Loading...
HomeMy WebLinkAbout12-18 CommentsH!'EDFRiCk, IVATE1 FREDERICK WATER SITE PLAN REVIEW COMMENTS PO Box 1877, Winchester, VA 22604-8377 315 Tasker Road, Stephens City, VA 22655 Project 540.868.1061 voice 540.868.1429 fax Applicant REVIEW STATUS attention p fG` oiwi�1( review number ) ' correct & resubmit pproved as npumay number of items to be corrected approved submit just cover sheet and the revised sheets. DRAWINGS send me by ' L print of sheets v 2. two CDs: each disc shall c ntain the following plan sheets a) One CD (containing all of the above noted sheets) shall be in PDF format. Each sheet shall be in its own file and be in landscape orientation. Each file shall be titled with the project name and appropriate sheet number. b) One CD shall be in DWG format; (1) in Model Space, (2) in state plane coordinate system NAD 83, (3) compatible with AutoCAD 2006. c) Each of the two CDs shall be labeled with its format and project name, and placed in its own paper CD envelope. EASEMENTS Y / F A copy of the recorded onsite FW easement(s) is/are required. Y / N A copy of the recorded offsite FW easement(s) is/are required. o The easement document shall contain a plat and both shall be signed by the Frederick Water. o The Frederick Water requires specific language in its deed of easement. o Visit our website www.frederickwater.com to obtain a copy of the form. o A copy of the recorded deed(s) of easement shall be received before service will be authorized. OTHER Y/11 This project also requires DEQ - Valley Region Office approval. Y/4 This project also requires VDH — Lexington Field Office approval. Y/If This project also requires VDH — Lexington Field Office — Project Summary Report. BY DATE FOR DRAWINGS ABOVE, see VDH website for form Y / This project has a sewer pump station that FW will own. Title to the pump station site shall be granted to the Frederick Water in fee simple absolute. Also, (1) a copy of DEQ's Certificate to Construct, (2) a copy of DEQ's Certificate to Operate, and (3) two copies of the FW approved O & M manual are required. These documents must be received before service will be authorized. (4) Work cannot commence that would connect to FW facilities or require FW inspections until the contract is returned XV t this office. Date: , 11V1 , F Earl W. Wiley — Engineering Assistant JAN 18 REQUEST FOR CONDITIONAL USE PERMIT COMMENTS Frederick County Fire Marshal Mail to: Frederick County Fire Marshal 1800 Coverstone Drive Winchester, Virginia 22602 (540) 665-6350 RECEIVED APR 0 -, 2018 Hand deliver to: Frederick County Fire & Rescue Dept. Attn: Fire Marshal Public Safety Building 1800 Coverstone Drive Winchester, Virginia Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Also, please attach two (2) copies of your application form, location map and all otlier pertinent information. Applicant's Name: ��' ��: �'�� �} �"� C Telephone: Mailing Address: ' S L-� c,91 t- C_ �,, tri ,.2 cl - s Cc- 7 E � Name of development and/or description of the request: Location of Property: Fire Marshai's Comments: Fire Marshal's Signature & 9elAlli 5.y e -- c � -e�' �> / / Notice to Fire Marshal - Please Return This Form to the Applicant 11 Date Received 4/3/2018 Frederick County Department of Fire and Rescue Office of the Fire 1Ell'arshal 1080 Coverstone Drive Winchester, VA 22602 (540) 665-6350 Fax: (540) 678-4739 Email: fmo@fcva.us rear Review & Comments Plan/Permit Type Conditional Use Permit 04-03-18 Name The Camp of Faith Church Address 635 Double Church RD Stephens City Project Name Applicant Name & Number RE# Permit Number Emergency Vehicle Access: Hydrant Location: Siamese Location: Fire Lanes Required: Plan Approval Status New Shelter The Camp of Faith Church 540-869-0497 Ad�ate Inadequate N/A Adequate Inadequate N/A Adequate Inadequate f� Yes No `Pd"/A Approve Comments CUP provided that a 2AA0BC multi-purpose fire extinguisher be hung and tagged in the pavilion Signature: Reviewed By: Kenneth Scott, Jr. Title: L�­,".