Loading...
HomeMy WebLinkAbout32-18 Site PlanHP HOOD TRAILER PARKING ADDITION SITE PLAN (SP # 32-18) FREDERICK COUNTY, VIRGINIA LOCATION MAP: PROJECT INFORMATION:SHEET INDEX: PROJECT NOTES: SCALE: 1" = 2000' PROJECT LOCATION SHEET DESCRIPTION SHEET NUMBER COVER SHEET....................................................................................... OVERALL PLAN...................................................................................... PRELIMINARY E&SC PLAN................................................................... SITE PLAN............................................................................................... GRADING AND FINAL E&SC PLAN....................................................... LANDSCAPE PLAN................................................................................. LIGHTING PLAN...................................................................................... STORMWATER MANAGEMENT PLAN.................................................. E&SC AND STORMWATER MANAGEMENT NOTES............................ E&SC AND STORMWATER MANAGEMENT DETAILS......................... CONSTRUCTION DETAILS.................................................................... C-01 C-02 C-03 C-04 C-05 C-06 C-07 C-08 C-09 C-10 C-11 VA S T A T E GR I D N O R T H PROJECT CONTACTS: OWNER: ADDRESS- PHONE NUMBER- FAX NUMBER- E-MAIL- CONTACT- CONTRACTOR: ADDRESS- PHONE NUMBER- FAX NUMBER- E-MAIL- CONTACT- ENGINEER (CIVIL): ADDRESS- PHONE NUMBER- FAX NUMBER- E-MAIL- CONTACT- HP HOOD, INC. 160 HOOD WAY WINCHESTER, VA 22602 540.868.4238 TOM.HAYES@HPHOOD.COM TOM HAYES TBD DICE ENGINEERING, PLC 101 SHELBY CT. WINCHESTER, VA 22602 540.974.5157 540.723.4868 DDUNLAP@DICE-ENG.COM DENNIE DUNLAP RESPONSIBLE LAND DISTURBER NAME: CERTIFICATION #: EXP. DATE: THE RESPONSIBLE LAND DISTURBER IS THE PARTY RESPONSIBLE FOR CARRYING OUT THE LAND DISTURBING ACTIVITY AS SET FORTH IN THE PLANS. ELECTRIC COMPANY: ADDRESS- PHONE NUMBER- CONTACT- WATER PROVIDER: ADDRESS- PHONE NUMBER- CONTACT- SEWER PROVIDER: ADDRESS- PHONE NUMBER- CONTACT- GAS COMPANY: ADDRESS- PHONE NUMBER- CONTACT- PHONE COMPANY: ADDRESS- PHONE NUMBER- CONTACT- SHEN. VALLEY ELECTRIC COOPERATIVE, INC. 3463 VALLEY PIKE WINCHESTER, VA 22602 540.450.0111 FREDERICK WATER P.O. BOX 1877 WINCHESTER, VA 22604 540.868.1061 FREDERICK WATER P.O. BOX 1877 WINCHESTER, VA 22604 540.868.1061 SHENANDOAH GAS 350 HILLANDALE LANE WINCHESTER, VA 22602 540.869.1111 VERIZON 404 HILLANDALE LANE WINCHESTER, VA 22602 540.665.3153 CA D D F I L E : DA T E : RE V . # SC A L E : DA T E SHEET NUMBER: DR A W N B Y : CH E C K E D B Y : BY CO V E R S H E E T JOB NO.: 17-29 C-01 C- 0 1 . D W G DD D N/ A DD D DE S C R I P T I O N 07 - 1 6 - 2 0 1 8 GENERAL NOTES: CONSTRUCTION NOTES: HP H O O D T R A I L E R P A R K I N G A D D I T I O N FR E D E R I C K C O U N T Y , V A IDENTIFICATION: MAGISTERIAL DISTRICT: ZONING: DESCRIPTION: ACREAGE: BUILDING HEIGHT: PHYSICAL ADDRESS: DISTURBED AREA: TAX MAP 63-A-86A PREVIOUS COUNTY SP #36-01, #14-02, #36-03, #71-04, #32-13, #35-13, #08-14, #25-14, #32-14, #12-16, #52-16, #2-17, & #36-17 SHAWNEE M-2 INDUSTRIAL $&5(6“ N/A 160 HOOD WAY WINCHESTER, VA 22602 3.02 ACRES FREDERICK