PC 09-18-13 Meeting Agenda
AGENDA
FREDERICK COUNTY PLANNING COMMISSION
The Board Room
Frederick County Administration Building
Winchester, Virginia
September 18, 2013
7:00 P.M. CALL TO ORDER TAB
1) Adoption of Agenda: Pursuant to established procedures, the Planning Commission
should adopt the Agenda for the meeting ................................................................ (no tab)
2) Committee Reports .................................................................................................. (no tab)
3) Citizen Comments .................................................................................................... (no tab)
PUBLIC HEARING
4) Rezoning #04-13 The Overlook, submitted by Greenway Engineering, Inc., to rezone 55.46
acres as follows: 14.183± acres from RP (Residential Performance) District to RA (Rural
Areas) District; 7.098± acres from RP (Residential Performance) District to B2 (General
Business) District; 10.040± acres from RA (Rural Area) District to RP (Residential
Performance) District; and 24.145± acres to remain RP (Residential Performance) District
with proffers. The property is located on the south side of Berryville Pike (U.S. Route 7)
near and adjoining the Valley Mill Road intersection and are identified by Property
Identification Numbers 55-A-161, 55-A-165A, 55-A-166, 55-A-167, 55-A-167A, 55-A-168,
55-A-174A, 55-A-174B, 55-A-174D, and 55-A-165 a portion, in the Red Bud Magisterial
District.
Mr. Ruddy ...................................................................................................................... (A)
5) Adjourn
REZONING APPLICATION #04-13
The Overlook
Staff Report for the Planning Commission
Prepared: September 3, 2013
Staff Contact: Michael T. Ruddy, AICP, Deputy Planning Director
Reviewed Action
Planning Commission: 09/18/13 Pending
Board of Supervisors: 10/09/13 Pending
PROPOSAL: To rezone 55.46 acres as follows: 14.183± acres from RP (Residential Performance)
District to RA (Rural Areas) District; 7.098± acres from RP (Residential Performance) District to B2
(General Business) District; 10.040± acres from RA (Rural Areas) District to RP (Residential
Performance) District; and 24.145± acres remaining as RP (Residential Performance) District.
LOCATION: The property is located on the south side of Berryville Pike (U.S. Route 7) near and
adjoining the Valley Mill Road intersection.
EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 09/18/13 PLANNING
COMMISSION MEETING:
The Overlook rezoning application is generally consistent with future land use designations of the 2030
Comprehensive Plan. More specifically, the commercial land use adjacent to Valley Mill Road in
proximity to Route 7 and the residential land uses also along Valley Mill Road and to the interior of the
project are consistent with the Senseny/Eastern Frederick Urban Areas Plan which provides guidance on
the future development of the property.
The impacts associated with this rezoning request have generally been addressed; in particular, the
transportation improvements proposed which are substantial and further the County’s long range
transportation efforts. A couple of elements of the rezoning application have been identified that should
be recognized by the Planning Commission during your consideration of this request. The most recent
Development Impact Model output identifying the impacts to community facilities is not recognized
and the number of entrances to the project from Valley Mill Road, as pointed out by Mr. Bishop, should
be evaluated.
Confirmation of these items, and any issues raised by the Planning Commission, should be addressed
prior to the decision of the Planning Commission.
Following the required public hearing, a recommendation regarding this rezoning application to
the Board of Supervisors would be appropriate. The applicant should be prepared to adequately
address all concerns raised by the Planning Commission.
Rezoning #04-13 The Overlook
September 3, 2013
Page 2
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist them in making a decision on this
application. It may also be useful to others interested in this zoning matter. Unresolved issues
concerning this application are noted by staff where relevant throughout this staff report.
Reviewed Action
Planning Commission: 09/18/13 Pending
Board of Supervisors: 10/09/13 Pending
PROPOSAL: To rezone 55.46 acres as follows: 14.183± acres from RP (Residential Performance)
District to RA (Rural Areas) District; 7.098± acres from RP (Residential Performance) District to B2
(General Business) District; 10.040± acres from RA (Rural Areas) District to RP (Residential
Performance) District; 24.145± acres remaining as RP (Residential Performance) District.
LOCATION: The property is on the south side of Berryville Pike (U.S. Route 7) near and adjoining
the Valley Mill Road intersection.
MAGISTERIAL DISTRICT: Red Bud
PROPERTY ID NUMBERS: 55-A-161, 55-A-165A, 55-A-166, 55-A-167, 55-A-167A, 55-A-168,
55-A-174A, 55-A-174B, 55-A-174D, and 55-A-165 a portion.
PROPERTY ZONING: RA (Rural Areas) District and RP (Residential Performance) District.
PRESENT USE: Residential, agricultural, and vacant.
ADJOINING PROPERTY ZONING & PRESENT USE:
North: RA (Rural Areas) Use: Residential
South: RA (Rural Areas) Use: Residential and Agricultural
East: RA (Rural Areas) Use: Residential
West: MH1 (Mobile Home Community) Use: Mobile Home Community
Rezoning #04-13 The Overlook
September 3, 2013
Page 3
REVIEW EVALUATIONS:
Virginia Dept. of Transportation: Please see attached comments dated July 1, 2013, from Matthew
Smith, VDOT.
Fire and Rescue: Plan approved.
Public Works Department: No comments at this time.
Department of Inspections: No Comments.
Frederick County Sanitation Authority: Please see attached letter dated November 27, 2012, from
Uwe E. Weindel, PE.
Service Authority: Please see attached letter date November 28, 2012, from Jesse W. Moffett,
Executive Director.
Frederick-Winchester Health Department: No Comment.
Parks & Recreation: The applicant is addressing the Community (County) Development Impact
Model for Parks and Recreation as addressed in the Impact Analysis statement dated 11/11/12.
Winchester Regional Airport: Please see attached letter dated January 16, 2013, from S. R. Manuel,
Executive Director.
Frederick County Attorney: Please see attached comment dated June 21, 2013, from Rod Williams,
County Attorney.
Frederick County Public School: Please see attached letter dated February 19, 2013, from K. Wayne
Lee, Jr., LEED GA.
Historic Resources Advisory Board: No comments.
Planning & Zoning:
1) Site History
In 2007, the Board of Supervisors approved a request to rezone 30.26 acres from RA (Rural
Areas) District to RP (Residential Performance) District, and 15.18 acres from MH1 (Mobile
Home Community) District to RP (Residential Performance) District, totaling 45.44 acres, with
proffers, for up to 240 single family attached townhouses. This rezoning application,
Rezoning#12-06, was approved on July 25, 2007. In essence, this rezoning application
(Rezoning#04-13) is a reprogramming of Rezoning#12-06.
Rezoning #04-13 The Overlook
September 3, 2013
Page 4
The original Frederick County Zoning Map (U.S.G.S. Stephenson Quadrangle) identified the
parcels for which the rezoning is being requested as being zoned a combination of A-1
Agricultural and MH Mobile Home zoning classifications. The County’s A-1 and A-2
agricultural zoning districts were combined to form the RA (Rural Areas) District upon
adoption of an amendment to the Frederick County Zoning Ordinance on May 10, 1989. The
corresponding revision of the zoning map resulted in the re-mapping of the subject properties
and all other A-1 and A-2 zoned land to the RA (Rural Areas) District. The Mobile Home
designation encompassed the original boundaries of the Blue Ridge Mobile Home Park.
The most recent Site Plan for the development of the remaining areas of the Blue Ridge Mobile
Home Park was approved by the County on July 30, 1987. In 2005, a Boundary Line
Adjustment plat was approved by the County that reorganized the parcels that made up rezoning
request Rezoning#12-06. Parcels 55-A-161, 55-A-165A, 55-A-166, 55-A-167, 55-A-167A, 55-
A-174A maintained the RA zoning classification. Parcels 55-A-168 and 55-A-174D maintained
the MH1 zoning classification. Parcel 55-A-174A contains both the MH1 and RA zoning
classification. The approval of this rezoning request would place all of the properties entirely
into the RP zoning classification. As stated previously, Rezoning#12-06 was approved on July
25, 2007 by the Board of Supervisors.
2) Comprehensive Policy Plan
The 2030 Comprehensive Plan is the guide for the future growth of Frederick County.
The 2030 Comprehensive Plan and the Senseny/Eastern Frederick Urban Areas Plan provide
guidance on the future development of the property. Appendix I includes the Senseny/Eastern
Frederick Urban Areas Plan as an approved Area Plan.
The property is located in the UDA (Urban Development Area) and the SWSA (Sewer and
Water Service Area).
The 2030 Comprehensive Plan identifies the general area including and surrounding this
property with a residential land use designation. In general, the proposed residential designation
for this property is consistent with this residential land use designation of the Comprehensive
Plan. In addition, a small area of commercial land use is identified on this property at the
intersection of the related Valley Mill Road and Route 7, south of the environmental features
that run parallel to Route 7. This area of commercial land use is consistent with the commercial
designation identified in the Plan.
The anticipated residential density is consistent with the residential densities of the RP
(Residential Performance) section of the Zoning Ordinance, which was recently updated in
implementation of the Comprehensive Plan. In addition, the introduction of a small area of
commercial land use provides for a mix of uses in conjunction with each other, also an element
of the 2030 Comprehensive Plan.
Rezoning #04-13 The Overlook
September 3, 2013
Page 5
3) Site Suitability/Environment
The Overlook site has been identified as a site typical of the Martinsburg Shale Region with
steeply eroded side slopes and reasonably level plain areas. This is an accurate identification
that presents challenges when planning the development program for this property. Ash Hollow
Run parallels Route 7 along the entire frontage of the property. Abram’s Creek forms a portion
of the eastern boundary of the property. A pond is located central to the property. These features
and their associated slopes, natural drainage ways, and floodplains warrant particular attention
and provide an opportunity for enhanced protection of the riparian corridor. The site is
predominantly heavily wooded. The application proposes development of a greater intensity in
the reasonably level wooded areas and offers areas that will be set aside for environmental and
open space purposes. The reversion of a portion of the land to the rural areas ensures the
conservation of open areas and preservation of Valley Mill farm, a significant historical and
agricultural resource in this area.
The Comprehensive Plan identifies the preservation of the stream valleys as environmental open
space as an important goal that contributes to the protection of flood plains and water quality
and provides a continuous system of green open space. The application minimizes the impact to
the identified environmental features.
4) Potential Impacts
A. Transportation
The Frederick County Eastern Road Plan provides the guidance regarding future arterial and
collector road connections in the eastern portion of the County by identifying needed
connections and locations. Plans for new development should provide for the right-of-ways
necessary to implement planned road improvements and new roads shown on the road plan
should be constructed by the developer when warranted by the scale, intensity, or impacts of the
development. Existing roads should be improved as necessary by adjacent development to
implement the intentions of the plan
Route 7 is an arterial road whose character should be fully recognized in any rezoning
application. Route 7 is characterized with high volumes of traffic traveling at rates of speed in
excess of 55 miles per hour. Access management is a key consideration.
Valley Mill Road is identified as an improved major collector road in the County’s Eastern
Road Plan. In addition, Valley Mill Road is shown as being relocated on a new alignment to a
new location approximately 800 feet west on Route 7.
New development in the Urban Development Area should only be approved when roads and
other infrastructure with sufficient capacity have been provided. The Comprehensive Plan
identifies that a level of service “C” should be maintained on roads adjacent to and within new
Rezoning #04-13 The Overlook
September 3, 2013
Page 6
developments and that traffic analysis should be provided by the applicants to ensure that
needed road improvements are identified in order to maintain or improve upon the level of
service. In some cases, new development may need to contribute to the provision, construction,
or improvement of roads that are not adjacent to the development. In such cases, developments
should contribute their fair share costs of road improvements needed to accommodate the traffic
generated by a particular development.
Traffic Impact Analysis
The Traffic Impact Analysis (TIA) prepared for this project, dated November 9, 2012, and
revised June 5, 2013 projected that the development of 270 residential dwelling units and
35,300 square feet of commercial land use would generate 1,348 vehicle trips per day.
The TIA concludes that the traffic impacts associated with The Overlook application are
acceptable and manageable, assuming suggested improvements are in place. Suggested
improvements include the signalization of the intersection of Route 659, Valley Mill Road with
Route 7. The TIA identifies that this intersection will function at an acceptable level of service
with the suggested improvements. The Applicant has provided for the signalization of the
entrance to the commercial land bay if warranted and approved by VDOT.
As noted previously, the Comprehensive Plan identifies that a level of service “C” should be
maintained and that traffic analysis should be provided by the applicants to ensure that needed
road improvements are identified in order to maintain or improve upon the level of service.
Transportation Program
The Generalized Development Plan for The Overlook delineates the general public road system
that will serve the residential and commercial development. Primary access to the site is from a
relocated and realigned Route 659, Valley Mill Road. A new intersection of Valley Mill Road
and Route 7 is proposed to be established approximately 800 feet west of its current
intersection. The existing portion of Valley Mill Road, including the existing one lane bridge
crossing of Abrams Creek, is proposed to abandoned. The existing median crossover within
Route 7 at Valley Mill Road is proposed to be closed.
The applications proffer includes the construction of a traffic signal at the intersection of Valley
Mill Road and Route 7 and all associated improvements within Route 7.
The 2030 Comprehensive Plan promotes an effort to enhance and relocate Valley Mill Road so
that it serves as a major collector road. The Senseny/Eastern Frederick Urban Areas Plan
indicates the relocation and realignment of Valley Mill Road to provide the potential for a future
alignment with the future Route 37 ramps on the north side of Route 7. This application
implements the transportation goals of the 2030 Comprehensive Plan.
Private inter parcel access accommodations have been included in the proffers to provide access
between the commercial land bay and the adjacent Blue Ridge Mobile Home Park property. No
other internal streets have been identified in the GDP. Other opportunities may exist for inter
parcel connectivity with the future development of the property.
Rezoning #04-13 The Overlook
September 3, 2013
Page 7
B. Sewer and Water
The Overlook rezoning proposal is estimated to require approximately 66,135 gallons per day of
water usage and approximately 66,135 gallons per day of wastewater. The Frederick County
Sanitation Authority will serve the property and the wastewater flow from the site will go to the
Opequon Wastewater Treatment Plant.
C. Community Facilities
The comment provided by the Frederick County Public Schools anticipates that the proposed
270 detached single family units will yield 127 students; 38 high school students, 31 middle
school students and 58 elementary school students. The cumulative impact of this project, and
others of similar nature, will necessitate the future construction of new school facilities to
accommodate increased student enrollments. The impact of this rezoning on current and future
school needs should be considered during the approval process.
The Frederick County Development Impact Model is a tool that is used to identify the capital
costs associated with various types of development proposals presented to the County. The
projected costs to Fire and Rescue, Public Schools, Parks and Recreation, Library, Sheriff’s
Office and for the Administration Building are calculated and made available to rezoning
applicants for their consideration. Most recently, the DIM update was approved by the Board of
Supervisors on June 12, 2013. The 2013 update of the Development Impact Model has not been
followed by the Applicant in this submission. The Applicant has followed the 2012
Development Impact Model outputs and yet to update the application based on its time of
submission. Based on the 2013 update, the impacts associated with residential projects are
fixed at $19,600 for single family detached residential units, $13,062 for single family
attached residential dwelling units, and $11,339 for multifamily units.
5) Proffer Statement – Dated November 11, 2012 (Revised May 27, 2013)
A.
The Applicant has provided a Generalized Development Plan for the purpose of
identifying the general configuration of the relocated Valley Mill Road providing access
to the project, residential and commercial land use areas, the bicycle and pedestrian
facility, and open space and reservation areas within The Overlook development. The
GDP may be utilized to a greater extent to more clearly address the sensitive
environmental features on the property and the buffering of the adjacent residential uses.
Generalized Development Plan
B. Land Use
In addition to the residential land uses, the Applicant has committed to a maximum of
50,000 square feet of gross commercial floor area. The Applicant has also provided for
rural area land uses east of relocated Valley Mill Road in support of the existing Valley
Rezoning #04-13 The Overlook
September 3, 2013
Page 8
Mill Farm, preserving the character of this farm and historical resource.
C.
a. The Applicant has proffered a substantial transportation improvement package. All
right of way necessary for the relocation of the ultimate section of Valley Mill Road
through the property, and right of way necessary to allow the intersection of relocated
Valley Mill Road and Route 7 to be constructed is proffered to be dedicated to the
County.
Transportation
b. The construction of the ultimate section of relocated Valley Mill Road between Route 7
and the full access entrance to the commercial land bays, and a two lane section of
relocated Valley Mill Road from this full access commercial entrance to the existing
Valley Mill Road is proffered to occur in conjunction with the first phase of
development on the property. At the same time, the Applicant shall design and construct
the removal of the existing section of Valley Mill Road in a manner that is acceptable to
VDOT.
c. Proffered improvements within Route 7 to allow for the signalization of the
intersection of relocated Valley Mill Road and Route 7 include all median crossings and
associated turn lanes and the removal of the existing median crossover, in addition to
the signalization of this intersection.
d. The Applicant has by proffer established the ability to construct a total of four
entrances to the project from Valley Mill Road; three entrances for the residential
portion of the development, and one entrance for the commercial part of the
development. Please see Mr. Bishop’s comment regarding the number of entrances
proposed.
e. If necessary, warranted, and permitted by VDOT, the Applicant has proffered for the
signalization of the entrance to the commercial land bay from relocated Valley Mill
Road. Please see Mr. Matthew Smith, VDOT’s comment regarding the signalization
of this entrance.
f. Bicycle and pedestrian accommodations have been proffered generally along Valley
Mill Road, into the commercial land bay, and to the adjacent property to the west. This
is depicted on the Generalized Development Plan for this project.
D.
Access Management
The Applicant has provided for inter parcel access between the commercial land bay and
the adjacent Blue Ridge Mobile Home Park to the east by proffering to provide an
easement to allow a private access drive to be constructed by others.
Rezoning #04-13 The Overlook
September 3, 2013
Page 9
E. Community Facilities
The Applicant has proffered a monetary contribution totaling $18,507 for each single
family dwelling unit, $12,354 for each single family attached dwelling unit, and $9,983
for each apartment dwelling unit and potential above retail residential unit to offset the
capital costs associated with this request.
The Development Impact Model (DIM) is updated annually, with the most recent update
being approved by the Board of Supervisors on June 12, 2013. Please note that the
monetary contributions proffered by the Applicant to offset the community facility
impacts do not reflect the current DIM. An adjustment to the monetary contributions
to reflect the current DIM at the time of application would be appropriate.
The Applicant has proposed a reduction in the proffered monetary contributions should
age restricted residential units be developed on the property.
EXECUTIVE SUMMARY & STAFF CONCLUSION FOR THE 09/18/13 PLANNING
COMMISSION MEETING:
The Overlook rezoning application is generally consistent with future land use designations of the 2030
Comprehensive Plan. More specifically, the commercial land use adjacent to Valley Mill Road in
proximity to Route 7 and the residential land uses also along Valley Mill Road and to the interior of the
project are consistent with the Senseny/Eastern Frederick Urban Areas Plan which provides guidance on
the future development of the property.
The impacts associated with this rezoning request have generally been addressed; in particular, the
transportation improvements proposed which are substantial and further the County’s long range
transportation efforts. A couple of elements of the rezoning application have been identified that should
be recognized by the Planning Commission during your consideration of this request. The most recent
Development Impact Model output identifying the impacts to community facilities is not recognized
and the number of entrances to the project from Valley Mill Road, as pointed out by Mr. Bishop, should
be evaluated.
Confirmation of these items, and any issues raised by the Planning Commission, should be addressed
prior to the decision of the Planning Commission.
Following the required public hearing, a recommendation regarding this rezoning application to
the Board of Supervisors would be appropriate. The applicant should be prepared to adequately
address all concerns raised by the Planning Commission.
TWINLAKES OVERLOOKSubdivision
SOVERIEGNVILLAGESubdivision
FIELDSTONESubdivision
MILL RACEESTATESSubdivision
017
ST660
ST659
ST659
ST820
ST659
THOMPSON CT
BERR
Y
V
I
L
L
E
P
I
K
E
ST
E
E
P
W
O
O
D
L
N
EDDY
S
L
N
VALLEYMILL RD
CLARKECOUNTYVIRGINIA
REZ0413
REZ0413
REZ0413
REZ0413 REZ0413 REZ0413
REZ0413
REZ0413
REZ0413REZ0413
Applications
Parcels
Building Footprints
B1 (Business, Neighborhood District)
B2 (Business, General Distrist)
B3 (Business, Industrial Transition District)
EM (Extractive Manufacturing District)
HE (Higher Education District)
M1 (Industrial, Light District)
M2 (Industrial, General District)
MH1 (Mobile Home Community District)
MS (Medical Support District)
OM (Office - Manufacturing Park)
R4 (Residential Planned Community District)
R5 (Residential Recreational Community District)
RA (Rural Area District)
RP (Residential Performance District)
I
Note:Frederick County Dept ofPlanning & Development107 N Kent StSuite 202Winchester, VA 22601540 - 665 - 5651Map Created: August 27, 2013Staff: mruddy
BERRYVILLE PIKE
VALLEY MILL RD
EDD
Y
S
L
N
C
H
A
N
N
I
N
G
D
R
JULEE DR
017017
M
I
L
L
R
A
C
E
D
R
R
E
B
E
C
C
A
D
R
GIN
G
E
R
S
T
MIL
L
S
T
O
N
E
C
I
R
EVE
T
T
E
P
L
REZ # 04 - 13The OverlookPINs:55 - A - 161, 55 - A - 165, 55 - A - 165A, 55 - A - 166, 55 - A - 167, 55 - A - 167A, 55 - A - 168, 55 - A - 174A, 55 - A - 174B, 55 - A - 174DRP and RA to B2, RP, RA
REZ # 04 - 13The OverlookPINs:55 - A - 161, 55 - A - 165, 55 - A - 165A, 55 - A - 166, 55 - A - 167, 55 - A - 167A, 55 - A - 168, 55 - A - 174A, 55 - A - 174B, 55 - A - 174DRP and RA to B2, RP, RA
0 840 1,680420 Feet
A
Remainder of55 A 165(Not to be Rezoned)
Portion of55 A 165
55 A 174A
55 A 174D 55 A 166
55 A 165A 55 A 174B
55 A 161
55 A 167A
55 A 167
55 A 168
55 A 165B
55 A 174
55 A 174C
55 A 210
56 A 19
55 4 2
55 4 355 A 181
55 A 147
55 A 165C
55 4 1
55 A 159
55 A 174E 55 A 160
55 4 4A
55 4 1A
55 A 16
4
55 A
1
6
2
55 3 B
55 3
D
55 3 E
55 4 4B
55 3 C
55 A 168A
55 4 1B
VALLEY MILL RD
EDDY
S
L
N
BU
R
N
T
F
A
C
T
O
R
Y
R
D
659
820
65977
BERR
Y
V
I
L
L
E
P
I
K
E
BERRYVILLE PIKE
Map Data Source: Frederick County, Va. GIS Department, May 2012 Data
RE
Z
O
N
I
N
G
RE
D
B
U
D
M
A
G
I
S
T
E
R
I
A
L
D
I
S
T
R
I
C
T
TH
E
O
V
E
R
L
O
O
K
FR
E
D
E
R
I
C
K
C
O
U
N
T
Y
,
V
I
R
G
I
N
I
A
DA
T
E
:
2
0
1
2
-
0
7
-
0
3
P
R
O
J
E
C
T
I
D
:
5
3
0
1
S
DE
S
I
G
N
E
D
B
Y
:
D
W
E
SC
A
L
E
:
1
I
n
c
h
=
4
0
0
F
e
e
t
Legend
Parcels & Portions of Parcels To Be Rezoned
Adjoining Properties
Parcel Boundary
400 0 400 800
Feet
THE OVERLOOK REZONINGADJOINING PROPERTIES MAP
TH
E
O
V
E
R
L
O
O
K
RE
Z
O
N
I
N
G
AD
J
O
I
N
I
N
G
P
R
O
P
E
R
T
I
E
S
M
A
P
AD
J
O
I
N
I
N
G
P
R
O
P
E
R
T
I
E
S
M
A
P
Th
e
Ov
e
r
l
o
o
k
Re
z
o
n
i
n
g
Adjoining Properties Listing
Ta
x
Ma
p
Nu
m
b
e
r
O
w
n
e
r
Ma
i
l
i
n
g
Ad
d
r
e
s
s
Ci
t
y
an
d
St
a
t
e
ZI
P
A
c
r
e
s
(G
I
S
)
Z
o
n
i
n
g
D
e
e
d
Book
P
a
g
e
I
n
s
t
r
.
Year
I
n
s
t
r
.
No.
L
a
n
d
I
m
p
r
o
v
e
m
e
n
t
T
o
t
a
l
Assessment
55
3
B
C
A
R
T
E
R
LU
W
A
N
N
A
S
13
7
ED
D
Y
S
LN
WI
N
C
H
E
S
T
E
R
VA
2
2
6
0
2
0
.
9
5
5
2
8
4
R
A
0
2
0
0
2
2
3
1
$
3
3
,
5
0
0
$
3
0
0
$33,800
55
3
C
C
A
R
T
E
R
LU
W
A
N
N
A
S
13
7
ED
D
Y
S
LN
WI
N
C
H
E
S
T
E
R
VA
2
2
6
0
2
0
.
6
7
9
9
7
8
R
A
0
2
0
0
2
2
3
1
$
3
3
,
5
0
0
$0 $33,500
55
3
D
C
A
R
T
E
R
LU
W
A
N
N
A
S
13
7
ED
D
Y
S
LN
WI
N
C
H
E
S
T
E
R
VA
2
2
6
0
2
0
.
9
2
1
5
8
4
R
A
0
2
0
0
2
2
3
1
$
3
3
,
5
0
0
$
5
7
,
2
0
0
$90,700
55
3
E
C
A
R
T
E
R
RO
G
E
R
W
12
5
ED
D
Y
S
LN
WI
N
C
H
E
S
T
E
R
VA
2
2
6
0
2
0
.
9
8
8
6
5
9
R
A
3
0
3
3
4
5
0
0
$
3
3
,
5
0
0
$
7
2
,
4
0
0
$
1
0
5
,
9
0
0
55
4
1
F
R
E
D
E
R
I
C
K
‐WI
N
C
H
E
S
T
E
R
PO
BO
X
43
WI
N
C
H
E
S
T
E
R
VA
2
2
6
0
4
7
.
