Loading...
HomeMy WebLinkAbout33-18 Site PlanPlan Revisions Revision Revision Comment No Date 01 09/11/2018 Planning Comments 02 09/19/2018 Frederic* Water Comments 3 Boundary and Existing Topo 4 Overall Plan 5 E&S Phase I & D 6 E&S Narrative 7 E&S Details 8 Site Plan 02 09/19/2018 9 Existing Utility Plan 02 09/19/2018 10 Trail Sections 11 Trail Sections 12 Trail Sections 13 VDOT Details 14 VRRM Calculations 15 SWM Plan CALL "MISS UTILITY" VIRGINIA UTILITY PROTECTION SERVICE (VUPS) AT 811 OR 1-800-552-7001,48 HOURS PRIOR TO THE START OF WORK. EXCAVATORS MUST NOTIFY ALL PUBLIC UTILITY OPERATORS WHO MAINTAIN UNDERGROUND UTILITY LINES IN THE AREA OF PROPOSED EXCAVATING OR BLASTING AND HAVE THOSE FACILITIES LOCATED BY THE UTILITY COMPANIES PRIOR TO COMMENCING EXCAVATION. THE EXCAVATOR IS RESPONSIBLE FOR COMPLIANCE WITH ALL COUNTY REQUIREMENTS, VIRGINIA CODE AND REGULATIONS. UTILITY NOTICE REQUIRED Contractors shall notify all public utility operators who maintain underground utility lines In the area of proposed excavating or blasting at least two (2) working days, but not more than ten (10) working days, prior to commencement of excavation or demolition. Names and telephone numbers of the operators of underground utility lines appear below. These numbers shall also be used to some in an emergency condition. WaterlSewer: Frederick Water P.O. Box 1877 Winchester, VA. 22604 (540)868-1061 Power: Rappahannock Electric Coop 137 Kelly Court Front Royal, VA 22630 1-800-552-3904 Phone: Verizon P.O. Box 17398 Baltimore. MD 21297 (301)954-6282 Gas: Washington Gas Co. P.O. Box 2400 Winchester, VA 22604 (540)869-1111 SITE DEVELOPMENT PLAN SHAWNEE MAGISTERIAL DISTRICT FREDERICK COUNTY, VA SP#33-18 OWNER NAVY FEDERAL CREDIT UNION 820 FOLLIN LN. VIENNA, VA 22180 703-206-3405 VICINITY MAP SCALE: I"= 1000' I�1a97[1119a:4 NAVY FEDERAL CREDIT UNION 820 FOLLIN LN. VIENNA, VA 22180 703-206-3405 APPROVAL Sheet List Table Sheet Sheet Title Revsion Revison Number No Date 1 Cover Sheet 02 09/19/2018 2 General Notes and Legend 3 Boundary and Existing Topo 4 Overall Plan 5 E&S Phase I & D 6 E&S Narrative 7 E&S Details 8 Site Plan 02 09/19/2018 9 Existing Utility Plan 02 09/19/2018 10 Trail Sections 11 Trail Sections 12 Trail Sections 13 VDOT Details 14 VRRM Calculations 15 SWM Plan ZONING ADMINISTRATOR FREDERIC ATER RE NUMBER APPROVED APPROVED AS NOTED ;f COR CT &RESUBMIT r, i ITEMS TO CORRECT : 4 REVIEWER " �Vi - DATE - SITE PLAN VALID FOR (5) FIVE YEARS FROM DATE OF APPROVAL W LU W _ U) X W O U rte^ z V W J i W F - Ln> 0 J } az ix :) WO t% U Y LU W W a LU Uj Z IX 3LL a MNDY L, KEPLEF Lic. No. 32809 DATE: 07/2412018 SCALE: N/A DESIGNED BY: KAS/7TC DATE I FILE NO. 3015L SHEET 1 OF -15 fE:IIlk] GENERAL NOTES VDOT GENERAL NOTES PROJECT NOTES LEGEND 1. Greenway Engineering, Inc. (GE) issued this plan set based on project criteria dictated by the client and municipal codes. EXISTING INTERMEDIATE CONTOUR r w This plan set is not considered complete or appropriate for construction until ALL necessary agencies have given approval V1. All work on this project shall conform to the current editions of and latest revisions to the Virginia Department of EXISTING INDEX CONTOUR 0 Y AND this plan set is signed and sealed by a licensed professional. Any work, planning, scheduling, material purchases Transportation (VDOT) Road and Bridge Specifications and Standards, the Virginia Erosion and Sediment Control 400 c r u and/or construction prior to approvals and licensed/professional sealing will be performed at the risk of the personnel Regulations, and any other applicable state, federal or local regulations. In case of a discrepancy or conflict between the 1. This plan for construction of sidewalk and trails only. PROPOSED CONTOUR _ c H m authorizing work. GE shall be held harmless from and costs, time delay and/or material changes incurred on work started Standards or Specifications and Regulations, the most stringent shall govern. EXISTING EDGE OF PAVEMENT ----- - rn o w r before this plan set receives approvals and seals. 2. Methods and materials used in the construction of the improvements herein shall conform to current County Construction V2. All construction shall comply with the at U.S. Department of Labor, Occupational Safety and Health Administration (OSHA), and Virginia Occupational Safety &Health (NOSH) Rules and Regulations. PROPOSED EDGE OF PAVEMENT nr 3 v - o c '= Standards and Specifications and/or current VDOT Standards and Specifications. ----------- EXISTING CURB AND GUTTER ----------- 3 c 3. The Engineer shall not have control over or charge of and shall not be responsible for construction means, methods, V3. When working within VDOT right-of-way, all traffic control, whether permanent or temporary, shall be in accordance with PROPOSED CURB AND GUTTER u n LL techniques, sequences or procedures nor for safety precautions and programs in connection with work shown on these the current edition of VDOTs Work Area Protection Manual. A transportation management plan needs to be submitted c m plans. The Engineer is not responsible for the contractor's schedules or failure to carry out the work. The Engineer is not for approval and land use permit issued prior to any execution of work within the VDOT right of way. TRANSITION TO REVERSE CURB F responsible for acts of omissions of the contractor, subcontractor, or their agents or employees, or any other person V4 The developer shall be responsible for relocating, at his expense, any and all utilities, including traffic signal poles, EXISTING TELEPHONE LINE -T----T----T----T--- performing portions of the work. junction boxes, controllers, etc., owned by VDOT or private / public utility companies. It is the sole responsibility of the PROPOSED TELEPHONE LINE T T 4. The Contractor, Owner or Developer shall be responsible for securing any third parry inspection/testing service to insure developer to locate and identify utility facilities or items that may be in conflict with the proposed construction activity. EXISTING STORM SEWER WITH INLET construction compliance with these plans and specifications. It is Greenway Engineering's recommendation that a third VDOT approval of these plans does not indemnity the developer from this responsibility. party inspection/testing service be employed to ensure that project is completed and materials installed meet the details PROPOSED STORM SEWER WITH INLET and specifications in these plans. V5. Design features relating to field construction, regulations, and control or safety of traffic may be subject to change as deemed necessary by VDOT. Any additional expense incurred as a result of any field revision shall be the responsibility EXISTING SANITARY SEWER WITH MANHOLE--a----s---a--- 5. The location of existing utilities shown in these plans are taken from existing records. It shall be the contractors of the developer. responsibility to verify the exact horizontal and vertical location of all existing utilities as needed prior to construction. The PROPOSED SANITARY SEWER WITH MANHOLE contractor shall be responsible for the digging of all test holes that may be required, whether recommended or not by these to determine the exact location and elevation of existing utilities. If any conflicts arising from this existing utility V6. If required by the local VDOT Land Development Office, a pre -construction conference shall be arranged and held by the engineer and/or developer with the attendance of the contractor (s), various County agencies, utility companies and PROPOSED SAN. LAT. CLEANOUT s S z plans, ELECTRIC SERVICE--E----s----E----cease verification or if during the course of construction, any object of an unusual nature is encountered, the contractor shall 662-0185 the authority.Greenway VDOT prior to initiation of work.EXISTING ELECTRIC SERVICE E E Zcost work in that area and immediately notify Greenway Engineering at (540) and/or proper 0902 Engineering or any engineer associated with these plans shall not be responsible or liable for any construction that may be associated with the installation or reinstallation any utility or other improvements if not notified of anyundetermined V7. The contractor shall notify the local VDOT Land Development Office when work is to begin or cease for anyPROPOSED length of time. VDOT requires and shall receive 48 hours advance notice prior to any required or inspection. EXISTING GAS LINE--c----p----c----c--- 0 W Z discrepancies between actual field conditions and the approved plan. the developer, the or their agents of any legal responsibility requested that impacts PROPOSED GAS LINE D EXISTING WATERLINE WI TEE--m1-----F--- __TT W V' Z 6. The approval of these plans in noway relieve contractor, V8. The contractor shall notify the Traffic Operations Center at (540) 332-9500 for any traffic control plan a ix which may be required by the code of Virginia or any other ordinance enacted by the County nor does it guarantee the VDOT maintained Interstate or Primary roadway to provide notification of the installation and removal of the work zone. PROPOSED WATERLINE W/ TEE •�T• f A issuance of any required penult by the County, VDOT or any other Agency. �/ 7. An approved set of plans and all applicable permits must be available at the construction site at all times during V9. The contractor shall be responsible for maintaining a VDOT permitted temporary construction entrance(s) in accordance EXISTING FIRE HVDRANT/VALVEIMETER w" construction. A representative of the developer must be available at all times, with Section 3.02 of the Virginia Erosion and Sediment Control Handbook. Furthermore, access to other properties affected by this project shall be maintained through construction. PROPOSED FIRE HYDRANTNALVEIMETER 0) 8. Prior to the initiation of any land disturbing activities the Developer, the Contractor or the Responsible Land Disturber shall PROPOSED REDUCER •M obtain a Land Disturbance Permit from the County Engineer's office. The Contractor, Developer or his agent shall be V10. Contractor shall ensure adequate drainage is achieved and maintained on the site during and at the antl of responsible for obtaining a Virginia Stormwater Management Program (VSMP) Permit and shall be responsible for the construction. PROPERTY LINE registration of the construction site as required by law. They shall also be responsible for obtaining and maintaining on site EXISTING EASEMENT -- a Stormwater Pollution Prevention Plan (SWPPP). The approval of these plans in no way relieves the developer or his V11. All water and sewer lines within existing or proposed VDOT right-of-way shall have a minimum thirty-six (36) inches agent of the responsibilities contained in the Virginia Erosion and Sediment Control Handbook. cover and when possible shall be installed under roadway drainage facilities at conflict points.PROPOSED V12. Any unusual subsurface conditions (e.g., unsuitable soils, springs, sinkholes, voids, caves, etc.) encountered during the EASEMENT --- - 9. The Developer or his agent shall be responsible for obtaining any required permits from the Virginia Department of course of construction shall be immediately brought to the attention of the engineer and VDOT. Work shall cease in that PROPOSED CENTERLINE Environmental Quality (DEQ) or the United States Army Corp of Engineers for any plan wetland disturbance as shown on vicinity until an adequate design can be determined by the engineer and approved by VDOT. EXISTING CENTERLINE - - these plans. They shall also be responsible the identification and delineation of any wetlands that may be present on the construction site. V13. All fill areas, borrow material and undercut areas shall be inspected and approved by a VDOT representative prior to EXISTING TREE LINE - 10. The contractor shall provide adequate means of cleaning mud from trucks and/or other equipment prior to entering public placement of fill. A VDOT representative shall be present to insure the soil sample(s) obtained for CBR's is FLOW LINE •••- streets, and it is the contractors responsibility to clean streets, allay dust, and to take whatever measures are necessary to representative of the location. When soil samples are submitted to private laboratories for testing, the samples shall be insure that public streets are maintained in a clean, mud and dust free condition at all times. clearly identified and labeled as belonging to a project to be accepted by VDOT and that testing shall be performed in FENCELIKE -x -v x x -a - 11. A permit must be obtained from the Office of the Resident Engineer, Virginia Department of Transportation (VDOT) and accordance with all applicable VDOT standards and procedures. EXISTING UTILITY POLE/GUIDE WIRE j Frederick County prior to any construction activities within existing State right-of-way. V14. All roadway fill, base, subgrade material, and backfill in utility/storm sewer trenches shall be compacted in accordance EXISTING TELEPHONE PEDESTAL ❑ 12. The developer will be responsible for any damage to the existing streets and utilities which occurs as a result of his with the lift thicknesses, density and moisture requirements as specified in the current VDOT Road and Bridge construction project within or contiguous to the existing right-of-way. Specifications. Certified copies of test reports shall be submitted to VDOT daily, unless specified otherwise. SIGNS 13. Warning signs, markers, barricades or flagmen should be in accordance with the State and Federal Manual on Uniform PARKING INDICATOR Traffic Control Devices (MUTCD). "A V15. VDOT Standard CD and UD underdrains shall be installed where indicated on these plans and/or as specified byINDICATES VDOT. THE NUMBER OF TYP. PARKING SPACES 1 W 14. The exact location of all guardrails and paved ditches will be determined by