COUNTY SP # 32-18 08-13-2018 1 RE V I S I O N S P E R F R E D E R I C K C O U N T Y A G E N C Y C O M M E N T S 08 - 1 3 - 2 0 1 8 DD D D R Y W A R E H O U S E U N N A M E D T R I B U T A R Y O F H O G U E R U N CADD FILE: DATE: REV. # SCALE: DESCRIPTIONDATE S H E E T N U M B E R : DRAWN BY:CHECKED BY: BY HP HOOD TRAILER PARKING ADDITION FREDERICK COUNTY, VA OVERALL PLAN J O B N O . : 1 7 - 2 9 C - 0 2 C-02.DWG DDD 07-16-2018 1" = 100' DDD 1 i n c h = f t . ( I N F E E T ) G R A P H I C S C A L E 1 0 0 P R O P O S E D T R A I L E R P A R K I N G L O T A D D I T I O N F R E D E R I C K C O U N T Y S P # 3 2 - 1 8 0 8 - 1 3 - 2 0 1 8 1 REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS08-13-2018 DDD S T SFSFSFSFSF S F S F S F S F S F S F S F S F S F S F S F S F D V D V D V D V D V SF SF SF SF SF SF SF SF SF SF S F S F S F S F S F S F S F S F S F S F S F S F SF SF SF SF SF SF SF S F S F SF SF SF SF SF SF SF SF SF SF SF SF S F S F S F S F S F SF S F SFCE T E M P . T O P S O I L S T O C K P I L E SF SF SF SF S F S F S F S F S F S F S F S F S F S F S F S F S F S F O P CADD FILE: DATE: REV. # SCALE: DESCRIPTIONDATE S H E E T N U M B E R : DRAWN BY:CHECKED BY: BY HP HOOD TRAILER PARKING ADDITION FREDERICK COUNTY, VA INITIAL E&SC PLAN J O B N O . : 1 7 - 2 9 C - 0 3 C-03.DWG DDD 07-16-2018 1" = 30' DDD 1 i n c h = f t . ( I N F E E T ) G R A P H I C S C A L E 3 0 F R E D E R I C K C O U N T Y S P # 3 2 - 1 8 DRAINA G E A R E A T O S E D I M E N T T R A P AREA = 2 . 4 3 A C R E S B O T T O M E L E V . = 7 2 3 . 6 5 T O P O F W E T S T O R A G E = 7 2 6 . 0 0 T O P O F D R Y S T O R A G E = 7 2 7 . 6 5 T O P O F B E R M = 7 2 8 . 6 5 B E R M W I D T H = 2 . 5 ' R I P R A P L E N G T H = 1 5 ' 0 8 - 1 3 - 2 0 1 8 1 REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS08-13-2018 DDD CADD FILE: DATE: REV. # SCALE: DESCRIPTIONDATE S H E E T N U M B E R : DRAWN BY:CHECKED BY: BY HP HOOD TRAILER PARKING ADDITION FREDERICK COUNTY, VA SITE PLAN J O B N O . : 1 7 - 2 9 C - 0 4 C-04.DWG DDD 07-16-2018 1" = 30' DDD 1 i n c h = f t . ( I N F E E T ) G R A P H I C S C A L E 3 0 F R E D E R I C K C O U N T Y S P # 3 2 - 1 8 1 0 " C U R B 4 ' C U R B C U T 4 ' C U R B C U T 10" CURB 5 5 ' 1 0 0 ' 5 5 ' 2 4 2 8 1 2 ' H E A V Y - D U T Y C O N C . P A V E M E N T 10" CURB L . P . L . P . E . P . E.P. 1 0 " C U R B 3 6 ' 3 3 . 7 ' R 5 0 ' R 8 6 ' S A W C U T & R E M O V E E X . A S P H A L T W I T H I N L I M I T S O F P R O P O S E D C O N C R E T E A N D A S P H A L T P A V E M E N T A S D E P I C T E D I N H A T C H E D A R E A . R E P L A C E H E A V Y D U T Y A S P H A L T P A V E M E N T I N R O A D L E A D I N G T O E X I S T I N G W W T P . L . P . L . P . L . P . L . P . L . P . L . P . 2 7 . 