CPPC 01-09-06 Meeting AgendaCOUNTY of FREDERICK
Department of Planning and Development
540/665-5651
FAX: 540/665-6395
MEMORANDUM
TO: Comprehensive Plans and Programs Subcommittee (CPPS)
FROM: Susan K. Eddy, Senior Planner C
RE: January Meeting and Agenda
DATE: December 30, 2005
The Frederick County Comprehensive Plans and Programs Subcommittee (CPPS) will be meeting on
Monday, January 9, 2006 at 7:30 p.m. in the Board of Supervisor's Room of the County
Administration Building, 107 North Kent Street, Winchester, Virginia. The CPPS will discuss the
following agenda items:
AGENDA
Proposed expansion of the Sewer and Water Service Area (SWSA) in the Round Hill Area.
2. Other
Please contact our department if you are unable to attend this meeting.
You are also reminded that the Board of Supervisors and Planning Commission will be holding a
work session on the Urban Development Area (UDA) study on Tuesday, January 17th, 2006 at
11:00 p.m. in the Board of Supervisors Meeting Room. Lunch will be provided. You are
strongly encouraged to attend.
SKE/dlw
Attachments
Access is limited during the evening hours. Therefore, it will be necessary to enter the building
through the back double doors of the Board of Supervisors Room, located in the rear of the new
addition of the County building. I would encourage committee members and interested citizens to
park in the County parking lot located in the rear of the building and follow the sidewalk to the
back double doors of the Board Room.
107 North Kent Street, Suite 202 • Winchester, Virginia 22601-5000
ITEM #1
Proposed Expansion of the Sever and Water Servi: e Area 1(SWSA)
in the Round Hill Area.
The Board of Supervisors at its meeting on December 14, 2005 passed a resolution directing the
Planning Commission to undertake a study to consider the expansion of sewer and water service to
incorporate properties adjacent to and east of Poorhouse Road in the Round Hill community. A copy
of that resolution is attached. Also attached is a map specifically identifying the properties noted in
the resolution (the Bishop property, the other properties bisected by the current SWSA, Emmanuel
Baptist Church and Rosedale Baptist Church).
The first step in the process is for the CPPS to study the area and make a recommendation to the
Planning Commission.
The Board resolution speaks of adjustment to the SWSA boundary. It is important to clarify what
extension of the SWSA would allow. Extension of the SWSA would allow future extension of water
and sewer lines and connections to water and sewer for commercial purposes and for existing
residences in the Round Hill Community. It would not allow access to water and sewer for new
residences. This would require extension of the Urban Development Area (UDA).
All of the area being studied is within the boundaries of the Round Hill Community Land Use Plan.
Attached to this agenda is a copy of that plan. The map accompanying the plan has been updated to
reflect the current SWSA boundary. Also attached is a zoning map of the area.
Clearly, Phase I of the Round Hill Plan and the eastern section of Phase II of the Round Hill Plan are
being implemented. Some properties, including the Wal-Mart site, the Winchester Medical Center
site and the Marathon Bank site, have been zoned for commercial and institutional uses. Water and
sewer lines have been extended on the north side of Route 50 (Northwestern Pike) to the Wal-Mart
site. Water and sewer lines are set to go under Route 50 at Ward Avenue in 2006. Phase 1 of the
Plan calls for business/office development. Phase 11 of the plan call for commercial uses and
specifically discourages residential uses in Phase II.
An important aspect of the Round Hill Plan is design standards. The plan calls for standards to be
developed to minimize the visual disruption to the Route 50 corridor. This would include standards
for shared entrances, require a green space along Route 50, address screening, control the size,
number and location of signs, require underground utilities and set minimum standards for
landscaping. These design standards have not yet been written.
