HomeMy WebLinkAbout04-17 CommentsREQjTE,ST FOR SUBDWISION PLAN COMMENTS
Frederick Couni), Pu
blic Works Comment
.Mail it):
Frederick County Public 'N'orks, Dqwtuscia
Attn: Coulli), Higincer
107 North Kent 'Strc-t,
Winchesicr, Wirt inirt 2.2601
HEind deliver 11-0:
Public Works Department
107 North Kent Street, ""J
Winchester, Virginia 226 )0 1
Phone: ('5401) 065--504-1
4PPUSPIt. It is VOW rC5P47)0SiN11P',' 10 i�011 th�:
IInIn X5 ZIUMMMIN' iS
Applicaars Njjnje:
Mailing Addr,ss: 15 ! Wr-dt-I 141H Lane '
VirwAC*Wi, VA 126U2
Nanic audcir dcwripfion oftherquest:
S,-jtem
Location of Property:
South of Stephens City, east side ci"Towr Rur, Lane (R.Juta IC 1,^;
Public Works Department Comwenti:
We 2 f4,,— ko Co
ve c�
jUL
-FREDERICK COUNTY PUDLIC WORS DE'PAP.1'MV.N'r t-,'sF oNi,,t,-
Date Received Review Number 1 2 3 4 5 (circle one)
Date Re%wiewcd
Re,vicion Rc.quircd Date Appro-ved
4, -4
Plemse Return i�Orm to Applicant**
Bettie Lamberson
From: Eric Gottshall
Sent: Tuesday, August 01, 2017 9:55 AM
To: Bettie Lamberson
Subject: FW: Southern Hills Phase II
Below is approval from Parks and Rec.
Will Planning except this as approval without the comment sheet? May want to send one?
Please update tracker and save email.
Thank you,
Eric
From: Jonathan Turkel [mailto:jturkel@fcva.us]
Sent: Tuesday, August 01, 2017 9:53 AM
To: Eric Gottshall <egottshall@greenwayeng.com>
Cc: Front Desk <FrontDesk@greenwayeng.com>
Subject: RE: Southern Hills Phase II
Good morning Eric,
The revised plans, dated 7/26/17, satisfactorily show the community access to the common open space. I didn't receive
a comment form, but wanted to get you something so you could move forward.
Please let me know if you have any questions,
Thanks,
Jon
From: Jonathan Turkel
Sent: Wednesday, July 26, 2017 8:34 AM
To: 'frontdesk@greenwayeng.com'
Subject: Southern Hills Phase II
Hello Betty,
I don't know why you didn't get this back from us. This is from our archived files, I hope this is what you needed. Please
let me know if there is anything else.
Thanks,
Jon
Jon Turkel
Park and Stewardship Planner
Frederick County Parks and Recreation
107 N. Kent St.
Winchester, VA 22601
iturkelC@fcva.us
0:(540)722-8300
F: (540) 665-9687
Bettie Lamberson
From:
Eric Gottshall
Sent:
Tuesday, August 15, 2017 1:07 PM
To:
Front Desk
Subject:
FW: SDP - Southern Hills Phase 2
Attachments:
SF&R Konica 17081513110.pdf
Please file the attached approval and update the project tracker accordingly.
Thank you,
Eric Gottshall
From: Barbara Johnson [mailto:bjohnson@fcva.usj
Sent: Tuesday, August 15, 2017 1:04 PM
To: Eric Gottshall <egottshall@greenwayeng.com>
Subject: SDP - Southern Hills Phase 2
Regarding the Subdivision Design Plan that was submitted for Southern Hills — Phase 2 on Town Run Lane in Frederick
County, VA please find attached the Fire Marshal's Office Plan Review and Comment Sheet(s).
If you should have any questions please call our office at the number listed below.
Barbara Johnson, Secretary
Frederick County Fire & Rescue
Life Safety Division/Office of the Fire Marshal
1080 Coverstone Drive
Winchester, VA 22602
(540) 665-6350
FAX (540) 678-4739
A'rederick Coun47
Department o f' wire and Rescue
-Office of the _Fire Marshal
1080 C oversione Drive H ir,chesrer, IA 22602
540)665-6350 Fax: (540) 6; 8-4739 Enrail: f no(a1 fc va. us
Flan Review & Comments
Date Received
7/28/2017
Plan/Permit Type Subdivision Design Plan Resubmittal 07-28-17
Name Southern Hills - Phase 2
Address Town Run Ltd Stephens City
Project Name Subdivision Design Plan
Applicant Name & Number Greenway Engineering 540-662-4185
RE##
Permit Number
Emergency Vehicle Access:
Aderq a e Inadequate
N/A
Hydrant Location:
Ad /ate Inadequate
N/A
Siamese Location:
Adequate Inadequate
>A
Fire Lanes Required:
Yes No
N,A'
Plan Approval Status
A oDrpVP
Comments
1,
� r
Signature:
Reviewed By: )& neth Scott, Jr.