2
2
7
5
6
4
R
A
6
0
0
6
9
1
0
0
$
5
0
,
1
0
0
$0 $50,100
55
4
1A
D
I
M
M
E
L
RI
C
H
A
R
D
S ‐
DI
M
M
E
L
MA
R
Y
E
60
0
4
JO
H
N
MO
S
B
Y
HW
Y
B
O
Y
C
E
VA
22
6
2
0
2
.
1
7
1
8
5
1
R
A
0
2
0
0
6
1
2
6
2
2
$
1
3
,
5
0
0
$0 $13,500
55
4
1B
S
O
W
E
R
S
JO
S
E
P
H
D & AM
Y
H
11
1
ED
D
Y
S
LN
WI
N
C
H
E
S
T
E
R
VA
2
2
6
0
2
0
.
6
0
5
7
7
8
R
A
8
2
1
1
6
0
8
0
0
$
3
3
,
5
0
0
$
1
4
9
,
5
0
0
$
1
8
3
,
0
0
0
55
4
2
I
N
V
E
S
T
O
R
S
AT
LL
C
PO
BO
X
55
0
ST
E
P
H
E
N
S
CI
T
Y
VA
2
2
6
5
5
1
2
.
1
4
1
5
1
1
R
A
0
2
0
0
5
6
5
9
2
$
1
2
0
,
2
0
0
$
2
6
,
0
0
0
$
1
4
6
,
2
0
0
55
4
3
M
C
K
E
E
MI
C
H
A
E
L
ED
W
A
R
D
28
3
ED
D
Y
S
LN
WI
N
C
H
E
S
T
E
R
VA
2
2
6
0
2
1
1
.
5
2
3
6
4
9
R
A
0
2
0
0
3
2
4
7
8
7
$
1
3
4
,
6
0
0
$0
$
1
3
4
,
6
0
0
55
4
4A
R
O
B
E
R
T
S
KA
T
R
I
N
A
LE
W
I
S
10
0
4
CL
A
R
K
ST
ST
A
R
K
E
FL
32
0
9
1
3
.
3
5
1
5
5
9
R
A
0
2
0
0
8
4
3
6
6
$
1
0
2
,
5
0
0
$
5
0
0
$
1
0
3
,
0
0
0
55
4
4B
PE
R
R
Y
MA
R
Y
CA
R
O
L
Y
N
MC
H
A
L
E
‐
C/
O
MA
R
Y
ST
A
F
F
O
R
D
8
7
3
9
C ST
CH
E
S
A
P
E
A
K
E
BE
A
C
H
MD
2
0
7
3
2
1
.
0
4
3
8
5
7
R
A
4
2
7
4
5
1
0
0
$
5
7
,
8
0
0
$
7
9
,
6
0
0
$
1
3
7
,
4
0
0
55
A
14
7
B
A
L
L
I
N
G
WI
L
L
I
A & MA
R
I
A
H
11
1
BU
R
N
T
FA
C
T
O
R
Y
RD
S
T
E
P
H
E
N
S
O
N
VA
2
2
6
5
6
9
.
6
5
3
2
8
5
R
A
2
9
8
5
9
2
0
0
$
1
1
3
,
7
0
0
$
7
2
,
4
0
0
$
1
8
6
,
1
0
0
55
A
15
9
B
A
G
G
E
R
L
Y
TH
O
M
A
S
R SR
11
2
BU
R
N
T
FA
C
T
O
R
Y
RD
S
T
E
P
H
E
N
S
O
N
VA
2
2
6
5
6
7
.
6
9
7
0
3
8
R
A
9
3
9
4
5
0
0
0
$
8
1
,
9
0
0
$
6
9
,
9
0
0
$
1
5
1
,
8
0
0
55
A
16
0
B
E
C
K
WI
L
L
I
A
M
W & RU
B
Y
LE
E
28
5
1
BE
R
R
Y
V
I
L
L
E
PI
K
E
WI
N
C
H
E
S
T
E
R
VA
2
2
6
0
3
3
.
5
2
0
6
1
8
R
A
3
3
3
2
0
1
0
0
$
7
6
,
5
0
0
$
1
3
5
,
3
0
0
$
2
1
1
,
8
0
0
55
A
16
2
B
A
Y
L
I
S
IN
V
E
S
T
M
E
N
T
S
LL
C
23
3
2
MI
D
D
L
E
RD
WI
N
C
H
E
S
T
E
R
VA
22
6
0
1
1
.
7
1
1
0
1
7
R
A
8
0
6
1
3
6
0
0
$
8
2
,
5
0
0
$
8
0
,
0
0
0
$
1
6
2
,
5
0
0
55
A
16
4
C
A
R
T
E
R
GL
A
D
D
I
E
R
15
6
0
VA
L
L
E
Y
MI
L
L
RD
WI
N
C
H
E
S
T
E
R
VA
2
2
6
0
2
1
.
9
0
3
7
2
8
R
A
4
4
5
8
3
3
0
0
$
5
7
,
1
0
0
$
1
2
7
,
8
0
0
$
1
8
4
,
9
0
0
55
A
16
5
V
A
L
L
E
Y
MI
L
L
FA
R
M
LC
87
3
9
C ST
CH
E
S
A
P
E
A
K
E
BE
A
C
H
MD
2
0
7
3
2
8
5
.
8
7
8
1
5
3
R
A
0
0
1
3
6
2
$
3
7
0
,
3
0
0
$
4
3
5
,
3
0
0
$
8
0
5
,
6
0
0
55
A
16
5
B
M
C
H
A
L
E
MA
T
T
H
E
W
CH
A
R
L
E
S
12
9
1
VA
L
L
E
Y
MI
L
L
RD
WI
N
C
H
E
S
T
E
R
VA
2
2
6
0
2
3
8
.
4
4
0
7
4
6
R
A
5
6
7
2
8
5
0
0
$
2
8
7
,
8
0
0
$
1
8
2
,
8
0
0
$
4
7
0
,
6
0
0
55
A
16
5
C
M
C
H
A
L
E
MA
T
T
H
E
W
C & KA
T
H
E
R
I
N
E
M
12
9
1
VA
L
L
E
Y
MI
L
L
RD
WI
N
C
H
E
S
T
E
R
VA
2
2
6
0
2
1
0
.
8
1
6
0
6
7
R
A
9
5
9
1
8
5
1
0
0
$
1
2
4
,
6
0
0
$0
$
1
2
4
,
6
0
0
55
A
16
8
A
W
I
L
L
I
A
M
S
BR
I
A
N
SC
O
T
T
27
1
8
BE
R
R
Y
V
I
L
L
E
PI
K
E
WI
N
C
H
E
S
T
E
R
VA
2
2
6
0
3
0
.
6
7
3
5
1
7
R
A
0
2
0
0
4
2
1
2
7
8
$
3
3
,
5
0
0
$
5
8
,
5
0
0
$92,000
55
A
17
4
B
R
A
D
F
I
E
L
D
JO
H
N
G TR
U
S
T
E
E
82
2
5
CA
M
B
O
U
R
N
E
CT
GA
I
T
H
E
R
S
B
U
R
G
MD
2
0
8
7
7
1
1
5
.
7
0
2
6
3
9
R
A
0
2
0
1
0
1
2
5
7
9
$
4
0
3
,
0
0
0
$0
$
4
0
3
,
0
0
0
55
A
17
4
C
B
L
U
E
RI
D
G
E
AS
S
O
C
I
A
T
E
S
24
3
2
BE
R
R
Y
V
I
L
L
E
PI
K
E
WI
N
C
H
E
S
T
E
R
VA
2
2
6
0
3
6
4
.
8
6
8
7
0
1
M
H
1
0
2
0
0
3
2
2
9
4
1
$
1
,
8
1
6
,
3
0
0
$
8
1
9
,
5
0
0
$
2
,
6
3
5
,
8
0
0
55
A
17
4
E
B
L
U
E
RI
D
G
E
AS
S
O
C
I
A
T
E
S
24
3
0
BE
R
R
Y
V
I
L
L
E
PI
K
E
LO
T
3
W
I
N
C
H
E
S
T
E
R
VA
2
2
6
0
3
5
.
9
6
3
6
1
1
R
A
6
9
0
6
5
5
0
0
$
7
8
,
6
0
0
$
5
,
5
0
0
$84,100
55
A
18
1
A
R
C
A
D
I
A
DE
V
E
L
O
P
M
E
N
T
CO
PO
BO
X
53
6
8
SA
N
JO
S
E
CA
95
1
5
0
2
2
.
3
3
5
9
7
R
P
0
2
0
0
2
4
8
1
5
$
5
4
1
,
7
0
0
$0
$
5
4
1
,
7
0
0
55
A
21
0
T
H
E
CA
N
Y
O
N
‐
C/
O
DA
V
E
HO
L
L
I
D
A
Y
CO
N
S
T
R
IN
C
42
0
W JU
B
A
L
EA
R
L
Y
DR
ST
E
10
3
W
I
N
C
H
E
S
T
E
R
VA
2
2
6
0
1
7
0
.
3
4
6
1
4
6
R
P
0
2
0
0
6
6
1
1
3
$
9
1
2
,
0
0
0
$
6
3
,
9
0
0
$
9
7
5
,
9
0
0
56
A
19
F
R
E
D
E
R
I
C
K
‐WI
N
C
H
E
S
T
E
R
‐
PM
B
35
3
40
1
7
WA
S
H
I
N
G
T
O
N
RD
M
C
M
U
R
R
A
Y
PA
15
3
1
7
2
4
.
0
6
4
5
5
9
R
A
5
1
1
1
4
5
0
0
$
1
2
5
,
8
0
0
$0
$
1
2
5
,
8
0
0
So
u
r
c
e
:
Fr
e
d
e
r
i
c
k
Co
u
n
t
y
GI
S
,
Ma
y
20
1
2
11/9/2012
VALLEY MILL RD rs659
55 A 174A
Portion of55 A 165
55 A 166
55 A 174B
55 A 167A
55 A 174D
55 A 165A
55 A 167
55 A 161
55 A 168
ËÊ7ËÊ7
BE
R
R
Y
V
I
L
L
E
P
I
K
E
Map Data Source: Frederick County, Va. GIS Department, November 2011 Data; Aerial Photo from 2006; Greenway Engineering
RE
Z
O
N
I
N
G
RE
D
B
U
D
M
A
G
I
S
T
E
R
I
A
L
D
I
S
T
R
I
C
T
TH
E
O
V
E
R
L
O
O
K
FR
E
D
E
R
I
C
K
C
O
U
N
T
Y
,
V
I
R
G
I
N
I
A
DA
T
E
:
8
-
2
3
-
2
0
1
2
P
R
O
J
E
C
T
I
D
:
5
3
0
1
S
DE
S
I
G
N
E
D
B
Y
:
D
W
E
SC
A
L
E
:
1
I
n
c
h
=
3
0
0
F
e
e
t
Legend
Parcels & Portions of Parcels To Be Rezoned
Parcel Boundary
300 0 300 600
Feet
THE OVERLOOK REZONINGAERIAL OVERVIEW µ
TH
E
O
V
E
R
L
O
O
K
RE
Z
O
N
I
N
G
AE
R
I
A
L
O
V
E
R
V
I
E
W
AE
R
I
A
L
O
V
E
R
V
I
E
W
55 A 174A
Portion of55 A 165
55 A 166
55 A 174B
55 A 167A
55 A 174D
55 A 165A
55 A 167
55 A 161
55 A 168
VALLEY MILL RD
EDDY
S
L
N
BU
R
N
T
F
A
C
T
O
R
Y
R
D
rs659
rs820
rs659
ËÊ7ËÊ7
BERR
Y
V
I
L
L
E
P
I
K
E
BERRYVILLE PIKE
Map Data Source: Frederick County, Va. GIS Department, November 2011 Data; Greenway Engineering
RE
Z
O
N
I
N
G
RE
D
B
U
D
M
A
G
I
S
T
E
R
I
A
L
D
I
S
T
R
I
C
T
TH
E
O
V
E
R
L
O
O
K
FR
E
D
E
R
I
C
K
C
O
U
N
T
Y
,
V
I
R
G
I
N
I
A
DA
T
E
:
8
-
2
3
-
2
0
1
2
P
R
O
J
E
C
T
I
D
:
5
3
0
1
S
DE
S
I
G
N
E
D
B
Y
:
D
W
E
SC
A
L
E
:
1
I
n
c
h
=
4
0
0
F
e
e
t
Legend
Parcels & Portions of Parcels To Be Rezoned
Parcel Boundary
Frederick County Zoning
MH1 (Mobile Home Community District)
RA (Rural Area District)
RP (Residential, Performance District)
300 0 300 600
Feet
THE OVERLOOK REZONINGLOCATION AND ZONING MAP µ
TH
E
O
V
E
R
L
O
O
K
RE
Z
O
N
I
N
G
LO
C
A
T
I
O
N
A
N
D
Z
O
N
I
N
G
M
A
P
LO
C
A
T
I
O
N
A
N
D
Z
O
N
I
N
G
M
A
P
ClarkeCounty
Winchester SITE
SENSENY
R
D
VALLEY MIL
L
R
D
£¤11
ËÊ37ËÊ37
£¤50
£¤522
£¤522
ËÊ7
§¨¦81
LOCATION MAP
OUTSIDE U
D
A
/
S
W
S
A
INSIDE UDA
/
S
W
S
A
55 A 174A
Portion of55 A 165
55 A 166
55 A 174B
55 A 167A
55 A 174D
55 A 165A
55 A 167
55 A 161
55 A 168
VALLEY MILL RD
EDDY
S
L
N
BU
R
N
T
F
A
C
T
O
R
Y
R
D
rs659 rs820
rs659
ËÊ7
ËÊ7
BE
R
R
Y
V
I
L
L
E
P
I
K
E
BERRYVI
L
L
E
P
I
K
E
Map Data Source: Frederick County, Va. GIS Department, November 2011 Data; FCSA; Greenway Engineering
RE
Z
O
N
I
N
G
RE
D
B
U
D
M
A
G
I
S
T
E
R
I
A
L
D
I
S
T
R
I
C
T
TH
E
O
V
E
R
L
O
O
K
FR
E
D
E
R
I
C
K
C
O
U
N
T
Y
,
V
I
R
G
I
N
I
A
DA
T
E
:
8
-
2
3
-
2
0
1
2
P
R
O
J
E
C
T
I
D
:
5
3
0
1
S
DE
S
I
G
N
E
D
B
Y
:
D
W
E
SC
A
L
E
:
1
I
n
c
h
=
3
0
0
F
e
e
t
Legend
Parcels & Portions of Parcels To Be Rezoned
Parcel Boundary
SWSA Boundary
UDA Boundary
Water Line
Sewer Line
300 0 300 600
Feet
THE OVERLOOK REZONINGUDA & SWSA MAP
µ
TH
E
O
V
E
R
L
O
O
K
RE
Z
O
N
I
N
G
UD
A
&
S
W
S
A
M
A
P
UD
A
&
S
W
S
A
M
A
P
55 A 174A
Portion of55 A 165
55 A 166
55 A 174B
55 A 167A
55 A 174D
55 A 165A
55 A 167
55 A 161
55 A 168
550
575
525
600
625
575
550
600
525
575
525
575
6
0
0
575
600
55
0
57
5
525
525
55
0
575
525
600
575
550
600
6
2
5
525
625
550
600
575
625
550
575
55
0
550
550
575
625
575
5
5
0
600
5
7
5
575
550
550
600
VALLEY MILL RD
EDDY
S
L
N
BU
R
N
T
F
A
C
T
O
R
Y
R
D
rs659 rs820
rs659
ËÊ7
ËÊ7
BERRYVILLE PIKE
BE
R
R
Y
V
I
L
L
E
P
I
K
E
Map Data Source: Frederick County, Va. GIS Department, November 2011 Data; US Dept. of the Interior (Wetlands); Greenway Engineering
RE
Z
O
N
I
N
G
RE
D
B
U
D
M
A
G
I
S
T
E
R
I
A
L
D
I
S
T
R
I
C
T
TH
E
O
V
E
R
L
O
O
K
FR
E
D
E
R
I
C
K
C
O
U
N
T
Y
,
V
I
R
G
I
N
I
A
DA
T
E
:
8
-
2
3
-
2
0
1
2
P
R
O
J
E
C
T
I
D
:
5
3
0
1
S
DE
S
I
G
N
E
D
B
Y
:
D
W
E
SC
A
L
E
:
1
I
n
c
h
=
3
0
0
F
e
e
t
Legend
Parcels & Portions of Parcels To Be Rezoned
Parcel Boundary
Lake or Pond
Wetland (NWI)
100 Year Flood Plain
Stream
5 Foot Intermediate Contours
25 Foot Index Contours
300 0 300 600
Feet
THE OVERLOOK REZONINGENVIRONMENTAL FEATURES MAP µ
TH
E
O
V
E
R
L
O
O
K
RE
Z
O
N
I
N
G
EN
V
I
R
O
N
M
E
N
T
A
L
F
E
A
T
U
R
E
S
M
A
P
EN
V
I
R
O
N
M
E
N
T
A
L
F
E
A
T
U
R
E
S
M
A
P
55 A 174A
Portion of55 A 165
55 A 166
55 A 174B
55 A 167A
55 A 174D
55 A 165A
55 A 167
55 A 161
55 A 168
29
41D
41E
41C
41E
1C
9B
41D
41C
41E
41C
41E
VALLEY MILL RD
EDDY
S
L
N
BU
R
N
T
F
A
C
T
O
R
Y
R
D
rs659 rs820
rs659
ËÊ7
ËÊ7
BE
R
R
Y
V
I
L
L
E
P
I
K
E
BERRYVILLE
P
I
K
E
Map Data Source: Frederick County, Va. GIS Department, November 2011 Data;Greenway Engineering
RE
Z
O
N
I
N
G
RE
D
B
U
D
M
A
G
I
S
T
E
R
I
A
L
D
I
S
T
R
I
C
T
TH
E
O
V
E
R
L
O
O
K
FR
E
D
E
R
I
C
K
C
O
U
N
T
Y
,
V
I
R
G
I
N
I
A
DA
T
E
:
8
-
2
3
-
2
0
1
2
P
R
O
J
E
C
T
I
D
:
5
3
0
1
S
DE
S
I
G
N
E
D
B
Y
:
D
W
E
SC
A
L
E
:
1
I
n
c
h
=
3
0
0
F
e
e
t
Legend
Parcels & Portions of Parcels To Be Rezoned
Parcel Boundary
Soils
1C, BERKS CHANNERY SILT LOAM, 7 TO 15 PERCENT SLOPES
9B, CLEARBROOK CHANNERY SILT LOAM, 2 TO 7 PERCENT SLOPES
29, MASSANETTA LOAM
41C, WEIKERT-BERKS CHANNERY SILT LOAMS, 7 TO 15 PERCENT SLOPES
41D, WEIKERT-BERKS CHANNERY SILT LOAMS, 15 TO 25 PERCENT SLOPES
41E, WEIKERT-BERKS CHANNERY SILT LOAMS, 25 TO 65 PERCENT SLOPES300 0 300 600
Feet
THE OVERLOOK REZONINGSOILS MAP
µ
TH
E
O
V
E
R
L
O
O
K
RE
Z
O
N
I
N
G
SO
I
L
S
M
A
P
SO
I
L
S
M
A
P
!e
55 A 174A
Portion of55 A 165
55 A 166
55 A 174B
55 A 167A
55 A 174D
55 A 165A
55 A 167
55 A 161
55 A 168
34-108 Valley Mill Farm
VALLEY MILL RD
EDDY
S
L
N
M
I
L
L
R
A
C
E
D
R
JULEE DR
BU
R
N
T
F
A
C
T
O
R
Y
R
D
WO
O
D
S
M
I
L
L
R
D
R
E
B
E
C
C
A
D
R
GI
N
G
E
R
S
T
M
I
L
L
S
T
O
N
E
C
I
R
rs659
rs820
rs1270
rs660
rs1274
rs1299
rs1491
rs1290
rs1289
rs659
ËÊ7
BERRYVILLE
P
I
K
E
Map Data Source: Frederick County, Va. GIS Department, November 2011 Data; Greenway Engineering
RE
Z
O
N
I
N
G
RE
D
B
U
D
M
A
G
I
S
T
E
R
I
A
L
D
I
S
T
R
I
C
T
TH
E
O
V
E
R
L
O
O
K
FR
E
D
E
R
I
C
K
C
O
U
N
T
Y
,
V
I
R
G
I
N
I
A
DA
T
E
:
8
-
2
3
-
2
0
1
2
P
R
O
J
E
C
T
I
D
:
5
3
0
1
S
DE
S
I
G
N
E
D
B
Y
:
D
W
E
SC
A
L
E
:
1
I
n
c
h
=
5
0
0
F
e
e
t
Legend
Parcels & Portions of Parcels To Be Rezoned
Parcel Boundary
!e National Registry Landmarks
Civil War Battlefields
Third Winchester
500 0 500 1,000
Feet
THE OVERLOOK REZONINGHISTORIC FEATURES MAP µ
TH
E
O
V
E
R
L
O
O
K
RE
Z
O
N
I
N
G
HI
S
T
O
R
I
C
F
E
A
T
U
R
E
S
M
A
P
HI
S
T
O
R
I
C
F
E
A
T
U
R
E
S
M
A
P
THE OVERLOOK
Traffic Impact Study
Located in: Frederick County, Virginia
Prepared For:
Tim Stafford
1494 Valley Mill Road
Winchester, VA 22602
Prepared By:
Volkert, Inc.
5400 Shawnee Road, Suite 301
Alexandria, VA 22312
Ph: 703.642.8100 Fax: 703.642.8106
November 9, 2012
Revised June 5, 2013
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 1
Table of Contents
Description Page #
Report Summary and Methodology……………..…….…………. 4
Existing Conditions..……………...………………………..…….. 6
Phase 1 Development Description………..………………..…….. 10
2015 Background Conditions..…...….……………………..…….. 10
Phase 1 Trip Generation…………………………….….…..……. 13
Phase 1 Trip Distribution And Trip Assignments..…………….... 13
2015 Phase 1 Build-Out Conditions ………………………...…… 13
Phase 2 Development Description………..………………..…….. 21
2020 Background Conditions..…...….……………………..……. 21
Phase 2 Trip Generation…………………………….….…..……. 24
Phase 2 Trip Distribution And Trip Assignments..…………….... 24
2020 Phase 2 Build-Out Conditions ………………………...…... 24
“Design Year” Development Description………..………………. 31
2026 “Design Year” Background Conditions..…...….………….. 31
“Design Year” Trip Distribution And Trip Assignments……..…. 31
2026 “Design Year” Build-Out Conditions.……….......……….... 31
Conclusions……………..………...……………………………....
Access Management…………………………….………………...
Pedestrian and Bicycle Accommodations…………….………….
40-43
43
43
Background Developments Location Map………………………
Background Developments Trip Distribution……………………
VDOT Scoping Document…………………...………...….……..
Appendix
Appendix
Appendix
Existing Traffic Count Data………………………………….…... Appendix
Generalized Development Plan……..…………………………… Appendix
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 2
List of Figures
Figure # Description Page #
1 Vicinity Map 5
2 Existing Traffic Volumes 7
3 Existing Lane Geometry and Levels of Service 8
4 2015 Background Traffic Volumes 11
5 2015 Background Lane Geometry and Levels of Service 12
6 Phase 1 Trip Distribution Percentages 14
6A
7
Phase 1 Trip Distribution Percentages at Site-Driveways
Phase 1 The Overlook development Trip Assignments
15
16
8 2015 Phase 1 Build-out Traffic Volumes 17
9 2015 Phase 1 Build-out Lane Geometry and Levels of Service 18
10 2020 Background Traffic Volumes 22
11 2020 Background Lane Geometry and Levels of Service 23
12 Phase 2 Trip Distribution Percentages 25
13 Phase 2 The Overlook development Trip Assignments 26
14 2020 Phase 2 Build-out Traffic Volumes 27
15 2020 Phase 2 Build-out Lane Geometry and Levels of Service 28
16 2026 “Design Year” Background Traffic Volumes 32
17 2026 “Design Year” Background Lane Geometry and LOS 33
18 “Design Year” Trip Distribution Percentages 34
19 “Design Year” The Overlook development Trip Assignments 35
20 2026 “Design Year” Build-out Traffic Volumes 36
21 2026 “Design Year” Build-out Lane Geometry and LOS 37
A
A1-A7
Background Developments Location Map
Background Developments: Trip Distribution Percentages
Appendix
Appendix
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 3
List of Tables
Table # Description Page #
1 Existing Levels of Service, Delay and Back of Queue Results 9
2 2015 Background Trip Generation Summary 10
3 Phase 1 Trip Generation Summary 13
4 2015 Background and Phase 1 Build-out LOS/Delay/Queue 19-20
5 2020 Background Trip Generation Summary 21
6 Phase 2 Trip Generation Summary 24
7 2020 Background and Phase 2 Build-out LOS/Delay/Queue 29-30
8 2026 “Design Year” Background and Phase 3 Build-out
LOS/Delay/Queue
38-39
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 4
OVERVIEW
Report Summary
Volkert, Inc. has prepared this document to present the traffic impacts associated with the
proposed The Overlook development to be located along the south side of Route 7 (Berryville
Pike), west of Valley Mill Road (Route 659), in Frederick County, Virginia. The Study is based
upon a projected development program of 270 single-family detached units, 21,800 square feet
of Retail, a Convenience Mart/ Fast Food (2,000 square feet) with a 16 pump Gas Station, a
4,100 square foot Drive-in Bank and a 7,400 square foot High-Turnover “Sit Down” Restaurant.
Access is to be provided along Route 7 via a relocated Valley Mill Road. Build-out is
anticipated to occur over two (2) transportation phases by the Year 2020. Weekday AM peak
hour, weekday PM peak hour and Saturday peak hour midday analyses are provided for Existing,
2015 Phase 1 Background (no-build), 2015 Phase 1 build-out, 2020 Phase 2 Background, 2020
Phase 2 Build-out, 2026 “Design Year” Background and 2026 “Design Year” Build-out
conditions. The Overlook development Generalized Development Plan (GDP) is included in the
Appendix section of this Report. Figure 1 is provided to illustrate the location of the proposed
The Overlook development with respect to the surrounding roadway network.
Methodology
All methodology utilized in this Report is based upon an “approved” scoping letter
established between the Applicant, the Virginia Department of Transportation (VDOT) and the
Frederick County Planning Department. Documentation associated with this scoping letter is
provided in the Appendix section of this Report.