The Round Hill Plan states that it will ultimately be up to the Board of Supervisors to determine
when it is appropriate to include other areas of the community within the Sewer and Water Service
Area. Staff would suggest that the CPPS consider extending the SWSA to cover all of Phase II of
the Round Hill Plan. This would add approximately 150 acres of land to the SWSA, all of which is
proposed for commercial development. Completion of Phase II would be a logical implementation
of the Round Hill Plan. Any future rezoning of course, would be dependent on the applicant
extending water and sewer lines at his own expense, providing the road infrastructure called for in
the plan, mitigating the impacts of development, and providing the design features called for in the
plan. Water and sewer lines will need to be sized to ultimately include residential land in the
community center core area. The CPPS may consider it a priority to filly develop the design
standards called for in the plan.
Phase III of the Round Hill Plan, west of Phase 11, is yet to be implemented. It includes the large
residential core of the community center and other land for L5 miles along Route 50 planned for
business/office uses. The residential portion of Phase III is to take place in the existing residential
core where development would be based on a new zoning category that allow lots as small as'/2 acre
on central sewer. No work has been done yet on a new zoning category to accomplish the infill
development.
The Round Hill Plan makes clear that the expansion of business/retail uses westward on Route 50 is
meant to be the funding mechanism for the extension of water and sewer to the whole area. Such an
extension would be a considerable investment and is meant to be undertaken through private
investment. It would likely be outside of the ability of two churches to pay for the extension ofwater
and sewer for over 1 mile along Route 50.
Development of Phase III of the Round Hill plan is long range. Standards for the Route 50 corridor
have not been developed. A new zoning category for the residential portion of the Round Hill
community has not been developed. Extending water and sewer to Phase III, even if paid for by
private developers or the churches, would promote leapfrog development, instead of the orderly
westward progression called for in the plan. Staff would caution against extending the SWSA to
Phase III of Round Hill Community.
Staff Note: Comments from Wellington Jones, Engineer -Director of the Frederick County Sanitation
Authority, will be available on the night of the meeting.
-2-
41G� C4
®: RESOLUTION
® Action: BOARD OF SUPERVISORS: December 14, 2005
CP APPROVED ❑ DENIED
DIRECTING THE PLANNING COMMISSION TO UNDERTAKE A STUDY CONSIDERING
THE EXPANSION OF THE SEWER AND WATER SERVICE TO INCORPORATE
PROPERTIES ADJACENT TO, AND EAST OF POORHOUSE ROAD, IN THE ROUND HILL
COMMUNITY
WHEREAS, Route 803 (Round Hill Road) has been re -aligned to improve traffic circulation associated
with the Round Hill Crossing commercial center, the home to a Wal-Mart Supercenter, located in the
Round Hill Community, within the Gainesboro and Back Creek Magisterial Districts; and
WHEREAS, The County has been approached by a property owner (Bishop) whose property (PIN 52-
A-254) is adjacent to the re -aligned roadway, and same property is presently bisected by the existing
Sewer and Water Service Area (SWSA). A total of 11 properties, adjacent to the Bishop's property, are
bisected by the existing SWSA boundary. As such, it may be reasonable to adjust the SWSA boundary
to coincide with the new Route 803 location; and
WHEREAS, This request to adjust the SWSA boundary was sponsored and presented to the Board of
Supervisors by the Back Creek Magisterial District Supervisor on December 14, 2005; and
WHEREAS, The Board of Supervisors felt the study area should include properties adjacent to and east
of Poorhouse Road, specifically including the Emmanuel Baptist Church and the Rosedale Baptist
Church;
NOW, THEREFORE, BE IT ORDAINED that the Board of Supervisors directs the Planning
Commission to study and return to the Board of Supervisors a recommendation regarding the expansion
of the sewer and water service area to accommodate the properties adjacent to the re -aligned Route 803.
Passed this 14th day of December 2005 by the following recorded vote:
Richard C. Shickle, Chairman Aye Barbara E. Van Osten Aye
Lynda J. Tyler
Aye
Gary W. Dove
Aye
Gina A. Forrester
Aye
Bill M. Ewing
Abgent
Gene E. Fisher
PDRes.##39-05
Resolution No.: 035-05
Aye
A COPY TTE
John
, Jr.
