HomeMy WebLinkAboutPC 03-02-11 Meeting Agenda7:00 P.M. AGENDA FREDERICK COUNTY PLANNING COMMISSION The Board Room Frederick County Administration Building Winchester, Virginia March 2, 2011 CALL TO ORDER TAB Adoption of Agenda: Pursuant to established procedures, the Planning Commission shouldadopt the Agenda for the meeting................................................................ (no tab) CommitteeReports................................................................................................. (no tab) CitizenComments........................................................................ ......................... (no tab) COMMISSION DISCUSSION Middletown Land Use Plan Mr. Lawrence................................................................................................................... (A) 2011 Planning Commission Retreat Summary Mr. Lawrence................................................................................................................... (B) Other FILE COPY COUNTY of FR EDERYC Departmeat of Planning and Development 540/665-565? MEMORANDUM FAX: 540/665-6395 TO: Frederick County Planning Commission FROM: Eric R. Lawrence, AICP, Planning Director rtt,/ SUBJECT: Discussion Item — Draft Reliance Road Area Joint Land Use Plan DATE: February 15, 2011 In spring 2010, the Town of Middletown approached Frederick County seeking a Boundary Line Adjustment (BLA) between the two jurisdictions. The request was with the support of the major land owners within the proposed BLA area. The County agreed to evaluate the Town's request, and the Reliance Road Steering Committee (RRSC) was convened. The RRSC consists of representation from each jurisdiction: Supervisors Bill Ewing and Gary Lofton representing Frederick County, and Mayor Mark Brown and Councilor John Blaisdell representing the Town of Middletown. Through extensive discussions and evaluations, the RRSC identified three steps in the process which might lead to a BLA: (1) adopt a Land Use Plan for the area in question; (2) evaluate provisions for water and sewer service to the area; and then (3) consider the BLA. The Planning Commission is now requested to consider the first step in the process, the draft land use plan. The RRSC has developed a draft land use plan for the Reliance Road area. This area plan was presented at a community meeting on November 18, 2010, and comments were received. The comments received addressed both the draft land use plan as well as the overall proposed BLA, with mixed support/opposition. The draft plan is now being considered individually by each jurisdiction. Ultimately, if the land use plan is deemed appropriate, the plan would be adopted as part of the County's Comprehensive Plan. The Comprehensive Plans and Programs Committee (CPPC) discussed the draft plan at their meeting on February 14, 2011. It was noted that the plan's proposed uses (Highway Commercial and Mixed -Use Industrial Office) could potentially enable heavy water usage, so if the plan is adopted, efforts should be implemented to properly manage the permitted land use reflective of available water and sewer capacities. It was also noted that the draft plan does not include an expansion for the Sewer and 107 North Kent Street, Suite 202 a Winchester, Virginia 22691-5000 Page 2 Planning Commission Discussion Draft Reliance Road Area Joint Land Use Plan February 15, 2011 Water Service Area (SWSA), a County policy which permits the use of public utilities. The SWSA issue would be revisited as the Town's water capacities are deemed available to serve the various sites. Following discussion, the CPPC forwarded a favorable recommendation regarding the land use plan. The Planning Commission will consider this land use plan as a discussion item on March 2, 2011. Comments offered during the Planning Commission discussion will be forwarded to the Board of Supervisors for their consideration. Please contact staff should you have questions. Thank you. Attachment: Draft Reliance Road Area Land Use Plan narrative and map cc: Reliance Road Steering Committee ERL/bad Zoning B2 (Business, General Distrist) 6o }) 1 { y M a p M1 (Industrial, Light District) Study Area (apprx 317 ac.) R Fo@ rd —. N � a n rc e Road A ® - �'a Note: TownandCityBoundary y Map Created: October 15, 2010 !