare
October 18, 2010
Page 5
• SIC 76 — Miscellaneous repair services.
• SIC 861 — Business Associations.
• Self-service storage facilities.
• Public Buildings.
• Public utility distribution facilities.
The following uses shall be permitted within the B2 District on tax map parcel 33-A-93:
• SIC 48 — Communication facilities and offices, including telephone, telegraph, radio,
television and other communications.
• SIC 73 — Business Services.
• SIC 76 — Miscellaneous repair services.
• SIC 8351— Child day-care facilities.
• SIC 861 — Business Associations.
• Self-service storage facilities.
• Public Buildings.
• Public utility distribution facilities.
Staff Note: The only change to the permitted uses is the addition of SIC 8351 for child day-care
facilities (only permitted on the parcel proposed to be rezoned to the B2 District), all other uses are
consistent with Rezoning #05-01.
B) Access Management.
1. Tax map parcels 33-A-92 and 33-A-93 shall be served by the existing commercial
entrance on Martinsburg Pike (Route 11).
2. The applicant proffers to dedicate right-of-way along the Martinsburg Pike frontage
of parcel 33-A-93 to accommodate the future widening of this corridor. This one-
time right-of-way dedication shall not exceed ten feet in width and shall occur
subsequent to the final Martinsburg Pike design plan approval. The Applicant shall
provide the required right-of-way dedication within 90 days of written request by
Frederick County and/or VDOT.
C) Structural Development Limitation:
Tax map parcel 33-((A))-93 shall be limited to a maximum structural area of 3,000
square feet for all land uses, exclusive of self-service storage facilities, identified in
Section A(2) of the proffer statement.
D) Monetary Contribution to Offset Impact of Development.
The Applicant hereby proffers that in the event rezoning application #01-10 is approved,
the undersigned will pay to the Treasurer of Frederick County, Virginia $0.10 per square
footage of structural area developed subsequent to approval of this rezoning application.
This monetary contribution is intended to offset impacts to fire and rescue services and
will be paid prior to issuance of an occupancy permit for the first land use constructed
on tax map parcel 33-((A))-93.
Rezoning #01-10 Busy Beez Daycare
October 18, 2010
Page 6
STAFF CONCLUSIONS FOR THE 10/20/10 PLANNING COMMISSION MEETING:
This is an application to revise the proffers for 1.324 acres of land zoned B3 (Industrial Transition) and
to rezone 0.567 acres of land from the B3 District to the B2 (Business General) District with revised
proffers, totaling 1.89 acres. The 1.89 acre property was originally rezoned in 2001 to the B3 District
with proffers. This rezoning seeks to allow for the addition of SIC 8351 (child day-care facilities) only
on the 0.567 acre portion seeking the B2 Zoning, all other uses are consistent with the 2001 rezoning.
The land uses proposed in this application are consistent with the business designation of the Northeast
Land Use Plan (NELUP) and the application has addressed all of staff's concerns.
Followinje the required public hearing, a recommendation regarding this rezoning application to
the Board of Supervisors would be appropriate. The applicant should be prepared to adequately
address all concerns raised by the Planning Commission.
CGUNTY ®g IN IRETWUR T CK
Roderick B. Williams
County Attorney
540/722-8383
Fax 540/667-0370
E-mail:
rwill1a@co.frederick.va.us
September 7, 2010
VIA FACSIMILE — (540) 772-9528 — AND REGULAR MAIL
Mr. Evan Wyatt
Greenway Engineering
151 Windy Hill Lane
Winchester VA 22602
Re: Busy Beez — Route 11 North (4489 & 4491 Martinsburg Pike) — Proposed
Rezoning — Proposed Proffer Statement dated August 19, 2010
Dear Evan:
You have submitted to Frederick County for review the above -referenced
proposed proffer statement dated August 19, 2010 (the "Proffer Statement") for the
proposed rezoning of 1.89± acres constituting the property of Timothy W. Johnson and
Margo D. Johnson (the "Johnsons"), Parcel Identification Number 33-A-92 (4491
Martinsburg Pike), and Clear Brook Rentals LLC, Parcel Identification Number 33-A-93
(4489 Martinsburg Pike), in the Stonewall Magisterial District, from the B3 (Industrial
Transition) District, with proffers to the B3 (Industrial Transition) District and B2
(Business General) District, both with revised proffers. I have now reviewed the Proffer
Statement and it is my opinion that the Proffer Statement would be in a form to meet the
requirements of the Frederick County Zoning Ordinance and the Code of v irginia-, and
would be legally sufficient as a proffer statement, subject to the following comments:
1. As the introductory portions of the Proffer Statement acknowledge, Parcel
Identification Number 33-A-93 is owned by Clear Brook Rentals LLC.
Accordingly, both the rezoning application and the Proffer Statement should
have a separate signature block for that entity, in addition to the signature
blocks for the Johnsons for Parcel Identification Number 33-A-92. Assuming
he has the authority to do so, Mr. Johnson might be able to sign in the separate
signature block for Clear Brook Rentals LLC, but that signature block should
also indicate Mr. Johnson's (or such other signatory's) capacity on behalf of
Clear Brook Rentals LLC.
107 North Kent Street , Winchester, Virginia 22601
Mr. Evan Wyatt
September 7, 2010
Page 2
2. Proffer C — In light of the references contained in the Application and in the
Impact Analysis Statement accompanying the Application, it appears that the
reference in Proffer C for the structural area square footage limitation should
be to parcel 33-A-93, and not to parcel 33-A-92.
Proffer D — First, in light of the references contained in the Application and in
the Impact Analysis Statement accompanying the Application, it appears that
the reference in Proffer D for the monetary contribution should be to parcel
33-A-93, and not to parcel 33-A-92. In addition, Proffer D may not
necessarily be clear regarding what constitutes "development" for purposes of
triggering the contribution, especially given that the site already contains an
existing structure. Finally, staff should be aware that Proffer D only requires
the contribution upon issuance of an occupancy permit, and not a building
permit, to the extent that either would necessarily be required for the existing
structure. The recently enacted Virginia Code § 15.2-2303.1:1, which makes
certain changes to the timing of cash proffer payments, applies only to
residential construction.
I have not reviewed the substance of the proffers as to whether the proffers are
suitable and appropriate for this specific development, as my understanding is that that
review will be done by staff and the Planning Commission.
OSincellliams
County Attorney
cc: Candice E. Perkins, AICP, Senior Planner
CO UN" -,' of EREI)ERICK
Department of Planning and Development
540/665-5651
FAX: 540/665-6395
September 2, 2010
Mr. Evan Wyatt
Greenway Engineering
151 Mindy Hill Lane
irchester, .Virginia 2260
RE: Proposed Rezoning of the Timothy W. Johnson and Margo D. Johnson Property
Property Identification Number (PIN): 33 -A -92,33-A-93
Dear Evan:
I have had the opportunity to review the draft rezoning application for the Johnson Property.
This application seeks to rezone 1.89 acres of land from the B3 (Industrial Transition)
District to the B2 (Business General) District. Staff's review comments are listed below for
your consideration.
1. Martinsburg Pike Improvements. As indicated in the Frederick County Eastern
Road Plan, Martinsburg Pike is identified as an improved minor arterial road (U41)).
With this rezoning application, the need for additional Route 11 R -O -W should be
addressed.
2. Proffers. Proffer #4 from the 2001 rezoning should be included in the revised
rezoning proffer statement.
3. Agency Comments. Please provide appropriate agency comments from the
following anencies: %irginia Department of Tran porta ion. The proposed proffers
have been forwarded by staff to the Frederick County Attorney. Once attorney
comments are received by the Planning Department, they will be forwarded to your
office. Attorney comments are required Rjr acceptance of the rezoning application.
4. Special Limited Power of Attorney. Provide a Power of Attorney for the property
owners.
