Loading...
43A21_Stonewall IVAction: PLANNING COMMISSION: BOARD OF SUPERVISORS AMENDMENT June 6, 2018 Public Hearing Held; Postponed for 45 days July 18, 2018 Recommended Approval August 8, 2018 Approved AN ORDINANCE AMENDING THE ZONING DISTRICT MAP REZONING #01-18 STONEWALL IV WHEREAS, REZONING #01-18 submitted by Equus Capital Partners, Ltd., to rezoning 8 8.9 11 acres from RA (Rural Areas) District to the M I (Light Industrial) District with proffers with a final revision date of 07/27/18 was considered. The subject properties are located at the southern terminus of Lenoir Drive (Route F-732), in the Stonewall Magisterial District and is identified by Property Identification Nos. 43-A- 21, 43-A-21 B, 43-19-4 and 43-A-24; and WHEREAS, the Planning Commission held a public hearing on this rezoning on June 6, 2018 and postponed the application for 45 days; and WHEREAS, the Planning Commission held a public meeting on July 18, 2018 and recommended approval; and WHEREAS, the Board of Supervisors held a public hearing on this rezoning on August 8, 2018; and WHEREAS, the Frederick County Board of Supervisors finds the approval of this rezoning to be in the best interest of the public health, safety, welfare, and in conformance with the Comprehensive Policy Plan; NOW, THEREFORE, BE IT ORDAINED by the Frederick County Board of Supervisors, that Chapter 165 of the Frederick County Code, Zoning, is amended to amended to rezone 88.91± acres from RA (Rural Areas) District to the M 1 (Light Industrial) District with proffers with a final revision date of 07/27/18. The conditions voluntarily proffered in writing by the Applicant and the Property Owner is attached. PDRes #28-18 -1- This ordinance sball be in effect on the date of adoption. c Passed this 8th day of August 2018 by the following recorded vote: Charles S. DeHaven, Jr., Chain-nan Aye Gary A. Lofton Aye J. Douglas McCarthy Aye Robert W. Wells Aye Shannon G. Trout Aye Judith McCann -Slaughter Aye Blaine P. Dunn Aye A COPY ATTEST Kris iern ; Frederick County Administrator 'V'X(31NIA: Fh..3DERICK COUNTY.SUI . This instrument of writing was produced to me on 0-1 K at o�'� *4p X. and with certific•�,te arkrr;,�.Elexlgeme�rt tfrcr��1�� �intxed was ada33att�'a! i« €�,_�;3tat. -l�a., a:r�frosed by �i't. J�1.1-14#12 of s — , and 18-1-801 have been Paid, if assessable, Gerk PDRes #28-18 -2- BOS Res. #008-18 180008103 G5 PROFFER STATEMENT EQUUS CAPITAL PARTNERS STONEWALL MAGISTERIAL DISTRICT 88.91+/- Acres Rezoning: Record Owner Applicant: #01-18 Cheryl Grimm Morris Equus Capital Partners, LTD Property: Parcels 43 A 21, 43 A 21B, 43 19 4 and 43 A 24, comprising a total of approximately 88.91 acres, as shown on the Generalized Development Plan (hereinafter "the Property"). Zoning: RA (Rural Areas) to M -I (Light Industrial) Project Name: Stonewall IV Date: June 6, 2018 Resubmittal Date: July 27, 2018 Pursuant to Va. Code Ann. § 15.2-2296, et seg., and § 165-102.06 of the Frederick County Zoning Ordinance, the undersigned hereby proffers that the development and use of the Property, consisting of 88.91 f acres, located on the north side of Route 37 and west of its intersection with the Martinsburg Pike, shall be in substantial conformance with the following conditions. In the event this rezoning is granted as applied for by the Applicant, then these proffers shall supersede and replace in their entirety all other proffers made prior hereto. In the event this rezoning is not granted as applied for by the Applicant, then these proffers shall be deemed withdrawn and shall be null and void. The term "Applicant" as referenced herein shall include within its meaning the current owner, all future owners and successors in interest. The term "Generalized Development Plan" or "GDP" as referenced herein shall refer to the plan entitled "Stonewall IV Generalized Development Plan," prepared by Dice Engineering, PLC, and dated April 5, 2018. 