9 ' R 2 5 ' R 2 5 ' 3 3 6 ' 2 4 ' 0 8 - 1 3 - 2 0 1 8 H E A V Y D U T Y A S P H A L T P A V E M E N T S T O P S I G N 1 REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS08-13-2018 DDD SF S F S F S F S F S F SF S F SF R R R R T E M P . T O P S O I L S T O C K P I L E SFSFSFSFSF S F S F S F S F S F S F S F S F S F S F S F S F SF SF SF SF SF SF SF SF SF S F S F S F S F S F S F S F S F S F S F S F S F S F SF SF SF SF SF SF SF S F S F SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF S F S F S F S F S F S F S F S F S F S F S F S F S F S F L S O P S F CADD FILE: DATE: REV. # SCALE: DESCRIPTIONDATE S H E E T N U M B E R : DRAWN BY:CHECKED BY: BY HP HOOD TRAILER PARKING ADDITION FREDERICK COUNTY, VA GRADING & FINAL E&SC PLAN J O B N O . : 1 7 - 2 9 C - 0 5 C-05.DWG DDD 07-16-2018 1" = 30' DDD 1 i n c h = f t . ( I N F E E T ) G R A P H I C S C A L E 3 0 F R E D E R I C K C O U N T Y S P # 3 2 - 1 8 T / C = 7 4 0 . 6 4 T / C = 7 3 3 . 0 8 T/C =737.28T/C =743.76 T / C = 7 4 2 . 1 7 741.83745.48 T/C =740.52 T / C = 7 3 5 . 4 7 745.02 742.5 9 743.36743.82745.60 (EX.)746.20 (EX.)743.31 7 4 1 . 9 1 2 . 0 0 % 2.25% 2.25% C L A S S A I R I P R A P W / G E O T E X T I L E F A B R I C U N D E R L A Y ( 1 0 ' W x 1 8 ' L ) C L A S S A I R I P R A P W / G E O T E X T I L E F A B R I C U N D E R L A Y ( 1 0 ' W x 4 0 ' L ) P E R M A N E N T L E V E L S P R E A D E R W / R I G I D 6 " x 6 " L I P B O T T O M O F C H A N N E L = 7 2 5 . 0 0 T O P O F T I M B E R = 7 2 6 . 0 0 L E N G T H = 2 0 ' 0 8 - 1 3 - 2 0 1 8 C O N V E R T E X . S E D I M E N T B A S I N T O P E R M A N E N T S W M B A S I N B Y M O D I F Y I N G O U T L E T S T R U C T U R E ( S E E S H E E T C - 1 0 ) 7 2 5 . 0 0 7 2 6 . 0 0 7 2 6 . 0 0 E C - 3 E R O S I O N C O N T R O L B L A N K E T 1 REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS08-13-2018 DDD N O T E : 1 . C O N T R A C T O R T O R E S T O R E E X I S T I N G W A L K I N G T R A I L A S N E C E S S A R Y D U E T O G R A D I N G M O D I F I C A T I O N S I N T H E V I C I N I T Y O F T H E S T O R M W A T E R M A N A G E M E N T B A S I N E M B A N K M E N T . CADD FILE: DATE: REV. # SCALE: DESCRIPTIONDATE S H E E T N U M B E R : DRAWN BY:CHECKED BY: BY HP HOOD TRAILER PARKING ADDITION FREDERICK COUNTY, VA LANDSCAPE PLAN J O B N O . : 1 7 - 2 9 C - 0 6 C-06.DWG DDD 07-16-2018 1" = 30' DDD 1 i n c h = f t . ( I N F E E T ) G R A P H I C S C A L E 3 0 F R E D E R I C K C O U N T Y S P # 3 2 - 1 8 L A N D S C A P I N G N O T E S : 1 . O W N E R O F P R O P E R T Y S H A L L M A I N T A I N R E Q U I R E D L A N D S C A P I N G I N G O O D C O N D I T I O N . 2 . S P E C I F I E D P L A N T S P E C I E S M A Y B E S U B J E C T T O S U B S T I T U T I O N W I T H T H E R E Q U I R E M E N T T H A T N E W L Y S E L E C T E D S P E C I E S P R O V I D E T H E S A M E V I S U A L E F F E C T . 3 . P R I O R T O P L A N T S P E C I E S S U B S T I T U T I O N W R I T T E N A P P R O V A L M U S T B E G R A N T E D B Y T H E F R E D E R I C K C O U N T Y P L A N N I N G D E P A R T M E N T . 4 . A L L P L A N T I N G S H A L L C O N F O R M W I T H 1 6 5 - 2 0 3 . 0 1 B O F T H E F R E D E R I C K C O U N T Y Z O N I N G O R D I N A N C E ( P L A N T S E L E C T I O N , P L A N T I N G P R O C E D U R E , A N D M A I N T E N A N C E ) . 