5. Plat of the Property and Verification of Taxes Paid. A plat of the property needs to be
included with the application that identifies the limits of the property, as well as, the
proposed zoning boundaries needs to be included along with verification that property
taxes have been paid.
6. Fees. The fee for this application includes a $5,000.00 base fee plus $100.00 per
acre, and a $50.00 public hearing sign fee. This is based on fees as of May 1, 2008.
Fees may change.
107 North Dent Street, Smile 202 s Winchester, Virginia 22601-5000
Page 2
Mr. Evan Wyatt
RE: Johnson Property Rezoning
September 2, 2010
All of the above comments and reviewing agency comments should be appropriately
addressed before staff can accept this rezoning application. Please feel free to contact me
with questions regarding this application.
Sincerely,
Candice E. Perkins, AICP
Senior Planner
CEP/dlw
33 9 1
B3zoned 24.98ac.
Rezom'ng 01 - 10
Buser Beez Daycare
PiNs # 33-A-92&93
(B3 to 113 (revised proffers))
(33 to B2 (revised proffers))
aC,
R��33\�
L, Y
yo 33q q
33q Rq�pne
Y ?5
CI OSO
�°ea 4 age lfyE rPn
VA—SwIl'�= fm
^] P.—I, zoning
R-1camm N NeeMer BS IB,!-.. Inayshlol Garvlfian f�shidl
1o1non6Ci111 oundary MI Il.1d,11111, Light 11WHc11
REZ0110_BusyB-0,ycara_09MIG M2 flyd.lriol. General Disi,d)
Urban DBvelop—1 Area
:+Sew_r one Wafer Service Area
„ � r
Ml�o'lery ]pyA � -
51
Rezoning # 01 - 10
Note:
Busy Beez Daycare
33 A 91
`
M2 zoned 3.79 ac.
(B3 to B3 (revised proffers))
Suite 202
(B3 to B2 (revised proffers))
Winchester, VA 22601
540-665-5651
33 /t 97
0 100 200
400 Feet
33 A 92
33 A 93
' B3zoned O.s6ac
zoned 1.33 ac.
tr
83
7
Lf3
ri
A .y4
Zoned 0:43cc.
33 -A 95
>
11
RA zoned 1.29 oc.
i
Y
33 A 96A
r
RAzoned 1:06ac.
VA—SwIl'�= fm
^] P.—I, zoning
R-1camm N NeeMer BS IB,!-.. Inayshlol Garvlfian f�shidl
1o1non6Ci111 oundary MI Il.1d,11111, Light 11WHc11
REZ0110_BusyB-0,ycara_09MIG M2 flyd.lriol. General Disi,d)
Urban DBvelop—1 Area
:+Sew_r one Wafer Service Area
„ � r
Ml�o'lery ]pyA � -
51
Rezoning # 01 - 10
Note:
Busy Beez Daycare
Frederick County Dept of
4
Planning Development
107 N Kent St
(B3 to B3 (revised proffers))
Suite 202
(B3 to B2 (revised proffers))
Winchester, VA 22601
540-665-5651
33 /t 97
0 100 200
400 Feet
Staff Planner: CPerkins
Inset Map
qtr
PA1 zoned 2 oc
VA—SwIl'�= fm
^] P.—I, zoning
R-1camm N NeeMer BS IB,!-.. Inayshlol Garvlfian f�shidl
1o1non6Ci111 oundary MI Il.1d,11111, Light 11WHc11
REZ0110_BusyB-0,ycara_09MIG M2 flyd.lriol. General Disi,d)
Urban DBvelop—1 Area
:+Sew_r one Wafer Service Area
„ � r
Ml�o'lery ]pyA � -
51
Rezoning # 01 - 10
Note:
Busy Beez Daycare
Frederick County Dept of
PINS # 33 - A - 92 & 93
Planning Development
107 N Kent St
(B3 to B3 (revised proffers))
Suite 202
(B3 to B2 (revised proffers))
Winchester, VA 22601
540-665-5651
Map Created: Sept 28, 2010
0 100 200
400 Feet
Staff Planner: CPerkins
Greenway Engineering August 19, 2010 Busy Beez Daycare Rezoning
Revised September 21, 2010
Revised October 1, 2010
PROFFER STATEMENT
REZONING: R Z# 01 -it)
Industrial Transition District (133) with Proffers to Industrial
Transition District (133) and Business General District (132) with
Revised Proffers
PROPERTY: 1.89 acres +/-;
Tax Parcels #33-((A))-92 & 33-((A))-93
RECORD OWNER: Timothy W. Johnson & Margo D. Johnson (TM# 33-A-92)
Clear Brook Rentals, LLC (Timothy W. Johnson) (TM# 33-A-93)
APPLICANT: Timothy W. Johnson & Margo D. Johnson and Clear Brook
Rentals LLC (here -in after "the Applicant")
PROJECT NAME: Busy Beez Daycare Rezoning
ORIGINAL DATE
OF PROFFERS: May 9, 2001
REVISION DATE: October 1, 2010
Preliminary Matters
Pursuant to Section 15.2-2296 Et. Seq. of the Code of Virginia, 1950, as amended, and
the provisions of the Frederick County Zoning Ordinance with respect to conditional
zoning, the undersigned Applicant hereby proffers that in the event the Board of
Supervisors of Frederick County, Virginia, shall approve Rezoning Application # 01 -/o
for the rezoning of 1.89± acres from the Industrial Transition (133) District with Proffers
to the Industrial Transition (133) District and Business General (B2) District with Revised
Proffers, development of the subject property shall be done in conformity with the terms
and conditions set forth herein, except to the extent that such terms and conditions may
be subsequently amended or revised by the Applicant and such be approved by the
Frederick County Board of Supervisors in accordance with the said Code and Zoning
Ordinance. In the event that such rezoning is not granted, then these proffers shall be
deemed withdrawn and have no effect whatsoever. These proffers shall be binding upon
this Applicant and their legal successors, heirs, or assigns. These proffers are a
conditional zoning amendment to Rezoning #05-01 of Timothy W. Johnson, approved by
the Frederick County Board of Supervisors on September 12, 2001.
The subject properties are more particularly described as the land owned by Clear Brook
Rentals, LLC being all of Tax Map Parcel 33-((A))-93 and further described by
Instrument No. 100001314, and the land owned by Timothy W. Johnson & Margo D.
File #2624/EAW
Greenway Engineering August 19, 2010 Busy Beez Daycare Rezoning
Revised September 21, 2010
Revised October 1, 2010
Johnson being all of Tax Map Parcel 33-((A))-92 and further described by Instrument No.
060001525, and are further described by the Boundary Survey Plat prepared by W. Stuart
Dunn, L.S., dated June 6, 1996 and recorded as Deed Book 860 Page 1476 (see attached
Boundary Survey Plat).
PROFFERED CONDITIONS
A.) Allowed Uses
1.) The following land uses shall be permitted within the B-3, Industrial Transition
District on tax map parcel 33-((A))-92:
➢ SIC 15, 16 & 17 — Office and storage facilities for building construction
contractors, heavy construction contractors and special trade contractors.
➢ SIC 48 — Communication facilities and offices, including telephone,
telegraph, radio, television and other communications.
➢ SIC 73 — Business services.
➢ SIC 75 — Automotive repair, services and parking.
➢ SIC 76 — Miscellaneous repair services.
➢ SIC 861 — Business Associations.
➢ Self-service storage facilities (No SIC).
➢ Public buildings (No SIC).
➢ Public utility distribution facilities (No SIC).
All other land uses within the B-3, Industrial Transition District shall not be permitted on
tax map parcel 33-((A))-92 unless approved through a subsequent conditional zoning
amendment.
2.) The following land uses shall be permitted within the B-2, Business General
District on tax map parcel 33-((A))-93:
➢ SIC 48 — Communication facilities and offices, including telephone,
telegraph, radio, television and other communications.
➢ SIC 73 — Business services.
➢ SIC 76 — Miscellaneous repair services.
➢ SIC 8351— Child day-care facilities.
