Loading...
HomeMy WebLinkAbout17-18 ApplicationSITE PLAN APPLICA,nON Date Application "Zeceive€r: 5 t tDffice Use (Dfrly__-- Application #• Fees Received: Receipt #: _ � � � �-�t� � Initiails:__— 1 . Proyect Title: 'i 5149 - Amherst 2 3 Ell Project Description: d eleeorm-nunications monopole tower and fenced compound and related lines, antenna, remote radio heads, platforms, concrete pads and cabinets. Location of Property: Back Creek District (Street address) 219 Round Hill Road, Winchester, VA Applicant/Designer: Name: Lynn Koerner Telephone: 540-335-0030 Primary Point of Contact: Lynn Koerner - Consultant email: lynnk@shentel.net Address: 3126 South Ox Road, Edinburg, VA 228-44 Engineering Firm: TSquared Sites Services, 2500 Highland Road, Suite 201, Hermitage, PA 16148 Phone 724-308-7855 POC: Kevin 5. Property Owner (if different than abode): Name: Gregory A. Bishop Address: 108 Stonewall Drive, Winchester, VA 6. Property Information: a. Property Identification Number: b. Total ac-eage of tlae parcel to be developed: c. Total disturbed area of the parcel. d. Present Use: e. Proposed Use: f. Magisterial District(s) 8 Telephone: 540-533-8107 52-A-254 7 11,68G sq. ft. vacant same Back Creek 7. Site Plan Type: a. Is this an original or new site plan'? Yes Ltl l No y b. is this a revised site plan? Yes o No _ If yes provide all previous site plan numbers: C. Is this a minor site plan? Yes Il No If yes provide all previous site plan numbers: 8. Zoning Int'ormation: a. Current Zoning: RA b. Was this property Rezoned? Yes No C. If yes provide the rezoning number for this property: d. Are there any proffers for this property? Yes No3'` e. Has a MDP been approved for this property? Yes r No f. If yes provide the MDP number for this property: 9. Adjoining property zoning and use: USE ZONING North Residential RA East Sub -station - Shen Valley Electric RA South Golf Course RA eSt VDOT Maintenance Facility B3 I have read the material included in this package and understand what is required by the Frederick County Planning Department. I also understand that all required material will be complete prior to the submission of my site plan. Q::�� V Signature: Name (Printed): Lynn Koerner Date: 9