5 . N O T R E E S O R S H R U B S S H A L L B E P L A C E D W I T H I N A N Y F R E D E R I C K W A T E R E A S E M E N T . Q U A N T . P L A N T S C H E D U L E C O M M O N N A M E B O T A N I C A L N A M E R E M A R K S L i t t l e l e a f L i n d e n T i l i a c o r d a t a 2 " C a l i p e r 1 5 E a s t e r n R e d b u d C e r c i s c a n a d e n s i s 5 T Y P E I n t e r i o r & P e r i m e t e r T r e e P E R I M E T E R L A N D S C A P I N G : R E Q U I R E D : x 1 T R E E F O R E V E R Y 2 , 0 0 0 S Q . F T . O F I M P E R V I O U S A R E A F O R F I R S T 1 0 0 , 0 0 0 S Q . F T . O F E N T I R E S I T E . + 1 T R E E F O R E V E R Y 5 , 0 0 0 S Q . F T . I N E X C E S S O F F I R S T 1 0 0 , 0 0 0 S Q . F T . O F E N T I R E S I T E . x C U R R E N T S I T E C O N D I T I O N S E X C E E D 1 0 0 , 0 0 0 S Q . F T . O F I M P E R V I O U S A R E A , T H E R E F O R E 1 T R E E R E Q U I R E D F O R E A C H 5 , 0 0 0 S Q . F T . O F N E W I M P E R V I O U S A R E A x T O T A L N E W I M P E R V I O U S A R E A = 7 4 , 8 0 1 S Q . F T . x ( 7 4 , 8 0 1 / 5 , 0 0 0 ) = 1 5 T R E E S P R O V I D E D : x 1 5 T R E E S A R O U N D P E R I M E T E R O F P A R K I N G A R E A I N T E R I O R L A N D S C A P I N G : R E Q U I R E D : x M I N I M U M O F 5 % O F I N T E R I O R P A R K I N G L O T S S H A L L B E L A N D S C A P E D W I T H S H A D E T R E E S . x T O T A L I N T E R I O R P A R K I N G A R E A = 7 0 , 5 6 0 S Q . F T . x ( 0 . 0 5 ) * 7 0 , 5 6 0 = 3 , 5 2 8 S Q . F T . x 1 S H A D E T R E E F O R E V E R Y 1 0 P A R K I N G S P A C E S x 5 2 S P A C E S / 1 0 = 5 R E Q U I R E D T R E E S P R O V I D E D : x D U E T O N A T U R E O F T R U C K / T R A I L E R U S E O F P A R K I N G A R E A , N O I N T E R I O R L A N D S C A P I N G I S P R O V I D E D x 5 S H A D E T R E E S ( O U T S I D E P A R K I N G A R E A ) L I T T L E L E A F L I N D E N L E G E N D : E A S T E R N R E D B U D 2 " C a l i p e r I n t e r i o r & P e r i m e t e r T r e e 0 8 - 1 3 - 2 0 1 8 1 REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS08-13-2018 DDD CADD FILE: DATE: REV. # SCALE: DESCRIPTIONDATE S H E E T N U M B E R : DRAWN BY:CHECKED BY: BY HP HOOD TRAILER PARKING ADDITION FREDERICK COUNTY, VA LIGHTING PLAN J O B N O . : 1 7 - 2 9 C - 0 7 C-07.DWG DDD 07-16-2018 1" = 30' DDD 1 i n c h = f t . ( I N F E E T ) G R A P H I C S C A L E 3 0 F R E D E R I C K C O U N T Y S P # 3 2 - 1 8 L . P . Luminaire ScheduleSymbolQtyLabel A r r a n g e m e n t T o t a l W a t t s T a g 6ALED 4 T 3 6 0 2 S H O E B O X E S 2 @ 9 0 D E G R E E S 4 3 1 2 . 8 3 5 ' P O L E 3 8 ' M T G H E I 2ALED 4 T 3 6 0 1 S I N G L E 7 1 8 . 8 3 5 ' P O L E 3 8 ' M T G H E I 1ALED 4 T 3 6 0 a d d t o e x i s t i n g p o l e S I N G L E 3 5 9 . 4 3 5 ' P O L E 3 8 ' M T G H E I Calculation SummaryLabelCalcT y p e U n i t s A v g M a x M i n CalcPts_2Illum i n a n c e F c 4 . 5 8 1 0 . 3 0 . 0 ( W / A L E D 4 T 3 6 0 A D D E D ) N O T E S : 1 . L I G H T I N G P L A N A N D P H O T O M E T R I C I N F O R M A T I O N P R O V I D E D B Y C A P I T A L T R I S T A T E . 2 . A L L L I G H T I N G M U S T B E D O W N C A S T A N D F U L L C U T O F F A N D S H A L L C O N F O R M W I T H S E C T I O N 1 6 5 - 2 0 1 . 0 7 O F T H E F R E D E R I C K C O U N T Y Z O N I N G O R D I N A N C E . L . P . L . P . L . P . L . P . L . P . L . P . L . P . 