➢ SIC 861 — Business Associations.
➢ Self-service storage facilities (No SIC).
➢ Public buildings (No SIC).
➢ Public utility distribution facilities (No SIC).
File #2624/EAW 2
Greenway Engineering August 19, 2010 Busy Bcez Daycare Rezoning
Revised September 21, 2010
Revised October 1, 2010
All other land uses within the B-2, Business General District shall not be permitted on tax
map parcel 33-((A))-93 unless approved through a subsequent conditional zoning
amendment.
B.) Access Mana eg ment
1.) Tax map parcels 33-((A))-92 and 33-((A))-93 shall be served by the existing
commercial entrance on Martinsburg Pike (U.S. Route 11).
2.) The Applicant hereby proffers to dedicate right-of-way along the Martinsburg
Pike (U.S. Route 11) frontage of tax map parcel 33-((A))-93 to accommodate the
future widening of this corridor. This one time right-of-way dedication shall not
exceed 10 feet in width and shall occur subsequent to the final Martinsburg Pike
design plan approval. The Applicant shall provide the required right-of-way
dedication within 90 days of written request by Frederick County and/or VDOT.
C.) Structural Development Limitation
1.) Tax map parcel 33-((A))-93 shall be limited to a maximum structural area of 3,000
square feet for all land uses, exclusive of self-service storage facilities, identified in
Section A(2) of the proffer statement.
D.) Monetary Contribution to Offset Impact of Development
The Applicant hereby proffers that in the event rezoning application # is
approved, the undersigned will pay to the Treasurer of Frederick County, Virginia
$0.10 per square footage of structural area developed subsequent to approval of this
rezoning application. This monetary contribution is intended to offset impacts to fire
and rescue services and will be paid prior to issuance of an occupancy permit for the
first land use constructed on tax map parcel 33-((A))-93.
Please refer to Page 4 and Page 5 of the Proffer Statement
for Notarized Owner Signatures
File #2624/EAW 3
Greenway Engineering August 19, 2010 Busy Beez Daycare Rezoning
Revised September 21, 2010
Revised October 1, 2010
E.) Signatures
The conditions proffered above shall be binding upon the heirs, executors, administrators,
assigns and successors in the interest of the Applicant and owner of tax map parcel 33-
((A))-93. In the event the Frederick County Board of Supervisors grants this rezoning
and accepts the conditions, the proffered conditions shall apply to the land rezoned in
addition to other requirements set forth in the Frederick County Code.
Respectfully Submitted:
imothy W. ohnson,
By: ago
nohnson
Commonwealth of Virginia,
/Vb?-2-D to
Date
Date
City ounty f Seek,v`I L To Wit:
The foregoing instrument was acknowledged before me this (-L4'day of CC+D
2oJ_Dby
C D. JbW-'-' a 0
Notary Public
My Commission Expires �-e-b Lel
File #2624/EAW 4
Greenway Engineering August 19, 2010 Busy Beez Daycare Rezoning
Revised September 21, 2010
Revised October 1, 2010
E.) Signatures
The conditions proffered above shah be binding upon the heirs, executors, administrators,
assigns and successors in the interest of the Applicant and owner of tax map parcel 33-
((A))-92. In the event the Frederick County Board of Supervisors grants this rezoning
and accepts the conditions, the proffered conditions shall apply to the land rezoned in
addition to other requirements set forth in the Frederick County Code.
Respectfully Submitted:
Cle` Brook Rentals LLC (Timothy W.Johnson) Date
Commonwealth of Virginia,
City/'`ount f To Wit:
The foregoing instrument was acknowledged before me this 12*day of cK L- t1-
201 D by
'jo
Notary Public
M Commission Expires 'Feb- Z�..� , ZL%f z-
7C'G�tS VC<I tL 6'1 1� 20(0100( '
QItt&fill#,
Ask
e�Otw ptit9.kd
•r
;� ,tom•. t�RGIzt�P.��V�
TORY PV
File #2624/EAW
IMPACT T L "I STA T EM E SIT`
im; DAYCAREDAYCARE 1���G1v� T�
BUSY B
Frederick County, Virginia
Stonewall Magisterial District
Tax Parcel # 33-((A))-92 & 33-((A))-93
Aggregate Area of 1.89± acres
August 19, 2010
Revised September 21, 2010
Current Owners: Timothy W. Johnson
Margo D. Johnson
Clear Brook Rentals LLC (Timothy W. Johnson)
Contact Person: Evan A. Wyatt, AICP
Greenway Engineering
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
Greenway Engineering August 19, 2010 Busy Beez Daycare Rezoning
Revised September 21, 2010
BUSY BEEZ DAYCARE REZONING
INTRODUCTION
This report has been prepared for the purpose of assessing the impact to Frederick County
by the proffered rezoning of a 1.89± acre parcel owned by Timothy W. Johnson and
Margo D. Johnson, identified as tax map parcels 33-((A))-92 and 33-((A))-93. Tax map
parcel 33-((A))-92 is owned by Clear Brook Rentals LLC (Timothy W. Johnson), is
currently zoned B-3, Industrial Transition District and is approximately 1.324± acres. Tax
map parcel 33-((A))-93 is owned by Timothy W. Johnson and Margo D. Johnson, is
currently zoned B-3, Industrial Transition District and is approximately 0.567± acres.
Both properties are conditionally zoned as described in Rezoning Application #05-01 and
are both currently developed. Tax map parcel 33-((A))-92 contains the American Auto
Body automotive repair facility, and tax map parcel 33-((A))-93 contains a church. The
Johnson's desire to modify the previous rezoning application to rezone tax map parcel
33-((A))-93 to B-2, Business General District to allow for the development of a new
daycare facility that will take the place of the existing church, and to modify the proffered
conditions for both properties to make this consistent with the current developed
conditions of the subject properties.
Basic Information:
Location: West side of Martinsburg Pike (U.S. Route 11);
approximately 2,000 feet south of Interstate 81 Exit 323.
Magisterial District: Stonewall District
Property ID Numbers: 33-((A))-92 & 33-((A))-93
Current Zoning: B3, Industrial Transition District
Current Use: Church and Automotive Repair Facilities
Proposed Zoning: B-2, Business General District with proffers (33-((A))-93)
B-3, Industrial Transition District with revised proffers
(33-((A))-92)
Total Rezoning Area: 1.89± acres
Proposed Development: Busy Beez Daycare Facility (3,000 square feet maximum)
File #2624/EAW
Greenway Engineering August 19, 2010 Busy Beez Daycare Rezoning
Revised September 21, 2010
COMPREHENSIVE POLICY PLAN
Sewer and Water Service Area
The 1.89± acre subject property is currently located within the Sewer and Water Service
Area (SWSA). Therefore, the rezoning of this property for commercial land use is
appropriate based on current policy. The Johnson's propose to extend public water and
sewer service to the proposed daycare facility to ensure state standards are met for a
commercial daycare facility.
Northeast Land Use Plan
The 1.89± acre subject properties are a component of the Northeast Land Use Plan. The
current land use plan, as well as the proposed 2010 land use plan recommends the
development of business and commercial land uses along the Martinsburg Pike (U.S.
Route 11 North) corridor, which includes the subject properties. The current land use
plan identifies a developmentally sensitive area designation for the existing residential
properties that front along the east side of Martinsburg Pike across from the subject
properties; however, the proposed 2010 land use plan identifies these residential
properties for future business and commercial land use without the developmentally
sensitive area designation. The conversion of the church to the proposed daycare facility
is consistent with land uses that support surrounding residential land use; therefore, the
proposed project will not adversely impact the community or the existing residents within
this area. Additionally, the Applicants' Proffer Statement establishes a 3,000 square -feet
limitation on the size of the proposed day care facility; therefore, the scale and intensity
of this rezoning is consistent with the policies guiding future land use development
within this area of the County.