The traffic impacts accompanying The Overlook development were obtained through a
sequence of activities as the narratives that follow document:
Collection and evaluation of existing traffic data,
Assessment of background traffic (includes planned projects in the area of impact),
Calculation of trip generation for the proposed The Overlook development,
Distribution and assignment of The Overlook development-generated trips onto the study
area roadway network,
Analysis of capacity and level of service using the latest version of Synchro for existing and
future conditions.
SITE
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 6
EXISTING CONDITIONS
Volkert, Inc. conducted weekday AM, weekday PM and Saturday midday peak hour
manual turning movement counts at the intersections of Route 7 (Berryville Pike) /Valley Mill
Road (Route 659), Route 7/Greenwood Road (Route 656), Greenwood Road/Valley Mill Road,
Valley Mill Road/ Channing Drive and Senseny Road (Route 657) /Channing Drive in Year
2010. In order to represent the current year (Year 2012) traffic condition, the counts were
increased by applying an annual compounded growth rate of 0.25% from Year 2010 to Year
2012. ADT (Average Daily Traffic) was established along each of the study area roadway links
using a “k” factor (the ratio of PM peak hour traffic volumes to 24-hour traffic volumes) of 8%
based upon the current VDOT traffic data.
Figure 2 shows the existing weekday and Saturday ADT, as well as the weekday
AM/PM and Saturday mid-day peak hour traffic volumes, at key locations within the study area.
Figure 3 shows the corresponding existing lane geometry and peak hour levels of service results.
All traffic count data and Synchro levels of service worksheets are included in the Appendix
section of this Report.
Table 1 is provided to show the existing levels of service, vehicle delay and 95th
percentile back of queue, by lane group/approach, for each of the study area intersections.
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL R
D
BERR
Y
V
I
L
L
E
P
I
K
E
VALLE
Y
M
I
L
L
R
D
GR
E
E
N
W
O
O
D
R
D
F
I
R
S
T
W
O
O
D
S
DR
2
1
X (Y)[Z]
1
1
72(5
)
[
2
]
569(
9
6
8
)
[
8
8
1
]
24(1
6
8
)
[
7
8
]
[4](5
)
7
1
[731]
(
6
8
9
)
8
8
5
[136]
(
6
3
)
3
1
7
7
(
6
2
)
[
7
6
]
2
2
2
(
4
9
)
[
4
]
4
0
(
4
3
)
[
4
6
]
[
6
]
(
1
9
)
2
1
[
2
2
]
(
5
9
)
1
0
3
[
4
4
]
(
7
)
2
7
559
(
1
2
5
1
)
[
7
6
8
]
45(
1
6
1
)
[
4
7
]
[39](
4
0
)
4
1
[667
]
(
6
3
8
)
1
1
2
6
[26](
2
2
)
2
1
1
7
4
(
6
3
)
[
5
0
]
1
5
(
8
)
[
6
]
534
SITE
16
15
14
13
12
11
10
9
6
5
2
1
3
2
3
4
5
7
8 1
4
[29](33)36
[73](97)62
[121](189)11
4
69(2
2
)
[
1
7
]
117(
8
5
)
[
4
9
]
76(8
0
)
[
4
9
]
37
(
6
8
)
[
3
0
]
13
1
(
2
2
4
)
[
1
2
4
]
21
(
3
3
)
[
1
5
]
[9
5
]
(
1
6
2
)
1
5
2
[8
4
]
(
1
6
7
)
2
1
1
[3
8
]
(
9
0
)
5
3
C
H
A
N
N
I
N
G
D
R
80(110)[56]
17(78)[17][39
]
(
6
8
)
1
0
8
[79
]
(
9
7
)
3
1
6
6
(
2
1
)
[
2
2
]
1
2
2
(
5
1
)
[
5
6
]
F
I
R
S
T
W
O
O
D
S
D
R
60
(
5
9
)
[
7
9
]
11
(
1
0
)
[
1
2
]
17(11)
[
1
0
]
306(26
6
)
[
1
9
7
]
[72](
7
9
)
4
7
[252]
(
3
2
8
)
1
5
1
CHA
N
N
I
N
G
D
R
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
BERR
Y
V
I
L
L
E
P
I
K
E
GR
E
E
N
W
O
O
D
R
D
F
I
R
S
T
W
O
O
D
S
DR
2
1
C(B
)
[
B
]
[B](C
)
C
D
(
B
)
[
B
]
[
B
]
(
C
)
C
B(B
)
[
A
]
*
D
(
B
)
[
B
]
*
534
SITE
2
3
4
5
1
[C](C)C
B(B
)
[
B
]
A(
B
)
[
A
]
[A
]
(
B
)
A
C
H
A
N
N
I
N
G
D
R
A(B)[A]**[
A
]
(
A
)
A
F
I
R
S
T
W
O
O
D
S
D
R
A(
A
)
[
A
]
C(B)[
B
][C](
B
)
B
CHA
N
N
I
N
G
D
R
STOP
1
*
VALLEY MILL RD
VALLE
Y
M
I
L
L
R
D
X (Y)[Z]
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 9
EB/U N/A N/A N/A N/A N/A N/A N/A N/A N/A
EB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
EB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A
EB/WB: Route 7 EB LOS
NB: Valley Mill Road WB/L B 12 s. 8 ft B 10 s. 19 ft A 10 s. 5 ft
WB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
Traffic Control: Stop Sign WB LOS
NB/LR D 25 s. 79 ft B 14 s. 15 ft B 12 s. 9 ft
NB LOS
OVERALL
EB/L D 45 s. 88 ft D 38 s. 16 ft C 33 s. 11 ft
EB/T C 31 s. 354 ft C 23 s. 224 ft B 19 s. 207 ft
EB/R B 12 s. 26 ft A 7 s. 29 ft A 5 s. 38 ft
EB LOS
EB/WB: Route 7 WB/L D 41 s. 41 ft C 34 s. 150 ft C 33 s. 81 ft
NB: Greenwood Road WB/T C 30 s. 216 ft B 11 s. 233 ft B 12 s. 207 ft
SB: First Woods Drive WB/R A 7 s. 32 ft A 4 s. 5 ft A 6 s. 3 ft
WB LOS
Traffic Control: Signalization NB/LTR D 50 s. 376 ft B 20 s. 120 ft B 12 s. 67 ft
NB LOS
SB/LT C 33 s. 124 ft C 22 s. 76 ft B 20 s. 32 ft
SB/R B 12 s. 23 ft B 13 s. 11 ft A 8 s. 25 ft
SB LOS
OVERALL
EB/L C 31 s. 43 ft C 25 s. 37 ft C 25 s. 32 ft
EB/TR C 22 s. 98 ft C 28 s. 170 ft C 21 s. 101 ft
EB LOS
WB/L B 20 s. 55 ft B 19 s. 55 ft B 16 s. 35 ft
EB/WB: Valley Mill Road WB/TR B 17 s. 103 ft B 14 s. 63 ft B 12 s. 38 ft
NB/SB: Greenwood Road WB LOS
NB/L A 10 s. 81 ft B 14 s. 112 ft A 9 s. 51 ft
Traffic Control: Signalization NB/TR A 9 s. 119 ft B 10 s. 133 ft A 7 s. 50 ft
NB LOS
SB/L A 8 s. 16 ft B 11 s. 27 ft A 9 s. 13 ft
SB/TR A 8 s. 74 ft B 11 s. 160 ft A 8 s. 68 ft
SB LOS
OVERALL
WB/L A 10 s. 8 ft B 10 s. 12 ft A 9 s. 5 ft
WB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A
WB: Valley Mill Road WB LOS
NB: Channing Drive NB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB: Valley Mill Road NB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A
NB LOS
Traffic Control: Stop Sign SB/L A8 s.7 ftA8 s.4 ftA8 s.2 ft
SB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB LOS
OVERALL
EB/L B 16 s. 33 ft B 16 s. 46 ft B 19 s. 49 ft
EB/T B 15 s. 74 ft B 20 s. 150 ft C 23 s. 136 ft
EB LOS
EB/WB: Senseny Road WB/T C 21 s. 148 ft B 17 s. 119 ft C 20 s. 107 ft
SB: Channing Drive WB/R A 6 s. 10 ft A 6 s. 8 ft A 8 s. 9 ft
WB LOS
Traffic Control: Signalization SB/L A7 s.8 ftA7 s.8 ftA6 s.8 ft
SB/R A 3 s. 15 ft A 3 s. 16 ft A 2 s. 15 ft
SB LOS
OVERALL
EB = Eastbound, WB =Westbound, NB = Northbound, SB = Southbound, L: Left, T:Thru, R: Right
Table 1
The Overlook
Levels of Service, Delay and Back of Queue (95%) Results
Existing Conditions
N/A
B
B
A
A
B
B
B
CC
N/A
N/A
C
LOSDelay
(in sec)
Queue
(in feet)
N/A N/A
N/A N/A
CC
Intersection
AM Peak Hour PM Peak Hour
N/A N/A
Delay
(in sec)
Queue
(in feet)
N/A N/A
LOS
CB
C
CC
DB
N/A N/A
BB
AB
AB
B
CB
N/A N/A
N/A N/A
A
B
AA
BB
Delay
(in sec)
Queue
(in feet)
N/A
B
BBB
N/A
CB
Existing Conditions
N/A
N/A
N/A
N/A
N/A
B
B
Saturday Peak Hour
LOS
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 10
In Out Total In Out Total In Out Total
Red-Bud Run
210 Single-Family Detached 25 units 7 20 27 19 11 31 290 19 11 31 286
Total 7 20 27 19 11 31 290 19 11 31 286
Twin Lakes Phases 9 and 10
210 Single-Family Detached 65 units 14 41 55 46 27 73 700 46 27 73 702
230 Townhouse/Condo* 71 units 10 37 47 38 21 58 585 30 24 54 549
Total 24 78 102 84 48 131 1,284 76 51 126 1,251
Lynnhaven
210Single-Family Detached 3 units 39123254132539
820 Retail 87,120 SF 88 56 144 274 297 572 6,209 412 380 791 8,471
(10-acres @ 0.2 FAR)Total 91 65 156 277 299 576 6,250 414 382 796 8,510
Fieldstone Development
230 Townhouse/Condo* 93 units 13 47 60 49 27 76 760 39 31 69 719
Total 13 47 60 49 27 76 760 39 31 69 719
Sovereign Village
210 Single-Family Detached 42 units 10 29 39 31 18 49 468 31 18 49 466
220 Apartment* 64 units 9 30 39 32 18 50 503 30 18 48 499
820 Retail 104,544 SF 98 63 161 309 335 645 6,990 463 428 891 9,502
(12-acres @ 0.2 FAR)Total 18 59 78 63 36 99 971 61 37 97 964
Haggerty Property
210 Single-Family Detached 180 units 34 102 135 115 67 182 1,786 115 67 182 1,829
220 Apartment* 60 units 8 28 36 30 17 47 472 28 17 45 468
230 Townhouse/Condo* 60 units 9 31 40 32 18 50 497 25 20 46 464
Total 51 161 211 177 102 278 2,754 168 105 273 2,760
Opequon Crossing
210 Single-Family Detached 155 units 29 88 118 100 59 159 1,556 100 59 159 1,589
230 Townhouse/Condo* 170 units 23 84 107 88 48 136 1,364 69 55 124 1,314
Total 53 173 225 188 107 295 2,920 169 114 283 2,903
* Determined using trip generation rates provided by VDOT.
Code Land Use
Table 2
2015 Background "Other Developments"
Trip Generation Summary
ADTAmountSaturday Peak HourADTAM Peak Hour PM Peak Hour
PHASE 1 TRAFFIC ANALYSES (2015)
The proposed Phase 1 development is to include 270 single-family detached units and a
4,100 square foot Drive-in Bank. Access is to be provided via four (4) site-driveways located
along the relocated Valley Mill Road (Route 659). Access to the retail parcel is provided via the
northernmost driveway. Access to the residential parcels is provided via three (3) other
driveways. All driveways are stop-controlled. Phase 1 is to be built-out by Year 2015.
2015 BACKGROUND CONDITIONS
In order to determine the 2015 background traffic conditions, Volkert, Inc. increased the
existing traffic volumes, shown on Figure 2, using a rate of 0.5% per year through Year 2015.
Per the September 2012 VDOT/County approved Scoping Agreement, 20% of the Greenwood
Road traffic volumes were then reassigned to the new intersection of Route 7/Valley Mill Road.
Additionally, all trips relating to specific future “other developments” located within the vicinity
of the site were incorporated. Table 2 is provided below to summarize the 2015 “other
developments” trip generation as determined using rates provided by VDOT (Apartment and
Townhouse/Condo residential uses) as well as those included in the 7th Edition of the Institute of
Transportation Engineers’ (ITE) Trip Generation Report. Figure A is provided in the Appendix
section of the report showing the location the background developments. Figures A1 through A7
area also provided in the Appendix showing the trip distribution percentages associated with
each of the background developments.
Figure 4 shows the 2015 background weekday and Saturday ADT, as well as the
weekday AM/PM and Saturday mid-day peak hour traffic volumes, at key locations within the
study area. Figure 5 shows the corresponding 2015 background lane geometry and peak hour
levels of service results. All Synchro levels of service worksheets are included in the Appendix
section of the Report.
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
16
15
14
13
12
11
9
10
7
6
5
2
4
1
2
3
4
5
3
16
8
SITE
2
1
X (Y)[Z]
1
118(
1
5
)
[
3
]
863(
1
1
7
9
)
[
1
1
0
4
]
20(1
3
8
)
[
6
4
]
[4](5
)
7
3
[1043
]
(
1
0
1
0
)
9
9
4
[209]
(
1
2
4
)
4
8
6
4
(
5
1
)
[
6
3
]
1
8
2
(
4
0
)
[
3
]
5
9
(
9
0
)
[
1
0
5
]
[
1
1
]
(
3
1
)
4
2
[
1
8
]
(
4
9
)
8
4
[
4
5
]
(
7
)
2
8
5
6
3 4
[30](34)37
[75](99)64
[123](193)11
6
96(7
7
)
[
8
5
]
119(
8
7
)
[
5
0
]
83(1
1
5
)
[
6
6
]
38
(
7
0
)
[
3
1
]
10
2
(
1
7
1
)
[
7
9
]
44
(
1
0
6
)
[
1
1
3
]
[9
7
]
(
1
6
5
)
1
5
5
[6
1
]
(
1
3
9
)
1
4
8
[5
4
]
(
1
0
5
)
7
0
C
H
A
N
N
I
N
G
D
R
87(145)[73]
73(198)[164][55
]
(
8
2
)
1
2
5
[17
9
]
(
1
7
2
)
5
5
1
7
2
(
1
3
6
)
[
1
5
1
]
1
5
0
(
1
0
7
)
[
1
2
5
]
F
I
R
S
T
W
O
O
D
S
D
R
13
2
(
2
0
9
)
[
2
6
5
]
61
(
9
8
)
[
1
2
3
]
80(98)
[
1
1
7
]
312(2
7
2
)
[
2
0
1
]
[278
]
(
2
3
6
)
1
0
9
[257]
(
3
3
4
)
1
5
4
CHA
N
N
I
N
G
D
R
69
0
(
1
5
5
7
)
[
9
7
3
]
41
(
1
4
6
)
[
1
3
5
]
[873]
(
8
4
4
)
1
3
8
4
[202
]
(
2
1
9
)
6
2
1
3
3
(
8
3
)
[
8
8
]
2
0
0
(
1
2
5
)
[
1
3
1
]
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
87 9
[40](
4
1
)
4
2
[916
]
(
9
1
0
)
1
2
1
4
[67](
5
7
)
5
1
1
VA
L
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
[4
2
]
(
4
7
)
8
1
[1
5
9
]
(
1
5
2
)
2
3
2
814(
1
4
0
2
)
[
9
3
4
]
77(2
8
0
)
[
1
7
0
]
10
7
8
9
10
A(
B
)
[
B
]
[B](
B
)
B
B
(
B
)
[
B
]
2
1
B(B
)
[
B
]
[B](C
)
B
C
(
C
)
[
C
]
[
B
]
(
C
)
B
534
[C](C)C
B(B
)
[
B
]
A(
B
)
[
A
]
[A
]
(
B
)
A
C
H
A
N
N
I
N
G
D
R
B(B)[B]**[
A
]
(
A
)
A
F
I
R
S
T
W
O
O
D
S
D
R
A(
A
)
[
A
]
B(B)[
B
][C](
C
)
B
CHA
N
N
I
N
G
D
R
STOP
1
*
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
B(
C
)
[
B
]
[B](
B
)
C
C
(
B
)
[
B
]
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
1
2
3
4
5
6
SITE
6 87 9 10
7
8
9
10
X (Y)[Z]
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 13
PHASE 1 TRIP GENERATION
Volkert, Inc. utilized the latest 8h Edition of the Institute of Transportation Engineers’
(ITE) Trip Generation Report to establish the total trips for Phase 1 of The Overlook. Table 3 is
provided to summarize the total trip generation associated with Phase 1 of the development.
PHASE 1 TRIP DISTRIBUTION AND TRIP ASSIGNMENT
The distribution of trips was based upon local travel patterns for the roadway network
surrounding the proposed site. Access to the site is provided Per the VDOT/County approved
Scoping Agreement, Volkert, Inc. utilized the trip distribution percentages shown in Figure 6 to
assign the proposed The Overlook Phase 1 development trips (Table 3) throughout the study area
roadway network. Figure 6A is provided to show the percentages of site generated trips
entering and exiting each of the site-driveways. Figure 7 shows the development-generated trip
assignments for the weekday and Saturday ADT, as well as the weekday AM/PM and Saturday
mid-day peak hours.
PHASE 1 (2015) BUILD-OUT CONDITIONS
The Phase 1 development assigned trips (Figure 7) were added to the 2015 background
traffic volumes (Figure 4) to obtain 2015 build-out conditions. Figure 8 shows the 2015 Phase 1
build-out weekday and Saturday ADT, as well as the weekday AM/PM and Saturday mid-day
peak hour traffic volumes, at key locations within the study area. Figure 9 shows the
corresponding build-out lane geometry and peak hour levels of service results. All Synchro
levels of service worksheets are included in the Appendix section of this Report.
Volkert, Inc. has provided Table 4 to show the 2015 background and Phase 1 build-out
levels of service, vehicle delay and 95th percentile back of queue, by lane group/approach, for
each of the study area intersections.
ITE
Code Land Use Amount In Out Total In Out Total ADT In Out Total ADT
210 Single-Family Detached 270 units 50 149 199 162 95 257 2700 132 117 250 2720
912 Drive-in Bank 4,100 SF 28 22 51 53 53 106 607 57 52 109 354
78 171 249 215 148 363 3,307 189 170 359 3,074
AM Peak Hour PM Peak Hour
Total Trips
Table 3
Proposed Development: The Overlook
Phase 1 Trip Generation Summary
Sat Peak Hour
25%
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
S
I
T
E
-
D
R
I
V
E
#
1
S
I
T
E
-
D
R
I
V
E
#
2
S
I
T
E
-
D
R
I
V
E
#
3
10%
10%
15%
40%
SITE
S
I
T
E
-
D
R
I
V
E
#
4
BER
R
Y
V
I
L
L
E
P
I
K
E
VA
L
L
E
Y
M
I
L
L
R
D
(R
E
L
O
C
A
T
E
D
)
SI
T
E
-
D
R
I
V
E
#
1
SITE
35%
65
%
65%
35
%
SI
T
E
-
D
R
I
V
E
#
2
5%
25
%
30%
10
%
SI
T
E
-
D
R
I
V
E
#
3
20%
25
%
20%
20
%
S
I
T
E
-
D
R
I
V
E
#
4
10%
1
5
%
15%
5
%
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
S
I
T
E
-
D
R
I
V
E
#
1
S
I
T
E
-
D
R
I
V
E
#
2
S
I
T
E
-
D
R
I
V
E
#
3
16
15
14
13
12
11
9
10
7
6
5
2
4
1
2
3
4
5
3
1
1
7
1
9
6
7
8
9
1
88
SITE
8
2
1
X (Y)[Z]
1
1
51(4
4
)
[
5
1
]
[57](
6
4
)
2
3
5
7
3 4
9
26(2
2
)
[
2
5
]
[2
8
]
(
3
2
)
1
2
C
H
A
N
N
I
N
G
D
R
26(22)[25]
34(30)[34][28
]
(
3
2
)
1
2
1
6
(
4
3
)
[
3
8
]
F
I
R
S
T
W
O
O
D
S
17
(
1
5
)
[
1
7
]
17
(
1
5
)
[
1
7
]
8(21)[
1
9
]
[19](
2
1
)
8
CHA
N
N
I
N
G
D
R
[20]
(
1
9
)
1
0
[76]
(
6
2
)
9
7
[
3
4
]
(
3
4
)
1
4
[
1
8
]
(
1
9
)
8
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
2
18(3
4
)
[
3
7
]
32(1
0
5
)
[
8
6
]
[7](
8
)
2
[67]
(
5
7
)
7
0
[
2
9
]
(
2
4
)
3
7
[
1
2
]
(
1
0
)
1
5
15(4
9
)
[
4
0
]
25(7
5
)
[
6
5
]
[26]
(
3
2
)
1
0
[44]
(
4
1
)
3
5
[
2
9
]
(
2
4
)
3
7
[
2
3
]
(
1
9
)
3
0
10(3
2
)
[
2
6
]
30(
5
2
)
[
5
0
]
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
3
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
1
6
20
(
5
4
)
[
4
7
]
[42](
3
7
)
4
3
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
[76](
8
6
)
3
1
1
VA
L
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
[6
8
]
(
5
9
)
6
9
[4
2
]
(
3
7
)
4
3
20(5
4
)
[
4
7
]
10
S
I
T
E
-
D
R
I
V
E
#
4
2
0
10
[13]
(
1
6
)
5
[53]
(
5
9
)
2
2
[
1
8
]
(
1
4
)
2
2
[
6
]
(
5
)
7
7(2
4
)
[
2
0
]
53(4
7
)
[
5
4
]
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
4
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
S
I
T
E
-
D
R
I
V
E
#
1
S
I
T
E
-
D
R
I
V
E
#
2
S
I
T
E
-
D
R
I
V
E
#
3
16
15
14
13
12
11
9
10
7
6
5
2
1
2
3
4
5
3
1
1
7
1
9
6
7
8
9
1
88
SITE
2
1
X (Y)[Z]
1
1
118(
1
5
)
[
3
]
915(
1
2
2
3
)
[
1
1
5
5
]
20(1
3
8
)
[
6
4
]
[4](5
)
7
3
[1100
]
(
1
0
7
4
)
1
0
1
7
[209]
(
1
2
4
)
4
8
6
4
(
5
1
)
[
6
3
]
1
8
2
(
4
0
)
[
3
]
5
9
(
9
0
)
[
1
0
5
]
[
1
1
]
(
3
1
)
4
2
[
1
8
]
(
4
9
)
8
4
[
4
5
]
(
7
)
2
8
534
[30](34)37
[75](99)64
[123](193)11
6
96(7
7
)
[
8
5
]
119(
8
7
)
[
5
0
]
108(
1
3
8
)
[
9
1
]
38
(
7
0
)
[
3
1
]
10
2
(
1
7
1
)
[
7
9
]
44
(
1
0
6
)
[
1
1
3
]
[9
7
]
(
1
6
5
)
1
5
5
[6
1
]
(
1
3
9
)
1
4
8
[8
3
]
(
1
3
7
)
8
1
C
H
A
N
N
I
N
G
D
R
113(167)[98]
107(227)[198][84
]
(
1
1
4
)
1
3
7
[17
9
]
(
1
7
2
)
5
5
1
8
8
(
1
7
9
)
[
1
8
9
]
1
5
0
(
1
0
7
)
[
1
2
5
]
F
I
R
S
T
W
O
O
D
S
D
R
14
9
(
2
2
3
)
[
2
8
2
]
78
(
1
1
3
)
[
1
4
0
]
88(11
9
)
[
1
3
6
]
312(2
7
2
)
[
2
0
1
]
[297
]
(
2
5
8
)
1
1
7
[257]
(
3
3
4
)
1
5
4
CHA
N
N
I
N
G
D
R
6
71
0
(
1
6
1
0
)
[
1
0
2
1
]
41
(
1
4
6
)
[
1
3
5
]
[916]
(
8
8
1
)
1
4
2
7
[202
]
(
2
1
9
)
6
2
1
3
3
(
8
3
)
[
8
8
]
2
0
0
(
1
2
5
)
[
1
3
1
]
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
[40](
4
1
)
4
2
[916
]
(
9
1
0
)
1
2
1
4
[142]
(
1
4
3
)
8
2
VA
L
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
[1
1
0
]
(
1
0
7
)
1
4
9
[2
0
2
]
(
1
8
9
)
2
7
5
814(
1
4
0
2