VDOT personnel. joint inspection will be held with the Developer, County Representatives, and Representatives of the Virginia Department of Transportation V16. A post installation visuaUvideo camera inspection shall be Conducted by the Contractor on all pipes identified on the HANDICAP PARKING (VDOT) to determine if and where guard rail and/or paved ditches will be needed. The developer will be responsible for plans as storm Sewer pipe and a select number of pipe culverts. For pipe culverts, a minimum of one pipe installation for providing guardrail and paved ditches as determined by this joint inspection." Refer to Virginia Department of each size of each material type will be inspected or ten percent of the total amount for each size and material type VEHICLES PER DAY COUNT 100 Q Transportation (VDOT) Guard Rail and Paved Ditch Specifications. summarized. All pipe installations on the plans not identified as storm sewer pipe shall be considered as culvert pipe for 15. All unsuitable material Shall be removed from the construction limits of the site plan before placing embankment. inspection purposes. Additional testing may be required as directed by the Area Land Use Engineer or their PROPOSED BUILDING ENTRANCE 16. All pavement sections shown on these approved plans are based on a minimum CBR value of 6 and are for preliminary representative. ^ li ~ design only. Final pavement design shall be based upon actual field tested CBR values. The Contractor or Developer shall V17. The installation of any entrances and mailboxes within any dedicated street right-of-way shall meet VDOT minimum Z Ube responsible for field tests per VDOT standards to obtain actual CBR values for final design. Final pavement designs will res P to installation. design standards and is the responsibility of the developer. SANITARY MANHOLE IDENTIFIER 12 W J be approved by VDOT and/or the Owner/Developer, which ever applicable, prior V' Q 17. All springs shall be capped and piped to the nearest storm sewer manholes or curb inlet. The pipe shall be minimum 6" V18. Prior to VDOT acceptance of any streets, all required street signage and/or pavement markings shall be installed by the 6 r_ fn diameter and conform to VDOT standard SB -i, developer in accordance with the Manual On Uniform Traffic Control Devices. STORM DRAIN STRUCTURE IDENTIFIER Q -J 18. When grading is proposed within easements of utilities, letters of permission from all involved companies must be provided to the County Public Works Department prior to issuance of grading and/or site development permits. V19. The developer shall provide the VDOT Land Development Office with a list of all material sources prior to the start of P P P P EXISTING SPOT ELEVATION � J Z a 19. Notification shall be given to the appropriate utility company prior to construction of water and/or sanitary sewer lines. must be urovidetl to the construction. Copies a all invoices for materials utilized within any dedicated street l prices local VDOT Land Development Office prior to acceptance of the work. Unit and total prices may be obscured. 355 Z Information should also be obtained from the appropriate authority concerning permits, cut sheets, and connections to PROPOSED SPOT ELEVATION X � W O existing lines. V20. Aggregate base and subbase materials shall be placed on subgrade by means of a mechanical spreader. Density will A W U 20. The Developer and/or Contractor shall be responsible to supply all utility companies with copies of the approved plans and be determined using the density control strip in accordance with Section 304 of the VOOT Road and Bridge LIGHT POLE YLo Q Y advise them that all grading shall conform to the approved plans, and further that the utility companies shall be responsible Specifications and VTM-10. A certified compaction technician shall perform these tests. Certified copies of test reports be to VDOT daily, specified otherwise. In addition to checking stone depths, a VDOT Z for homing these plans and the finished grades in the installation of their utility lines. shall submitted unless the density FREDERICK WATER CONSTRUCTION NOTESIx PROJECT INFORMATION 21. All utilities to be located underground. representative shall be notified and given the opportunity to be present during the construction and testing of W 22. Contractors shall notify operators who maintain underground utility lines in the area of proposed excavating or blasting at control strip. PARCEL IDENTIFICATION NO: 64-11-11 (INSTR.# 170002409) Q W 0 least two (2) working days, but not more than ten It 0) working days, prior to commencement of excavation or demolition. V21. Asphalt concrete pavements shall be placed in accordance with Section 315 of the VDOT Road and Bridge 1. The Authority's Water and Sewer Standards and Specifications are available at STREET ADDRESS: Building 1: 141 SECURITY DRIVE W W W 23. The developer will be responsible for the relocation of any utilities which is required as a result of his project. The Specifications. Density shall be determined using the density control strip as specified in Section 315 and VTM-76. A www.frederickwater.com. Building 2: 146 SECURITY DRIVE ` Z LL relocation should be done prior to construction. certified compaction technician shall perform these tests. Certified copies of test reports shall be submitted to VDOT Building 3: 190 SECURITY DRIVE W LL 24. All parking lotJstreet light and dry utility design shall be performed and provided separately by others. All dry utility and or daily, unless specifie otherwise. A VDOT representative shall be notified and given the opportunity to be present during 2. The contractor shall adhere to the Authority's standards and specifications in effect at the time of construction. Parking Garage: 200 SECURITY DRIVE Ur Q lighting information shown hereon is as specified by others and is included for informational purposes only, as directed by the construction and testing of the Control strip. the Owner, Developer and/or public agency requirements. Greenway Engineering has not performed the lighting and/or V22. In accordance with Section the foundations for pipe culverts thirty-six (36) inches and larger shall explored 3. The contractor shall coordinate with and arrange for inspection by the Authority. PROJECT SITE AREA: 1 ACRES fn d utility design and does not warrant and is not responsible for the degree and/or adequacy of illumination on this project dry Y 9 , al below the bottom of the excavation to determine the type and condition of the foundation. The contractor shall report excavation 1.98 A DISTURBED AREA: 1.98 ACRES or the adequacy of the dry utility to service the site. findings of foundation exploration to the engineer and VOOT for approval prior to placing pipe. Foundation designs shall 4. The contractor shall connect a new sewer line to an existing manhole by core drilling the manhole. CURRENT ZONING: M1 CURRENT USE: PARKING/COMMERCIAL 25. All Sanitary sewers, water mains and appurtenances shall be constructed in accordance with the current standards and comply with VDOT Road and Bridge Standard PS -1. Where soft, yielding, or otherwise unsuitable foundation is specifications of Frederick Water. to the inlet or manhole locations as shown encountered, the foundation design and/or need for foundation stabilization shall be determined by the engineer and approved by VDOT. 5. A new water (or forced sewer) main shall be connected to an existing main by a wet tap. The Authority shall furnish PROPOSED USE: COMMERCIAL - GENERAL OFFICE PREVIOUSLY APPROVED PLANS: SP# 19-04, 83-07, 30-09, 25-10,19-12, 24-13, 24-14,11-17, 27-17 LL 26. All stormwater piping and structures shown on these plans are only accurate all needed material and make the tap. An Application for Wet Tap shall be submitted and the initial fee paid before MAXIMUM BUILDING HEIGHT: 60' hereon. Detail design of stormwater structures were not provided to Greenway Engineering. Actual pipe alignments will be based upon developed structural shop drawings as provided by the manufacturer. Contractor shall make adjustments to V23. VDOT Standard Guardrail shall be installed where warranted and/or as proposed on these plans in accordance with tap is made. PROPOSED BUILDING HEIGHT: WA` 7 L pipe alignments base on provided shop drawings. Greenway Engineering will not be held responsible or liable for any VDOT's installation criteria. Final approval of the guardrail layout to be given by VDOT after grading is mostly complete. 6. Exact locations of water and sewer services on new lines are to be coordinated with the Authority's inspector. REQUIRED SETBACKS PROVIDED SETBACKS PARKING SETBACK discrepancies or changes caused by the structural design. Contractor may submit shop drawings to Greenway V24. Approval of these plans shall expire five (5) years from the date of the approval letter. FRONT: 75' FRONT: N/A` FRONT: 25' Engineering for review and approval at contractor's expense. Shop drawings will be reviewed for compliance with design 7 Th e Authority's maintenance division shall furnish and install all water meters through 2 inch in size. It i the SIDE: 25' SIDE: N/A' SIDE: 5' plans. The Owner or Developer will be responsible for any redesign as a result of structural shop drawing design. V25. VDOT Standard CG -12 Curb Ramps shall be installed where indicated on these plans and/or as specified by VDOT. contractor's responsibility to have the meter box assembly installed correctly. Before a permanent meterr is installed: REAR: 25' REAR: N/A` REAR: 5' 27. Controlled fills shall be compacted to 95% of maximum density as determined by method "A" per standard proctor V26. The foundations for all box culverts shall be investigated by means of exploratory borings advanced below proposed a. The meter box, with its frame and cover, must be properly aligned with the coppersetter. AASHTO-T99, ASTM -D698, or VTM-1 as applicable. Density shall be Certified by a registered professional engineer and foundation elevation to determine the type and condition of the foundation. The contractor shall submit copies of b. The frame and cover shall be set to final grade. `NO BUILDING PROPOSED WITH THIS PLAN results submitted to Frederick County prior to pavement construction. If a geotechnical report has been prepared, it County borehole logs and report findings of foundation exploration to the engineer and VDOT for approval prior to constructing C. The distance between the top of the cover and the coppersetter shall be between 18 and 21 inches. should supersede the requirements in this note. pe eq box. Foundation designs shall comply with VDOT Road and Bridge Standard PB -1. Contrary to the Standard, where d. All components of the meter box assembly shall be in proper working order. NO SIGN IS BEING PROPOSED WITH THIS PROJECT 28. Refer to Geotechnical Engineer for methods, materials and details for construction of all earthwork activities. rock is encountered and cast -in-place box is proposed, the thickness of bedding shall be six (6) inches. Where soft, 29. Any retaining wall 2 ft. or greater in height shall require the issuance of a separate building permit. yielding, or otherwise unsuitable foundation is encountered, the foundation design and/or need for foundation6. existing lines: For services that connect to ex NO SITE LIGHTING IS BEING PROPOSED WITH THIS PROJECT 30. Construction debris shall be containerized in accordance with the Virginia Litter Control Act; no less than one litter stabilization shall be determined by the engineer and approved by VDOT. a. The Authority shall furnish and install: receptacle shall be provided at the construction site. 1. all x 1", 1 Y:' and 2" water services NO LANDSCAPING IS BEING PROPOSED WITH THIS PROJECT 31. These plans identify the location of all known gravesites. Gravesites shown on this plan will be protected in accordance services, 2. all sewer erices. sew FAR CALCULATION: WA with state law. In the event gravesites are discovered during construction, the owner and engineer must be notified b. The owner/developer shall: immediately. 1. coordinate (or have the contractor coordinate) the location of the service lateral with theAuthority's engineering PARKING CALCULATIONS WA 32. Individual sign permits will be required from the Zoning Office for all free standing and/or facade signs prior to erecting the 2. assistant sign and may require a separate building permit. 3. submit an Application for Service and pay the required fees. ADA SPACES REQUIRED: WA Rev. No. Date 9. All water service lines must have a backflow prevention assembly (double check valve or RPZ, as required). The PARKING SPACES PROVIDED: WA assembly must meet ASSE standard number 1015 or 1013. ADA SPACES PROVIDED: WA HOF 10. All fire lines must have a backflow prevention assembly (detector double check valve or RPZ, as required). The assembly shall meet ASSE standard number 1048 or 1047. Any exterior, privately owned fire line shall also have a OPEN SPACE CALCULATIONS: REQUIRED 25%= 8.99 ACRES; PROVIDED 51.5%= 18.54 ACRES Bra service meter. The assembly shall be installed immediately before the backflow prevention unit. Radio read remotes are required. v RAY L K LER 11. The Authority shall review the mechanical plan(s) for design and material approval of a building's: LiC. NO. 32809 t�-ZDmB �,L�Q JT a. domestic water meter and its backflow prevention device, and/or its b. fire service line's backflow prevention device. SS.fCsti ANAL 12. DEQ must also approve sewer pump stations. Frederick Water requires a copy of DEC's Certificate to Operate and a copy of the stations DEQ approved 08M Manual. These documents must be received before substantial completion is issued and water meters released. DATE: 0712412018 TRIP GENERATION DATA OCT 2011 SCALE: WA CLASS USE DWELLING UNITS TRIP RATE VPD FIRE MARSHAL'S NOTE FREDERICK WATER PROJECT INFORMATION DESIGNED BY: KASfTTC FILE NO. 3016E Fire lane markings and signage: WA NIA NIA NIA N/A Calculation of demand/discharge WATER AND SANITARY SEWER USAGE WATER DEMAND Any "No Parking" signs and yellow painted curb locations will be installed 'Resdnetlal: 235 gpd per connection by field inspection at the direction of the Fire Marshal's Office. WATER DEMAND 0,000 GPD •Commercial: 75 gpd per 1,000 at SHEET 2 OF 16 SANITARY SEWER DISCHARGE 0,000 GPD 'Industrial: 25 gpd @ 10 persona per acre sEwcDISCHARGE 18-09 ` TAKEN FROM ITE TRIP GENERATION 9TH EDITION ga equals water demand Sewer discharge IN[ , / T.M. 64-11-14; ' INDEPENDENCE DR WINCHESTER VA, LLC; T.M. 64-11-13; � INST. # 140008743 SAI PROPERTIES, LLC ZONE: M1 INST. 111030024440 / USE:VACANT ZONE:M1 ' USE: COMMERCIAL / I I , 1 1 y>f/.