SUITABILITY OF THE SITE
Floodplains
The 1.89± acre subject properties are located on FEMA NFIP Map #510063-075 B. This
map, as well as the Frederick County GIS database delineates the vast majority of the
subject properties as being outside of the 100 -year floodplain. Both mapping sources
identify a small portion of the subject properties as being located in the Duncan Run 100 -
year floodplain area. The Applicant's have advised that there have never been any
floodwater impacts on the subject properties; therefore, the limits of the 100 -year
floodplain may be inaccurate. Nonetheless, the developed portions of the subject
properties are located outside of the delineated 100 -year floodplain area so there will be
File #2624/FAW
Greenway Engineering August 19, 2010 Busy Beez Daycare Rezoning
Revised September 21, 2010
no impacts to the floodplain area. (Please refer to the Environmental Features Map
Exhibit.)
Wetlands
The 1.89± acre subject properties do not contain wetland areas as demonstrated on the
National Wetlands Inventory (NWI) Map, as well as information from the Frederick
County GIS Database. No evidence of wetlands features and vegetation is present on the
property; therefore, the subject site is not impacted by wetland areas. (Please refer to the
Environmental Features Map Exhibit.)
Steep Slopes
The 1.89± acre subject properties are predominately level with slopes ranging from 2 to 7
percent; therefore, the subject properties are not impacted by areas of steep slope. (Please
refer to the Environmental Features Map Exhibit and the Soils Map Exhibit.)
Woodlands
The 1.89± acre subject properties do not contain woodland areas; therefore, there are no
impacts to this environmental feature. (Please refer to the Aerial Overview Exhibit).
Soil Types
The Soil Survey of Frederick County, published by the USDA Soil Conservation Service
was consulted to determine soil types contained in this tract. The subject properties
contain the following soil types:
16B — Frederick-Poplimento Silt Loam: 2-7% slope
32B — Oaklet Silt Loam: 2-7% slope
The Oaklet Silt Loam soil type located within the 1.89± acre subject properties is
classified as prime farmland soil. The soil type on this property is suitable for
commercial development and has moderate shrink -swell potential. The soil's
characteristics are similar to the soil type found on developed properties along the
Martinsburg Pike corridor; therefore, the soils associated with the subject properties will
not create problems with the development of the proposed daycare facility. (Please refer
to the Soils Map Exhibit.)
File #2624/EAW 4
Greenway Engineering August 19, 2010 Busy Beez Daycare Rezoning
Revised September 21, 2010
Other Environmental Features
The 1.89± acre subject properties do not contain areas of lakes, ponds or natural storm
water retention areas as defined by the Frederick County Zoning Ordinance. There are
no environmental features present that create development constraints for the existing or
proposed commercial land uses on these properties.
SURROUNDING PROPERTIES
Adjoining property zoning and present use:
North: Zoned RA, Rural Areas District Use: Unimproved
South: Zoned RA, Rural Areas District Use: Residential
East: Zoned: RA, Rural Areas District Use: Residential
West: Zoned: RA, Rural Areas District Use: Interstate 81
Zoned: B-3, Industrial Transition District Heavy Commercial
TRANSPORTATION
The 1.89± acre subject properties have frontage along the west side of Martinsburg Pike
(U.S. Route 11) and are served by an existing commercial entrance and taper that was
approved by VDOT and Frederick County in September 2002. The commercial entrance
design also provides for a major drainage structure within the Martinsburg Pike right-of-
way, which was installed during the development of the American Auto Body facility
that is located on tax map parcel 33-((A))-92.
Greenway Engineering met with the Frederick County Transportation Planner to discuss
the proposed development plan and it was determined that a Traffic Impact Analysis
(TIA) study would not be required for this rezoning application. Additionally, Greenway
Engineering and the Applicants met with a VDOT representative on the project site to
discuss the project and review the existing commercial entrance and taper, as well as the
drainage structure to determine the adequacy of these improvements to serve the existing
automotive repair facility and the proposed daycare facility. The VDOT representative
felt that these improvements would be adequate for the proposed development and
advised that calculations would be reviewed during the Site Plan process to determine if
any additional improvements would be required.
The TIA utilizes traffic volumes from the 7°i Edition of the Institute of Traffic Engineers
(ITE) Trip Generation Report provides the following weekday AM and PM hour traffic
File #2624/EAW 5
Greenway Engineering August 19, 2010 Busy Beez Daycare Rezoning
Revised September 21, 2010
generator associated with the proposed development plan for the 1.89± acre subject
properties:
Automobile Care Center (942): AM Peak: 3.22/1,000 sq.ft. PM Peak: 4.01/1,000 sq.ft.
Daycare Center (565): AM Peak: 13.56/1,000 sq.ft. PM Peak: 13.91/1,000 sq.ft.
Therefore, the peak hour traffic impacts associated with this rezoning application are
projected as follows:
American Auto Body (4,200 sq.ft.): ANI Peak: 13.52 VPD PM Peak: 18.84 VPD
Busy Beez Daycare (3,000 sq.ft.): AM Peak: 40.68 VPD PM Peak: 41.73 VPD
The proposed development plan for the 1.89± acre subject properties is projected to
generate 54.20 vehicle trips during the AM Peak Hour and 58.57 vehicle trips during the
PM Peak Hour. These projected traffic volumes are below the requirements for right turn
lanes and tapers on 2 -lane highways and fall within the range for a taper on a 4 -lane
highway. This segment of Martinsburg Pike is currently a 2 -lane highway with a center
left turn lane. The 2009 VDOT Traffic Volumes for primary Roads identify this segment
of Martinsburg Pike with an average daily traffic volume of 4,500 trips. Therefore, the
existing commercial entrance and taper exceed current VDOT requirements and would
meet VDOT requirements should this segment of Martinsburg Pike become a 4 -lane
segment in the future. The proposed rezoning application does not create a negative
impact to the transportation system.
SEWAGE CONVEYANCE AND TREATMENT
The 1.89± acre subject properties are located within the Route l I North Sewer and Water
Service Area (SWSA). The Frederick County Sanitation Authority (FCSA) has
developed a 6 -inch sewer force main to provide sewer transmission from this area of the
County to the Opequon Water Reclamation Facility (OWRF) located on Berryville Pike
(U.S. Route 7). The proposed day care facility will be connected to the public sewer
system through a pump situation that will access the 6 -inch sewer force main located on
the east side of Martinsburg Pike directly across from the subject properties. The
Applicant's have proffered to limit the development of the proposed daycare facility to
3,000 square feet, which will allow for a maximum occupancy of 50 children and 7 staff
members based on state licensing requirements. As a comparable land use, The Virginia
Department of Health Sewage Handling and Disposal Regulations Manual identifies
schools without showers and with or without cafeterias as a sewage flow rate of 10
gallons per day (gpd) per person.
Q = 10 gallons/day/person
Q = 10 gpd x 57 persons (maximum)
Q = 570 gpd
File #2624/EAW 6
Greenway Engineering August 19, 2010 Busy Beez Daycare Rezoning
Revised September 21, 2010
The proposed daycare facility is estimated to add 570 gallons per day to the public
sewage conveyance system and the Opequon Water Reclamation Facility (OWRF). The
design capacity of the treatment plant is 8.4 million gallons per day (MGD) during
summer months and 16.0 MGD during winter months. The expansion and upgrade of the
OV -IRF will increase the hydraulic capacity of the facility to a maximum 12.6 MGD,
which is anticipated to be operational this calendar year. Approximately 6.8 MGD of this
capacity is currently being utilized at the OWRF; therefore, the development of the
proposed daycare facility would require approximately 0.0003% of the available capacity
at this facility. This information demonstrates that the subject property can be developed
with adequate sewer service. (Please refer to the SWSA Water & Sewer Lines Map
Exhibit)
WATER SUPPLY
The 1.89± acre subject properties are located within the Route 11 North Sewer and Water
Service Area. (SWSA). The Frederick County Sanitation Authority (FCSA) has
developed a 12 -inch water transmission line that was adequately sized to provide for
transmission and pressure needed to serve land uses within the Route 11 North Sewer and
Water Service Area. The proposed day care facility will be connected to the public water
system through a tap that will access the 12 -inch water transmission line located on the
east side of Martinsburg Pike directly across from the subject properties. The Applicant's
have proffered to limit the development of the proposed daycare facility to 3,000 square
feet, which will allow for a maximum occupancy of 50 children and 7 staff members
based on state licensing requirements. It is anticipated that the potable water demand for
the proposed daycare facility will be 20% greater than the sewage demands identified in
the previous section.