Frederkk
County A ministrator
Round Hill
Community
N
we
s
Feet
0 750 1,500
Streets
Primary Roads
Secondary Roads
Tertiary Roads
Winchester City Roads
railroads
Lakes
^'4^- Streams
Parcels
Urban Development Area
*VSWSA
Community Centers
Round Hill Landmarks
Frederick County Dept of
Planning & Development
107 N Kent St
Winchester, VA 22601
www.CO.FREDERICK.VA.US
December 2005
Land Use
Round Hill
The process of formulating a plan for the Round Hili Community began on May a 1995 when the
Frederick County Comprehensive Plans and Programs Committee (CPPC, a subcommittee of the
County Planning Commission) and staff from the Department of Planning and Development,
conducted a public meeting at the Round Hill Fire Hall.
The CPPC held a second meeting on September 25, 1995 to present the draft Land Use Plan. In
response to the opinions expressed by residents of the community throughout the process, and the
desires of the Board of Supervisors, the plan recommends leaving portions of the Community Center
designated as rural land use. In all, of the 1,100 acres within the community center, roughly 400 to
500 is designated to remain rural land.
In conjunction with the recommendation to maintain large amounts of open space adjacent to the
core area of the Community Center, the plan also calls for the development of a new zoning category
tailored to accommodate rural community uses and building patterns. This recommendation is
discussed in more detail later in the report.
It should be noted that only Phase I and a small portion of Phase Il is inside the current Sewer and
Water Service Area. It will ultimately be up to the Board of Supervisors to determine when it is
appropriate to include other areas of the community within the Sewer and Water Service Area, a
necessary first step to extending utilities. Development of any area would be dependent on the
availability of appropriate infrastructure; therefore, the plan does not recommend rezoning land
within the community for commercial development prior to the provision of central sewer and water.
It is also recommended that as land is developed over time and infrastructure extended, that
consideration be given to how this development might further the long range goal of providing
sewer to the core area of the community.
There are a number of recommendations that are important elements of the proposed phasing. First,
given the fairly uniform response from residents of the community, no area is proposed for high
density residential development. As mentioned previously, the plan recommends that a new zoning
category be adopted prior to development within Phase III, which, among other things, allows
residential development within the Community Center at a density in keeping with traditional
development patterns for the community.
The new zoning classification should establish building location and use regulations which perpetuate
existing development patterns. These regulations should be developed following a thorough
examination of existing building patterns within the community. Standards addressing such things
as minimum and maximum front setbacks and building height for structures within the core area of
the community, permitted commercial uses and their scale, the location of parking areas as well as
their size, and screening should all be considered. The intended purpose being to permit the
Frederick County 6-47 Comprehensive Plan
iz
Design Princ4p
Land Use
to be Established -for Round Hill �
Curb -side parking
Low speed limit
Shade trees on both sides of street
Modest front yard setback 15-30 feet
Large amounts of open space - 50%
Modest size commerciallretail uses
Large predominance of single family dwellings within
core area of community
Discreet signage - maximum 10% of facade area
Underground utilities
continuation of favorable building patterns, styles, and mix of uses found within the community rather
than utilizing existing regulations which were not written with small rural communities in mind.
In the case of the core area, the plan suggests that a minimum lot size in the range of one half, to one l
acre be established. The plan proposes that this would go into effect as part of Phase III of the land
use plan. This lot size change would only take place as part of an overall zoning change for the core
area of the Community, and would be dependent on the installation of a central sewer system. The
smaller lot size is not proposed for the entire Community Center. Areas on the periphery of the
community should be developed on larger lots. There should also be an effort made to preserve large
contiguous parcels of open land around the perimeter of the Community Center as a means of
maintaining the rural atmosphere.