� �. ■rrl�... I �' � • FAj EXISTING il�1� r uBUILDING#2 • r■1 EX. 20'FREDERICK �42111 •' WATER ESMT. gl- V 1ZONE: M1 USE: COMMERCIAL rm. WN INSTRUMENT YR. 2008 5.00 ACRES BUILDING #3 (UNDER CONSTRUCTION) ;, I.,,'. _,,,.:ul�■■■r.•_ \:mss `_�.�ii\1l\R��7(2A :r YILII SII I \ , -\tea^\\\\ \�•�� � Ly TM 64A -159A WINCHESTER REGIONAL AIROR7 , D.B. 842, PG. 1400 28.69 ACRES ZONE: MI USE: COMMERCIAL EX,I ELECTRI �V \\ OF WATER S TM 64 -A -159C � — �\ \ �\ `\\ \ I�ARM — �/ - \ `✓/ \ ` � ��\ WINCHESTER REGIONAL \ AIRPORT AUTHORITY ` —� �\ \ \\\\\\\\ D.B. 781, PG. 1427 - — i ` _ 5.28 ACRES ZONE: RAUSE; RESIDENTIAL`1 \ \ y \ / \ LI \WUSAGE \\ \\\\ \ \ \ \ \ I pIREQM \ ? \ RIf{ARIA� } i0UFF612 ear �® f pl / EX. 20'F.C.S.A. WATER LINE ESMT. INST. NO. 170009030 EXISTING ` PARKING GARAGE \ \ TM 64-11-11 \! WESTVIEW BUSINESS CENTRE NAVY FEDERAL CREDIT UNION INSTRUMENT YR. 2017 INSTRUMENT # 2409 35.9611 ACRES ZONE: M1 USE: COMMERCIAL EX. 20'S.A` LIN E WATER LINE SMT. INST. NO. 170009030 \ F I I // ` T 65-1G- ' �M@NTjFA'f�76 L{ 716ES ' \ ONE�dUSE: RESIDENTIAL TTITTI� i / till 3 T. ;3�/¢/,//yam/j��/ / MPMMT ESMT. 1NaTQ 010008162 FF118T. Nb6. 030017554 I 14 %S�i I ``I Ili` I11111i 11�Ii i l r 11 ". , ,111 11111.1,; I ► \. 11 1 1Ik"��k1��1f1\�\1 I 1 \\ 1\�� �1� l\ 11 li la,�7 -J.��yy11T� RY SEWER& 11 1 \ \\ \IN�jttlSS(Eq�RES ESMT. \\ \ \\Co. 010006153 W 1\\\\ \` RAD/US IL10N DELTA ANGLE CHORD BEAR/NG CHORD LENGTH TANGENT C7 233203 475.28 \ \h 474.46 238.47 E 35.46 L4 E:�4L' £ 31.03 L5 -Z-6-37 \ 1 n // ` 60.48 3' 12 30 S 23-47-57-E 60.47 30.25 Lem/C-G -_�/■ ■E�fS� 11125001 Y 23'51 45 N 73'43 33 E 465.16 237.71 :3 O O Z v/ 'Y Y ' «Y vw a w w Z i/ Z Q' LL Ili � •. d_'11�I �� r�« Q to ki N Will II.� 4�1 fid-. «yl �Q1 r•, I F �► U X711 20'STORM .alll «� «r ■- �- _ Z INST. No. 010008162 It NI •, E. 11 lE 42 I �M EXISTING 1:. BUILDING #1r +, •a INGRESS/EGRESS ESVT. .. -I iii, II —EX. 30'SANITARY SEWER &�] ■ ZONE: , ■■IUSEVACANT \ F I I // ` T 65-1G- ' �M@NTjFA'f�76 L{ 716ES ' \ ONE�dUSE: RESIDENTIAL TTITTI� i / till 3 T. ;3�/¢/,//yam/j��/ / MPMMT ESMT. 1NaTQ 010008162 FF118T. Nb6. 030017554 I 14 %S�i I ``I Ili` I11111i 11�Ii i l r 11 ". , ,111 11111.1,; I ► \. 11 1 1Ik"��k1��1f1\�\1 I 1 \\ 1\�� �1� l\ 11 li la,�7 -J.��yy11T� RY SEWER& 11 1 \ \\ \IN�jttlSS(Eq�RES ESMT. \\ \ \\Co. 010006153 W 1\\\\ \` LOCATION OF FUTURE RTE 37 R.O.W. CUR RAD/US IL10N DELTA ANGLE CHORD BEAR/NG CHORD LENGTH TANGENT C7 233203 475.28 \ \h 474.46 238.47 E 35.46 L4 E:�4L' £ 31.03 L5 -Z-6-37 \ 1 n // ` 60.48 3' 12 30 S 23-47-57-E 60.47 30.25 C4 LOCATION OF FUTURE RTE 37 R.O.W. CUR RAD/US ARC LENGTH DELTA ANGLE CHORD BEAR/NG CHORD LENGTH TANGENT C7 233203 475.28 11'4038 N 72'3830 E 1 474.46 238.47 E 35.46 L4 f 13'1126 £ 31.03 L5 -Z-6-37 C3 1080.00 60.48 3' 12 30 S 23-47-57-E 60.47 30.25 C4 11125001 468.54 23'51 45 N 73'43 33 E 465.16 237.71 LIN£ BEAR/NG I DISTANCE L1 S 56'1731 W 45.94 L2 S 33'4229 E 28.00 L3 N 56'1731 E 35.46 L4 f 13'1126 £ 31.03 L5 -Z-6-37 S 062923 W 79.10 Z 66'28 43 W 50.01 SURVEY AND TOPOGRAPHIC INFORMATION 1. Boundary survey was performed by: GREENWAY ENGINEERING Dated: JULY 2016 Lic. No. 32809 2. Aerial, horizontal and vertical control surveys were DATE: 07/2412018 performed by: GREENWAY EN -1NF:F.RING JULY 2016 Date SCALE: 1"=80' 3. Aerial topographic mapping performed by: VIRGINIA MAPPING Dated: MARCH 2007 DESIGNED BY: KAS/TTC FILE NO. 3015L 80 40 0 80 160 SHEET 3 OF 15 SCALE: 1" = 80' 18-09 It W Q 0 a F_ J F_ Z Q U) Q Z RIx Ud W :3 O O Z v/ S2 Y = au vw a w w Z i/ Z Q' LL O \� Q to U Z Lic. No. 32809 2. Aerial, horizontal and vertical control surveys were DATE: 07/2412018 performed by: GREENWAY EN -1NF:F.RING JULY 2016 Date SCALE: 1"=80' 3. Aerial topographic mapping performed by: VIRGINIA MAPPING Dated: MARCH 2007 DESIGNED BY: KAS/TTC FILE NO. 3015L 80 40 0 80 160 SHEET 3 OF 15 SCALE: 1" = 80' 18-09 r/ LIMITS OF 1 of `,4 r L'Eli ;.�• �Iq �� �, d' � � � f��,0 `_- ��'!'! � ice_ '�.,-�1�.L•�1��11!�\,t 'a����\�\� \\l e\•- • /r,r r�•,, pry �����a�.� � �-=�..� n., •. ' `\���\�` o N y N d N tN0 N A Nt o.�a u y LL c 3� � 3z •r S . I j B LIMITS OF �F y1LF `\ iii C7 r I J /?Y - u I M FAJ.zr E T X39' DISTURBANCE��� :•.r / _`�_ , \ ^`-''-., i� L 4— Ilk �II I ITS OF I I LIMITS OF DISTURBANCE i I I = _— I _^� - II I (DISTURBANCE AA li I o _ _ _ — _ — J V W Lu EX1571NG � V � PROP. BUILDING /1 V --� II Ix ; OP. 20 Q x x �;' _ o E I I 1 w w _ wo 06 - ' a 0 CSF Lu LU ILuz Er J wo be I w ?> LL n G� N U I _ — Ip �_. PROP 20 LIMITS OF ITS 678- DISTURBANCE F.W. ESM'T DLMTURBAk1\. . 0 / / / / 3 q; •_ / _ —` ail �i39Pi.�`39 /' ,� �' ii i5 i / 3 fl` IS,—' 11 III 1 I POP. 0' � � ��•— ' y' 676 - -- - w- _ -- - X -- - -' - i _ - � . Rev. No. Date 3 90 -... ' _ _- _. •, _ .SF rX� K _7S,c i _IP. _ S U i� r- `..:hti. ^•r.: 1 SF T op PROP. 20' \ ,e�� r i IP �.TT \ _ _ _ .5 R 20' M X j F.W. ESM'T. p —y� i q LIMITS OF -ybi `` X�� —��, yy DISTURBANCE F.W SM'T. 08� DISTURBANCE - ASF ilUp I — ___��\ T c--- T \ •` —674 I� r) RA Y L EPLER v — ---- LIMITS OF I y— T LIC. NO. 32809 DISTURBANCE PROP. 20' \ / T G I F. W. ESM'T. _ — — =� X76-- BENC 1\d--- hi S —S --S C rIONAL 1 I � Nd— �DATE: 07/24/2018 ---5 1 e I SCALE: N/A .•.r 1 I� T DESIGNED BY: KASITTC FILE NO. 3015L �. 030 15 0 30 SHEET 5 OF 15 18-09FOR PHASE I&11 EROSION AND SEDIMENT CONTROL ONLY .i.i SCALE: 1" = 30' EROSION AND SEDIMENT CONTROL NARRATIVE Description: The project development will consist of the construction of concrete sidewalks around Management Strategies: Building #1 and Security Drive. The property is zoned M1 and is located in Westview Business Centre along Security Drive in Frederick County, Virginia. The total site area is 36.5259 acres, of Construction shall be sequenced such that grading operations will begin and end as quickly as which approximately 1.98 acres will be disturbed for construction. possible. Date of construction: Construction will begin following plan approval and will take approximately one The site superintendent shall be responsible for the installation and maintenance of all erosion (1) months to complete. and sediment control measures. Maintenance of these measures throughout the project is critical to the effectiveness of the program. Existing site conditions: The site is currently developed, consisting of commercial office space, parking lots and stormwater BMP's. Stormwater is collected by the storm sewer and BMPs onsite. Ad scent areas: The site is bounded by commercial property to the north, east and west of same zoning. Property zoned RA is to the south. Offsite areas: No offsite areas will be impacted by this project. Soils: The existing soil conditions were obtained from the NRCS Soils Survey. Refer to the soils map this sheet. Critical areas: No critical areas are identified with this project. Erosion And Sediment Control Measures: Unless otherwise indicated, all vegetative and structural erosion and sediment control measures shall be constructed and maintained according to the minimum standards ands specifications of the Virginia inia Erosion and Sediment Control Handbook. Pe Structural Measures: Phase l: Install silt fence (3.05) as shown on the plans to intercept and detain small amounts of sediment from disturbed areas during construction in order to prevent sediment from leaving the site. Install inlet protection (3.07) at storm drain inlets as shown on the plans to prevent sediment from entering, accumulating in and being transferred through the storm drain system. Temporary seeding (3.31) and/or permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater) and as needed to stabilize disturbed areas. Phase II: Phase I controls shall remain into Phase II for the duration of the project or until drainage area is stabilized. Fill slope surface shall be left in a roughened condition to reduce erosion, see Plate 3.29-4. Contractor shall redirect the concentrated flow away from the fill slope by installing diversion dike and divert the runoff to sediment traps or sediment basins. Temporary seeding (3.31) and/or permanent seeding (3.32) shall be placed on all critical slopes (3:1 or greater) and as needed to stabilize disturbed areas. Contractor to coordinate relocation of existing utilities as necessary. Vegetative Measures: Permanent or temporary soil stabilization shall be applied to denuded areas within seven (7) days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven (7) days to denuded areas that may not be at final grade but will remain dormant for longer than fourteen (14) days. Permanent soil stabilization shall be applied to all areas that are to be left dormant for more than six (6) months. Topsoil that has been stockpiled shall be surrounded with silt fence and protected by mulch and/or temporary vegetation immediately after grading. All earth berms, diversions and sediment trap embankments are to be machine -compacted, seeded and mulched (hay mulch or straw) for temporary and/or permanent vegetative cover immediately after construction Erosion control mats shall be installed over steep (2:1) cut and fills slope which have been brought to final grade and seeded to protect from rill and gully erosion. After areas above controls have been stabilized, the controls shall be cleaned up and removed. Electric power, telephone, storm, sanitary, water & gas supply trenches are to be compacted, seeded and mulched within five (5) days after backfilling. No more than 500 feet are to be open at any one time. All cut and fill slopes are to be seeded and mulched within five (5) days of completion of grading. Drainage swales shall be stabilized with check dams until vegetation has been well established, at which time the check dams shall be removed. Devices listed above are considered minimum erosion and sediment controls. Additional control measures may be necessary due to contractor ctor hasin or other unforeseen een condition . phasing s It is the contractor's responsibilityto provide additional measures to those shown, as needed, in order to control erosion and contain sediment on site. All measures shall be installed according to the standards and specifications in the Virginia Erosion and Sediment Control Handbook. Stormwater Management: Increased runoff from this development will be controlled by the Project's stormwater management facilities (See stormwater management plan sheets 14 and 15 for calculations). Maintenance Program All control measures shall be inspected daily by the site superintendent or his representative and within 24 hours after any storm event greater than 0.5 inches of rain per 24-hour period. Any damaged structural measures are to be repaired by the end of the day. Seeded areas shall be checked regularly to ensure that a good stand of grass is maintained. All areas shall be fertilized and reseeded as needed until grass is established. Trapped sediment is to be removed as required to maintain 50% trap efficiency and disposed of by spreading on site. Inlet protection shall be checked regularly for sediment build-up. If the gravel outlet is clogged by sediment, it shall be removed and cleaned or replaced immediately. The contractor is responsible for keeping existing public roads in a clean, dust and mud free, condition at all times. Erosion and sediment control Drouram 1. Hold pre -construction meeting on site with inspector. 2. Clearing and grubbing for sediment control devices only (Silt Fence). 3. Placement of sediment control devices. 4. Obtain inspector's approval prior to beginning grading operations. 5. Clear and grub main area of site protected by installed E&S controls. 6. Rough grade site area. 7. Final grading. 8. Restoration and stabilization of disturbed areas. 9. Remove erosion and sediment control measures with the approval of the inspector. . Note: The Frederick County Public Works and Engineering Department retain the right to add and/or modify these erosion and sediment control measures during the construction process, within reason, to ensure adequate protection to the public and the environment. Seeding schedule (soil stabilization): 1. All permanent seeding shall be in accordance with section 3.31 & 3.32 of the VESCH. 2. Spread topsoil at a minimum depth of four (4) inches. 3. Incorporate pulverized agricultural limestone Into the topsoil at a rate of 92 lbs. per 1,000 square feet (2 tons per acre). 4. Fertilize with 10-10-10 fertilizer at a rate of 23 lbs per 1,000 square feet (1,000 lbs per acre). 5. Seed all areas with a seed mix consisting of 67% Kentucky 31 Tall Fescue and 33% Red Top Clover, 6. Mulch all seeded areas with straw mulch applied at a rate of 3,500 lbs per acre anchored with cutback or emulsified asphalt applied at a rate of 200 gallons per acre. Dust control: 1. Temporary seeding shall be applied to all disturbed areas subject to little or no construction traffic. 