Date Reviewed
8/14/2017
VA 22655
(j.v Hii! ik ar.0
'A 22602
N(; i N 1- F!? I
July 25, 2017
Frederick County Fire Marshal
1800 Coverstone Drive
Winchester, VA 22602
Attn: Kenneth Scott, Jr.
Re: Southern Hills — Phase 11
Comment Response titter
Dear Mr. Scott:
We are in receipt of the Fire Marshal's comments dated April 24. 2017, and offer the following responses:
Review Comments
("it rnant 1,
-M.—... —
Cul-de-sac does not ineet h'redei-ick County Fire Prevention Code Appendix 1).
Response: The cul-de-sac is revised per Frederick County Fire prevention Code Appendix D.
Thank you for your assistance with this prqject. Contact us with any questions or need for additional
information,
Sincerely,
Greenway Engineering, Inc.
0�
Eric (3tottshall
Enclosures
F 4 4 V t C I i I
I-& RMoll.61"I'l
REQUEST FOR SUBDIVISION PLAN COMMENTS
F cede ek County Inspections
Department Comment~
maii to:
Frederick County Inspections Department
Attn: Building Official
107 North Dent Street,
Winchester, Virginia 22601
Land deliver to.
Frederick County Inspections Dept.
107 North Dent Street, 2nd Floor
Winchester, Virginia 22601
Phone: (540) 565-5550
Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the
agepcy with their review P'1 a+ hoe 1 c o iclin D '' " d'A-- � � u
�.es� as,e�t, 99
�- �`r.�«e'L i ,xei � + , - r' .�.. ,. Ml , .. ,��. � �s",ie:, _. Y'f •�. ., _. ir'd` .[rTM6A+it.ts ,. �.. �.:e�c!Aa^. s i. _ _.ac, ..r ..-w ]
1'.,pplicant'S Name: Greenrmay Engineering, Inc.
10 ding Address: 151 Windy Hill Lane
Wnchester, VA 22802
Name of development and/or description of the request:
Southern Hills - Phase II
Location of Property:
South of Stephens City, east side of Town Run Lane (Route 1012)
T elej)honQ: .540-662-4185
Insp ptions Department Comments: 1
-FREDERICK COUNTY INSPECTIONS DEPAR 1iIENT USE OI+iLY-
Date Received 4/ / -7 Review Number 1 2 3 4 5 (circle one)
Date Reviewed 23 11-7
Revision Required N6 ate Approved 3-12--? -7
Signature & Date:
s
111
+ � j AUG 21 2017
APR 1 �, %Uj !�_. rA
Public rWO ks h Cagng4
& 1rtsE�i�y�N
GREENWAY
ENGINEERIN
Dwellings shall comply with The Virginia Uniform Statewide Building Code (USBC) and The
International Residential 2012 Codes.
Engineer Design required on all foundations and/or slabs with greater than 8" fill or 24" clean
sand/gravel. Lots 61 — 64, 80, 81, 83 & 89 indicate fill exceeding the 24" allowance under
basement slabs. All garage slabs in excess of allowed fill require an engineered design as well.
Backwater valves shall be installed on all plumbing fixtures, (subject to back sewer), located
below the lop elevation of the upstream man hole cover.
Lots with elevations in excess of 20' require engineering on slope stability.
Engineering on Storm water retention ponds and drains that are higher than lowest floor
elevations.
Grade shall be sloped away from foundations a min 6" in 10'.
SASite Plan comments120121Residential, South Hills phase2.doc
Bettie Larnberson
From: Eric Gottshall
Sent: Thursday, November 02, 2017 2:10 PM
To: Bettie Lamberson; Rayna Flythe
Cc: Randy Kepler
Subject: FW: Southern Hills Phase 2 Subdivision Plan - VDOT review
Please file this approval email from VDOT. I'm giving coversheets to Derek for owner signature. We need to compile the
submission package. Please gather all agency approvals. Also, Please submit a draft copy of the Subdivision PLAT to
Mark Cheran for review along with the Construction Bond Estimate.
I'm printing a set for Randy's signature now.