)
[
9
3
4
]
96(3
3
4
)
[
2
1
8
]
1
4
10
S
I
T
E
-
D
R
I
V
E
#
4
2
0
87 9
[20]
(
1
9
)
1
0
[277
]
(
2
6
1
)
4
1
0
[
3
4
]
(
3
4
)
1
4
[
1
8
]
(
1
9
)
8
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
2
18(3
4
)
[
3
7
]
160
(
4
4
3
)
[
3
2
3
]
[7](
8
)
2
[268
]
(
2
5
6
)
3
8
2
[
2
9
]
(
2
4
)
3
7
[
1
2
]
(
1
0
)
1
5
15(4
9
)
[
4
0
]
153
(
4
1
3
)
[
3
0
2
]
[26]
(
3
2
)
1
0
[245
]
(
2
4
0
)
3
4
7
[
2
9
]
(
2
4
)
3
7
[
2
3
]
(
1
9
)
3
0
10(3
2
)
[
2
6
]
158
(
3
9
0
)
[
2
8
7
]
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
3
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
1
10
[13]
(
1
6
)
5
[254
]
(
2
5
8
)
3
3
5
[
1
8
]
(
1
4
)
2
2
[
6
]
(
5
)
7
7(24
)
[
2
0
]
180
(
3
8
5
)
[
2
9
1
]
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
4
2
1
B(B
)
[
B
]
[B](C
)
B
C
(
C
)
[
C
]
[
B
]
(
C
)
C
5
6 7
3 4
[C](C)C
B(B
)
[
B
]
A(
B
)
[
A
]
[A
]
(
B
)
A
C
H
A
N
N
I
N
G
D
R
B(C)[C]**[
A
]
(
A
)
A
F
I
R
S
T
W
O
O
D
S
D
R
A(
A
)
[
A
]
B(B)[
A
][C](
C
)
B
CHA
N
N
I
N
G
D
R
STOP
1
*
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
S
I
T
E
-
D
R
I
V
E
#
1
S
I
T
E
-
D
R
I
V
E
#
2
S
I
T
E
-
D
R
I
V
E
#
3
*[A]
(
A
)
A
*
[
C
]
(
C
)
B
[A](
B
)
C
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
1
2
3
4
5
6
7
8
9
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
1
SITE
X (Y)[Z]
A(
A
)
[
B
]
[C](
C
)
B
C
(
B
)
[
B
]
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
B(
C
)
[
B
]
C
(
B
)
[
B
]
10
S
I
T
E
-
D
R
I
V
E
#
4
*[A]
(
A
)
A
*
[
B
]
(
C
)
B
*[A]
(
A
)
A
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
2
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
3
8
*[A
]
(
A
)
A
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
4
109
*
[
B
]
(
C
)
B
*
[
B
]
(
C
)
B
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 19
EB/T C 26 s. 655 ft B 11 s. 325 ft B 20 s. 238 ft C 31 s. 687 ft B 12 s. 374 ft A 8 s. 61 ft
EB/R A 2 s. 9 ft A 3 s. 49 ft A 1 s. 7 ft A 2 s. 8 ft A 2 s. 45 ft A 1 s. 0 ft
EB LOS
EB/WB: Route 7 WB/L D 42 s. 56 ft D 45 s. 142 ft D 47 s. 143 ft D 42 s. 56 ft D 45 s. 142 ft D 47 s. 143 ft
NB: Haggerty Connection WB/T A 10 s. 142 ft B 19 s. 480 ft B 16 s. 265 ft A 10 s. 147 ft B 20 s. 515 ft B 13 s. 244 ft
WB LOS
Traffic Control: Signalization NB/L C 27 s. 164 ft C 25 s. 106 ft C 20 s. 99 ft C 27 s. 164 ft C 25 s. 106 ft C 24 s. 109 ft
NB/R B 14 s. 54 ft A 10 s. 39 ft B 11 s. 43 ft B 14 s. 54 ft A 10 s. 39 ft B 11 s. 43 ft
NB LOS
OVERALL
EB/U D 51 s. 61 ft D 51 s. 61 ft D 45 s. 57 ft D 51 s. 61 ft D 51 s. 61 ft D 45 s. 57 ft
EB/T B 18 s. 390 ft B 18 s. 269 ft B 16 s. 252 ft B 18 s. 390 ft C 24 s. 310 ft C 25 s. 320 ft
EB/R A 4 s. 18 ft A 4 s. 20 ft A 3 s. 20 ft A 3 s. 22 ft A 4 s. 35 ft A 4 s. 36 ft
EB LOS
WB/L D 35 s. 89 ft D 49 s. 254 ft D 53 s. 221 ft D 37 s. 107 ft C 33 s. 269 ft C 34 s. 202 ft
EB/WB: Route 7 WB/T A 6 s. 84 ft A 4 s. 133 ft A 4 s. 48 ft A 6 s. 83 ft A 4 s. 123 ft A 8 s. 103 ft
NB: Valley Mill Road WB LOS
NB/L D 36 s. 89 ft C 35 s. 58 ft C 32 s. 51 ft D 41 s. 151 ft D 37 s. 112 ft C 31 s. 110 ft
Traffic Control: Signalization NB/R A 9 s. 64 ft A 9 s. 53 ft A 7 s. 52 ft A 9 s. 70 ft A 9 s. 59 ft A 7 s. 58 ft
NB LOS
OVERALL
EB/L D 46 s. 107 ft D 42 s. 16 ft D 41 s. 13 ft D 43 s. 95 ft D 40 s. 15 ft D 42 s. 13 ft
EB/T B 15 s. 272 ft C 23 s. 326 ft B 19 s. 309 ft B 15 s. 281 ft C 23 s. 357 ft B 18 s. 326 ft
EB/R A 6 s. 22 ft A 7 s. 47 ft A 5 s. 59 ft A 6 s. 22 ft A 7 s. 49 ft A 5 s. 59 ft
EB LOS
EB/WB: Route 7 WB/L C 34 s. 32 ft D 43 s. 142 ft D 40 s. 79 ft C 35 s. 33 ft D 44 s. 142 ft D 41 s. 79 ft
NB: Greenwood Road WB/T B 16 s. 210 ft B 11 s. 303 ft B 11 s. 274 ft B 17 s. 234 ft B 12 s. 350 ft B 11 s. 284 ft
SB: First Woods Drive WB/R A 3 s. 24 ft A 3 s. 8 ft A 5 s. 4 ft A 3 s. 25 ft A 4 s. 9 ft A 4 s. 3 ft
WB LOS
Traffic Control: Signalization NB/LTR C 29 s. 295 ft C 30 s. 163 ft C 27 s. 149 ft C 30 s. 295 ft C 31 s. 163 ft C 28 s. 151 ft
NB LOS
SB/LT C 23 s. 112 ft C 28 s. 82 ft C 26 s. 38 ft C 24 s. 112 ft C 28 s. 82 ft C 27 s. 38 ft
SB/R A 9 s. 21 ft B 15 s. 11 ft A 9 s. 28 ft A 9 s. 21 ft B 15 s. 11 ft A 9 s. 29 ft
SB LOS
OVERALL
EB/L C 30 s. 43 ft C 26 s. 39 ft C 25 s. 33 ft C 31 s. 44 ft C 26 s. 39 ft C 25 s. 34 ft
EB/TR C 22 s. 99 ft C 29 s. 182 ft C 21 s. 104 ft C 23 s. 100 ft C 30 s. 182 ft C 22 s. 106 ft
EB LOS
WB/L B 19 s. 57 ft B 20 s. 72 ft B 16 s. 43 ft C 20 s. 72 ft C 21 s. 85 ft B 17 s. 55 ft
EB/WB: Valley Mill Road WB/TR B 16 s. 110 ft B 11 s. 74 ft A 8 s. 48 ft B 16 s. 110 ft B 11 s. 74 ft A 8 s. 47 ft
NB/SB: Greenwood Road WB LOS
NB/L A 10 s. 84 ft B 15 s. 121 ft A 9 s. 53 ft A 10 s. 82 ft B 16 s. 122 ft B 10 s. 55 ft
Traffic Control: Signalization NB/TR A 8 s. 94 ft B 11 s. 131 ft A 6 s. 43 ft A 8 s. 96 ft B 11 s. 145 ft A 5 s. 48 ft
NB LOS
SB/L A 9 s. 28 ft B 14 s. 78 ft A 9 s. 61 ft A 9 s. 28 ft B 14 s. 80 ft B 11 s. 63 ft
SB/TR A 7 s. 62 ft B 12 s. 139 ft A 7 s. 49 ft A 7 s. 60 ft B 12 s. 139 ft A 8 s. 50 ft
SB LOS
OVERALL
WB/L B 12 s. 16 ft B 14 s. 58 ft A 8 s. 4 ft B 13 s. 27 ft C 18 s. 94 ft C 16 s. 62 ft
WB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A C 16 s. 62 ft
WB: Valley Mill Road WB LOS
NB: Channing Drive NB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB: Valley Mill Road NB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
NB LOS
Traffic Control: Stop Sign SB/L A 8 s. 10 ft A 8 s. 6 ft B 14 s. 38 ft A 9 s. 11 ft A 8 s. 9 ft A 8 s. 6 ft
SB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB LOS
OVERALL
EB/L C 25 s. 70 ft C 32 s. 147 ft C 30 s. 174 ft C 27 s. 76 ft C 32 s. 163 ft C 29 s. 182 ft
EB/T B 14 s. 73 ft B 16 s. 150 ft B 15 s. 122 ft B 14 s. 73 ft B 15 s. 148 ft B 14 s. 118 ft
EB LOS
EB/WB: Senseny Road WB/T C 20 s. 147 ft B 15 s. 120 ft B 14 s. 95 ft C 20 s. 147 ft B 14 s. 118 ft B 13 s. 92 ft
SB: Channing Drive WB/R A 4 s. 22 ft A 3 s. 21 ft A 3 s. 24 ft A 4 s. 23 ft A 3 s. 23 ft A 3 s. 25 ft
WB LOS
Traffic Control: Signalization SB/L A 7 s. 28 ft B 11 s. 58 ft B 12 s. 74 ft A 7 s. 34 ft B 12 s. 71 ft B 13 s. 88 ft
SB/R A 2 s. 23 ft A 3 s. 38 ft A 3 s. 43 ft A 2 s. 24 ft A 3 s. 42 ft A 3 s. 46 ft
SB LOS
OVERALL
EB = Eastbound, WB =Westbound, NB = Northbound, SB = Southbound, L: Left, T:Thru, R: Right
2015 Background Conditions
N/A
N/A
N/A
C
B
B
B
B
B
B
Saturday Peak Hour
LOS Delay
(in sec)
Queue
(in feet)
B
B
2015 Phase 1 Build-out Conditions
BBB
N/A N/A N/A
A
A
B
AA
BB
N/A
N/A N/A
BC
BB
N/A
N/A N/A
BB
AB
AB
BB
CC
CC
BB
C
BC
Saturday Peak Hour
LOS Delay
(in sec)
Queue
(in feet)
A
B
B
B
B
B
C
B
C
B
B
BBB
B
C
C
B
B
CC
B
BB
BB
AB
B
Delay
(in sec)
Queue
(in feet)
C
CB
LOS Delay
(in sec)
Queue
(in feet)LOSIntersection
BC
CA
B
AM Peak Hour PM Peak Hour
CC
C
B
PM Peak Hour
Delay
(in sec)
B
BB
CB
A
CB
CC
B
B
BA
CC
B
B
A
A
AM Peak Hour
LOS Queue
(in feet)
C
Delay
(in sec)
B
N/A
B
A
A
B
N/A N/A
AB
A
B
BC
BB
B
CC
B
BB
N/A
LOS Queue
(in feet)
BC
N/A N/A
N/A
B
N/A
BB
AA
Table 4
The Overlook
Levels of Service, Delay and Back of Queue (95%) Results
2015 Phase 1 Background and Build-out Conditions
C
A
A
B
N/A
N/A
N/A
N/A
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 20
EB/L B 14 s. 3 ft C 17 s. 9 ft C 15 s. 8 ft
EB/R A 9 s. 1 ft B 12 s. 3 ft B 10 s. 2 ft
EB: Site-Driveway #1 EB LOS
NB/SB: Valley Mill Road NB/L A 8 s. 1 ft A 9 s. 2 ft A 8 s. 1 ft
NB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
Traffic Control: Stop Sign NB LOS
SB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB LOS
OVERALL
EB/L B 14 s. 7 ft C 16 s. 6 ft B 14 s. 6 ft
EB/R A 9 s. 1 ft B 11 s. 1 ft B 10 s. 1 ft
EB: Site-Driveway #2 EB LOS
NB/SB: Valley Mill Road NB/L A 8 s. 0 ft A 9 s. 1 ft A 8 s. 1 ft
NB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
Traffic Control: Stop Sign NB LOS
SB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB LOS
OVERALL
EB/L B 13 s. 7 ft C 16 s. 6 ft B 14 s. 6 ft
EB/R A 9 s. 3 ft B 11 s. 3 ft B 10 s. 3 ft
EB: Site-Driveway #3 EB LOS
NB/SB: Valley Mill Road NB/L A 8 s. 1 ft A 8 s. 3 ft A 8 s. 2 ft
NB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
Traffic Control: Stop Sign NB LOS
SB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB LOS
OVERALL
EB/L B 13 s. 4 ft C 15 s. 3 ft B 14 s. 4 ft
EB/R A 9 s. 1 ft B 11 s. 1 ft B 10 s. 1 ft
EB: Site-Driveway #4 EB LOS
NB/SB: Valley Mill Road NB/L A 8 s. 0 ft A 8 s. 1 ft A 8 s. 1 ft
NB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
Traffic Control: Stop Sign NB LOS
SB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB LOS
OVERALL
EB = Eastbound, WB =Westbound, NB = Northbound, SB = Southbound, L: Left, T:Thru, R: Right
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/AN/AN/A
2015 Background Conditions
The Overlook
Levels of Service, Delay and Back of Queue (95%) Results
2015 Phase 1 Background and Build-out Conditions
Table 4 (Continued)
N/A
N/A
N/A
N/A
2015 Phase 1 Build-out Conditions
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A
N/A
Saturday Peak Hour
LOS Delay
(in sec)
Queue
(in feet)
N/A
N/A N/A
N/A
N/A N/A
N/A N/A
Saturday Peak Hour
LOS Delay
(in sec)
Queue
(in feet)
Queue
(in feet)
Queue
(in feet)LOS Delay
(in sec)LOS Delay
(in sec)
Queue
(in feet)
Intersection
AM Peak Hour PM Peak Hour AM Peak Hour PM Peak Hour
LOS Queue
(in feet)
N/A N/A
N/A N/A
N/A N/A
N/A N/A
Delay
(in sec)
N/A N/A
LOS Delay
(in sec)
N/A N/A
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 21
In Out Total In Out Total In Out Total
Red-Bud Run
210 Single-Family Detached 25 units 7 20 27 19 11 31 290 19 11 31 286
Total 7 20 27 19 11 31 290 19 11 31 286
Twin Lakes Phases 9 and 10
210 Single-Family Detached 65 units 14 41 55 46 27 73 700 46 27 73 702
230 Townhouse/Condo* 71 units 10 37 47 38 21 58 585 30 24 54 549
Total 24 78 102 84 48 131 1,284 76 51 126 1,251
Lynnhaven
210Single-Family Detached 3 units 39123254132539
820 Retail 87,120 SF 88 56 144 274 297 572 6,209 412 380 791 8,471
(10-acres @ 0.2 FAR)Total 91 65 156 277 299 576 6,250 414 382 796 8,510
Fieldstone Development
230 Townhouse/Condo* 93 units 13 47 60 49 27 76 760 39 31 69 719
Total 13 47 60 49 27 76 760 39 31 69 719
Sovereign Village
210 Single-Family Detached 42 units 10 29 39 31 18 49 468 31 18 49 466
220 Apartment* 64 units 9 30 39 32 18 50 503 30 18 48 499
820 Retail 104,544 SF 98 63 161 309 335 645 6,990 463 428 891 9,502
(12-acres @ 0.2 FAR)Total 18 59 78 63 36 99 971 61 37 97 964
Haggerty Property
210 Single-Family Detached 180 units 34 102 135 115 67 182 1,786 115 67 182 1,829
220 Apartment* 60 units 8 28 36 30 17 47 472 28 17 45 468
230 Townhouse/Condo* 60 units 9 31 40 32 18 50 497 25 20 46 464
Total 51 161 211 177 102 278 2,754 168 105 273 2,760
Opequon Crossing
210 Single-Family Detached 155 units 29 88 118 100 59 159 1,556 100 59 159 1,589
230 Townhouse/Condo* 170 units 23 84 107 88 48 136 1,364 69 55 124 1,314
Total 53 173 225 188 107 295 2,920 169 114 283 2,903
* Determined using trip generation rates provided by VDOT.
Code Land Use
Table 5
2020 Background "Other Developments"
Trip Generation Summary
ADTAmountSaturday Peak HourADTAM Peak Hour PM Peak Hour
PHASE 2 TRAFFIC ANALYSES (2020)
The proposed Phase 2 development is to include 270 single-family detached units, 21,800
square feet of Retail, a Convenience Mart/ Fast Food (2,000 square feet) with a 16 pump Gas
Station, a 4,100 square foot Drive-in Bank and a 7,400 square foot High-Turnover “Sit Down”
Restaurant. Access is to be provided via four (4) site-driveways located along the relocated
Valley Mill Road (Route 659). Access to the retail parcel is provided via the northernmost
driveway (signalized control). Access to the residential parcels is provided via three (3) other
driveways (stop control). Phase 2 is to be built-out by Year 2020.
2020 BACKGROUND CONDITIONS
In order to determine the 2020 background traffic conditions, Volkert, Inc. increased the
existing traffic volumes, shown on Figure 2, using a rate of 0.5% per year through Year 2020.
Per the September 2012 VDOT/County approved Scoping Agreement, 20% of the Greenwood
Road traffic volumes were then reassigned to the new intersection of Route 7/Valley Mill Road.
Additionally, all trips relating to specific future “other developments” located within the vicinity
of the site were incorporated. Table 5 is provided below to summarize the 2020 “other
developments” trip generation as determined using rates provided by VDOT (Apartment and
Townhouse/Condo residential uses) as well as those included in the 7th Edition of the Institute of
Transportation Engineers’ (ITE) Trip Generation Report.
Figure 10 shows the 2020 background weekday and Saturday ADT, as well as the
weekday AM/PM and Saturday mid-day peak hour traffic volumes, at key locations within the
study area. Figure 11 shows the corresponding 2020 background lane geometry and peak hour
levels of service results. All Synchro levels of service worksheets are included in the Appendix
section of this Report.
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
16
15
14
13
12
11
9
10
7
6
5
2
4
1
2
3
4
5
3
16
8
SITE
1
X (Y)[Z]
1
2
120(
1
5
)
[
3
]
878(
1
2
0
4
)
[
1
1
2
7
]
20(1
4
2
)
[
6
6
]
[4](5
)
7
5
[1062
]
(
1
0
2
7
)
1
0
1
7
[213]
(
1
2
6
)
4
9
6
6
(
5
3
)
[
6
5
]
1
8
8
(
4
2
)
[
3
]
6
0
(
9
1
)
[
1
0
6
]
[
1
1
]
(
3
2
)
4
2
[
1
9
]
(
5
0
)
8
7
[
4
6
]
(
7
)
2
8
5
6
3 4
[30](35)38
[77](102)65
[126](198)11
9
98(7
7
)
[
8
5
]
122(
8
9
)
[
5
2
]
85(1
1
7
)
[
6
7
]
39
(
7
1
)
[
3
2
]
10
5
(
1
7
7
)
[
8
2
]
45
(
1
0
7
)
[
1
1
4
]
[1
0
0
]
(
1
6
9
)
1
5
9
[6
3
]
(
1
4
4
)
1
5
3
[5
5
]
(
1
0
7
)
7
1
C
H
A
N
N
I
N
G
D
R
89(148)[74]
73(200)[165][56
]
(
8
4
)
1
2
8
[18
1
]
(
1
7
4
)
5
5
1
7
4
(
1
3
6
)
[
1
5
1
]
1
5
3
(
1
0
8
)
[
1
2
6
]
F
I
R
S
T
W
O
O
D
S
D
R
13
4
(
2
1
0
)
[
2
6
7
]
61
(
9
8
)
[
1
2
3
]
80(98)
[
1
1
7
]
320(2
7
9
)
[
2
0
6
]
[280]
(
2
3
8
)
1
1
0
[264]
(
3
4
3
)
1
5
8
CHA
N
N
I
N
G
D
R
70
6
(
1
5
9
3
)
[
9
9
4
]
41
(
1
4
6
)
[
1
3
5
]
[892]
(
8
6
2
)
1
4
1
7
[202
]
(
2
1
9
)
6
2
1
3
3
(
8
3
)
[
8
8
]
2
0
0
(
1
2
5
)
[
1
3
1
]
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
[41](
4
2
)
4
3
[933
]
(
9
2
7
)
1
2
4
3
[68](
5
8
)
5
2
1
VA
L
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
[4
2
]
(
4
8
)
8
1
[1
6
1
]
(
1
5
4
)
2
3
6
828(
1
4
3
4
)
[
9
5
4
]
78(2
8
4
)
[
1
7
2
]
7 9 108
7
9
10
8
2
1
B(B
)
[
B
]
[B](B
)
B
C
(
C
)
[
C
]
[
B
]
(
B
)
B
534
[C](B)C
B(A
)
[
B
]
A(
B
)
[
B
]
[A
]
(
B
)
A
C
H
A
N
N
I
N
G
D
R
B(B)[C]**[
A
]
(
A
)
A
F
I
R
S
T
W
O
O
D
S
D
R
A(
A
)
[
A
]
B(A)[
A
][C](
B
)
C
CHA
N
N
I
N
G
D
R
STOP
1
*
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
[B](
B
)
B
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
1
2
3
4
5
6
SITE
6
X (Y)[Z]
B(
C
)
[
B
]
[B](
C
)
B
B
(
B
)
[
B
]
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
A(
B
)
[
B
]
C
(
B
)
[
B
]
87 9 10
9
10
7
8
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 24
PHASE 2 TRIP GENERATION
Volkert, Inc. utilized the latest 8th Edition of the Institute of Transportation Engineers’
(ITE) Trip Generation Report to establish the total trips for Phase 2 of The Overlook. Table 6 is
provided to summarize the total trip generation associated with the Phase 2 development.
PHASE 2 TRIP DISTRIBUTION AND TRIP ASSIGNMENT
The distribution of trips was based upon local travel patterns for the roadway network
surrounding the proposed site. Per the VDOT/County approved Scoping Agreement, Volkert,
Inc. utilized the trip distribution percentages shown in Figure 12 to assign the proposed The
Overlook development Phase 2 development trips (Table 6) throughout the study area roadway
network. Trip distributions at the site-driveways remain consistent with Figure 6A. Figure 13
shows the development-generated trip assignments for the weekday and Saturday ADT, as well
as the weekday AM/PM and Saturday mid-day peak hours.
PHASE 2 (2020) BUILD-OUT CONDITIONS
The Phase 2 development assigned trips (Figure 13) were added to the 2020 background
traffic volumes (Figure 10) to obtain 2020 build-out conditions. Figure 14 shows the 2020
Phase 2 build-out weekday and Saturday ADT, as well as the weekday AM/PM and Saturday
mid-day peak hour traffic volumes, at key locations within the study area. Figure 15 shows the
corresponding build-out lane geometry and peak hour levels of service results. All Synchro
levels of service worksheets are included in the Appendix section of this Report.
Table 7 is provided below to show the 2020 background and Phase 2 build-out levels of
service, vehicle delay and 95th percentile back of queue, by lane group/approach, for each of the
study area intersections.
ITE
Code Land Use Amount In Out Total In Out Total ADT In Out Total ADT
210 Single-Family Detached 270 units 50 149 199 162 95 257 2700 132 117 250 2720
820 Retail 21,800 SF 38 24 63 110 119 229 2,523 166 153 318 3,539
853 Convenience Mart w\pumps 16 pumps 133 133 265 153 153 305 8,682 82 78 160 3,272
912 Drive-in Bank 4,100 SF 28 22 51 53 53 106 607 57 52 109 354
932 H-T Restaurant 7,400 SF 44 41 85 49 34 83 941 55 49 104 1172
933 Fast Food w/out DT 2,000 SF 53 35 88 27 26 52 1432 53 56 109 1392
(located inside Conv. Mart)
Sub-Total 346 404 750 553 479 1,032 16,885 545 505 1,050 12,449
30 30 60 39 39 77 810 37 37 75 816
8 8 16 29 29 57 631 40 40 80 885
71 71 141 71 71 143 4,045 54 54 108 1,865
238 296 534 414 340 754 11,399 414 374 788 8,882
Internal Trips (to/from Res. And Non-Res.)