Q = 12 gallons/day/person
Q = 12 gpd x 57 persons (maximum)
Q = 684 gpd
The proposed daycare facility is estimated to require 684 gallons of potable water per day
from the public water system. The Northern Water Treatment Plant provides 2.0 million
gallons per day of potable water from the former Global Chemstone Quarry as one of the
water sources contributing to the public water system within the Route 11 North Sewer
and Water Service Area. The projected water usage for the build -out of the subject
property would require approximately 0.0003% of the capacity at this facility; therefore,
this information demonstrates that adequate water capacity is available for the proposed
daycare facility. (Please refer to the SWSA Water & Sewer Lines Map Exhibit)
File #2624/EAW 7
Greenway Engineering August 19, 2010 Busy Beez Daycare Rezoning
Revised September 21, 2010
SITE DRAINAGE
The 1.89± acre subject properties have very little topographic relief and have been
designed and developed to direct storm water towards the central portion of the subject
properties to a storm water management facility. Storm water is collected into the
existing storm water management facility and is then piped to a drainage structure within
the VDOT right-of-way. The development of the proposed daycare facility and required
parking area is not anticipated to significantly increase the impervious surface area of the
subject properties; therefore, the existing storm water management facility should be
adequate to accommodate the demands of this site. A Site Plan will be prepared and
submitted for review and approval by the County Engineer prior to any new development
activity on the subject properties, which will allow for the analysis of the existing storm
water management facility to ensure that there are no negative impacts to surrounding
properties.
SOLID WASTE DISPOSAL
The impact on solid waste disposal facilities can be projected from an average annual
commercial consumption of 5.4 cubic yards per 1,000 square feet of structural area (Civil
Engineering Reference Manual, 4th Edition). The following figures show the increase in
the average annual volume based on an additional maximum development of a 3,000
square feet daycare facility:
AVV = 5.4 cu. Yd. Per 1,000 sq. ft. commercial
AAV = 5.4 cu. Yd. x 3.0
AAV = 16.2 cu. Yd. at build out, or 11.3 tons at build out
The Municipal Solid Waste area of the regional Landfill has a current remaining capacity
of 13,100,000 cubic yards of air space. The maximum development of the daycare
facility will generate approximately 11.3 tons of solid waste annually on average. This
represents a 0.007% increase in the annual solid waste received by the Municipal Solid
Waste area of the Regional Landfill, which currently average 150,000 tons per year;
therefore, this information demonstrates that the Regional Landfill has adequate capacity
to accommodate the solid waste impacts associated with this proposal. Solid waste
produced by the proposed daycare facility will be routed to the Regional Landfill by a
commercial waste hauler; therefore, the County will receive tipping fees associated with
this land use to mitigate this impact.
HISTORICAL SITES AND STRUCTURES
The 1.89± acre subject properties do not contain structures deemed to be historically
significant, nor are there potentially significant structures adjacent to the subject property.
File #2624/EAW 8
Greenway Engineering August 19, 2010 Busy Beez Daycare Rezoning
Revised September 21, 2010
Additionally, the subject properties are not located within defined battlefield areas or
potential historic districts as demonstrated in the National Park Service Study of Civil
War Sites in the Shenandoah Valley and the Frederick County Comprehensive Policy
Plan.
The Frederick County Rural Landmarks Survey identifies Saspirilla Springs (#34-156)
approximately 1/z mile east of the subject properties as a potentially significant structure;
however, this structure is not deemed to be eligible for the state or national registers.
Saspirilla Springs is located on the east side of the railroad tracks and is adjacent to
properties that are currently zoned M-1, Light Industrial District. This structure is not
visible from the subject properties; therefore, the development of the subject properties
will not negatively impact this structure or it's viewshed. (Please refer to the Historic
Features Map Exhibit)
OTHER IMPACTS
The rezoning and development of the 1.89± acre subject property is not anticipated to
negatively impact public services and will provide economic development revenue that
will benefit the County, as well as child daycare service to this geographic area of the
County. However, the Applicants' proffer statement provides a monetary contribution to
Frederick County for general fire and rescue services to further mitigate impacts
associated with this project. No additional impacts to County capital facilities or services
are anticipated by this proposal.
File #2624/EAW 9
REZONING APPLICATION FORM
FREDERICK COUNTY, VIRGINIA
To be completed by Planning Staff:
Fere Amount Paid r
�-
Zoning Amendment Number _� Date Receive
PC Hearing Date !P�% A BOS Hearing Date
The following information shall be provided by the applicant:
All parcel identification numbers, deed book and page numbers may be obtained from the
Office of the Commissioner of Revenue, Real Estate Division, 107 North Kent
Street, Winchester.
1. Applicant:
Name: Greenway Engineering
Telephone: 540-662-4185
Address: 151 Windy Hill Lane, Winchester, VA 22602
2. Property Owner (if different from above)
Name: Timothy W. Johnson & Margo D. Johnson
Telephone: 540-662-7878
Address: 4491 Martinsburg Pike Clearbrook, VA 22624
3. Contact person if other than above
Name: Evan A. Wyatt, AICP
Telephone: 540-662-4185
4. Checklist: Check the following items that have been included with this
application.
Location map ® Agency Comments
Plat ® Fees
Deed to Property ® Impact Analysis Statement
Verification of taxes paid ® Proffer Statement
The Code of Virginia allows us to request full disclosure of ownership in relation to
rezoning applications.
Please list below all owners or parties in interest of the land to be rezoned:
Timothy W Johnson & Margo D. Johnson
5. Current Use of the Property: American Autobody & Church
6. Proposed Use of the Property: American Autobody & Child Day Care
7. Adjoining Property: Please see attached adjoining property owner map
exhibit and adjoining property owner mailing address table.
PAR
8. Location: The property is located at (give exact located based on nearest road
and distance from nearest intersection, using road names and route number):
The subject properties are located on the west side of Martinsburg Pike (U.S. Route 11),
approximately 2,000 feet south of Interstate 81 Exit 323.
Information to be Submitted for Capital Facilities Impact Model
In order for the Planning Staff to use its capital facilities impact model, it is necessary for
the applicant to provide information concerning the specifics of the proposed use.
Otherwise, the planning staff will use the maximum possible density or intensity scenario
for the proposed Zoning District as described on Page 9 of the application package.
9. Parcel Identification/Location: Parcel Identification Number 33-A-92 & 33-A-93
Districts
Magisterial: Stonewall High School: James Wood High
School
Fire Service:
Rescue Service
10.
11.
Clear Brook
Clear Brook
Middle School: James Wood Middle
School
Elementary School: Stonewall
Elementary School
Zoning Change: List the acreage included in each new zoning category
being requested.
Acres Current Zoning Zoning Requested
1.324± B3 (with proffers) B3 (with revised proffers)
0.567± B3 (with proffers) B2 (with revised proffers)
1.89± Total Acreage to be rezoned
The following information should be provided according to the type of
rezoning proposed:
Single Family homes
Non -Residential Lots
Office:
Self Serve Storage:
Lumber Store:
Number of Units Proposed
Townhome:
Mobile Home:
Square Footage of Proposed Uses*
Wholesale:
Warehouse:
Other:
Multi -Family
Hotel Rooms:
*Structural square footage is limited to 3,000 square feet for tax map parcel 33-((A))-
93 as described in Section C(1) of the proffer statement.