From: Rhodes, Timothy (VDOT) [mailto:Timothy.Rhodes@vdot.virginia.gov]
Sent: Thursday, November 02, 2017 11:03 AM
To: Eric Gottshall <egottshall@greenwayeng.com>
Cc: Randy Kepler <rkepler@greenwayeng.com>; Funkhouser, Rhonda (VDOT)
<Rhonda.Funkhouser@VDOT.Virginia.gov>; Smith, Matthew, P.E. (VDOT) <Matthew.Smith@vdot.virginia.gov>
Subject: RE: Southern Hills Phase 2 Subdivision Plan - VDOT review
Eric,
I have completed my review for the Southern Hills Phase 2 Subdivision. It appears all previous
comments have been addressed. Please submit three signed hard copies as well as one signed
electronic copy of the plans to this office for VDOT Approval.
Please let me know if you have any questions.
Thanks,
Timothy Rhodes
—Land Development Engineer
Clarke, Frederick, Shenandoah & Warren Counties
14031 Old Valley Pike
Edinburg, VA. 22824
(540)-984-5630
From: Eric Gottshall [ma iIto: egottshalI(cbgreenwaveng.com]
Sent: Wednesday, November 01, 2017 3:40 PM
To: Rhodes, Timothy (VDOT)
Subject: RE: Southern Hills Phase 2 Subdivision Plan - VDOT review
The update is much appreciated Tim.
Thanks for that, Eric
From: Rhodes, Timothy (VDOT) [mailto:Timothy.Rhodes(@vdot.virginia gov]
Sent: Wednesday, November 01, 2017 2:06 PM
To: Eric Gottshall <egottshall(@greenwayeng.com>
Subject: RE: Southern Hills Phase 2 Subdivision Plan - VDOT review
Eric,
I hope to have everything wrapped up by weeks end.
Timothy Rhodes
Land Development Engineer
Clarke, Frederick, Shenandoah & Warren Counties
14031 Old Valley Pike
Edinburg, VA. 22824
(540)-984-5630
From: Eric Gottshall [ma iIto: egottshal1ggreenwayena com]
Sent: Wednesday, November 01, 2017 8:29 AM
To: Rhodes, Timothy (VDOT)
Subject: RE: Southern Hills Phase 2 Subdivision Plan - VDOT review
Good Morning Tim,
I hate bugging you for status updates. I've put off the clients' inquiries several times now. VDOT approval is the last one
we need, so I'm catching heat.
Any word I could pass along would be helpful.
Thanks for your time,
Eric Gottshall
From: Rhodes, Timothy (VDOT) [mailto:Timothy.Rhodes vdot.vireinia gov]
Sent: Thursday, October 19, 2017 10:33 AM
To: Eric Gottshall <egottshallC@Rreenwayeng.com>
Subject: RE: Southern Hills Phase 2 Subdivision Plan - VDOT review
Eric,
The plans were received in this office on the 13th of this month
my review yet. I hope to get to them next week.
Thanks,
Timothy Rhodes
—Land Development Engineer
Clarke, Frederick, Shenandoah & Warren Counties
14031 Old Valley Pike
Edinburg, VA. 22824
(540)-984-5630
From: Eric Gottshall[ma iIto: eaottshaIICabareenwayena com]
Sent: Thursday, October 19, 2017 10:13 AM
To: Rhodes, Timothy (VDOT)
Cc: Randy Kepler
Subject: Southern Hills Phase 2 Subdivision Plan - VDOT review
Good Morning Tim,
I have not had the opportunity to start
The client has asked that I follow up with FW and VDOT on the revised plan submissions.
Do you have an idea, when the plan may be returned? I'll update Van Metre accordingly.
Thanks for the help,
Eric Gottshall
151 Windy Hill Lane
Winchester, VA 22602
Phone: 540.662.4185
Coli: 540.931.7796
Fax: 540.722.9528
Web: www.GreenwayEng.com
Finair egottshall@greenwayeng.com
EItiC: 7NEER IN G
3
Bettie i_amberson
From: Wayne Lee <leew@fcpskl2.net>
Sent: Thursday, July 27, 2017 10:20 AM
To: Bettie Lamberson
Subject: Fwd: Southern Hills Phase II
FYI
---------- Forwarded message ----------
From: Wayne lee <leew@fcpsk12.net>
Date: Thu, Jul 27, 2017 at 10:17 AM
Subject: Fwd: Southern Hills Phase II
To: blamberson@greewayene.com
I�
---------- Forwarded message ----------
From: Wayne Lee <leew@fcpskl2.net>
Date: Thu, May 11, 2017 at 4:42 PM
Subject: Fwd: Southern Hills Phase II
To: Al Orndorff <orndorfa@fcpskl2.net>, David Sovine <Sovined@fcpskl2.net>, John Grubbs <Grubbs'@fcpskl2.net>,
Beth Brown <BrownEL@fcpskl2.net>
FYI
---------- Forwarded message ----------
From: Wayne Lee <leew@fcpskl2.net>
Date: Thu, May 11, 2017 at 4:36 PM
Subject: Southern Hills Phase II
To: Evan Wyatt <ewyatt@greenwaveng.com>
Evan,
Good afternoon.