Proposed Development: The Overlook
Phase 2 Trip Generation Summary
AM Peak Hour PM Peak Hour
Table 6
Pass-by Trips 40% (Code 853/933)
Pass-by Trips 25% (Code 820)
Total "New" Trips
Sat Peak Hour
25%
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
S
I
T
E
-
D
R
I
V
E
#
1
S
I
T
E
-
D
R
I
V
E
#
2
S
I
T
E
-
D
R
I
V
E
#
3
10%
10%
15%
40%
SITE
S
I
T
E
-
D
R
I
V
E
#
4
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
S
I
T
E
-
D
R
I
V
E
#
1
S
I
T
E
-
D
R
I
V
E
#
2
S
I
T
E
-
D
R
I
V
E
#
3
16
15
14
13
12
11
9
10
7
6
5
2
1
2
3
4
5
3
1
1
7
1
9
6
7
8
9
1
88
SITE
2
1
X (Y)[Z]
1
1
89(1
0
2
)
[
1
1
2
]
[124]
(
1
2
4
)
7
1
534
44(5
1
)
[
5
6
]
[6
2
]
(
6
2
)
3
6
C
H
A
N
N
I
N
G
D
R
44(51)[56]
59(68)[75][62
]
(
6
2
)
3
6
4
8
(
8
3
)
[
8
3
]
F
I
R
S
T
W
O
O
D
S
30
(
3
4
)
[
3
7
]
30
(
3
4
)
[
3
7
]
24(41)
[
4
1
]
[41](
4
1
)
2
4
CHA
N
N
I
N
G
D
R
6
59
(
1
0
3
)
[
1
0
3
]
[94](
8
5
)
7
4
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
[-47]
(
-
5
0
)
-
3
9
[212
]
(
2
1
6
)
1
3
4
1
VA
L
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
[1
9
7
]
(
1
8
6
)
1
5
8
[1
4
0
]
(
1
3
5
)
1
1
3
-39(
-
5
0
)
[
-
4
7
]
99(1
5
4
)
[
1
5
0
]
-X(-Y)[-Z]
4
10
S
I
T
E
-
D
R
I
V
E
#
4
2
0
87 9
[118
]
(
1
0
7
)
8
6
[65]
(
5
3
)
8
2
[
2
7
2
]
(
2
6
9
)
1
8
9
[
1
2
0
]
(
1
2
0
)
7
1
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
2
205
(
2
8
0
)
[
2
8
9
]
27(8
9
)
[
7
3
]
[6](
7
)
2
[151
]
(
1
3
4
)
1
2
8
[
3
2
]
(
2
5
)
4
1
[
1
0
]
(
8
)
1
3
16(5
1
)
[
4
1
]
83(1
5
8
)
[
1
5
2
]
[23]
(
2
8
)
8
[126
]
(
1
1
6
)
9
0
[
3
1
]
(
2
5
)
4
1
[
2
0
]
(
1
6
)
2
5
10(3
7
)
[
2
9
]
85(1
3
0
)
[
1
3
4
]
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
3
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
1
10
[11]
(
1
4
)
4
[134
]
(
1
3
1
)
7
9
[
1
5
]
(
1
2
)
1
9
[
5
]
(
4
)
6
13(3
1
)
[
2
8
]
97(1
1
5
)
[
1
2
6
]
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
4
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
S
I
T
E
-
D
R
I
V
E
#
1
S
I
T
E
-
D
R
I
V
E
#
2
S
I
T
E
-
D
R
I
V
E
#
3
16
15
14
13
12
11
9
10
7
6
5
2
1
2
3
4
5
3
1
1
7
1
9
6
7
8
9
1
88
SITE
1
X (Y)[Z]
1
2
120(
1
5
)
[
3
]
967(
1
3
0
6
)
[
1
2
3
9
]
20(1
4
2
)
[
6
6
]
[4](5
)
7
5
[1186
]
(
1
1
5
2
)
1
0
8
8
[213]
(
1
2
6
)
4
9
6
0
(
9
1
)
[
1
0
6
]
1
8
8
(
4
2
)
[
3
]
6
6
(
5
3
)
[
6
5
]
[
1
1
]
(
3
2
)
4
2
[
1
9
]
(
5
0
)
8
7
[
4
6
]
(
7
)
2
8
5
6
3 4
[30](35)38
[77](102)65
[126](198)11
9
98(7
7
)
[
8
5
]
122(
8
9
)
[
5
2
]
129(
1
6
9
)
[
1
2
3
]
39
(
7
1
)
[
3
2
]
10
5
(
1
7
7
)
[
8
2
]
45
(
1
0
7
)
[
1
1
4
]
[1
0
0
]
(
1
6
9
)
1
5
9
[6
3
]
(
1
4
4
)
1
5
3
[1
1
7
]
(
1
6
9
)
1
0
7
C
H
A
N
N
I
N
G
D
R
133(199)[131]
132(268)[240][11
8
]
(
1
4
6
)
1
6
4
[18
1
]
(
1
7
4
)
5
5
2
2
1
(
2
1
9
)
[
2
3
4
]
1
5
3
(
1
0
8
)
[
1
2
6
]
F
I
R
S
T
W
O
O
D
S
D
R
16
3
(
2
4
4
)
[
3
0
5
]
91
(
1
3
3
)
[
1
6
0
]
104(14
0
)
[
1
5
8
]
320(2
7
9
)
[
2
0
6
]
[321]
(
2
8
0
)
1
3
4
[264]
(
3
4
3
)
1
5
8
CHA
N
N
I
N
G
D
R
76
5
(
1
6
9
6
)
[
1
0
9
8
]
41
(
1
4
6
)
[
1
3
5
]
[985
]
(
9
4
7
)
1
4
9
1
[202
]
(
2
1
9
)
6
2
1
3
3
(
8
3
)
[
8
8
]
2
0
0
(
1
2
5
)
[
1
3
1
]
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
[41](
4
2
)
4
3
[887
]
(
8
7
7
)
1
2
0
4
[280
]
(
2
7
4
)
1
8
6
1
VA
L
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
[2
3
8
]
(
2
3
4
)
2
3
9
[3
0
1
]
(
2
8
9
)
3
4
9
789(
1
3
8
4
)
[
9
0
7
]
176(
4
3
8
)
[
3
2
2
]
4
10
S
I
T
E
-
D
R
I
V
E
#
4
2
0
87 9
[118
]
(
1
0
7
)
8
6
[267
]
(
2
5
4
)
4
0
0
[
2
7
2
]
(
2
6
9
)
1
8
9
[
1
2
0
]
(
1
2
0
)
7
1
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
2
205
(
2
8
0
)
[
2
8
9
]
157
(
4
3
2
)
[
3
1
2
]
[6](
7
)
2
[354
]
(
3
3
5
)
4
4
6
[
3
2
]
(
2
5
)
4
1
[
1
0
]
(
8
)
1
3
16(5
1
)
[
4
1
]
213
(
5
0
0
)
[
3
9
2
]
[23]
(
2
8
)
8
[328
]
(
3
1
7
)
4
0
7
[
3
1
]
(
2
5
)
4
1
[
2
0
]
(
1
6
)
2
5
10(3
7
)
[
2
9
]
215
(
4
7
2
)
[
3
7
3
]
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
3
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
1
10
[11]
(
1
4
)
4
[336
]
(
3
3
2
)
3
9
6
[
1
5
]
(
1
2
)
1
9
[
5
]
(
4
)
6
13(3
1
)
[
2
8
]
227
(
4
5
7
)
[
3
6
5
]
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
4
2
1
C(B
)
[
B
]
[B](C
)
C
D
(
C
)
[
C
]
[
B
]
(
B
)
C
534
[C](B)C
B(B
)
[
B
]
A(
B
)
[
A
]
[A
]
(
B
)
B
C
H
A
N
N
I
N
G
D
R
B(D)[C]**[
A
]
(
A
)
A
F
I
R
S
T
W
O
O
D
S
D
R
A(
A
)
[
A
]
B(A)[
A
][C](
B
)
C
CHA
N
N
I
N
G
D
R
STOP
1
*
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
S
I
T
E
-
D
R
I
V
E
#
1
S
I
T
E
-
D
R
I
V
E
#
2
S
I
T
E
-
D
R
I
V
E
#
3
[B](
B
)
B
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
1
2
3
4
5
6
7
8
9
SITE
6
X (Y)[Z]
B(
C
)
[
C
]
[B](
C
)
B
C
(
C
)
[
C
]
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
A(
C
)
[
B
]
C
(
B
)
[
B
]
[A](
A
)
A
[
C
]
(
C
)
C
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
1
7
A(
A
)
[
A
]
10
S
I
T
E
-
D
R
I
V
E
#
4
*[A]
(
A
)
A
*
[
C
]
(
C
)
C
*[A]
(
A
)
A
*
[
C
]
(
C
)
C
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
2
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
3
8 9
*[A
]
(
A
)
A
*
[
C
]
(
C
)
B
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
4
10
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 29
EB/T B 19 s. 263 ft C 21 s. 256 ft B 18 s. 471 ft B 18 s. 284 ft B 17 s. 250 ft
EB/R A 3 s. 39 ft A 3 s. 35 ft A 3 s. 17 ft A 3 s. 37 ft A 2 s. 30 ft
EB LOS
EB/WB: Route 7 WB/L D 42 s. 145 ft D 52 s. 181 ft D 43 s. 59 ft D 44 s. 148 ft D 52 s. 188 ft
NB: Haggerty Connection WB/T B 12 s. 352 ft B 10 s. 190 ft A 6 s. 107 ft B 12 s. 383 ft A 8 s. 178 ft
WB LOS
Traffic Control: Signalization NB/L C 31 s. 123 ft C 25 s. 121 ft D 36 s. 193 ft C 33 s. 125 ft C 28 s. 127 ft
NB/R A 8 s. 39 ft A 7 s. 37 ft A 8 s. 49 ft A 9 s. 39 ft A 8 s. 39 ft
NB LOS
OVERALL
EB/U D 48 s. 60 ft D 43 s. 57 ft D 52 s. 62 ft D 51 s. 31 ft D 45 s. 59 ft
EB/T C 22 s. 332 ft B 15 s. 251 ft B 20 s. 384 ft D 39 s. 384 ft C 23 s. 305 ft
EB/R A 5 s. 24 ft A 3 s. 19 ft A 2 s. 32 ft B 17 s. 147 ft A 3 s. 49 ft
EB LOS
WB/L D 46 s. 245 ft D 53 s. 186 ft D 54 s. 194 ft D 49 s. 422 ft D 52 s. 329 ft
EB/WB: Route 7 WB/T B 13 s. 395 ft A 9 s. 226 ft A 8 s. 162 ft B 12 s. 371 ft A 10 s. 207 ft
NB: Valley Mill Road WB LOS
NB/L C 35 s. 59 ft D 36 s. 54 ft D 51 s. 279 ft D 53 s. 258 ft D 48 s. 265 ft
Traffic Control: Signalization NB/R A 9 s. 53 ft A 9 s. 55 ft B 17 s. 99 ft A 9 s. 108 ft A 9 s. 41 ft
NB LOS
OVERALL
EB/L D 43 s. 16 ft D 42 s. 13 ft D 53 s. 96 ft D 40 s. 15 ft D 41 s. 13 ft
EB/T C 26 s. 357 ft B 19 s. 361 ft C 29 s. 473 ft C 25 s. 387 ft B 20 s. 385 ft
EB/R A 8 s. 54 ft A 6 s. 61 ft B 11 s. 33 ft A 7 s. 50 ft A 7 s. 72 ft
EB LOS
EB/WB: Route 7 WB/L D 45 s. 146 ft D 45 s. 83 ft D 46 s. 36 ft D 46 s. 139 ft D 40 s. 79 ft
NB: Greenwood Road WB/T B 13 s. 344 ft B 12 s. 329 ft D 36 s. 421 ft B 15 s. 379 ft B 11 s. 318 ft
SB: First Woods Drive WB/R A 4 s. 9 ft A 5 s. 4 ft A 5 s. 37 ft A 7 s. 4 ft A 4 s. 3 ft
WB LOS
Traffic Control: Signalization NB/LTR C 28 s. 159 ft C 29 s. 151 ft D 51 s. 338 ft C 35 s. 181 ft C 29 s. 154 ft
NB LOS
SB/LT C 26 s. 81 ft C 27 s. 39 ft D 39 s. 134 ft C 29 s. 85 ft C 27 s. 39 ft
SB/R B 14 s. 11 ft A 9 s. 28 ft B 13 s. 24 ft B 15 s. 11 ft A 9 s. 29 ft
SB LOS
OVERALL
EB/L C 25 s. 40 ft C 26 s. 35 ft C 28 s. 42 ft C 28 s. 40 ft C 28 s. 36 ft
EB/TR C 29 s. 189 ft C 24 s. 115 ft C 20 s. 96 ft C 35 s. 193 ft C 26 s. 125 ft
EB LOS
WB/L B 20 s. 74 ft B 18 s. 71 ft B 18 s. 74 ft C 30 s. 109 ft B 20 s. 77 ft
EB/WB: Valley Mill Road WB/TR B 11 s. 75 ft A 7 s. 47 ft B 13 s. 97 ft B 14 s. 75 ft A 8 s. 51 ft
NB/SB: Greenwood Road WB LOS
NB/L B 16 s. 128 ft B 11 s. 60 ft B 11 s. 91 ft B 17 s. 135 ft B 11 s. 62 ft
Traffic Control: Signalization NB/TR B 11 s. 138 ft A 5 s. 57 ft A 9 s. 118 ft B 12 s. 178 ft A 5 s. 55 ft
NB LOS
SB/L B 14 s. 80 ft B 12 s. 69 ft A 10 s. 31 ft A 9 s. 45 ft B 11 s. 71 ft
SB/TR B 12 s. 146 ft A 9 s. 56 ft A 9 s. 67 ft A 7 s. 76 ft A 9 s. 57 ft
SB LOS
OVERALL
WB/L B 15 s. 60 ft A 9 s. 10 ft B 15 s. 44 ft D 28 s. 191 ft C 23 s. 126 ft
WB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
WB: Valley Mill Road WB LOS
NB: Channing Drive NB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB: Valley Mill Road NB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A
NB LOS
Traffic Control: Stop Sign SB/L A 8 s. 6 ft C 23 s. 126 ft A 9 s. 14 ft A 9 s. 12 ft A 9 s. 10 ft
SB/T N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
SB LOS
OVERALL
EB/L C 35 s. 155 ft C 29 s. 200 ft C 35 s. 99 ft D 42 s. 191 ft C 27 s. 188 ft
EB/T B 17 s. 159 ft B 13 s. 116 ft B 15 s. 77 ft B 19 s. 154 ft B 12 s. 109 ft
EB LOS
EB/WB: Senseny Road WB/T B 15 s. 126 ft B 12 s. 90 ft C 21 s. 155 ft B 18 s. 122 ft B 11 s. 85 ft
SB: Channing Drive WB/R A 3 s. 22 ft A 3 s. 26 ft A 4 s. 25 ft A 2 s. 23 ft A 2 s. 25 ft
WB LOS
Traffic Control: Signalization SB/L B 11 s. 60 ft B 14 s. 109 ft A 7 s. 39 ft C 21 s. 117 ft B 14 s. 105 ft
SB/R A 3 s. 39 ft A 4 s. 51 ft A 2 s. 25 ft A 7 s. 65 ft A 4 s. 51 ft
SB LOS
OVERALL
EB = Eastbound, WB =Westbound, NB = Northbound, SB = Southbound, L: Left, T:Thru, R: Right
A
B
Table 7
The Overlook
Levels of Service, Delay and Back of Queue (95%) Results
2020 Phase 2 Background and Build-out Conditions
N/A
N/A N/A
B
N/A
N/A
N/A
N/A
C
AB
N/A N/A
B
CC
B
AB
BB
A
B
C
C
B
LOS Queue
(in feet)
CC
N/A
A
C
N/A
B
A
A
B
N/A N/A
BB
AM Peak Hour
LOS Queue
(in feet)
C
Delay
(in sec)
B
C
LOS
B
PM Peak Hour
Delay
(in sec)
BB
B
BB
C
A
B
CC
CC
C
B
C
Intersection
BC
B
PM Peak Hour
B
Delay
(in sec)
Queue
(in feet)
B
C
C
B
C
B
C
B
C
C
B
B
C
C
CC
D
B
B
C
B
B
C
C
B
B
B
C
C
C
Saturday Peak Hour
LOS Delay
(in sec)
Queue
(in feet)
B
B
C
N/A
B
B
B
B
A
N/A
N/A
N/A
A
B
A
A
B
BBBB
2020 Phase 2 Build-out Conditions
Saturday Peak Hour
LOS Delay
(in sec)
Queue
(in feet)
B
B
B
B
B
B
B
B
B
A
2020 Background Conditions
N/A
N/A
N/A
C
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 30
EB/L D 44 s. 170 ft D 43 s. 223 ft D 42 s. 223 ft
EB/R A 9 s. 34 ft A 6 s. 39 ft A 6 s. 39 ft
EB: Site-Driveway #1 EB LOS
NB/SB: Valley Mill Road NB/L A 5 s. 36 ft A 11 s. 59 ft A 8 s. 62 ft
NB/T A 6 s. 151 ft A 10 s. 115 ft A 7 s. 118 ft
Traffic Control: Signalization NB LOS
SB/T A 2 s. 26 ft A 2 s. 3 ft A 3 s. 49 ft
SB/R A 1 s. 0 ft A 1 s. 0 ft A 1 s. 0 ft
SB LOS
OVERALL
EB/L C 16 s. 10 ft C 19 s. 8 ft C 17 s. 9 ft
EB/R A 10 s. 1 ft B 12 s. 1 ft B 11 s. 1 ft
EB: Site-Driveway #2 EB LOS
NB/SB: Valley Mill Road NB/L A 8 s. 0 ft A 9 s. 1 ft A 8 s. 0 ft
NB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
Traffic Control: Stop Sign NB LOS
SB/T N/AN/AN/AN/AN/AN/AN/AN/AN/A
SB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB LOS
OVERALL
EB/L C 15 s. 10 ft C 19 s. 8 ft C 17 s. 9 ft
EB/R A 10 s. 3 ft B 12 s. 2 ft B 11 s. 3 ft
EB: Site-Driveway #3 EB LOS
NB/SB: Valley Mill Road NB/L A 8 s. 1 ft A 9 s. 2 ft A 8 s. 2 ft
NB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
Traffic Control: Stop Sign NB LOS
SB/T N/AN/AN/AN/AN/AN/AN/AN/AN/A
SB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB LOS
OVERALL
EB/L B 15 s. 4 ft C 18 s. 3 ft C 16 s. 4 ft
EB/R A 10 s. 1 ft B 11 s. 1 ft B 11 s. 1 ft
EB: Site-Driveway #4 EB LOS
NB/SB: Valley Mill Road NB/L A 8 s. 0 ft A 9 s. 1 ft A 8 s. 1 ft
NB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
Traffic Control: Stop Sign NB LOS
SB/T N/AN/AN/AN/AN/AN/AN/AN/AN/A
SB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB LOS
OVERALL
EB = Eastbound, WB =Westbound, NB = Northbound, SB = Southbound, L: Left, T:Thru, R: Right
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A
N/A N/A
AA
AA
BB
CC
LOS Delay
(in sec)
Queue
(in feet)LOS Delay
(in sec)
Queue
(in feet)
Intersection
AM Peak Hour PM Peak Hour PM Peak Hour
Queue
(in feet)LOS Delay
(in sec)LOS Delay
(in sec)
Queue
(in feet)
N/A N/A
Saturday Peak Hour
N/A N/A
N/A N/A
N/A N/A
N/A N/A
C
A
A
B
Saturday Peak Hour
LOS Delay
(in sec)
Queue
(in feet)
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2020 Phase 2 Build-out Conditions2020 Background Conditions
The Overlook
Levels of Service, Delay and Back of Queue (95%) Results
2020 Phase 2 Background and Build-out Conditions
Table 7 (Continued)
N/AN/AN/A
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 31
“DESIGN YEAR” TRAFFIC ANALYSES (2026)
As per VDOT Chapter 527 requirements, Volkert, Inc. has provided traffic analyses
assuming a “Design Year” of 2026 (6-years after build-out). This condition assumes the
completion of the interchange of Route 7/Route 37 with 500 vehicles per hour assigned to each
ramp (as per the September 2012 scoping agreement). All other methodology remains consistent
with the Phase 2 Background and Build-out conditions, respectively.
2026 “DESIGN YEAR” BACKGROUND CONDITIONS
In order to determine the 2026 background traffic conditions, Volkert, Inc. increased the
existing traffic volumes, shown on Figure 2, using a rate of 0.5% per year through Year 2026.
Per the September 2012 VDOT/County approved Scoping Agreement, 20% of the Greenwood
Road traffic volumes were then reassigned to the new intersection of Route 7/Valley Mill Road.
Additionally, all trips relating to specific future “other developments” located within the vicinity
of the site were incorporated (See Table 5).
Figure 16 shows the 2026 background weekday and Saturday ADT, as well as the
weekday AM/PM and Saturday mid-day peak hour traffic volumes, at key locations within the
study area. Figure 17 shows the corresponding 2026 background lane geometry and peak hour
levels of service results. All Synchro levels of service worksheets are included in the Appendix
section of this Report.
THE OVERLOOK TRIP DISTRIBUTION AND TRIP ASSIGNMENT
The distribution of trips was based upon local travel patterns for the roadway network
surrounding the proposed site. Per the VDOT/County approved Scoping Agreement, Volkert,
Inc. utilized the trip distribution percentages shown in Figure 18 to assign the proposed The
Overlook development Phase 2 development trips (Table 6) throughout the study area roadway
network. Figure 19 shows the development-generated assignments for the weekday and
Saturday ADT, as well as the weekday AM/PM and Saturday mid-day peak hours.
2026 “DESIGN YEAR” BUILD-OUT CONDITIONS
The Phase 2 development assigned trips (Figure 18) were added to the 2026 background
traffic volumes (Figure 16) to obtain 2026 “Design Year” build-out conditions. Figure 20
shows the 2026 “Design Year” build-out weekday and Saturday ADT, as well as the weekday
AM/PM and Saturday mid-day peak hour traffic volumes, at key locations within the study area.
Figure 21 shows the corresponding build-out lane geometry and peak hour levels of service
results. All Synchro levels of service worksheets are included in the Appendix section of this
Report.
Volkert, Inc. has provided Table 8 to show the 2026 “Design Year” background and
build-out levels of service, vehicle delay and 95th percentile back of queue, by lane
group/approach, for each of the study area intersections.
