HomeMy WebLinkAbout12-18 CommentsH!'EDFRiCk,
IVATE1
FREDERICK WATER
SITE PLAN REVIEW COMMENTS
PO Box 1877, Winchester, VA 22604-8377
315 Tasker Road, Stephens City, VA 22655
Project
540.868.1061 voice
540.868.1429 fax
Applicant
REVIEW STATUS attention p fG` oiwi�1(
review number ) '
correct & resubmit pproved as npumay
number of items to be corrected
approved submit just cover sheet and the revised sheets.
DRAWINGS
send me by '
L print of sheets
v
2. two CDs: each disc shall c ntain the following plan sheets
a) One CD (containing all of the above noted sheets) shall be in PDF format. Each sheet shall be in its
own file and be in landscape orientation. Each file shall be titled with the project name and appropriate
sheet number.
b) One CD shall be in DWG format; (1) in Model Space, (2) in state plane coordinate system NAD 83, (3)
compatible with AutoCAD 2006.
c) Each of the two CDs shall be labeled with its format and project name, and placed in its own paper CD
envelope.
EASEMENTS
Y / F A copy of the recorded onsite FW easement(s) is/are required.
Y / N A copy of the recorded offsite FW easement(s) is/are required.
o The easement document shall contain a plat and both shall be signed by the Frederick Water.
o The Frederick Water requires specific language in its deed of easement.
o Visit our website www.frederickwater.com to obtain a copy of the form.
o A copy of the recorded deed(s) of easement shall be received before service will be authorized.
OTHER
Y/11 This project also requires DEQ - Valley Region Office approval.
Y/4 This project also requires VDH — Lexington Field Office approval.
Y/If This project also requires VDH — Lexington Field Office — Project Summary Report. BY DATE FOR
DRAWINGS ABOVE, see VDH website for form
Y / This project has a sewer pump station that FW will own. Title to the pump station site shall be granted
to the Frederick Water in fee simple absolute. Also, (1) a copy of DEQ's Certificate to Construct, (2) a
copy of DEQ's Certificate to Operate, and (3) two copies of the FW approved O & M manual are
required. These documents must be received before service will be authorized. (4) Work cannot
commence that would connect to FW facilities or require FW inspections until the contract is returned
XV
t this office.
Date: , 11V1 ,
F
Earl W. Wiley — Engineering Assistant JAN 18
REQUEST FOR CONDITIONAL USE PERMIT COMMENTS
Frederick County Fire Marshal
Mail to:
Frederick County Fire Marshal
1800 Coverstone Drive
Winchester, Virginia 22602
(540) 665-6350
RECEIVED APR 0 -, 2018
Hand deliver to:
Frederick County Fire & Rescue Dept.
Attn: Fire Marshal
Public Safety Building
1800 Coverstone Drive
Winchester, Virginia
Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the
agency with their review. Also, please attach two (2) copies of your application form, location map and
all otlier pertinent information.
Applicant's Name: ��' ��: �'�� �} �"� C Telephone:
Mailing Address: ' S L-� c,91 t- C_ �,, tri ,.2 cl
- s Cc- 7 E �
Name of development and/or description of the request:
Location of Property:
Fire Marshai's Comments:
Fire Marshal's Signature &
9elAlli
5.y e -- c � -e�' �> / /
Notice to Fire Marshal - Please Return This Form to the Applicant
11
Date Received
4/3/2018
Frederick County
Department of Fire and Rescue
Office of the Fire 1Ell'arshal
1080 Coverstone Drive Winchester, VA 22602
(540) 665-6350 Fax: (540) 678-4739 Email: fmo@fcva.us
rear Review & Comments
Plan/Permit Type Conditional Use Permit 04-03-18
Name The Camp of Faith Church
Address 635 Double Church RD Stephens City
Project Name
Applicant Name & Number
RE#
Permit Number
Emergency Vehicle Access:
Hydrant Location:
Siamese Location:
Fire Lanes Required:
Plan Approval Status
New Shelter
The Camp of Faith Church 540-869-0497
Ad�ate Inadequate N/A
Adequate Inadequate N/A
Adequate Inadequate f�
Yes No `Pd"/A
Approve
Comments
CUP provided that a 2AA0BC multi-purpose fire extinguisher be hung and tagged in the pavilion
Signature:
Reviewed By: Kenneth Scott, Jr.