2. All haul roads and other heavy traffic routes shall be sprinkled with water until the surface is wet and repeated as needed to control dust. MINIMUM CONSTRUCTION STANDARDS An erosion and sediment control program adopted with this plan must be consistent with the VSECH for 9VAC25-840-40 minimum standards: 1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year. 2. During construction of the project, soil stock piles and borrow areas shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site. 3. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosion. 4. Sediment basins and traps, perimeter dikes, p , pe es, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land -disturbing activityand shall be made functional before u slo land disturb a once takes lace. upslope P 5. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6. Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin. a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap shall only control drainage areas less than three acres. b. Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres shall be controlled by a sediment basin. The minimum storage rapacity of a sediment basin shall be 134 cubic yards per acre of drainage area. The outfall system shall, at a minimum, maintain the structural integrity of the basin during a 100 -year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. 7. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8. Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume or slope drain structure. 9. Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10. All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11. Before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of nonerodible material shall be provided. 14. All applicable federal, state and local requirements pertaining to working in or crossing live watercourses shall be met. 15. The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16. Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: a. No more than 500 linear feet of trench may be opened at one time. b. Excavated material shall be placed on the uphill side of trenches. c. Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off-site property. d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e. Restabilization shall be accomplished in accordance with this chapter. f. Applicable safety requirements shall be complied with. 17. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well as to larger land -disturbing activities. 18. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the VESCP authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. 19. Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following standards and criteria. Stream restoration and relocation projects that incorporate natural channel design concepts are not man-made channels and shall be exempt from any flow rate rapacity and velocity requirements for natural or man-made channels: a. Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate natural or man-made receiving channel, pipe or storm sewer system. For those sites where runoff is discharged into a pipe or pipe system, downstream stability analyses at the outfall of the pipe or pipe system shall be performed. b. Adequacy of all channels and pipes shall be verified in the following manner: (1) The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is one hundred times greater than the contributing drainage area of the project in question; or (2) (a) Natural channels shall be analyzed by the use of a two-year storm to verity that stormwater will not overtop channel banks nor cause erosion of channel bed or banks. (b) All previously constructed man-made channels shall be analyzed by the use of a 10 -year storm to verify that stormwater will not overtop its banks and by the use of a two-year storm to demonstrate that stormwater will not rause erosion of channel bed or banks; and c Pipes and tl storm sewers s () Pe terns shall be analyzed b the use of Y a 10- ear Y Y 0-y ear to verify that stormwater will be contained within h t ePe i or system. P c. If existing natural receiving channels or previously constructed man-made channels or pipes are not adequate, the applicant shall: (1) Improve the channels to a condition where a 10 -year storm will not overtop the banks and a two-year storm will not cause erosion to the channel, the bed, or the banks; or (2) Improve the pipe or pipe system to a condition where the 10 -year storm is contained within the appurtenances; (3) Develop a site design that will not cause the pre -development peak runoff rate from a two-year storm to increase when runoff outfalls into a natural channel or will not cause the pre -development peak runoff rate from a 10 -year storm to increase when runoff outfalls into a man-made channel; or (4) Provide a combination of channel improvement, stormwater detention or other measures which is satisfactory to the VESCP authority to prevent downstream erosion. d. The applicant shall provide evidence of permission to make the improvements. e. All hydrologic analyses shall be based on the existing watershed characteristics and the ultimate development condition of the subject project. f. If the applicant chooses an option that includes stormwater detention, he shall obtain approval from the VESCP of a plan for maintenance of the detention facilities. The plan shall set forth the maintenance requirements of the facility and the person responsible for performing the maintenance. g. Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipators shall be placed at the outfall of all detention facilities as necessary to provide a stabilized transition from the facility to the receiving channel. h. All on-site channels must be verified to be adequate. I. Increased volumes of sheet flows that may rause erosion or sedimentation on adjacent property shall be diverted to a stable outlet, adequate channel, pipe or pipe system, or to a detention facility. 1. In applying these stormwater management criteria, individual lots or parcels in a residential, commercial or industrial development shall not be considered to be separate development projects. Instead, the development, as a whole, shall be considered to be a single development project. Hydrologic parameters that reflect the ultimate development condition shall be used in all engineering calculations. k. All measures used to protect properties and waterways shall be employed in a manner which minimizes impacts on the physical, chemical and biological integrity of rivers, streams and other waters of the state. I. Any plan approved prior to July 1, 2014, that provides for stormwater management that addresses d esses an flow y rate capacity and velocity requirements for natural or man-made channels shall satisfy flow rate capacity and velocity requirements for natural or man-made channels if the practices are designed ed to i detain the water quality volume and to release ease it over 48 hours; rs(ii)detain and release ease over a 24-hour period the expected rainfall resulting from the one year, 24-hour storm; and (iii) reduce the allowable peak flow rate resulting from the 1.5, 2, and 10 -year, 24-hour storms to a level that is less than or equal to the peak flow rate from the site assuming it was in a good forested condition, achieved through multiplication of the forested peak flow rate by a reduction factor that is equal to the runoff volume from the site when it was in a good forested condition divided by the runoff volume from the site in its proposed condition, and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels as defined in any regulations promulgated pursuant to § 62.1-44.15:54 or 62.1-04.15:65 of the Act. m. For plans approved on and after July 1, 2014, the flow rate capacity and velocity requirements of § 62.1-44.15:52 A of the Act and this subsection shall be satisfied by compliance with water quanfity requirements in the Stormwater Management Act (§ 62.1-44.15:24 at seq. of the Code of Virginia) and attendant regulations, unless such land -disturbing activities are in accordance with 9VAC25-870-48 of the Virginia Stormwater Management Program (VSMP) Regulation or are exempt pursuant to subdivision C 7 of § 62.1-44.15:34 of the Act. n. Compliance with the water quantity minimum standards set out in 9VAC25-870-66 of the Virginia Stormwater Management Program (VSMP) Regulation shall be deemed to satisfy the requirements of this subdivision 19. J W H IX Q Z U) 06 W No. F U_ Q.' t- Q U) > J Q Z LU0 D U 0 Y Q U W W 0 W LU Z X LL Q x CO 7ANDY L VQEPLEF Lic. No. 32809 DATE: 07/24/2018 1 SCALE: N/A DESIGNED BY: KASITTC FILE NO. 3015L SHEET 6 OF 15 18-09 CONSTRUCTION OF A SILT FENCE (WITH WIRE SUPPORT) 1. SET POSTS MD EXCAVATE A 4•X4• 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSIGPE ALONG TIE LINE OF POSTS. FLOG 3. ATTp THE FILTER FORIC TO THE WIRE FENCE AND EXTEND R INTO THE TRENCH. 4. EACMU. ANO COMPACT THE EXCAVATED S011- 3. OIL SOURCE: 31eReM EMENSION OF FABRIC AND WIRE INTO THE TRENCH. FILTER FABRIC Ij WIRE 1 from HETB 3.05-1 RUNOFF WITH SE GRAVEL AND WIRE MESH DROP INLET SEDIMENT FILTER 18' MIN. ---+I GRAVEL (12"MIN. DEPTH) SEDIMENT :e: WIRE MESH FILTERED WATER SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY CONCENTRATED FLOWS ARE EXPECTED, BUT NOT WHERE PONDING AROUND THE STRUCTURE MIGHT CAUSE EXCESSIVE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. • GRAVEL SHALL BE VDOT #3, #357 OR #5 COARSE AGGREGATE. SOURCE: VA. DSWC PLATE. 3.07-2 CURB INLET PROTECTION WITH 2 -INCH X 4 -INCH WOODEN WEIR ClMVELL 6'INXWM SPACIIG a z•%t SPMFRS . T % 4• NILYpRS TX4•WE1RJ 2• X 4• SPM SIDE ELEVATION PERSPECTIVE VIEW SMO BIG OR Y MWMUM IENOTII KTERIMT: MEIOM OFT x 2•x 4' WO —�•)! r GMVFL z' x t svAGER MRE YM SOURCE: USDA SCS GRAVEL FILTER' RUNOFF WATER WIRE MESH FILTERED WATER CURB INLET THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE FORDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. • GRAVEL SHALT. BE VDOT N3, M357 OR 6 COARSE AGGREGATE. DSWC PLATE 3.07-6 BLOCK & GRAVEL CURB INLET SEDIMENT FILTER CUM INLET fig:=V�xo�i:�1�►� `�•:lii:�!j���i2�}�5�. ' + N1 . IIIIII �• I III�I IIIW— Wig=u`i A li` ire., =�J �I�IIIII 111111�-ATTIC==111111==111111 111�I=11 — = I �IIIIII SPECIAL APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT (ORB DFLETS WHERE AN OVERFLOW CAPABILITY IS NECESSARY TO PREVENT EXCESSIVE PONDING IN FRONT OF THE STRUCTURE. • GRAVEL SHALL BE VDO'I g3, #357 OR /5 COARSE AGGREGATE PLATE 3.07-7 SOURCE: VA. DSWC PLATE 3.07-8 TABLE 3,31-B ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS 'QUICK REFERENCE FOR ALL REGIONS' Rate Planting Dates Species (lbs./acre) Sept, I - Feb, 15 Feb, 16 - Apr, 30 May I - Aug. 31 Seeding 50/50 Mix of Annual Ryegrass (Lolium multi-florum) Cereal (Winter) Rye (SECat cereate) Anual Ryegrass (Lolllum, multi-florum) German Millet 50 - 100 [1E)01=I1I11 50 Seed shall be evenly applied with a broadcast seeder, drill, cultipacker seeder or hydroseeder. Small grains shall be planted no more than one Inch deep, Grasses and legumes shall be planted with no less than 1/4' Boll cover. TABLE 3,32-C SITE SPECIFIC PERMANENT SEEDING MIXTURES FOR APPALACHIAN/MOUNTAIN AREA Total Lbs, Minimum Care Lawn INLET SPECIFIC APPLICATION TO 1 - Kentucky 31 or Turf -Type Tall Fescue PIPE THIS METHOD OF INLET PROTECTION IS APPLICABLE 0-10% TO CURB INLETS WHERE A STURDY, COMPACT INSTALLATION 0-10% IS DESIRED. EMERGENCY OVERFLOW CAPABILITIES ARE 11II MINIMAL, SO EXPECT SIGNIFICANT PONDING WITH THIS bluegrass from approved list for use In MEASURE. General Slope (3d or less) 'GRAVEL SHALL BE VDOT COARSE AGGREGATE - Kentucky 31 Fescue /3, /357 OR /5 - Red Top Grass SOURCE: USDA SCS GRAVEL FILTER' RUNOFF WATER WIRE MESH FILTERED WATER CURB INLET THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE FORDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. • GRAVEL SHALT. BE VDOT N3, M357 OR 6 COARSE AGGREGATE. DSWC PLATE 3.07-6 BLOCK & GRAVEL CURB INLET SEDIMENT FILTER CUM INLET fig:=V�xo�i:�1�►� `�•:lii:�!j���i2�}�5�. ' + N1 . IIIIII �• I III�I IIIW— Wig=u`i A li` ire., =�J �I�IIIII 111111�-ATTIC==111111==111111 111�I=11 — = I �IIIIII SPECIAL APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT (ORB DFLETS WHERE AN OVERFLOW CAPABILITY IS NECESSARY TO PREVENT EXCESSIVE PONDING IN FRONT OF THE STRUCTURE. • GRAVEL SHALL BE VDO'I g3, #357 OR /5 COARSE AGGREGATE PLATE 3.07-7 SOURCE: VA. DSWC PLATE 3.07-8 TABLE 3,31-B ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS 'QUICK REFERENCE FOR ALL REGIONS' Rate Planting Dates Species (lbs./acre) Sept, I - Feb, 15 Feb, 16 - Apr, 30 May I - Aug. 31 Seeding 50/50 Mix of Annual Ryegrass (Lolium multi-florum) Cereal (Winter) Rye (SECat cereate) Anual Ryegrass (Lolllum, multi-florum) German Millet 50 - 100 [1E)01=I1I11 50 Seed shall be evenly applied with a broadcast seeder, drill, cultipacker seeder or hydroseeder. Small grains shall be planted no more than one Inch deep, Grasses and legumes shall be planted with no less than 1/4' Boll cover. TABLE 3,32-C SITE SPECIFIC PERMANENT SEEDING MIXTURES FOR APPALACHIAN/MOUNTAIN AREA xxx If Flatpea Is used, Increase to 30 lbs./acre. All legume seed must be properly Inoculated. Weeping Lovegrass may also be Included In any slope or low-maintance mixtures during warmer seeding periods/ add 10-20 lbs/acre In mixes, TRACKING SOURCE: MICHIGAN SOIL EROSION AND SEDIMENTADON GUIDE PLATE. 3.25-4 J LU W O 08 LU z V W W Q 2 a J_ U) 5a V V LL Z H U_ LY NQ 0 J az S2 V Y LU W❑ 3LL Q V) lY L. �EPLER N0.32809 56)T -)6A DATE: 0 7124/2 01 8 SCALE: NIA DESIGNED BY: KASlTTC FILE NO. 3015E SHEET 7 OF 15 18-09 Total Lbs, Minimum Care Lawn Per Acre - Commercial or Residential 200-250 lbs. - Kentucky 31 or Turf -Type Tall Fescue 90-100% - Improved Perennial Ryegrass x 0-10% - Kentucky Bluegrass 0-10% High -Maintenance Lawn Minimum of three (3) up to five (5) varieties of bluegrass from approved list for use In Virginia. 