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
SB RA
M
P
S
N
B
R
A
M
P
S
F
I
R
S
T
W
O
O
D
S
DR
16
15
14
13
12
11
9
10
7
6
5
2
4
1
2
3
4
5
3
16
8
SITE
2
1
X (Y)[Z]
1
1
[4](5
)
7
7
[1346
]
(
1
2
5
8
)
1
2
3
0
[217]
(
1
2
8
)
5
0
6
8
(
5
5
)
[
6
7
]
1
9
5
(
4
3
)
[
4
]
6
1
(
9
2
)
[
1
0
8
]
[
1
1
]
(
3
2
)
4
3
[
1
9
]
(
5
2
)
9
0
[
4
8
]
(
8
)
2
9
5
6
3 4
[31](36)39
[79](105)67
[130](204)12
2
100(
7
8
)
[
8
6
]
126(
9
2
)
[
5
3
]
87(1
2
0
)
[
6
9
]
40
(
7
4
)
[
3
2
]
10
9
(
1
8
4
)
[
8
6
]
46
(
1
0
8
)
[
1
1
4
]
[1
0
3
]
(
1
7
4
)
1
6
4
[6
6
]
(
1
4
9
)
1
6
0
[5
6
]
(
1
1
0
)
7
3
C
H
A
N
N
I
N
G
D
R
91(151)[76]
172(349)[361][57
]
(
8
6
)
1
3
1
[18
3
]
(
1
7
7
)
5
6
2
7
4
(
2
8
4
)
[
3
4
8
]
1
5
7
(
1
0
9
)
[
1
2
8
]
F
I
R
S
T
W
O
O
D
S
D
R
17
5
(
2
7
1
)
[
3
4
8
]
12
0
(
1
8
7
)
[
2
4
1
]
120(1
5
7
)
[
1
9
6
]
329(2
8
7
)
[
2
1
2
]
[400
]
(
3
2
9
)
1
7
0
[272]
(
3
5
3
)
1
6
2
CHA
N
N
I
N
G
D
R
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
[189](
1
6
6
)
1
4
2
[1068]
(
1
0
3
3
)
1
3
6
7
[68](5
9
)
5
2
98(1
2
3
)
[
1
4
7
]
49(7
4
)
[
9
8
]
353
(
3
3
0
)
[
2
7
9
]
[4
2
]
(
4
8
)
8
2
[9
8
]
(
7
4
)
4
9
[2
6
0
]
(
2
2
9
)
2
9
1
376(
3
1
5
)
[
2
6
7
]
910(
1
5
7
5
)
[
1
1
0
4
]
128(
3
6
3
)
[
2
7
1
]
SB R
A
M
P
S
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
N
B
R
A
M
P
S
14
7
(
1
9
6
)
[
2
4
5
]
10
(
3
6
)
[
3
4
]
34
3
(
2
9
4
)
[
2
4
5
]
122(
1
5
)
[
3
]
105
9
(
1
4
5
9
)
[
1
4
2
7
]
21(1
4
7
)
[
6
9
]
1
0
0
(
6
3
)
[
6
6
]
3
3
(
2
1
)
[
2
2
]
2
0
0
(
1
2
5
)
[
1
3
1
]
[24
5
]
(
1
9
6
)
1
4
7
[11
5
9
]
(
1
1
7
8
)
1
8
0
2
[20
2
]
(
2
1
9
)
6
2
34
3
(
2
9
4
)
[
2
4
5
]
10
6
8
(
1
9
3
2
)
[
1
2
6
5
]
31
(
1
0
9
)
[
1
0
1
]
87 9 10
9
8
10
7
2
1
B(B
)
[
B
]
[B](C
)
B
D
(
D
)
[
D
]
[
B
]
(
C
)
C
534
[C](C)C
B(B
)
[
B
]
A(
B
)
[
B
]
[A
]
(
B
)
A
C
H
A
N
N
I
N
G
D
R
A(A)[A]
[C]
(
C
)
D
F
I
R
S
T
W
O
O
D
S
D
R
A(
A
)
[
B
]
B(A)[
A
][C](
C
)
C
CHA
N
N
I
N
G
D
R
STOP
1
*
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
1
2
3
4
5
7
8
9
SB RA
M
P
S
N
B
R
A
M
P
S
6
N
B
R
A
M
P
S
B(D
)
[
C
]
[C](
C
)
C
[D
]
(
D
)
D
SB RA
M
P
S
C(D
)
[
C
]
[D
]
(
D
)
D
SITE
6
X (Y)[Z]
C(
D
)
[
C
]
D(D
)
[
D
]
D
(
C
)
[
C
]
[B
]
(
B
)
B
87 9 10
10
15%
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
SB RA
M
P
S
N
B
R
A
M
P
S
F
I
R
S
T
W
O
O
D
S
DR
S
I
T
E
-
D
R
I
V
E
#
1
S
I
T
E
-
D
R
I
V
E
#
2
S
I
T
E
-
D
R
I
V
E
#
3
10%
10%
10%
15%
30%
10%
SITE
S
I
T
E
-
D
R
I
V
E
#
4
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
F
I
R
S
T
W
O
O
D
S
DR
S
I
T
E
-
D
R
I
V
E
#
1
S
I
T
E
-
D
R
I
V
E
#
2
S
I
T
E
-
D
R
I
V
E
#
3
16
15
14
13
12
11
9
10
7
6
5
2
1
2
3
4
5
3
1
7
1
9
7
8
9
1
88
SITE
2
1
X (Y)[Z]
1
1
89(1
0
2
)
[
1
1
2
]
[124]
(
1
2
4
)
7
1
534
44(5
1
)
[
5
6
]
[6
2
]
(
6
2
)
3
6
C
H
A
N
N
I
N
G
D
R
44(51)[56]
59(68)[75][62
]
(
6
2
)
3
6
4
8
(
8
3
)
[
8
3
]
F
I
R
S
T
W
O
O
D
S
30
(
3
4
)
[
3
7
]
30
(
3
4
)
[
3
7
]
24(41)
[
4
1
]
[41](
4
1
)
2
4
CHA
N
N
I
N
G
D
R
59
(
1
0
3
)
[
1
0
3
]
[94](
8
5
)
7
4
[-47]
(
-
5
0
)
-
3
9
[212
]
(
2
1
6
)
1
3
4
1
VA
L
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
[1
9
7
]
(
1
8
6
)
1
5
8
[1
4
0
]
(
1
3
5
)
1
1
3
-39(
-
5
0
)
[
-
4
7
]
99(1
5
4
)
[
1
5
0
]
-X(-Y)[-Z]
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
SB RA
M
P
S
N
B
R
A
M
P
S
16
4
10
S
I
T
E
-
D
R
I
V
E
#
4
2
0
6
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
N
B
R
A
M
P
S
87 9
[118
]
(
1
0
7
)
8
6
[65]
(
5
3
)
8
2
[
2
7
2
]
(
2
6
9
)
1
8
9
[
1
2
0
]
(
1
2
0
)
7
1
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
2
205
(
2
8
0
)
[
2
8
9
]
27(8
9
)
[
7
3
]
[6](
7
)
2
[151
]
(
1
3
4
)
1
2
8
[
3
2
]
(
2
5
)
4
1
[
1
0
]
(
8
)
1
3
16(5
1
)
[
4
1
]
83(1
5
8
)
[
1
5
2
]
[23]
(
2
8
)
8
[126
]
(
1
1
6
)
9
0
[
3
1
]
(
2
5
)
4
1
[
2
0
]
(
1
6
)
2
5
10(3
7
)
[
2
9
]
85(1
3
0
)
[
1
3
4
]
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
3
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
1
10
[11]
(
1
4
)
4
[134
]
(
1
3
1
)
7
9
[
1
5
]
(
1
2
)
1
9
[
5
]
(
4
)
6
13(
3
1
)
[
2
8
]
97(
1
1
5
)
[
1
2
6
]
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
4
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
SB RA
M
P
S
N
B
R
A
M
P
S
F
I
R
S
T
W
O
O
D
S
DR
S
I
T
E
-
D
R
I
V
E
#
1
S
I
T
E
-
D
R
I
V
E
#
2
S
I
T
E
-
D
R
I
V
E
#
3
16
15
14
13
12
11
9
10
7
6
5
2
1
2
3
4
5
3
1
1
7
1
9
6
7
8
9
1
88
SITE
1
X (Y)[Z]
1
2
1
[4](5
)
7
7
[1470
]
(
1
3
8
2
)
1
3
0
2
[217]
(
1
2
8
)
5
0
6
8
(
5
5
)
[
6
7
]
1
9
5
(
4
3
)
[
4
]
6
1
(
9
2
)
[
1
0
8
]
[
1
1
]
(
3
2
)
4
3
[
1
9
]
(
5
2
)
9
0
[
4
8
]
(
8
)
2
9
5
6
3 4
[31](36)39
[79](105)67
[130](204)12
2
100(
7
8
)
[
8
6
]
126(
9
2
)
[
5
3
]
132(
1
7
1
)
[
1
2
5
]
40
(
7
4
)
[
3
2
]
10
9
(
1
8
4
)
[
8
6
]
46
(
1
0
8
)
[
1
1
4
]
[1
0
3
]
(
1
7
4
)
1
6
4
[6
6
]
(
1
4
9
)
1
6
0
[1
1
8
]
(
1
7
2
)
1
0
8
C
H
A
N
N
I
N
G
D
R
136(203)[132]
231(417)[436][11
9
]
(
1
4
8
)
1
6
7
[18
3
]
(
1
7
7
)
5
6
3
2
1
(
3
6
7
)
[
4
3
1
]
1
5
7
(
1
0
9
)
[
1
2
8
]
F
I
R
S
T
W
O
O
D
S
D
R
20
4
(
3
0
5
)
[
3
8
6
]
15
0
(
2
2
1
)
[
2
7
8
]
144(1
9
9
)
[
2
3
7
]
329(2
8
7
)
[
2
1
2
]
[441
]
(
3
7
0
)
1
9
4
[272]
(
3
5
3
)
1
6
2
CHA
N
N
I
N
G
D
R
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
[189](
1
6
6
)
1
4
2
[1021]
(
9
8
3
)
1
3
2
8
[239](
2
3
3
)
1
6
3
98(1
2
3
)
[
1
4
7
]
73(1
1
5
)
[
1
3
9
]
353
(
3
3
0
)
[
2
7
9
]
[2
0
1
]
(
2
0
0
)
2
1
0
[1
3
5
]
(
1
0
8
)
7
9
[4
0
1
]
(
3
6
4
)
4
0
4
376(
3
1
5
)
[
2
6
7
]
871(
1
5
2
5
)
[
1
0
5
7
]
227(
5
1
6
)
[
4
2
1
]
SB R
A
M
P
S
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
N
B
R
A
M
P
S
17
1
(
2
3
7
)
[
2
8
6
]
10
(
3
6
)
[
3
4
]
34
3
(
2
9
4
)
[
2
4
5
]
122(
1
5
)
[
3
]
114
8
(
1
5
6
1
)
[
1
5
3
9
]
21(1
4
7
)
[
6
9
]
1
0
0
(
6
3
)
[
6
6
]
3
3
(
2
1
)
[
2
2
]
2
0
0
(
1
2
5
)
[
1
3
1
]
[28
2
]
(
2
3
0
)
1
7
7
[12
1
6
]
(
1
2
2
9
)
1
8
4
6
[20
2
]
(
2
1
9
)
6
2
34
3
(
2
9
4
)
[
2
4
5
]
11
0
4
(
1
9
9
4
)
[
1
3
2
7
]
31
(
1
0
9
)
[
1
0
1
]
87 9
[118
]
(
1
0
7
)
8
6
[465
]
(
4
0
3
)
5
0
4
[
2
7
2
]
(
2
6
9
)
1
8
9
[
1
2
0
]
(
1
2
0
)
7
1
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
2
205
(
2
8
0
)
[
2
8
9
]
257
(
5
8
5
)
[
5
1
1
]
[6](
7
)
2
[552
]
(
4
8
5
)
5
5
0
[
3
2
]
(
2
5
)
4
1
[
1
0
]
(
8
)
1
3
16(5
1
)
[
4
1
]
313
(
6
5
3
)
[
5
9
0
]
[23]
(
2
8
)
8
[526
]
(
4
6
6
)
5
1
1
[
3
1
]
(
2
5
)
4
1
[
2
0
]
(
1
6
)
2
5
10(3
7
)
[
2
9
]
315
(
6
2
5
)
[
5
7
2
]
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
3
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
1
10
[11]
(
1
4
)
4
[534
]
(
4
8
2
)
5
0
0
[
1
5
]
(
1
2
)
1
9
[
5
]
(
4
)
6
13(
3
1
)
[
2
8
]
327
(
6
1
0
)
[
5
6
4
]
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
4
4
10
S
I
T
E
-
D
R
I
V
E
#
4
2
0
2
B(B
)
[
B
]
[B](C
)
B
D
(
D
)
[
D
]
[
B
]
(
C
)
C
534
[C](C)C
B(B
)
[
B
]
A(
B
)
[
B
]
[A
]
(
B
)
B
F
I
R
S
T
W
O
O
D
S
D
R
A(
B
)
[
B
]
B(A)[
A
][C](
C
)
C
CHA
N
N
I
N
G
D
R
STOP
1
*
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
S
I
T
E
-
D
R
I
V
E
#
1
S
I
T
E
-
D
R
I
V
E
#
2
S
I
T
E
-
D
R
I
V
E
#
3
[A](
A
)
A
[
D
]
(
D
)
D
*[A]
(
A
)
A
*
[
D
]
(
D
)
C
*[A]
(
A
)
A
*
[
D
]
(
D
)
C
1
2
3
4
5
7
8
9
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
2
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
3
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
1
SB RA
M
P
S
N
B
R
A
M
P
S
6
SITE
87 9
X (Y)[Z]
1
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
N
B
R
A
M
P
S
B(D
)
[
C
]
[C](
D
)
C
[D
]
(
D
)
D
SB RA
M
P
S
C(D
)
[
C
]
[D
]
(
D
)
D
6
C(
D
)
[
C
]
D(D
)
[
D
]
D
(
D
)
[
D
]
A(
A
)
[
A
]
C
H
A
N
N
I
N
G
D
R
A(A)[A]
[C]
(
C
)
D
[B
]
(
B
)
B
10
S
I
T
E
-
D
R
I
V
E
#
4
*[A
]
(
A
)
A
*
[
D
]
(
D
)
C
S
I
T
E
-
D
R
I
V
E
W
A
Y
#
4
10
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 38
EB/L D 55 s. 92 ft F 94 s. 156 ft D 47 s. 141 ft D 38 s. 68 ft F 131 s. 232 ft E 74 s. 170 ft
EB/T D 52 s. 962 ft B 12 s. 243 ft D 38 s. 490 ft E 55 s. 938 ft C 20 s. 507 ft C 24 s. 432 ft
EB/R A 5 s. 27 ft A 2 s. 30 ft B 12 s. 87 ft A 9 s. 17 ft A 2 s. 41 ft A 3 s. 37 ft
EB LOS
EB/WB: Route 7 WB/L D 54 s. 28 ft E 65 s. 84 ft D 54 s. 69 ft D 52 s. 28 ft E 77 s. 95 ft D 48 s. 59 ft
NB: Haggerty Connection WB/T C 25 s. 406 ft E 56 s. 1156 ft C 35 s. 559 ft C 27 s. 452 ft E 61 s. 1358 ft D 43 s. 582 ft
SB: Route 37 WB/R A3 s.48 ftA5 s.87 ftA4 s.55 ftA3 s.51 ftA7 s.110 ftA3 s.44 ft
WB LOS
Traffic Control: Signalization NB/L E 71 s. 281 ft F 101 s. 238 ft E 78 s. 204 ft E 70 s. 281 ft F 109 s. 262 ft E 77 s. 188 ft
NB/T D 42 s. 54 ft D 53 s. 46 ft D 39 s. 39 ft D 44 s. 55 ft E 62 s. 51 ft C 32 s. 33 ft
NB/R B 18 s. 70 ft B 15 s. 46 ft B 11 s. 40 ft B 15 s. 61 ft B 17 s. 49 ft A 10 s. 36 ft
NB LOS
SB/L E 65 s. 222 ft F 98 s. 240 ft E 58 s. 140 ft E 64 s. 210 ft F 94 s. 255 ft D 51 s. 129 ft
SB/T D 44 s. 25 ft D 53 s. 68 ft D 39 s. 53 ft D 44 s. 25 ft E 62 s. 75 ft C 32 s. 45 ft
SB/R B 14 s. 71 ft D 37 s. 179 ft C 21 s. 148 ft B 14 s. 71 ft E 59 s. 299 ft C 30 s. 213 ft
SB LOS
OVERALL
EB/L D 52 s. 87 ft E 75 s. 126 ft E 62 s. 115 ft E 58 s. 91 ft E 71 s. 131 ft E 58 s. 113 ft
EB/T D 52 s. 722 ft D 41 s. 511 ft D 37 s. 471 ft D 51 s. 701 ft D 46 s. 510 ft D 44 s. 518 ft
EB/R A7 s.29 ftA7 s.32 ftA5 s.28 ftA6 s.57 ftA5 s.60 ftA5 s.60 ft
EB LOS
EB/WB: Route 7 WB/L E 60 s. 84 ft E 57 s. 153 ft E 65 s. 122 ft E 78 s. 150 ft D 48 s. 267 ft E 58 s. 236 ft
NB: Valley Mill Road WB/T C 30 s. 398 ft D 40 s. 586 ft D 42 s. 422 ft C 30 s. 317 ft D 43 s. 785 ft C 31 s. 447 ft
SB: Route 37 WB/R A 4 s. 61 ft B 13 s. 101 ft B 11 s. 79 ft A 9 s. 108 ft A 5 s. 81 ft A 3 s. 49 ft
WB LOS
Traffic Control: Signalization NB/L E 71 s. 135 ft E 72 s. 88 ft E 63 s. 72 ft D 55 s. 246 ft E 73 s. 262 ft E 61 s. 252 ft
NB/T D 37 s. 66 ft D 54 s. 115 ft D 40 s. 119 ft D 41 s. 104 ft D 51 s. 138 ft D 43 s. 166 ft
NB/R C 32 s. 222 ft B 12 s. 81 ft B 13 s. 115 ft E 55 s. 402 ft C 26 s. 212 ft C 25 s. 229 ft
NB LOS
SB/L E 66 s. 219 ft E 74 s. 232 ft E 58 s. 157 ft E 66 s. 219 ft D 51 s. 175 ft E 69 s. 184 ft
SB/T C 32 s. 62 ft D 45 s. 106 ft C 33 s. 109 ft D 46 s. 99 ft D 55 s. 149 ft D 53 s. 174 ft
SB/R A 7 s. 42 ft A 9 s. 55 ft A 7 s. 52 ft B 11 s. 50 ft B 12 s. 56 ft B 11 s. 60 ft
SB LOS
OVERALL
EB/L D 53 s. 103 ft D 43 s. 16 ft D 43 s. 13 ft D 51 s. 115 ft D 43 s. 16 ft D 43 s. 13 ft
EB/T C 22 s. 430 ft C 21 s. 402 ft B 17 s. 448 ft B 14 s. 380 ft C 24 s. 473 ft B 17 s. 443 ft
EB/R A7 s.28 ftA6 s.45 ftA5 s.57 ftA5 s.21 ftA6 s.47 ftA5 s.57 ft
EB LOS
EB/WB: Route 7 WB/L D 50 s. 38 ft D 51 s. 167 ft D 47 s. 86 ft D 39 s. 36 ft D 53 s. 167 ft D 47 s. 86 ft
NB: Greenwood Road WB/T C 26 s. 374 ft B 11 s. 394 ft B 10 s. 407 ft B 16 s. 301 ft B 12 s. 450 ft B 10 s. 407 ft
SB: First Woods Drive WB/R A4 s.32 ftA3 s.7 ftA3 s.3 ftA2 s.23 ftA3 s.7 ftA3 s.3 ft
WB LOS
Traffic Control: Signalization NB/LTR C 27 s. 258 ft D 40 s. 202 ft D 41 s. 194 ft D 48 s. 386 ft D 42 s. 202 ft D 41 s. 194 ft
NB LOS
SB/LT C 22 s. 109 ft C 33 s. 91 ft C 32 s. 42 ft C 33 s. 138 ft C 34 s. 91 ft C 32 s. 42 ft
SB/R A 8 s. 19 ft B 16 s. 13 ft B 11 s. 31 ft B 11 s. 23 ft B 16 s. 13 ft B 11 s. 31 ft
SB LOS
OVERALL
EB/L C 27 s. 42 ft C 25 s. 41 ft C 26 s. 35 ft C 29 s. 43 ft C 26 s. 41 ft C 26 s. 35 ft
EB/TR C 20 s. 97 ft C 30 s. 201 ft C 24 s. 119 ft C 22 s. 100 ft C 32 s. 201 ft C 24 s. 119 ft
EB LOS
WB/L B 17 s. 54 ft B 20 s. 75 ft B 18 s. 72 ft B 18 s. 75 ft C 23 s. 103 ft B 18 s. 72 ft
EB/WB: Valley Mill Road WB/TR B 14 s. 102 ft B 11 s. 78 ft A 7 s. 48 ft B 13 s. 101 ft B 11 s. 78 ft A 7 s. 48 ft
NB/SB: Greenwood Road WB LOS
NB/L B 11 s. 89 ft B 17 s. 137 ft B 11 s. 63 ft B 12 s. 95 ft B 18 s. 138 ft B 11 s. 63 ft
Traffic Control: Signalization NB/TR A 9 s. 103 ft B 12 s. 149 ft A 6 s. 61 ft A 10 s. 125 ft B 13 s. 180 ft A 6 s. 60 ft
NB LOS
SB/L A 9 s. 30 ft B 15 s. 84 ft B 12 s. 70 ft B 10 s. 32 ft B 16 s. 87 ft B 12 s. 70 ft
SB/TR A 8 s. 67 ft B 13 s. 157 ft A 9 s. 59 ft A 9 s. 71 ft B 13 s. 157 ft A 9 s. 59 ft
SB LOS
OVERALL
WB/L A 5 s. 61 ft A 5 s. 115 ft A 7 s. 168 ft A 7 s. 98 ft A 7 s. 169 ft A 7 s. 167 ft
WB/R A2 s.16 ftA1 s.18 ftA2 s.22 ftA2 s.22 ftA2 s.26 ftA2 s.22 ft
WB: Valley Mill Road WB LOS
NB: Channing Drive NB/T C 28 s. 118 ft C 28 s. 89 ft C 27 s. 98 ft C 26 s. 116 ft C 26 s. 88 ft C 27 s. 98 ft
SB: Valley Mill Road NB/R A7 s.55 ftA8 s.59 ftA8 s.69 ftA6 s.57 ftA8 s.63 ftA9 s.68 ft
NB LOS
Traffic Control: Signalization SB/L D 43 s. 115 ft C 31 s. 78 ft D 37 s. 105 ft D 45 s. 144 ft D 38 s. 125 ft D 36 s. 101 ft
SB/T C 23 s. 50 ft C 33 s. 137 ft C 31 s. 136 ft C 22 s. 49 ft C 30 s. 136 ft C 31 s. 136 ft
SB LOS
OVERALL
EB/L D 50 s. 139 ft C 32 s. 205 ft C 32 s. 316 ft D 52 s. 158 ft C 31 s. 238 ft C 32 s. 311 ft
EB/T B 14 s. 75 ft B 12 s. 137 ft B 10 s. 111 ft B 13 s. 74 ft B 11 s. 133 ft B 10 s. 111 ft
EB LOS
EB/WB: Senseny Road WB/T B 20 s. 154 ft B 11 s. 109 ft A 10 s. 86 ft B 18 s. 151 ft A 10 s. 105 ft A 10 s. 86 ft
SB: Channing Drive WB/R A4 s.26 ftA2 s.22 ftA2 s.27 ftA3 s.27 ftA2 s.22 ftA2 s.27 ft
WB LOS
Traffic Control: Signalization SB/L A 8 s. 54 ft B 17 s. 139 ft C 24 s. 240 ft A 10 s. 73 ft C 22 s. 192 ft C 24 s. 239 ft
SB/R A2 s.29 ftA4 s.54 ftA5 s.68 ftA3 s.33 ftA5 s.64 ftA5 s.68 ft
SB LOS
OVERALL
EB = Eastbound, WB =Westbound, NB = Northbound, SB = Southbound, L: Left, T:Thru, R: Right
DDDDDD
DDDDDD
DCCDDD
CDDCDC
DDDDDD
DDDDDD
DED
DEDDED
C
BDCCD
DE
B
A
2026 Background Conditions
B
C
2026 "Design Year" Build-out Conditions
D
A
B
A
B
A
B
B
B
AA
BB
BB
C
BA
BB
B
DC
CB
AA
BB
AB
AB
Saturday Peak Hour
LOS Delay
(in sec)
Queue
(in feet)
BB
Saturday Peak Hour
LOS Delay
(in sec)
D
D
B
B
C
D
B
B
C
D
C
Queue
(in feet)
D
LOS
C
B
C
CDC
D
CC
B B
C
C
CD
BC
Queue
(in feet)
Intersection
AM Peak Hour PM Peak Hour PM Peak Hour
Delay
(in sec)
Delay
(in sec)
Queue
(in feet)LOS Delay
(in sec)
B
B
AM Peak Hour
LOS Queue
(in feet)
Delay
(in sec)
D
BB
B
B
A
B
B
AA
BB
AB
C
B
C
BC
BB
CC
B
C C
D
BB
C
Table 8
The Overlook
Levels of Service, Delay and Back of Queue (95%) Results
2026 "Design Year" Background and Build-out Conditions
C
BB
AB
B B
LOS Queue
(in feet)
C
B
B
A
B
C
B
A
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 39
EB/L D 55 s. 205 ft D 53 s. 271 ft D 52 s. 271 ft
EB/R A 10 s. 39 ft A 7 s. 42 ft A 7 s. 44 ft
EB: Site-Driveway #1 EB LOS
NB/SB: Valley Mill Road NB/L A 5 s. 39 ft A 9 s. 71 ft A 9 s. 75 ft
NB/T A 6 s. 221 ft A 8 s. 205 ft A 9 s. 250 ft
Traffic Control: Signalization NB LOS
SB/T A 3 s. 13 ft A 6 s. 96 ft A 5 s. 89 ft
SB/R A1 s.6 ftA1 s.2 ftA1 s.3 ft
SB LOS
OVERALL
EB/L C 20 s. 14 ft D 32 s. 15 ft D 33 s. 20 ft
EB/R B10 s.2 ft B14 s.2 ft B13 s.2 ft
EB: Site-Driveway #2 EB LOS
NB/SB: Valley Mill Road NB/L A 8 s. 0 ft A 10 s. 1 ft A 9 s. 1 ft
NB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
Traffic Control: Stop Sign NB LOS
SB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB LOS
OVERALL
EB/L C 20 s. 14 ft D 32 s. 15 ft D 32 s. 19 ft
EB/R B10 s.3 ft B13 s.3 ft B13 s.4 ft
EB: Site-Driveway #3 EB LOS
NB/SB: Valley Mill Road NB/L A 8 s. 1 ft A 10 s. 3 ft A 9 s. 2 ft
NB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
Traffic Control: Stop Sign NB LOS
SB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB LOS
OVERALL
EB/L C 18 s. 6 ft D 26 s. 6 ft D 26 s. 7 ft
EB/R B10 s.1 ft B13 s.1 ft B13 s.1 ft
EB: Site-Driveway #4 EB LOS
NB/SB: Valley Mill Road NB/L A8 s.0 ftA9 s.1 ftA9 s.1 ft
NB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
Traffic Control: Stop Sign NB LOS
SB/T N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB/R N/A N/A N/A N/A N/A N/A N/A N/A N/A
SB LOS
OVERALL
EB = Eastbound, WB =Westbound, NB = Northbound, SB = Southbound, L: Left, T:Thru, R: Right
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
N/AN/AN/A
2026 Background Conditions
The Overlook
Levels of Service, Delay and Back of Queue (95%) Results
2026 "Design Year" Background and Build-out Conditions
Table 8 (Continued)
B
DD
A
A
A
N/A
N/A
2026 "Design Year" Build-out Conditions
N/A
N/A
D
A
A
N/A N/A
N/A N/A
N/A
N/A N/A
N/A
N/A
B
Saturday Peak Hour
LOS Delay
(in sec)
Queue
(in feet)
B
Queue
(in feet)
N/A N/A
A
N/A N/A
N/A N/A
Saturday Peak Hour
LOS Delay
(in sec)
Queue
(in feet)
Queue
(in feet)LOS
AM Peak Hour PM Peak Hour
Delay
(in sec)
AM Peak Hour PM Peak Hour
Queue
(in feet)LOS Delay
(in sec)
Queue
(in feet)LOS Delay
(in sec)
Delay
(in sec)
Intersection
N/A N/A
LOS
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 40
CONCLUSION
Each of the study area intersections were evaluated using Synchro 7.0 capacity analysis
software. The following describes the results for the future Phase 1, Phase 2 and “Design Year”
build-out traffic conditions analyzed in this Study:
PHASE 1 (2015):
1. Route 7 & Haggerty Connection Road: Signalized capacity analyses revealed
overall levels of service of “C” or better during the weekday AM/PM and Saturday
midday peak hours. All lane groups maintain levels of service of “D” or better. This
intersection would be implemented in conjunction with the build-out the Haggerty
Development The Study assumes an eastbound right-turn lane, a westbound left-turn
lane, a northbound left-turn lane and a northbound right-turn lane.
2. Route 7 & Realigned Valley Mill Road: Signalized capacity analyses revealed
overall levels of service of “B” or better during the weekday AM/PM and Saturday
midday peak hours. All lane groups maintain levels of service of “D” or better. This
intersection would relocate to the west from its current location along Route 7. The
Study assumes an eastbound right-turn lane, a westbound left-turn lane, a northbound
left-turn lane and a northbound right-turn lane.
3. US Route 7 & Greenwood Road: Signalized capacity analyses revealed overall
levels of service of “B” or better during the weekday AM/PM and Saturday midday
peak hours. All the approaches maintain levels of service of “C” or better. Volkert,
Inc. does not recommend improvements for this intersection.
4. Greenwood Road & Valley Mill Road: Signalized capacity analyses revealed overall
levels of service of “B” or better during the weekday AM/PM and Saturday midday
peak hours. All the approaches maintain levels of service of “C” or better. Volkert,
Inc. does not recommend improvements for this intersection.
5. Valley Mill Road & Channing Drive: Unsignalized analyses revealed lane group
levels of service of “C” or better during the weekday AM/PM and Saturday midday
peak hours. Volkert, Inc. does not recommend improvements for this intersection.
6. Senseny Road & Channing Drive: Signalized capacity analyses revealed overall
levels of service of “B” or better during the weekday AM/PM and Saturday midday
peak hours. All lane groups maintain levels of service of “C” or better. Volkert, Inc.
does not recommend improvements for this intersection.
7. Valley Mill Road & Site-driveway #1: Unsignalized capacity analyses revealed lane
group levels of service of “C” or better during the weekday AM/PM and Saturday
midday peak hours. Volkert, Inc. does not recommend improvements for this
intersection.
8. Valley Mill Road & Site-driveway #2: Unsignalized capacity analyses revealed lane
group levels of service of “C” or better during the weekday AM/PM and Saturday
midday peak hours. Volkert, Inc. does not recommend improvements for this
intersection.
9. Valley Mill Road & Site-driveway #3: Unsignalized capacity analyses revealed lane
group levels of service of “C” or better during the weekday AM/PM and Saturday
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 41
midday peak hours. Volkert, Inc. does not recommend improvements for this
intersection.
10. Valley Mill Road & Site-driveway #4: Unsignalized capacity analyses revealed lane
group levels of service of “C” or better during the weekday AM/PM and Saturday
midday peak hours. Volkert, Inc. does not recommend improvements for this
intersection.
PHASE 2 (2020):
1. Route 7 & Haggerty Connection Road: Signalized capacity analyses revealed
overall levels of service of “B” or better during the weekday AM/PM and Saturday
midday peak hours. All approaches maintain levels of service of “C” or better. This
intersection would be implemented in conjunction with the build-out the Haggerty
Development The Study assumes an eastbound right-turn lane, a westbound left-turn
lane, a northbound left-turn lane and a northbound right-turn lane.
2. Route 7 & Realigned Valley Mill Road: Signalized capacity analyses revealed
overall levels of service of “C” or better during the weekday AM/PM and Saturday
midday peak hours. All approaches maintain levels of service of “C” or better. This
intersection would relocate to the west from its current location along Route 7. The
Study assumes an eastbound right-turn lane, a westbound left-turn lane, a northbound
left-turn lane and a northbound right-turn lane.
3. US Route 7 & Greenwood Road: Signalized capacity analyses revealed overall
levels of service of “C” or better during the weekday AM/PM and Saturday midday
peak hours. All approaches maintain levels of service of “D” or better. Volkert, Inc.
does not recommend improvements for this intersection.
4. Greenwood Road & Valley Mill Road: Signalized capacity analyses revealed overall
levels of service of “B” or better during the weekday AM/PM and Saturday midday
peak hours. All approaches maintain levels of service of “C” or better. Volkert, Inc.
does not recommend improvements for this intersection.
5. Valley Mill Road & Channing Drive: Unsignalized analyses revealed lane group
levels of service of “D” or better during the weekday AM/PM and Saturday midday
peak hours. Volkert, Inc. does not recommend improvements for this intersection.