�S Frederick County Dept of DemaStudy Planning n Development 107 N Kent St Suite 202 0 0.125 025 0.5 Miles DRAFT Winchester, VA 22601 ! Y' i F� 540 - 665 - 5651 Revised reflective of January 6, 2011 Steering Committee discussions ®raft Reliance Road Area Joint Land Use Plan — Concept for County/Town and their respective Committee/PC reviews In spring 2010, the Town of Middletown expressed interest in expanding its boundaries to incorporate approximately 222 acres of land on the east side of 1-81, Exit 302, following Reliance Road. Shortly thereafter, the Reliance Road Steering Committee (RRSC) was convened. The RRSC was composed of representatives from the Town Council and the Board of Supervisors. The RRSC met various times over the ensuing months. The Town representatives also held a community meeting and met with individual property owners within the study area to gain an understanding of the interest of the property owners in terms of the Town's desired boundary line adjustment with the County, as well as future land use opportunities; these meetings were summarized and presented to the RRSC by Town representatives. It was noted that while approximately 37 acres of B2 Business General Zoning exists within the study area, only one site has been developed and benefits from the Town's water and sewer system: the 2.7 acre site occupied by an existing Exxon service station. The RRSC also evaluated the existing transportation network in addition to water and sewer availability. The RRSC considered the Foresight Middletown plan (adopted into the Town's Comprehensive Plan in 2005), which promoted the implementation of a technology park east of the interstate. The results of these findings led to the crafting of the conceptual Reliance Road Area Joint Land Use Plan as a means to illustrate the potential land uses for the area, and to foster further discussions. The conceptual land use plan is envisioned to guide land use decisions over the next 20 to 30 years. Recognizing the Town's current water availability, development within the study area will initially be limited until additional water supply is more readily available. Land Use The proximity of the study area to 1-81, Exit 302, enhances the opportunities for land uses that benefit from the interstate. As such, commercial and technology uses would be most beneficial at this location. The plan calls for the establishment of approximately 44 acres of commercial uses that serve the travelling public, such as hotels, gasoline service stations, and restaurants. The commercial opportunities would be located southeast of the interstate interchange, County/Town and their respective Committee/PC Reviews Draft Reliance Road Area Joint Land Use Plan - Concept January 6, 2011 on the southside of Reliance Road. This is also the area where public water and sewer presently serves the existing Exxon service station. These land uses could be implemented through the B2 Business General Zoning District. Technology uses are envisioned both north and south of Reliance Road, covering approximately 138 acres. Based on the targeted businesses identified by the Winchester -Frederick County Economic Development Commission, the technology uses would include economic sectors such as: Advanced Security, Assembly, Business Services, and Life Sciences. These land uses would be implemented through the OM Office Manufacturing Zoning District. Transportation Network While the existence of 1-81, Exit 302, is a strong asset to the areas' transportation network, the actual configuration of the interchange and its close proximity of Buckton Road is not conducive to accommodating future traffic demands. In order for the interchange to operate efficiently and effectively in the future, it is essential to migrate the existing intersection of Reliance and Buckton Roads further east, creating a greater separation distance from the 1-81 northbound on/off ramps. Increasing this separation distance will avoid significant degradation of the interchange similar to what has occurred at Exit 307 in Stephens City. As noted in Foresight Middletown, in rapidly growing areas, controlling and coordinating the number, design and location of new access points to major roadways is critical to maintaining the safety and capacity of the road system as traffic volumes increase. Accordingly, access to Reliance Road should be managed and limited. The plan calls for limiting Reliance Road access to two points: a signalized intersection that is established with the relocation of Buckton Road, and a future new intersection further east. These two access points would facilitate traffic movement to/from Reliance Road into the various future land uses to the north and south. It may also be appropriate to utilize a roundabout at the relocated Buckton Road intersection with Reliance Road as a means to define where the developed portion of Reliance Road ends and the rural land uses of the County begin. A similar technique was suggested by Foresight Middletown as a means to create an entrance to the developed area. Finally, Foresight Middletown calls for Reliance Road within the Town limits to be a boulevard with a landscaped median; the Reliance Road Area Joint Land Use Plan carries this design concept forward east of the interstate. Page 2 County/Town and their respective Committee/PC Reviews Draft Reliance Road Area Joint Land Use Plan - Concept January 6, 2011 Water and Sewer System The provision of an adequate public water and sewer system is essential to facilitating