Please forward this on to Eric Gotshall; I don't have his email address.
Frederick County Public Schools has reviewed the
Southern Hills Phase II
site plan application submitted to us on
April 19, 2017
. We offer
no
comment
S.
Thank you for the opportunity to comment.
Wayne
Kenneth Wayne Lee, Jr., ALEP, LEED AP
Coordinator of Planning and Development
Frederick County Public Schools
1415 Amherst Street
P. 0. Box 3508
Winchester, VA 22604-2546
teew@fcpskl 2. net
(office) 540-662-3889 x88249
(cell) 540-333-2941
CONFIDENTIALITY NOTICE: This email message and any attachments are for the sole use of the intended
recipient and may contain confidential or privileged information, Any unauthorized review, use, disclosure or
distribution is prohibited and may be a violation of law. If you are not the intended recipient or a person
responsible for delivering this message to an intended recipient, please contact the sender by reply email and
destroy all copies of the original message. All communications may also be subject to Virginia's Freedom of
Informa6wi Act
Bettie Lamberson
From: Robin Cummings <rcumming@fcva.us>
Sent: Tuesday, July 25, 2017 10:17 AM
To: Bettie Lamberson
Subject: Frederick County GIS Comments for Southern Hills Ph 2
Attachments: South ern_Hills-PHII_REVII_comments.pdf
Hi Bettie,
The comments we provided back for Southern Hills Phase 2 are attached. It looks like I only sent a hard copy in the mail
(out standard practice, unfortunately), so that's probably why no one could locate an electronic copy.
Let me know if there's anything else you need!
Robin Cummings
GIS Technician Information Technologies —GIS Frederick County, VA 107 N Kent Street, Winchester, VA 22601 (540) 665-5614
RE, QUEST FOR SUBRI IISIOiv PLAN COM-1,41ENTS
Request for Street: ?dame Comment
a
m.
Frederick County
Information Technologies, CIS Division
Attn: GIS Manager
107 North Kent Street,
Winchester, Virginia 22601
Hand debt__ 'vim
Frederick County
Information Technologies, GIS Division
107 North Kent Street, I" Floor
Winchester, Virginia 22601
Phone: (540) 665-5614
Applicant It is your responsibility to complete this form as accurately as possible in order to assist the
agency with their review. >E'i a . .
j tach twa f2) ca�nle� o the S visao
�+ i 1Ji Desism
wrtl? t1 ' sli
Applicants Name: Greenway Engineering, Inc.
Mailing Address; 151 Wndy Hill Lane
Winchester, VA 22602
Name of development and/or description of the bequest:
Southern Hills - Phase it
Location of Property:
South of Stephens City, east side of Town Run Lane (Route 10 12)
GIS Manager Comments:
4r o` Cp✓vt �r.1'j' s
Telephone: 540-662-4185
Date Received
-GIS MANAGER Review Number USE ONLY -
Date
`l -1 �
Date Reviewed S--,3-/
1 d)3 4 5 (circle one)
Revisron Required Date Approved
Signature & Date: `'`" -
may 3^r
!'#ease Rein V FDrm to Ap lima t**
.. ..ve�.x m... A.,.. z ..... ..... ... A.. ..... .._ .,- ., ..,,,. . ,i. 2�.M...s4 ...5. .�....�u.._,-ia.�.,e._..0
17
N
INFORMATION TECHNOLOGIES
COUNTY OF FREDERICK, VIRGINIA
k�
W E
STREET NAME COMMENTS
SOUTHERN HILLS PHASE II
S DATE: May 3, 2017
SUBDIVISION: Southern Hills — Phase II
STAFF MEMBER: Robin Cummings, GIS Technician
APPLICANT: Greenway Engineering, Inc
151 Windy Hill Ln
Winchester, VA 22602
COMMENTS: The Frederick County Department of GIS has reviewed the requested road
names for use by the subdivision and has made the following determinations:
1. The following road names have been APPROVED and/or ADDED into the Frederick
County Road Naming and Structure numbering system:
Westchester Dr (Extension)
Brandenbury Ct
Nathan Dr
Savannah Way
No other revisions are required at this time.