1. DEVELOPMENT AND USE OF THE PROPERTY 1.1. Development on the Property shall be limited to the construction of not more than 820,000 gross square feet that shall be used solely for Warehousing, or High - Cube Transload and Short Term Storage, Land Use Codes 150 and 154, as those land uses are defined in the ITE Trip Generation Manual (10th Ed). G5 C PROFFER STATEMENT -- EC)T JUS CAPITAL PARTNERS STONEWALL MAGISTERIAL DISTRICT 88.91+/- Acres 1.2. The development of the Property shall be in general conformance with the GDP. However, upon the submission of final site or subdivision plans, minor modifications and adjustments may be made to the road alignments, entrances, parking, dimensions of the SWM/BMP facilities, the exact configuration and location of building footprints, and other similar features shown on the GDP. 1.3. The maximum height of the each building shall be sixty feet (60'). 2 TRANSPORTATION. 2.1 Within 90 calendar days of a written request by the County, the Applicant shall dedicate approximately 17.05 acres to the Frederick County Board of Supervisors, as depicted on the GDP, for the Future Route 37 Bypass. 2.2 Access to the Property shall be as shown on the GDP. Provided that access to the buildable area of the Property is not impeded or eliminated, the Applicant shall not place above grade improvements on the southeast corner of the Property near the terminus of Lenoir Drive in such a way as to preclude the construction of proposed slip ramps that are currently depicted on the graphic entitled "Eastern Road Plan — Lenoir Drive Slip Ramp Clarification," created by the Frederick County Department of Planning and Development, dated October 17, 2017, and attached hereto for reference. The southeast corner of the Property is subject to existing easements and/or covenants of record, as of June 6, 2018. 2.3 Within 90 calendar days of a written request by the County, the Applicant shall further dedicate such right-of-way as it may own at the terminus of Lenoir Drive for the purpose of construction of access to existing Route 37 as described in Proffer 2.2 above. 2.4 The Applicant shall contribute $250,000 to the County for the purpose of general transportation planning, right-of-way acquisition, or construction. It shall make such contribution upon issuance of an occupancy permit for any building. 3 FIRE AND RESCUE. 3.1 The Applicant shall contribute to Frederick County the sum of $0.10 per gross square foot of construction as depicted on each site plan, to be used for fire and rescue purposes in the general area. The contribution shall be made at the time of issuance of the occupancy permit for each structure. 2 05 PROFFER STATEMENT EnUUS CAPI T AL PAR i 114 ERS _�_ STONEWALL MAGISTERIAL DISTRICT 88.91+/- Acres 4 CULTURAL RESOURCES. 4.1 The Applicant shall retain a qualified professional architectural historian to perform a Historic American Building Survey (HABS) — standard level III, as defined by the National Park Service Heritage Documentation Program on the residential building and its associated agricultural buildings located on the property. The HABS standard level III documentation shall be submitted to the Planning Director no later than with the submission of a preliminary subdivision or preliminary site plan for the Property. Following acceptance of the HABS standard level III documentation by the Planning Director, the documentation shall be submitted to the National Park Service Heritage Documentation Program. 