The plan recommends that standards also be developed that will minimize the visual disruption to the
Route 50 corridor. This would involve standards for shared entrances, require a green space along
Route 50 which might include a bike and or walking trail, address screening of structures and parking
areas and their location in relation to Route 50 itself, control the size, number and location of signs,
require underground utilities, and finally, set minimum standards for landscaping. The objective is
to prevent the creation of a typical commercial strip along this route. The regulations should
discourage individual business entrances on Route 50 both for aesthetics reasons as well as
transportation efficiency. Commercial establishments should front feeder roads which connect to
Route 50 at signalized intersections.
Frederick County 6-48 Comprehensive Plan
Figure 13
Land Use
Description of Phases
Round .bill Community
Number of Lots by Acreage
200 -T-
0 150 .
i
0 100
i
� 50 -jam
Z
0
0-112 1/2-1 1-2 2-5 5and up
Lot Size
Phase I
The first phase in the proposed plan contains approximately 110 acres. The area within the first phase
is bounded on the west by the current limits of Sewer and Water Service Area. The Service Area
boundary falls along a natural drainage divide which runs north -south across Route 50, approximately
one half mile west of Route 37, and roughly parallel to 37. The southern limit of the phase also
follows a natural drainage divide. This divide runs in a southeasterly direction beginning near the
intersection of Route 803 and Route 50, to a point on Route 3 7 approximately mid -way between the
interchange with Route 50 and the railroad crossing.
This phase calls for the establishment of a Business/Office Area immediately adjacent to the Route
37 interchange. Implementation of this phase is anticipated to begin within the near term. For our
purposes we have assumed a five-year time frame. Business/Office development would require the
extension of public sewer and water.
Frederick County 6-49 Comprehensive Plan
Land Use
Phase 11
The second phase of the proposed plan involves an area designated for additional business and office
uses. The total area in this phase amounts to just over 180 acres. There was a great deal of
discussion at the Committee level regarding the best category of use for this portion of the
community. It was finally determined that the prospect of residential development of any sort in this
area should be avoided in favor of commercial uses.
Phase III
The third phase encompasses the core area of the Community as well as some additional
business\office uses along Route 50 for a total area of roughly 300 acres. The plan calls for infill
residential development within the core area along with some appropriately scaled commercial uses.
This portion of the phase involves roughly 250 acres. As mentioned above, it is not recommended
that residential development take place under the current Residential Performance regulations, but
rather that new regulations be developed that enable the continuation of the rural community
atmosphere. It is also recommended that the development be predominately single family residential
with the possibility of some small scale businesses aimed at serving the immediate community.
As with other phases, the type of development anticipated would require the availability of central
sewer. Since the provision of public utilities will involve a substantial investment, this phase also
proposes further expansion of business\retail westward out Route 50 as a means of funding the
extension. The business area in this phase contains roughly 50 acres. Again, it is recommended that
the commercial development be permitted only after the formulation of specific standards designed
to address the visual impact of such development.
The Phase III portion of the Land Use Plan should be considered long range. There is significant
work in terms of the development and adoption of regulations that would need to be accomplished
before the County would consider permitting the extension of public utilities. Such an extension
would involve a considerable investment and will likely have to be undertaken through private
investment.
Frederick County 6-50 Comprehensive Plan
Land Use
Infrastructure
Seaver
An agreement, signed in 1984, between the City of Winchester and the Frederick County Sanitation
Authority reserves 953,600 gallons of capacity within the sewer line which terminates just east of
Route 37 for use by the County to serve the Round Hill Community. Despite this agreement, it
appears that the actual capacity currently available is only 200,000 gallons per day. This means that
unless or until the factors limiting capacity are addressed, it will not be feasible to extend sewer to
Phases II and III. Even with the restriction eliminated, there would be a significant private investment
required to extend the line to the western limits of Phase II and into Phase III.
For the purposes of determining whether the limits of Phase I can realistically be served by the
estimated 200,000 gallon capacity available, a hypothetical list of uses that might be expected to
locate within the phase was developed. An estimated water demand was then generated using
standard multipliers obtained from the Virginia State Health Department. The totals indicate that the
200,000 gallons would be adequate for the type and amount of development that could be expected
in the near future within Phase I.