Title:
L�,".- E� 7 ()A
Date Reviewed
4/10/2018
VA 22655
l 2�
RE AP 9018
REQUEST FOR SITE PLAN COMMENTS oris
Q Fredi!'r A W13ROOnsA
Frederick County Inspections
Department Comment
Mail to:
Frederick County Inspections Department
Attn: Building Official
107 North Kent Street
Winchester, Virginia 22601
Hand deliver to:
Frederick County Inspections Dept.
107 North Kent Street, 2°d Floor
Winchester, Virginia 22601
Phone: (540) 665-5650
'51111%%Q lu,g0,
H m
Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their
review. Please attach two (2) copies of the Site Plan with thus sheet.
.. ._' ;:. -.: -.::. ,. :: e•.. a.. ..... .:_ .. _ ,_ T.-.rc „re.*sz_,.,4...mow. oma ,.r.. - ,.. ra.w..r�., a».r-w,.::Y., .--,«.r-s.�w.
Applicant's Name:e- armgo o'F Fay f C4Wct- Telephone: 5`10 —8'6 -1— p �!
Email Address: Pas c -Tr (9) E, ve_Z vmtL_ s of,:,
Mailing Address: Cv 3 c v M C k -V L.,,r,�-V 01A .
s�phe s GL -c---4 vd
Name of development and description of the request:
S11.
Location of Property:
W
(/y�
Department Comments:
l
-FREDERICK COUNTY INSPECTIONS DEPARTMENT USE ONLY -
Date Received r-1 $ Review NumbeG2 3 4 5 (circle one)
Date Reviewed
s Revision Required ate Approved
Signature &Date:
** Please Return Form to Applicant**
18
Buildings shall comply with The Virginia Uniform Statewide Building Code 2012 and section
303-- A,Assembly Use Group. Other Code that applies is ICC/ANSI A117.1-09 Accessible and
Usable Buildings and Facilities, Virginia Energy Code 2012, Virginia Mechanical Code 2012
and Virginia Plumbing Code 2012. Building plans, including all structural plans, submitted for
permit application shall be sealed by a Virginia Licensed Design Professional.
Proposed expansion of an existing A -Assembly Use Group. Building shall comply with height
and area requirements as allowed for type of construction in T503, IBC 2012. Future addition
and pavilion exceed allowable area under Chap 9 without a sprinkler system. Fire barriers can be
utilized to reduce the fire area.
Question on the existing Type of Construction as defined in Chapter Six with allowable
height and area in T503 with proposed addition and wood framed pavilion.
Both the roposed new sanctuary and the proposed new gymnasium area less than 12000 sq ft.
Occupant load in excess of 300 people require an NFPA 13 approved sprinkler system.
Question on sprinkler requirements.
Main entrances into areas larger than 3000 sq ft require a vestibule per USBC/International
Energy Code. All required exits shall be accessible.
Handicap parking shall comply with ANSI Al 17.1-09. Van accessible parking/unloading shall
have a minimum of 11' width with 5' unloading area or a minimum of 8' unloading area with
an 8' width. Car unloading area shall provide a minimum of 5' unloading area. Max slope of
parking and unloading area is 1:48
IBC 1106.6 requires HC parking to be located on the shortest accessible route of travel from
adjacent parking to the accessible building entrance. Approaches and door clearances for main
exit/entrance shall comply with ANSI Al 17.1-09. Landings shall not exceed 1":48" slope.
Walkways shall not exceed 5% (1" in 20") slope.
Accessible transition from parking and accessible route shall comply with ANSI A 117.1-09.
Curb ramps shall comply with Section 406 ANSI Al 17.1-09. ANSI Al 17.1-09 ramps shall not
exceed 1:12 slope. Ramp landings and change of direction shall comply with VUSBC Section
1010.7. Handrails shall be provided and shall comply with VUSBC Section 1010.9
Please note the requirements in Chapter 17 of ICC for special inspection requirements on the
type of structure.( Soils, concrete ect..). Slabs with greater than 24" gravel or 8" earth requires
an engineer design.
SASite Plan comments\2012\Assembly, Camp of faith church.doc