the conceptual land uses envisioned along Reliance Road. The Town presently serves the existing Exxon service station with its water and sewer needs; it is envisioned that the Town also serve the needs of the future land uses depicted in the Reliance Road area. The Town recently completed an upgrade to its wastewater treatment facility which enables it to treat upwards of 400,000 gpd. Reflective of the slowing economy and the Town's limited water availability, the wastewater facility is currently operating at less than 30 percent capacity; the facility is available to service future wastewater demands. Existing limitations in water availability and the conveyance lines under the interstate may hinder development in the near future. As the Town secures additional water availability, upgrades to the conveyance system could easily be undertaken. Reflective of current water availability, the Town is positioned to dedicate up to 18,000 gpd of water to development on the east side of 1-81. This available water resource could facilitate an initial expansion of the commercial land uses to include a hotel, expanded gasoline service station/convenience center, and a restaurant. Any additional commercial uses would certainly warrant additional water resources. Development of the technology park land uses will be limited until additional water resources are identified and available. Technology uses that require limited water resources would certainly be more desirable initially, until the expanded water supply has been secured and accessible. Page 3 COUNTY of FREDERICK Department of Planning and Development 540/665-5651 FAY: 540/665-6395 MEMORANDUM TO: Frederick County Planning Commission FROM: Eric R. Lawrence, AICP, Planning Director�ivV SUBJECT: 2011 Planning Commission Retreat Summary DATE: February 15, 2011 Thank you for participating in the 2011 Planning Commission Retreat on February 12, 2011 at the Frederick County Public Safety Building. It was certainly a productive day of strategic resource planning and interaction, and staff appreciates your participation. As a follow-up to the day, staff has created a summary of the topics and associated discussions, which includes the identified major planning projects for 2011 (see the attachment) In reviewing the day's discussions, as well as input staff has received since the day of the Retreat, the Planning staff is prepared to move forward on the following identified projects during the next year (the complete list of pending projects in attached): 2011 Planning Projects a Eastern Frederick Area Plan C Finalize TND Traditional Neighborhood Design ordinance to implement the Urban Center concepts from the UDA Study E Develop LEED, Wind Energy, and MED Cottage standards 0 Further the planning, design, right-of-way acquisition, and construction of Route 37 Access Management Plan/Policy Attachment: 2011 Retreat Summary ERL/bad 07 North Kent Street, Suite 202 4 Winchester, Virginia 22601-5000 2011 Frederick County Planning Commission Annual Retreat Meeting Summary Notes Public Safety Building Winchester, VA Saturday, February 12, 2011 Meeting Attendees: Board of Supervisors Present: Gene E. Fisher, Shawnee District; Charles S. DeHaven, Jr., Stonewall District; Christopher Collins, Red Bud District; Gary Lofton, Back Creek District; and Bill Ewing, Opequon District Planning Commissioners Present: June Wilmot, Chairman, Member at Large; Roger L. Thomas, Vice Chairman, Opequon District; Greg Unger, Back Creek District; Kevin Crosen, Back Creek District; Brian Madagan, Opequon District; Christopher Mohn, Red Bud District; Lawrence R. Ambrogi, Shawnee District; H. Paige Manual, Shawnee District; Gary R. Oates, Stonewall District; Stan Crockett, Stonewall District; and George Kriz, Gainesboro District County Administration Present: Kris Tierney, Assistant County Administrator Other Guests/Attendees: Patrick Barker, Executive Director of Economic Development Commission and Ellen Murphy, Commissioner of the Revenue Planning Staff Present: Eric Lawrence, Director; Mike Ruddy, Deputy Director -Land Use; John Bishop, Deputy Director -Transportation; Candice Perkins, Senior Planner; Mark Cheran, Zoning Administrator; Dana Johnston, Zoning Inspector Fiscal Balance through Land Use Planning Overview: The County has successfully utilized the Comprehensive Policy Plan to designate areas of the County for future commercial and industrial land use opportunities since 1970. This practice also helps reserve designated land for vital tax -generating land uses. These goals are achieved by simply creating a real estate tax assessment ratio of 25% commercial and industrial to 75% for other land uses, such as residential. The County currently contains 4,556 acres of developed commercial and industrial uses, approximately 13% of the County's real estate assessment for 2010. To achieve the 25% assessment target, an additional 2,761 developed