Loading...
HomeMy WebLinkAbout02-18 Impact Analysis Statement151 Windy Hili Lane Winchester, VA 22502 ENGINEERING July 20, 2018 Frederick County Planning Department Attn: Mike Ruddy, Director 107 North Kent Street Winchester, VA 22601 RE: St. Paul's on the Hill Land Use Conditional Zoning Amendment Information Dear Mike: As discussed, St. Paul's on the Hill has agreed to file a Conditional Zoning Amendment specific to Tax Map Parcel 54-A-128 that limits the development of the property to a Church and Elderly Housing land use. The information in this letter is intended to provide projected impacts for this land use development compared to the by -right land use development that can be accomplished through the Site Plan process. Please note the following: Transportation The following table provides a comparison of the traffic generation rates specific to the maximum elderly multifamily housing units and the maximum townhouse units that could be developed by - right. The values used from this comparison were obtained from the Institute of Traffic Engineers (ITE) Trip Generation Manual, 9`h Edition, which is the source currently utilized by VDOT and Frederick County for transportation impact analysis. Weekday Average Daily Traffic Volume Comparison Land Use ITE ADT Rate Unit Numbers Totals Single -Family Attached (Townhouse) 210 9.52 49 467 ADT Senior Adult Housing Attached 252 3.44 98 337 ADT Project#6387W Engincers Surveyors Planners l[nvironme-ma! Scientists Laboratory Telephone 540-662-41&S Fax 540-722-9528 www.greenwayimg.com 7-20-18 Weekday AM Peak Hour Traffic Volume Comparison Land Use ITE AM Peak I Unit Numbers I Totals Hour Rate Single -Family Attached (Townhouse) 210 0.77 49 38 Peak Hour Trips Senior Adult Housing Attached 252 0.39 38 27 Peak Hour Trips Weekday PM Peak Hour Traffic `volume Comparison Land Use ITE PM Peak Unit Numbers Totals Hour Rate Single -Family Attached (Townhouse) 210 1.0 49 49 Peak Hour Trips Senior Adult Housing Attached 252 0.35 98 34 Peak Hour Trips The above tables demonstrate that the development of the maximum number of elderly multifamily housing units results in reduced impacts to transportation compared to the development of the maximum townhouse units that are permitted by -right. The subject parcel has approximately 250' of frontage along Senseny Road (Route 657) and is currently served by a single entrance. The proposed development project is intended to be served by the same entrance; therefore, there will not be additional points of access onto Senseny Road. Water and Sewer Capacities The 4.97± acre subject parcel is located within the Urban Development Area (UDA) and the Sewer and Water Service Area (SWSA). Greenway Engineering has analyzed the water and sewer capacity requirements for the proposed mixed-use church and elderly housing project assuming a projected volume of 750 gallons per acre. This projection results in an average daily demand of 3,750 GPD, which can be accommodated by the community's water and sewer capacities. Project #6387W 2 7-20-18 Public Schools The proposed mixed-use church and elderly housing project will provide affordable housing options for seniors within the community that will not create an impact to Frederick County Public Schools. The 49 townhouses that could be developed by -right would generate 14 students on average based on the students/household calculation utilized by the Frederick County Public Schools Planning Division. Therefore, the proposed mixed-use development project would be a beneficial land use to the County compared to the by -right land use allowance specific to Public School Services. Fire and Rescue The proposed mixed-use church and elderly housing project will create an impact to Fire and Rescue Services provided by the County. The multifamily residential structure will have a sprinkler system throughout the facility that will assist with fire suppression. The multifamily residential structure will have elevator access for all occupied floors that will assist with ambulatory service needs. These design considerations are intended to assist in the mitigation of impacts to emergency services specific to the proposed land use, which would not be required for the by -right residential development. The subject parcel is located approximately 0.85 miles from the Greenwood Volunteer Fire and Rescue Company, which allows for appropriate emergency response time from the first due company. Additionally, a few years ago, the County Volunteer Fire and Rescue Companies agreed to establish a fee -for -services program that was intended to provide revenue recovery for ambulatory services from insurance reimbursements to assist in the mitigation of this impact. Parks and Recreation The proposed mixed-use church and elderly housing project will provide affordable housing options for seniors within the community that will not create an impact to Frederick County Parks and Recreation Services provided by the County. Operations specific to the proposed project include an on-site manager that is responsible for providing activities that promote socialization, health and wellness activities within the facility. Please advise me if you need any additional information regarding projected impacts specific to the proposed mixed-use church and elderly housing project. Sincerely, Evan Watt, Dire for of Land Planning Greenway Engineering, Inc. Cc: Bob Lovan, St. Paul's on the Hill Rosa Estrada, Wesley Housing Development Corporation Project #6387W 3 7-20-18