RE: Artillery Business Center Proffer Amendment — Postponement Request
Dear Mr. Bishop,
On behalf of the Applicant, I formally request to postpone the Artillery Business Center Proffer
Amendment application, currently scheduled for today's Board of Supervisors meeting, until the
Board's December 9, 2015 meeting.
If you have any questions, please feel free to contact me at (540) 667-2139.
Sincerely,
PENNONI ASSOCIATES INC.
J
Patrick Sowers
Senior Project Engineer
117 East Piccadilly Street • Winchester, VA 22601 • Ph: 540-667-2139 • Fx: 540-665-0493
www.pennoni.com
Penn onu
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
October 2, 2015
Mr. John Bishop, AICP
Deputy Director, Transportation
Frederick County Planning and Development
107 N Kent Street, Suite 202
Winchester, VA 22601
RE: Artillery Business Center — Proffer Amendment Request
Statement of Justification
Dear Mr. Bishop,
Please find attached a revised proffer statement dated September 29, 2015 and associated
generalized development plan and exhibit for Artillery Business Center, comprised of two tax map
parcels identified by Frederick County records as 75-A-1 and 75-A-1 F (r011ectively, the "Property")
totaling 57.6 acres zoned M-1 (Light Industrial). The Property is located east and adjacent to Shady
Elm Road approximately 4,500 feet south of the intersection of Shady Elm Road and Apple Valley
Drive. This proposed amendment would modify the proffers approved by the Board of Supervisors
on February 13, 2008 as part of Rezoning Application #07-08. A general summary of the proposed
modifications is as follows:
1) A $250,000 monetary contribution and a continuous right turn lane across the Shady Elm
Road frontage has been removed in favor of a commitment for the construction of
Renaissance Drive from its existing terminus to Shady Elm Road utilizing the revenue
sharing program. Ultimately, the Shady Elm Road entrance requirements will be subject to
VDOT review and approval at the site plan phase of development. The proposed proffer
would require that the owner of Land Bay 2 enter into an agreement with Frederick County
for the funding of the design and construction of Renaissance Drive prior to issuance of a 2nd
Building Permit within Land Bay 1 or a 2 d Building Permit in Land Bay 2.
2) The land bay boundaries have been modified to reflect the two existing tax map parcels that
form the Property and which are under separate ownership currently. Accordingly, we have
assigned proffered obligations to the respective land bay owners as opposed to using a
blanket "Applicant" for the entirety of the project.
3) Removed the proffer for right of way dedication along Shady Elm Road as this dedication
has already been completed.
4) Removed the proffered limitations on signage as the existing 2008 proffer statement
predates modifications made to the County's signage regulations.
5) The 5 year limitation on warehouse distribution facilities in excess of 200,000 square feet has
been removed as this requirement of the 2008 rezoning approval is now more than 7 years
old.
6) The requirement for a minimum of three end users for the site and the escalator clause for
monetary contributions has been removed. Monetary proffers for the site include $5,000 for
fire and rescue services as well as $2,500 each for Sheriffs office and general government,
which are now proposed prior to certificate of occupancy for the first structure on Land Bay 2.
7) The proffer for a potential internal access road has been removed as the Frederick County
Subdivision Ordinance would already require that improvement in order to comply with road
frontage/access requirements for any potential future lots within the Property.
117 East Piccadilly Street • Winchester, VA 22601 • Ph: 540-667-2139 • Fx: 540-665-0493
www.pennoni.com
Artillery Business Center October 2, 2015 Page 2
Proffer Amendment
The proposed proffer amendment seeks to implement Renaissance Drive from Route 11 io Shady
Elm Road as envisioned by the Comprehensive Plan, which is key to the long term success of the
business development type uses envisioned by the County in the area of Shady Elm Road, the
railroad, and Route 11. The proposed proffer amendment would help implement the long range land
use plans for Frederick County and also ensure that the Property is available for business
development uses that are critical for the continued success of Frederick County.
If you have any questions or comments, please feel free to contact me at (540) 667-2139.
Sincerely,
PENNONI ASSOCIATES INC.
