Loading...
HomeMy WebLinkAbout37-18 CommentsREQUEST FOR SITE PLAN COMMENT'S I Frederick Water Comment � Mail to: Hanel deliver to: Frederick Water Frederick Water Attn: Engineer 315 'Tasker Road P.O. Box 1877 Stephens City, Virginia 22655 Winchester, Virginia 22604 Phone: (540) 868-1061 Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their ti review. Please attach two (2) copies of the Site Plan with this sheet. Applicants Name: James L. Hinze/Zion Church Builders, Inc. Telephone: 269-544-7211 Email Address: zionchurchbuilders@gmail.com Mailing Address: Po Box 218 Mattawan, MI 49071 Name of development and description of the request: Cornerstone United Pentecostal Church building addition Location of Property: 189 Parson Court Winchester, VA 22603 Frederick Water: � ���✓, � �� I y --I—I 1 ulV- JWJ7`( y- Vuw.> GW1 d Carn DERICK WATER AUTHORITY USE ONLY - Date Received Review Number 1 2 3 4 5 (circle one) Date Reviewed Revision Required Date Approved Signature & Date: ** Please Return Form to Applicant" _= 34 REQUEST FOR SITE PLAN COMMENTS Virginia Department of Transportation Mail to: Virginia Department of Transportation Attn: Resident Engineer 14031 Old Valley Pike Edinburg, Virginia 22824 Phone: (540) 984-5600 Hand deliver to: Virginia Department of Transportation Attn: Resident Engineers sig 'ppp 2275 Northwestern Pike �1 Winchester, Virginia 22603 i Applicant: Please fill out the information as accurately as possible in order to assist the Virginia Department of "Transportation with their review. Please attach two (2) copies of the site plan with traffic generation data and drainage calculations with this sheet. Applicant's Name: James L. HinzelZion Church Buiklers, Inc. Email Address: zionchurchbuiilders@gmail.corr Mailing Address: tea Box tis Mattawan, MI 49o71 Name of development and description of the request: Cornerstone United Pentecostal Church building addition Telephone: 269-544.7211 Location of Property: 189 Parson Court - _�.. _ Winchester VA 22603 _ _ Vi ima De artment of Transportatio Comments: _. IteL ma -VDOT USE ONLY - Date Received Review Number 1 2 3 4 5 (circle one) Date Reviewed Revision Required -_-_- .--- - /'/1 Date Approved VDOT Signature & Date: ** MOW- Return Form to Applicant** 15 Kristen Simpson From: Rhonda Funkhouser <Rhonda.Funkhouser@vdot.virginia.gov> Sent: Friday, September 7, 2018 3:59 PM To: eric@lighthouseengineeringconsultants.com Cc: zionchurchbuilders@gmail.com;jbishop @fcva.us; Matthew Smith; Lloyd Ingram Subject: Cornerstone United Pentecostal Church Building Addition - VDOT Comments to Site Plan Attachments: Scanned from a Xerox Multifunction Printer.pdf DEPARTMENT OF TRANSPORTATION Staunton/Edinburg Land Development 14031 Old Valley Pike Edinburg, VA 22824 Mr. Hess, A VDOT review was conducted for the Cornerstone United Pentecostal Church Building Addition site plan with a seal date of August 13, 2018. Based on the review of the drawings, the existing entrance from Route 661 is adequate and acceptable to our office. Please ensure that all applicable agencies have the most recent set of approved drawings. We offer the following general comments: • Our review and comments are general in nature. Should details be overlooked during plan review or conditions in the field exist such that additional measures are warranted, such measures shall be completed to the satisfaction of the department. • Materials used and methods of construction shall adhere to the current observed VDOT Road and Bridge Specifications, Road and Bridge Standards, Manual on Uniform Traffic Control Devices, and Land Use Permit Special Provisions. • All drainage is to be carried within the right-of-way in ditch lines or gutters along the street to a pipe or drainage easement. e Any construction related changes to the approved plan must come through the design engineer to VDOT for approval. Please allow a minimum of 5 business days for VDOT review. • A Land Use Permit shall be obtained before any work is performed on the State's right-of-way. The permit is issued by this office and may require application fees, the salary & expenses of a State assigned inspector, and surety bond coverage. If you have any questions or need further information, please do not hesitate to contact me. Regards, Lloyd A. Ingram| Lana ' bpment Engineer Virginia Department oTanporta[o�n 2G we. .'rederick, enanft-h & WarrenCu:tnties i 31 Old l»y bke %bu3.V« 2 8 voice: gS 5612 wm%§ Lloyd. Ing @m9votammb.gv