125 lbs. General Slope (3d or less) - Kentucky 31 Fescue 128 lbs. - Red Top Grass 2 lbs. - Seasonal Nurse Cropxx 20 lbs. 150 tbs Low -Maintenance Slope (Steeper than 311) - Kentucky 31 Fescue 108 lbs. - Red Top Grass 2 lbs. - Seasonal Nurse Cropxx 20 lbs, - Crownvetch xxx 20 tbs, 150 lbs x Perennial Ryegrass will germinate faster and at lower Solt temperatures than fescue, thereby providing cover and erosion resistance for seedbed. xx Use seasonal nurse crop In accordance with seeding dates as stated below, March, April through May 15th Annual Rye May 16th through August 15th Foxtail Millet August 16th through Sept„Oct, Annual Rye November through February Winter Rye xxx If Flatpea Is used, Increase to 30 lbs./acre. All legume seed must be properly Inoculated. Weeping Lovegrass may also be Included In any slope or low-maintance mixtures during warmer seeding periods/ add 10-20 lbs/acre In mixes, TRACKING SOURCE: MICHIGAN SOIL EROSION AND SEDIMENTADON GUIDE PLATE. 3.25-4 J LU W O 08 LU z V W W Q 2 a J_ U) 5a V V LL Z H U_ LY NQ 0 J az S2 V Y LU W❑ 3LL Q V) lY L. �EPLER N0.32809 56)T -)6A DATE: 0 7124/2 01 8 SCALE: NIA DESIGNED BY: KASlTTC FILE NO. 3015E SHEET 7 OF 15 18-09 / W I i/ URBALIMITC NCEE DISTURBANCE I N n E I' ,,7111 _ PROPOSED oe N 6p�p�FA - ; N 8 � n Q / /' _-652" "'• `�.i - __ SIDEWALK SEE NOTE #2 THIS SHEET 1 I I I c 6 j7T S m �? - FUTURE PROPOSED '/ // _ t — -'. 26'BRL _ ;. - TRAIL END SIDEWALK SIDEWALK / PHASE1 PHASE2 / 1 I '^ I 3 " c Nt a I CROSSWALK I ._ - •S l - -� �_ - - _ - - . - - _- - 2 I` / SEE NOTE #2 - 67 -' - - _ ' - - 4 g�� +SB /b FUTURE BOARDWALK /"�' THIS SHEET NDlC4oP� D _ — – I .LIMITS OF - _ - _. _ ���� .. - - CONSTRUCTED - PHASE I 1 \ \ _ ` I - RAMP `D } TRAIL #5� DISTURBANCEPROPOSED 30(ay .6% SIDEWAL�'-o X.I/\--xP.STAIRS IN H 2 gg0 IN L1,5f\ �—I (�1 Rj-i-JNI-H1W4RAIL =SI91�S ((BR) �-- HANDRA� _ 25' � 6% � - �. � � / \ � z INST N0. 010008162��. - - EX. OG EX. Lu Z I .- ,, ,_ EX. CGL PROPOSE ' I OdCRE19SWANC Oj 0 L) ®�l \ I EX � � -- - \ . G LIMITS Of T "l\. �. Lu C7 Lu ' I I I , _ LJ r� S M Fb_ >A..\.. .... W `6 1LIMITS PROPOSED \_. CROSSWALK / \ OF .�� DISTURBANCE \ PROPOSED SIDEWALK \ �, .. .:: - '•:••.: �.'.r .•'� ;. - _ -- -'-�,� \ •� `�T �`_ -- \ - > ✓" �:, TYPE B, TIE INTO EX. S/W EXISTING SIDEWALK — I PROPOSED ® CROSSWALK aMITSOF EX. -� DISTURBANCE ! I EX. S/W LIMITS OF I I ;DISTURBANCE I l I o— — — — — — — _�_-•� 1 I Y. \\ \ \ \ \� Ir I I� uu I - EXISTING PROP. 20' PROPOSED \ ;' I BUILDING J%1 i W F.W.ES � CG \ rv• I EX. is/ 1 ("L 1 I 1 .a. 20 I I •: - EX. S/W -\ I F' I fX. SIGN (Trp) .• / 3 \> 1n 9 F TRAIL #9 H F kI �. I I. \ w J \ I - I Z a Q ` � J IL EX. CG r LU O Lu D •• I 3 ' W In ��v I I I W �� 5w LU w f // MT. L Z w Q u In • / INST. N . 170009030/ A./ I I '" ,. / / frt1 EX S/VY - k V LL � EX S/W •.I fX.•CG -/ ,' �\ 1 '-� L4 � I W I f —� \_ - - / EX CG ion Z I I EX. Cc I �_ _--- — — — — — _ _ L EX CROSSWALK\ LIMITS �o 'A ' I _ DISTURBANCE • / I � 1 O 1 `I EX. II (C,h - I 75' BRL - LIMITS J�.I- I PROP. 20' OF F.W. ESMT / / ; '��-! _� �`pT- — _ — EK HANDICAP �I ff1 I u 1 I I f l LIMITS F 1 \ DI TURtNC� �/ --` _ \ I, , \ EX. CG'S– __ DISTURBANCE -a. -- �`�97b- -- PROPOSED qZ / _ " / s :. PRO �b - RAMPS 3 TIE IN E — D/ SID ALK I j� S� C�1 Lu• D E, .}1Y. o W INST 000 162- 0 1 I \, J SIDEWALK ._- _ ?t7n -- \ PROP 20' II } 1 5�" ' PfOPOS PROPOSED SIDEWALK' EX. CG Ti SIDEWALK -` EX CROSSWW h. ;. „ - - Ir�'1 p f W. ESMT. _I �, =PE B Y. /•\ �'- SEE NOTE #2 1 r - - ASL. Y�C - 1 - I'I I. THIS SHEET y,9�e� I FW OP. P ESM �- -_ S FIR P.20' \ Il t�t � PROPOSED M 678^^ fi80 � • F.W. ESM-T. —575 / /W '-�-� L- EX. S Rev. No. DaEe T1:- 1111 . • CROSSWAL ... ..,. ..` .. ... + .: ...,. •-.: _- -_ ,r. -- / .. �,� $ L. .: _ __ Y674 CROSSWALK _ — — oz oe/La/aoLe // - — G DRIVE CH. CG TRAIL #11 --- - fX.�HAND ,6 RA s \ PROP. 20' F.W. ESMT. �Wi _ _ — �_� s . NM LIMITS OF .. .. , : .,. .. T OF 1'2' M // — --•�-r- EX CC / SECURITY ��� `�' RIW LIMITS OF EX. _ EX HANDICAP / _-- CG TIE INTp E7(, .l s EwaLK __ -1 £X. CG .W4 F, -- -r_ _� -� ,� DISTURBANCE EX 20 ECSA WATER LINE WATER LINE ESMT. _ - �� _ EX. HAND/CA NOTES: ESMT INST. NO. 170009030 I INSL N0. 170009030 �° �_ C V y� RA L EPLER I 65� EX EX HANDICAP I ROMPS \ msT.#tT600�s64 HANDICAP DISTURBANCE CG 3o�G A SAN SA EX. — bYI RAMPS - - - - -G- r G— - - __T \ r _ RAMPS \ _ X674 / -r - ^' - - r ' 1. CROSS WALKS SHALL BE TYPE CLASS I WHITE PAVEMENT MARKING. LONGITUDINAL LINES SHOULD BE 12 TO 241NCHES WIDE AND SEPARATED BY GAPS OF 12 TO 601NCHES. THE DESIGN OFTHE LINES SHOULD •. Lic. No. 3za0s O II 4 LIMITS OF DISTURBANCE 'I RAMPS \ �— ��"INST.-ND— / — — r - G- - _ - c- - - G TG - -G� 'I� ' _I - .- ,. 6'7�' -BENC _ 67? �� AVOID THE WHEEL PATHS IF POSSIBLE, AND THE GAP BETWEEN THE LINES SHOULD NOT EXCEED 2.5 TIMES THE WIDTH OF THE LONGITUDINAL LINES. JD LR L"S •"+�, SjONAL w --G--�-- E�� --G--- G--- ��— Wj- - Wd-%I \O —S '[ — we — — s — `� � j' -5� / s -:" TRAIL#12 PRO SED , � "' "' � 9Ip .� ��.J SED I 'I T 2. CROSSWALK SYMBOLS SHOWN ON THE PLAN ARE TO SHOW THE LOCATION OF THE PROPOSED CROSSWALKS. CROSSWALK MARKINGS ARE TO BE LONGITUDINAL WITH THE FLOW OF TRAFFIC AND MATCH THE EXISTING CROSSWALK MARKINGS ON THE NFCU CAMPUS. •' 3. ALL TRAILS/SIDEWALKS ARE 5'WIDE. DATE: 07I2M2018 -vu -7 �.�C K� - -1 S____ — /r I I J� SIDEWALK/ `J TYPE B INTO EX. EX S 4. TREES IN CONFLICT WITH SIDEWALK TO BE RELOCATED ADJACENT TO TRAIL TREES WHICH ARE DAMAGED DURING RELOCATION SHALL BE REPLACED WITH A TREE OF THE SAME TYPE. THERE SHALL BE NO o I wje-t� I �— �_�—�� �- f s EX. CG _� -- ,n ' / F y /W \ \ E1" S ,� SIDEWALK ' I I - EX GG '� �— .: ,'s , REDUCTION IN THE NUMBER OF TREES. 5. ALL SIDEWALKS ARE TYPE A UNLESS NOTED OTHERWISE SCALE: 1"=30' // =� �S 7� _ �(�� jI 'C> ' ••� J!-_ _ ,�� •- --- _ 1 ' j 6. ALL TRAIL SLOPES OVER 5% IDENTIFIED ON PLAN AS SHOWN 7. THE UNDERGROUND UTILITIES SHOWN HEREON HAVE NOT BEEN PHYSICALLY LOCATED BY THE SURVEYOR,HOWEVER, THE INFORMATION WAS OBTAINED FROM EXISTING PLANS AND/OR SURFACE DESIGNED BY: KAS/TTC I / I - FACILITIES. NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. NO WARRANT THAT THE UNDERGROUND UTILITIES SHOWN FILENO. 3015L SHEET 8 OF 15 30 15 0 30 60 ,fX. 20' F.CS.A. \ EX. CROSSWALK ` ARE IN THE EXACT LOCATION INDICATED ALTHOUGH THEY ARE SHOWN AS ACCURATELY AS POSSIBLE CC Il / FROM THE INFORMATION AVAILABLE. I E GA5 S I \ SCALE: 1" = 30' WATER LINE INS L N0. 12001303 1 _ EX S/ — ��_. / I \ S. CONTRACTOR SHALL COORDINATE WORK NEAR FREDERICK WATER (F.W.) FACILITIES WITH THE F.W. 1� n� V-V INSPECTOR. TEST PITS AND WORK SHALL BE PER THE F.W. INSPECTOR REQUIREMENTS(TYP.). / I - LIMITS OF 1 H / I I DISTURBANCE I i EX UTILITY EX Dl VAULT TOP = 673.87 I I a /INV /N = 665.97 1 I I �FRiO c N V 00 OUT = 66575 EX UNDERGROUND FIBER OPTIC I �gULTTILIry EX. SPRINKLER 1 I I I pc 67�T = O1a n m CONTROL VALVE EX UTILITY VAULT 1 I 2 0 vdi m I EX D/ " � / ~ t EX. RlNKLER TOP = 676.54 ' t o W fX. Dl 4 �/ !�` INV /N = 664.22 IjOP = 681.95 _ EX. CG��` CONTRPL VALUE INV OUT = 663.89 I I 3 IN = 675.90 •_ 1 I IN OUT = 675.85 EX HANDICA�,E,XCLlGJ/.I�T RAMPl NP•I I M 0 EX. UTILITY I y �D DIS C VAULT I I he CG EX 30" p �_- - EX. LIGHT I I EX. SMH RCp ` - 1F EX� " TOP = 66336 Iv U,Q /j1/NE=-Ea![-28= BTBRd - {? - 2�L I /NV /N = 653.77 Q z UNDERGROU Ul \ b M - D- INV OUT = 65375 a TELEPHONi 1 I �' 1 M '� D� ^ _ I � }� I •I.• N0. 010008162 _ Ea: `. EX FIRE .� CG \ -.. J4 W EX CC� 0� 7YP.) 1 WYQRANT EX c�G X. 6' CP I i W Z EX. sSMH O:.. r _ LIMITS OF W TOP = 687.55 I b \ U m \ . • 1/ �( EX. UNDERGROUNDS I I fR C� _ __ fX. (yy A�'I' WATERVNE F.W. ESMT.1� _ �/ W .: LIMITS OF FIBER OPTIC i� II�V /N = 675.42 b VA T M DISTURBANCE / • ; . 1` EX UN ERGROUND \� 1 rf OUT = 67519 � �'>� � I sa I EX. FIRE V ® r. EX 'WV HYDRANT EX. Dl EX' wv RC ND SEC. X. ' II I `• ` � � EX TOP = 676.04 E - m � MIT--- INV IN = 667.36 EX INV 63.19 EX. CG rj-1 S n x = 9� IILIMITS OF I DISTURBANCE - IIS INV OUT = 667.04 EX. 12, PVC R \ �S� ^� I FIRE I 1 L _ __ \ = 3.24 \ I I (DISTURBANCE I o HYDRA INV 67 I , ° - _ _ _ _ _ _ -� _ X \ EX FIRE EX. WV DEPARTMENT {I CONNECTION \ � IIS I o £X. UNDERGROUND f III W - " f7BER OPTIC III I --------- SII.�� coII I I M l,. I E'•I PROP. _ V/ EXISTING L Q I BUILDING 11 EX SIGN I. - I �:i EX. S/W Z LLF� D)> l' LL _ 1I > a a U77LITr VAULT '- 1 I ' I EX CG - J w O I� Z U Z II �II• �•�> K WW CCarn W G -O I - . UNOERGROUNDI EX. Dl LL m FIBER OPTIC EX S$MH 1 Q Z I TOP = 679.44 TOP = 679.38 EX. DI INST. N . 170009030 -/ 2 O I: INV /N = 669.91 INV IN = 669.01 TOP = 676.21 1 / U) \ m I f . S� - V OUT = 669.83 �.e;.1 I v Z m INV OUT = 668.58 NV /N = 667.05 EX. UNDERGROUND m I I INV OUT = 66Z02 EX. ;/w TELEPHONE _ / I TOP = 66211 .� IX SMH I V 676 O/ '� TOP = 679.86 r _, .f. ��_� ; INV OUT = 650.47 ,�I U i"+b- INV OUT = 670.31_-- .. I I 1 _ c> T II - EX LIGHT INV 0 T 5ZM {'� -! �:,:. ,i�:-^' ->-' •`I i 24. R -` c�i -i erI - - IIII f (TYP.) / - -- EX. SS/W - - - - - _ EX. CG '. 1 � � �� W X J EX. CG \ I �� ` ` \ / 21 EX. CROSSWALK LIMITS OF BRL PROP.2lY /y/ 1EX. S/W i DISTURBANCE TOP = 671.94 ``w i�S� � I (Q -� EX. SPRINKLER F.W. ESMT. / ° _ INV IN = 666.88 m _LIMITS OF LIMITS OF I EX SIRE O II XCG CONTROL VALVEDISTURBANCE / HYDNA 3 - -' - IW IN_ 664.60(56) EX. HANDICAP ''� DISTURBANCk_RPW��//��`20' D`,MEL CTNDERGROU D , 3 / II S' EX-CROSSWrj(>1C� INST 0 00 162 IIS I EX. UTILITY �34ir EX. I 1 VAULT - I �- I I DERGROUND III TELEPHONE �.,-, F.W ES l LfR \\ EMC ALVf PROP EX. WA ON I I - ! CO VALVE WATF�?LI I FN. ESMT.IA� E py R P Date � ... _ _ - 11 R oe/Le/zoLa fX. FBP-�iL� - EX. CG EX Dl ; 5"'- '�, INV IN = 664.65(24J r � � DRIVE TOP = 676.37 fa: HANDl�4(' PROP. 20' F.W. ESMT. mow, � � �DF EX. WATERLINE EX. CG J� -~ SECURITY s \ -_ _ - EX CG J INV OUT = 671.65 CG _ _ �- -� =EXSC LIMITS OF R - - LIMITS OF EX. HANDICAP) G I EX NAND/CAP DISTURBANCE INST#170007504 - / - J/ - -f = DISTURBANCE F X EX 20 FCSA WATER LINE WATER LINE ESMT. /�Q> �Z I fX. HANDCAR NOTES: ESMT INST. NO 170009030 I VST. NO 170009030 V RA Y L PLER EX HANDICAP £X. 30' FC•S.A-5A- - PS - - - - G- - T f \ __ RAMP$ 1. CROSSWALKS SHALL BE TYPE A CLASS I WHITE PAVEMENT MARKT G. LONGITUDINAL LINES SHOULD BE 12 LIMITS OF RAMPS EX CG ��- 081 _ .- _� _ TO 24 INCHES WIDE AND SEPARATED BY GAPS OF 12 TO 601NCHES. THE DESIGN OF THE LINES SHOULD "� �IC. N0.32809 II RAMPS �1M -G -G �•� •/ o/ �- AVOID THE WHEEL PATHS IF POSSIBLE, AND THE GAP BETWEEN THE LINES SHOULD NOT E%CEED 2.STIMES DISTURBANCE / T --G- G _ _ �- _- _ _ .fOt' CG �� T -C ----G - -- �� y'\� II- BENC _ III EX / -G-- - -..11! ^I- I THE WIDTH OF THE LONGITUDINAL LINES.'] u'I Ij G \� I - P \ 2. CROSSWALK SYMBOLS SHOWN ON THE PLAN ARE TO SHOW THE LOCATION OF THE PROPOSED SED ' EX. Dl. CROSSWALKS. CROSSWALK MARKINGS ARE TO BE LONGITUDINAL WITH THE FLOW OF TRAFFIC AND NAL -S S �, 717P 6J. 6 - MATCH THE EXISTING CROSSWALK MARKINGS ON THE NFCU CAMPUS. DATE: 07/24/2018 J _ ( �� 666. 0( ` \ 4. EEES3. ALL SIIN CONFLICT WITH SIDEWALK TO BE RELOCATED ADJACENT TO TRAIL. TREES WHICH ARE DAMAGED ALKS ARE 5p WIDE. �j'S 7Q l"v-'/ M I D �' EX. SSW DURING RELOCATION SHALL BE REPLACED WITH A TREE OF THE SAME TYPE. THERE SHALL BE NO it II E. $�W REDUCTION IN THE NUMBER OF EES. •�t�-- 5---- ��--F*-'UNDEROIFOUND I E. S H'> SCALE: 1"=30' GAS LINE I, I T P fiJ .99 fX. CG I 5. ALL SIDEWALKS ARE TYPE A UNLESS NOTED OTHERWISE. EX 0l EX 8" GRAVI v I _ I / V l - �'68. 5(f S. ALL TRAIL SLOPES OVER 5% IDENTIFIED ON PLAN AS SHOWN. _ -___ - - �� TOP = 675.90 4' FORCE MAI } I f°- N-6 3 RO GA Ll E E R. 8 / 7. THE UNDERGROUND UTILITIES SHOWN HEREON HAVE NOT BEEN PHYSICALLY LOCATED BY THE DESIGNED BY: KASITTC • 1 SURVEYOR, HOWEVER, THE INFORMATION WAS OBTAINED FROM EXISTING PLANS AND/OR SURFACE EX. SMH INV OUT = 673.17 (APPROX. e I !�V OUT = 658.49 - OP - 74. 4 EX Dl 3 \ I m r C 69 62 / '" FACILITIES. NO GUARANTEE THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN FILE NO. 3015L TOP = 661.76 EX. L UNDERGROUND - ' THE AREA, EITHER IN SERVICE OR ABANDONED. NO WARRANT THAT THE UNDERGROUND UTILITIES SHOWN 30, 15 0 30 60 j EX. SSMH TELEPHONE TOP = 676.61 (70' PVC) 20' F.CSA. k EX CROSSWgLK - lNV /N = 668.39(N) TOP = 680.40 t� / T ARE IN THE EXACT LOCATION INDICATED ALTHOUGH THEY ARE SHOWN AS ACCURATELY AS POSSIBLE /NV /N = 668.89(Wf /NV OUT = 67217 INV OUT = 673.07 Wq7 LINE ESML / SHEET 9 OF 15 SCALE: 1" = 30' 10'PVC FROM THE INFORMATION AVAILABLE. INV OUT = 668.17 ( i INST. N0. 720013038 I EX. Sl / I\ 8. CONTRACTOR SHALL COORDINATE WORK NEAR FREDERICK WATER (F.W) FACILITIES WITH THE F.W. FINSPECTOR. TEST PITS AND WORK SHALL BE PER THE F.W. INSPECTOR REQUIREMENTS (TYP.). 18-09 t - NN +00 23+00PROPOSED 1 'y0 �O.q m m uNi a 682 "r`v' S DEWALK SEE NOTE #2 THISSHEET FUTURE 3 `24+00 �. _ _ - TRAIL#3 _ - END SIDEWALK PHASE2K - - _ _ - - - _ _ PHASE I I v LL 45:@8% 592-� FUTURE BOARDWALK O ` - TO BE CONSTRUCTED 0+50�D 4 — `• 'gw -__� — �— ��_ B80 IN PHASE 2 TRAIL#5 _ PROPOSED -D- \; _ _ - 1. .�-�y,_ 682�� _ ' SIDEWAL / ,\ -- - 2 0 00_M D PROP STAIRS (18itj ` - -W/HAN RAIL PROP:STA[RS BR _-k:75' @ 6% �{ -- Ml-�--D,_--., JAI HANDRAIL ---_- �� _ Q 3W i Oj '• \ 0 -30fiz 0+O W z OJCROSSWAL-K Oj 0 �.\ LIMITS OF 0. UJI PIZL J 301 W PROPOSED ' CROSSWALK �L•� PROPOSED SIDEWALK TYPE B, TIE INTO I PROPOSED ® �, �7---� 'I •" EXISTING SIDEWALK CROSSWALK 4+0 30 15 0 30 60 SCALE: 1" = 30' V! TRAIL 5 TRAIL 3 Q a .J 690 0 -- - - oo � b a - PROP. GRADE - - __ @ X -SEC. O7c= - - 690 _ b - 660 870 yIt - 660 670 690 880 - 680. 670 EX, GRADE @ - X -SEC_. � 2.00% -- - ZROP.GRADE SEC 680 _ - - - - - 670 Z 670 ----__ U - 660 680 N --. 660 880 - -- - 0 670 - LLJ -- 670 O J 0- LL — - _. Z 850 _J I O b 11 O O C o -Q _ _ - — _ ----B50 850 - - - 690 680 0 880 I b j C. -GRADE @.- _ 1fwE0, b a - PROP. GRADE - - __ @ X -SEC. O7c= - - 10 20 30 w0 EX. GRADE @ X -SEC. _ - - - 660 870 yIt U Y 660 670 690 880 ---- _ 680 - 670 Lu Lu -_ QLL Z w ----__ U a 660 - N --. 