Signature:
I (we), the undersigned, do hereby respectfully make application and petition the
Frederick County Board of Supervisors to amend the zoning ordinance and to change
the zoning map of Frederick County, Virginia. I (we) authorize Frederick County
officials to enter the property for site inspection purposes.
I (we) understand that the sign issued when this application is submitted must be
placed at the front property line at least seven days prior to the Planning Commission
public hearing and the Board of Supervisors' public hearing and maintained so as to
be visible from the road right-of-way until the hearing.
I (we) hereby certify that this application and its accompanying materials are true and
accurate to the bet of my (our) knowledge.
Applicant(s):
Owner (s): - Date: l 1
_J
Owner (s): ' -k Date: C i 3 /c
t
i
Special Limited Power of Attorney
County of Frederick, Virginia
Frederick Planning Web Site: www.co.frederick.va.us
Department of Planning & Development, County of Frederick, Virginia,
107 worth Tient Street, Suite 202 Winchester, Virginia 22601
Facsimile 540-665-6395 Phone 540-665-5651
Know All Men By These Presents: That I (We)
(Name) Timothy W. Johnson & Margo D. Johnson (Phone) (540) 662-7878
(Address) 4491 Martinsburg Pike Clear Brook, VA 22624
the owner(s) of all those tracts or parcels of land ("Property") conveyed to me (us), by deed recorded in the
Clerk's Office of the Circuit Court of the County of Frederick, Virginia, by
Instrument No. 030025588 on Page , and is described as
Parcel: 92 Lot: Block: A Section: 33 Subdivision:
Parcel: 93 Lot: Block: A Section: 33 Subdivision:
do hereby make, constitute and appoint:
(Name) Greenway Engineering, Inc. (Phone) (540) 662-4185
(Address) 151 Windy Hill Lane, Winchester, VA 22602
To act as my true and lawful attorney-in-fact for and in my (our) name, place and stead with full power and
authority I (we) would have if acting personally to file planning application for my (our) above described
Property, including:
® Rezoning (Including proffers)
❑ Conditional Use Permit
❑ Master Development Plan (Preliminary and Final)
❑ Subdivision
® Site Plan
® Variance or Appeal
❑ Comprehensive Policy Plan Amendment
My attorney-in-fact shall have the authority to offer proffered conditions and to make amendments to
previously approved proffered conditions except as follows:
This authorization shall expire one year from the day it is signed, or until it is otherwise rescinded or
modified.
In witness thereof, I (we) have hereto set my (our) hand and seal this 13fhday ofNt. 0_412062=0l 0
Signature(s)
State of Vir inia, Cit County f To -wit:
I, Dony 't,L- Ike( a Notary Public in and for the jurisdiction aforesaid, certify that the person(s) who
signed to the foregoing instrument and who I (ar®eyls�my*etto me, personally appeared before me and has
ac owledged the same before me in the jur' �igt�PUN this f �, day of �OA MO 2-010
%.X.t Q d� ��� , F.f`L�PGYy Gp'iniyssion Expires:t'
Notary Public A' �ti Regisfra�jrt#; _e46 (N,
Revised 3/17/08 Z.
" "'
Timothy W. Johnson Rezoning
TAX MAP NAME
ADDRESS
CITY & STATE
ZIP
ZONING
LAND USE
33 9
4 AB WHITE HALL LLC
8531 PULASKI HWY
BALTIMORE MD
21237
B3
4
33 9
5 PROFESSIONAL MOBILE HOME BROKERS INC
P O BOX 4091
WINCHESTER VA
22604
B3
33 A
91 JOHNSON CHERYL D ETALS
212 S WASHINGTON ST
WINCHESTER VA
22601
RA
4
4
33 A
94 COOKE CHARLES A. & BETTY L.
4481 MARTINSBURG PIKE
CLEAR BROOK VA
22624
RA
2
33 A
95 CLEAR BROOK RENTALS LLC
141 SISTER CHIPMUNK LN
CLEAR BROOK VA
22624
RA
2
33A 1
18 ROBY PHILLIP WENDELL & KIMBERLY F
4478 MARTINSBURG PIKE
CLEAR BROOK VA
22624 I
RA
2
33A 1
19 ROBY PHILLIP WENDELL & KIMBERLY F
14478 MARTINSBURG PIKE
ICLEAR BROOK VA
226241
RA
1 2
33A 1
20 VENSKOSKE RICHARD M
12038 CHESTNUT GROVE RDWINCHESTER
VA
22603
RA
2
Source: Frederick County GIS, August 2010
Adjoining Parcels Listing
8/12/2010
Timothy W Johnson Rezoning
-- ---- ----
• lr —r &rr� R7
b
Aerial Overview �*; `''�►, „Z
f 'r •i dc
ju
MC
�s pp//j4 T1In':Y ti _
'r 1 r 0
Z
O
IN
� W
• Z
33 A 93 r
w
33 A ;92
ry +� z >
~t z o
r O Q
ix
= a
O
U o
Z a z
Z ZS2
w 3
of w ¢ >
Le end p w
Ga` i mw t-Z
-- ri ®Timothy W. Johnson Parcels = O p
o�
�� ra Parcel Boundary¢ Y o 0
�of JUS
FW p m
O Z w 5
Feet 2 o w o
100 50 0 100 200 ~ `� a
---—
w
a
Map Data Source: Frederick County Va. GIS Department, Aerial Photos from 2006
p y
Timothy W. Johnson Rezoning
Soils Map
01
Legend
Timothy W. Johnson Parcels
Parcel Boundary
Soils
16B, FREDERICK-POPLIMENTO LOAMS, VERY ROCKY, 2 TO 7 PERCENT SLOPES
208, GUERNSEY SILT LOAM, 2 TO 7 PERCENT SLOPES
32B, OAKLET SILT LOAM, 2 TO 7 PERCENT SLOPES
34, PAGEBROOK SILT LOAM
Map Data Source: Frederick County, Va. GIS Depart t
32B
33 A 83
14
}
F
Feet
F
100 50 0 100 200,
r .
0
Z
Z
0
N
W
w
Z a
O Q
2
Z
Cn0
?7 co
cOc
G
Q
QC2 8�60PG I iib
M
Li
CD
d��'��e-
.
ti+a
•
IQO' 50'_ p i00' wYQ
S�lG
x IN FEET �J�p �j^y k #S �•ifxOop
'v.
BOUNDARY SURVEY OF THE LANDS OF
NICUAS MAWS, CHARLES 1.EWIS AND PALUNE LEWIS
TRUSTEES FOR LOCAL. LODGE NO. 2335 OF
D Y
It'll RrrATIoxAL ASsocIAnoN of MAcxrxlsrS
AND AEROSPACE WORKERS UNION B
a z'
DEED BOOK 507, PAGE 322
TAX MAP 33, TRACT 92 t4i)
AND TAX MAP 33, TRACT 93 ((A))
r
;* $ AND ON THE EAST SIDE
' LOCATED ON TM WEST SM OF U.B. ROVIE Na 11, MARTINSB W PBOy r
OF INT13MATE ROUTE N0.91 AHCFM I 3M MMM NORTH M Q•EARBROOK AM SIMATE IN
STONBWAIL LAMS 1MA1. DLgPR1CT, FR> IC1C OpUNiY, VIItC1U1tA. .K
lx ND-M NO TTILB RM-0 T RMMISM-
.r,., ..
N078: 1iII388 TitACI d ARE NOT IN THE loo YEAR FLOOD PLAIN DESIO NAT» BY RU-D.
- y" CO&DRUNny PANEL No. 510063 0075 B, DATED JULY 17,197L
I HEREBY CBitM THAT ON JUNG 1.199616tADB AN ACCURATE SURVEY RE THEARE NO MM
MU _
` SHOWN HERSON A:X TO THE BEST OF MY KNOWLMOB AND BE THERE ARE NO BASHt�v1S
OR E RMOACMAEM VIMBLE ON THE GROUND OT1II.'R THAN THOSH SHOWN1B�tBON.
