HomeMy WebLinkAbout16-18 ApplicationSITE PLAN APPLICATION
- Office Use Only -
Date Application Received: —3) /f� Application #: �• �D —� c5
Fees Received: JC'C - Receipt #: 7v? �7 Initials:
1. Project Title: WP Business Park
2. Project Description: The development of this site shall consist of the exististing office building and truck, fleet maintenance facility,
and existing self storage warehouse facilities.
3. Location of Property: Route 277, Fairfax Pike, White Post
(Street address)1114 Fairfax Pike, White Post, VA 22663
4. Applicant/Designer:
Name: Painter -Lewis, P.L.C.
5
Primary Point of Contact: Mr. Timothy G. Painter
Address: 817 Cedar Creek Grade, Suite 120
Winchester, VA 22601
Telephone: 540-662-5792
email: tgpainter@painterlewis.com
Property Owner (if different than above):
Name: 1400 LLC/White Properties of Winchester, Inc. Telephone: 540-667-1710
Address: 1520 Commerce Street, Winchester, VA 22601
6. Property Information:
a. Property Identification Number:
b. Total acreage of the parcel to be developed:
c. Total disturbed area of the parcel:
d. Present Use:
e. Proposed Use:
f. Magisterial District(s)
8
86-A-193
11,2847
5 acres
Office use permitted, Truck Maintenace Facility
Office use permitted, Truck Maintenace Facility
Opequon
7. Site Plan Type:
a. Is this an original or new site plan? Yes II No
✓
b. Is this a revised site plan? Yes — No
State Right of Way
If yes provide all previous site plan numbers:
Commercial/Residential
c. Is this a minor site plan? Yes M No
Residential
If yes provide all previous site plan numbers:
Vacant/Residential
8. Zoning Information:
a. Current Zoning: M2
b. Was this property Rezoned? Yes F-1
No ✓
C. If yes provide the rezoning number for this property:
d. Are there any proffers for this property? Yes
No ✓
e. Has a MDP been approved for this property? Yes ✓
No
f. If yes provide the MDP number for this property: Grandfathered
9. Adjoining property zoning and use:
ZONING
State Right of Way
M2&RA
Q
RA
I have read the material included in this package and understand what is required by the Frederick County Planning
Department. I also understand that all required material will be complete prior to the submission of my site plan.
Signature:
Name (Printed): Y C7. PAt NTIER h E.
Date: 4 ip-,1. 21, 2 G /
9
USE
North
State Right of Way
East
Commercial/Residential
South
Residential
West
Vacant/Residential
ZONING
State Right of Way
M2&RA
Q
RA
I have read the material included in this package and understand what is required by the Frederick County Planning
Department. I also understand that all required material will be complete prior to the submission of my site plan.
Signature:
Name (Printed): Y C7. PAt NTIER h E.
Date: 4 ip-,1. 21, 2 G /
9