Frederick County Information Technologies, 107 North Kent Street, Winchester, VA 22601, (540)665-5614
6 FREDERICK FREDERICK WATER
'
WATER SITE PLAN REVIEW COMMENTS
PO Box 1877, Winchester, VA 22604-8377
315 Tasker Road, Stephens City, VA 22655
Proj ect
X2 WAs9,
540.868.1061 voice
540.868.1429 fax
Applicant
REVIEW STATUS attention
review number b
correct & resubmit proved as note number of items to be corrected
approved au may submit just cover sheet and the revised sheets.
DRAWINGS
send me by
1. print of sheets
2, two CDs: each disc shall contain the following plan sheets
0 Oem IZ m iwmzu N -z& 14A 33
a) One CD (containing all of the above noted sheets) shall be in PDF format. Each sheet shall be in its
own file and be in landscape orientation. Each file shall be titled with the project name and appropriate
sheet number.
b) One CD (containing all of the above noted sheets) shall be in DWG format. Each sheet shall be in its
own file and each sheet shall be titled with the project name and with the appropriate sheet number.
Each sheet shall (1) be in landscape orientation, (2) be without border, (3) be in state plane coordinate
system NAD 83, and (4) be compatible with AutoCAD 2006.
C) Each of the two CDs shall be labeled with its format and project name, and placed in its own paper CD
envelope.
EASEMENTS
ONA copy of the recorded onsite FW easement(s) is/are required.
Y 0 A copy of the recorded offsite FW easement(s) is/are required.
o The easement document shall contain a plat and both shall be signed by the Frederick Water.
o The Frederick Water requires specific language in its deed of easement.
o Visit our website www,frederickwater.com to obtain a copy of the form.
o A copy of the recorded deed(s) of easement shall be received before service will be authorized.
OTHER
Y 9 This project also requires DEQ - Valley Region Office approval.
YN9 This project also requires VDH — Lexington Field Office approval.
(9/ N This project also requires VDH — Lexington Field Office — Project Summary Report. BY DATE FOR
DRAWINGS ABOVE, see VDH website for form
Y(9 This project has a sewer pump station that FW will own. Title to the pump station site shall be granted
to the Frederick Water in fee simple absolute. Also, (1) a copy of DEQ's Certificate to Construct, (2) a
copy of DEQ's Certificate to Operate, and (3) two copies of the FW approved O & M manual are
required. These documents must be received before service will be authorized. (4) Work cannot
commence that would connect to FW facilities or require FW inspections until the contract is returned
ce.
t this offiDate: Q2
�,/,
L�^
Earl W. Wiley — Engineering Assistant St',1' 2017
0
LOCAL FLOW AND DISCHARGE PRESSURE - 5',.
INDICATOR AND TRANSMITTER
,
3"0 ALUMINUM MOUNTING PEDESTAL
EMBED IN 2 CU FT OF CONCRETE
48" LOCKING ALUMINUM
CAST IN ACCESS HATCH
AS MANUFACTURED BY HALLIDAY
— -- 3" MIN.
-— TOP @ 749.0
PRESSURE GAGE.
0 - 50 PSI, 4" FACE
MOUNT WITH TAPPING
SADDLE AND
CORPORATION STOP,
THREADED DIAPHRAGM
SEAL
SIEMENS SITRANS P
SERIES DS III PRESSOR
TRANSMITTER
8" SOLID MASONRY SUPPORT BLOCK -
4 MOUNT
SLAM I
UE
PUMPING STATION
SCALE 1"
mega flange shall be placed on
the existing pipe cl 52 dip
mj solid sleeve and min. 5'f x pe
cl 52 dip required on down stream
side of flowmeter
4" FLOW METER
MODEL SITRANS F M MAG 5100
-AS MANUFACTURED BY SIEMENS, O. A. E.
WITH SISTRANS F M MAG 6000 TRANSMITTER, O. A. E.
11.
-sl ten- •.
o
N
EBAA MEGAFLANGE -4
IDARD MH
4"0 MAGNETIC FLOW METER
OUTPUT TO LOCAL RECORDER/TOTALIZER
10" FLANGED
a CARBON STEEL WITH EPDXY COATING HASTELLOY ELECTRODES
BUILT IN GROUNDING ELECTRODES
EBONITE HARD RUBBER LINER
SUITABLE FOR CONSTANT FLOODING
ACCESSORIES TO INCLUDE
FLOW TRANSMITTER (0.4% OF FLOW RATE)
PROGRAMMABLE LOCAL INDICATOR AND TOTALIZER
REMOTE DIGITAL RECORDER
30 X 30
LOCKING ALUMINUM
WASTEWATER FLOW METER DETAIL