Patrick Sowers
Senior Project Engineer
Mr. Patrick Sowers
September 28, 2015
Page t
Revised GDP does not include Proffer Statement; to the contrary, the Proffer
Statement includes the Revised GDP.
Proffers 1.1 through 1.3 - Staff should be aware that these Proffers would shift
the obligations therein solely to the owner of Land Bay 2. Therefore,Land Bay 1
could fully develop without the County receiving any of the monetary _ :..
contributions. The Proffers do not propose a proportionate split of the monetary
contributions between the two land bays.
. Proffer 2.1 Staff should be aware that the Proffer. :eliminates the previous
commitment to construct the widening of Shady Elin Road along the Property .
frontage..:
.Proffer 2.2.7 With respect to the second bullet point, t is unclear what a
"structure located in Land Bay .t .but with associated land area located in Land:..:. .-
:.Bay 2".:would be: Does this refer to a strUet&6 itself located in both land bays, a
structure with parking in the other or both land bays, a structure with buffer areas
located in the other of -.both land bays. a structure with associated facilities (such
as stormwater management facilities) iri the atlier or both .arid bays? :: With respect
to the .third bulletpoint; itis izriclear what "upon conimencenient of a railroad
crossing" rneans Does this mean "Upon commencement of construction of a.
railroad crossing .
Proffer 2.2.1 -- The Proffer is at least in part'contingent upon the Land Bay 2
Owner entering into a revenue sharing agreeiiieiit with theCounty.: is would
create inappropriate C6htract 0nmg; in which the landowner s obligations would
only vest upon the County undertaking certain coiaiinitments (entry into the
revenue sharing agreement and performance by the County of obligations
therein)In this regard well, should be aware that the Proffer Statement
eliminates the Applicant's full ;construction obligations for the:railroad crossing,
in Proffer 2:8 of the 2048 -.Proffer Staterrieiit_ .Also; :under Proffer2.2:1 of the
2QQ8 Proffer:Statement the County' is already' entitled -to request, at'no cost to the
ty y
Comity; an 80=foot right=of way acrossthe Property. The proposed Proffer'would -
eliminate that right and therefore raises an issue as to whether the Courity .can
agree to concede.such'-an:m erest zn real property without a separate public
hearing on the`sazthe. See Va:-Code' &.15.24900(B)..
® Proffer 2:3 The proffer :to construct aninternal access road commits to do what
is already an ordinance requirement (and a practical requirement for use of the : .
Property) acid therefore may be rnisleading in the Proffer Statement other than to
the extent that a road of less than 26 -foot mininiumri pavement Width could
otherwise be constructed.. Also with respect.. to the second sentence(makingthe
-
location of the internal access road subject to approval of both land bay owners),
the provisions of the first sentence (requiring prior written approval of the other
land bay owner to construct an internal access road) render it superfluous.
Pennon.'
PEiNNONI ASSOCIATES INC.
CONSULTING ENGINEERS
September 25, 2015
Mr. John Bishop, AICP
Deputy Director, Transportation
Frederick County Planning and Development
107 N Kent Street, Suite 202
Winchester, VA 22601
RE: Artillery Business Center — Proffer Amendment Request
Statement of Justification
Dear Mr. Bishop,
Please find attached the proposed proffer statement and associated generalized development plan
and exhibits for Artillery Business Center, comprised of two tax map parcels identified by Frederick
County records as 75-A-1 and 75-A-1 F (collectively, the "Property") totaling 57.6 acres zoned M-1
(Light Industrial). The Property is located east and adjacent to Shady Elm Road approximately
4,500 feet south of the intersection of Shady Elm Road and Apple Valley Drive. This proposed
amendment would modify the proffers approved by the Board of Supervisors on February 13, 2008
as part of Rezoning Application #07-08. A summary of the proposed modifications is as follows:
1) A $250,000 monetary contribution and a continuous right turn lane across the Shady Elm
Road frontage has been removed in favor of a commitment for the construction of
Renaissance Drive from its existing terminus to Shady Elm Road utilizing the revenue
sharing program. Ultimately, the Shady Elm Road entrance requirements will be subject to
VDOT review and approval at the site plan phase of development. The proposed proffer
reflects that the off-site portions of Renaissance Drive are dependent upon the availability of
off-site right of way and rights to an at grade railroad crossing.