6. Senseny Road & Channing Drive: Signalized capacity analyses revealed overall
levels of service of “B” or better during the weekday AM/PM and Saturday midday
peak hours. All approaches maintain levels of service of “C” or better. Volkert, Inc.
does not recommend improvements for this intersection.
7. Valley Mill Road & Site-driveway #1: Signalized capacity analyses revealed overall
levels of service of “B” or better during the weekday AM/PM and Saturday midday
peak hours. All approaches maintain levels of service of “C” or better. Volkert, Inc.
does not recommend improvements for this intersection.
8. Valley Mill Road & Site-driveway #2: Unsignalized capacity analyses revealed lane
group levels of service of “C” or better during the weekday AM/PM and Saturday
midday peak hours. Volkert, Inc. does not recommend improvements for this
intersection.
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 42
9. Valley Mill Road & Site-driveway #3: Unsignalized capacity analyses revealed lane
group levels of service of “C” or better during the weekday AM/PM and Saturday
midday peak hours. Volkert, Inc. does not recommend improvements for this
intersection.
10. Valley Mill Road & Site-driveway #4: Unsignalized capacity analyses revealed lane
group levels of service of “C” or better during the weekday AM/PM and Saturday
midday peak hours. Volkert, Inc. does not recommend improvements for this
intersection.
“Design Year” (2026):
1. Route 7 & Haggerty Connection Road/Route 37 NB Ramps: Signalized capacity
analyses revealed overall levels of service of “D” or better during the weekday
AM/PM and Saturday midday peak hours. All approaches, except the north and
south approaches in PM peak hour, maintain levels of service of “D” or better. The
aforementioned two approaches maintain LOS “E”. This intersection would be
implemented in conjunction with the build-out the Haggerty Development as well as
the completion of Route 37 through to Route 7. The Study assumes dual eastbound
left-turn lanes, an eastbound right-turn lane, dual westbound left-turn lanes, a
westbound right-turn lane, a northbound left-turn lane, a northbound thru lane, a
northbound right-turn lane, dual southbound left-turn lanes, a southbound thru lane
and a southbound right-turn lane.
2. Route 7 & Realigned Valley Mill Road/Route 37 SB Ramps: Signalized capacity
analyses revealed overall levels of service of “D” or better during the weekday
AM/PM and Saturday midday peak hours. All approaches also maintain levels of
service of “D” or better. This intersection would relocate to the west from its current
location along Route 7. As a result of the completion of Route 37 through to Route
7, the Study assumes dual eastbound left-turn lanes, an eastbound right-turn lane,
dual westbound left-turn lanes, a westbound right-turn lane, a northbound left-turn
lanes, a northbound thru lane, a northbound right-turn lane, dual southbound left-
turn lanes, a southbound thru lane and a southbound right-turn lane.
3. US Route 7 & Greenwood Road: Signalized capacity analyses revealed overall
levels of service of “C” or better during the weekday AM/PM and Saturday midday
peak hours. All approaches maintain levels of service of “D” or better. Volkert, Inc.
does not recommend improvements for this intersection.
4. Greenwood Road & Valley Mill Road: Signalized capacity analyses revealed
overall levels of service of “B” or better during the weekday AM/PM and Saturday
midday peak hours. All approaches maintain levels of service of “C” or better.
Volkert, Inc. does not recommend improvements for this intersection.
5. Valley Mill Road & Channing Drive: Signalized capacity analyses revealed overall
levels of service of “B” or better during the weekday AM/PM and Saturday midday
peak hours. All approaches maintain levels of service of “C” or better. Volkert, Inc.
recommends traffic signalization during 2026 “Design Year” conditions.
6. Senseny Road & Channing Drive: Signalized capacity analyses revealed overall
levels of service of “B” or better during the weekday AM/PM and Saturday midday
The Overlook – Revised Traffic Impact Study
June 5, 2013
Page 43
peak hours. All approaches maintain levels of service of “D” or better. Volkert,
Inc. does not recommend improvements for this intersection.
7. Valley Mill Road & Site-driveway #1: Signalized capacity analyses revealed overall
levels of service of “B” or better during the weekday AM/PM and Saturday midday
peak hours. All approaches maintain levels of service of “D” or better. Volkert, Inc.
does not recommend improvements for this intersection.
8. Valley Mill Road & Site-driveway #2: Unsignalized capacity analyses revealed lane
group levels of service of “D” or better during the weekday AM/PM & Saturday
midday peak hours. Volkert, Inc. does not recommend improvements for this
intersection.
9. Valley Mill Road & Site-driveway #3: Unsignalized capacity analyses revealed lane
group levels of service of “D” or better during the weekday AM/PM and Saturday
midday peak hours. Volkert, Inc. does not recommend improvements for this
intersection.
10. Valley Mill Road & Site-driveway #4: Unsignalized capacity analyses revealed lane
group levels of service of “D” or better during the weekday AM/PM and Saturday
midday peak hours. Volkert, Inc. does not recommend improvements for this
intersection.
SITE ACCESS AND ACCESS MANAGEMENT
To minimize the traffic impacts associated with the proposed development and to maintain
satisfactory traffic flow, four (4) site-driveways are proposed to the west of Relocated Valley
Mill Road. The northernmost driveway (#1) will provide sole access to the retail development.
The remaining three driveways will provide access to residential development only. All the
driveways are stop controlled during Phase 1 traffic condition. Driveway #1 is proposed to be
signalized to coincide with the build-out of Phase 2. Based on Table 2-2 of VDOT Road Design
Manual – Appendix F, all the proposed site-driveways maintain satisfactory spacing as described
below.
Site-driveway #1 maintain approximately 660 feet from the signalized intersection of Route
7 & Valley Mill Road, which satisfies the minimum spacing requirement of 660 feet between
signalized intersections for Collector with speed at or below 45 mph.
Distance between each of the site-driveways range from 660 feet to 775 feet, which satisfy
the minimum spacing requirement of 440 feet between unsignalized intersections for
Collector with speed limit at or below 45 mph.
PEDESTRIAN AND BICYCLE ACCOMODATIONS
The Overlook Proffer Statement provides for the development of a 10-foot hard surfaced bicycle
and pedestrian facility for this project. The proffered Generalized Development Plan identifies
the location of this facility along the northwestern side of the relocated Valley Mill Road
between the lower residential land bay and the commercial land bay, then through the
commercial land bay to connect to the adjoining mobile home park. Therefore, this project
accommodates pedestrian and bicycle needs through the limits of the project.
APPENDIX
Synchro Data
(Provided on CD)
Background Development Location Map
Figure A
Red-Bud
Run
Lynnhaven
Fieldstone
Development
Sovereign
Village
Haggerty
Property
Opequon
Crossing
Twin
Lakes
PROPOSED
SITE
Background Developments: Trip Distribution
Figures A1-A7
25%
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
75%SITE
40%
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
60%
SITE
20%
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
20%
40%
20%
SITE
30%
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
10%
30%
30%
SITE
20%
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
20%
40%
20%
SITE
40%
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
60%
SITE
40%
CH
A
N
N
I
N
G
D
R
SENS
E
N
Y
R
D
VALLEY MILL
RD
BERR
Y
V
I
L
L
E
P
I
K
E
VAL
L
E
Y
M
I
L
L
R
D
(RE
L
O
C
A
T
E
D
)
GR
E
E
N
W
O
O
D
R
D
HA
G
G
E
R
T
Y
CO
N
N
E
C
T
I
O
N
F
I
R
S
T
W
O
O
D
S
DR
60%
SITE
Scoping Documents
It is important for the applicant to provide sufficient information to the county and VDOT staff so that questions
regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting.
PRE-SCOPE OF WORK MEETING FORM
Information on the Project and the
Traffic Impact Analysis Base Assumptions
The applicant is responsible for entering the relevant information and submitting the form to VDOT and the
locality no less than three (3) business days prior to the meeting. If a form is not received by this deadline,
the scope of work meeting may be postponed.
Contact Information
Consultant Name:
Tele:
E-mail:
Michael Glickman, PE, PTOE
(540) 421-5685
Michael.Glickman@volkert.com
Developer/Owner Name:
Telephone:
E-mail:
Tim Stafford – 1494 Valley Mill Road, Winchester, VA 22602
Project Information
Project Name: The Overlook Locality/County: Frederick County
Project Location:
(Attach regional and site
specific location map)
The project is located along the south side of Route 7, west of Valley Mill Road, in
Frederick County, Virginia. A location map is Attached.
Submission Type: Comp Plan Rezoning Site Plan Subd Plat
Project Description:
(Including details on the land
use, acreage, phasing, access
location, etc. Attach additional
sheet if necessary)
Total Site Area is 28.4 Acres. Conceptual Plan is attached.
Proposed Use(s):
(Check all that apply; attach
additional pages as needed)
Residential Commercial Mixed Use Other
Residential Use(s) 270 Units
Single Family Detached
Commercial Use(s): 35,800 SF
21,800 SF General Retail
7,400 SF H-T Restaurant
16 Pump Gas Station/Convenience Mt.
(will assume 2,000 SF Fast Food)
4,100 SF Drive-in Bank
Square Feet or Other Variable:
1._ _________ 2.___________
3.___________ 4.__________
Other Uses:
ITE LU Code(s):
1. __________ 2. __________
3.___________ 4.__________
Independent Variable(s):
1.___________ 2. __________
Total Peak Hour Trip
Projection Less than 100 100 - 499 500 - 999 1,000 or more
It is important for the applicant to provide sufficient information to the county and VDOT staff so that questions
regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting.
Traffic Impact Analysis Assumptions
Study Period Existing Year: _2012_ Build-out Year: 2020 (Phased) Design Year: 2026
Study Area Boundaries
(Attach map)
North: Route 7 South: Senseny Road
East: Valley Mill Road West: Greenwood Road
External Factors That
Could Affect Project
(Planned road improvements,
other nearby developments)
Route 7-Senseny Road Connection
Connection between Valley Mill Road and Haggerty/ Opequon
Crossing
Route 37/Route 7 Interchange – Assume 500 vph/ramp
Consistency With
Comprehensive Plan
(Land Use, Transportation Plan)
Land Use – Yes, Transportation Plan - Yes
Available Traffic Data
(Historical, forecasts) VDOT Historical Count Data
Trip Distribution
(Attach Sketch)
Road Name: Route 7 (E) 25% Road Name: Route 7 (W) 40%
Road Name: Senseny Rd (E) 10% Road Name: Senseny Rd (W) 10%
Road Name: Greenwood Rd (S) 15% Road Name:
Annual Vehicle Trip
Growth Rate:
0.25% from Year
2009 (count date)
to Year 2012
(current year),
0.5% from Year
2012 to Year 2020
and Year 2026
Peak Period for Study AM PM SAT
Peak Hour of the Generator (7-9) (4-6) (11-1)
Study Intersections
and/or Road Segments
(Attach additional sheets as
necessary)
1a. Route 7/Valley Mill Road 1b. Route 7 Valley Mill Road
Relocated/Route 37
2. Route 7/Greenwood Road 6. Route 7/Haggerty Connection/Route
37
3. Greenwood Road/Valley Mill Road
4. Valley Mill Road/Channing Drive
5. Channing Drive/Senseny Road
Trip Adjustment
Factors
Internal allowance: Yes No
Reduction: __15___% trips
Pass-by allowance: Yes No
Reduction: 40% gas station, 15% Retail
Software Methodology Synchro HCS (v.2000/+) aaSIDRA CORSIM Other ________
It is important for the applicant to provide sufficient information to the county and VDOT staff so that questions
regarding geographic scope, alternate methodology, or other issues can be answered at the scoping meeting.
Traffic Signal Proposed
or Affected
Analysis software to be used,
progression speed, cycle length
Route 7 & Realigned Valley Mill Road
Route 7 & Senseny Road Connection
Improvement(s)
Assumed or to be
Considered
Realignment of Valley Mill Road
Background Traffic
Studies Considered
Haggerty, Opequon Crossing, Fieldstone, Twin Lakes (Phase 10), Sovereign
Village, Lynnhaven, Red Bud.
Plan Submission Master Development Plan (MDP) Generalized Development Plan (GDP)
Preliminary/Sketch Plan Other Plan type (Final Site, Subd. Plan)
Additional Issues to be
addressed
Queuing analysis Actuation/Coordination Weaving analysis
Merge analysis Bike/Ped Accommodations Intersection(s)
TDM Measures Other _____________
NOTES on ASSUMPTIONS:
Phase 1 – 2015
Phase 2 – 2020
- Assume approx. 500 vph/ramp.
- Assume 0.25% growth from count year (2009) to current year (2012) in order to
establish existing year 2012 traffic condition.
- Preliminary design on Route 37 ramp assuming 50-55 design speed.
- Reassignment of Existing Valley Mill Road traffic.
- Reassign Greenwood Road traffic to new intersection of Route 7/Valley Mill Road.
SIGNED: _________________________________ DATE: 9/14/2012
Applicant or Consultant
PRINT NAME: _ Michael Glickman, PE, PTOE_____
Applicant or Consultant
It is important for the applicant to provide sufficient information to the county and VDOT
staff so that questions regarding geographic scope, alternate methodology, or other issues can
be answered at the scoping meeting.
ITE
Code Land Use Amount In Out Total In Out Total ADT In Out Total ADT
210 Single-Family Detached 270 units 52 149 201 164 92 256 2700 132 117 250 2720
820 Retail 21,800 SF 38 24 63 110 119 229 2,523 166 153 318 3,539
853 Convenience Mart w\pumps 16 pumps 136 136 272 160 160 320 8,682 82 78 160 3,272
912 Drive-in Bank 4,100 SF 39 32 71 56 54 109 607 57 52 109 354
932 H-T Restaurant 7,400 SF 52 48 100 74 63 137 941 55 49 104 1172
933 Fast Food w/out DT 2,000 SF 66 61 127 58 55 113 1432 53 56 109 1392
(located inside Conv. Mart)
Total 384 451 835 621 543 1,165 16,885 545 505 1,050 12,449
ITE
Code Land Use Amount In Out Total In Out Total ADT In Out Total ADT
210 Single-Family Detached 270 units 50 149 199 162 95 257 2700 132 117 250 2720
820 Retail 21,800 SF 38 24 63 110 119 229 2,523 166 153 318 3,539
853 Convenience Mart w\pumps 16 pumps 133 133 265 153 153 305 8,682 82 78 160 3,272
912 Drive-in Bank 4,100 SF 28 22 51 53 53 106 607 57 52 109 354
932 H-T Restaurant 7,400 SF 44 41 85 49 34 83 941 55 49 104 1172
933 Fast Food w/out DT 2,000 SF 53 35 88 27 26 52 1432 53 56 109 1392
(located inside Conv. Mart)
Total 346 404 750 553 479 1,032 16,885 545 505 1,050 12,449
Table 1B: Peak Hour of Adjacent Street, Per Chapter 527
Proposed Development: The Overlook
Phase 2 Trip Generation Summary
AM Peak Hour PM Peak Hour Sat Peak Hour
Table 1A: Peak Hour of Generator, Per Chapter 527
Proposed Development: The Overlook
Phase 2 Trip Generation Summary
AM Peak Hour PM Peak Hour Sat Peak Hour
It is important for the applicant to provide sufficient information to the county and VDOT
staff so that questions regarding geographic scope, alternate methodology, or other issues can
be answered at the scoping meeting.
It is important for the applicant to provide sufficient information to the county and VDOT
staff so that questions regarding geographic scope, alternate methodology, or other issues can
be answered at the scoping meeting.
It is important for the applicant to provide sufficient information to the county and VDOT
staff so that questions regarding geographic scope, alternate methodology, or other issues can
be answered at the scoping meeting.
It is important for the applicant to provide sufficient information to the county and VDOT
staff so that questions regarding geographic scope, alternate methodology, or other issues can
be answered at the scoping meeting.
It is important for the applicant to provide sufficient information to the county and VDOT
staff so that questions regarding geographic scope, alternate methodology, or other issues can
be answered at the scoping meeting.
SCOPE OF WORK MEETING
ADDITIONS TO THE REQUIRED ELEMENTS, CHANGES TO THE METHODOLOGY
OR STANDARD ASSUMPTIONS, AND SIGNATURE PAGE
Any additions to the Required Elements or changes to the Methodology or Standard Assumptions
due to special circumstances that are approved by VDOT:
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
AGREED: _________________________________ DATE: _________________
Applicant or Consultant
PRINT NAME: _____________________________
Applicant or Consultant
SIGNED: __________________________________ DATE: ______________
VDOT Representative
PRINT NAME: _____________________________
VDOT Representative
SIGNED: __________________________________ DATE: ______________
Local Government Representative
PRINT NAME: _____________________________
Local Government Representative
Traffic Counts
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
File Name : ChanningDrive_SensenyRd_AM
Site Code : 00000000
Start Date : 12/3/2009
Page No : 1
Groups Printed- Unshifted - Bank 1
Senseny Road
Eastbound
Senseny Road
Westbound
Channing Drive
Northbound
Channing Drive
Southbound
Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total
07:00 AM 6 30 0 0 44 4 0 0 0 1 0 15 100
07:15 AM 6 40 0 0 86 3 0 0 0 3 0 7 145
07:30 AM 7 39 0 0 81 11 0 0 0 5 0 22 165
07:45 AM 13 43 0 0 77 2 0 0 0 0 0 18 153
Total 32 152 0 0 288 20 0 0 0 9 0 62 563
08:00 AM 21 28 0 0 60 1 0 0 0 3 0 13 126
08:15 AM 13 25 0 0 57 2 0 0 0 3 0 12 112
08:30 AM 27 22 0 0 69 4 0 0 0 2 0 11 135
08:45 AM 17 30 0 0 64 10 0 0 0 6 0 50 177
Total 78 105 0 0 250 17 0 0 0 14 0 86 550
Grand Total 110 257 0 0 538 37 0 0 0 23 0 148 1113
Apprch %30 70 0 0 93.6 6.4 0 0 0 13.5 0 86.5
Total %9.9 23.1 0 0 48.3 3.3 0 0 0 2.1 0 13.3
Unshifted 110 257 0 0 538 37 0 0 0 23 0 148 1113
% Unshifted 100 100 0 0 100 100 0 0 0 100 0 100 100
Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
Senseny Road
Eastbound
Senseny Road
Westbound
Channing Drive
Northbound
Channing Drive
Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:15 AM
07:15 AM 6 40 0 46 0 86 3 89 0 0 0 0 3 0 7 10 145
07:30 AM 7 39 0 46 0 81 11 92 0 0 0 0 5 0 22 27 165
07:45 AM 13 43 0 56 0 77 2 79 0 0 0 0 0 0 18 18 153
08:00 AM 21 28 0 49 0 60 1 61 0 0 0 0 3 0 13 16 126
Total Volume 47 150 0 197 0 304 17 321 0 0 0 0 11 0 60 71 589
% App. Total 23.9 76.1 0 0 94.7 5.3 0 0 0 15.5 0 84.5
PHF .560 .872 .000 .879 .000 .884 .386 .872 .000 .000 .000 .000 .550 .000 .682 .657 .892
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
File Name : ChanningDrive_SensenyRd_PM
Site Code : 00000000
Start Date : 12/3/2009
Page No : 1
Groups Printed- Unshifted - Bank 1
Senseny Road
Eastbound
Senseny Road
Westbound
Channing Drive
Northbound
Channing Drive
Southbound
Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total
04:00 PM 12 62 0 0 69 4 0 0 0 7 0 17 171
04:15 PM 9 64 0 0 52 3 0 0 0 3 0 20 151
04:30 PM 10 71 0 0 74 5 0 0 0 2 0 20 182
04:45 PM 15 77 0 0 68 5 0 0 0 2 0 20 187
Total 46 274 0 0 263 17 0 0 0 14 0 77 691
05:00 PM 22 84 0 0 68 0 0 0 0 1 0 12 187
05:15 PM 19 88 0 0 61 2 0 0 0 2 0 19 191
05:30 PM 23 77 0 0 68 4 0 0 0 5 0 8 185
05:45 PM 16 60 0 0 69 4 0 0 0 1 0 18 168
Total 80 309 0 0 266 10 0 0 0 9 0 57 731
Grand Total 126 583 0 0 529 27 0 0 0 23 0 134 1422
Apprch %17.8 82.2 0 0 95.1 4.9 0 0 0 14.6 0 85.4
Total %8.9 41 0 0 37.2 1.9 0 0 0 1.6 0 9.4
Unshifted 126 583 0 0 529 27 0 0 0 23 0 134 1422
% Unshifted 100 100 0 0 100 100 0 0 0 100 0 100 100
Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
Senseny Road
Eastbound
Senseny Road
Westbound
Channing Drive
Northbound
Channing Drive
Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM
04:45 PM 15 77 0 92 0 68 5 73 0 0 0 0 2 0 20 22 187
05:00 PM 22 84 0 106 0 68 0 68 0 0 0 0 1 0 12 13 187
05:15 PM 19 88 0 107 0 61 2 63 0 0 0 0 2 0 19 21 191
05:30 PM 23 77 0 100 0 68 4 72 0 0 0 0 5 0 8 13 185
Total Volume 79 326 0 405 0 265 11 276 0 0 0 0 10 0 59 69 750
% App. Total 19.5 80.5 0 0 96 4 0 0 0 14.5 0 85.5
PHF .859 .926 .000 .946 .000 .974 .550 .945 .000 .000 .000 .000 .500 .000 .738 .784 .982
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
File Name : ChanningDrive_SensenyRd_Sat
Site Code : 00000000
Start Date : 2/20/2010
Page No : 1
Groups Printed- Unshifted - Bank 1
Senseny Rd
Eastbound
Senseny Rd
Westbound Northbound
Channing Dr
Southbound
Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total
11:00 AM 14 49 0 0 62 0 0 0 0 4 0 26 155
11:15 AM 10 46 0 0 55 1 0 0 0 2 0 17 131
11:30 AM 9 49 0 0 62 0 0 0 0 3 0 11 134
11:45 AM 19 48 1 0 61 1 0 0 0 1 0 8 139
Total 52 192 1 0 240 2 0 0 0 10 0 62 559
12:00 PM 15 48 0 0 40 0 0 0 0 3 0 44 150
12:15 PM 13 63 0 0 51 3 0 0 0 2 0 8 140
12:30 PM 20 77 0 0 55 5 0 0 0 2 0 7 166
12:45 PM 24 63 0 0 50 2 0 0 0 5 0 20 164
Total 72 251 0 0 196 10 0 0 0 12 0 79 620
Grand Total 124 443 1 0 436 12 0 0 0 22 0 141 1179
Apprch %21.8 78 0.2 0 97.3 2.7 0 0 0 13.5 0 86.5
Total %10.5 37.6 0.1 0 37 1 0 0 0 1.9 0 12
Unshifted 124 443 1 0 436 12 0 0 0 22 0 141 1179