660 - -- - 670 - U -- 670 LL - _. Z 650 _J I O b 850 - 880 - 660 650 - - - " - -� - 650 690 680 0 - - tl - _ - PROP. GRADE - @ X -SEC. 2.001 \ -- - - 890 10 20 30 w0 EX. GRADE @ X -SEC. _ - - - 660 870 yIt U Y 660 670 J_ a �W RGP GRADE @X C. - 670 Lu Lu -_ QLL Z w ----__ U a 660 - N --. 660 - -- - U LL - _. Z 650 _J I O b 850 - -- --- -•" .. cu cv 0 Q o� aZ 0 10 20 30 w0 22+00 CROSS W � 24+00 yIt U Y 660 670 J_ a �W RGP GRADE @X C. - 670 Lu Lu -_ QLL Z w ----__ U a N --. -- - - -- - U LL Z -- --- -•" .. cu cv -au -Lu -1u u 10 20 30 -30 -20 -10 0 10 20 30 CROSS SECTION 0+50 CROSS SECTION 22+00 CROSS SECTION 24+00 680 690 660 — — - @ - 660 670 RGP GRADE @X C. - 670 -_ 860 850 ----__ T3 _ ULL: O J _ fi60 650 --. -- - - -- - F7a 690 _ -- - - 690 690 - 690 Rev. No. Date PROP. GRADE � PROP -Ii - -_ @ X -SEC — I EX. GRADE @ @ X -SEC EX. GRADE C. 1 - - . 2.00% XSEC. � 2.00% XSEC_ OF - ?'7 - 680 __ 660 880 - .� 880 r RA L PLER 04 Lic. No. 32809 0 1� ! D 670 _ _ _ - - - _ _ - - - I .670 670--_— — - 870 +� S� 1-� (1't ---- - - - -. -- - - - p O I 0712412018 660i - - - - - - - - 660 680 — - - — 680 SCALE: AS SHOWN Q - - _ - - _--- -- — — - o U DESIGNED BY: KAS/TTC $ 0o U1 650 - - - - 3' - - - --- 850 650 -— -- -- - - - + — FILE NO 3015E 0 650 -30 -20 -10 0 10 20 30-30 -20 40 0 10 20 30 JO -20 -10 0 10 20 30 10 0 10 20 SHEET 10 OF 15 CROSS SECTION 0+00 CROSS SECTION 21+00 CROSS SECTION 23+00 0 SCALE: 1" = 10' 18-09 TRAIL 9 TRAIL 11 710 710 710 - _- — _710 700 700 n ro N oopp N m 700-_ - - 700 780 - _ - 700 690 888 EX. G GRADE _ _ ___ - - e uLL PROP .. 690 -.._- . FR02. -. 880 690 --_ - _ 690 880- 8� ;1- - EX. GRADE @ _ PROP. - - - - - -- -- - - - - _ --- XaSEC. _ @ X -SEC _ 2.00%. 680 - - - - - _ LL - 880 880 - - - - _ - _ O LL - _ 880 870 - - d - - o _ - - - _ 670 U U - - ' 0670 870 670Wr W _ -- �ry F6560 T 0+ TRAIL#5 66 66 � 60 -30 -20 � 0 10 50 20 30 e FQ 30'@ .5% —_SIDEWA_ CROSS SECTION 2+00 CROSS SECTION 5+00 CROSS SECTION 2+00 0 00 M ' "I +50bm 710 G_12 � �710 _ I I o 710 _ _ _ _ 700 Uzi b 0+0 7� - - 799 766 700 890- _ 690 \ - EX. GRA SE@ 1 33 a PROP.. RADE ' I PROPOSED CROSSWALK - I 1 PROPOSED SIDEWALK • TYPE B, TIE INTO 690 - - - - - X-SE.C_ .._ - _ _ - - OS CRADE __ -- - - 690 890 -. -_ _ - - _ -- __ 888 - - _ 880 - - - @ X -SEC. - - - / EXISTING SIDEWALK �! 2.00% GRADE X -SEC. - -- --uj .680 2.00 , -- - - - - V ♦ 4+00 1 4+60— �i. 880 - - - - 880 680 _ - - 660 670 - - 3 _- - - - __ '. 670 i 4�- I - o LL LL O U 670 870 670 -_ d° _ - 670 880 - - - --- 0 Z J Z v 011:01 o - — - n 880 a 680 880 0 _ - _ — 660. - 850' L - o ii- 650 W F -30 -20 -10 0 10 20 30 JO -20 -10 0 10 20 30 -30 -20 _ -10 _ 0 10 20 30 V% � N Y CROSS SECTION 1+00 CROSS SECTION 4+00 CROSS SECTION 1+00 4 PROPOSED I 718 710 710 710 A ~ W ALK I hl I --����JJJJ _ ^� m = -I-- o _- -- - 5� rim Zw 3+00 I OP Tao 700 700 700 700' — � Toa Q w 47 .• � � = I � — _ TRAIL #9 {{' ' 1 �I EX. GRADE @ PROP. GRADE LL '' Im .• I 690 EX. GRADE @ _ _ _ 888 690 - X -SEC. �K-SEC. 690 690 - -- - - - F 690 X -SEC. - PO3 _ .. E- - _ - - _ -- _ - .. - ___ 2.00% 1 __ • iij 2.00°k 680 - _ -- - 680 680 - _ - - - _ - 680 680. .680 _ rn 2+00 I Z 2+0 ( - _ _ _ I EX. W/L J _ _ _ _ _ -_ _ C7 i I I 870 CROSSING -, - - 870 870 670 6701 670 IT1 I , - - - J -- - --- - - _ J _ _ o rnrl �o,;o ---- — s - -- o - < oo - 880 - 0 10 860 660 660 660 660 Rev. No. Date -30 -20 •10 20 3 -30 -20 -10 0 10 20 30 -30 -20 -10 0 10 20 30 CROSS SECTION 0+00 CROSS SECTION 3+00 CROSS SECTION 0+00 E4 op 575 —' ^67� PROP. 20� F.W. ESMT. F ' /9 /� 0 55 �� y J RAf�tlY L EPLER PROPOSEDL n/ N IC. 0. 32809 N I 1 `� SIDEWALK 3 n , �-itr-DJ�c31� �( r S NOTE 2 ( TH S SHEETSEE POP. S O OSSIONAL + I - _ 0 00 0+00 \ 678 DATE: 07/24/2018 D M� / 1' .-C SSW O J SCALE: AS SHOWN 3J� ' 1+00 2+00 In DESIGNED BY: KASffTC �- TRAIL#11 PROP. 20'� FILE NO. 3015E I -- 0 SECURITY DRIVE F.W. ESM'T. 50' WW 10 10 20 -�--� 30 15 0 30 @8% r � \ INST.#170007664 6 / I � �� O 63, - G- SCALE: 1" = 10' SHEET 11 OF 15 _�..trypy7-F1Z%g�l - - c- - - 18-09 1�apa f�� -/0 log r • L_ TRAIL 12 TRAIL 13 N N O ,I ry N E t jj � c d 1LL - - 3 ~ - 690 690 690 - - - -- 690 ;_ °-� —�� ••�`_.•_ .� '✓:` 190 - / ,'•;) / _ �`-, I � 880 _ EX. GRADE PROP. GRADE - - - 880 - 680 EX. GRADE@ X -SEC. PROP GRADE _ 680 } C7 ' @ XSEC. Q X-SECPROP.W. ?I r@ X -% 2.00% l 2:00% W F.W. ESMT. 670 $70 670 670_ Z� W PR00�-z Wil. 3 n n SID WA RO OSE--3� •� / /5/ 0 o ::: C7 `r �T PdOPOSED - RAI #13 SID WA E 8 r�-� / V ./. l .•:.- .- - - o �W - _ OSSWALK I I - •-•- _ � �✓ .. --`- r 860 _ _ ___ J x _ .660 860 -- fi p o -- -_ o 660 \/ s\ 1 gPROP. , - y x W. ESMW. .. --678 _ i 678.. I '.,. d,.. _'.. 676 SINTO _ - C_ __ a pJ -�• "C 674 ,.. .. ---CR o n _ . •..., r ,. 880 - --- - 3 _. 650 650 i o - 650 -- 40 -20 .10 0 10 20 30 -30 _ .20 -10 0 10 20 30 2 s __ CROSS SECTION 2+00 CROSS SECTION 2+00 PROP. 20' b \ \ JLt00_ / / / / /� 1+ S i R . 20' \ ` - F W. ESMT. y1 r �� _ TIE NTO EX. --�G=- T F. - - _- / _ — EWALK �- 2+00 TS /,�/ -�4:;�i874 - 2+17 mom I TRAILRI2 690 - 890 - - - '690 _ 1 690 _ -S -- 00 SED JDE �� SIDEWALK :. —E B 9 INTO X / I LK �I `' .- � - GOOF _._ - _X - - 880 680 EX GRADE C--- X -SEC. -- -- .880 W _ I I` I I l I 1 '- - _. '• Sv I e •. T _ -SEC. - @X -SEC.. -�XS --- -1 z2 670 - - - - - 870 670 - - 870c � O - - - I' 4E 1 _ \ \ - _ a x 880 a. 660 880 Z — 1 I <� x /Qy Ur WO W 0 rc� co C.)•� "IY,� I 130 y M I 650 _ _ S _ 650 650 650 Q a •••{{{��^ 30 20 0 0 10 29 36 .30 -20 26 30 a LU 1s o 3o so CROSS SECTION 1+00 CROSS SECTION 11+00 w °W zct tL SCALE: 1" = 30'- - Q 690 - - - - - - - - - - 690 690 - --- 690 I LL EX. GRADE @ _- �U -_ - -- X - "EC . ! L 680 EX. GRADE - = PROP. GRADE -_-, _ _ 880 680 PROP. GRADE XSEC. 680 @X -SEC. _ �� 200% - -- ?� 2.00% - 670 - - - - - - - — 670 670 - - - - 670 o X O J _ 660 660 660 - xo 660 _ Q Date o a, - 650 650 650 1650 00 -30 -20 .10 0 10 CROSS SECTION 0+00 20 30 .30 .20 -10 CROSS 10 SECTION 0+00 20 30 OPv o 04 o RAN L PLER Lic. No. 32809 �•,�9-Sc�rZa�3 v s �1� SIONAL w' 0 o II DATE: 07/24/2018 O Q SCALE: AS SHOWN U In DESIGNED BY: KAS/TTC FILE NO. 3015L 10 0 10 20 O SCALE: 1" = 10' SHEET 12 OF 15 18-09 2016 ROAD & BRIDGE STANDARDS HAMA%.6'-0"--f�MAX. 6'-0"+{ GRIPPING RAIL SEE ROAD FOR RETAINING PLANS ACCESSIBLE ELEMENTS OF A FACILITY THAT CM BE APPROACHED, ENTERED HR -1 ,I L_4'/1' OG. )'4" NPS PIPE PICNEi WALL DETAILS. 6'-0" MAX. 6'-0" �1 I I 4'/R" O.G %" SOLID PICKET_MAX. THAT THE SLOPE AT THE CONNECTION OF THE CURB OPENING IS DETECTABLE WARNING SUFACES. PRODUCTS NOT LISTED SHALL MEET RMP 12'1 MAX 481 MA% PERPENDICULAR TO THE CURB. 5.01N THE REQUIREMENTS OF THE SPECIAL PROVISION FOR CG -12 DETECTABLE 9. TYPICAL CONCRETE SIDEWALK IS 4" THICK. WHEN THE ENTRANCE RMIICANNOT WARNING SURFACE AND SHALL BE SUBMITTED TO THE STANDARDS AND S 6 ]] e 8 8 ACCOMMODATE THE TURNING REQUIREMENTS OF ANTICIPATED HEAVY TRUCK MIN SPECIAL DESIGN SECTION FOR APPROVAL. I 3, I/i' 4' DIA. SOLID STEEL SMOOTH FLOOR OR BY USING PERMISSIBLE CONSTRUCTION JOINT WITH REQUIRED BMS. 50 10, 4, IF RAMP FLOOR IS PRECAST, HOLES MUST BE PROVIDED FOR DOWEL BARS 10'1 MAX THE MINIMUM WIDTH SHALL BE THE WIDTH OF THE SHARED USE PATH. ROSTMDOOD (T OR II, WHEN ONLY ONE CURB RMP IS PROVIDED FOR TWO CROSSINGS )DIAGONAL% PRECAST RAMP FLOOR. PRECAST CONCRETE SHALL BE CLASS A 4, TYPE A 5, REOUIRED BMS ME TO BE NO.5 X 5" PLACED )'CENTER TO CENTER ALONG PEI INTO THE CROSSWALK WITHOUT GOING INTO THE TRAVELWAY. THIS 4'A 4' BOTH SIDES OF THE RAMP FLOOR. MID -DEPTH OF RAMP FLOOR. MINIMUM i LANDING AREA MAY INCLUDE THE GUTTER PAN. I i 12, 6. CURB / CURB AND GUTTER SLOPE TRANSITIONS ADJACENT 10 CURB RAMPS . �l 5'MIN CURB AT ENTRANCES OR STREET CONNECTIONS THE DETECTABLE ME INCLUDED IN PAYMENT FOR CURB / CURB AND GUTTER. GROUNDING 7. CURB RAMPS ARE TO BE LOCATED AS SHOWN ON THE PLANS OR AS DIRECTED -MODIFIED AS RECOMMENDED BY THE MANUFACTURER TO MATCH 27 BY THE ENGINEER. THEY ME TO BE PROVIDED AT INTERSECTIONS WHEREVER I ELECTRODE 12�MAY M ACCESSIBLE ROUTE WITHIN THE RICHT OF WAY OF A HIGHWAY FACILITY V - INDICATES TOTAL VOLUME OF STEPS N CUBIC YARDS, u CROSSES A CURB REGARDLESS OF WHETHER SIDEWALK IS EXISTING. PROPOSED, WITH ANCHOR OR NONEXISTENT, THEY MUST BE LOCATED WITHIN PEDESTRIAN CROSSWALKS NOT TYPE B 2 RAIL EXPANSION JOINTS AT 1' BT S JI IIS 1.265 75 1.496 DROP INLETS ETC ACCESSIBLE ROUTES PROVIDE A CONTINUOUS INTERVALSRETAIN) El UN 7 ITYPC 1.180 71 30 FEET 104 0.259 13 8 9 u� 88 1.574 101 1.861 EDULE 80 PIPE SCC 0.287 ' 9 12 1.4LT WALvTnmG EDULE 40 PIPE L S MRS (2 PIPE DIM 0.315 OE TECTABLE MIN O EXPANSION JOINT :ORNIMN. NPS OED.) SCHEDULE 440 PIPE AT BACK OF CURB 0.343 I- � 11 S" SEE PI KETS SOL0D5' EL TH 0 121 BASE DIAMETER 1]] 0.370 IB 11 13 1.793 ANCHOR BOLTS (FOR USE ALONG SIDEWALKS AND RAMPS) SEE ROADWAY PLANS 2" min. 12" OR TYPICAL SECTIONS MIN CONCRETE STEPS FOR DISTANCE TO I'/i' NPS SCHEDULE 40 PIPE POSTS : P/j' MIN. NPS (1.90" O.D.) SCHEDULE 80 PIPE GRIPPING RAIL SIDEWALK OR SHARED RAILS P/j' MIN. NPS (1.90" OD.) SCHEDULE 40 PIPE USE PATH. GRDUNDNG HR -1 TYPE I HANDRAIL `2 2'/" min ELECTRODE MINI (FOR USE ALONG STEPS) NOTES %" SOCIO STEEL 1. THE CONTRATOR SHALL SUBMIT DRAWINGS DETAILING ALL SMOOTH ROUND ROD ASPECTS OF FABRICATION AND INSTALLATION OF RAILING. CONCRETE FOOTING TO INCLUDING CONCRETE FOUNDATIONS FOR APPROVAL BY THE BE DESIGNED BASED ON GRIPPING RAIL DETAIL ENGINEER PRIOR TO INSTALLATION. SHOP DRAWINGS SHALL 2" ANCHOR BOLTS (FOR USE ALONG SIDEWALKS AND RAMPS) BE SIGNED AND SEALED BY A PROFFESSIONAL ENGINEER. SOIL CONDITIONS. HOLDING A VALID LICENSE TO PRACTICE ENGINEERING IN MIN GRIPPING RAL SHALL BE INSTALLED WHEN THE COMMONWEALTH OF VIRGINIA. THE SIDEWALK OR RAMP GRADES ME EQUAL 2. ALL RALING COMPONENTS AND FASTENERS SHALL BE GAVMIZED IN EARTH FOUNDATION DETAIL RNLOWILLRBETER THAN 5 INCIDENTAL TOTHEPERCENTGRIPPING OF TO ACHIEVEEWITH A UNIFORM COATING ON ALLT ROAD MSURFACCES VEIDGE NTINGAND (FOR USE WITH TYPE IIM IIIRAUNGS) THE RAILING. DRAINAGE HOLES FOR GALVANIZING SHALL BE INCLUDED IN THE SHOP DRAWINGS. 3. ALL FASTENERS SHALL BE IN ACCORDANCE WITH ASTM A307, ASTM A563, AND ASTM F846. ALL ANCHOR BOLTS SHALL BE IN MAX. 6'-0 MAY. 61-0. SEE ROAD PLANS ACCORDANCE WITH PASHTO M314, GRADE 36. 4'/°" O.C. Y" NPS PIPE PICKET 4' FOR RETANING 4. A CHEMICAL ANCHOR SYSTEM FROM VDOT'S APPROVED MATERIAL SOLID PICKET 4 WALL DETAILS. LIST MAY BE USED IN LIEU OF CAST IN PLACE ANCHORS AND SHALL BE INCLUDED IN THE SHOP DRAWINGS. 5, POSTS SHALL BE MITERED TO MATCH GRADE OF RAMPS, SIDEWALKS, AND STEPS. 6. HANDRAILS SHALL MATCH GRADE OF RAMPS SIDEWALKS AND STEPS. n 7. ALL POSTS AND PICKETS SHALL BE SET PLUMB. 6. RALINGS SHALL BE GROUNDED AND EFFECTIVELY BONDED. GROUNDING MATERIALS INSTALLATION TO BE IN ACCORDANCE I WITH ST D. FE 6. 9. COMMERCIALLY AVAILABLE RALING SYSTEMS MAY BE USED IN LIEU OF DESIGNING AND FABRICATING THE RAILING DOCUMENTATION FROM AND THE MANUFACTURER VERIFYING THAT PROJECT REQUIREMENTS ME RAL EXPANSION JOINTS ATL1 BOLTS MET WITH THE RALING SYSTEM SHALL BE SUBMITTED WITH THE INTERVALS NOT EXCEEDING 3" MAX. INSTALLATION DRAWINGS AND APPROVED BY THE ENGINEER IN 30 FEET. ACCORDANCE WITH NOTE 1. i'-3" POSTS 2" MIN. NP5 (2.375" 0.0.) SCHEDULE BO PIPE 10. HANDRAIL TO BE IN ACCORDANCE WITH THE LATEST EDITION OF RETAKING WALL RAILS 2" MIN. NPS (2.375" O.D.) SCHEDULE AO PIPE THE VIRGINIA UNIFORM STATEWIDE BUILDING CODE. EXPANSION JOINT PICKETS : Y" MIN. NPS (1.05" 0.0.) SCHEDULE 40 PIPE 11. THIS HANDRAL IS TO BE USED ONLY IS A PROTECTION FOR OR MIN. SOLID STEEL SMOOTH ROUND ROD GROUNDING PEDESTRIANS AND SHOULD NOT BE PLACED IN MY LOCATION HR -1 TYPE III BICYCLE RAILING ELECTRODE FORRVEHICULART PROTECTION STANDARD GUARDRTO MY AIL SHOULD (FOR USE ALONG SHARED USE PATHS) BE USED SPECIFICATION A COPY OF THE ORIGINAL IGNFILE IN THE CENTRAL OFFICE. \VDOT REFERENCE STANDARDHANDRAIL ROAD MO BRIDGE STANDARDS 105 METHOD OF LOCATING AND ERECTING REVISION DATE SHEET I OF 1 236 VIRGINIA DEPARTMENT OF TRANSPORTATION 7111 601.05 504 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS HYDRANTS CG -12 NUMBER OF BMS A NOTE: COMPONENTS OF CURB RAMPS CONSIST OF THE FOLLOWING: ACCESSIBLE ELEMENTS OF A FACILITY THAT CM BE APPROACHED, ENTERED INSTALLED ON A RADIUS DETAIL HYDRNJLIC CEMENT SIDEWALK (DEPTH IN INCHES, AREA IN SQUARE YARDS) GENERAL NOTES: CURB WHEN REQUIRED (CG -2 OR CG -3 IN LINEAR FEET) DETECTABLE WARNING SURFACE (AREA IN SQUARE YARDS) L THE DETECTABLE WARNING SHALL BE PROVIDED BY TRUNCATED DOMES. EACH OF THE ABOVE ITEMS IS A SEPARATE PAT ITEM AND SHOULD BE SUMMARIZED FOR EACH CURB CUT RAMP. 2. DETECTABLE WARNING SHALL BE FROM THE MATERIALS APPROVED LIST FOR SIpEWALK THAT THE SLOPE AT THE CONNECTION OF THE CURB OPENING IS DETECTABLE WARNING SUFACES. PRODUCTS NOT LISTED SHALL MEET RMP 12'1 MAX 481 MA% PERPENDICULAR TO THE CURB. 5.01N THE REQUIREMENTS OF THE SPECIAL PROVISION FOR CG -12 DETECTABLE 9. TYPICAL CONCRETE SIDEWALK IS 4" THICK. WHEN THE ENTRANCE RMIICANNOT WARNING SURFACE AND SHALL BE SUBMITTED TO THE STANDARDS AND S 6 ]] e 8 8 ACCOMMODATE THE TURNING REQUIREMENTS OF ANTICIPATED HEAVY TRUCK MIN SPECIAL DESIGN SECTION FOR APPROVAL. 12 3, SLOPING SIDES OF CURB RAMP MAY BE POURED MONOLITHICALLY WITH RAMP 4' TRUCK TRAFFIC) FOR CONCRETE DEPTH. FLOOR OR BY USING PERMISSIBLE CONSTRUCTION JOINT WITH REQUIRED BMS. 50 10, 4, IF RAMP FLOOR IS PRECAST, HOLES MUST BE PROVIDED FOR DOWEL BARS 10'1 MAX THE MINIMUM WIDTH SHALL BE THE WIDTH OF THE SHARED USE PATH. THAT ADJOINING FLARED SIDES CM BE CAST IN PLACE AFTER PLACEMENT OF II, WHEN ONLY ONE CURB RMP IS PROVIDED FOR TWO CROSSINGS )DIAGONAL% PRECAST RAMP FLOOR. PRECAST CONCRETE SHALL BE CLASS A 4, TYPE A 5, REOUIRED BMS ME TO BE NO.5 X 5" PLACED )'CENTER TO CENTER ALONG PERPENDICULAR INTO THE CROSSWALK WITHOUT GOING INTO THE TRAVELWAY. THIS 4'A 4' BOTH SIDES OF THE RAMP FLOOR. MID -DEPTH OF RAMP FLOOR. MINIMUM 27 LANDING AREA MAY INCLUDE THE GUTTER PAN. CONCRETE COVER 1'/2'. 