0 8 - 1 3 - 2 0 1 8 1 REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS08-13-2018 DDD CADD FILE: DATE: REV. # SCALE: DESCRIPTIONDATE S H E E T N U M B E R : DRAWN BY:CHECKED BY: BY HP HOOD TRAILER PARKING ADDITION FREDERICK COUNTY, VA STORMWATER MANAGEMENT PLAN J O B N O . : 1 7 - 2 9 C - 0 8 C-08.DWG DDD 07-16-2018 1" = 60' DDD 1 i n c h = f t . ( I N F E E T ) G R A P H I C S C A L E 6 0 F R E D E R I C K C O U N T Y S P # 3 2 - 1 8 C U R B C U T # 1 S C C A B C D A B CFLOW PATH FLOW PATH C U R B C U T # 2 A B C D A B C F L O W P A T H F L O W P A T H PRE-DEV. DA 'A'AREA = 8.97 AC.CN = 84Tc = 29 MIN.Q1 = 8.30 CFSQ2 = 11.53 CFSQ10 = 20.84 CFS PRE-DEV. DA 'B'AREA = 2.26 AC.CN = 74Tc = 20 MIN.Q1 = 1.26 CFSQ2 = 2.05 CFSQ10 = 4.51 CFS P R E - D E V . D A ' A ' S W M B O U T Q 1 = 4 . 1 6 C F S Q 2 = 9 . 2 2 C F S Q 1 0 = 2 0 . 0 8 C F S T O T A L C O M B I N E D P R E - D E V . Q 1 = 4 . 4 6 C F S Q 2 = 1 0 . 1 2 C F S Q 1 0 = 2 3 . 3 0 C F S P O S T - D E V . D A ' A ' A R E A = 1 1 . 1 5 A C . C N = 8 6 T c = 2 9 M I N . Q 1 = 1 1 . 6 6 C F S Q 2 = 1 5 . 8 6 C F S Q 1 0 = 2 7 . 6 7 C F S P O S T - D E V . D A ' B ' A R E A = 0 . 0 8 A C . C N = 7 4 T c = 6 M I N . Q 1 = 0 . 0 7 C F S Q 2 = 0 . 1 1 C F S Q 1 0 = 0 . 2 4 C F S P O S T - D E V . D A ' A ' S W M B O U T Q 1 = 2 . 6 2 C F S Q 2 = 3 . 7 2 C F S Q 1 0 = 2 1 . 7 8 C F S T O T A L C O M B I N E D P O S T - D E V . Q 1 = 2 . 6 3 C F S Q 2 = 3 . 7 3 C F S Q 1 0 = 2 1 . 8 1 C F S PRE-DEVELOPED DRAINAGE PLAN P O S T - D E V E L O P E D D R A I N A G E P L A N 0 8 - 1 3 - 2 0 1 8 N O T E : 1 . R E F E R T O E N G I N E E R I N G R E P O R T F O R V I R G I N I A R U N O F F R E D U C T I O N M E T H O D S P R E A D S H E E T D A T A A N D D E T A I L E D D R A I N A G E A R E A C A L C U L A T I O N S . 1 REVISIONS PER FREDERICK COUNTY AGENCY COMMENTS08-13-2018 DDD EROSION CONTROL NOTES: 1.THE CONTRACTOR SHALL ARRANGE FOR A PRE-CONSTRUCTION CONFERENCE WITH THE FREDERICK COUNTY EROSION AND SEDIMENT CONTROL DIRECTOR 48 HOURS PRIOR TO BEGINNING WORK. 2.ALL EROSION CONTROL DEVICES AS SHOWN OR AS REQUIRED ARE TO BE CONSTRUCTED TO STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (LATEST EDITION) AND ARE TO BE IN PLACE PRIOR TO ALL CONSTRUCTION. 3.THIS PLAN IS NOT COMPLETE WITHOUT THE APPROVED NARRATIVE. 4.EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED CONTINUOUSLY, RELOCATED WHEN AND AS NECESSARY AND SHALL BE CHECKED AFTER EVERY RAINFALL. SEEDED AREAS SHALL BE CHECKED REGULARLY AND SHALL BE WATERED, FERTILIZED, RESEEDED AND MULCHED AS NECESSARY TO OBTAIN A DENSE STAND OF GRASS. 5.ALL DISTURBED AREAS NOT PAVED OR BUILT UPON ARE TO BE FERTILIZED, SEEDED, AND MULCHED BY THE CONTRACTOR IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (LATEST EDITION). 6.ALL DRAIN INLETS SHALL BE PROTECTED FROM SILTATION. INEFFECTIVE PROTECTION DEVICES SHALL BE IMMEDIATELY REPLACED AND THE INLET CLEANED. FLUSHING IS NOT AN ACCEPTABLE METHOD OF CLEANING. 7.GRADE AREAS ADJACENT TO BUILDING TO ACHIEVE DRAINAGE AWAY FROM THE STRUCTURE AND TO PREVENT PONDING IN SWALES. 8.PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 21 DAYS. 9.DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. 10.VEGETATIVE STABILIZATION SHALL BE UNIFORM AND MATURE ENOUGH TO SURVIVE AND ADEQUATE TO INHIBIT EROSION. 