% Unshifted 100 100 100 0 100 100 0 0 0 100 0 100 100
Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
Senseny Rd
Eastbound
Senseny Rd
Westbound Northbound
Channing Dr
Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 12:00 PM
12:00 PM 15 48 0 63 0 40 0 40 0 0 0 0 3 0 44 47 150
12:15 PM 13 63 0 76 0 51 3 54 0 0 0 0 2 0 8 10 140
12:30 PM 20 77 0 97 0 55 5 60 0 0 0 0 2 0 7 9 166
12:45 PM 24 63 0 87 0 50 2 52 0 0 0 0 5 0 20 25 164
Total Volume 72 251 0 323 0 196 10 206 0 0 0 0 12 0 79 91 620
% App. Total 22.3 77.7 0 0 95.1 4.9 0 0 0 13.2 0 86.8
PHF .750 .815 .000 .832 .000 .891 .500 .858 .000 .000 .000 .000 .600 .000 .449 .484 .934
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
File Name : Channing_ValleyMill_AM
Site Code : 00000000
Start Date : 12/2/2009
Page No : 1
Groups Printed- Unshifted - Bank 1
Eastbound
Valley Mill Road
Westbound
Channing Dr
Northbound
Valley Mill Road
Southbound
Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total
07:00 AM 0 0 0 5 0 12 0 20 17 25 5 0 84
07:15 AM 0 0 0 3 0 21 0 31 24 24 3 0 106
07:30 AM 0 0 0 6 0 21 0 38 16 33 11 0 125
07:45 AM 0 0 0 3 0 26 0 32 9 25 12 0 107
Total 0 0 0 17 0 80 0 121 66 107 31 0 422
08:00 AM 0 0 0 2 0 16 0 23 14 22 6 0 83
08:15 AM 0 0 0 5 0 11 0 16 4 13 10 0 59
08:30 AM 0 0 0 3 0 15 0 21 9 13 11 0 72
08:45 AM 0 0 0 3 0 21 0 26 6 12 7 0 75
Total 0 0 0 13 0 63 0 86 33 60 34 0 289
Grand Total 0 0 0 30 0 143 0 207 99 167 65 0 711
Apprch %0 0 0 17.3 0 82.7 0 67.6 32.4 72 28 0
Total %0 0 0 4.2 0 20.1 0 29.1 13.9 23.5 9.1 0
Unshifted 0 0 0 30 0 143 0 207 99 167 65 0 711
% Unshifted 0 0 0 100 0 100 0 100 100 100 100 0 100
Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
Eastbound
Valley Mill Road
Westbound
Channing Dr
Northbound
Valley Mill Road
Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:00 AM
07:00 AM 0 0 0 0 5 0 12 17 0 20 17 37 25 5 0 30 84
07:15 AM 0 0 0 0 3 0 21 24 0 31 24 55 24 3 0 27 106
07:30 AM 0 0 0 0 6 0 21 27 0 38 16 54 33 11 0 44 125
07:45 AM 0 0 0 0 3 0 26 29 0 32 9 41 25 12 0 37 107
Total Volume 0 0 0 0 17 0 80 97 0 121 66 187 107 31 0 138 422
% App. Total 0 0 0 17.5 0 82.5 0 64.7 35.3 77.5 22.5 0
PHF .000 .000 .000 .000 .708 .000 .769 .836 .000 .796 .688 .850 .811 .646 .000 .784 .844
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
File Name : Channing_ValleyMill_PM
Site Code : 00000000
Start Date : 12/2/2009
Page No : 1
Groups Printed- Unshifted - Bank 1
Eastbound
Valley Mill Road
Westbound
Channing Drive
Northbound
Valley Mill Road
Southbound
Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total
04:00 PM 0 0 0 13 0 24 0 6 4 15 15 0 77
04:15 PM 0 0 0 14 0 30 0 6 3 18 16 0 87
04:30 PM 0 0 0 22 0 36 0 13 3 19 21 0 114
04:45 PM 0 0 0 15 0 20 0 10 6 13 27 0 91
Total 0 0 0 64 0 110 0 35 16 65 79 0 369
05:00 PM 0 0 0 24 0 23 0 13 7 16 23 0 106
05:15 PM 0 0 0 17 0 30 0 15 5 20 26 0 113
05:30 PM 0 0 0 23 0 23 0 11 2 22 19 0 100
05:45 PM 0 0 0 22 0 33 0 17 2 15 13 0 102
Total 0 0 0 86 0 109 0 56 16 73 81 0 421
Grand Total 0 0 0 150 0 219 0 91 32 138 160 0 790
Apprch %0 0 0 40.7 0 59.3 0 74 26 46.3 53.7 0
Total %0 0 0 19 0 27.7 0 11.5 4.1 17.5 20.3 0
Unshifted 0 0 0 150 0 219 0 91 32 138 160 0 790
% Unshifted 0 0 0 100 0 100 0 100 100 100 100 0 100
Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
Eastbound
Valley Mill Road
Westbound
Channing Drive
Northbound
Valley Mill Road
Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:30 PM
04:30 PM 0 0 0 0 22 0 36 58 0 13 3 16 19 21 0 40 114
04:45 PM 0 0 0 0 15 0 20 35 0 10 6 16 13 27 0 40 91
05:00 PM 0 0 0 0 24 0 23 47 0 13 7 20 16 23 0 39 106
05:15 PM 0 0 0 0 17 0 30 47 0 15 5 20 20 26 0 46 113
Total Volume 0 0 0 0 78 0 109 187 0 51 21 72 68 97 0 165 424
% App. Total 0 0 0 41.7 0 58.3 0 70.8 29.2 41.2 58.8 0
PHF .000 .000 .000 .000 .813 .000 .757 .806 .000 .850 .750 .900 .850 .898 .000 .897 .930
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
File Name : Channing_ValleyMill_Sat
Site Code : 00000000
Start Date : 2/20/2010
Page No : 1
Groups Printed- Unshifted - Bank 1
Eastbound
Valley Mill Road
Westbound
Channing Dr
Northbound
Valley Mill Road
Southbound
Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total
11:00 AM 0 0 0 2 0 12 0 14 5 8 14 0 55
11:15 AM 0 0 0 2 0 15 0 17 6 14 16 0 70
11:30 AM 0 0 0 4 0 15 0 12 5 12 21 0 69
11:45 AM 0 0 0 8 0 9 0 11 6 5 22 0 61
Total 0 0 0 16 0 51 0 54 22 39 73 0 255
12:00 PM 0 0 0 3 0 17 0 16 5 8 20 0 69
12:15 PM 0 0 0 3 0 15 0 8 4 13 17 0 60
*** BREAK ***
12:45 PM 0 0 0 5 0 13 0 14 1 10 19 0 62
Total 0 0 0 11 0 45 0 38 10 31 56 0 191
Grand Total 0 0 0 27 0 96 0 92 32 70 129 0 446
Apprch %0 0 0 22 0 78 0 74.2 25.8 35.2 64.8 0
Total %0 0 0 6.1 0 21.5 0 20.6 7.2 15.7 28.9 0
Unshifted 0 0 0 27 0 96 0 92 32 70 129 0 446
% Unshifted 0 0 0 100 0 100 0 100 100 100 100 0 100
Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
Eastbound
Valley Mill Road
Westbound
Channing Dr
Northbound
Valley Mill Road
Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 11:00 AM to 12:30 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 11:15 AM
11:15 AM 0 0 0 0 2 0 15 17 0 17 6 23 14 16 0 30 70
11:30 AM 0 0 0 0 4 0 15 19 0 12 5 17 12 21 0 33 69
11:45 AM 0 0 0 0 8 0 9 17 0 11 6 17 5 22 0 27 61
12:00 PM 0 0 0 0 3 0 17 20 0 16 5 21 8 20 0 28 69
Total Volume 0 0 0 0 17 0 56 73 0 56 22 78 39 79 0 118 269
% App. Total 0 0 0 23.3 0 76.7 0 71.8 28.2 33.1 66.9 0
PHF .000 .000 .000 .000 .531 .000 .824 .913 .000 .824 .917 .848 .696 .898 .000 .894 .961
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
File Name : Route7_Greenwood_AM
Site Code : 00000000
Start Date : 12/3/2009
Page No : 1
Groups Printed- Unshifted - Bank 1
Route 7
Eastbound
Route 7
Westbound
Greenwood Road
Northbound
Greenwood Road
Southbound
Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total
07:00 AM 8 239 7 1 105 8 5 25 28 4 14 4 448
07:15 AM 15 199 6 5 138 21 17 71 20 6 15 4 517
07:30 AM 21 218 8 7 157 24 14 66 16 5 29 7 572
07:45 AM 27 225 10 11 166 19 4 59 13 6 44 12 596
Total 71 881 31 24 566 72 40 221 77 21 102 27 2133
08:00 AM 1 206 1 1 155 9 10 12 27 1 4 2 429
08:15 AM 9 173 5 7 157 7 9 21 19 1 8 6 422
08:30 AM 12 169 14 18 151 6 6 25 17 2 11 8 439
08:45 AM 8 158 9 12 147 4 3 17 12 2 8 5 385
Total 30 706 29 38 610 26 28 75 75 6 31 21 1675
Grand Total 101 1587 60 62 1176 98 68 296 152 27 133 48 3808
Apprch %5.8 90.8 3.4 4.6 88 7.3 13.2 57.4 29.5 13 63.9 23.1
Total %2.7 41.7 1.6 1.6 30.9 2.6 1.8 7.8 4 0.7 3.5 1.3
Unshifted 101 1587 60 62 1176 98 68 296 152 27 133 48 3808
% Unshifted 100 100 100 100 100 100 100 100 100 100 100 100 100
Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
Route 7
Eastbound
Route 7
Westbound
Greenwood Road
Northbound
Greenwood Road
Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:00 AM
07:00 AM 8 239 7 254 1 105 8 114 5 25 28 58 4 14 4 22 448
07:15 AM 15 199 6 220 5 138 21 164 17 71 20 108 6 15 4 25 517
07:30 AM 21 218 8 247 7 157 24 188 14 66 16 96 5 29 7 41 572
07:45 AM 27 225 10 262 11 166 19 196 4 59 13 76 6 44 12 62 596
Total Volume 71 881 31 983 24 566 72 662 40 221 77 338 21 102 27 150 2133
% App. Total 7.2 89.6 3.2 3.6 85.5 10.9 11.8 65.4 22.8 14 68 18
PHF .657 .922 .775 .938 .545 .852 .750 .844 .588 .778 .688 .782 .875 .580 .563 .605 .895
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
File Name : Route7_Greenwood_PM
Site Code : 00000000
Start Date : 12/3/2009
Page No : 1
Groups Printed- Unshifted - Bank 1
Route 7
Eastbound
Route 7
Westbound
Greenwood Road
Northbound
Greenwood Road
Southbound
Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total
04:00 PM 8 156 21 38 200 1 13 14 8 6 22 5 492
04:15 PM 0 161 17 42 242 2 13 21 15 3 23 3 542
04:30 PM 1 180 18 41 237 1 8 9 17 6 18 3 539
04:45 PM 4 164 11 39 181 1 13 10 16 4 12 0 455
Total 13 661 67 160 860 5 47 54 56 19 75 11 2028
05:00 PM 0 181 17 45 303 1 9 9 14 6 6 1 592
05:15 PM 3 191 18 37 205 9 10 4 20 4 10 3 514
05:30 PM 2 148 20 39 221 5 11 16 18 4 15 0 499
05:45 PM 2 175 22 30 247 3 5 7 11 2 7 0 511
Total 7 695 77 151 976 18 35 36 63 16 38 4 2116
Grand Total 20 1356 144 311 1836 23 82 90 119 35 113 15 4144
Apprch %1.3 89.2 9.5 14.3 84.6 1.1 28.2 30.9 40.9 21.5 69.3 9.2
Total %0.5 32.7 3.5 7.5 44.3 0.6 2 2.2 2.9 0.8 2.7 0.4
Unshifted 20 1356 144 311 1836 23 82 90 119 35 113 15 4144
% Unshifted 100 100 100 100 100 100 100 100 100 100 100 100 100
Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
Route 7
Eastbound
Route 7
Westbound
Greenwood Road
Northbound
Greenwood Road
Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:15 PM
04:15 PM 0 161 17 178 42 242 2 286 13 21 15 49 3 23 3 29 542
04:30 PM 1 180 18 199 41 237 1 279 8 9 17 34 6 18 3 27 539
04:45 PM 4 164 11 179 39 181 1 221 13 10 16 39 4 12 0 16 455
05:00 PM 0 181 17 198 45 303 1 349 9 9 14 32 6 6 1 13 592
Total Volume 5 686 63 754 167 963 5 1135 43 49 62 154 19 59 7 85 2128
% App. Total 0.7 91 8.4 14.7 84.8 0.4 27.9 31.8 40.3 22.4 69.4 8.2
PHF .313 .948 .875 .947 .928 .795 .625 .813 .827 .583 .912 .786 .792 .641 .583 .733 .899
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
File Name : Route7_Greenwood_Sat
Site Code : 00000000
Start Date : 12/5/2009
Page No : 1
Groups Printed- Unshifted - Bank 1
Route 7
Eastbound
Route 7
Westbound
Greenwood Road
Northbound
Greenwood Road
Southbound
Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total
11:00 AM 0 147 17 9 227 0 12 0 17 0 6 0 435
11:15 AM 0 156 25 15 231 0 17 1 16 0 8 1 470
11:30 AM 1 171 34 21 221 0 15 1 14 1 4 10 493
11:45 AM 0 181 40 23 215 1 14 1 16 1 2 9 503
Total 1 655 116 68 894 1 58 3 63 2 20 20 1901
12:00 PM 1 189 32 18 226 0 8 1 24 2 9 14 524
12:15 PM 2 186 29 16 215 1 9 1 22 2 7 11 501
12:30 PM 1 191 27 18 207 1 9 0 22 3 4 6 489
12:45 PM 0 182 26 20 199 1 11 3 23 1 1 3 470
Total 4 748 114 72 847 3 37 5 91 8 21 34 1984
Grand Total 5 1403 230 140 1741 4 95 8 154 10 41 54 3885
Apprch %0.3 85.7 14 7.4 92.4 0.2 37 3.1 59.9 9.5 39 51.4
Total %0.1 36.1 5.9 3.6 44.8 0.1 2.4 0.2 4 0.3 1.1 1.4
Unshifted 5 1403 230 140 1741 4 95 8 154 10 41 54 3885
% Unshifted 100 100 100 100 100 100 100 100 100 100 100 100 100
Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
Route 7
Eastbound
Route 7
Westbound
Greenwood Road
Northbound
Greenwood Road
Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 11:30 AM
11:30 AM 1 171 34 206 21 221 0 242 15 1 14 30 1 4 10 15 493
11:45 AM 0 181 40 221 23 215 1 239 14 1 16 31 1 2 9 12 503
12:00 PM 1 189 32 222 18 226 0 244 8 1 24 33 2 9 14 25 524
12:15 PM 2 186 29 217 16 215 1 232 9 1 22 32 2 7 11 20 501
Total Volume 4 727 135 866 78 877 2 957 46 4 76 126 6 22 44 72 2021
% App. Total 0.5 83.9 15.6 8.2 91.6 0.2 36.5 3.2 60.3 8.3 30.6 61.1
PHF .500 .962 .844 .975 .848 .970 .500 .981 .767 1.000 .792 .955 .750 .611 .786 .720 .964
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
File Name : Route7_ValleyMill_AM
Site Code : 00000000
Start Date : 12/1/2009
Page No : 1
Groups Printed- Unshifted - Bank 1
Route 7
Eastbound
Route 7
Westbound
Valley Mill Road
Northbound Southbound
Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total
07:00 AM 11 327 7 5 135 0 2 0 44 0 0 0 531
07:15 AM 13 279 3 11 126 0 7 0 52 0 0 0 491
07:30 AM 14 256 6 14 171 0 5 0 39 0 0 0 505
07:45 AM 3 258 5 15 124 0 1 0 38 0 0 0 444
Total 41 1120 21 45 556 0 15 0 173 0 0 0 1971
08:00 AM 10 199 6 12 116 0 1 0 21 0 0 0 365
08:15 AM 7 200 9 10 157 0 4 0 17 0 0 0 404
08:30 AM 8 197 3 6 122 0 2 0 13 0 0 0 351
08:45 AM 8 167 7 4 122 0 1 0 12 0 0 0 321
Total 33 763 25 32 517 0 8 0 63 0 0 0 1441
Grand Total 74 1883 46 77 1073 0 23 0 236 0 0 0 3412
Apprch %3.7 94 2.3 6.7 93.3 0 8.9 0 91.1 0 0 0
Total %2.2 55.2 1.3 2.3 31.4 0 0.7 0 6.9 0 0 0
Unshifted 74 1883 46 77 1073 0 23 0 236 0 0 0 3412
% Unshifted 100 100 100 100 100 0 100 0 100 0 0 0 100
Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
Route 7
Eastbound
Route 7
Westbound
Valley Mill Road
Northbound Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:00 AM
07:00 AM 11 327 7 345 5 135 0 140 2 0 44 46 0 0 0 0 531
07:15 AM 13 279 3 295 11 126 0 137 7 0 52 59 0 0 0 0 491
07:30 AM 14 256 6 276 14 171 0 185 5 0 39 44 0 0 0 0 505
07:45 AM 3 258 5 266 15 124 0 139 1 0 38 39 0 0 0 0 444
Total Volume 41 1120 21 1182 45 556 0 601 15 0 173 188 0 0 0 0 1971
% App. Total 3.5 94.8 1.8 7.5 92.5 0 8 0 92 0 0 0
PHF .732 .856 .750 .857 .750 .813 .000 .812 .536 .000 .832 .797 .000 .000 .000 .000 .928
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
File Name : Route7_ValleyMill_PM
Site Code : 00000000
Start Date : 12/1/2009
Page No : 1
Groups Printed- Unshifted - Bank 1
Route 7
Eastbound
Route 7
Westbound
Valley Mill Road
Northbound Southbound
Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total
04:00 PM 6 140 7 34 232 0 0 0 9 0 0 0 428
04:15 PM 9 143 6 50 317 0 1 0 11 0 0 0 537
04:30 PM 13 142 8 42 269 0 2 0 17 0 0 0 493
04:45 PM 2 162 5 35 385 0 3 0 19 0 0 0 611
Total 30 587 26 161 1203 0 6 0 56 0 0 0 2069
05:00 PM 11 134 6 42 285 0 1 0 16 0 0 0 495
05:15 PM 14 197 3 41 306 0 2 0 11 0 0 0 574
05:30 PM 5 128 7 44 260 0 2 0 9 0 0 0 455
05:45 PM 8 155 6 34 264 0 2 0 4 0 0 0 473
Total 38 614 22 161 1115 0 7 0 40 0 0 0 1997
Grand Total 68 1201 48 322 2318 0 13 0 96 0 0 0 4066
Apprch %5.2 91.2 3.6 12.2 87.8 0 11.9 0 88.1 0 0 0
Total %1.7 29.5 1.2 7.9 57 0 0.3 0 2.4 0 0 0
Unshifted 68 1201 48 322 2318 0 13 0 96 0 0 0 4066
% Unshifted 100 100 100 100 100 0 100 0 100 0 0 0 100
Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
Route 7
Eastbound
Route 7
Westbound
Valley Mill Road
Northbound Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:30 PM
04:30 PM 13 142 8 163 42 269 0 311 2 0 17 19 0 0 0 0 493
04:45 PM 2 162 5 169 35 385 0 420 3 0 19 22 0 0 0 0 611
05:00 PM 11 134 6 151 42 285 0 327 1 0 16 17 0 0 0 0 495
05:15 PM 14 197 3 214 41 306 0 347 2 0 11 13 0 0 0 0 574
Total Volume 40 635 22 697 160 1245 0 1405 8 0 63 71 0 0 0 0 2173
% App. Total 5.7 91.1 3.2 11.4 88.6 0 11.3 0 88.7 0 0 0
PHF .714 .806 .688 .814 .952 .808 .000 .836 .667 .000 .829 .807 .000 .000 .000 .000 .889
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
File Name : Route7_ValleyMill_Sat
Site Code : 00000000
Start Date : 2/27/2010
Page No : 1
Groups Printed- Unshifted - Bank 1
Route 7
Eastbound
Route 7
Westbound
Valley Mill Road
Northbound Southbound
Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total
11:00 AM 8 176 7 5 191 0 1 0 14 0 0 0 402
11:15 AM 11 175 3 4 187 0 1 0 10 0 0 0 391
11:30 AM 8 165 6 6 209 0 0 0 10 0 0 0 404
11:45 AM 12 148 2 13 177 0 0 0 4 0 0 0 356
Total 39 664 18 28 764 0 2 0 38 0 0 0 1553
12:00 PM 7 151 3 11 180 0 0 0 6 0 0 0 358
12:15 PM 12 181 5 8 172 0 1 0 6 0 0 0 385
12:30 PM 11 138 5 5 177 0 0 0 5 0 0 0 341
12:45 PM 11 183 4 7 188 0 2 0 8 0 0 0 403
Total 41 653 17 31 717 0 3 0 25 0 0 0 1487
Grand Total 80 1317 35 59 1481 0 5 0 63 0 0 0 3040
Apprch %5.6 92 2.4 3.8 96.2 0 7.4 0 92.6 0 0 0
Total %2.6 43.3 1.2 1.9 48.7 0 0.2 0 2.1 0 0 0
Unshifted 80 1317 35 59 1481 0 5 0 63 0 0 0 3040
% Unshifted 100 100 100 100 100 0 100 0 100 0 0 0 100
Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
Route 7
Eastbound
Route 7
Westbound
Valley Mill Road
Northbound Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 11:00 AM
11:00 AM 8 176 7 191 5 191 0 196 1 0 14 15 0 0 0 0 402
11:15 AM 11 175 3 189 4 187 0 191 1 0 10 11 0 0 0 0 391
11:30 AM 8 165 6 179 6 209 0 215 0 0 10 10 0 0 0 0 404
11:45 AM 12 148 2 162 13 177 0 190 0 0 4 4 0 0 0 0 356
Total Volume 39 664 18 721 28 764 0 792 2 0 38 40 0 0 0 0 1553
% App. Total 5.4 92.1 2.5 3.5 96.5 0 5 0 95 0 0 0
PHF .813 .943 .643 .944 .538 .914 .000 .921 .500 .000 .679 .667 .000 .000 .000 .000 .961
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
File Name : ValleyMill_Greenwood_AM
Site Code : 00000000
Start Date : 12/2/2009
Page No : 1
Groups Printed- Unshifted - Bank 1
Valley Mill Road
Eastbound
Valley Mill Road
Westbound
Greenwood Road
Northbound
Greenwood Road
Southbound
Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total
07:00 AM 11 12 19 12 22 4 23 41 10 3 19 3 179
07:15 AM 8 10 27 18 38 16 37 46 18 2 26 8 254
07:30 AM 12 14 25 15 36 36 37 90 19 7 38 6 335
07:45 AM 11 16 33 26 26 11 44 40 10 11 43 14 285
Total 42 52 104 71 122 67 141 217 57 23 126 31 1053
08:00 AM 5 22 28 17 16 6 33 34 6 1 23 9 200
08:15 AM 10 12 39 12 17 4 22 21 11 3 20 3 174
08:30 AM 5 13 33 14 18 7 38 27 12 3 34 11 215
08:45 AM 10 9 23 13 25 18 22 21 11 3 30 4 189
Total 30 56 123 56 76 35 115 103 40 10 107 27 778
Grand Total 72 108 227 127 198 102 256 320 97 33 233 58 1831
Apprch %17.7 26.5 55.8 29.7 46.4 23.9 38 47.5 14.4 10.2 71.9 17.9
Total %3.9 5.9 12.4 6.9 10.8 5.6 14 17.5 5.3 1.8 12.7 3.2
Unshifted 72 108 227 127 198 102 256 320 97 33 233 58 1831
% Unshifted 100 100 100 100 100 100 100 100 100 100 100 100 100
Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
Valley Mill Road
Eastbound
Valley Mill Road
Westbound
Greenwood Road
Northbound
Greenwood Road
Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:15 AM
07:15 AM 8 10 27 45 18 38 16 72 37 46 18 101 2 26 8 36 254
07:30 AM 12 14 25 51 15 36 36 87 37 90 19 146 7 38 6 51 335
07:45 AM 11 16 33 60 26 26 11 63 44 40 10 94 11 43 14 68 285
08:00 AM 5 22 28 55 17 16 6 39 33 34 6 73 1 23 9 33 200
Total Volume 36 62 113 211 76 116 69 261 151 210 53 414 21 130 37 188 1074
% App. Total 17.1 29.4 53.6 29.1 44.4 26.4 36.5 50.7 12.8 11.2 69.1 19.7
PHF .750 .705 .856 .879 .731 .763 .479 .750 .858 .583 .697 .709 .477 .756 .661 .691 .801
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
File Name : ValleyMill_Greenwood_PM
Site Code : 00000000
Start Date : 12/2/2009
Page No : 1
Groups Printed- Unshifted - Bank 1
Valley Mill Road
Eastbound
Valley Mill Road
Westbound
Greenwood Road
Northbound
Greenwood Road
Southbound
Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total
04:00 PM 5 25 47 21 15 6 30 34 10 9 70 19 291
04:15 PM 5 22 67 18 17 3 36 50 17 7 53 17 312
04:30 PM 6 27 38 21 27 3 33 24 18 8 67 15 287
04:45 PM 3 20 47 21 25 4 33 37 12 10 59 25 296
Total 19 94 199 81 84 16 132 145 57 34 249 76 1186
05:00 PM 6 24 54 23 16 4 43 43 23 10 58 12 316
05:15 PM 15 24 41 19 27 9 32 42 23 6 58 13 309
05:30 PM 9 29 46 17 17 5 53 44 32 7 48 18 325
05:45 PM 5 26 41 24 26 5 45 23 12 5 46 12 270
Total 35 103 182 83 86 23 173 152 90 28 210 55 1220
Grand Total 54 197 381 164 170 39 305 297 147 62 459 131 2406
Apprch %8.5 31.2 60.3 44 45.6 10.5 40.7 39.7 19.6 9.5 70.4 20.1
Total %2.2 8.2 15.8 6.8 7.1 1.6 12.7 12.3 6.1 2.6 19.1 5.4
Unshifted 54 197 381 164 170 39 305 297 147 62 459 131 2406
% Unshifted 100 100 100 100 100 100 100 100 100 100 100 100 100
Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
Valley Mill Road
Eastbound
Valley Mill Road
Westbound
Greenwood Road
Northbound
Greenwood Road
Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:45 PM
04:45 PM 3 20 47 70 21 25 4 50 33 37 12 82 10 59 25 94 296
05:00 PM 6 24 54 84 23 16 4 43 43 43 23 109 10 58 12 80 316
05:15 PM 15 24 41 80 19 27 9 55 32 42 23 97 6 58 13 77 309
05:30 PM 9 29 46 84 17 17 5 39 53 44 32 129 7 48 18 73 325
Total Volume 33 97 188 318 80 85 22 187 161 166 90 417 33 223 68 324 1246
% App. Total 10.4 30.5 59.1 42.8 45.5 11.8 38.6 39.8 21.6 10.2 68.8 21
PHF .550 .836 .870 .946 .870 .787 .611 .850 .759 .943 .703 .808 .825 .945 .680 .862 .958
GREENWAY ENGINEERING
151 Windy Hill Lane
Winchester, VA 22602
540-662-4185
File Name : ValleyMill_Greenwood_Sat
Site Code : 00000000
Start Date : 1/30/2010
Page No : 1
Groups Printed- Unshifted - Bank 1
Valley Mill Road
Eastbound
Valley Mill Road
Westbound
Greenwood Road
Northbound
Greenwood Road
Southbound
Start Time Left Thru Right Left Thru Right Left Thru Right Left Thru Right Int. Total
11:00 AM 5 19 21 14 11 13 19 33 7 4 27 3 176
11:15 AM 14 25 37 14 19 3 31 13 9 6 32 14 217
11:30 AM 5 13 34 12 11 1 23 11 9 2 34 6 161
11:45 AM 5 16 28 9 8 0 22 27 13 3 30 7 168
Total 29 73 120 49 49 17 95 84 38 15 123 30 722
12:00 PM 5 13 23 6 11 3 10 8 10 3 28 5 125
12:15 PM 5 17 26 4 6 3 17 21 7 12 19 7 144
12:30 PM 6 14 21 10 2 12 4 16 10 6 17 4 122
12:45 PM 2 13 18 3 13 0 15 15 13 1 14 2 109
Total 18 57 88 23 32 18 46 60 40 22 78 18 500
Grand Total 47 130 208 72 81 35 141 144 78 37 201 48 1222
Apprch %12.2 33.8 54 38.3 43.1 18.6 38.8 39.7 21.5 12.9 70.3 16.8
Total %3.8 10.6 17 5.9 6.6 2.9 11.5 11.8 6.4 3 16.4 3.9
Unshifted 47 130 208 72 81 35 141 144 78 37 201 48 1222
% Unshifted 100 100 100 100 100 100 100 100 100 100 100 100 100
Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
% Bank 1 0 0 0 0 0 0 0 0 0 0 0 0 0
Valley Mill Road
Eastbound
Valley Mill Road
Westbound
Greenwood Road
Northbound
Greenwood Road
Southbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 11:00 AM to 12:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 11:00 AM
11:00 AM 5 19 21 45 14 11 13 38 19 33 7 59 4 27 3 34 176
11:15 AM 14 25 37 76 14 19 3 36 31 13 9 53 6 32 14 52 217
11:30 AM 5 13 34 52 12 11 1 24 23 11 9 43 2 34 6 42 161
11:45 AM 5 16 28 49 9 8 0 17 22 27 13 62 3 30 7 40 168
Total Volume 29 73 120 222 49 49 17 115 95 84 38 217 15 123 30 168 722
% App. Total 13.1 32.9 54.1 42.6 42.6 14.8 43.8 38.7 17.5 8.9 73.2 17.9
PHF .518 .730 .811 .730 .875 .645 .327 .757 .766 .636 .731 .875 .625 .904 .536 .808 .832
Generalized Development Plan