SURVEY N0.207 DUNN LAND SURVEYS INC.
SHEET N0, 1 OF 2 BERRYVILLE, VIRGD41A
JUNE 6, 1996
0
3UI+I'I Y of EREDE?R 1,CK
Department of Pianning and Development
540/665-565i
MEMORANDUM FAX: 540/665-6395
TO: Frederick County Planning Commission
FROM: Mark R. Cheran, Zoning and Subdivision Administrator �1e C
RE: Waiver Request — Telecommunications Tower — AT&T Corp.
DATE: October 15, 2010
On behalf of AT&T Corp., Greenway Engineering is requesting a waiver to Chapter 165 Zoning,
Article II Supplementary Use Regulations; Parking; Buffers; and Regulations for Specific Uses, Part
204 Additional Regulations for Specific Uses, 165-204.1913 Telecommunications Facilities,
Commercial to allow a 120 -foot lattice -type telecommunication tower in lieu of a 120 -foot
monopole -type telecommunication tower approved within Conditional Use Permit #05-10. The
properties are located on the east side of Martinsburg Pike (Route 11 North), approximately'/4 mile
northeast of Interstate 81, Exit 317, and are identified by Property Identification Numbers 43-A-130
and 43-A-132 in the Stonewall Magisterial District.
Back round
CUP #05-10 of AT&T Corp., Melissa Hall, Wesley Helsley and Bradley Pollack was approved by
the Board of Supervisors on August 11, 2010 for a 120- foot monopole -type telecommunication
tower.
On October 14, 2010, Frederick County Zoning Ordinance 165-204.19B (2) was approved to allow
for the Board of Supervisors to waive the monopole -type tower for properties which are located
outside the Urban Development Area and are not adjacent to properties identified as historic sites.
The AT&T Corp. properties are located outside the UDA and are not located adjacent to identified
historical resources. The applicant believes that the construction of a lattice -type telecommunication
tower will be less visually obtrusive to existing residential land uses and that a lattice -type tower will
provide a greater opportunity for collocating personal wireless service providers. Staff would note
that the conditions assigned to CUP# 05-10 will remain in effect.
Staff note: This waiver request for a lattice -type telecommunication tower does satisfy the ordinance
requirement to grant the waiver. A recommendation from the Planning Commission is requested.
Attachments
MRC/bad
107 North Rent Street, Suite 202 • Wincheste- Virginia 22601-5000
A§S/Wavier Request,
AT&T Telecom. Tower
Request a Lattice Tower
mn Lieu of Monopole)
n.
'q
^44
? �GPLSrF
M0nRl/ 4f
41
3ZV► O Ni
py p�
"A
L l i 6OMq r$PC � a 0 � A Ake F( 44 A 24 f i
11LSON RITA
RP Rl/ `Rp 4c z
iO")eaNSBV pG Gr2 MICCANN RD
4ryaa tee~ d� /. /;QP�� Approximate RP ed 10.08 ac
; )A'j 120ft Tower
ti f r•+/ v�����-t Location 1'0
.2gRTR 43 )RGSTFFS - zoQZM g7�rc 7,X2
yt ^�� �t r 0? OB �q ? of s3 RPr gR7)Nse RA
�Dfs 414
�� b �. \ Rp41q�Sq X33 �o° ���grzR yea �79OP7Kf 4
sQ ' / \lea BUR q//c yea SBOfe 8gP °
pl)F 9 � �� �. QS GA/QFC \ q97°P/KF rirrr ,
c ,,may
Zoo
Qi kP gRr/ Sri `ygB1 w.�\AF _
a.i A i34A
r •
;J�/��\\ to C rPGP!(E, / • BRIDGE CIIARIE$ U S. JANE 4
�� 2610MARiIN58URG PIKE
w
4� RA acnld 8.18 ar
\ — _lit
ofFt M
Inset 11,Aap
Stephenson �'•
/ f R nal Comrr[u..ity * a
l3
11 1 f
�pllcaClon
-`jC--nityC--e
iownordCity3aund�y
�uroan ❑e�P�oamPni a,en
�,_ erantlWaterser�i�eArea
Waterbotly
Toning
Ml (hdusHd'. ghi nislrict)
M2 llndu&t .I, General Dislrictl
RP (Rvidenliol Perlarmance District)
Wavier Request Note:
Frederick County Dept of
AT&T Telecom. Tower
Planning &Development
( Request a Lattice Tower Sui N Kent St
Suite 202
in Lieu of Monopole) Winchester, VA 22601
540 - 665 - 5651
Map Created: October 18, 2010
0 125 250 500 Feet
REENWAY ENGINEERING, INC.
151 Windy Hill Lane
Winchester, Virginia 22602 �.
i;
Founded in 1971
October 7, 2010
Frederick County Planning Department
Attn: Candice Perkins, Senior Planner
107 North Kent Street
Winchester, VA 22601
RE: AT&T Microwave Tower — Lattice Construction Waiver
Dear Candice:
The purpose of this letter is to request inclusion on the next available Planning Commission and
Board of Supervisor agendas for consideration of a waiver request by AT&T Corp., for the
purpose of allowing a 120 -foot lattice -type construction microwave tower on tax map parcels 43-
((A))-130 and 43-((A))-132. As you know, the Board of Supervisors approved a Conditional Use
Permit to allow for the construction of a new microwave tower with conditions during their
August 11, 2010 meeting. Included in the motion to approve was direction for staff to clarify the
procedures regarding lattice -type construction and to allow any applicant affected by this change
to come back to the Board of Supervisors within 120 days for reconsideration with fees to be
waived. Subsequent to that approval, a proposed text amendment was introduced that would
provide the Board of Supervisors with the ability to allow lattice -type construction for new
telecommunication towers when existing or planned residential areas will not be impacted and
when the site is not adjacent to identified historical resources.
The AT&T Corp., properties are not located adjacent to identified historical resources.
Additionally, the applicant believes that the construction of a lattice -type microwave tower will
be less visually obtrusive to existing residential land uses, as a monopole tower will have a
significant opaque base structure to meet wind -load and structural support requirements that is a
minimum of 6 -feet in diameter, which would resemble a smokestack. The applicant also believes
that the lattice -type microwave tower will provide a greater opportunity for collocating personal
wireless service providers, which is a condition of the permit that was issued to AT&T Corp., by
the Board of Supervisors.
Please find enclosed with this letter 70 color copies of an illustrative rendering of both a
monopole tower and lattice tower for the AT&T Corp., property. Please include these graphics as
part the Planning Commission and Board of Supervisors agenda packets and advise me if you
need anything else at this time. Please also advise me of the proposed dates for consideration of
this request so we can advise the applicant accordingly.
Sincerely,
&_Xt'J a—.
Evan A. yatt, C�
Al
Greenway Engineering
Cc: Robert R. Erciksen, AT&T Corp. PP��
Thomas M. La`�rSg Jni�e awn �e}�r�tIgInners Environmental Scientists
Telephone 540-662-4185 FAX 540-722-9528
www.greenwayeng.corn
•
J
C
MEMORANDUM
To: Frederick County Planning Commission
�� 0
From: Candice E. Perkins, AICP, Senior Planner C 1
COli_TNIFY of F REDERUCK
Department of Planning and Development
Subject: Public Hearing — Curb and Gutter Requirements
Date: October 19, 2010
540/665-5651
FAX: 540/665-6395
Staff has been requested to draft an amendment to the Zoning Ordinance to revise the curb and gutter
requirements for parking areas. The Zoning Ordinance currently requires parking lots in all zoning
districts (with the exception of the B3, OM, M 1 and M2 which were revised in 2009) to provide curb
and gutter around the perimeter of the entire parking lot. The amendment received by staff requests
to utilize header curb within parking lots (elimination of the concrete gutter pan) in all zoning
districts when not necessary for the drainage of stormwater.