11.SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND- DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. 12.STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. 13.UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: A.NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B.EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C.EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF-SITE PROPERTY. D.MATERIAL USED FOR BACK FILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. E.RESTABILIZATION SHALL BE ACCOMPANIED IN ACCORDANCE WITH THESE REGULATIONS. F.APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. 14.WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. 15.ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM ADMINISTRATOR. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. 16.ALL DISTURBED AREAS NOT PAVED OR BUILT UPON SHALL BE TOP SEEDED, MULCHED AND FERTILIZED. PERFORM PERMANENT TOP SOILING, SEEDING, LANDSCAPING, FERTILIZING, AND MULCHING AS SOON AFTER FINISH GRADING AS POSSIBLE. SEEDING SHALL COMPLY WITH THE FOLLOWING: A.TOPSOIL - 4 INCH MINIMUM FOR PERMANENT TURF B.FERTILIZER - 450 POUNDS PER ACRES OF 10-20-10 FERTILIZER OR EQUIVALENT POUNDAGE OF DIFFERENT ANALYSIS. WORK INTO SOIL PRIOR TO SEEDING. C.LIME (PERMANENT SEEDING) - AGRICULTURAL LIME SPREAD AT RATE OF 2 TONS/ACRE. WORK INTO SOIL PRIOR TO SEEDING. D.MULCH-CHOPPED STRAW AT RATE OF 2 TON PER ACRE AND TACKED IN PLACE. HYDRO-MULCH AT RATE OF 30 BALES PER ACRE. STORMWATER MANAGEMENT BASIN NOTES: 1. ALL STORMWATER MANAGEMENT POND CONSTRUCTION SHALL BE IN STRICT COMPLIANCE WITH ALL APPLICABLE FREDERICK COUNTY AND THE U.S. DEPARTMENT OF AGRICULTURE SOIL CONSERVATION SERVICE STANDARDS AND SPECIFICATIONS 2. MATERIAL. SITE AND STORMWATER MANAGEMENT BASIN FILL MATERIAL SHALL BE TAKEN FROM APPROVED DESIGNATED BORROW AREAS. IT SHALL BE FREE OF ROOTS, STUMPS, WOOD, RUBBISH, STONES WITH DIAMETERS GREATER THAN 6 INCHES, AND FROZEN OR OTHER OBJECTIONABLE MATERIALS. 3. COMPACTION . BACKFILL SHALL BE SPREAD IN HORIZONTAL LIFTS WHICH DO NOT EXCEED 4 INCHES AND COMPACTED. THE MOVEMENT OF THE HAULING AND SPREADING EQUIPMENT OVER THE FILL SHALL BE CONTROLLED SO THAT THE ENTIRE SURFACE OF EACH LIFT SHALL BE TRAVERSED BY NOT LESS THAN ONE TREAD TRACK OF HEAVY EQUIPMENT OR COMPACTION SHALL BE ACHIEVED BY A MINIMUM OF 4 COMPLETE PASSES OF A SHEEPSFOOT, RUBBER-TIRED OR VIBRATORY ROLLER. FILL MATERIAL SHALL CONTAIN SUFFICIENT MOISTURE SUCH THAT THE REQUIRED DEGREE OF COMPACTION WILL BE OBTAINED WITH THE EQUIPMENT USED. THE FILL MATERIAL SHALL CONTAIN SUFFICIENT MOISTURE SO THAT IF FORMED INTO A BALL IT WILL NOT CRUMBLE, YET NOT SO WET THAT WATER CAN BE SQUEEZED OUT. THE MINIMUM REQUIRED DENSITY OF THE COMPACTED BACKFILL SHALL NOT BE LESS THAN 95% OF MAXIMUM DRY DENSITY WITH A MOISTURE CONTENT WITHIN 2% OF THE OPTIMUM. EACH LAYER OF FILL SHALL BE COMPACTED AS NECESSARY TO OBTAIN THAT DENSITY, AND IS TO BE CERTIFIED BY THE ENGINEER AT THE TIME OF CONSTRUCTION. 