HomeMy WebLinkAbout03-17 ApplicationSUBDIVISION APPLICATION
FREDERICK COUNTY, VIRGINIA
- Office Use OnI -
Date: Ll I' `' r Application #: t MDP: ,,,.eves no
If no, has the NIDP requirement been waived by the Planning Director': yes no
If the MDP has been waived, fill in the following public meeting dates for the final plats:
PC Meeting Date _ BOS Meeting Date`
1. Applicant:
Telephone:
Name:
Greenway Engineering, Inc. 540-662-4185
Address: 151 Windy Hill Lane
Winchester, VA 22602
?. Property Owner (if different than above)
Name:
Brookfield Stephenson Village, LLC Telephone: 571-581-4791
Address: 3201 Jermantown Road, Suite 150
Fairfax, VA 22030
3. Please list names of all owners, principals, and/or majority stockholders:
James T. Devine - VP
4. Contact person if other than above
Name:
Kurt Pennington, Greenway Engineering, Inc. 'Telephone: 540-662-4185
_
5. Name of Proposed Subdivision:
Snowden Bridge, Sections 11 & 12 Subdivision
6. Number of Lots:
7. Total Acreage: 38.9
8. Property Location:
Off Old Charles Town Road (VA Route 761) -turn onto Snowden Bridge Blvd
(Give State Route # and name, distance and direction from intersection)
0
9.
10.
Magisterial District: Stonewall
Property Identification Number (PAX): 44-A-293 and 44 -A -292A
(Parent Tract)
Property zoning and present use: R4 Residential -Vacant
12. Adjoining property zoning and use:
USE ZONING
]north Residential RA
East Residential R4
South Vacant R4
West Vacant R4
13. Has a Master Development Plan been submitted for this project? Yes ONO
1.4. If yes, has the final MDP been approved by the Board of Supervisors? IIYes nNo
15. What was the Master Development Plan title? Snowden Bridge
16. Does the plat contain any changes from the approved MDP? laYes No
17. If yes, specify what changes:
18. Minimum Lot Size (smallest lot): SF - 3750sf (6597sf), TH - 1700sf (1920sf)
19. Number and types of housing units in this development: Modified Single Family Small Lot (Type 5) - 35
Modified Townhouse (Type 6) - 74
I have read the material included in this package and understand what is required by the
Frederick County Planning Department. I also understand that all required material will b;
complete prior to the submission of my site plan.
Signature:
Date:
10