12, 6. CURB / CURB AND GUTTER SLOPE TRANSITIONS ADJACENT 10 CURB RAMPS . �l 5'MIN CURB AT ENTRANCES OR STREET CONNECTIONS THE DETECTABLE ME INCLUDED IN PAYMENT FOR CURB / CURB AND GUTTER. V • 1.000 W1.88(N-ll•0.]50(WN•11.1.48 7. CURB RAMPS ARE TO BE LOCATED AS SHOWN ON THE PLANS OR AS DIRECTED -MODIFIED AS RECOMMENDED BY THE MANUFACTURER TO MATCH 27 BY THE ENGINEER. THEY ME TO BE PROVIDED AT INTERSECTIONS WHEREVER THE BACK OF CURB. 12�MAY M ACCESSIBLE ROUTE WITHIN THE RICHT OF WAY OF A HIGHWAY FACILITY V - INDICATES TOTAL VOLUME OF STEPS N CUBIC YARDS, u CROSSES A CURB REGARDLESS OF WHETHER SIDEWALK IS EXISTING. PROPOSED, WITH ENDING OR NONEXISTENT, THEY MUST BE LOCATED WITHIN PEDESTRIAN CROSSWALKS NOT TYPE B 2 M SHOWN ON PLANS OR AS DIRECTED BY THE ENGINEER. AND SHOULD 6 7 HE LOCATED BEHIND VEHICLE STOP LINES. EXISTING LIGHT POLES. FIRE PARALLEL 1.265 75 1.496 DROP INLETS ETC ACCESSIBLE ROUTES PROVIDE A CONTINUOUS _..... TR GATED UNOBSTRUCTED, STABLE, FIRM AND SLIP RESISTANT PATH CONNECTING ALL NUMBER OF BMS A DETECTABLE WARNING ACCESSIBLE ELEMENTS OF A FACILITY THAT CM BE APPROACHED, ENTERED INSTALLED ON A RADIUS DETAIL AND USED By PEDESTRIANS. DETAIL e. RAMPS MAY BE PLACED ON RAII OR TANGENTIAL SECTIONS PROVIDED THAT WE N-9 CG -12 DETECTABLE THE CURB OPENING 1S PLACED WITHIN THE LIMITS OF THE CROSSWALK AND SURFACE SPECIFICATION REFERENCE THAT THE SLOPE AT THE CONNECTION OF THE CURB OPENING IS 5. ONSTEPS 88 MORE INCHES�. ONE HANDRAILON EACH SIDE, AND ONE NTE IMEDATE H.MEIRAL QUANTITIESFOR TABULATION OF CONCRETE AND STEEL QUANTITIESSEE SHEET 2. PERPENDICULAR TO THE CURB. 5.01N TYPICAL PLACEMENT 9. TYPICAL CONCRETE SIDEWALK IS 4" THICK. WHEN THE ENTRANCE RMIICANNOT 5 S 6 ]] e 8 8 ACCOMMODATE THE TURNING REQUIREMENTS OF ANTICIPATED HEAVY TRUCK MIN NOTES) 12 y. TRAFFIC, REFER TO STANDARD CG -13, COMMERCIAL ENTRANCE (HEAVY SHEET I OF 5 REVISION DATE TRUCK TRAFFIC) FOR CONCRETE DEPTH. AT INTERSECTION 10, WHEN CURB RAMPS ME USED IN CONJUNCTION WITH A SHAPED USE PATH, 502 03.05 THE MINIMUM WIDTH SHALL BE THE WIDTH OF THE SHARED USE PATH. BARS B N0.4 II, WHEN ONLY ONE CURB RMP IS PROVIDED FOR TWO CROSSINGS )DIAGONAL% 0.494 0.587 Off EXIST. SID� A 4'w 4'LANDING AREA SHALL BE PROVIDED TO MANEUVER A WHEELCHAR WITHIN CROSSWALK 2 INTO THE CROSSWALK WITHOUT GOING INTO THE TRAVELWAY. THIS 4'A 4' OR SHOULDER. 27 LANDING AREA MAY INCLUDE THE GUTTER PAN. 12, ALL CASES WHERE CURB RAMPS INTERSECT A RADIAL SECTION OF 3 o CURB AT ENTRANCES OR STREET CONNECTIONS THE DETECTABLE V • 1.000 W1.88(N-ll•0.]50(WN•11.1.48 WARNING SURFACE SHALL HAVE A FACTORY RADIUS OR BE FIELD 0.148 -MODIFIED AS RECOMMENDED BY THE MANUFACTURER TO MATCH 27 0.]81 THE BACK OF CURB. A -A 0.176 V - INDICATES TOTAL VOLUME OF STEPS N CUBIC YARDS, u 6 WITH ENDING RMP } � 2 10 6 7 1.034 63 1.265 75 1.496 87 0.231 12 7 8 1.180 71 1419 N 1.878 104 0.259 13 8 9 u� 88 1.574 101 1.861 122 0.287 5 %-65% OF BASE DIAMETER 9 10 1.4LT 94 1.728 US 2.043 DIM 0.315 OE TECTABLE WARNING M 7.540 112 AT BACK OF CURB 0.343 I- � 11 S" SEE NOTE 12 121 BASE DIAMETER 1]] 0.370 IB DOME 13 _,�'IhII.11.IL I AT `A' .2" HIGHER THM EDGE OF PAVEMENT AT XX .SAME AS TOP OF CURB TYPE C PARALLEL S. PERPENDICULAR TRUNCATED DOME zl .6"-2.4" C -C 0 0 0 0 0 0 O O O O O O o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 t o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O 0 O 0 O O 0 O O 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 [ n o 0 0 C 0 0 0 0 0 0 0 0 0 DETECTABLE WARNING UN NUMBER OF BMS A DETECTABLE WARNING 4 INSTALLED ON A RADIUS DETAIL PREFERABLY ON THE RICHT SDE DESCENDING. DETAIL Nb �VDOT WE N-9 CG -12 DETECTABLE WARNING SURFACE SPECIFICATION REFERENCE ROAD MD BRIDGE STANDARDS 5. ONSTEPS 88 MORE INCHES�. ONE HANDRAILON EACH SIDE, AND ONE NTE IMEDATE H.MEIRAL QUANTITIESFOR TABULATION OF CONCRETE AND STEEL QUANTITIESSEE SHEET 2. OOR A MEDWAY THE WIDTH. TYPICAL PLACEMENT W N 5 S 6 ]] e 8 8 (GENERAL NOTES) 12 105 SHEET I OF 5 REVISION DATE Va AT INTERSECTION 0.340 0.405 ` CONCRETE TO BE AIR ENTRAINED. AIR TO BE 6%;1.5. SLUMP TO BE 5": 1" 502 03.05 O)/IS BARS B N0.4 VIRGINIA pEPARTMENT OF TRANSPORTATION I CONCRETE SIDEWALK - B 2016 ROAU IS BKIUGt 51 ANUAKUJ 2016 ROAD & BRIDGE STANDARDS I A BARB A TO BE EWALLY SPACED._ FOR LA0. BMS SEE TABLEE BELOW. AT V2 I. ELEV. PROPOSED OffAND E%ISTNO WALK, BARS YARD, ETC. •-„ S-2 BMS A AND C A - N N .n ONE BM 8 TO BE BMS B BARS A PLACED )RIOTER EACH STEP AND TWO UaER PLAN ENDING AS SHOWN. BARS CM 4 Vt - 1.000 CU. FT. V1 HNaRIS TO BE FOR STEPS IUVNG THREE OR MORE RISERS, Na WILL MEET THE NUMBER OF BMS A - 4 0. W. FT. V}-0.]50750 A LNONG IS TO BE PROVIDED WHEREI2 OR MORE STEPS ARE REWIRED. MNMIM SIZE OF LMaING TO BE W • 1 FOOT X 4 FEET. PREFERABLY ON THE RICHT SDE DESCENDING. 1/zN Nb W. FT.11/z WE N-9 I WM N-11 1 N•12 N-13-25 W- W- W 3' 4' T'p V4. 0.708 CU. FT. 5. ONSTEPS 88 MORE INCHES�. ONE HANDRAILON EACH SIDE, AND ONE NTE IMEDATE H.MEIRAL QUANTITIESFOR TABULATION OF CONCRETE AND STEEL QUANTITIESSEE SHEET 2. OOR A MEDWAY THE WIDTH. TYPICAL PLACEMENT W N 5 S 6 ]] e 8 8 A NO. a 6 1 ] 1 B 10 1 9 1a 11 12 CVRB FROM PICTORIAL VIEW R IS SEEN TNAt1BARS Va AT INTERSECTION 0.340 0.405 ` CONCRETE TO BE AIR ENTRAINED. AIR TO BE 6%;1.5. SLUMP TO BE 5": 1" CWB PROPOSED SLOPE. BARS B N0.4 CROSSWALK I CONCRETE SIDEWALK - B 0.494 0.587 Off EXIST. SID� Y Vt W2V2 (N -1),V3 (WN•11.2V a WITHIN CROSSWALK 2 ..� OR SHOULDER. 27 OGMMB 0.768 m SUBSTITUTING VALUER OF ELEMENTARY VOLUTES' 3 o 0.654 V • 1.000 W1.88(N-ll•0.]50(WN•11.1.48 0.148 4 27 0.]81 SECTION A -A 0.176 V - INDICATES TOTAL VOLUME OF STEPS N CUBIC YARDS, CONCOFETE CIA'6 6 WITH BUFFER STRIP SI VI • VMS[M3INMCVI IND) ATE ELEMEAR NTY VOLUMES Y. W - INDICATES CLEAR WDTH OF STEPS, N FEET, BETWEEN SIDEW&I-S. N - INDICATES NUMBER OF STEPS N NSTALLATDN EXCLUSIVE OF LANDING. Ll - NeDAMS LENGTH OF BARS A N INCHES. L1 - 13.41811 • 8" B" 12" L2 - INDICATES LENGTH OF BMS B. N LACHES. L2 - 12W 0 - INDICATES LENGTH OF BMS C. IN INCHES. L3 - 13.416N • IB" HNaRIS TO BE FOR STEPS IUVNG THREE OR MORE RISERS, Na WILL MEET THE NUMBER OF BMS A FOLLOWINGFRONDED CONDI 1AI 4 11 ON STEPS LESS THAN 44 LACHES WIDE HOMING BOTH SUES ENCLOSED, AT LEAST ONE HANXtAL, A LNONG IS TO BE PROVIDED WHEREI2 OR MORE STEPS ARE REWIRED. MNMIM SIZE OF LMaING TO BE W • 1 FOOT X 4 FEET. PREFERABLY ON THE RICHT SDE DESCENDING. N-1-5 Nb I N-7 WE N-9 I WM N-11 1 N•12 N-13-25 W- W- W 3' 4' T'p h 5. ONSTEPS 88 MORE INCHES�. ONE HANDRAILON EACH SIDE, AND ONE NTE IMEDATE H.MEIRAL QUANTITIESFOR TABULATION OF CONCRETE AND STEEL QUANTITIESSEE SHEET 2. OOR A MEDWAY THE WIDTH. TYPICAL PLACEMENT 6 N 5 S 6 ]] e 8 8 D 6 1 ] 1 B 10 1 9 1a 11 12 12" L2 - INDICATES LENGTH OF BMS B. N LACHES. L2 - 12W 0 - INDICATES LENGTH OF BMS C. IN INCHES. L3 - 13.416N • IB" HNaRIS TO BE FOR STEPS IUVNG THREE OR MORE RISERS, Na WILL MEET THE �• A.'S°VIAE LII0NG 4KA FOLLOWINGFRONDED CONDI 1AI 4 11 ON STEPS LESS THAN 44 LACHES WIDE HOMING BOTH SUES ENCLOSED, AT LEAST ONE HANXtAL, A LNONG IS TO BE PROVIDED WHEREI2 OR MORE STEPS ARE REWIRED. MNMIM SIZE OF LMaING TO BE W • 1 FOOT X 4 FEET. PREFERABLY ON THE RICHT SDE DESCENDING. CROSSWALK 2. ON STEPS LESS THAN 44 INCHES WIDE HAVING ONE SIDE OPEN. ONE HANDRAIL ON EACH SDE. THS ITEM MAY BE PRECAST OR CAST N PLACE. 3. ON STEPS LESS THAN 14 INCHES WIDE HAVING BOTH SIDES OPEN, ONE HANDRAILON EACH SDE. CONCRETETO BE CLASS A3 IF CAST N PRIPLACE. 4000 PSI F PR FOR OTHER WIDTHS THE APPROXIMATE SPACING OF BARS A 4. ON STS. MORE THAN 44 NCIES WIDE BUT LESS 88 INCHES RDE, ONE HNDRNL ON L BE EUV& TO /N WITH A WNRIM SPACING OF 6". CHES WILLOO N INCHES EACH REINFORCING BARS TO BE USED N NSTKLATIONS OF 5 OR MORE STEPS. 5. ONSTEPS 88 MORE INCHES�. ONE HANDRAILON EACH SIDE, AND ONE NTE IMEDATE H.MEIRAL QUANTITIESFOR TABULATION OF CONCRETE AND STEEL QUANTITIESSEE SHEET 2. OOR A MEDWAY THE WIDTH. ERENa STANDARD CONCRETE STEPS FOR 2:1 SLOPE ROAD AND BRIDGE STANDARDS W157 REVISION CAE S1EET / OF 504 VIRQNIA DEPARTMENT OF TRANSPORTATION BOLOS CG -12 W5 DOWELS, 8" LONG AT 13" C -C- -.. PERMISSIBLE CONSTRUCTION JOINT , n 2016 ROAD & BRIDGE STANDARDS 12:1 MAX, 1:'s\ 1e 2 «l zt MAX IPIWITH BUFFER STRIP TRUNCATED DOMES SEE SHEET IOF 5 FOR DETAILS 5'-0" MN SHAPE LO MATCH FACE OF ROADWAY CURB BACK OF CURB 20:1 48:1 A 2'MIN. SECTION A -A WITH BUFFER STRIP WITHOUT BUFFER STRIP 7 p 4'MI. TYPE 8 PARALLEL APPLICATION ROADWAY GRADE IN PERCENT �• A.'S°VIAE LII0NG 4KA 0 4 •/ OUT59E CF TRAVELWAY 5 CROSSWALK CUM I..L BE lK010 O 10i NOTES: FOR GENERAL NOTES ON THE DETECTABLE WARNING SURFACE. 3 6 AERPEM%CMAR CRMSW0.1 SEE SHEEL 1 OF 5. B 3' iiv cu....K AMI° 0 TYPICAL PLACEMENT 6 N 5 CURB THE REQUIRED LENGTH OF A PARALLEL RAMP LBS. W. YARDS CVRB BIFFER STRP IS LIMITED i0 15 FEET, REGARDLESS OF THE AT INTERSECTION 0.340 0.405 ` CONCRETE TO BE AIR ENTRAINED. AIR TO BE 6%;1.5. SLUMP TO BE 5": 1" CWB 5'SIDEWKK SLOPE. 2 CROSSWALK I CONCRETE SIDEWALK - B 0.494 0.587 a 0.093 WITHIN CROSSWALK 2 MO` CROSSWALK ��:) TYPE 8 PARALLEL APPLICATION ROADWAY GRADE IN PERCENT MINIMUM RAMP LENGTH IN FEET 4" CURB B' CURB 0 4 fi I 5 4" 4000 PSI VDOT 6X6 WWM 2 4" 4000 PSI VDOT 8 3 6 9 4 B RE9F. STELZ 5 0 S 6 N 5 WITHOUT BUFFER STRIP \VDOT CG -12 DETECTABLE WARNING SURFACE SPECIFICATION ROM AND BRIDGE STANDARDS REFERENCE SHEET 3 OF 5 REVISION DATE TYPE 8 (PARALLEL) APPLICATION Ds 203.07 0)/16 VIRGINIA DEPARTMENT OF TRANSPORTATION 502 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS S-2 WIDTH VARIES WIDTH VARIES 2 MIN SEE SITE PLAN 2' MIN TABLE OF QUANTITIES DIAGONAL PLACEMENT LAMONG 48:1 MM, 4" 4000 PSI VDOT 6X6 WWM W - 3' 4" 4000 PSI VDOT saPE INCREMENTS a18 1M N CONCRETE RE9F. STELZ LINGIG 48:14A%. A 48:1 WV. CONCRETE STEEL N so LBS. W. YARDS LBS. W. YARDS LBS. W. YARDS CVRB 1 0.2]5 M 0.340 0.405 ` CONCRETE TO BE AIR ENTRAINED. AIR TO BE 6%;1.5. SLUMP TO BE 5": 1" CWB 9 1 2 CROSSWALK I CONCRETE SIDEWALK - B 0.494 0.587 a 0.093 1 2 MO` CROSSWALK ��:) VER 1 OGMMB 0.768 0.120 3 4 0.654 0.802 0.950 0.148 4 5 0.]81 OWn n CMN 0.176 CONCOFETE CIA'6 6 WITH BUFFER STRIP 1.111 61 1.315 71 2 10 6 7 1.034 63 WITHOUT BUFFER STRIP \VDOT CG -12 DETECTABLE WARNING SURFACE SPECIFICATION ROM AND BRIDGE STANDARDS REFERENCE SHEET 3 OF 5 REVISION DATE TYPE 8 (PARALLEL) APPLICATION Ds 203.07 0)/16 VIRGINIA DEPARTMENT OF TRANSPORTATION 502 2016 ROAD & BRIDGE STANDARDS 2016 ROAD & BRIDGE STANDARDS S-2 WIDTH VARIES WIDTH VARIES 2 MIN SEE SITE PLAN 2' MIN TABLE OF QUANTITIES SEE SITE PLAN 2' MIN 4" 4000 PSI VDOT 6X6 WWM W - 3' 4" 4000 PSI VDOT W 4' W 5' INCREMENTS a18 1M N CONCRETE RE9F. STELZ CONCRETE RERF. CONCRETE STEEL RE9F. STEAL CONCRETE STEEL N CU. YARDS I LBS. W. YARDS LBS. W. YARDS LBS. W. YARDS LBS. 1 0.2]5 0.340 0.405 ` CONCRETE TO BE AIR ENTRAINED. AIR TO BE 6%;1.5. SLUMP TO BE 5": 1" 0.065 1 2 0.101 I CONCRETE SIDEWALK - B 0.494 0.587 �i 0.093 N.T.S. 2 3 0.528 VER 1 OGMMB 0.768 0.120 3 4 0.654 0.802 0.950 0.148 4 5 0.]81 0.957 1.133 0.176 5 6 0.907 51 1.111 61 1.315 71 0.204 10 6 7 1.034 63 1.265 75 1.496 87 0.231 12 7 8 1.180 71 1419 N 1.878 104 0.259 13 8 9 1.287 88 1.574 101 1.861 122 0.287 15 9 10 1.4LT 94 1.728 US 2.043 04 0.315 I6 10 Ti 7.540 112 1.883 129 2.226 155 0.343 17 11 12 1.888 121 2.038 148 2.408 1]] 0.370 IB 12 13 1.793 140 2.191 Al 2.589 201 0.398 30 13 14 1.919 150 2.345 183 2.771 215 0.426 32 14 15 2.046 180 2.500 195 2.954 229 0.454 35 15 B 2.172 170 2.853 207 3,134 244 0.481 37 16 17 2.299 180 2.606 219 3.317 258 0.509 39 17 IS 2.425 1W 2.962 231 3.489 272 0.537 41 B D 2.552 200 3AT2 243 1 3.682 287 0.585 43 19 20 2.678 210 3.271 258 3.884 301 0.593 45 20 21 2.805 1 220 3.425 268 1 4.045 315 0.620 48 21 22 1 2.931 1 230 3.579 260 4.227 330 0.648 50 22 23 3.058 240 3.734 292 1.410 344 0.676 52 23 24 3.184 250 3.886 304 4.582 358 0.704 54 24 25 1 3.311 1 260 4.042 318 4.]]3 372 0.731 58 1 25 • Mcr...Iu to W added for .x11 o0dorlal foot of WEN. N - Mdestss number of Reps eXWuhs of Imdln9. W - 919cates Wdib betWsuo eldewdW. For ftta drowino olid dlsowNWons of steps use Meet 1. DO ROM D TANDARDS STANDARD CONCRETE STEPS FOR VIRONA DEPARTMENT OF TRANSPORTATION 20 SLOPE WECIFDATXN REFERENCE D5 504 SHEET 2 OF 2 1 RZVSDN DATE 801.04 N N 0 o E c N 4 of DJ A p N W - C O N O N r C � C t�of ' a 0 31 M z C) W U_ Q y Q Z LU S2 U Y �LU W LU a LU LU Z Iw LL a Rev. No. I Date H op 1, U RA LK R Lic. No. 32609 yr- dd) ti SSrONAL 1. DATE: 07124/2018 SCALE: NIA DESIGNED BY: KASITTC FILE NO. 3015L SHEET 13 OF 15 18-09 WIDTH VARIES WIDTH VARIES 2 MIN SEE SITE PLAN 2' MIN 2' MIN SEE SITE PLAN 2' MIN 4" 4000 PSI VDOT 6X6 WWM 4" 4000 PSI VDOT A3 CONCRETE A3 CONCRETE 2% 1 1M 0 4 .2/2�M\/\\ 4 - •• /\ /\ \\ 4" SUBBASE (21-A STONE) \. �\. �\ ��.�\ \, \/��� (21-A STONE) \\.1 l \ /\ COMPACTED SUBGRADE (COMPACTED TO 95% DENSITY COMPACTED SUBGRADE (COMPACTED TO 95% DENSITY AT OPTIMUM MOISTURE CONTENT VDOT VTM-1 METHOD) AT OPTIMUM MOISTURE CONTENT VDOT VTM-1 METHOD) ` CONCRETE TO BE AIR ENTRAINED. AIR TO BE 6%;1.5. SLUMP TO BE 5": 1" two, CONCRETE SIDEWALK - A 1/05n4 t%s I CONCRETE SIDEWALK - B 1/11115 �i N.T.S. VER 1 N.T.S. VER 1 N N 0 o E c N 4 of DJ A p N W - C O N O N r C � C t�of ' a 0 31 M z C) W U_ Q y Q Z LU S2 U Y �LU W LU a LU LU Z Iw LL a Rev. No. I Date H op 1, U RA LK R Lic. No. 32609 yr- dd) ti SSrONAL 1. DATE: 07124/2018 SCALE: NIA DESIGNED BY: KASITTC FILE NO. 3015L SHEET 13 OF 15 18-09 PROP TRAIL PROP. TRAIL TRAIL VRRM COMPS, @ BLDGS 1 & 2 PROP. TRAIL EX BLDG 2 -J� EX BLDG 3 7. J � ef il 17 EX BLDG 1 E% PARKING,-F� GARAGE � j� BLDG 3 VRRM COMPS. W/TRAIL PROP. TRAIL. TRAIL VRRM COMPS. @ BLDGS 1 & 2 r►.