4. VEGETATION . NO TREES OR SHRUBS SHALL BE PLANTED ON ANY EMBANKMENT OF THE STORMWATER MANAGEMENT BASINS. SWM MAINTENANCE SCHEDULE 1. POST CONSTRUCTION STORM-WATER MANAGEMENT: THE FOLLOWING CONTROL MEASURES SHALL BE IMPLEMENTED TO REDUCE POLLUTANTS IN STORM-WATER DISCHARGE AFTER THE HEAVY SITE CIVIL CONSTRUCTION PHASES HAVE BEEN COMPLETED AT THE SITE. A. ROUTINE INSPECTION OF DRAINAGE WAYS BEFORE AND AFTER STORM SEASONS, INCLUDING CLEANING AND REMOVAL OF SEDIMENT AND DEBRIS. B. IMPLEMENTATION OF EROSION CONTROL MEASURES AS NEEDED IN THE LONG-TERM TO MITIGATE THE EFFECTS OF EROSION ON OPEN SLOPES ADJACENT TO AND WITHIN THE DEVELOPMENT. C. PERMANENT RE-VEGETATION OF THE FILL SLOPES USING PROVEN TECHNIQUES UPON COMPLETION. D. REGULAR STREET AND PARKING LOT SWEEPING TO COLLECT SEDIMENT AFTER/BEFORE RUNOFF EVENTS AND TO PREVENT DUST POLLUTION. 2. MAINTENANCE AND INSPECTION: THE STORM-WATER POLLUTION PREVENTION PLAN SHALL INCLUDE MAINTENANCE, REPAIR, AND TRACKING PROCEDURES TO ENSURE THAT ALL GRADED SURFACES AND MITIGATION MEASURES, AND OTHER PROTECTIVE DEVICES, IN SITE PLAN, ARE MAINTAINED IN A GOOD AND EFFECTIVE CONDITION, AND ARE REPAIRED OR RESTORED IF DAMAGED. 3. GENERAL PROCEDURE: ALL MITIGATION MEASURES SHALL BE INSPECTED AFTER EACH AND EVERY MAJOR STORM EVENT. A STORM EVENT IS DEFINED AS A RAINFALL EVENT WHERE MORE THAN 1/2" OF RAINFALL OCCURS DURING A 24 HOUR PERIOD. REPAIRS SHALL BE MADE TO ALL MITIGATION DEVICES UPON DISCOVERY OF DAMAGE. ADDITIONALLY, MONTHLY INSPECTION SHALL OCCUR UNTIL THE NOTICE OF TERMINATION (NOT) IS FILED. 4. RECORD KEEPING DOCUMENTATION: RECORDS OF ALL INSPECTION, COMPLIANCE CERTIFICATION, AND NON-COMPLIANCE REPORTING WILL BE RETAINED FOR A PERIOD OF AT LEAST 3 YEAR. A COPY OF THIS STORM-WATER POLLUTION PREVENTION PLAN WILL BE KEPT ONSITE DURING ALL CONSTRUCTION ACTIVITIES. SEEDING SPECIFICATIONS: TEMPORARY CONTROL MEASURES: TEMPORARY SOIL EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSTALLED PRIOR TO ANY MAJOR SOIL DISTURBANCE IN ORDER TO PREVENT ACCELERATED EROSION AND TRANSPORTATION OF SEDIMENT DURING SITE DISTURBANCE. SILT FENCE WILL BE USED TO LIMIT SEDIMENTATION FROM SMALL UPHILL AREAS. ANY DISTURBED AREAS THAT WILL BE LEFT EXPOSED MORE THAN 7 DAYS, AND NOT SUBJECT TO CONSTRUCTION TRAFFIC WILL IMMEDIATELY RECEIVE TEMPORARY SEEDING AND MULCH. IF THE SEASON PREVENTS ESTABLISHMENT OF TEMPORARY COVER, THE DISTURBED AREAS WILL BE MULCHED WITH STRAW, OR EQUIVALENT MATERIAL AT A RATE OF 2.0 TONS PER ACRE. ALL CRITICAL AREAS (I.E. STEEP SLOPES AND ROADWAY EMBANKMENTS) WILL RECEIVE A TEMPORARY SEEDING IMMEDIATELY FOLLOWING THE ESTABLISHMENT OF FINAL GRADE IN COMBINATION WITH STRAW OR MULCH, OR A SUITABLE EQUIVALENT AT A RATE OF 2.0 TONS PER ACRE. THE DESIGN OF THE PROJECT INTENDS TO DISTURB AS LITTLE OF THE SITE AS POSSIBLE. SEED: FALL - RYE, TWO ¼ BUSHELS PER ACRE [SEPTEMBER 1 - NOVEMBER 15] SPRING - OATS, TWO ¼ BUSHELS PER ACRE [MARCH 1 - MAY 15] MULCH: 2.0 TONS PER ACRE MULCH BINDER: EMULSIFIED ASPHALT SS-1 AT THE RATE OF 150 GALLONS PER ACRE FERTILIZER: 3 TON DOLOMITIC LIMESTONE/ACRE; 600 LBS.; 10-10-10/ACRE SEEDING SPECIFICATIONS (CONT'D.): PERMANENT CONTROL MEASURES: PERMANENT CONTROL MEASURES WILL BE INSTALLED IN THEIR PROPER SEQUENCE THROUGHOUT THE CONSTRUCTION PERIOD. THESE MEASURES WILL PREVENT EROSION ONCE CONSTRUCTION ACTIVITY IS COMPLETE. PERMANENT CONTROL MEASURES FOR THIS PROJECT INCLUDE THE ESTABLISHMENT OF PERMANENT COVER AND INSTALLATION