acres of commercial and industrial land uses are needed. The land use designation contained within the 2030 Comprehensive Policy Plan accommodates the goal of providing 25% commercial and industrial land uses to 75% for other land uses. Representatives of the Planning Department and the Economic Development Commission presented an overview of the importance of planning for future commercial and industrial land uses. Primary focus on planning for future C&I uses starts with consistent comprehensive plan enforcement. Market for C&I lands, specifically for manufacturing/industrial uses, remains strong when reviewing past inquires both locally and across Virginia. However the area's competitive nature is hindered as Frederick County boasts significantly higher asking prices for industrial land and a shortage of ample inventory compared to what is found in competing localities nearby and across the State. Maintaining an ample quantity of commercial and industrial lands should remain an important goal for the short term and long term needs. Significant and likely immediate focus should occur on those large land bays of high quality for industrial use as just a few remain. To that end, the past system employed by Frederick County to create commercial and industrial lands is arguably broken. The new system should likely include an enhanced public role, like assistance with rezoning and creative financing alternatives like installment purchase agreements. Once the commercial and industrial use is constructed, the realized are benefits for the community. Discussion Issues and Concerns: Projects are challenged due to factors such as land prices. Kriz — The traditional process is broken. If anything could be changed, would it be the Installment Purchase Agreement? ® Barker — The installment purchase agreement could be a long term solution. • Kriz — What could be done long term? We can't influence land prices. o Barker — We need both short and long term solutions. We need to stick to the Comp Plan as well as working with citizens. Infrastructure bonding, etc.; we need property that is ready to go. Wilmot — What causes prices to be so low in other areas? We can figure out if we are competitive with other areas and look at what else we can do. We need incentives for land owners to keep property for future C/I uses. Why can't people keep their property in land use taxation once they rezone but haven't yet developed? We need more ready- to - go sites on the EDC list. • DeHaven — Very pleased with the discussion, but we have been having the same discussion for years and it never makes it to a productive use. He hopes that we have the 2 will to make steps forward. We have a limited amount of land and how do you finance preserving sites for future use. There are consequences if you don't preserve that land. * Fisher/DeHaven — There are areas that have issues with redundancy. Collins — Could we offer incentives to help if the user would be great for the community? ® Barker — We could look at the benefit of the users and would also need to work with the cooperatives. A Lofton — Is it worth our while to look at uses other than manufacturing? Barker — Office use is the next step, but we would have to compete with Northern Virginia. Wilmot — The value of the land is not important to Frederick County, it is the other additional taxes received. How many acres do we need to get to the 25% assessment value from C/I uses? ® DeHaven — We have looked at 40% instead of 25% in the past years. We have lost ground over the years and we need to follow through with this. We need to proactively follow up on this and get serious. Wilmot — We need to re-evaluate this every five years. Conclusions: In an effort to reinforce a sound policy basis that balances land use planning and fiscal policies, the ratio of 25/75 between C/I and other land uses, in terms of available land areas and taxable value of the land uses, shall be the established benchmark. This policy shall dictate that at least 25 percent of the taxable land value (land plus improvement value) in the County should contain C/I land uses, and conversely that no more than 75 percent of the taxable land area should be for uses other than C/I land. By achieving this policy goal, the County will ensure that taxable land values equate to the projected expenditures. EDC should continue to promote programs that prepare and market industrial lands for targeted industries. The 2030 Comprehensive Plan "The Plan" Overview: Throughout 2010, staff, the CPPC, and the Planning Commission have been working with a large group of community partners and stakeholders to draft "The Plan." Public input has been excellent and the draft 2030 Comprehensive Plan has been compiled. The purpose of "The Plan" is to comprehensively address the future of Frederick County for citizens, underscore building upon the history, and further the great community