��ar �-r�s�rris:ler se PROP. TRAIL ■ • a y r -e a r '�J VRRM AREA LIMITS FROM 1 CAMPUS TRAIL NEAR BLDG t 81 2 (REDEVELOPMENT) VRRM AREA LIMITS FROM PARKING PLAN (NEW DEVELOP ENT), 100 0 100 200 SCALE: 1 " = 100' Vagina Runoff Reduction Method Worksheet DER Virginia Runoff Reduction Metheld Re -Development Compliance Spreadsheet Version 3.0 8MP ❑esiyrn Spe[Sfieotrons List: 2011 Stds ISI Specs Site Summary Progect title: NFC LI Campus Trail around Bidg 1 g 2 Date: 43270 Total Rain fall (in): 43 Total Disturbed Acreage: 0.77 Site Land Cover 'Summary Pre-ReDevelooment Land Caves facresl Post-ReDevelooment Land Cover facres} Asolls 0Solls CSolis. Dsoils Totals 55ofTotal Forest/Open (acres) 0.00 0.00 0.00 0,00 0,00 0 Men aged Turf (acres) 0.00 0.00 0.00 0,77 0,77 100 IrnpervlousCover (ocral 0.00 0.00 0,00 0,00 0. DO 0 0.68 1 016 351 1 me i DAD 1 0.77 100 Post-ReDevelooment Land Cover facres} Site Tv and Land Cover Nutrient Loads A soils B Solis C Soils D Soils Totals % of Total Farest/Open (acres) 0-00 0.00 0.00 0.00 0.00 0 Managed Turf (acres) 0.00, 0.00 0.00 0.46 0,46 59 Impel to u s Cov er (cc rem) 0.00 0.00 0.00 0,31 031 41 0.68 1 016 351 1 me i DAD 1 0.77 100 Site Tv and Land Cover Nutrient Loads FTo'-'lTp-L7'1Reduction Required (lb/yr) 0.58 0,03 0.55 Final Post-Deveinpment Past- Post- Adjusted Pre- 3.14 [Po5t-RaDav4dopmenY Redevdaprnent Development ReDevdiopmeat CICO &New lm vioui P+r } 5'', liti••rtW lmpvvfou s) Managed Turita.Cl Site RV 0.54 0.25 0.95 015 Treatment Volume ft' 1,497 414 1,083 414 TP Load (Ib/yr) 0.94 0.26 0.68 1 016 FTo'-'lTp-L7'1Reduction Required (lb/yr) 0.58 0,03 0.55 Vifon a Rur4df ReducW W wNWmef OEpVIrglnia Runoff Rodudlam Method New Owelopment Cornpllanm Spriadsheat -Vernon 3.0 aNF Deo grp Sped roerms Lw! MIT Stdta specs Sita Summary Total Ralufal - 43 Tol Sita Lana cover summal Final Post-Developmeltl.oad (Post-ReDevelopment & New Impervious) Prr ReDevdopment TN load (lb/yr) b. 73 3.14 Vifon a Rur4df ReducW W wNWmef OEpVIrglnia Runoff Rodudlam Method New Owelopment Cornpllanm Spriadsheat -Vernon 3.0 aNF Deo grp Sped roerms Lw! MIT Stdta specs Sita Summary Total Ralufal - 43 Tol Sita Lana cover summal Slte Tv and Land Cavan Nutrlent Loads Ittl 101! A. MAN esu& C; "N Dsdk Talak of Tout Foci loPen(a Cres} aw cl -- CICO 5.:2 5'', 28 Managed Turita.Cl 0160 a. fib a.w 6.34 7__'? 33 7m erriouscaRef acres aa7 1.7E 0.06 6.$ a.+ 38 To.l Aram cre5]. C38 1 351 1 me i DAD 1 :'t L iCa Slte Tv and Land Cavan Nutrlent Loads Ittl 101! 11,7 ireetnlellt vllutneTPtoed(rolls] 10.73 Total TN L0IdlIedretl0r Arhkwed Ill 221is Lwd Ih IS& im/7+1 11A3 Total TP LwdReduction Required Dh/rrl 1351 Site Compliance Summary lobi Runoff Volume Reduction re) 11,7 Tota I SP Load Reduritw Achieved Phlvr! 10.73 Total TN L0IdlIedretl0r Arhkwed Ill 67.30 Remaining hast Deretownmt TP Load f rreskd'opee (acres! im/7+1 11A3 kemeining R iwd Reduction (rolp) I,71 Required A.06 Dralnaaf Afss CQcnollalG Su'tnmanr DA.A I DAB 1 OAC DAD D✓iE 10td1 TP load lied tired A. r 4 51 S.c'f1 :.16 0 -:(1 0 40 10..73 to Load Reduced {oil l 168u 1 37r04 1 8.37 ra !>;_i is [Xl 6230 Drell nage Area A Summary u n d caper 3un,ma n DAA DA D.A.[ DAD DAE TutaI f rreskd'opee (acres! 0.Ct7 D.oc I 0_QD _ om I om A.06 ManagedT ((acres) 118. o.d8 1A4 aw O.CD 336 ImPer0-Cover ga[se3) Z9D OW 1.76 O.Q7 .22 9.70 To.l Aram cre5]. C38 1 351 1 me i DAD 1 DOD 11Os Dralnaaf Afss CQcnollalG Su'tnmanr DA.A I DAB 1 OAC DAD D✓iE 10td1 TP load lied tired A. r 4 51 S.c'f1 :.16 0 -:(1 0 40 10..73 to Load Reduced {oil l 168u 1 37r04 1 8.37 ra !>;_i is [Xl 6230 Drell nage Area A Summary u n d caper 3un,ma n •.al 1 DRt P "Utrons A Sols_ aSdis CSdk D Salk Total % of Total rorRSvopenlacre:] o.m E. aoD ax acre aw D Managed Turf (aired Dp6trcunt AL1 C7.7D 1.33 1.48 34 Irnperriovstarer acres 0-00 0.36 0.00 2.60 2.90 66 •.al 1 DRt P "Utrons TW I Pmperrloas Corer. Ta®ted ganef) Managed Turf ImPenWus Cpx all it®tlnenC TP Lad 1-DUwnstrmm drtreated ZP Load fp Re+sawed TP Rema[ning Tatar Ta LoadReduRlm Achlered In D.A. Practke Cr4dlt Area Credit Area Volume qft'] Dp6trcunt tP Plattloc{4i1 PWvr] lT7llr+1 1raatmentwtPe [acres) [&'l garret] i i Rradkes [lis) Emplaced ri.h.11k[+#entWn #7 [,r Mlvo all Eln.pkryed 4.6. CYafi Cha nnel CID Solh[5p er e; l) 0.75 0°.73 2,OI5.81. Ill 1.77 0.30 0.97 14.I1.11l throning 611.. 51 cfeteMkm 47 or Ml aD BAonaentiw _ - - 8;967.75 0.00 son ;Art 0.55 L7eca'9 0.618 0.841 3,449.57 831u I.16 195 0. Z2 Myl 14. h. Man utaltured Treatment DtvkCe V � Fikrri D.fl 1.536 7,all 0.97 3,55 I.I6 7. "t6 TW I Pmperrloas Corer. Ta®ted ganef) 2.90 rotas Turi Alea Treated lanae) 1.28 Total TP load Reduction A.chlered h DA. / Ss ro TP Remailrillg Tatar Ta LoadReduRlm Achlered In D.A. PraRice L.r 15.x7 Drainage Area B Summary Sen d Cw er 9un,rna ry ASals BSdis CSalk OSdI; total 4, of Total Pxest/apm (aces] 00o D.IXi am 0.46 -:�; 0 Al Tu-[ (acres) �mmmmmIXw aIXi 0.w 01.45 ,<n All un errkruSc~(acres) 0.00 136 6.06 1.76 3'�ri d7 all Seledlms TMI IlnpCriods carer Trmted [arfesl Mandel Nil 1mpnvh Cs GMP tree "'"dff[MII Untreated rA Ladd' TP RenTaeed TP Remailrillg nfay. min PraRice Gedi Arm EredC Aron vdivrrle pt'1 Del Dpstr�rn CC Practtice (itis] PNn] Dnln] 7r Cltnxr4 wire [acres) gane3 -tree] i i Practices qbs Emplaced ri.h.11k[+#entWn #7 [,r Mlvo all Empbi.ed 4.L.ISI'uetalslgn a74r MirrD biwden'Dan aa� w VJ xl [Spxx9 0.195 0.543 7p49.50 el M#9 0. 4 ?198 8;967.75 0.00 son ;Art 0.55 TMI IlnpCriods carer Trmted [arfesl 250 Total Turf Alta irmted [acre) 0.39 Total TP Lwd Reduction Attila red In DA Untreated IP iwd ro 5.06 Total TH Lcad Redudlan Acham ed In DA Credit Ar® (alai 37°` Dralnap Area C Summary Land Cogs Sucmary ASA85dk CShck 1 0Sol% TACH 'A of Total f west(0p en (arses] "i _ o.w 01.0 "'Do ar„o p Managed Tlafjacre5] G1, CICO O.w 1AD 1.40 45 emprrtik /5i.cwer jasretj DLX I OAa I 000 I s.67 1.74 55 1 114 fihl P S eleCtims Pre- ReDevelopment Managed Turf ImPereidusCea'9tlTP BMP Yrsltment Lwd from Untreated IP iwd TP Bemused Downstream IP Remeir4lg practice Credit Ar® CredLAr® YdDrcIC (iC} OPsfr[gm to Rarticte(6Si WWI P6I5'r) lreaimrnL t4de z (arses) [acres) r Practlaes qbs) i i W0 Emplaced ri.h.11k[+#entWn #7 [,r Mlvo all F� ;4 aa� w VJ xl [Spxx9 0.195 0.543 7p49.50 000 iffi LII a.13 Pre- ReDevelopment Total l mpeniws Caen Trwted[acrno-1 a5d Total Turf MeA Tfwted [4ctesJ acro Total TP Lwd Reductl.onAchle red kr uA. 6 acre r Ob/acrel 1.16 Tota TLA Londa lion Ac ler n pA 1.22 ih &d7 Pre- ReDevelopment Final Post -Development Post-ReDevelopmetrt TP TP Load per acre TP Load per acre Load per acre 6 acre r Ob/acrel {l6/acre/yr) 0.57 1.22 0.57 Site Compliance Summary Mal imum %Reduction Required baa 6. 109' Pr4rReDevelopment Load Total Runoff Volume Reduction (ft') 0 Total TP Load Reduction Achieved (!b/yr) 0.00 Total TN Load Reduction Achieved (Ib/yr) 0.00 Remnining Post Development TP Lae 0.94 U) G cn # fa Remaining TP Load Reduction (lb/yr. 0.58 Required a WATER QUALITY NARRATIVE THIS IS PLAN IS FOR A PROPOSED CAMPUS TRAIL. WATER QUALITY COMPUTATIONS ARE FOR BOTH PHASE 1 & 2 OF THE PROPOSED TRAIL. TO CALCULATE THE PHOSPHORUS CREDITS WE USED TWO VRRM SPREADSHEETS (NEW DEVELOPMENT - BLDG3/PARKING GARAGE & RE-DEVELOPMENT-BLDG1&2). A MAJORITY OF THE TRAIL IS LOCATED WITHIN THE BUILDING 3 & PARKING GARAGE DEVELOPMENT AREA, THEREFORE WE REVISED THE BUILDING 3 SPREADSHEET. WE USED THE REDEVELOPMENT SPREADSHEET FOR THE TRAIL OUTSIDE THE BUILDING 3 AREA NEAR BUILDINGS 1 & 2. THE RE -DEVELOPMENT SPREADSHEET COMPUTED 0.58 LB/YR, THE NEW DEVELOPMENT SPREADSHEET FOR BUILDING 3 WAS REVISED TO INCLUDE THE PROPOSED TRAIL. THE COMPUTED PHOSPHORUS FOR BUILDING 3 CHANGED FROM 2.24 LBfYR TO 2.78 LB/YR FOR A DIFFERENCE OF 0.54 LB/YR. NFCU ALREADY PURCHASED 2.24 LB1YR CREDITS WITH THE PARKING GARAGE & BUILDING 3 PLAN. THE PHOSPHORUS INCREASE WiTH THE TRAIL IS THE DIFFERENCE FROM 2.24 TO 2.78. THE OFFSITE WATER QUALITY CREDITS THAT NEED TO BE PURCHASED IS 1.12 LBIYR FOR THE CAMPUS TRAIL. NEW DEVELOPMENT (BLDGS) RE -DEVELOPMENT (BLDG1&2) TOTAL TP REQUIRED REDUCTION 4.54 LBfYR 4.58 LB/YR 1.12 LBfYR N 4ti CO LtY T- E C C N N IT V � r C � N � r. _ 1 4) �. U) G cn # fa r = 4) LL a a a a z z r LU z i i W0 F� ;4 aa� w VJ E_ V 1VV 111 I� 0 1-� < F E z l.4 Ul IGO U I-1 y , D _ ` Y ,1rU",�! iyi � W Myl z V � U. z Rev. No. Date RAN Y L, K LER LIC, NO. 32.809 + 26A 16.1 DATE: 07/24/2018 SCALE: AS SHOWN DESIGNED BY: KAS/TTC FILE NO. 3015LI SHLET 14 OF 15 0 _ / "1 i�-r ♦ �i 0400 TC FLOW \ ( ••-+lt PATH (TYP.) TC FLOW � I 1 PATH (TYP.) EX. POND r�F'RICKETTS POND" EX. !N RIVED CE I - - • , EX. SECURITY DRIVE 151J { EX. POND "AIRPORT POND" 14 A ,� TC FLOW % �r PATH (TYP.) Z a` EX. BIORETENTION 'N' SIORETENTION `P -+ 1 EX. POND "FARM POND" BIORETENTION n r.0 TC FLOW - PATH (TYP.) OTENTIAL FUTURI l -� PRE -DEVELOPMENT SHIM DRAINAGE DIVIDE MAP♦ � 200 0 200 400 ♦ 0 ,. SCALE: 1 " = 200' ~ ...� STORMWATER MANAGEMENT & BEST MANAGEMENT PRACTICES NARRATIVE 1. OVERVIEW THE PROJECT `NFCU - CAMPUS TRAIL" IS LOCATED IN THE WESTVIEW BUSINESS CENTRE ALONG SECURITY DRIVE. THUS PROPERTY IS IDENTIFIED IN THE FREDERICK COUNTY TAX MAPS AS PROPERTY IDENTIFICATION NUMBER 64-11-11 AND IS CURRENTLY ZONED M1 WITH AN AREA OF 36.39 ACRES. THIS PROJECT PROPOSES SIDEWALK, TRAILS AND BOARDWALK. THE CAMPUS TRAIL IS TO BE BUILT IN TWO PHASES. THE FIRST PHASE IS SIDEWALK AROUND BUILDING 1 AND SECURITY DRIVE, THE SECOND PHASE IS THE REMAINING AREA OF THE SITE (AROUND BUILDING 2,3 AND PARKING GARAGE). THIS REPORT IS PREPARED FOR THE FULL BUILD -OUT OF BOTH PHASES. TO MEET SWM (WATER QUANTITY) REQUIREMENTS WE ARE UTILIZING EXISTING SWM FACILITIES AS PROPOSED IN THE NFCU PARKING GARAGE AND BUILDING 3 PLANS. REFERENCE NFCU BUILDING 3 SWM REPORT FOR ADDITIONAL INFORMATION. TO MEET BMP (WATER QUALITY) REQUIREMENTS WE ARE PROPOSING PURCHASING OFFSITE WATER QUALITY CREDITS FOR THE PHOSPHORUS LOAD. 2. WATER QUALITY CONTROL (BMP) TO CALCULATE THE PHOSPHORUS CREDITS WE USED TWO VRRM SPREADSHEETS (NEW DEVELOPMENT - BLDG31PARKING GARAGE & RE-DEVELOPMENT-BLDG1&2). A MAJORITY OF THE TRAIL IS LOCATED WITHIN THE BUILDING 3 & PARKING GARAGE DEVELOPMENT AREA, THEREFORE WE REVISED THE BUILDING 3 SPREADSHEET. WE USED THE REDEVELOPMENT SPREADSHEET FOR THE TRAIL OUTSIDE THE 'BUILDING 3 AREA NEAR BUILDINGS 1 & 2. THE RE -DEVELOPMENT SPREADSHEET COMPUTED 4.58 LBlYR- THE NEW DEVELOPMENT SPREADSHEET FOR BUILDING 3 WAS REVISED TO INCLUDE THE PROPOSED TRAIL, THE COMPUTED PHOSPHORUS FOR BUILDING 3 CHANGED FROM 2.24 LBIYR TO 2.78 L6/YR FOR A DIFFERENCE OF 0.54 LBfYR, NFCU ALREADY PURCHASED 2.24 LB/YR CREDITS WITH THE PARKING GARAGE & BUILDING 3 PLAN, THE PHOSPHORUS INCREASE WITH THE TRAIL IS THE DIFFERENCE FROM 2.24 TO 2.78. THE OFFSITE WATER QUALITY CREDITS THAT NEED TO BE PURCHASED IS 1.12 LBIYR FOR THE CAMPUS TRAIL. TP REQUIRED REDUCTION NEW DEVELOPMENT (BLDG3) 0.54 LBIYR RE -DEVELOPMENT (BLDG1&2) 0.58 LBNR TOTAL 1.12 LBNR OW'= -- --.. 0000 ' BIORETENTION"E" WITH UNDERGROUND STORAGE STUDY POINT #1 s , 1 EX. POND "'WINCHESTER PRINTERS POND" 1 EX. POND `13n -. ,�► �, POND "An WITH UNDERGROUND 2 STORAGE j, `/�11 1 ri�+ll ( I� 3. WATER QUANTITY CONTROL (SWM) EXISTING SWM FACILITIES PROPOSED WITH THE 'PARKING GARAGE AND BUILDING 3 WILL CONTROL THE MINIMAL INCREASE OF RUNOFF FROM THE PROPOSED TRAIL, REFERENCE NFCU - BUILDING 3 SWM REPORT FOR ADDITIONAL INFORMATION ON THE EXISTING SWM FACILITIES, 3.1 CHANNEL PROTECTION TO MEET CHANNEL PROTECTION REQUIREMENTS THE ENERGY BALANCE EQUATION, FROM 9VAC25-870-66-B-3, WAS USED TO EVALUATE THE STUDY POINT- THE PROPOSED 1 Y 24 HR STORM EVENT WAS REDUCED TO THE REQUIRED MAXIMUM PEAK FLOW RATE DETERMINED BY THE ENERGY BALANCE EQUATION FOR STUDY POINT 1. SINCE STUDY POINT 1 INCLUDES OFFSITE AREA WE HAD TO SEPARATE THE ONSITE AND OFFSITE ENERGY SO THAT WE WERE ONLY APPLYING AN IMPROVEMENT FACTOR TO THE ONSITE AREA. THE ENERGY BALANCE CALCULATIONS SHOW REMOVING THE ONSITE ENERGY FROM THE TOTAL, THEN APPLYING THE IMPROVEMENT FACTOR TO THE ONSITE AREA ONLY AND ADDING IT BACK TO GET A REDUCED TOTAL (REQUIRED PEAK FLOW) AT THE STUDY POINT. 1YR STORM EVENT DA REQUIRED PEAK FLOW POST -DEVELOPMENT PEAK FLOW STUDY POINT #1 94.18 CFS 92.56 CFS 3.2 FLOOD PROTECTION TO MEET FLOOD PROTECTION REQUIREMENTS OF 9VAC25-870-66-C-2-B THE POST -DEVELOPMENT PEAK FLOW RATE FOR THE 1 DYR 24HR STORM EVENT WAS REDUCED TO BELOW PREDEVELOPMENT PEAK FLOW RATES THEREFORE NO ADDITIONAL DOWNSTREAM ANALYSIS IS NECESSARY FOR STUDY POINT 1. SEE SUMMARY TABLE BELOW. 10YR STORM EVENT DA PRE -DEVELOPMENT PEAK FLOW POST -DEVELOPMENT PEAK FLOW STUDY POINT #1 262.01 CFS 259.65 CFS TC FLOW .� PATH(TYP �\ TC FLOW PATH (TYR) EX. POND wJ "RICKETTS POND" I ---'� l EX. INDEPEND CE —;_-- / DRIVE N11`\ � � - � �, , EX. SECURITY r f ` j + DRIVE 15) J ' 7 EX. POND �o AIRPORT POND 4, SUMMARY 14A E7(. MbRETENTION "An { -- BIORETENTION "Bn 1 EX. POND ,' "FARM POND" BIORETENTION — n.•n a 4 TC FLOW - PATH (TYR) �� POST-DEVELOPMENt SWM DRAINAGE DIVIDE MAP 200 0 200 400 SCALE: 1 " = 200' 13. 1Il wf, I' OTENTIAL FU f pur THE WATER QUALITY REQUIREMENTS WILL BE MET BY PURCHASING WATER QUALITY CREDITS. AN AFFIDAVIT OF CREDIT OF SALE FOR 1.12 POUNDS OF PHOSPHORUS FROM ONE OF THE DEQ APPROVED NUTRIENT BANK FACILITIES FOR FREDERICK COUNTY WITHIN THE POTOMAC WATERSHED WILL BE PROVIDED TO BOTH DEQ AND FREDERICK COUNTY PRIOR TO ISSUANCE OF A LAND DISTURBANCE PERMIT. THE STORM WATER REQUIREMENTS (CHANNEL AND FLOOD PROTECTION) WERE MET BY EXISTING SWM FACILITIES FOR STUDY POINTS 1. THE VA RUNOFF REDUCTION METHOD (VRRM) WAS USED TO VERIFY BMP REQUIREMENTS WERE MET. HYDROCAD SOFTWARE VERSION 10, BUILD 15 WAS USED TO ROUTE THE STORMWATER MANAGEMENT FACILITY TO VERIFY SWM REQUIREMENTS WERE MET. 00-r_7� al -ft fteaft 00 ' BIORETENTION"E" WITH UNDERGROUND STORAGE STUDY POINT #1 I EX. POND "WINCHESTER PRINTERS POND r� �I I I ,�rcr�f EX. POND "'Bn �► r�1 l f POND "A" WITH UNDERGROUND 12 STORAGE V 1 e \ SWM LEGEND SITE BOUNDARY DRAINAGE AREA LABELS DRAINAGE DIVIDES SITE AREA "ONSITE" (AREA WITH I.F. FOR ENERGY BALANCE COMPUTATIONS PRE -DEVELOPMENT OFFSITE .-� DRAINAGE DIVIDE MAP 1 10000 0 1000 2000 SCALE: 1 " = 10007' 1 � 1 1 1 ! �I 15 _ 1 j, r ■ ''r `\ 16 14A 5� `�. 21 14 '= t 12 ` .. JDY DINT #1 00 E c am°° N N �.�2 of'' t 0 W)�cCL u LL Rev. No. I Date op RA Y L. X PL Lic. Na. 32809 %, ZOIVAL DATE: 07/24/2018 1 SCALE: AS NOTED DESIGNED BY: KAS%TTC FILE NO. 3015L SHEET 15 OF 15 18-09