OF RIP-RAP APRONS AT STORM PIPE OUTLETS. ALL AREAS SHALL BE PERMANENTLY SEEDED AND MULCHED WITHIN ONE WEEK OF REACHING FINAL GRADE, OTHERWISE TEMPORARY REQUIREMENTS SHALL BE MET. ADDITIONALLY, ALL AREAS SHALL BE SEEDED AND MULCHED WITHIN 7 DAYS IF THE AREA IS TO REMAIN UNWORKED FOR A PERIOD OF 21 DAYS OR MORE. DURING THE FIRST GROWING SEASON AFTER REACHING FINAL GRADE, A PERMANENT SEED MIXTURE WILL BE ADDED. ANY SOIL THAT WILL NOT PROVIDE A SUITABLE ENVIRONMENT TO SUPPORT ADEQUATE VEGETATIVE GROUND COVER, SHALL BE REMOVED OR TREATED IN SUCH A WAY THAT WILL PERMANENTLY ADJUST THE SOIL CONDITIONS AND RENDER IT SUITABLE FOR VEGETATIVE GROUND COVER. IF THE REMOVAL OR TREATMENT OF THE SOIL WILL NOT PROVIDE SUITABLE CONDITIONS, NON-VEGETATIVE MEANS OF PERMANENT GROUND STABILIZATION WILL HAVE TO BE EMPLOYED. ALL ROADWAY SLOPES AND DISTURBED AREAS ARE TO BE SEEDED AND MULCHED. GROUND IS TO BE DISCED TO A DEPTH OF SIX (6) INCHES AND SEEDED AS SOON AS POSSIBLE AFTER GROUND HAS BEEN DISTURBED. 10-20-10 FERTILIZER IS TO BE APPLIED AT THE RATE OF 1000 LBS PER ACRE AND LIME AT THREE TONS PER ACRE PRIOR TO DISCING. MULCHING IS TO BE 2.0 TONS OF STRAW WITH 100 GALLONS OF TAR MIXED PER ACRE. ALL WORK SHALL BE DONE IN ACCORDANCE WITH SOIL CONSERVATION SERVICE STANDARDS. PERMANENT SEEDING (MARCH 1 -SEPT. 1 ) WILL BE APPLIED AS FOLLOWS: SEED: 150 LBS/ACRE KENTUCKY 31 - 90% RED TOP GRASS - 5% WHITE CLOVER - 5% FERTILIZER: 2 TONS DOLOMITIC LIMESTONE/ACRE; 1000 LBS/ACRE OF 10/20/10 MULCH: 2.0 TONS/ACRE OF STRAW DUST CONTROL MEASURES SIDE ELEVATION PLAN VIEW SECTION A-A SECTION B-B STONE CONSTRUCTION ENTRANCE DIVERSIONS TYPICAL PARABOLIC DIVERSION TYPICAL TRAPEZOIDAL DIVERSION TYPICAL VEE-SHAPED DIVERSION 15' ELEV.=723.65 ELEV.=726.00 ELEV.=727.65 Q2 = 9.37 CFS 2-YR VEL. = 2.18 FT/S Q10 = 2.49 CFS 10-YR. DEPTH = 1.22' LINING = GRASS ELEV.=720.50 EX. 24" CMP @ 7.00%; 6 2 . 7 0 L F BOTTOM OF BASIN = 714.60 2:1 ( E X . ) IF NECESSARY, CONTRACTOR TO EXCAVATE UNSUITABLE BASE MATERIAL THAT EXISTS BELOW BASE OF RISER AND REPLACE WITH COMPACTED UNCLASSIFIED FILL. 2 : 1 ( E X . ) 6' (EX.) OUTLET PROTECTION RISER ELEV.=717.50 INV.=714.60 TRASH RACK 4' DIA. CONC. RISER (REPLACE EX. 24" CMP RISER) 717.51 717.81 718.2410 yr. 1 yr. 2 yr. 719.46 (100% THRU EMERG. SPILLWAY)100 yr. ELEVATIONS EMERG. SPILLWAY (20' WIDE) ELEV.=718.50 (LINED W/ VDOT EC-3 BLANKET) 8" 6' SQUARE 3,000 PSI CONCRETE FOOTINGCONTRACTOR TO ENSURE RISER STRUCTURE IS ADEQUATELY ANCHORED TO FOOTING. 8" ORIFICE INV.=714.60 W/ DEBRIS RACK NOTE: REMOVE EXISTING 24" CMP RISER AND REPLACE WITH THE PRINCIPAL SPILLWAY OUTLET STRUCTURE AS DEPICTED ABOVE IN THE SAME LOCATION. CA D D F I L E : DA T E : RE V . # SC A L E : DA T E SHEET NUMBER: DR A W N B Y : CH E C K E D B Y : BY CO N S T R U C T I O N D E T A I L S JOB NO.: 17-29 C-11 C- 1 1 . D W G DD D N/ A DD D STANDARD STOP SIGN DE S C R I P T I O N 07 - 1 6 - 2 0 1 8 08-13-2018 FREDERICK COUNTY SP # 32-18 HP H O O D T R A I L E R P A R K I N G A D D I T I O N FR E D E R I C K C O U N T Y , V A INTERFACE NEW PAVEMENT WITH EXISTING PAVEMENT TYPICAL SECTION 1 RE V I S I O N S P E R F R E D E R I C K C O U N T Y A G E N C Y C O M M E N T S 08 - 1 3 - 2 0 1 8 DD D