OMM
As with development proposals within the current Urban Development Area, construction of new
collector roads and the installation of sewer and water within the Community Center would be the
responsibility of the developer. Each of the phases contain segments of collector roads which are
intended to channel traffic to and from a few key intersections along Route 50. These collectors are
seen as a preferred alternative to permitting an excessive number of individual business entrances
on Route 50. The locations of collectors roads shown are not intended to be precise. Development
proposals submitted for specific areas would be expected to provide for roads which make the
connections indicated and serve the intended function, but would not necessarily follow the precise
alignments shown.
As the areas develop, signalization will be required where collectors intersect Route 50. Procedures
already in place would require that development pay a pro rata share toward the cost of such
facilities.
The recommendations contained within the Round Hill Land Use Plan attempt to allow for growth
within the Community Center without overwhelming, and ultimately destroying, the features that
distinguish the community from the surrounding County. In particular, the plan:
Frederick County 6-53 Comprehensive Plan
Land Use
i
calls for the development of a variety of regulations that would protect the appearance of the
corridor and limit uses within the Community prior to any extension of sewer or water,
► directs large scale commercial growth away from the core area of the community,
► minimizes residential development,
► maintains large amounts of open space,
► ensures that new development within the core area is in keeping with the scale of the
community,
► calls for a transportation network that would feed traffic to and from Route 50 at controlled
intersections, and discourages a proliferation of entrances along Route 50 itself.
While the plan does not offer specific design standards or land use regulations, it suggests features
that should be examined and calls for the development of a new zoning district that is tailored to
Round Hill. Route 50 West should not become a typical commercial strip. A green space should be
maintained along either side of the road and a pedestrian/bikeway should be incorporated into
development plans. It is hoped that many of the standards proposed, once developed, will be
applicable to other Community Centers throughout the County.
Rural Community Center Conclusion
Rural community centers have been identified and specific policies have been developed for these
centers. Potential rural community centers have also been identified. These should be evaluated and
plans should be prepared for each according to need.
Issues:
► All Community Centers need to be evaluated on an individual basis and appropriate
land use policies developed
► There is a need to determine to what extent rural community centers will be the
primary location of commercial and service uses in the rural areas.
10. The extent to which additional commercial and residential development should be
allowed in each rural community center needs to be determined.
What density of housing development should be allowed in each center?
e A policy governing the provision ofpublic services to rural community centers needs
to be established.
Frederick County 6-54 Comprehensive Plan
[Round Hill
Community
Land Use Plan
Total Study Area
1180 Acres
N
W*
,}.�
JJa�,
V S
Feet
0 750 1,500
Proposed Traffic Signal
Proposed Collector Roads
Phase 1 - 110acres
Phase 2 - 180acres
Phase 3 - 300acres
Streets:
/V Primary Roads
Secondary Roads
Terciary Roads
Winchester City Roads
railroads
Lakes
^M� Streams
Parcels
Urban Development Area
SW(
Community Centers
Frederick County Dept of
Planning & Development
107 N Kent St
Winchester, VA 22601
www.CO.FREDERICK.VA.US
June 1996
Updated as of Dec 2005
Round Hill
Community
Zoning
N}yy�'/�}
s
Feet
0 750 1,500
Streets
/V Primary Roads
/V Secondary Roads
Terciary Roads
Winchester City Roads
A/ railroads.
Lakes
Streams
Parcels
Urban Development Area
JVSWSA
1^00 Community Centers
61 (Business, Neighborhood District)
B2 (Business, General District)
B3 (Business, Industrial Transition District)
EM (Extractive Manufacturing District)
HE (Higher Education District)
M1 (Industrial, Light District)
M2 (Industrial, General District)
MH1 (Mobile Home Community District)
MS (Medical Support District)
R4 (Residential, Planned Community District)
R5 (Residential Recreational Community District)
RA (Rural Areas District)
RP (Residential Performance District)
Frederick County Dept of
Planning & Development
107 N Kent St
Winchester, VA 22601
www. CO. FREDERICK.VA.US
December 2005