which exists in 2010. Implementing "The Plan" is of the highest importance. The chapters that make up "The Plan" have been structured to provide a clear focus for the future; where Frederick County wants to be in 2030. The eight chapters are listed as follows: Urban Areas, Rural Areas, Residential Development, Business Development, Transportation, Public Facilities, Natural Resources, and Historical Resources. "The Plan" also contains two appendixes. Appendix I will be the primary implementation tool and will be instrumental to the future planning efforts of the County. The included Area Plans are: Northeast Frederick; Route 277 Triangle; Round Hill; Western Jubal Early; Tasker Woods; Southern Frederick; Route 37 West; Stephens City; Route I I South Corridor; Route 7; and Route 50 East Corridor. Appendix II consists of background, analysis, and supporting studies such as 3 Historical Background, Geographical Impacts, Demographic Analysis, Economic Analysis, and Land Use Analysis. Discussion Issues and Concerns: • Mohn — We need to be aware of the impact our actions have on the cost of housing and need to be aware that what we require will impact the market. • Wilmot — Not quite getting to the issue of preserving sites in the office/industrial section. We need ideas on how we can achieve what we want within that section. • Kriz — In the public facilities section, each group states they need their own master plan. This needs to be revised; we have been encouraging them to work together more. This section has been cut to bare bones and everything was cut out — now you just get references to each department's plan. • Wilmot — We have a commitment to create a guide to assist the Board of Supervisors with their decision making. Conclusions: There are many tools in place for future planning in The Frederick County's 2030 Comprehensive Policy Plan. A special thanks to the CPPC, Planning Commission, and stakeholders for helping provide knowledge in creating a great tool for future land use planning. There are hopes of the Board of Supervisors adopting this plan in April 2011. 2011 Work ProEram Priorities Overview: Throughout the 2010 calendar year, the Board, Commission, and Planning Staff have expressed interest in various projects that would further the planning program, as well as assist in their decision-making process. These projects, while not necessarily significant endeavors, may still have a significant impact on our community. Projects include long range planning projects, current planning projects, ongoing ordinance projects, transportation projects and administrative projects. Lon1z RanlZe Planning Proiects Overview: Planning Staff provided a brief overview of the three long range planning projects: the Eastern Frederick Area Plan, the development of Rural Community Center Area Plans and the implementation of Affordable/Workforce Housing Initiatives. Current Planning Projects Overview: Planning Staff presented a list of 13 potential current planning projects. These projects included: revisions to Chapters 165 and 144, LEED Standards, Affordable Housing, Wind Energy V Ordinances, revisions to the RP District, RCC and Round Hill ordinances, MED Cottage additions, tractor trailer parking, HOA requirements, commercial corridor standards, business/industrial district evaluation, proportional site improvement standards and OM District Revisions. Discussion Issues and Concerns: The group briefly discussed the proposal to create a Wind Farm/Small Wind Energy Ordinance for the County. Some questioned whether the County wanted these in the skyline and others stated that they would be necessary for the County to create its own energy (self -grown power). It was stated that wind energy is a big issue and that it definitely needs to be looked at. It was commented that Staff should look at fast tracking proposed ordinance amendments that pertain to low impact design techniques so that projects are not stalled waiting for the outcome of the amendment. Ongoing Ordinance Projects Overview: Planning Staff presented a list of four projects that have either been reviewed in the past or are currently under review. The four projects are: the TND District development, revisions to the sign ordinance, revisions to the landscaping and buffering requirements and development of a district for the Commercial Recreation land use. Staff stated that getting the TND District reviewed and adopted was the top priority. Transportation Planning Projects Overview: Planning Staff provided a brief overview of the transportation planning projects: Route 37, Access Management Plan/Policy, site design for traffic flow, facility maintenance flow, data gathering and maintenance efforts, and construction project management. Staff stated that construction project management is becoming a larger part of the County's duties and that staff will need to become more skillful with this task. 5