4.2 The applicant, working with a qualified professional architectural historian, shall inspect prior to demolition the non -heated areas of the residential building for the presence of partially hidden or obscured historical artifacts or material. The applicant shall notify the Planning Director of any historic artifacts or material that may be discovered during the inspection and subsequent demolition of the residential building. 5 ESCALATOR. 5.1 In the event the monetary contributions set forth in this Proffer Statement are paid to Frederick County within eighteen (18) months after final approval of this rezoning, as applied for by the Applicant, said contributions shall be in the amounts as stated herein. Any monetary contributions set forth in this Proffer Statement which are paid to the County after eighteen (18) months following final approval of this rezoning shall be adjusted in accordance with the Urban Consumer Price Index (CPI -U), published by the United States Department of Labor, such that at the time contributions are paid they shall be adjusted by the percentage change in the CPI -U from that date eighteen (18) months after final approval of this rezoning to the most recently available CPI -U to the date the contributions are paid. [Signatures on following page.] 3 PROFFER STATEMENT EQUUS CAPITAL PARTNERS STONEWALL MAGISTERIAL DISTRICT 88.91+/- Acres C SIGNA'T'URE PAGE ry APPLICANT: EQUUS CAPITAL PARTNERS, LTD By: Name: Jot�N �-NO Title: State of County of-e!XLG�lL� Subscribed and sworn to before me this 2CA day of , 2018 in my County and State aforesaid, by the aforenamed principa NOTARY PUBLIC My Commission Expires: Ly My Notary Registration Number: % 1% q 3 3 colowmemot pei0nt1anlo • Notary sod /tA9R C. � hWk mew"MOF CUU0 00 bpkn Apt 30. 2NI C0 Number t1690)) PROFFER STATEMENT EQUUS CAPITAL PARTNERS STONEWALL MAGISTERIAL DISTRICT 88.91+/- Acres • wI C Cheryl G m Morris, sole surviviVig tenant by the entirety Commonwealth of Vir iiniia: 1 County of Frederick: / Subscribed and sworn to before me this day of� 2018 in my County and State aforesaid, by the aforenamed principal. a NOTARY PUBLIC My Commission Expires: d/, ao'-Z� C f My Notary Registration Number: 0( 0361 5 25- ACTIVE u+ACTrvE Iw /J� OPIDE� I� \ \ ,�/ - 7 PDMS PFJt 10 WEAR fFET 25 �.`. TYPICAL CATEGORY'C' BUFFER DETAIL NOT TO SCALE OI 1 I I lam,•; � _ _ � \ � \\ / � APPROX. LIMITS OF 100-YR------- FLOODPLAIN -----\LI`O`PLAIN (ZONE 'A') \\ Io\YYY 00 —21 ACRES \ I ` PROPOSED ACCESS ' / ass' NaN&cs ACTNE BUFFER I 20D ACRlS �.T.1-1J "75=N=CTI=E BUFFER _ 0.10 ACRE CATEGORY C'ZONMJG DISTRICT BUFFER W/ FULLTANDSCA, SCREEN - '\ (SODETAIL) 1 ' FUTURE ROUTE 37./ RIGHT-OF-WAY DEDICATION O `CC ..... NOTES' •1 I �pQ$ i 1. BOUNDARY INFORMATION FOR SUBJECT PARCELS PROVIDED BY GREYWOLFE. .� INC. TOPOGRAPHIC AND ADJOINING PROPERTY INFORMATION OBTAINED VIA FREDERICKCOUNTY GIS RECORDS. 2. UTILITY CONNECTIONS WILL BE PROVIDED FROM EXISTING SERVICES AT LENOIR DRIVE, WITH FINAL LOCATIONS AS DETERMINED DURING THE SITE PLAN DESIGN LOCATION MAP. SCALE: 1"= 3000' PROJECT INFORMATION: APPLICANT EODUS CAPITAL PARTNERS, LTD. CURRENT OWNER. CHERYL &JOHN MORRIS REFERENCE' TM 43-A-21, 43.A-210, 43-1R 4, AND 43-A.J.A STONEWALL MAGISTERIAL DISTRICT PROPOSED USE: WAREHOUSEIDISTRMUTION ACREAGE 85.91 AC. CURRENTZONING RA PROPOSED ZONING. M-1 FLOODPLAIN: 10.14 ACRES (+/.) WITHIN FLOODPLAIN ZONE 'A' PER FEMA FIRM 51069CO208D, 51089CO209D, AND 51069CO210D (7 2 z N W N N m 2 w �anaw Y > iy Z m�000 2Lvpie� z w -=zx'LL w �ziLLo p e� w o Q w y O Q FREDERICK COUNTY RZ #_ 18 SHEET NUMBER: GDP * f Urban Development Area Sewer and Water Service Area PMp Created by Fb,4Cn(k County Dept a pbnning ana Development October 17, 7017