- E� 7 ()A Date Reviewed 4/10/2018 VA 22655 l 2� RE AP 9018 REQUEST FOR SITE PLAN COMMENTS oris Q Fredi!'r A W13ROOnsA Frederick County Inspections Department Comment Mail to: Frederick County Inspections Department Attn: Building Official 107 North Kent Street Winchester, Virginia 22601 Hand deliver to: Frederick County Inspections Dept. 107 North Kent Street, 2°d Floor Winchester, Virginia 22601 Phone: (540) 665-5650 '51111%%Q lu,g0, H m Applicant: It is your responsibility to complete this form as accurately as possible in order to assist the agency with their review. Please attach two (2) copies of the Site Plan with thus sheet. .. ._' ;:. -.: -.::. ,. :: e•.. a.. ..... .:_ .. _ ,_ T.-.rc „re.*sz_,.,4...mow. oma ,.r.. - ,.. ra.w..r�., a».r-w,.::Y., .--,«.r-s.�w. Applicant's Name:e- armgo o'F Fay f C4Wct- Telephone: 5`10 —8'6 -1— p �! Email Address: Pas c -Tr (9) E, ve_Z vmtL_ s of,:, Mailing Address: Cv 3 c v M C k -V L.,,r,�-V 01A . s�phe s GL -c---4 vd Name of development and description of the request: S11. Location of Property: W (/y� Department Comments: l -FREDERICK COUNTY INSPECTIONS DEPARTMENT USE ONLY - Date Received r-1 $ Review NumbeG2 3 4 5 (circle one) Date Reviewed s Revision Required ate Approved Signature &Date: ** Please Return Form to Applicant** 18 Buildings shall comply with The Virginia Uniform Statewide Building Code 2012 and section 303-- A,Assembly Use Group. Other Code that applies is ICC/ANSI A117.1-09 Accessible and Usable Buildings and Facilities, Virginia Energy Code 2012, Virginia Mechanical Code 2012 and Virginia Plumbing Code 2012. Building plans, including all structural plans, submitted for permit application shall be sealed by a Virginia Licensed Design Professional. Proposed expansion of an existing A -Assembly Use Group. Building shall comply with height and area requirements as allowed for type of construction in T503, IBC 2012. Future addition and pavilion exceed allowable area under Chap 9 without a sprinkler system. Fire barriers can be utilized to reduce the fire area. Question on the existing Type of Construction as defined in Chapter Six with allowable height and area in T503 with proposed addition and wood framed pavilion. Both the roposed new sanctuary and the proposed new gymnasium area less than 12000 sq ft. Occupant load in excess of 300 people require an NFPA 13 approved sprinkler system. Question on sprinkler requirements. Main entrances into areas larger than 3000 sq ft require a vestibule per USBC/International Energy Code. All required exits shall be accessible. Handicap parking shall comply with ANSI Al 17.1-09. Van accessible parking/unloading shall have a minimum of 11' width with 5' unloading area or a minimum of 8' unloading area with an 8' width. Car unloading area shall provide a minimum of 5' unloading area. Max slope of parking and unloading area is 1:48 IBC 1106.6 requires HC parking to be located on the shortest accessible route of travel from adjacent parking to the accessible building entrance. Approaches and door clearances for main exit/entrance shall comply with ANSI Al 17.1-09. Landings shall not exceed 1":48" slope. Walkways shall not exceed 5% (1" in 20") slope. Accessible transition from parking and accessible route shall comply with ANSI A 117.1-09. Curb ramps shall comply with Section 406 ANSI Al 17.1-09. ANSI Al 17.1-09 ramps shall not exceed 1:12 slope. Ramp landings and change of direction shall comply with VUSBC Section 1010.7. Handrails shall be provided and shall comply with VUSBC Section 1010.9 Please note the requirements in Chapter 17 of ICC for special inspection requirements on the type of structure.( Soils, concrete ect..). Slabs with greater than 24" gravel or 8" earth requires an engineer design. SASite Plan comments\2012\Assembly, Camp of faith church.doc