2) The land bay boundaries have been modified to reflect the two existing tax map parcels that
form the Property and which are under separate ownership currently. Accordingly, we have
assigned proffered obligations to the respective land bay owners as opposed to using a
blanket "Applicant" for the entirety of the project.
3) Removed the proffer for right of way dedication along Shady Elm Road as this dedication
has already been completed.
4) Removed the proffered limitations on signage as the existing 2008 proffer statement
predates modifications made to the County's signage regulations.
5) The 5 year limitation on warehouse distribution facilities in excess of 200,000 square feet has
been removed as this requirement of the 2008 rezoning approval is now more than 7 years
old.
6) The requirement for a minimum of three end users for the site and the escalator clause for
monetary contributions has been removed.
The proposed proffer amendment seeks to implement Renaissance Drive from Route 11 to Shady
Elm Road as envisioned by the Comprehensive Plan, which is key to the long term success of the
business development type uses envisioned by the County in the area of Shady Elm Road, the
railroad, and Route 11. The proposed proffer amendment would help implement the long range land
use plans for Frederick County and also ensure that the Property is available for business
development uses that are critical for the continued success of Frederick County.
117 East Piccadilly Street • Winchester, VA 22601 • Ph: 540-667-2139 • Fx: 540-665-0493
www.pennoni.com
Artillery Business Center September 25, 2015 Page 2
Proffer Amendment
!f you have any questions or comments, pleacc feel free to contact me at (540} 567-2139.
Sincerely,
PENNONI ASSOCIATES INC.
Patrick Sowers
Senior Project Engineer
A -110-11 =nn0n#'
PENNONI ASSOCIATES INC.
CONSULTING ENGINEERS
September 9, 2015 ty
Mr. John Bishop, AICP L I SEP 9 2015
Deputy Director, Transportation
Frederick County Planning and Development Fs� )ER'CiC Ct^LlP+1TY
107 N Kent Street, Suite 202 (y,�'=1
Winchester, VA 22601
RE: Artillery Business Center — Proffer Amendment Request
Dear Mr. Bishop,
Please find attached the proposed proffer statement and associated generalized development plan
and exhibits for Artillery Business Center for your review. This amendment would modify the
proffers approved by the Board of Supervisors on February 1. 3, 2008 as part of Rezoning Application
#07-08. For reference, I have also included a copy of the approved 2008 proffers. A summary of
the proposed modifications is as follows:
1) A $250,000 monetary contribution and a continuous right turn lane across the Shady Elm
Road frontage has been removed in favor of a commitment for the construction of
Renaissance Drive from its existing terminus to Shady Elm Road. Ultimately, the Shady Elm
Road entrance requirements will be subject to VDOT review and approval at the site plan
phase of development.
2) The land bay boundaries have been modified to reflect the two existing tax map parcels that
form the property and which are under separate ownership currently. Accordingly, we have
assigned proffered obligations to the respective land bay owners as opposed to using a
blanket "Applicant" for the entirety of the project.
3) Removed the proffer for right of way dedication aiong Shady Elm Road as this dedication
has already been completed.
4) The proffered continuous right turn lane across the Shady Elm road frontage has been
removed. Ultimately, the entrance requirements will be subject to VDOT approval at the site
plan phase of development.
51) Removed the proffered limitations on signage as the existing 2008 proffer statement
predates modifications made to the County's signage regulations.
6) The 5 year limitation on warehouse distribution facilities in excess of 200,000 square feet has
been removed since this requirement of the 2008 rezoning approval is now more than 7
yews old.
7) The requirement for a minimum of three end users for the site and the escalator clause for
monetary contributions has been removed.
If you have any questions or comments, please feel free to contact me at (540) 667-2139.
Sincerely,
PCir1NONI ASSOCIATES INC.
Patrick Sowers
Senior Project Engineer