The item was emailed to the Development Review and Regulations Committee (DRRC) on
September 20, 2010. The DRRC had concerns over the request as submitted by the applicant and
requested it be revised. The DRRC discussed the durability of the use of only header curb within
parking areas and the fact that it would not hold up as well as curb and gutter. They felt that when
parking areas are adjacent to buildings (and a sidewalk with a turndown curb is used) that the
elimination of the gutter pan may be appropriate, but that the remainder of the parking area should be
constructed utilizing curb and gutter (either CG -6 or CG -6R). Based on the comments and concerns
received by the DRRC, the draft amendment was revised to only allow for the elimination of the
gutter when the stormwater drains away from the curb and only for parking areas that abut buildings
when sidewalks with turndown curbing are used. With those changes, the DRRC recommended that
the ordinance amendment be forwarded to the Planning Commission for discussion. The Planning
Commission discussed this item on October 6, 2010; the Commission had no comments and
forwarded the amendment to the Board of Supervisors for discussion. The Board of Supervisors
discussed this item at their October 13, 2010 meeting and ultimately sent the amendment forward for
public hearing. During the discussion, the Board of Supervisors members expressed concern over
the curb and gutter requirements contained within the Zoning Ordinance and its affect on
stormwater management and water quality and directed the Public Works Committee to look into
additional revisions to the curb and gutter requirements.
The attached document shows the proposed additions discussed by the Board of Supervisors. A
recommendation from the Planning Commission on this proposed Zoning Ordinance text
amendment is sought. Please contact me if you have any questions.
Attachments: 1. Revised ordinance with eliminated text in strikethrough and
added text in bold underlined italics.
2. Request Letter.
CEP/bad
107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000
ATTACHMENT 1
PC Discussed 10/6/10
BOS Discussed 10/13/10
Article II
SUPPLEMENTARY USE REGULATIONS, PARKING, BUFFERS,
AND REGULATIONS FOR SPECIFIC USES
Part 202 — Off -Street Parking, Loading and Access
§ 165-202.01. Off-street parking; parking lots.
D. Parking lots. Parking spaces shared by more than one dwelling or use, required for any
use in the business or industrial zoning district or required for any institutional,
commercial or industrial use in any zoning district shall meet the following
requirements:
(2) Curbs and gutters. Concrete curbing and gutters shall be installed around the
perimeter of all parking lots. in the RP Residential Performance District, the
Distriet, the B2 Business General District, the MS (Medical Suppea) District and the
HE (14igher EdueatiG..) nistFi t when stormwater drains away from the curb
gutter pans shall not be required for parking areas that abut buildings when
sidewalks with turndown curbing are used. All curbing shall be a minimum of six
inches in height. All parking lots shall be included within an approved stormwater
management plan.
a. In the 133 Industrial Transition District, the OM Office -Manufacturing Park
District, the M1 Light Industrial District and the M2 Industrial General District
the use of header curb shall be permitted in areas where the use of gutters is
not necessary for stormwater management purposes.
b. The Zoning Administrator may allow for the use of concrete bumpers instead
of curbing for parcels located outside of the Sewer and Water Service Area if
the site plan provides for effective stormwater management and efficient
maintenance.
c. The Zoning Administrator may allow for the elimination of curb and gutter
for parcels located inside of the Sewer and Service Area when necessary to
implement low impact development design. This shall only be permitted
where practices such as bio -retention, infiltration trenches, and rain gardens
are used and only where it can be demonstrated that soil conditions are
favorable, or if an adequate under -drain is included in the design and only
when approved by the Director of Public Works.
Patton Harris Rust & Associates
Engineers. Surveyors. Planners. Landscape Architects.
September 15, 2010
LABORATORIES: We would propose that header curb may be used in any zoning district provided that gutters
a
Chntilly
Chnlick56urg are not necessary for stormwater management purposes. As you know, curb and gutter
better accommodates drainage as it is installed as a monolithic pour, ensuring no gap or
MARYLAND OFFICES: crevice where water can infiltrate. When positive drainage is provided away from the curb,
Baltimore there is no need to provide the concrete gutter pan. The Zoning Ordinance recognizes this
Columbia currently by not requiring the gutter when it is not needed for stormwater management
Frederick purposes in the above specified districts.
Germantown
Hollywood
Mr. Mark Cheran
Hunt Valley
Zoning Administrator
Williamsport
Frederick County, Virginia
PENNSYLVANIA OFFICE:
107 North Kent Street
Allentown
Winchester, Virginia 22601
T 540.667.2139
RE: Text Amendment, Use of Header Curb in Parldng Lots
F 540.665.0493
Dear Mark:
��
P i � `
I have provided the language found below for a text amendment to the Frederick County
Suite zoo
Zoning Ordinance that would allow for the use of header curb within parking lots in areas
Winchester, VA
where positive drainage is provided. Currently, the Zoning Ordinance requires both
CORPORATE:
concrete curb and gutter around the full perimeter of parking lots within the following
Chantilly
zoning districts_
VIRGINIA OrricES:
Chantilly
RP (Residential Performance), R4 (Planned Community), R5 (Residential
Charlottesville
Recreational), Mill (Mobile Home), Bl (Neighborhood Business), B2 (General
Fredericksburg
Business), MS (Medical Support), HE (Higher Education)
Hcrrisonburg
Leesburg
The use of header curb (with no concrete gutter pan) is only permitted in the following
Newport News
zoning districts and where a gutter is not needed for stormwater management purposes:
Norfolk
Winchester
B3 (Industrial Transition), OM (Office Manufacturing), M1 (Light Industrial),
Woodbridge
M2 (General Industrial)
LABORATORIES: We would propose that header curb may be used in any zoning district provided that gutters
a
Chntilly
Chnlick56urg are not necessary for stormwater management purposes. As you know, curb and gutter
better accommodates drainage as it is installed as a monolithic pour, ensuring no gap or
MARYLAND OFFICES: crevice where water can infiltrate. When positive drainage is provided away from the curb,
Baltimore there is no need to provide the concrete gutter pan. The Zoning Ordinance recognizes this
Columbia currently by not requiring the gutter when it is not needed for stormwater management
Frederick purposes in the above specified districts.
Germantown
Hollywood
Some retailers prefer the use of header curb adjacent to the building, particularly near the
Hunt Valley
building entrance(s). The different density of asphalt parking areas and concrete gutters
Williamsport
inevitably leads to different wearing capacities between the two materials. In parking lots,
PENNSYLVANIA OFFICE:
this can sometimes lead to small elevation changes between the asphalt parking area and the
Allentown
concrete gutter. While the vertical separation between the nvo surfaces may be minor, it can
T 540.667.2139
still become a tripping hazard for patrons of the site. With the use of header curb, asphalt is
F 540.665.0493
provided continuously to the curb thereby removing the potential tripping harzard.
117 East Piccadilly Street
Suite zoo
Our proposed modifications to Section 165-202.01D(3) of the Zoning Ordinance is as
Winchester, VA
follows:
22601
Proposed Ordinance
(3) Curbs and gutters. Concrete curbing and gutters shall be installed around the perimeter
of all parking lots provided that i the PP's ef! effnaflEe—Dime e R4
T7 * t Planned Ceftit " Lhs-trfE T. n C T) .. .7,..-,+;
t ft -a the HE
a
T h F ftgT] 1 Di "t aftEl the T f2 ln&strial Gen 1
lit; the use of header curb shall be permitted in areas where the use of gutters is not
necessaiy for stormwater management purposes. All curbing shall he a minimum of six
/� inches in height. All parking lots shall be included within an approved stormwater
management plan.
We look forward to presenting this proposed ordinance change to you and members of the
Development Review and Regulations Subcommittee. Please feel free to contact me with
any questions or comments you may have.
Sincerely,
PATTON HARRIS RUST & ASSOCIATES
6AZU-4�
Ronald A. Mislowsky, P.E.