HomeMy WebLinkAbout01-15 PC Staff Report MASTER DEVELOPMENT PLAN #01-15
Graystone Commerce Center
Staff Report for the Planning Commission
Prepared: March 31, 2015
Staff Contact: Candice E. Perkins, AICP, Senior Planner
This report is prepared by the Frederick County Planning Staff to provide information to the
Planning Commission and the Board of Supervisors to assist in the review of this application. It may
also be useful to others interested in this zoning matter.
Reviewed Action
Planning Commission: 04/15/15 Pending
Board of Supervisors: 04/22/15 Pending
PROPOSAL: To develop 271.40 acres zoned M1 (Light Industrial) District with industrial land uses.
MAGISTERIAL DISTRICT: Stonewall
PROPERTY ID NUMBERS: 43-A-158, 44-A-26, and 44-A-27
LOCATION: The properties are located on the north side of Redbud Road (Rt. 661), the east side of
the CSX Railroad, the west side of Milburn Road (Rt. 662), and the south side of McCanns Road (Rt.
838).
PROPERTY ZONING & PRESENT USE:
Zoned: M1 Use: Undeveloped
ZONING & PRESENT USE OF ADJOINING PROPERTIES:
North: RA (Rural Areas) Use: Agricultural/Vacant
South: RA (Rural Areas) Use: Agricultural/Residential/Historic
East: RA (Rural Areas) Use: Agricultural (Agricultural District)
R4 (Residential Planned Community) Vacant (Snowden Bridge)
West: RA (Rural Areas) Use: Agricultural/Vacant
M1 (Light Industrial) Industrial/Vacant
STAFF CONCLUSIONS FOR THE 04/15/15 PLANNING COMMISSION MEETING:
The Master Development Plan for the Graystone Commerce Center depicts appropriate land uses and
appears to be consistent with the requirements of Article VIII, Master Development Plan, of the Zoning
Ordinance, and this MDP is in a form that is administratively approvable. The MDP is also in
conformance with the proffers for Rezoning #03-12. All of the issues brought forth by the Planning
Commission should be appropriately addressed by the applicant.
It appears that the application meets all requirements. Following presentation of the application to
the Planning Commission and the Board of Supervisors, and the incorporation of your comments,
staff is prepared to proceed to approval of the application.
MDP #01-15Graystone Commerce Center
March 31, 2015
Page 2
REVIEW EVALUATIONS:
Virginia Department of Transportation: We have reviewed the Preliminary Master Development
Plan for Graystone Commerce Center dated February 18, 2015 and we offer the following comment:
VDOT is currently in the preliminary engineering stage for designing the relocation of Redbud
Road to connect to Snowden Bridge Boulevard. At this time, the ultimate alignment of Redbud
Road has not been determined and may differ from what is proposed on the above-referenced
MDP.
Frederick County Fire Marshal: Plan approved.
Frederick County Public Works: Plan approved
Frederick County Inspections: Any removal or demolition of existing structures shall have an
asbestos inspection/abatement and require demolition permit. Additional comments shall be made at the
site plan submittal phase.
Frederick County Sanitation Authority: Please see attached letter dated February 26, 2015, Uwe E.
Weindel, PE.
Planning & Zoning:
A) Master Development Plan Requirement
A master development plan is required prior to development of this property. Before a master
development plan can be approved, it must be reviewed by the Planning Commission, Board of
Supervisors and all relevant review agencies. Approval may only be granted if the master
development plan conforms to all requirements of the Frederick County Zoning and Subdivision
Ordinances. The purpose of the master development plan is to promote orderly and planned
development of property within Frederick County that suits the characteristics of the land, is
harmonious with adjoining property and is in the best interest of the general public.
B) Site History
The original Frederick County zoning map (U.S.G.S. Stephenson Quadrangle) identifies the
subject parcels as being zoned A-2 (Agricultural General). The County’s agricultural zoning
districts were combined to form the RA (Rural Areas) District upon adoption of an amendment
to the Frederick County Zoning Ordinance on May 10, 1989. The corresponding revision of the
zoning map resulted in the re-mapping of the subject properties and all other A-1 and A-2 zoned
land to the RA District. The subject properties were rezoned with proffers to the M1 District
with Rezoning #09-09 and a proffer revision was approved with Rezoning #03-12.
C) Site Suitability & Project Scope
Comprehensive Policy Plan:
MDP #01-15Graystone Commerce Center
March 31, 2015
Page 3
The 2030 Comprehensive Plan is an official public document that serves as the community's
guide for making decisions regarding development, preservation, public facilities and other key
components of community life. The primary goal of this plan is to protect and improve the
living environment within Frederick County. It is in essence a composition of policies used to
plan for the future physical development of Frederick County.
Land Use Compatibility:
The North East Land Use Plan, Appendix I of the 2030 Comprehensive Plan, recognizes that this
property is planned for industrial land uses. The parcels comprising this MDP application are
also located within the County’s Sewer and Water Service Area (SWSA).
Site Access and Transportation:
Access to this site will be via a connection to Snowden Bridge Boulevard that would align with
an access point already approved with the North Stephenson, Inc., rezoning application. The
initial segment of Snowden Bridge Boulevard has been constructed and aligns at a signalized
intersection of Martinsburg Pike across from the Rutherford Crossing Shopping Center. The
MDP shows the location of Snowden Bridge Boulevard that runs through the property, along
with the three access points proposed on the road, the Route 37 corridor area, and the proffered
area for the relocation of Redbud Road.
Per the proffers, the applicant has proffered a 350’ Route 37 corridor study area and an area for
an 800’ wide interchange. This study area is available for eight years following the rezoning
approval (revised in 2012); the purpose of the study area is to give “Frederick County with an
opportunity to determine a final alignment for Route 37 throughout the limits of the Property
through the final engineering design sufficient for this purpose”. Following the determination of
the final alignment, the applicant shall dedicate the right-of-way to Frederick County. Should the
final alignment not be made within the eight year timeframe, the applicant may extend the
timeframe or dedicate a 225’ wide right-of-way dedication for Route 37.
Direct access is prohibited (except for emergency services) on Milburn Road, Redbud Road and
McCann’s Road.
Snowden Bridge Boulevard through the Graystone property shall be a public street, however; per
the proffers, the internal streets shall be private and their locations shall be determined at the site
plan stage.
STAFF CONCLUSIONS FOR THE 04/15/15 PLANNING COMMISSION MEETING:
The Master Development Plan for the Graystone Commerce Center depicts appropriate land uses and
appears to be consistent with the requirements of Article VIII, Master Development Plan, of the Zoning
Ordinance, and this MDP is in a form that is administrati vely approvable. The MDP is also in
conformance with the proffers for Rezoning #03-12. All of the issues brought forth by the Planning
Commission should be appropriately addressed by the applicant.
MDP #01-15Graystone Commerce Center
March 31, 2015
Page 4
It appears that the application meets all requirements. Following presentation of the application to
the Planning Commission and the Board of Supervisors, and the incorporation of your comments,
staff is prepared to proceed to approval of the application.